Date post: | 23-Jul-2016 |
Category: |
Documents |
Upload: | phillip-markwood-architects |
View: | 213 times |
Download: | 0 times |
Phillip Markwood Architects, Inc.
In-Progress Design Projects
First Community Church - North Campus
First Community Church - South Campus
Christ Church Cathedral - Chapel and Garden Renovation
First Community Church - North CampusPMA is currently designing a renovation and addition project for this facility. A new main sanctuary and columbarium will be built in addition to an updated narthex and classroom wing. The addition will be integrated with a landscape renovation plan and connect with an existing labyrinth.
First Community Church - South CampusThe renovation and addition design for the South Campus church includes a new canopy and atrium. The surrounding classrooms and circulation will be reworked in order to better connect the entrance to the community facilities and original sanctuary space.
Christ Church Cathedral - Chapel & GardenThe original chapel space will be updated to provide more modern aesthetics and accessibility. The exterior landscape plan, in conjunction with Human Nature, will create a more usable and contemplative garden space and better connect the streetscape with the chapel entrance.