Incident Tracking Report June

Date post: 03-Jun-2018
Category:
Upload: giahao
View: 220 times
Download: 0 times
Share this document with a friend

of 91

Transcript
  • 8/12/2019 Incident Tracking Report June

    1/91

    Person in charge:

    .......

    .

    (***) Please do not merge cells.

    Incident

    ID

    (Date)

    Incident Title Equipment

    2-Jan Tool EBO 012tripped EBO 012

    2-Jan Tool SEM's RCBO 20A tripped

    at FA Lab

    SEM 04

    6-Jan Incident of Branch line 110kV Thuc Duc Dong All Facility equipment

    6-Jan Tripped CB of ACL022 ACL022 tool

    7-Jan Tripped CB of GSC00005 CAM003

    7-Jan Tool SEM's RCBO 20A tripped

    at FA Lab

    SEM 04

    8-Jan Water leakage on PCWR pipe of EBO004 EBO004

    8-Jan The wire burnt at socket out let at WC#1 socket

    9-Jan Tripped MCCB 100A of Domestic and Diesel pump Domestic waterand Diesel pumps

    11-Jan Tool GSC0002 tripped GSC 00002

    Incident Report Tracking Ma

  • 8/12/2019 Incident Tracking Report June

    2/91

    12-Jan Water leakage on PCWS pipe of EBO002 EBO002

    14-Jan PLC # 8 lost signal PLC # 8

    14-Jan Power sagged NA

    15-Jan Control panel of primary and high level pump of

    deflux#1 lost power

    DFX001

    15-Jan Tool GSC0008 tripped GSC 00008

    16-Jan Tripped CB of ACL024 ACL024 tool

    20-Jan Power sagged NA

    22-Jan Elevator #2 in GPB fault Elevator #2 in GPB

    23-Jan There was a leakage NaOH on coupler of hand valve

    (HV261-1-MP9) for 2nd adjustment tanks

    NaOH dosing pump#1

    24-Jan Window glass was damaged at locker E NA

    27-Jan SMS system was down NA

    27-Jan Tripped MCCB NS6D1C02A 250A NA

    29-Jan Tool GSC0006 tripped GSC 00006

    29-Jan There is hole on the IDW pipe of cooling tower#4 Cooling Tower#4

    30-Jan While R&R, One operator detected water leak ont

    PCW tool EBO007 & 008

    EBO007 & EBO008

  • 8/12/2019 Incident Tracking Report June

    3/91

  • 8/12/2019 Incident Tracking Report June

    4/91

    24-Mar Power Sag Incoming A&B with magnitude 87.36%

    and 0.1s

    External power

    28-Mar Power sag of Incoming A 88.24% duration 0,080s,

    Incoming B 87.38%, duration 0.080s

    External power

    28-Mar Power sag of Incoming A 85.71% duration 0,049s,

    Incoming B 83.29%, duration 0.050s

    External power

    29-Mar Cracked AWN piping AWN pipe

    30-Mar CHB001 loss power CHB001

    1-Apr Power sag External power

    1-Apr Server system in south mezzanine was problem WIN911 system

    2-Apr o power supply for tool BTU of module training CA Tool training CAM

    2-Apr One small snake at Lobby GPB NA

    3-Apr Tool TH#1 tripping TH#1

    3-Apr Flexible water pipe was broken Gas stove

    7-Apr " Security Guidelines" board was loosen NA

    8-Apr ICOS# 03,08,09,011 was problem"Auto machine off" IOCS# 3,8,9,11

    8-Apr The elevator in ATM was problem The elevator

    8-Apr Two CB outgoing of battery ES6D1D08A in HT room

    CUB were tripped

    Battery ES6D1D08A

    8-Apr Dock lift #6 got problem Dock lift

    9-Apr Back guard house lost power almost equipment ir conditioner,camera,outlet sock

    9-Apr The temperature in south clean room is unstable Main valve DCC

    12-Apr Out let workstation tripped workstation PCK002

    22-Apr Power sag External power

    22-Apr LPG detector MB-1-SS3-025 actived Gas Detector

    23-Apr Power sag External power

  • 8/12/2019 Incident Tracking Report June

    5/91

    24-Apr Leak on piping of Jockey pump Jockey pump

    24-Apr compressor 1 in the kitchen fault freezer 1

    25-Apr auto paging was hung NA

    29-Apr Underground domestic pipe leak detected Domestic water supply line

    30-Apr ATM flooding Domestic water supply line

    2-May The freezer #1 lost power in the kitchen Freezer#1

    2-May Water leak at tool DFX001 DFX001

    2-May Power loss MFG tool GSC00009 of the module

    CAM005

    CAM005

    2-May Oven of Bam002 tripped BAM002

    4-May Water leak service duct tool dock 1 ATM Toilet

    5-May Freezer #6 lost power in the kitchen Freezer #6

    6-May Strange smell at G23 column in clean room NA

    7-May The cable of Led lights below fruit tray was damage Service light

    9-May Dead frog stuck in insect killer NA

    11-May Power outage NA

    13-May Tripping MCCB 100A on panel ES6D1C02A serving

    power for Diesel pump

    Fire pump

    13-May Main gate of front guard house couldn't open Main gate

    15-May DX #6 fault DX#6

    15-May Cooling Tower Fan 4D was fault Cooling Tower

    15-May Employee was injury on his finger near cafeteria NA

  • 8/12/2019 Incident Tracking Report June

    6/91

    19-May PCWS water leak at EBO010 EBO010

    20-May Tripped MCB Ckt#14B 220V 16A 1P onpanel

    TS1D2H27A

    ICO#4

    20-May Tripping RCCB 40A, NS3D1F02A/28RYB Coca-Cola machine

    22-May Power supply loss NA

    24-May TIR004 modole EPX004 link004 lost power TIR004 modole EPX004

    link004

    24-May Wet chemical fire suppression system kitchen accidenti NA

    28-May Tool PBM005 belong BAM 05 Lost power PBM005

    28-May Water leakage at flange in suction of 1st RO feed

    pump

    1st RO feed pump

    6-Jun OFA gauge of RLM006 did not work RLM0006

    7-Jun abnormal corona was found while UDT scanning at

    HV switchgear South ATM

    NA

    7-Jun CT #3 cell A was tripped the thermal relay CT#3

    10-Jun Valve pneumatic discharge of CT#2 cell C was fault CT#2

    10-Jun OFA Lateral pressure low alarm Compressor

    12-Jun Tool BPM0002 belong BAM 002 link 2 Lost power BPM0002

    12-Jun PCWS water leak at EBO007 EBO007

    15-Jun MCCB 100A at panel NS3L2G07A tripped NA

  • 8/12/2019 Incident Tracking Report June

    7/91

    18-Jun RCCB 63A(0.3A) ES7L1P03Aon panel ES7D2Q01A

    .It supply for lighting and socket in IW tripped

    Lighting and socket

    23-Jun 7 street ligh did not work

    24-Jun The finger of an employee Intel was injury Locker '' 3732''

    24-Jun Tool HAST#2 was tripped in Street LAB and Tool

    under PM and testing

    Tool HAST #2

    25-Jun Win 911 was hang WIN911 system

  • 8/12/2019 Incident Tracking Report June

    8/91

    Note: Classify A1 : Faults by equipment

    B1 : Faults by operation

    C1 : Faults by maintenance, sanitary

    D1 : Faults by other

    E1 : Fault by PCII shut down

    (Equipment or system is not stopped)

    System Area Time of

    Incident

    Building

    Information

    Electrical Manufacturingfloor 08:30hrs ATM

    Electrical FA Lab

    09:00hrs

    ATM

    All Facility system ATM, CUB, GPB

    09:16hrs

    All Building

    Electrical MFG

    18:16hrs

    ATM

    Electrical MFG

    11:18hrs

    ATM

    Electrical FA Lab

    12:00hrs

    ATM

    PCW MFG 0:05hrs ATM

    Electrical MFG 13:30hrs ATM

    Electrical CUB, LV room11:30hrs

    CUB

    Electrical MFG 10:20hrs ATM

    agement

  • 8/12/2019 Incident Tracking Report June

    9/91

    PCW MFG 22:10hrs ATM

    I&C ATM Mezzanine 11:00hrs ATM

    Electrical External 20:24hrs NA

    Electrical MFG 15:52hrs ATM

    Electrical MFG 19:01 ATM

    Electrical MFG 09:45hrs ATM

    Electrical External 06:12hrs NA

    Elevator GPB 17:04hrs GPB

    AWN RODI bay 0:30hrs CUB

    NA locker E - ATM 18:40hrs ATM

    BMS External 8:30hrs External

    Electrical CUB, LV room 18:08hrs CUB

    Electrical MFG 10:10hrs ATM

    Mechanical CUB roof 16:00hrs CUB

    Mechanical Walkable ceiling 10:00hrs ATM

  • 8/12/2019 Incident Tracking Report June

    10/91

    Electrical Kitchen 21:25hrs GPB

    Mechanical K16 at clean room 16:45 ATM

    Process MFG 13:10 ATM

    Electrical MFG 16:45 ATM

    LSS Walkable celling D20-21 8:10 ATM

    Electrical MFG 7:48 ATM

    Electrical MFG 10:50 ATM

    Process MFG 22:10 ATM

    Mechanical MFG 9:00 ATM

    Electrical Kitchen 11:59 GPB

    Electrical Whole site 6:16 ALL Bldg

    Mechanical GPB Elevator 15:57 GPB

    Process L15 14:46 ATM

    Electrical MFG 5:00 ATM

    NA MFG 16:00 ATM

    Electrical MFG 13:35 ATM

    Electrical GPB 19:40 GPB

    Electrical MFG 13:21 ATM

    Mechanical MFG 8:30 ATM

    Electrical MFG 10:15 ATM

    Electrical Street light 22:54 GPB

    Electrical MFG 9:40 ATM

    Electrical MFG 9:30 ATM

    Electrical Kitchen 0:31 GPB

    Electrical IW 11:41 IW

  • 8/12/2019 Incident Tracking Report June

    11/91

    Electrical ATM 14:06 MIS

    Electrical ATM 0:40 MIS

    Electrical ATM 17:55 MIS

    Process ATM 13:15 ATM

    Electrical MFG 6:24 ATM

    Electrical ATM 10:20 ATM

    I&C ATM 20:50 ATM

    Electrical ATM 14:50 ATM

    NA Lobby 22:10 GPB

    Electrical ATM 13:55 ATM

    Gas stove kitchen 23:20 GPB

    NA ATM 20:50 ATM

    Electrical ATM 6:00 ATM

    The elevator ATM 14:00 ATM

    Electrical HT room 14:00 CUB

    Electrical IW 16:53 IW

    Electrical HC06 10:00 HC07

    DCC system South ATM 13:23 SS1

    Electrical ATM 9:55 ATM

    Electrical Whole site 5:25 Whole site

    LSS Kitchen GPB

    Electrical ATM 8:45 ATM

  • 8/12/2019 Incident Tracking Report June

    12/91

    LSS HC04 11:15 HC04

    Mechanical Kitchen 20:25 GPB

    BMS CUB 5:30 CUB

    Mechanical HC04 12:15

    Mechanical ATM 8:20 ATM

    Electrical Kitchen 6:00 GPB

    Process MFG 8:11 ATM

    Electrical MFG 8:00 ATM

    Electrical MFG 8:15 ATM

    Mechanical Service duct 5:30 ATM

    Electrical kitchen 15:50 GPB

    NA Clean room 18:39 ATM

    Electrical Near cafeteria 3:35 ATM

    NA Turnstile 0:30 ATM

    Electrical External 2:36 All

    Electrical LV room at CUB 5:03 CUB

    Electrical Front guard house 17:30 HCO6

    Mechanical CCR#1 in GPB 14:30 GPB

    Electrical CUB 19:10 CUB

    NA GPB 23:06 GPB

  • 8/12/2019 Incident Tracking Report June

    13/91

    Mechanical Clean room 4:45 ATM

    Electrical Clean room 1:30 ATM

    Electrical GPB 11:30 GPB

    NA all 13:52 all

    Electrical ATM 9:20 ATM

    LSS Kitchen 17:20 GPB

    Electrical Clean room 12:50 ATM

    RO train A/ RODI/ CUB 7:45 AM CUB

    Mechanical ATM 12:04 PM ATM

    Electrical South ATM 9:30 AM ATM

    Electrical CUB 22:25 CUB

    Electrical CUB 7:05 PM CUB

    Mechanical CUB 7:50 PM CUB

    Electrical ATM 9:20 ATM

    Mechanical Clean room 4:45 ATM

    Electrical GPB 15:38 GPB

  • 8/12/2019 Incident Tracking Report June

    14/91

    Electrical IW 15:07 IW

    Electrical Road

    \ ATM - Locker 4:18 ATM

    Electrical Street LAB 9:45 ATM

    BMS mezzanine NA ATM

  • 8/12/2019 Incident Tracking Report June

    15/91

    Problem Description

    Tool tripped while start-upafter holiday

    Tool tripped while start-up

    after holiday

    Power interruption on line 110kV

    Tool tripped while start-up after recovered facility

    system

    Tool tripped while start-up after updating software for

    tool

    Tool tripped while start-up

    after repair tool.

    water dripped possile due to condensation. Need to

    replace insulation layer

    The electrical wiring of the vacuum cleaner was burnt

    Tripping MCCB 100A EH4D1A06A at panelES6D1C02A, causing power interruption for domestic

    pumps (one power source) and battery charger for

    diesel fire pump

    Tool GSC0002 tripped while restarting after PM about

    2hrs (Module Cam001, link#1) DB-

    TS1D2F27B/CKT#3, 16A 3P 380V type C

  • 8/12/2019 Incident Tracking Report June

    16/91

    Water dripped possible due to leak Y-strainer

    PLC # 8 lost signal can't monitor status of MAH#11,

    3temperature sensors , 4 dry coils and temperature

    SCR#11

    Incoming A 82.74% duration 0,06s, Incoming B

    82.42%, duration 0.06s.

    Tripping MCCB serving power for panel ES1L2C19A

    Tool GSC0008 tripped while starting after was hung

    tool.(Module Cam004, link#4) DB-

    TS1D2F25B/CKT#12, 20A 3P 380V type C

    Tool tripped while start-up after recovered facility

    system

    There was in power sag issue with magnitude 87.96%duration 0.06s

    Elevator#2 out of service

    The supply valve coupling of 2nd

    Adjustment tank

    NaOH dosing pump#1 was damaged

    window glass was damaged at locker E

    Cannot receive all alarm by SMS

    Tripping MCCB NS6D1C02A supply power for

    Compressor#3 control panel, Normal power of

    PLC#1,2,3,4), Rodi PLC amd Battery charger at HV

    room

    Tool GSC0006 tripped while starting after PM about

    2hrs (Module Cam003, link#3) DB-

    TS1D2F25B/CKT#7, 20A 3P 380V type C

    Appear a hole on IW pipe and causing water dripping

    along the pipe

    Water leak at PCW flange of tool EBO007 and

    EBO008

  • 8/12/2019 Incident Tracking Report June

    17/91

    Tripped MCCB NS3C1F02A supply power to Pizza

    oven in the Kitchen

    OFA regulator valve supply was broken

    Water leak at ball valve of PCWR pipe

    Tool GSC0004 tripped while starting after PM about

    2hrs (Module Cam002, link#2) DB-

    TS1D2F27B/CKT#7, 20A 3P 380V type C

    Water leak from pipe (D150) LSS system at D20-21

    walkable celling.

    Tool ICO013 tripping CB on panel TS1D2H27A

    CKT#4R

    Socket outlet cable is loosely connected

    primary lift pump sometimes has no water flow.

    PCW cooling insulation is missing

    fan of compressor was burn in the rotor fan

    Power sag of the incoming power supply

    Abnormal vibration on carriage

    out going valve was closed

    Tool tripping after PM finished

    Instant noodle smell infront of Break room at D9 when

    MCB of tool CHB001 was failure inside tool panel.

    Tripped Overload MCCB( 100A, Ir 0.8)Of intel LOGO

    at panel NS3D3C07A

    There was touch issue between a phase and coverpoint drop

    loose connection of OFA pipe to tool

    CMT025 module CXT025

    Tool ICO010 tripping CB on panel TS1D2H25A

    CKT#11Y

    RCCB 40A tripping

    RCBO 32A 30mA on panel US1D1A28A tripping

    Tool DESPATCH tripping RCBO 32A 30mA on panel

    NS1D1A28A

    Freezer 7 does not work

    Tripping MCCB 200A on panel: ES7D2Q01A supply

    for panel: ES7D1Q07B

  • 8/12/2019 Incident Tracking Report June

    18/91

    Power sag of the incoming power supply

    Power sag of the incoming power supply

    Power sag of the incoming power supply

    Cracked AWN piping - double containment

    MCB of tool CHB001 was failure inside tool panel.

    Power sag of the incoming power supply

    Server system in south mezzanine was problem

    General contrator not yet turn on CB on Bus-duct(TS1B2F05A)

    SCC informed One small Snake in Lobby GPB we

    called Pest Control for help Then It was caught by

    them

    Tripped RCCB, Ckt#3B/NS1D1A28A supply power to

    tool TH#1

    flexible water pipe supply water to cold down the gas

    stove in the kitchen was broken.

    " Security Guidelines" board was loosen.

    ICOS# 03,08,09,011 was problem"Auto machine off"

    the elevator was problem with error is 9 KB fault

    Two CB outgoing 110v battery ES6D1D08A supply

    power to all Sepam in panel NS6S1E02A in HT room

    CUB were tripped

    Dock lift out of function

    Back guard house lost power almost equipment dueto

    RCCB on panel DB-HC07 tripped

    Temperature control main valve of the south DCC lost

    control and create water condensation on piping inthe main South.

    Plug of workstation PCK

    Power sag of the incoming power supply

    Gas detector activated and shut off gas supply valve

    Power sag of the incoming power supply

  • 8/12/2019 Incident Tracking Report June

    19/91

    leak on piping of Jockey pump

    freezer 1 fault

    auto paging was hung

    Underground domestic pipe leak detected

    Water flooding casued by Deflux #1 open valve

    RCCB 40A 0.03 A on panel NS3D1F02A serving

    power for freezer#1 was tripped .

    Water leak at tool DFX001

    There was no power supply for Mfg tool GSC00009 of

    the module CAM005 (belong to link5) in

    DB Tool TS1D2F25C/CKT#2RYB, MCB D16 3P

    380v type D.

    After holiday, tool started and there was no power

    Coupling was loosen

    When doing round and reading we found that the

    freezer #6 was lost power in the kitchen.

    Customer detected Strange smell at G23 column inclean room

    The cable of Led lights below fruit tray was damaged

    Dead frog stuck in insect killer

    Power supply loss

    Tripping MCCB 100A on panel ES6D1C02A

    Main gate of front guard house couldn't open

    DX supply cool air to CCR#1 in GPB wasnt running

    Cooling Tower Fan 4D was fault

    Employee finger was injuried at cafeteria. Incident

    happen when he stand up holding the edge of the table

  • 8/12/2019 Incident Tracking Report June

    20/91

    PCWS water leak at EBO010 Ystrainer

    ICO#4 was lost power supply

    Power supply for coca-cola dispenser was tripped

    Power supply loss

    Power supply loss

    Wet chemical fire suppression system kitchen

    accidentially triggered by CSC

    Tool PBM005 belong BAM 05 Lost power

    Water leakage at flange in suction of 1st RO feed

    pump

    OFA gauge of RLM006 did not work

    abnormal corona was found while UDT scanning at

    HV switchgear ATM

    The thermal of Cell #3 A relay was tripped

    Pneumatic discharge valve of CT#2 cell C was fault

    Three compressor was fault due to the CWP pressure

    was unstable, air penertration happned in condenser

    piping system. That led the air into the pump and made

    the CWP pressure changedTool BPM0002 belong BAM 002 link 2 Lost power

    PCWS water leak at EBO007 on pipe connection

    MCCB 100A at panel NS3L2G07A

  • 8/12/2019 Incident Tracking Report June

    21/91

    Lighting at IW was lost power .we checked and

    detected RCCB 63A(0.3A) ES7L1P03Aon panel

    ES7D2Q01A

    The door was hurt her finger.

    RCBO 32A 30mA on panel NS1D1A28A, ckt #7b

    supply for tool HAST#2 was tripped

    the SMS alarm didnt trigger.due to Win 911 was

    hang

  • 8/12/2019 Incident Tracking Report June

    22/91

    Site INTEL VN

    Month/Year: May 2013 m-To :, Dec 2013

    A1 : Faults by equipment

    B1 : Faults by operation

    C1 : Faults by maintenance, sanitary

    D1 : Faults by other

    E1 : Fault by PCII shut down

    (Equipment or system is stopped)

    Interim Corrective Action Initiated by Date

    Implemented

    Check and coordinate with tool owner to resetbreaker Bao 2-Jan

    Coordinate with tool owner to hook up power

    analyzer and reset breaker

    Bao 2-Jan

    Coordinate with EVN to investigate Kha 6-Jan

    Check and coordinate with tool owner to reset

    breaker

    Kha 6-Jan

    Check and coordinate with tool owner to reset

    breaker

    A.Tuan 7-Jan

    Check and coordinate with tool owner to reset

    breaker

    A.Tuan 7-Jan

    Replace insulation layer and keep monitoring Canh 8-Jan

    Remove the wiring and replace new cover of

    socket outlet

    A.Tuan 8-Jan

    Reset MCCB to restore the power and coordinatewith electrical team for further investigation

    A.Tuan 9-Jan

    Check and coordinate with tool owner to reset

    breaker

    Bao 11-Jan

  • 8/12/2019 Incident Tracking Report June

    23/91

    Remove insulation layer and fix leak at Y-strainer Tu 12-Jan

    Coordinate with BMS and IT teams to restore

    the system

    Tuan 14-Jan

    Site check all facilities equipment and production

    tools none is affected

    A.Tuan 14-Jan

    Check and coordinate with tool owner to reset

    breaker

    Canh 15-Jan

    Check and coordinate with tool owner to reset

    breaker

    A.Tuan 15-Jan

    Check and coordinate with tool owner to reset

    breaker

    Tu 16-Jan

    Site check all facilities equipment and productiontools - none affected N.Tuan 20-Jan

    Check and Barricade then call hotline Schindler

    for investigate

    N.Tuan 22-Jan

    Closed NaOH main valve of supply piping then

    replace new coupler

    A.Tuan 23-Jan

    Barricade that area and then escalate to next level Bao 24-Jan

    Close monitor the system on BMS and contactwith third party to restore the SMS system

    A.Tuan 27-Jan

    Stop the project, and then reset the CB to restore

    the power. Escalate to management team for

    further investigation

    A.Tuan 27-Jan

    Check and coordinate with tool owner to reset

    breaker

    A.Tuan 29-Jan

    * Isolate the IDW pipe. Plan to Replace the

    damaged IDW pipe - cooling tower #4 on

    WW06.3.* Take the sample to analyze the damaged IDW

    pipe - cooling tower #4 on WW09.3

    Bao 29-Jan

    Re-tighten for bolts and keep monitoring. Bao 30-Jan

  • 8/12/2019 Incident Tracking Report June

    24/91

    Conduct tripping investigation and restore the

    power for Pizza oven

    Tu 31-Jan

    LOTO valve supply and barricade A.Tuan 5-Feb

    Check and fixed A.Tuan 6-Feb

    Conducted investigation and reset breaker A.Tuan 6-Feb

    Check and containing water by bucket and

    barricade area.

    N.Tuan 20-Feb

    Check physical condition of panel and reset CB Tu 21-Feb

    Get get from CSC for the correction Tu 22-Feb

    adjust regulator valve Bao 21-Feb

    Return back insulation Bao 27-Feb

    check and escalate to Mechanical team fix it Tu 27-Feb

    Restore affected equipment due power sag (CUBequipment) Tu 25-Feb

    Shutdown, barricade and call OEM Bao 28-Feb

    Re-open out valave Bao 27-Feb

    Reset CB Tu 28-Feb

    Re-balance aircon supply at break room Bao 1-Mar

    Check and measure power supply A.Tuan 5-Mar

    Check ,Reset MCCB and measure current 10.2A N.Tuan 5-Mar

    Fixed issue of socket outlet and restore powersupply

    A.Tuan 6-Mar

    Seek Atea's help to fix it Bao 7-Mar

    Check physical condition of panel and reset CB Bao 8-Mar

    Replaced faulty ballast and restore lighting Tu 13-Mar

    Check power panel and tool condition and

    measured leak current

    Tuan 13-Mar

    Check physical condition of panel and reset

    RCBO

    Tuan 20-Mar

    Checked and release emergency button Bao 21-Mar

    De-activated Rudolf earth leakage relay which is

    suspected to be faulty and reset the 200amp main

    circuit breaker

    Tu 21-Mar

  • 8/12/2019 Incident Tracking Report June

    25/91

    Restore affected equipment due power sag --

    Tool CHB001 was hang.

    - Tool CMT on module CXT#16 was tripped

    A.Tuan 24-Mar

    Site validation for impacted tools - No impact

    tools

    Tu 28-Mar

    Site validation for impacted tools - No impact

    tools

    Tu 28-Mar

    Seal crack and close monitoring as temporary

    containment

    Bao 29-Mar

    Check and measure power supply A.Tuan 5-Mar

    Impact to CXT#016,021 power lost A.Tuan 1-Apr

    Checked and re-start server system N.Tuan 1-Apr

    Checked and turn on CB on Bus-Duct A.Tuan 2-Apr

    Call pest Control N.Tuan 2-Apr

    Check physical condition of panel and reset

    RCCB

    A.Tuan 3-Apr

    Close valve and replace new flexible. N.Tuan 3-Apr

    " Security Guidelines" board was loosen. Now

    we put caution this area and remove it

    A.Tuan 7-Apr

    Check power and OFA pressure supply A.Tuan 8-Apr

    recuse the person inside the elevator and call

    Schindler for troubleshoot

    N.Tuan 8-Apr

    check and reset CB N.Tuan 8-Apr

    check and barricade N.Tuan 8-Apr

    Check and reset RCCB N.Tuan 9-Apr

    we changed the temperature control main valve

    form auto mode to manual mode to adjust thetemperature in spec control

    N.Tuan 10-Apr

    Check and reset CB Tu 12-Apr

    Restore affected equipment due power sag N.Tuan 22-Apr

    Measure possible gas leak but not registered on

    measuring tool. Gas sensor was then reset

    A.Tuan 22-Apr

    Impact tool handler module CXT022 was hung A.Tuan 23-Apr

  • 8/12/2019 Incident Tracking Report June

    26/91

    cover the leaking point with tape and contain

    water.

    Requently check and make plan to repair.

    Bao 24-Apr

    Tu 24-Apr

    reset win 911 system Bao 25-Apr

    Close main supply line from SHTP Anh Tuan 29-Apr

    Close pole drop isolation DI supply main supply li Anh Tuan 30-Apr

    Lock out freezer and pass down to Electrical and

    Mechanical to investigate and correct fault. VTI

    also inform to transfer food to other freezers

    Tuan 2-May

    Temporarily isolated the valve supply DI water

    for DFX001 and coordinated with Panpa to clean

    water on floor

    Bao 2-May

    Reset CB Bao 2-May

    Coordinated with elect. Team and

    Atea to fix issue (wrong phase connection)

    Bao 2-May

    Installed pipe support and tighten coupling Tu 4-May

    Lock out freezer and pass down to Electrical to

    investigate earth leakage fault and correct

    problem. VTI also inform to transfer food to

    other freezers

    Tuan 5-May

    Responded to the call on starnge smell at G23-G27 but could not indentify. Strange smell just

    disappear and back to normal.

    A.Tuan 6-May

    After checking carefully and put caution,

    barricade this area.

    A.Tuan 7-May

    Contact with pest control to handle it Bao 9-May

    Recover system and support for tool Bao 11-May

    MCCB earth leakage protection relay temporary

    disable function

    A.Tuan 13-May

    Temprorary fix N.Tuan 13-May

    Apply loto CB pass to CM team fix N.Tuan 15-May

    checked and reset already A.Tuan 15-May

    checked and get information, we have already

    remove and change one new table

    A.Tuan 15-May

  • 8/12/2019 Incident Tracking Report June

    27/91

    Defective seal was replaced and funded findings

    to other similar tools

    Bao 19-May

    Reset MCB N.Tuan 20-May

    Perform investigation and was found cuased by

    ongoing ketchen expansion. Coordiante for repairto CSC

    A.Tuan 20-May

    Recover system and support for tool Bao 22-May

    Reset CB MCB 63A at TS1D2E25B Bao 24-May

    Clean up affected area and recommision fire

    suppression using Ansulex chemical from less

    utilized area. Affected of pizza oven currently

    repair by ATEA

    Bao 24-May

    Check and investigate the issue and identify to aloose spliced inside cable tray. Cable connection

    was temporarily restored using electrical terminal

    block

    N.Tuan 28-May

    Replaced damage parts and recommission the

    system

    Chuong 29-May

    Planning o replace the new one. It was replaced

    on WW25.5 at warm down shift

    Bao 6-Jun

    coordinate with electrical team to fix it Bao 8-Jun

    Checked the current setting was 70A range. It

    was difference with others. We adjusted the

    setting up to 80A. Re-measured the inrush

    current, working current.

    Tu 7-Jun

    Changed over for CT other. Replaced new

    actuator 26 June 2013

    A.Tuan 10-Jun

    Change three compressors to manual mode are

    operated and open air vent on CWP, OFA pump.

    A.Tuan 10-Jun

    Tool BPM0002 belong BAM 002 link 2 Lost

    power

    Bao 12-Jun

    co-ordinate with CM team to fix Bao 12-Jun

    The yellow cable was damaged. We replaced new

    one

    Bao 15-Jun

  • 8/12/2019 Incident Tracking Report June

    28/91

    Check and reset RCCB N.Tuan 18-Jun

    Check and temporary change a locker for her A.Tuan 24-Jun

    Check and reset RCBO N.Tuan 24-Jun

    Restart system N.Tuan 25-Jun

  • 8/12/2019 Incident Tracking Report June

    29/91

    Rev01

    Root Cause Stopping-

    Time

    (hh.mm)

    Tool tripped due to in-rush current 08:45hrs

    Detected high inrush current while start-up

    value 260A

    11:00hrs

    There was a temporary ground fault incident on

    110KV transmission Line 1 from CAT LAI

    THU DUC DONG.

    11:00hrs

    Tool tripped due to in-rush current 18:40hrs

    Tool tripped due to in-rush current 11:30hrs

    Tool tripped due to in-rush current 12:20hrs

    Possible the adhesive is getting aged 0:45hrs

    Due to short circuirt 15:10hrs

    Under investigation by Electrical team 11:45hrs

    Tool tripped due to in-rush current 10:50hrs

  • 8/12/2019 Incident Tracking Report June

    30/91

    Water leak at Y-Strainer because the teflon was

    not wrapped properly

    22:30hrs

    Error of IT switch 12:15hrs

    Under investigation by Electrical team 17:00hrs

    Tool tripped which was due to in-rush curren 19:26hrs

    Tool tripped which was due to in-rush curren 10:10hrs

    Under investigation by Schindler 19:00hrs

    The supply vavle couling was damaged. 03:30hrs

    Under investigation NA

    Viettel server was down 17:04hrs

    JLL contractor installed new CB for exhaust fan

    in CS store ( on panel NS6C1D01A ). And

    caused tripping the MCCB 250A

    18:15hrs

    Possible: high inrush current while tool starting 10:30hrs

    Possible: The IDW pipe was damaged due to

    corrosion

    NA

    Under investigation by operation team 10:30hrs

  • 8/12/2019 Incident Tracking Report June

    31/91

    Detected CB tripped due to earth leakage 4A 23:00hrs

    Tool owner moved workstation up and bump

    regulator

    Failure of piping

    Possible: high inrush current while tool starting 14:35

    Failure of Fire piping coupling 16:00

    Possible: high inrush current while tool starting 8:22

    Workmanship issue on the tool install 15:35

    Possible: no water in the tank. 23:50

    Related to leak tracing on PCW 16:00

    Rotor of fan burn 12:00

    Eternal fault at EVN side 7:00

    Under testing 13:48

    under investigation 17:36

    Maybe high inrush current while start-up 5:15

    Differential room pressure between break room

    and mfg is marginal

    23:10

    MCB of tool CHB001 was fault in tool panel. 16:30

    Circuit breaker protection was activated and was

    reset normally

    20:20

    Socket outlet wire fastener screw grounded tothe pole drop

    18:30

    OFA leak on fittings - Fixed issue of loose

    connection and tool run back to normal

    9:30

    Possible: high inrush current while tool starting 10:45

    Leak current on a ballast of street light due to

    failed ballast

    10:00

    The 2 tools were used same neutral line. They

    had cause leak current on facility CB - Ask tool

    owner used 2 plugs of these tools on single

    source (used one double holes socket)

    11:00

    Maybe high inrush current while start-up 10:00

    VTI staff had open freezer door and

    unintentionally triggered emergency button to

    shutdown the system.

    1:15

    Under investigation since fault recorded was far

    below the operating limits. Suspect earth

    leakage relay faulty

    11:55

  • 8/12/2019 Incident Tracking Report June

    32/91

  • 8/12/2019 Incident Tracking Report June

    33/91

    Under investigation

    Under investigation ????

    Under investigation 15:30

    Under investigation

    Open deflux #1 internal valve

    Motor fan condenser damaged (Fan motor is run

    to fail due to size is very small)

    NA

    DI water overlow through the mounting screw

    hole of the level switch of of the deflux

    equipment

    NA

    NA 8:30

    ATEA contrator connected wrong phases

    and neutral

    12:15

    Lacking support on of the HDPE water supply

    line

    14:00

    Lamp inside freezer has high leakaged current

    causing tripping

    16:05

    Area under observation for re-currence 19:10

    Detected the cable of fruit lights was damaged

    and lights still under warranty

    4:15

    NA 1:00

    Main 110KV redundancy power cable from Thu

    Duc supply along SHTP main gate was hit by

    mobile crane

    4:15

    Under observation due to the need for full power

    shutdown which is not accepatble

    5:15

    The limit control swicth fautly 18:30

    Thermal relay was tripped. Changed the set

    point

    15:30

    The coupling was broken and root cause is under

    investigation by the team

    19:30

    Table was removed from use while incident will

    be investigated

    23:20

  • 8/12/2019 Incident Tracking Report June

    34/91

    Strainer drain plug has expanded rubber seal that

    caused misalignment and does not properly seal

    water from going out

    19:00

    Tool related problem 1:50

    ATEA cutting the floor had damage

    underground cable supplying coca coladispenser

    NA

    500KV main power supply for southern

    Vietnam was external interrupted

    19:30

    Tool related problem 10:00

    Wet chemical fire suppression system kitchen

    accidentially triggered by ATEA

    18:00

    Loosen hot wire at a spliced located insideenclosed cable tray

    8:53

    Cracked flange with contributing factors of life,

    material and workmanship

    NA

    Long time using, so material was in bad

    condition

    NA

    arc between PT 3:00

    Wrong current setting NA

    Actuator was loosen due to the O-ring was

    broken.

    NA

    Under investigation 21:12

    possibility: high inrush current 9:50

    Long time using Keep following but no more

    leak.

    The yellow cable was damaged. We replaced

    new one

  • 8/12/2019 Incident Tracking Report June

    35/91

    under investigate. Ngoc Tuan updates reason 15:25

    The gasket rubber was loosen 4:30

    under investigate 10:00

    under investigate 18:08

  • 8/12/2019 Incident Tracking Report June

    36/91

    Classification Remarks

    CSC issue on CB Non-JLL Control

    Mfg issue on CB Non-JLL Control

    ITP

    (External)

    Non-JLL Control

    CSC issue on CB Non-JLL Control

    CSC issue on CB Non-JLL Control

    Mfg issue on CB Non-JLL Control

    Mfg issue

    ( Complaint)

    Non-JLL Control

    ITS nearmiss

    (JLL Sub con)

    JLL

    ITS nearmiss Under investigation onroot cause

    CSC issue on CB Non-JLL Control

  • 8/12/2019 Incident Tracking Report June

    37/91

    Mfg issue

    (Complaint)

    Non-JLL Control

    ITS nearmiss Non-JLL Control

    ITS nearmiss Non-JLL Control

    Issue on CB Under investigation on

    root cause

    CSC issue on CB Non-JLL Control

    CSC issue on CB Non-JLL Control

    ITS Nearmiss (External) Non-JLL Control

    ITS nearmiss

    (Component Failure)

    Non-JLL Control

    ITS nearmiss (Componet failure not under

    PM plan)

    Non-JLL Control

    Safety Incident Non-JLL Control

    Complaint(External services)

    Non-JLL Control

    ITS nearmiss

    (Attributed by JLL Subcon)

    JLL

    CSC issue on CB Non-JLL Control

    ITS nearmiss Non-JLL Control

    ITS nearmiss Non-JLL Control

  • 8/12/2019 Incident Tracking Report June

    38/91

    ITS nearmiss

    (Attributed by JLL Subcon - under

    investigation)

    JLL

    MFG issue

    Non-maintenance issue by Norfolk

    Mfg issue on CB

    Non-maintenance issue by Norfolk

    Mfg issue on CB

    CSC issue

    Complaint

    Complaint

    Non-maintenance issue by Norfolk

    External fault

    Maintenance issue JLL under control

    Complaint

    (Norfolk out of control)

    Mfg issue on tool

    Complaint

    Mfg issue on tool

    Under investigation

    CSC issue

    CSC issue

    Mfg issue on tool

    Component failure Non-JLL Control

    Mfg issue on CB

    Mfg issue on CB

    Intel contractor fault

    Component failure Non-JLL Control

  • 8/12/2019 Incident Tracking Report June

    39/91

    ITS nearmiss - External fault

    ITS nearmiss - External fault

    ITS nearmiss - External fault

    Component failure Non-JLL Control

    Mfg issue on tool Non-JLL Control

    External fault

    IT issue

    CSC issue - complaint

    Safety issue - complaint

    Mfg issue

    Maintenance issue JLL/Norfolk under control

    Complaint

    Mfg issue

    Maintenance issue JLL/Norfolk under control

    Non-maintenance issue by Norfolk

    Maintenance issue JLL/Norfolk under control

    JLL contractor issue JLL under control

    CSC issue

    Complaint

    External fault

    Non-maintenance issue by Norfolk

    External fault

  • 8/12/2019 Incident Tracking Report June

    40/91

    Non-maintenance issue by Norfolk

    Non-maintenance issue by Norfolk ????? JLL/Norfolk under control

    IT issue

    Non-maintenance issue by Norfolk JLL out of control

    Mfg issue

    ITS near miss JLL/Norfolk under control

    MFG issue

    Complaint

    ATEA related issue CSC related

    Base built issue

    Base built issue - All freezer is under

    investigation due to recurring tripping of

    freezers

    Customer complaint

    Complaint

    Complaint

    External ITP

    ITS near miss Under investigation on

    root cause

    ITS near miss JLL/Norfolk under control

    Complaint

    ITS near miss - no speed entry due to

    availablity of n+1 however all AR's is

    currently addressed

    JLL/Norfolk under control

    Complaint/ Safety issue

  • 8/12/2019 Incident Tracking Report June

    41/91

    Complaint.

    MFG issue

    ITS near miss - no speed entry due to fault

    was originally a complaint. Load is notoriginal base built equipment - CSC related

    External ITP

    MFG issue

    CSC relelated ITS

    CSC related ITP near miss

    None maintenance issue by Norkfolk For further investigation

    Complaint

    None maintenance issue by Norkfolk (Proactively detected &

    Coordinated activity

    None maintenance issue by Norfolk

    None maintenance issue by Norfolk

    None operational issue by Norfolk

    Complaint

    Maintenance issue (ITS nearmiss) Charged as ITS nearmiss

    to Norfolk

  • 8/12/2019 Incident Tracking Report June

    42/91

  • 8/12/2019 Incident Tracking Report June

    43/91

  • 8/12/2019 Incident Tracking Report June

    44/91

  • 8/12/2019 Incident Tracking Report June

    45/91

  • 8/12/2019 Incident Tracking Report June

    46/91

  • 8/12/2019 Incident Tracking Report June

    47/91

  • 8/12/2019 Incident Tracking Report June

    48/91

  • 8/12/2019 Incident Tracking Report June

    49/91

  • 8/12/2019 Incident Tracking Report June

    50/91

  • 8/12/2019 Incident Tracking Report June

    51/91

  • 8/12/2019 Incident Tracking Report June

    52/91

  • 8/12/2019 Incident Tracking Report June

    53/91

  • 8/12/2019 Incident Tracking Report June

    54/91

  • 8/12/2019 Incident Tracking Report June

    55/91

  • 8/12/2019 Incident Tracking Report June

    56/91

  • 8/12/2019 Incident Tracking Report June

    57/91

  • 8/12/2019 Incident Tracking Report June

    58/91

  • 8/12/2019 Incident Tracking Report June

    59/91

  • 8/12/2019 Incident Tracking Report June

    60/91

  • 8/12/2019 Incident Tracking Report June

    61/91

  • 8/12/2019 Incident Tracking Report June

    62/91

  • 8/12/2019 Incident Tracking Report June

    63/91

  • 8/12/2019 Incident Tracking Report June

    64/91

  • 8/12/2019 Incident Tracking Report June

    65/91

  • 8/12/2019 Incident Tracking Report June

    66/91

  • 8/12/2019 Incident Tracking Report June

    67/91

  • 8/12/2019 Incident Tracking Report June

    68/91

  • 8/12/2019 Incident Tracking Report June

    69/91

  • 8/12/2019 Incident Tracking Report June

    70/91

  • 8/12/2019 Incident Tracking Report June

    71/91

  • 8/12/2019 Incident Tracking Report June

    72/91

  • 8/12/2019 Incident Tracking Report June

    73/91

  • 8/12/2019 Incident Tracking Report June

    74/91

  • 8/12/2019 Incident Tracking Report June

    75/91

  • 8/12/2019 Incident Tracking Report June

    76/91

  • 8/12/2019 Incident Tracking Report June

    77/91

  • 8/12/2019 Incident Tracking Report June

    78/91

  • 8/12/2019 Incident Tracking Report June

    79/91

  • 8/12/2019 Incident Tracking Report June

    80/91

  • 8/12/2019 Incident Tracking Report June

    81/91

  • 8/12/2019 Incident Tracking Report June

    82/91

  • 8/12/2019 Incident Tracking Report June

    83/91

  • 8/12/2019 Incident Tracking Report June

    84/91

  • 8/12/2019 Incident Tracking Report June

    85/91

  • 8/12/2019 Incident Tracking Report June

    86/91

  • 8/12/2019 Incident Tracking Report June

    87/91

  • 8/12/2019 Incident Tracking Report June

    88/91

  • 8/12/2019 Incident Tracking Report June

    89/91

  • 8/12/2019 Incident Tracking Report June

    90/91

  • 8/12/2019 Incident Tracking Report June

    91/91