Date post: | 25-Jul-2015 |
Category: |
Technology |
Upload: | alcatel-lucent |
View: | 160 times |
Download: | 3 times |
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
IN-BUILDING SOLUTIONS – EVALUATING INDUSTRY OPTIONSMike Schabel – Vice President, Alcatel-Lucent Small Cells Business DivisionJune 2014
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
2
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
THE LAW OF 80 PERCENT
80%MOBILE DATA TRAFFIC GROWTH IN 2014*
80%MOBILE USAGE OCCURING IN-BUILDING*
80%WLAN INSTALLATIONS AT RISK OF NOT BEING ABLE TO HANDLE TRAFFIC LOADS**
EXPLODING TRAFFIC NOT BEING ADEQUATLY SERVICED WHERE IT IS CONSUMED
* ABI Research, “In-building Wireless”** Gartner Symposium, Gartner Research VP Paul DeBeasi
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
3
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
IN-BUILDING MARKET OPPORTUNITY
$4.3B 2014 IN-BUILDING MARKET OPPORTUNITY*
$8.5B2019 IN-BUILDING MARKET OPPORTUNITY*
<10%PENETRATION OF INDOOR ENVIRONMENTS TODAY
LARGE AND UNTAPPED IN-BUILDING MARKET OPPORTUNITY FOR MOBILE OPERATORS TO SERVICE
* ABI Research, “In-building Wireless”
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
4
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
THE MARKET SHIFT FROM COVERAGE TO CAPACITY
40%OF TOTAL SPEND WILL BE IN PRIVATE AND ENTERPRISE SPACES WHERE SMALL CELLS ARE THE BEST CHOICE.
1-5 YRS AS USER DEMAND FOR DATA GROWS, DECISION CRITERIA WILL SHIFT FROM COVERAGE TO CAPACITY.
BASIC COVERAGE DOMINATES TODAY’S DECISION CRITERIA, BUT GROWING USER DEMAND WILL SHIFT OPERATOR FOCUS TO PROVIDING CAPACITY
CAPACITYCOVERAGE
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
5
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
IN-BUILDING REQUIREMENTS
20%
31%14%
14%
11%11%DISTRIBUTION OF US
FOOTPRINt
73%
22%3% 2% 1% 0%
Distribution of US buildings
<10,000 ft2 10,000 – 50,000 ft250,000 – 100,000 ft2100,000 – 200,000 ft2200,000 – 500,000 ft2>500,000 ft2
VENUE SIZE:
REQUIREMENTS:
• Scalable coverage and capacity
• Simple installation
• Unified communications
• IP-PBX & mobility to the wireless network
• BYOD with corporate intranet
• “Proximity” based services
• Value added services
• Application development tools
• Neutral Host
• Compelling ROISource: Bell Labs modeling based on data from Energy Information Administration, Office of Energy Markets and End Use, Form EIA-871A of the Commercial Buildings Energy Consumption Survey
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
6
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
WHAT’S HOLDING BACK THE IN-BUILDING CELLULAR MARKET1) ENTERPRISE
• Poor coverage = responsibility of Wireless Operators
• Voice & data are viewed as commodities
• Wi-Fi widely deployed and “does what’s required”… today
• Wi-Fi vendors and Enterprise System Integrators are trusted partners
• Lack Integration into the IT application infrastructure as part of the reference architecture
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
7
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
WHAT’S HOLDING BACK THE IN-BUILDING CELLULAR MARKET2) MOBILE OPERATOR
• Getting into the building for deployment and support is non-trivial for many wireless operators
• Environment is challenging for RF design
• ROI beyond churn control
• Protecting the security of the wireless network while serving private enterprise networks
• Achieving macro-like performance in every deployment: getting better but remains challenging
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
8
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
WHAT’S HOLDING BACK THE IN-BUILDING CELLULAR MARKET3) CONFUSING TECHNOLOGY CHOICES
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
9
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
SIMPLIFYING THE SOLUTIONBASIC BUILDING BLOCKS FOR ALL INDOOR WIRELESS
Baseband unit Radio head AntennaPacket core
Ethernet CPRI RF
DIFFERENT COMBINATIONS OF THE BASIC BUILDING BLOCKS LEADS TO DIFFERENT BENEFITS/CHALLENGES
…plus various Security, Port Aggregation, Protocol Conversion, and Application Gateways
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
10
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
IN-BUILDING CELLULAR ADDRESSED BY THREE ARCHITECTURESINNOVATE AROUND THE SAME BASIC BUILDING BLOCKS
BASEBAND UNIT
RADIO HEAD ANTENNA IN-BUILDING CABLING
Distributed ANTENNA Systems (DAS)
Centralized Centralized DistributedAnalog RF or Digitized RF (dedicated)
Distributed RADIO Systems (“DRS”)
CentralizedDistributed as integrated
modules CPRI (dedicated)
Distributed BASEBAND (Small Cells)
Distributed as integrated modules Ethernet (shared)
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
11
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
COMBINING THE BUILDING BLOCKS IN DIFFERENT WAYS LEADS TO DIFFERENT PROS/CONS
BENEFIT CHALLENGE
DAS• Neutral host• Coverage• Well understood technology
• Requires dedicated backhaul• Capacity limited by backhaul• High TCO (cooling and space)
DRS(not yet common)
• Very high capacity system (e.g. stadiums)• Early example of Cloud RAN
architectures
• Not neutral host• Needs “unlimited” backhaul
Small cells
• Easy to scale capacity• Shared backhaul• Cost effective for capacity
and some coverage
• RF Interference management• Not neutral host• New technology
(proving KPIs and new processes)
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
12
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
IN-BUILDING SEGMENTATIONSELECTING THE RIGHT SOLUTION
• Public spaces (with no operator differentiation)
• Sponsored public spaces (allow operator differentiation)
• Private and Enterprise spaces
Shopping Train
Hospital Building(factory)
Airport
Bank Regional headquarter
s
Restaurant
Retail store front Stadium
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
13
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
IN-BUILDING CELLULAR GUIDELINEDRAFT
Venue Category
Focus
Solution
DAS
DRS
Smal
l Cel
ls
DAS
DRS
Smal
l Cel
ls
DAS
DRS
Smal
l Cel
ls
DAS
DRS
Smal
l Cel
ls
DAS
DRS
Smal
l Cel
ls
DAS
DRS
Smal
l Cel
ls
1,000,000 to 3,000,000 square feet
500,000 to 1,000,000 square feet
250,000 to 500,000 square feet
100,000 to 250,000 square feet
50,000 to 100,000 square feet
10,000 to 50,000 square feet
<10,000 square feet
2017/ 2018
Capacity
Size
Public Space (Strong
Neutral Host
Requirement – No
Vendor Differentiation)
Sponsored Public Space
(Vendor Differentiation
Allowed)
Private Enterprise
Space or Other Mono-
Vendor Deployment
Allowed
2014/ 2015
Coverage
2017/ 2018
Capacity
2014/ 2015
Coverage
2017/ 2018
Capacity
2014/ 2015
Coverage
Caveat:Innovations change color coding
Solution readily exists
www.alcatel-lucent.com/solutions/in-buildingfor available whitepaper
Solution may exist but with some technical constraints
Solution is an unlikely fit
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
14
COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
IN-BUILDING CELLULAR: WRAPPING IT UP
LET’S BE CAREFUL NOT TO CONFUSE THE MARKET AS WE INNOVATE
EXTRAORDINARY OPPORTUNITY, BUT A VERY LARGE SET OF USE CASES WITH CHALLENGES FOR THE VENUE, THE WIRELESS OPERATORS, AND THE INFRASTRUCTURE VENDORS
EACH ARCHITECTURE HAS DEBATABLE PROS/CONS, BUT WE BELIEVE THERE WILL BE CO-EXISTENCE OF THE ARCHITECTURES AS EACH EVOLVES
1NETWORK
3BASIC
ARCHITECTURES
80%