In Reply Refer To: HS 5231 March 21. 1991 Santa Pa International Corporation Attention: Mr. J . E. Jordan 13455 Noel Road. Suite 1100 Dallas. Taxaa 75240-6620 Gentlenen: NOTED - KRAMER Reference la made to tha following plan received March 7, 1991: Typa Plan • Initial Development Oparationa Coordination Docuaent Leases OCS-G 604? and 7202 Blocka • 633 and 634 Araa - Matag~.oa Island Activitias Proposad - a platfora. a caisson, and four walls In accordanca with 30 CFR 250.34, this plan Is hereby deeaed subaitted and Is now being conaldarad for approval. Your control nuaber is N-4020 and ahould ba referenced ln your coaaunlcatlon and rorraspondance concerning this plan. Sincerely, for (Orig. Sgd.) William H. Martin D. J . Bourgeois Regional Supervisor Flaid Oparations bcc: Lease OCS-C 6042 POD Flla (MS 5032) Lease OCS-C 7202 POD Flla (MS 5032) V.S 5034 w/publlc info, copy of the plan and accoap. Info. MTolbert:cic:03/11/91:DOCDCOM
Transcript
Page 1: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

In Reply Refer To: HS 5231 March 21. 1991

Santa Pa International Corporation Attention: Mr. J . E . Jordan 13455 Noel Road. Suite 1100 Dallas. Taxaa 75240-6620

Gentlenen: NOTED - KRAMER

Reference la made to tha following plan received March 7, 1991:

Typa Plan • I n i t i a l Development Oparationa Coordination Docuaent Leases • OCS-G 604? and 7202 Blocka • 633 and 634 Araa - Matag~.oa Island A c t i v i t i a s Proposad - a p lat fora . a caisson, and four wal l s

In accordanca with 30 CFR 250.34, th i s plan Is hereby deeaed subaitted and Is now being conaldarad for approval.

Your control nuaber i s N-4020 and ahould ba referenced ln your coaaunlcatlon and rorraspondance concerning this plan.

Sincerely ,

for (Orig. Sgd.) William H. Martin

D. J . Bourgeois Regional Supervisor F l a i d Oparations

bcc: Lease OCS-C 6042 POD F l l a (MS 5032) Lease OCS-C 7202 POD F l l a (MS 5032)

V.S 5034 w/publlc info, copy of the plan and accoap. Info.

MTolbert:cic:03/11/91:DOCDCOM

Page 2: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

sonto fc irrtemstiana' corporation

March 5, 1991

U. S. Department of tha In ta r io r Minerals Management Sarvica 1201 Elmwood Park Boulevard New Orleans, Louisiana 70123-2394

A t ten t ion : Nr. D. J . Bourgeois Regional Supervisor Office of F ie ld Operations

Gentlenan:

In coapliance with tha provisions of 30 CFR 250.34, Santa Fa International Corporation hereby submits for your review and approval nine (9) copies of a Jo in t Developaent Operations Coordination Docuaent for OCS-G-6042/7202, Matagorda Island Blocks 633 and 634F. Five (5) copies ara "Proprietary Inforaat ion" and four (4) copies are "Public Inforaat ion". The structure map 1s considered proprietary data to be exeapt froa disclosure under the Freedom o f Inforaation Act and should not be aade available to the publ ic. In th is respect proprietary data has been removed froa the copies marked public inforaat ion.

Yours very t ru ly ,

SAMA FE INTERNATIONAL CORPORATION

Re: Jo int Developaent Operations Coordination Docuaent for OCS-G-6042/7202 Matagorda Island Blocks 633 and 634F Offshore, Texas

J . E. Jordan Sr. Regulatory Special ist

JEJ:sam

Enclosures

HM4 On-ce WOO Souff* frvmori A,«nuc • A")»mom OJftfMM 9'802-*00C Resoorc Tc Two Gaitt* Tow • W55 Noe' «c • S«c» "00 • DMM 'S240-S62C • Te+phone (2U) 701-7300

Page 3: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

JOINT DEVELOPMENT OPERATIONS COORDINATION DOCUNENT SANTA FE INTERNATIONAL CORPORATION

NATA60RDA ISLAND BLOCKS §33 ANO 634F OCS-G-6042/7202

In compl Unci with T i t l e 30 CFR 250.34 and the Regional Director 's l e t t e r of October 12, 1988 and Septenber S, 1989 the fol lowing Information Is subaUted f o r the Joint Developaent Operations Coordination Docuaent (DOCD) for leases OCS-6-6O42/7202 Matagorda Island Blocks 633 and 634F.

1 . Description of Developaent Act iv i t ies

Santa Fe International Corporation Is operator of leases OCS-G-6042/7202, Matagorda Island Block 633/634.

Matagorda Island Block 633 was obtained through a faraout f roa Aaoco. Nell No. 3 was d r i l l e d In Noveaber 1968, and tested two Intervals froa 7400'-7500' at +5 MMCFD each and TPIA. A DOCD for th is wall was subaitted to the "Minerals Nanageaant Service on May 29, 1989 and approved on June 30, 1989. Well No. 3 was coapleted In June 1990 with a plat fora and fac i l i t y deck Insta l led thereafter. This well wat placed on production In Deceaber 1990.

Under the revised Plan ot Exploration for Matagn-da Island 633 Well No. 4 was dr i l led In July 1990 and encountered 128' of nat pay which tested +6 MMCFD froa the bottoa 20' Interval and temporarily abandoned.

Matagorda Island Block 634F was acquired In the July 1984 Lease Sala -Well Ko. 1 was d r i l l e d In March 1989 and ancouncered 55'-60' of net pay which tested 14 MMCFD plus 100 BOPD and temporarily abandoned. Well No. 2 was dr i l l ed In September 1989 and temporarily abandoned In Noveaber 1989. Santa Fe plans to re-enter Well No. 2 In Apr i l 1991 and directionally d r i l l the wall to a new BHL. This should prove up an additional 6 BCF of gas. A Moss I I structure Is to be Instal led upon coapletion of d r i l l i n g operations.

Santa Fe proposes to do the following work under this DOCO.

Install a four p i l e , seven well production platfora 1n Matagorda Ml and Block 633.

Dr i l l two addi t ional wells froa tha Matagorda Island 633A production platfora.

Production froa Matagorda Island Blocks 633/634F w i l l be processtd and commingled on the 633A platfora and transported via an 8" natural gas pipeline to a t i e 1n with Seagull Pipeline In Matagorda Island Block 624 for salt in the spot aarket.

The estimated U f a o ' reserves for Matagorda .'Jand Blocks 633/634F Is 10 years. Dally production 1s expected to be 40 MMCFD.

PUBLIC INFORMATICN

Page 4: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Activities proposed under this Joint DOCO for Matagorda Island Blocks 533/634F commenced 1n December 1990 with production to commence In December 1991.

Activity

Commence Design of Well Protector for MI 634F #2

Commence Design of Deck and Faci l i t ies MI 633A

Fabrication of 4-Pile Jacket for MI 633A

Install 4-Pile Jacket MI 633A

Approximate Start-Up Data

Deceiaber 1590

January 1991

February 1991

March 1991

March 1991

March 1991

April 1991

May 1991

May 1991

Juna 1991

July 1991

August 1991

August 1991

August 1991

October 1991

November 1991

Conmence Production December 1991

2. Description of Dri l l ing Unit and Proposed Faci l i t ies

Drilling Unit

The proposed wells will be drilled with a jack-up drill ing r ig . When a rig Is selected, the rig specs will be made a part of the Application for Permit to D r i l l . Typical diverter and BOP schematics are enclosed herewith as Exhibit 1. Any rig utilized by Santa Fe will be designed, operated and maintained in accordance with 30 CFR 250.40 (b) (4).

Pollution prevention features will include a dr i l l floor containment system with collection tank In hull.

Commence Design of 8" Pipeline Extension of MI 634F to NI 633A Platfom

Commence 4" FlowHna MI 634F 12 to MI 633A

Sidetrack and Complete MI 634F 12

Coaplate Fabrication MI 634F #2 Wall Protector

Install NI 634F #2 Well Protector

Coenence Design of Deck for NI-634F #2 Wall Protector

Drill and Complete MI 634F #3

Drill and Complete MI 633 #5

Complete NI 633 #4

Install 8" Pipeline Extension and 4" Flowline

Complete Fabrication of Deck for MI 634F #2

Install NI 634F #2 Well Protector Deck and MI 633A Deck and Fac i l i t i es

Page 5: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Safety features wil l Include well control and blowout prevention equipaent as described In 30 CFR, Subpart D. Santa Fe will perforn all operations In a safe and workmanlike aanner and will aaintain all equipaent in a safe condition, thereby ensuring the protection of lease and associated f a c i l i t i e s , tha health and safety of a l l persons, and the preservation and conservation of property and the environaent. Lifesaving appliances and fire fighting equipaent on the rig will ba In accordanca with the U. S. Coast Guard regulations.

Description of Platforaa

The Matagorda Island Block 633 "A" Platfora Is a 4-p1le, 7-slot drilling/production platfora. Attached as Exhibit 2 Is a schematic of this platfora.

Install a Moss I I well protection structure at Matagorda Island Block 634F Well No. 2. See Exhibit 3 for schematic of wall structure and deck.

All hydrocarbon handling equipaent for testing and production such as separators, tanks and treaters shall be designed, Installed and operated to prevent pollution.

Maintenance or repairs which ara necessary to prevent pollution of offshore waters shall be undertaken lowed lately.

Curbs, gutters, drip pans, and drains shall be Installed In deck areas In a aanner necessary collect a l l contaminants not authorized for discharge. Oil drainage shall ba piped to a properly designed, operated, and maintained suap system which will automatically aaintain tha oil at a level sufficient to prevent discharge of oil Into offshore waters. All gravity drains shall be equipped with a water trap or other aeans to prevent gas In the suap systea froa escaping through the drains. Suap piles shall not be used as processing devices to treat or skla liquids, but aay be used to collect treated-produced water, treated-produced sand, or liquids froa drip pans and deck drains and as a final trap for hydrocarbon liquids in the event of equipaent upsets. Improperly designed, operated or maintained suap piles which do not prevent the discharge of oil Into offshore waters shall be replaced or repaired.

There shall be no disposal of equipaent, cables, chains, containers, or other aaterials Into offshore waters.

3. Well Locations

A table Indicating the surface locations, bottoa hole locations, total vertical depths and aeasured depths for these wells covered by this Joint DOCD are enclosed as Exhibit 4.

Supporting Inforaation

1. Structure Map

A Structure Map for Matagorda Island Blocks 633 and 634F Is nel osed as Exhibit 5.

Page 6: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

2. Bathymetry Hap

A Bathymetry Map showing tha location of axisting wall and proposad walls for Matagorda Island Blocks 633 and 634F Is enclosed as Exhibit 6.

3. Shallow Hazards

Information on geological hazards and surface location for Matagorda Island Block 633 Wall No. 4 was Included In our Revised Exploration Plan that was submitted to the N1 nerals Management Service on March 6, 1990. Tha raport Indicated no magnetic anomalies, shallow gas, r iser channels or other bottom conditions to hamper completion and production operations. A four pile jacket will ba Installed over this well. Two additional walls will ba drilled fron this location. See Exhibit 7 for copy of Shallow Hazard Raport.

4. 011 Spill Contingency Plan

See Exhibit 8 for reference to our 011 Spil l Contingency Plan.

5. No new techniques or unusual technology will be required for these operations.

6. Lease Stipulations

In accoroance with Lease Stipulation No. 1 attached to lease for Matagorda Island Block 633, Anoco Production Co. subnltted to the Minerals Managenent Service with the Plan of Exploration datad October 5, 1983 a Cultural Resources Report which assessed the potential existence of any cultural resources and was reviewed by Minerals Managenent Service on December 5, 1983 and satisfied the requirements of Notices to Lessees and Operators No. 75-3 (Revision No. 1).

In accordanca with Laasa Stipulation No. 1 attached to lease for Matagorda Island Block 634F, Santa Fe International Corporation subnltted a Cultural Resources Report to the Minerals Managenent Service on June 18, 1985 which was reviewed on August 6, 1985 and satisfied the requirements of Notice to Lessees and Operators No. 75-3 (Revision No.

In accordance with Lease Stipulation No. 3 attached to leases for Matagorda Island 633/634F, Santa Fa will notify tha Chief, Naval Air Training, Naval Air Station, Corpus Chr ist i , Texas regarding air and boat operations affecting the Military Wanting Area W-228.

Santa Fe International Corporation 1s environmentally sensitive to the wildlife In the Matagorda Island Area and agrees to abide by the two conditions covering endangered whooping cranes and the Brown Pelican mentioned in Minerals Management Service letter dated April 13, 1990 approving our Revised Plan of Exploration.

7. Discharges

Listed below ara the discharges to be Incurred during dr i l l ing and production operations. Any discharge will be done within the guidelines as set forth In the Final NPDES Permit dated July 9, 1986.

Page 7: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Drillinq Operations

Tho anticipated discharge rates for Santa Fa's dril l ing operations for Matagorda Island Blocks 633/634F are l isted balow:

* Basad on SO gals/parson/day with average 40 persons on board.

The quantity of discharge of cuttings Is based on the average hole size for each section of hole. Mud nay ba discharged for purposes of dilution or at the end of the well. Fifty percent (50*) for attached liquids to cuttings Is addad to give a total dr i l l ing fluids discharge. Sewage Is treated on location. Solid domestic wastes are transported to shore for proper disposal at an authorized disposal s i te .

The fluid used for dri l l ing will be a typical lignosulfonate nud, unless otherwise noted In the drill ing prognosis. Concentrations of the chemicals In tha mud can ba estimated from the dally fluids chemical Inventory. Other surveillance of the fluid Is accomplished by the monthly and end-of-well LC 50 toxicity tests required by tha EPA. A 11st of mud additives that nay ba usad while conducting development dril l ing operations 1s enclosed as Exhibit 9.

In no Instance wil l the dril l ing fluid discharge rate exceed 1,000 bbls/hr.

Any drilling fluid contaminated with oil will be transported to shore for proper disposal at an authorized disposal s i te .

Production Operations

The volume of produced water discharge Is presently unknown. However, all produced watar discharges will be monitored In accordance with the EPA NPDES Permit.

The Natagorda Island Production platform will be manned after dril l ing operations are completed.

Deck drainage Is estimated to be approximately 900 bbls/month from the structure.

I f any solid wastes ara generated on the platform, these wastes will ba transported to shore for proper disposal at an authorized disposal s i te .

8. Hydrogen Sulfide

Narathon, McMoran and Amoco has previously drilled wells 1n Matagorda Island Block 633 and no H?S was encountered. Santa Fe dril led Well No. 3 to a depth of 8246' and Well No. 4 to a depth of 8950' and encountered no H2S in either wel l .

Drilling Fluids Drill Cuttings Deck Drainage

3,000 bbls/month 2,002 bbls/month 1,500 bbls/month 2,000 gals/day* Sewage and Domestic Liquid Waste

Page 8: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

In Matagorda Island Block 634F, Santa Fa drilled Wall No. 1 to a dapth of 13.935' and Wall No. 2 to a dapth of 10.055' and ancountarad no H2S gas.

Therefore, In accordanca with 30 CFR 250.67, Santa Fa haraby requests that a determination ba mada, that drilling and production oparations will taka place whan tha absanca of hydrogen sulfide has baan confirmed.

9. Coastal Zone Consistency

Certificate of Coastal Zone Consistency Is not applicable.

10. Projected Emissions

See Exhibit 10 for Air Quality Report.

H. Environmental Report

Environmental Raport 1s not applicable.

12. Onshore Base

Matagorda Island Blocks 633/634 ara located approximately 10 miles from shore in watar depths of approximately 80 feet. A map showing tha location of Blocks 633/634 relative to the shoreline and onshore base Is enclosed as Exhibit 11.

Santa Fe Intamatlonal Corporation will utilize the existing onshore facilities located at Harbor Island Terminal In Aransas Pass, Texas. This will serve as port of debarkation for supplies and craws. No onshore expansion or construction Is anticipated with respect to this activity.

This base 1s capable of providing the services necessary for tha proposed activities. It has 24 hour service, a radio tower with a phone patch, dock space, equipment and supply storage base, drinking and drill water, etc. This will serve as our base of operations for Matagorda Island Blocks 633/634. During drilling oparations, a supply boat will maka a round trip every three days, a crew boat will maka a round trip aach day and a helicopter will make two (2) round trips per week. During production activities, a supply boat will make one (1) round trip per week and a helicopter will make two (2) round trips pcr week.

The onshore activities associated with Matagorda Island Blocks 633/634 should not result in any increase in the size and number of onshore support and storage facilities or land and personnel requirements.

Page 9: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Authorized Representative

Inquiries concerning this plan mey be made to the following authorized representative of Santa Fa International Corporation:

Nr. James E. Jordan Santa Fa International Corporation Two Gal lar 1a Towar 13455 Noel Road, Suite 1100 Dallas, Texas 75240-6620 (214) 701-7533

Page 10: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

LIST Of EXHIBITS

1. Typical D1 vartar vtd BOP Schematics

2. 4 Pile, 7 Slot Drilling/Production Platfona

3. Schematic of Mail Structure and Deck

4. Well Information Sheet

5. Structure Maps for Matagorda Island Blocks 633 and 634F

6. Bathymetry Maps for Matagorda Island Blocks 633 and 634F

7. Shallow Hazard Report

8. 011 Spill Plan, Deployment Time and Trajectory Analysis

9. Drilling Mud Components

10. Air Quality Review

11. Vicinity PHt

Page 11: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

B.O.P. ARRANGEMENT

3 m r WM# Hi«rmc

\

••.3 t / § * t * * * Ann»*«r t . 0 . » .

3 fe/t* IOM* IUM ft.OJ». f D»uot»

3 t n r tw-r

rri \ Tl

— 3 \ t l f t©»#* Ma>M««I Vai»»

'.3 ft/f * 10*** »*•» BMJ

mm*

Page 12: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

SFIC

DIVERTER HOOKUP

I C . 2000 ' fctmou Control Val»r

IC" LO.

20* 2 0 0 0 * f LC

10*. 2 0 0 0 ' R t m o w Cont ro l Voiwt

SECTION *A-A*

21 I M * 2 0 0 0 * A n n u m r>r»»«ni«f

J 10* LD

IC*. 2 0 0 0 * * * m e t e Contro' Voiveft

Page 13: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

MAIN DECK T.O.S.

^ | Omega Marine Houston. Texcs

son to fe in te r r .o t .ono l corp .

^ | Omega Marine Houston. Texcs

* - P I L L . 7-WILL PRODUCTION PLATFORM ^ | Omega Marine Houston. Texcs

MATAGORDA 'Sl.AND 622 * A " - 6* TT w.D ^ | Omega Marine

Houston. Texcs ASSEMBLY ELEVATiON

OS AWN DAT. SCA-E £NG"N££fi J M A T A 27 DEC 90 T - 3 0 - 0 "

pSCJ£C* NyMB-S DSAWTNC NUMSt* *5S2

Page 14: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

NBJMCK Wf>gL.«#»0,-<>'

AfflrCATtOW BV: COMPANY SANTA FE INTERNATIONAL COfy*

m i

taoVoNDUCTOP-(PUTURt)

LEAH NO

•LOCK NO.

AMA

QCS-G-7202

^ •̂•cArsaow MUDMAT *

BLOCK 034F WELL » 2A MATAOORPA 184. ANP

cmATON SANTA FE itTERHATIOfiAL CORP.

Page 15: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

WELL INFORMATION SHEET

MATAGORDA ISLAND BLOCKS 633/634F OCI I W l OCS-G-7202

Woll Surfice Location BHL _M0__ TVD WO

12 Re-Entry and Sidetrack 7003.99' FSL & 4420.15' FWL 81' of MI 634F

#5 3006' FSL & 1010' FEL 78' of Ml 633

13 3006' FSL a 1010' FEL 78' of MI 633

Exhibit 4

Page 16: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

7 m 3EST AVAILABLE COPY y f i •

Exhibit 6

Santo Fo International

MATAGORDA ISL. 633 OFFSHORE TEXAS

BATHYMETRY MAP

Page 17: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Exhibit 6

Page 18: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

St^ss.7ir fr ninsrzis.in:. Two Gumt.t Tow* • 13455 NoH «0 • Su<« 1100 • Dallas fries 7U40-MX • 7«Wpfto*# (214) 701-7300

DRILLING HAZARDS

MATAGORDA ISLAND BLOCK 633

Cultural Resources conducted a geophysical survey over Matagorda Island Block 633. The geophysical systems used during the survey were comprised of a sub-bottom profiler, side scan sonar, magnetometer, depth sounder and 6-fold CDP Super Sparkar.

Water depths over Matagorda Island Block 633 range from 73 feet in the northwest corner to 88 feet in the southeast. Water depth over the proposed d r i l l i n g locations i s approximately 86 feet.

Location D: Shallow hazard surveys conducted over this location indicate no shallov gas, river channels, or bottom conditions to hamper dri l l i n g operations.

7. M. Stevens Sem-. Staff Geophysicist

Exhibit 7

Santa fa Mmar»it A Divition ol Sania Fa mtarnanona' Corporation • SFM Holdings mc Santa fi-Anoovar Oil Comoany • Santa fa Btaun mc

Page 19: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

OIL SPILL PLAN AND TRAJECTORY ANALYSIS

MATAGORDA ISLANO BLOCKS 633/634

Santa Fa has an approved 011 Spi l l Contingency Plan for the Gulf of Mexico. An updated plan was subnltted to Minerals Managenent Service on Novenber 6, 1990 in accordance wi th 30 CFR 2S0.42 (a-1) and approved on January 28, 1991. in the event of a s p i l l , th is plan w i l l be act ivated.

Santa Fe Is a member of Clean Gulf Associates (CGA), and in the event of a s p i l l at Matagorda Island Blocks 633/634F, equipment would be mobilized from the CGA stockpile at Aransas Pass, Texas.

Estimated response time fo r a sp i l l at Matagorda Island Blocks 633/634F during nonnal weather conditions would be 10 hours based on the fol lowing:

A. Procurement Time:

1. Estimated time to assemble the equipment 2.0 Hours

2. Estimated time to procure transportation vessel and deployment to CGA base at Aransas Pass, Texas 4.0 Hours

3. Secure personnel to load and operated the equipment 2.5 Hours

Maximum Procurement Time 4.0 Hours

B. Equipment Load Out 2.0 Hours

C. Travel to lease s i t e from CGA Base (30 miles at 10 miles/hour - 3 hours) (1/2 hour to t ravel to open water)

3.5 Hours

0. Deployment of equipment at sp i l l s i te 0.5 Hours

Total Time 10.0 Hours

The Minerals Management Service published an Oil Spi l l Risk Estimates for the Lease Sales 131, 135 and 137 (Hannon and Lear, 1989). The results of that analysis as i t related to Matagorda Island Blocks 633/634F are summarized in the following paragraphs. A detailed description of the model used in the Minerals Management Service analysis can be found in papers by Smith et al (1982), Lafear and Samuels (1981), La Belle and Anderson (1985), and La Belle (1986).

Exhibit 8

Page 20: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Matagorda Island Blocks 633/634F f a l l s in Launch Sita 4 ( re f : o i l sp i l l launch aap furnished by M1rara1s Management Service on June 2, 19B9). The probabi l i t ies (expressed as percentage of chance) that a s p i l l occurring In t h i s block wi l l contact la.id within 10 days ara l is ted below:

Environnental Resource Category Probabil i ty

Land Segraent 5 Nueces, Texas San Pat r ic io , Texas IX

Land Segment 6 Aransas, Texas 4% Land Segraent 7 Calhoun, Texas 41% Land Segraent 8 Matagorda, Texas 23X

The environraental resources that are located within these land segments are depicted on the maps l i s t e d below found 1n Section V, Volume I I of the Clean Gul f Associates Operations Manual.

Texas

Map 2 Ident i f icat ion of the Biological ly Sensitive Areas V-32.0e thru V-42.Ob and Protection Response Modes for the Biological ly Sensitive Areas V-43.0 th ru V-52.0a.

Map 3 Ident i f icat ion of the Biological ly Sensitive Areas V-54.0a thru V-62.0b and Protection Response Modes for the Biological ly Sensitive Areas V-63.0a thru V-68.0a.

The recommended response strategies to protect these resources are presented on pages VI-1.Ob through VI-23.0 of Section I I of the CGA Operations Manual.

Literature Cited

Hannon, L. J . and Eileen M. Lear 1989 Draft o i l - s p i l l r i s k analysis: Gulf of Mexico (proposed sales 131,

135 and 137) outer continental shelf. USDOI, MMS, Offshore Environmental Assessment Division, Branch of environmental Modeling, Herndon, VA.

La Bel le , R. P. 1986 Use of applied oceanography in stochastic modeling of o i l sp i l l s on

the outer cont inental shelf. Proceedings of OCEANS 86 Conference, September 1986.

La Bel le, R. P. and C. M. Anderson 1985 The application of oceanography to o i l - s p i l l modeling for the outer

continental shel f o i l and gas leasing progran. Marine Tech. Soc. Journal 19(2):19-26

Exhibit 8

Page 21: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Lanfear, K. J . and W. B. Samuels 1981 Documentation of user s guide to the U. S. Geological Survey oil spil l

risk analysis model: oil spi l l trajectories and the calculation of conditional probabilities. USGS Open-File Report 81-316. 95 pp.

Smith, R. A., J . R. Slack, T. Uyant, and K. J . Lanfear 1982 The oil sp i l l r isk analysis model of the U. S. Geological Survey, USGS

Professional Paper 1227. 40 op.

Exhibit 8

Page 22: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

DF.: JSK yzb CRK>KIK?S

CPMriOK CHIKICAl or. CKDSCAi TF.A3I N/Jg

Aiuninue Stearate "AZTAJLO-S" Bar i te Caleiua Carbonate Caleiua Chloride Ci ic iuc Oxide Caleiua Suifat t Carboryaechyl Cel lulose Caustic Potash Caustic Soda Chrcae Lignite Chroae Lignosulfonate Dr i l l ing B « t « r f « i t •1 -?Al" Jerrochreae L i g n o s u l f o n a t e Cel

Cypsus

L i g n i t e L i gaosuifonate "Mud Sweep" ••MOF.-F.II" "Sr.LlfZzcl" Sapp Soda Aah Sodiun Bicarbonate Sodiun Carbcryaet::;.! Cel lulose Sodiun Chloride Sodiun Chr cnate Starch "~-901C" 'TORQ-rris-"Black hagic" " - l a e t Magic Suaers lx" r i e s e i

" J e i f i a k e " -KILA

Tipi TM" ~*eLi-Nut" »ooc Tiber*

Discr.irrioK or MATTRIAL

Aiuninue Stearate Koniocic Sur fac t an t Bariue Sul fa te (EaSo^) Araronl te (CaCc,) Byd ropk i l i t e t W L j Liae (Quick) Aahydriate (CaSO ) Carboryaethy: Ce . l u lo se ?otassius Rycrate Sodiun Evercribe (NaOE) Chro»a L i g n i t e Chroae L ignosu l fona t e Soap

Nor - tox ic . Biodegradable defoeaer derived f r o r vood p u l p Sodius B O D t a o r i l i o r . i a t e , b e n t o n i t e . a t t a p u l g i t e

L i g n i t e L ignosu l f onate Ceaert P r e - f l u s h ryd ro lo r r ed Cereal S o l i d Orgaac— aiuninue eosale.: Sodiun Acid Pyrophosphate Sodius Carbonate

Sodiun Carbcryaetbyl C e l l u l e s t N a d KaCr0a.lCE20 "e r r Starch Biodegradable d r i l l i n g l u b r i c a n t Biodegradable d r i l l i n g l u b r i c a n t O i l base aud cone. Sacked concentrated c i i bast aud t-sed to air. c e r t i i r l o s s - c i r c u L a r i c n p i l l s P l a s t i c f e l l , shredded cel lophane L o s s - c i r c u l a t i o n a a t e r l a l Surf a c tar.: n ixed v i t h d i e s e l Crouad va inu t s h e l l s L o s s - c i r c u l a r i c s a a t e r i a i

Exhibit 9

Page 23: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

AIR QUALITY REVIEW FOR

MATAGORDA ISLAND AREA BLOCKS 633 ANO 634F OCS-G-6042 AND OCS-G-7202

SANTA FE INTERNATIONAL CORPORATION 13455 NOEL ROAD, SUITE 1100 DALLAS. TEXAS 75240-6620

SUBMITTED TO: HR. JAMES E. JORDAN

SENIOR REGULATORY SPECIALIST

FEBRUARY 27, 1991

PREPARED BY JOHN E. CHANCE & ASSOCIATES, INC. REGULATORY & ENVIRONMENTAL DIVISION

PROJECT NO. 91-8048

John E. Chance *% Aowoom, Inc. Exhibit 10

Page 24: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Projected Eul ssions Schedule for Project

I . General Infonnation

Location of F a c i l i t y - Matagorda Island Area Blocks 633 and 634F

Nave of Rig/Pi at f o r * - Jack Up Or i l l inc Rig, Production Platfomi, and a Single Uell P la t fon i

Owner/Operator - Santa Fe International Corporation ~wo Gallerla Tower 13455 Noel Road, Suite UOO Dal las, Texas 75240-6620

Contact Person - Mr. Janes E. Jordan Senior Regulatory Special ist

Project Start Data - March 1991 Project End Date - March 2002

27,510 Feet to be Dr i l led 10 Miles Offshore

I I . Total Enissions f o r Construction

Total Time f o r Construction: 2 months

Projected Enissions (Pounds/Day of Construction)

Eni tted Substance CO S02 N0X VOC TSP

Welding Machines 16.90 5.19 78.08 6.25 5.58

Crane 2.32 0.71 10.74 0.86 0.77

Crewboat 73.02 * 25.69 30.52 *

Supply Boat 13.07 * 93.05 50.95 *

Helicopter 11.58 0.37 1.16 1.06 0.51

Derrick Barge 689.88 309.25 2616.77 76.12 261.68

Pipeline Lay Barge 21.62 6.64 99.91 7.99 7.14

Tug Boat Assist 134.78 * 663.12 63.72 *

V John C. Chance et Ammoo^ Inc.

Page 25: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Construction Enissions (Continued)

Calculated construction enissions are based on the following factors:

Crewboat horsepower of 2,000 Port of Aransas Pass, Texas Waiting Tine 2 hour(s) per t r i p

3 t r i p ( s ) per week

Supply Boat horsepower of 2,500 Port of Aransas Pass, Texas Waiting Tine 24 hours(s) per t r i p

3 t r1p(s) per week

Helicopters Port of Aransas Pass, Texas

3 t r i p ( s ) per week

Derrick Barge horsepower of 4,500 Working for 20 day(s)

Pipeline Lay targe Working for 10 day(s)

Tugboat Assist horsepower of 3,500 Working for 10 day(s)

Two Cranes horsepower of 110 Operating 4 hour(s) per day for 12 day(s)

Four Welding Machines horsepower of 50 Operating 12 hour(s) per day for 32 day(s)

Total Enissions for Dr i l l i ng

Total Time for D r i l l i n g 3 wel ls: 4 nonths

Projected Enissions (Pounds/Day of D r i l l i ng )

Emitted Substance CO S02 NO, VOC TSP

Dr i l l ing Rig 86.65 38.84 328.66 9.56 32.87

Cranes 5.87 1.80 27.13 2.17 1.94

Welding Machine 1.33 0.41 6.17 0.49 0.44

Crewboat 79.10 * 27.83 33.07 *

Supply Boat 14.16 * 100.80 55.20 *

Stand-by Boat 2.72 2.75 13.97 1.79 •

•John E. Chance et Ammoo-, ino.

Page 26: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Projected Eaissions (Continued)

Ealtted Substance CO so, N0X VOC TSP

Helicopter U.M 0.40 1.25 1.14 0.55

Tow Tugboat(s) 404.35 * 1969.36 191.16 *

C u t Ing Skid 64.07 19.69 296.04 23.68 21.15

Calculated d r i l l i n g eaissions are based on the following factors:

Dr i l l ing R' ei issions are based on 60 horsepower-hour/foot d r i l l e d ;

Two Cranes, horsepower of 110 each, operating four hours/day;

Welding Machine, hc-sepover of 50, operating four hourr/day.

Crewboat horsepower of 2 000 Port of Aransas Pass, Texas Waiting Tlae 2 hour(s) p*r t r i p

7 t r l p ( s ) per week

Supply Boat horsepower of 2,50" Port of Aransas Pass, Texas Waiting Tlae 24 hours(s) per t r i p

1 t r i p every three days

Stand-by Boat Generator Rating 200 ki lowatts

Running 24 hou» [ ) per day

Helicopters Port of Aransas Pass, Texas

2 t r l p ( s ) per week

Towing Tugboats horsepower of 3,600 each Working for 6 day(s)

Ceaenting Skid horsepower of 400 Working for 1 day(s) per well

Total Emissions for Production

Total Time for Production: 10 years

John E. Chance et ABBOO-, Ino,

Page 27: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Projected Eaissions (Pounds/Day of Production)

Emitted Substance CO so2 HO, VOC TSP

Stand-by Boat 2.72 2.75 13.97 1.79 *

Helicopter 12.54 0.40 1.25 1.14 0.55

Supply Boat 1.18 * 8.40 4.60 *

Venting Eaissions * * * 561.75 *

Calculated production emissions are based on the following factors:

Ventmg eaissions tre based .n "*5 cubic feet of gai ver*ec" o t r barrel of o i l produced. Average specif ic gravi ty of the gas is assumed to be .65;

Two cranes, horsepower of 110 each, operating two hours/day.

Helicopters Port of Aransas Pass, Texas

2 t r1p(s) per week

Stand-by Boat Generator Rating of 200 ki lowatts

Running for 24 hours per day

Supply Boat wi th horsepower of 2,400 Port of Aransas Pass, Texas

Waiting Time 2 hour(s) per t r i p 1 t r i p per week

Project Summary, Total Emissions

Emitted Substance CO so2 N0X

VOC TSP

Allowable ( tons/yr ) 15781 33J 333 333 333

Projected Emissions (Tons/Year)

Year 1 22.62 6.28 70.57 24.89 5.08 Year 2 5.12 1.14 15.88 106.66 0.27 "ear 3 5.12 1.14 15.88 106.66 0.27 Year 4 5.12 1.14 15.88 106.66 0.27 Year 5 5.12 1.14 15.88 106.66 0.27 Year 6 5.12 1.14 15.88 106.66 0.27 Year 7 5.12 1.14 15.88 106.66 0.27

John E. Chance et ABBOC^ Inc.

Page 28: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

Total Eaissions (Continued)

Ealtted Substance CO S02 N0X VOC TSP

Projected Eaissions (Tons/Year)

Year 8 Year 9 Year 10 Year 11

5.12 5.12 5.12 5.12

1.14 1.14 1.14 1.14

15.88 15.88 15.88 15.88

106.66 106.66 106.66 106.66

0.27 0.27 0.27 0.27

Total Eaissions are comprised of a l l Construction, D r i l l i n g , and Production Emissions.

V I . Findings o ' A i r Quality Review

As per DOI-MMS regulations, th is f a c i l i t y is exempt from further air quality review as i t has been determined that i t s operation w i l l not have a s ign i f i cant adverse environmental iapact on a i r qual i ty . Calculated eaissions are for a worst case condition. Actual eaissions froa this project w i l l probably be lower.

VII. Methodology

Dri l l ing - horsepower-hour/ft d r i l l e d method Boats - horsepower-hour method Helicopters - landing/takeoff (LTO) cycle method All Others - horsepower-hour method

VIII References

ATMOSPHERIC EMISSIONS FROM OFFSHORE OIL DEVELOPMENT AND PROOUCTION, EPA-450/3-77-026 (June, 1977).

COMPILATION OF AIR POLLUTANT EMISSIONS FACTORS, EPA Report AP 42 (September, 1985), 4th Edit lor..

* The EPA does not provide S02 and TSP emission factors for boat engines or TSP emission factors for diesel powered electr ical generates In vessels.

John E. Chance at Ammoo^ Ino.

Page 29: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

# EMISSION SOURCES AT THIS ELEVATION INCLUDE : SUPPLY BOATS. CREW BOATS. ANO STANDBY BOATS.

P R E P A R E D BY ./•Aw £. Cnonce S Mttociotrs, Inc L » t 9 f 9 t t f , LOltillOKO

Page 30: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

1 11 '1 f '<

T Y P I C A L P R O D U C T I O N P L A T F O R M

• EMISSION SOURCES AT T H I S E L E V A T I O N INCLUDE : P O W E R GENERATION EOUIPMENT. OAS COMPRESSION. HEATER T R E A T E R . VENTING, H E L I C O P T E R S . AND WELDING MACHINES.

• EMISSION SOURCES AT THIS E L E V A T I O N INCLUDE I SUPPLV BOATS. CREW B O A T S . AND STANDBY BOATS.

P R E P A R E D BY

John £. Chance 8 Associates, lnc Latoyet te , Louisionc

Page 31: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

MAHJ DECK

TYPICAL WELL PROTECTOR

EMISSION SOURCES AT THIS ELEVATION INCLUDE! POWER GENERATION EOUIPMENT. CAS COMPRESSION. HEATER TREATER. V E N T I N C . HELICOPTERS. AND WELDiNC MACHINES.

EMISSION SOURCES AT THIS ELEVATION INCLUDE: SUPPLY BOATS. CREW BOATS. AND STANDBY BOATS

John E. Chance A Assoc., Ino.

Page 32: In Reply Refer To: HS 5231 March 21. 1991 Santa Pa ... · commingled on the 633A platfora and transported via an 8" natural gas pipeline to a tie 1n with Seagull Pipeline In Matagorda

g f Santa fo International Corp.

MATAGORDA ISL. 633 & 634F OFF8HOM: TUX AS

OCS-G-6042 OCS-G-7202

DOCD VICINITY PLAT


Recommended