+ All Categories
Home > Documents > Important information€¦ · Information Purposes: This presentation is for information purposes...

Important information€¦ · Information Purposes: This presentation is for information purposes...

Date post: 16-Aug-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
38
Transcript
Page 1: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,
Page 2: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer, invitation, solicitation or

recommendation in relation to the purchase or sale of shares in Superior Resources Limited (Superior) in any jurisdiction. The information in this presentation is provided in

summary form, has not been independently verified, and should not be considered to be comprehensive or complete.

Not Financial Product Advice: This presentation does not constitute financial product or investment advice. It has been prepared without taking into account the objectives,

financial circumstances or needs of recipients and cannot be relied upon as advice to recipients. Before making an investment decision, investors or prospective investors

should consider the appropriateness of the information having regard to their own objectives, financial situation and needs and seek legal and taxation advice appropriate to their

jurisdiction.

Forward Looking Statements: This presentation may contain forward looking statements. Forward looking statements are often, but not always, identified by the use of words

such as “seek”, “indicate”, “target”, “anticipate”, “forecast”, “believe”, “plan”, “estimate”, “expect” and “intend” and statements that an event or result “may”, “will”, “should”, “could”

or “might” occur or be achieved and other similar expressions. Indications of, and interpretations on, future expected exploration results or technical outcomes, production,

earnings, financial position and performance are also forward looking statements. The forward looking statements in this presentation are based on current interpretations,

expectations, estimates, assumptions, forecasts and projections about Superior, Superior’s projects and assets and the industry in which it operates as well as other factors that

management believes to be relevant and reasonable in the circumstances at the date that such statements are made. The forward looking statements are subject to technical,

business, economic, competitive, political and social uncertainties and contingencies and may involve known and unknown risks and uncertainties. The forward looking

statements may prove to be incorrect. Many known and unknown factors could cause actual events or results to differ materially from the estimated or anticipated events or

results expressed or implied by any forward looking statements. All forward-looking statements made in this presentation are qualified by the foregoing cautionary statements.

Disclaimer: Superior and its related bodies corporate, any of their directors, officers, employees, agents or contractors do not make any representation or warranty (either

express or implied) as to the accuracy, correctness, completeness, adequacy, reliability or likelihood of fulfilment of any forward looking statement, or any events or results

expressed or implied in any forward looking statement, except to the extent required by law. Superior and its related bodies corporate and each of their respective directors,

officers, employees, agents and contractors disclaims, to the maximum extent permitted by law, all liability and responsibility for any direct or indirect loss or damage which may

be suffered by any person (including because of fault or negligence or otherwise) through use or reliance on anything contained in or omitted from this presentation. Other than

as required by law and the ASX Listing Rules, Superior disclaims any duty to update forward looking statements to reflect new developments.

Important information

The information in this presentation that relates to exploration results in respect of the Greenvale, Riesling and NW Qld lead/zinc projects is based on information

compiled by Mr Ken Harvey, a director and shareholder of the Company, who is a Member of the Australasian Institute of Mining and Metallurgy and a Member

of the Australian Institute of Geoscientists. Mr Harvey has sufficient experience which is relevant to the style of mineralisation and type of deposit under

consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting

of Exploration Results, Mineral Resources and Ore Reserves. Information relating to mineral resources are based on information compiled by Mr Ken Harvey as

a Competent Person under the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Harvey

consents to the inclusion in this presentation of the matters based on his information in the form and context in which it appears.

Page 3: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

• Tier 1 calibre exploration projects

• Potential cash flow from Tick Hill Tailings

Reprocessing Project

• Material exposure to:

Zinc – Gold – Copper

• Nicholson Project – Zinc/Lead – Copper

• Victor Project – Zinc/Lead – Copper(“The Next Mt Isa”)

• Tick Hill Gold Project – Gold

• Steam Engine – Gold

(under EPM application)

• Greenvale – Copper/Gold

• New projects:

• active focus on new project acquisition

Company Snapshot

Page 4: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Corporate Summary

ASX CODE: SPQ

Ordinary shares 279 million

Options (listed/unlisted) Nil

Market cap. $1.4 million

Cash and listed assets A$124,000

7,000,000 DYL Shares A$63,000

Shareholders 529

Directors and Officers

13%

Substantial holders (>5%)

12%

Other top 20 holders

39%

Other holders36%

Share Structure

Total top 20 holders: 64.02%

0.005

0.008

0.012

0.015

0.019

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

13-N

ov-1

5

11-D

ec-1

5

08-J

an-1

6

05-F

eb-1

6

04-M

ar-

16

01-A

pr-

16

29-A

pr-

16

27-M

ay-1

6

24-J

un-1

6

22-J

ul-16

19-A

ug-1

6

16-S

ep-1

6

14-O

ct-

16

11-N

ov-1

6

Sh

are

pric

e ($

)V

olu

me

(m

)

12 month price and volume

Volume Period average volume Share price

Page 5: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Board of Directors

• Carlos Fernicola – Chairman

– Over 30 years in accounting, taxation audit, financial

services industry, Chartered Company Secretary

• Peter Hwang – Managing Director

– 17 years in resources, native title and corporate law

10 years in mineral exploration

• Ken Harvey – Non-executive Director

– 42 years in base metals mineral exploration, project

evaluation, resource estimation and exploration

management

Page 6: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Projects overview

Gold

Tick Hill – high grade gold

Tick Hill – tailings re-

processing

Steam Engine (under application)

Zinc-Lead-Copper

Victor Project (Mount Isa Style –

“The Next Mt Isa”)

Nicholson Project (Mount Isa

Style – Teck JVA)

Copper-Gold

Greenvale Project (VMS and

Porphyry Copper)

• One Mile Dam – VMS

• Cockie Creek – Porphyry

• Wyandotte

• Galah Dam

• Bottletree

• Halls Reward (Ninety Mile)

Page 7: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Tick Hill Gold Tailings Project

• Completed - maiden resource estimate

• Completed - metallurgical testing

• Completed - scoping study (CIL processing)

• Completed - initial gravity testing

Steam Engine Gold Deposit

Priority Applicant Status

• Application – EPMA 26165 “Cockie South”

• Successfully obtained priority applicant status

Corporate / commercial

Gold Mining Alliance

• Entered into a Gold Mining Alliance and Joint

Venture Agreement with Dysart Mining Group

Summary 2016 – Gold

Page 8: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

NW Qld Projects (Zinc-Lead-copper-silver)

Nicholson Project

• Earn-in and JV – Teck Australia

• Completed - 3-D geological modelling

• Completed - land access requirements

• Commenced field exploration

• Completed - Audio Magneto-telluric (AMT) survey

• Processing and interpretation of AMT data

Victor Project – “The Next Mt Isa”

• Grant of new tenements – EPM25264 and EPM25843

• Data compilation and modelling of geophysical data

Greenvale Project

Riesling Project

• Completed - initial drilling program

Summary 2016 – Zinc-Lead-Silver

Page 9: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Greenvale Project (Zinc-Lead-copper-silver)

New EPM application

• Application – EPMA 26165 “Cockie South”

• Successfully obtained priority applicant status

Drilling program planning

• Completed - geophysical data compilation and modelling

• Completed - target generation

• Completed - drill program planning

Summary 2016 – Copper-Gold

Page 10: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Commodities Focus: Gold – Zinc – Copper

• Gold – strong and proven fundamentals esp. for juniors

• Zinc – developing bull market

• Copper – price increases and favourable outlook

Tier 1 exploration projects:

• Substantial exposure to zinc and copper sectors

• 2 potential company-maker zinc projects

• Potential company-maker gold project

Exploration in 2017:

• Gold – Copper – Greenvale: drilling of drill-ready

targets

• Gold – Tick Hill: evaluate tailings project and

underground exploration project

• Zinc – Nicholson Project: $2,500,000 Earn-In by Teck

• Zinc – Victor Project: developing exploration programs

Focus for 2017

Page 11: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

New project acquisition opportunities

• Commodities cycle timing – now is the opportune time

• Commodity sectors – Gold, Zinc, Copper focus

• Project types

– advanced stage exploration or pre-

production

– strategic exploration position

• Industry sector-leading Board skill-set

– very low transactional costs, high efficiency

– acquisition procedures and tools in place

Low company overhead costs

Focus for 2017

Page 12: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Gold – 2017

Page 13: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Tick Hill – Two projects

Tailings reprocessing assessment

• Old mine tailings

• Mine rock dumps

• Potential residual underground ore

Exploration opportunity

• High grade historic gold production513,333 ounces of gold at a recovered grade of 22.6 g/t gold

• At $1,466/ounce worth A$753 million

• Granted mining leases

• Excellent exploration target - the faulted offset of

the mined gold shoot

• Potential for discovery of another 500,000oz ore

body

Gold – 2017

Page 14: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Tailings Dam Assessment

Drill ProgramWestern Paddock

g/t Au

Eastern Paddock

g/t Au

Overall – Tailings Dam

g/t Au

First Stage Program 0.73 1.42 1.04

Second Stage Program 0.88* 1.43 1.12*

Overall (g/t) 0.81* 1.42 1.08*

• 55 air-core holes, 398m drilled, 373

geochem samples

• Metallurgical test work indicates:

• Significant water-soluble gold content –

11-15%

• Cyanide leach – 95% - 98% recovery of

contained gold (Fine Grind)

• Simple extraction – no refractory gold

Gold – 2017

• Process and grinding optimisation

• Process flowsheet design

• Feasibility/scoping study

Next steps

Page 15: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Fault

Fault

Tick Hill – Exploration Opportunity

• Evaluating datasets

• Developing exploration strategy

Gold – 2017

Page 16: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Gold – 2017

Page 17: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Gold – 2017

Page 18: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Steam Engine Gold Deposit

(under EPM application)

2 main gold lodes

• Steam Engine Lode

• Eastern Ridge Lode

• Southern Zone Lodes

Historic drilling

• Covered by MDL from 1991 to recent

• Extensive drilling on Steam Engine

Lode

• Shallow drilling within top 120m

• Only 1 deeper hole – confirmed

continuity

2017 program

• Establish a Mineral Resource

• Expand on Mineral Resource at Steam

Engine and Eastern Ridge Lode

Gold – 2017

Page 19: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Steam Engine Gold Deposit (under application)

Gold – 2017

0.03

0.03

0.02

0.02

0.03

0.04

0.04

0.03

0.03

0.03

0.02

0.02

0.02

0.01

0.02

0.01

0.01

0.03

0.02

<0.01

0.04

0.02

0.03

0.02

0.03

0.06

0.03

0.03

0.04

0.02

0.02

0.03

0.10

0.13

0.04

0.11

0.35

0.42

0.04

1.47

0.03

1.33

0.13

0.05

0.36

0.02

0.04

0.07

0.02

0.05

0.01

<0.01

<0.02

<0.02

0.01

0.02

0.09

0.11

0.03

0.140.06

0.04

<0.02

0.08

0.05

0.100.28

0.06

0.53

4.08

0.45

0.66

0.22

0.18

0.60

0.54

0.16

0.15

0.59

0.24

1.94

3.81

6.04

14.70

1.03

4.57

6.22

1.22

1.60

0.63

5.36

4.00

0.04

0.09

8.18

5.48

3.30

5.57

2.35

0.08

0.17

1.46

0.60

2.70

0.07

1.52

0.03

<0.01

<0.01

0.02

0.01

0.10

<0.01

<0.01

4.36

4.205.36

4.37

0.030.28

0.03

1.11

<0.02

<0.02

0.37

1.61

2.19

3.67

<0.02

<0.02

2.89

0.05

0.74

4.33

0.212.38

0.27

0.01

0.01

<0.02

0.02

0.06

0.21

0.16

3.08

0.18

2.32

2.04

2.24

2.40

2.66

0.07

0.05

0.04

0.07

0.07

0.04

0.08

0.44

0.32

0.01

0.01

0.01

0.01

0.01

0.01

0.01

<0.005

<0.005

0.01

0.01

0.01

0.02

0.02

<0.005

0.02

0.74

0.25

1.38

0.47

0.15

0.68

0.38

1.98

4.83

2.96

3.39

3.30

3.99

1.11

1.11

0.04

0.08

0.13

0.16

0.02

0.05

0.01

0.08

0.15

0.18

0.19

0.19

0.11

0.19

0.20

0.12

<0.01

<0.01

<0.01

<0.01

0.01

<0.01

<0.01

<0.01

0.03

1.02

0.08

0.08

<0.02

0.06

<0.01

<0.01

0.030.02

0.01

0.02

0.02

0.02

0.02

0.03

0.02

0.02

<0.01

<0.01

<0.01

<0.01

<0.01<0.02

<0.02

<0.02

<0.02

0.03

0.03

<0.02

<0.02

<0.02

0.03

0.18

0.16

0.12

0.16

0.12

0.16

0.17

0.13

0.04

0.18

0.18

1.02

2.94

4.68

2.96

3.94

1.33

1.47

2.46

2.38

2.82

1.38

30m

42m

90m

31m

LS

RC

05

3

LS

RC

05

4

SE

RC

00

4

79m

130m

LS

RC

01

2

LS

RC

05

5

LS

DD

00

6

9350mE

9350mE

9400mE

9400mE

500

mR

L

500

mR

L

550

mR

L

550

mR

L

Superior Resources LimitedEPM 26165 "Cockie South"

Steam Engine ProspectDrill Hole Section 10350N

Gold Values (g/t)

2.0 to 3.0

1.0 to 2.0

3.0 to 5.0

5.0 to 100

LEGEND

0 to 0.2

0.2 to 0.5

0.5 to 1.0

Au (g/t)

Ste

am E

ngin

e Lode

0 25metres

Page 20: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Zinc-Lead-Copper – 2017

Page 21: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Zinc trends

So

urc

e : W

oo

d M

acke

nzie

Forecast global zinc production

So

urc

e : V

en

de

tta

Min

ing

Page 22: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Zinc trends

Forecast global zinc production

Zinc Trends

• Physical metal market

enters supply deficit

• Shift from Bear market to

Bull market – delayed

reaction

• CRU's Zinc Market

Outlook (July 2016):

“further significant price

increases look likely

through the course of next

year”

Page 23: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Tier 1 Projects – Large zinc-lead-silver deposits

• Victor Project – “Next Mt Isa”

• Nicholson Project – Teck Earn-In and JVA

Zinc-Lead-Copper – 2017

Page 24: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Mount Isa to Century - Mag (RTP) and Gravity

Magnetic Anomaly

Eastern Creek Volcanics

Basalts – Copper Source

Magnetic Anomaly

Basalts? – Copper Source

Major Structure

Magnetics and Gravity

Mount Isa – within

sediments adjacent

or over Basalts

MI2

Major Structure

Magnetics and Gravity

Page 25: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Mount Isa to Century - Lead and Zinc

Zinc-Lead-Copper – 2017

Page 26: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Soil Lead Anomalies

Zinc-Lead-Copper – 2017

Page 27: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Nicholson Project (Teck JVA)

• Mt Isa Style zinc-lead-copper

• Earn-in and JVA – Teck Australia

• Teck proceeds to Earn-In

- $2.5m exploration spend

• Audio Magnetotellurics (AMT) survey

completed

• Preliminary results expected

December 2016

• Teck can earn 70% by:

– minimum expenditure of $250,000 by 30

September 2016 (or paid in cash); and

– $2,250,000 expenditure by 31

December 2018.

Nicho

lson

River

InterpretedPyrite Body

VTEMAnomaly

EPM15670

EPM15670

EPM18203

EPM18203

EPM18203

8020000 N

8010000 N

190000 E 200000 E

210000 E 220000 E

8030000 N

190000 E 200000 E 210000 E 220000 E

8020000 N

8010000 N

8030000 N

Fish

River Fault

Fault

River

Nicholson

Calvert Fault

0 5 10km

Geology after SPQ, GA and DME

Soil and Alluvium

Mesozoic Sediments

South Nicholson Group

Cover RocksProterozoic

Fault

LEGEND

Fish River Formation &Walford Dolomite

Peters Creek Volcanics

Nicholson Granite

Cliffdale Volcanics

Doomadgee Formation

Mount Les Siltstone

Minor lead prospect

Superior prospect

Existing drill hole

Previous Company Drilling

WalfordSouthProspect

HedleysUraniumProspect

KFWProspect

NicholsonWestProspect

WalfordCreekProspect

KingfisherEastProspect

Zinc-Lead-Copper – 2017

Page 28: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Superior’s zinc projects – very significant potential for Mount Isa style deposit

Five advanced prospects with potential for large Mount Isa style copper and

lead-zinc-silver deposits.

Four high priority drill targets defined.

Historically not explored.

Teck proceeding to $2.5m Earn-In – Nicholson Project

Superior holds most of the prospective ground as Exploration Permits or

Applications.

Superior holds a commanding position in zinc.

Zinc-Lead-Copper – 2017

Page 29: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Copper-Gold-Zinc – 2017

Page 30: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

GREENVALE PROJECT – Drill-ready targets

• Steam Engine Gold Deposit (under application)

• One Mile Dam (VMS Copper)

• Galah Dam (Gold-Zinc-Copper)

• Cockie Creek (Porphyry Copper-Gold)

• Bottletree (Porphyry Copper)

• Halls Reward (Ninety Mile) Copper

Copper-Gold-Zinc – 2017

Page 31: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Copper-Gold-Zinc – 2017

GREENVALE PROJECT – Remnant of Ordovician Porphyry Belt

• Ordovician porphyry belt extends through northern NSW

• Hosts the large Cadia and North Parkes porphyry copper mines

Page 32: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Copper-Gold-Zinc – 2017

Page 33: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

GREENVALE PROJECT – Cockie Creek Prospect

• Maiden mineral resource – (JORC 2004) – 13Mt @ 0.42% copper (ASX announcement 27 March 2013)

• Potential for significant porphyry copper deposit

Copper-Gold-Zinc – 2017

Page 34: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

GREENVALE PROJECT – Galah Dam Prospect

• Large alteration zone – similarities to nearby Balcooma Copper-Zinc-Polymetallic Mine

• Historic drilling with Zinc-Gold-Copper intersections

• IP chargeability anomaly – drill target

Copper-Gold-Zinc – 2017

Page 35: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

GREENVALE PROJECT – Galah Dam Prospect

Copper-Gold-Zinc – 2017

Page 36: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

GREENVALE PROJECT – Galah Dam Prospect

Copper-Gold-Zinc – 2017

Page 37: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

GREENVALE PROJECT – Galah Dam Prospect

Copper-Gold-Zinc – 2017

Page 38: Important information€¦ · Information Purposes: This presentation is for information purposes only. The information contained in this presentation does not constitute an offer,

Recommended