+ All Categories
Home > Documents > Incorporated Administrative Agency Japan Nuclear Energy Safety Organization 1 Niigataken Chuetsu-oki...

Incorporated Administrative Agency Japan Nuclear Energy Safety Organization 1 Niigataken Chuetsu-oki...

Date post: 18-Dec-2015
Category:
Upload: elijah-reynolds
View: 216 times
Download: 0 times
Share this document with a friend
Popular Tags:
30
1 Incorporated Administrative Agency Incorporated Administrative Agency Japan Nuclear Energy Safety Organizat Japan Nuclear Energy Safety Organizat Niigataken Chuetsu-oki Earthquake an d its Influences on the Kashiwazaki- Kariwa NPP
Transcript

1 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa NPP

Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa NPP

2 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Summary of the Earthquake andSituation of the Kashiwazaki-Kariwa NPP

• Summary of the Earthquake– Occurrence: July 16, 2007 at 10:13 am JST– Earthquake Source:

• 17km below the seabed off Jo-chuetsu area in Niigata prefecture (37°33.4′North 、 138°36.5′East )

• Epicenter Distance: 16km from the NPP– Magnitude: 6.8

• Situation of the NPP– When the earthquake occurred:

• Unit 2 was in start-up• Unit 3, 4 and 7 were in normal operation• Unit 1, 5 and 6 were out of operation for the periodic inspections

– Units 2, 3, 4 and 7 were automatically shut down following the high seismic acceleration trip signals

Kashiwazaki-Kariwa NPP

Niigata city

Epicenter

4 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 Unit 2 Unit 3 Unit 4 Unit 7 Unit 6 Unit 5Unit

Maximum Acceleration

(gal)

Vertical

S-N

E-W

Ob

De408

235

680

274

273

311

Vertical

S-N

E-W

ObDe 311235

384

192

193308

Vertical

S-N

E-W

Ob

De 337

235

492

193

194

310

Vertical

S-N

E-W

Ob

De 355

235

356

263

263

267

Vertical

S-N

E-W

Ob

De

488

235

322

263

263271

Vertical

S-N

E-W

ObDe 282235

606

167

167304

Vertical

S-N

E-W

ObDe205235

442

249

254311

Unit 1 Unit 2 Unit 3 Unit 4 Unit 7 Unit 6 Unit 5Unit

Maximum Acceleration

(gal)

Vertical

S-N

E-W

Ob

De408

235

680

274

273

311

Vertical

S-N

E-W

ObDe 311235

384

192

193308

Vertical

S-N

E-W

Ob

De 337

235

492

193

194

310

Vertical

S-N

E-W

Ob

De 355

235

356

263

263

267

Vertical

S-N

E-W

Ob

De

488

235

322

263

263271

Vertical

S-N

E-W

ObDe 282235

606

167

167304

Vertical

S-N

E-W

ObDe205235

442

249

254311

Maximum Acceleration

(gal)

Vertical

S-N

E-W

Ob

De408

235

680

274

273

311

Vertical

S-N

E-W

Ob

De408

235

680

274

273

311

Vertical

S-N

E-W

Ob

De408

235

680

274

273

311

Vertical

S-N

E-W

ObDe 311235

384

192

193308

Vertical

S-N

E-W

ObDe 311235

384

192

193308

Vertical

S-N

E-W

ObDe 311235

384

192

193308

Vertical

S-N

E-W

Ob

De 337

235

492

193

194

310

Vertical

S-N

E-W

Ob

De 337

235

492

193

194

310

Vertical

S-N

E-W

Ob

De 337

235

492

193

194

310

Vertical

S-N

E-W

Ob

De 355

235

356

263

263

267

Vertical

S-N

E-W

Ob

De 355

235

356

263

263

267

Vertical

S-N

E-W

Ob

De 355

235

356

263

263

267

Vertical

S-N

E-W

Ob

De

488

235

322

263

263271

Vertical

S-N

E-W

Ob

De

488

235

322

263

263271

Vertical

S-N

E-W

Ob

De

488

235

322

263

263271

Vertical

S-N

E-W

Ob

De

488

235

322

263

263271

Vertical

S-N

E-W

ObDe 282235

606

167

167304

Vertical

S-N

E-W

ObDe 282235

606

167

167304

Vertical

S-N

E-W

ObDe 282235

606

167

167304

Vertical

S-N

E-W

ObDe205235

442

249

254311

Vertical

S-N

E-W

ObDe205235

442

249

254311

Vertical

S-N

E-W

ObDe205235

442

249

254311

Vertical

S-N

E-W

ObDe205235

442

249

254311

Rx. Coolant Temp.Unit 2under Stat up

Rx. Water Level19:40 <100℃

Unit 3100% Power

23:07 <100℃

Unit 4100% Power 7/17 6:54 <100℃

Unit 7100% Power

7/17 1:15 <100℃

Unit 1 Unit 5Unit 6Unit 2 Unit 3 Unit 4 Unit 7

5 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 RPV Inspection Schedule

August September October November December

Phase 1 Phase 2 Phase 3

Visual inspection using under water TV camera

8/21 8/23

6 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 : Phase 1 InspectionFlange

Guide Rod

Feed Water SpargerCore Shroud

Upper Grid

Core Spray PipeCore Spray Sparger

As a result of phase 1 inspection, the abnormality such as the damage / transformation / the falling off was not confirmed.

7 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 : Flange

Guide Rod

Flange

8 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 :Guide Rod

FW Sparger

Guide Rod

Core Spray Pipe

9 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 :Feed Water Sparger

10 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 :Core Spray Pipe

11 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 :Core Spray Sparger

Core Spray Sparger

Core Shroud(upper ring)

12 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 :Upper Grid

LPRM

13 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 : RPV base bolts(A,As)

14 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 : Leakage of water into B5 floor

Leakage of water into B5 floor ofthe reactor combination building (Unit 1)

Leakage of water into B5 floor ofthe reactor combination building (Unit 1)

Break of Fire Extinguishing Pipe (B,C)

B1 Floor

B2 Floor

B3 Floor

B4 Floor

B5 Floor

Sump

Duct

Reactor Combination Building

PeneWater Flow-in

15 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 1 : Oil Tank (B,C)

Land Subsidence

16 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 3 :Fire of House Transformer(1/3)

As for the duct, 16 - 18cm dropped

(B,C)

17 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 3 :Fire of House Transformer(2/3)

Bedrock

House Transformer

Bus Duct1 – 3 cmdropped 20 – 25 cm

dropped

18 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 3 :Fire of House Transformer(3/3)

Unit 7 6 5 4 2 1

Unit 3 Main Transformer

Unit 3Main

Generator

House Transformer

Start-up Transformer

Emergency BusNormal Bus

Fire of House Trans. was not safety related problem

19 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 3 : DG(A,As)Upside

Downside

20 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 3 : HCU (A,As)( Hydraulic Control System (CRD))

21 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 3 : MSIV (A,As)

22 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 3 : PLR Pump (A,As)

23 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 3 : RHR Pump (A,As)

24 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 3 : Blow-out Panel came off(B,C)

25 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 3 : Displacement of the main exhaust duct

(B,C)

26 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 6 : Leakage of water including radioactive materials

Leakage of water including radioactive materials into non-controlled area

in the reactor building

Leakage of water including radioactive materials into non-controlled area

in the reactor building

(B,C)

27 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 6 : Leakage of water including radioactive materials

Leakage of water including radioactive materials into non-controlled area

in the reactor building

Leakage of water including radioactive materials into non-controlled area

in the reactor building

28 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

MotorMotor

Damaged

Unit 6 : Damage of the reactor building overhead crane

Damage found on the coupling of the drive axisof the reactor building overhead crane

Damage found on the coupling of the drive axisof the reactor building overhead crane

29 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Unit 7 : Detection of radioactive materials in the main exhaust duct

Detection of radioactive materials in the main exhaust duct resulting from loss of the steam seal inside the turbine

Detection of radioactive materials in the main exhaust duct resulting from loss of the steam seal inside the turbine

Main ExhaustDuct

MonitoringHouse

Main E

xhaust Duct

Filter

Filter

Reactor Building

TurbineBuilding

Reactor Turbine

Conden-ser

Rare Gas Hold-up Equipment

Turbine GlandSteam Exhauster

Building Ventilation

Still Workingafter Plant Shutdown

30 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Other (B,C)

31 

Incorporated Administrative AgencyIncorporated Administrative Agency Japan Nuclear Energy Safety Organization Japan Nuclear Energy Safety Organization

Solid waste storage warehouse


Recommended