0 20 50 100 200 300m NTS N ST LAWRENCE Parliament St Parliament Slip Cherry St Foot of Yonge Park (Future) Lower Sherbourne St Lower Jarvis St Queens Quay E Bonnycastle St Samll St Waters Edge Promenade & Boardwalk Corktown Common Waters Edge Promenade Potential Harbour St Extension Lake Shore Blvd E Bouchette St Logan Ave Saulter St Don Roadway Richardson St Frederick St Cooper St Freeland St Yonge St Queens Quay E Inner Harbour Jarvis Slip Yonge Slip Don Greenway Don Valley Parkway Union Station Rail Corridor Villiers St Cherry St (re-aligned) Front St Union Station Rail Corridor Potential Cooper/ Church St Extension Air Canada Centre (50m) Harbourfront Centre (250m) Union Station (50m) Jack Layton Ferry Terminal Don Rail Yard Keating Rail Yard Future Sediment and Debris Management Facility Proposed Munitions Street Bridge Proposed Pedestrian/ Bicycle Bridge Victory Soya Mills Silos Stormwater Management Facility Harbour Lead Rail Line Wilson Rail Yard Proposed Trinity Street Underpass Potential Broadview Ave Extension St Lawrence Market (40m) Martin Goodman Trail East Bayfront LRT Transit Gardiner Expressway Gardiner Expressway Lake Shore Blvd E Improved Lake Shore Blvd Re-Aligned Lake Shore Blvd Improve the urban fabric while maintaining the existing expressway Maintain the elevated expressway Gardiner Expressway Level Lake Shore Blvd E Level Maintain does not include the Lake Shore Blvd public realm & transportation improvements depicted here. Those are part of the Improve plan.
Transcript
1. Gardiner Expressway LevelDon Valley Parkwayrdiner GaGardiner
Expresswaysway xpres EFront Strry S CheSamll StFrederick
StRichardson StLower Jarvis Steade enProm Edge ters WaDon Greenway
Proposed Munitions Street BridgeStCooper StLinhetteFreeland Stailgn
KeatiBoucYonge StdRd il Yar Raer St SaultlipJarvis SlipS YongeJack
Layton Ferry TerminalFoot of Yonge Park
(Future)eaway(250m)rLRoadQueouDonHarbourfront CentreVictory Soya
Mills Siloslipuay E ens Qeen QuS mentMartinan Trail Goodmay E Qu s)
gnedEast BaBlvd E hore Lake Si (re-al ry StTransit T yfront
LRStormwater Management FacilityCherial Harbo Potention Sta
UnParliaxtension ur St EProposed Trinity Street UnderpassrbdE Blv
ore e Sh Lake(50m)Corridor l tion RaiHantial Pote Ave dview on Broa
tensi Exn AvAir Canada Centreastle St BonnycUnion Station Rail
CorridorImproved Lake Shore BlvdRe-Aligned Lake Shore
BlvdWilsonFuture Sediment and Debris Management
FacilityRat(40m)Lower Sherbourne St(50m)Doard il YLogaPotential
Cooper/ Church St ExtensionUnion StationST LAWRENCESt Lawrence
MarketnRParliament StLake Shore Blvd E Leveld Yar ailCorktown
Commonrs St VillieProposed Pedestrian/ Bicycle Bridgewalk oardProm
Edge aters We&B enadNInner HarbourImprove the urban fabric
while maintaining the existing expressway0 20 50100200300m
NTSMaintain the elevated expresswayMaintain does not include the
Lake Shore Blvd public realm & transportation improvements
depicted here. Those are part of the Improve plan.