+ All Categories
Home > Documents > Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

Date post: 17-Jan-2016
Category:
Upload: tillie
View: 52 times
Download: 0 times
Share this document with a friend
Description:
Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS). James H. Butler, NOAA Global Monitoring Division Towards a Global Carbon Observing System: Progress and Challenges 23 April 2014. (Slides 1-10 excerpted from CAS TECO 2013). A global challenge. - PowerPoint PPT Presentation
12
IGIS CAS MG 2014 - Geneva JH Butler 23 April 2014 Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS) James H. Butler, NOAA Global Monitoring Division Towards a Global Carbon Observing System: Progress and Challenges 23 April 2014 (Slides 1-10 excerpted from CAS TECO 2013)
Transcript
Page 1: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

Implementing an Integrated, Global Greenhouse Gas Information System

(IG3IS)

James H. Butler, NOAA Global Monitoring Division

Towards a Global Carbon Observing System:

Progress and Challenges

23 April 2014

(Slides 1-10 excerpted from CAS TECO 2013)

Page 2: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

Page 2

A global challenge

• Society is attempting to advance efforts to reduce CO2 emissions and will likely do so even more in the future

• Mitigation efforts will vary by nation, region, & emission sector (energy, industry, etc.), and will be diverse in their approach

• The complexity & variability of the carbon cycle, the scale of problem, and the number of GHGs are challenging, but surmountable.

• Emission reduction approaches (e.g., international, national, state) all require independent, scientific monitoring to support verification and policy decisions.

Page 3: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

Page 3

Tools for Global Monitoring of Greenhouse Gases

• “Bottom-up” estimate (Accounting = “checkbook”) Emissions reporting Reported and “verified” offsets Site-specific measurements

• “Top-down” estimate (Validation = “bank statement”) Comprehensive atmospheric observation system Ecosystem and ocean observations

• Reanalysis (compares checkbook with bank statement) Transport model Assimilation Regional fluxes (emission and uptake)

Page 4: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

Page 4

Gaps in the current integrated observing system

• Insufficient density of the observations over the ground, sea and in the free atmosphere

• Insufficient measurements of isotopes and co-emitted gases for source attribution

• Incompatible observations on different scales (e.g. global and local observations) and in different media (e.g. atmospheric observations vs. pCO2 observations)

• Insufficient complexity and performance of transport models on global/regional and local scales

Page 5: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

Page 5

Atmosphere Biosphere

Ocean

Surface Ocean Biosphere Inventories & Fluxes

Emission Inventories

Deep Ocean

Surface Based

(Satellite)

Aircraft

Satellite Mapping

Data Integration ProductsCO2 and Other GHGs

WMO Domain(with partners, e.g., GCOS, CEOS)

Page 6: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

So, What is WMO Doing?

• WMO Capabilities WMO Global Atmosphere Watch

o Long term observing network for greenhouse gases o Other observing networks for atmospheric composition (e.g., aerosols,

ozone)o Support for “megacities” research

World Weather Research Programmeo Improving forecast models

• Seasonal to sub-seasonal predictions (with WCRP)• Polar Prediction Program (with WCRP)• Tropical Meteorology• Others . . Improving transport resolution

World Climate Research Programmeo Improving climate modelso Focused efforts, e.g., extreme events, statistical downscaling, etc.

Page 6

Page 7: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

IG3IS Implementation(within WMO)

• Bimodal approach Active Orgs

within WMOo ICOS, China,

Brazil, INACP, SE Asia, et al.

Partnerso FAO, UNEP,

ICSU, GEO, GCOS, GOOS, et al.

Page 7

CAS Mgt(May 2013)

WMO/GAW GGMT

(Jun 2013)

CAS(Nov 2013)

WMO Exec Council

(Jun 2014)

WMO Congress(Jun 2015)

Who should have responsibility for service delivery? GFCS? WMO is working to coordinate its contribution.

Page 8: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

Page 8

Some surface-based networks

ICOS

WMO Global Atmospheric Watch FluxNet

TCCON

NOAA

AGAGE

Page 9: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

Coordinating Networks in Developing Countries

Page 9

Tefé

• Emerging Networks anchored with WMO/GAW stations

• Using WMO/GAW Standards

• Taking part in GAW QA/QC Activities

• Sharing Data Openly

• Placing Data into World Data Centre for Greenhouse Gases

Page 10: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

“New” Players for Observations

• IAGOS (Aircraft) Builds on efforts from MOSAIC (Euro airlines),

CARIBIC (Lufthansa), and CONTRAIL (Japan Airlines)

Fourth package approved for CO2 and CH4 on commercial aircraft

o Operational, but not much funding for instrument construction

Many airlines are interested in participating• Earth Networks (Surface)

Investing $25M over 5 years to enhance global network with ~100 sites

o Enhancement of ~40% over existing networko Committed to high quality positions

Business Plan?• Satellites (Existing and *Forthcoming)

AIRS/IASI (passive, mid-tropospheric sensors) SCHIAMACHY (passive sensor) GOSAT (passive sensor, large footprint) *OCO-2 (passive sensor, small footprint) *ASCENDS (active laser)

Page 11: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

Accomplishments for IGIS2014 Status of Observations

• Europe (ICOS) – continued development of infrastructure, setting up sites, cross-Atlantic coordination

• North America – continued cooperation among US, Canada, Mexico through CARBONA; US receiving restoration of funds for global and North American networks

• Asia – US-China bilateral, biennial agreement between NOAA and CMA continues to receive high level support in both nations; developing greenhouse gas observing networks is part of this annually renewed, high level agreement (Strategic and Economic Dialog). Korea enhancing observations at several sites. Networks in India?

• South America – Brazil network producing substantial, useful data on greenhouse gases; currently lacks assurance of long-term funding

• Southwest Pacific – Australia, Indonesia, developing national networks through international cooperation (including AGAGE, NOAA)

• Africa – Cape Verde Islands (?), Cape Point; and Assekrem, Namibia, (NOAA measurements)

Page 11

Page 12: Implementing an Integrated, Global Greenhouse Gas Information System (IG 3 IS)

IGISCAS MG 2014 - Geneva

JH Butler23 April 2014

Accomplishments for IGIS (2014 Status of Modeling & Satellites)

• Modeling Improvements – ECMWF, NOAA doing some; universities, national institutions beginning to look at using weather models to improve transport in GHG models Higher resolution GHG monitoring will also help improve

transport for weather predictions and Earth system analysis No coordination of efforts so far

• Satellite Retrievals – Early successes noted from SCIAMACHY; Significant international attention to GOSAT; international community looking forward to OCO-2 launch this year Efforts are still exploratory at this time and will be on a steep

learning curve during the next decade OCO, GOSAT, and SCIAMACHY scientists working together to

improve retrievals

Page 12


Recommended