Incorporating LID in D.C.’s RiverSmart Schools Program P. Trinh Doan District Department of the Environment Watershed Protection Division
Transcript
Page 1: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Incorporating LID in D.C.’s

RiverSmart Schools Program

P. Trinh DoanDistrict Department of the EnvironmentWatershed Protection Division

Page 2: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Presentation Agenda• Overview of District’s issues• Stormwater requirements• Cistern projects (harvest/reuse)• Stream Restoration projects• School case studies• RiverSmart Schools process and workplan

Page 3: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Stormwater in Washington DC

• Stormwater runoff is rainfall that flows over land and hard (impervious) surfaces and into drainage pipes which then empty to surface water such as the Potomac and the Anacostia River. – Stormwater runoff carries sediment and other pollutants that degrade the quality of our waterways.

Page 4: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Impervious Surface in Washington DC

Map of impervious area in Chesapeake Bay watershed

Map of impervious area in Washington DC

Page 5: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Challenges with Water Quality

• Aging infrastructure• Growing population• MS4 vs CSO• Largest sources of pollution:– Combined sewer overflows

– High volume stormwaterdischarges 

Page 6: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Eroded stream bank in Rock Creek

Trash accumulation in Pope Branch

Combined Sewer Overflow into Anacostia River

Page 7: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Current District Regulations for Stormwater Management

• Current regulations: requirement is treatment of first 0.5 inch) 

• Effective at capturing suspended solids, oils/grease• Less effective at

capturing N, P

Page 8: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Proposed regulations

• Retain first 1.2 inches of every rain event for all NEW construction projects over 5,000 sq ft in disturbance (previous requirement was treatment of first 0.5 inch)

• Federal regulations require retention of 1.7 inches on all new federal sites

• This will likely force usage of cisterns in downtown core area.

Page 9: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Demonstration projects funded by DDOE:  Firestation Cisterns

• 2 Firestation cistern projects

• Stormwater to be used to wash trucks (daily)

Page 10: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Schematic of system

Page 11: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Stream restoration projectsRestoration in DCTidal Wetland projects (3)Stream restoration projects (3)

Page 12: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Schoolyard Conservation

Page 13: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Schoolyard Strategy: Primary Goals1. Create an attractive, safe and secure schoolyard

In order for a schoolyard to be fully functional, it must be inviting and safe.

2. Increase opportunities for outdoor learning Learning landscapes and connections to the environment enrich the educational experience.

3. Increase opportunities for children (and the community) to participate in physical activities. The schoolyard environment should promote a healthy lifestyle.

4 Continue to promote a participatory process Community. School buy-in is critical for short-term and long-term success.

5. Integrate LID opportunities and the conversion of impervious to pervious surfaces.A comprehensive approach can significantly reduce storm water runoff.

Page 14: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Schoolyard Strategy: Approach1. Identify a case study schoolyard site that highlights representative

opportunities and challenges

Are the most important components identified? Are issues framed correctly?

• Based on “lessons learned” from the case study develop recommendations to be considered for schoolyards District-wide;

• Final District-wide recommendations may include a phasing strategy or tiered approach that emphasizes more basic/critical elements to enhanced versions).

Page 15: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Demonstration projects funded by DDOE: IDEA public charter school cistern project

• Cisterns to capture rainwater from roof and parking lot separately

• Overflow to go to raingarden

• Water from roof to be used to irrigate playing field

Page 16: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Demonstration projects funded by DDOE: Anacostia High School Harvest and Reuse

• Roof runoff to be harvested in cisterns

• Water to be used in flushing toilets

Page 17: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Schoolyards Strategy Process

RESOURCE ANALYSISVision

AMENITIES (ACTIVE REC., OPEN

SPACE, ETC)

LOCATION

LOCATION

ADJACENT RESOURCES

ENVIRONMENTAL GOALS

COMMUNITY GOALS

DISTRICT-WIDE RECOMMENDATIONS

NEEDS ANALYSIS

SCHOOL OFFICIALSPARENT COORDINATORS

DDOE21st CENTURY SCHOOLS

Etc.

STAKEHOLDERSGREENING

LID

FINAL CONCEPT PLAN

STEERING COMMITTEE

CASE STUDY

DRAFT CONCEPT

PLAN

RECREATION

Phase 1 Phase 2

Page 18: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Case Study: Benjamin Orr Elementary School

• Representative challenges and opportunities

• Average schoolyard size

• Not undergone major renovation

• Located in area underserved by parks and recreation facilities

Page 19: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

• Schools provide 40% of all active recreation facilities (East of Anacostia)

• Schools provide:– 49% of playgrounds– 56% football fields– 39% basketball courts(District‐wide)

Orr Elementary School

ORR

Page 20: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Orr Elementary School: Key Statistics

• Built: 1974

• 352 students

• 1:22 teacher: student 

• 75% eligible for free or reduced lunch

• Boys and Girls Club branch location

Page 21: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Orr Elementary School: Existing Conditions

Play Area Basketball Hoops

Page 22: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Concrete Amphitheater

Orr Elementary School: Existing Conditions

Page 23: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Grass Lawn and Baseball Area

Orr Elementary School: Existing Conditions

Page 24: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Orr Elementary School: Summary of Challenges

Page 25: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Orr Elementary School: Summary of Challenges

Page 26: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Orr Elementary School: Summary of Challenges

Page 27: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Orr Elementary School: Summary of Challenges

Page 28: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Orr Elementary School: Summary of Challenges

Page 29: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...
Page 30: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Orr Aerial View

Page 31: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Parking

Blacktop

Athletic Field

Perimeter

Page 32: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Hybrid Approach to School Yard Access

24 hour public access

limited public access organized approved after school hours

student access only

Page 33: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Orr Concept Plan: efficiency, scale, green

• Parking• Active Recreation

– hardscape: asphalt– softscape: fields

• Outdoor Learning• Unique Site Elements• Secured Play Area• Perimeter Opportunities

Page 34: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Existing School Yard Greening Efforts to Build On:

• Bottom Up, Grassroots, Parent/Teacher  – DC Schoolyard Greening– DDOE & USDA/NRCS – NFWF Chesapeake Bay Small Watershed– Other Large Grants

• Top Down, Facilities Driven– DDOE & OPEFM

Page 35: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Primary Goals can be Contradictions:

OUTDOOROUTDOORLEARNING

SAFETY:closed

COMMUNITY:open

PHYSICAL EDUCATION:

hardsurfaces

LOW IMPACT DEVELOPMENT: soft surfaces

Page 36: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Next Steps:

• Define  the components of a successful school yard– Can every site balance the contradictions?– How do we best support existing efforts?

• Plan to achieve these elements– Can a grassroots approach get us there?– What requires major investment?

Page 37: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Other Demonstration Stormwaterprojects

• Raingardens• Low Impact Development• Bioretention

Page 38: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

M Place Rain Gardens

Page 39: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Senate Parking Lot: Excavation of landscaped area for bioretention

Page 40: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Green Roof Subsidy

• $5.00 per square foot, up to $20,000.00

• Green roof project up to 4,000 square feet 

• Vegetated cover over at least 50% of the available roof space (excluding skylights and utilities) 

• Growing medium depth of at least 3 inches

Page 41: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Department of TransportationGreen Roof

Page 42: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Before During

Page 43: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...
Page 44: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...
Page 45: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Chevy Chase LibraryAfterBefore

Page 46: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Programs for Schools & Homeowners: RiverSmart

Rain Gardens Permeable Pavement

BayScaping

Rain Barrels

Shade Trees

Page 47: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

RiverSmart

Page 48: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

District of Columbia Sedimentation and Erosion Control Program

• Erosion and sediment control plan and approval– Pre‐construction meeting – DDOE inspectors review plan with contractors

• Inspection and enforcement– Throughout duration of construction– DDOE signs off at completion of construction

Page 49: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Erosion Control Best Management Practices

• Road Stabilization• Sediment Barriers• Dikes and Diversions• Sediment Traps and Basins• Inlet and outlet protection• Soil and slope stabilization

Page 50: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Soil/Slope Stabilization: Seed and Straw

Rock Creek restoration

Before After

Page 51: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

Case Studies

• Sidwell Friends– Green roof – Unique harvest/reuse project captures both site storm water runoff and building greywater

– 3000 gpd– Terraced constructed wetlands– Re circulating sand filter– Trickle filter– Final use in low flush toilets

Page 52: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

School’s greenroof also provides a living science observatory for students.

Page 53: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...
Page 54: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

What you can do on your school grounds

• Conservation vegetation: native plant beds

• Reforestation• Strategic Grading• Downspout 

disconnection• Soil Amendments

• Permeable pavement

• Bioswales• Planter Boxes• Bioretention• Rain gardens• Rain 

Barrels/Cisterns

Page 55: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

What you can do on your school grounds (continued)

• Reduce pollutants that get in stormwater

– School energy audit– Get your school to eat 

locally (school gardens)– Use public transit– Reduce/eliminate the use of 

toxic cleaning supplies, fertilizers & pesticides

– recycle everything! 

Page 56: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

How about your schoolyard?

• Teacher Training will be provided by DDOE on SW, soils, native plants, trees, ect.– Curriculum materials– Classroom support – Building greening team and to support thee teachers integrating 

conservation practices into the curriculum.

Phase I: Application, Site assessments, Master Plan, Habitat team, EE curriculum connections

Phase II: Project installation – landscaping and/or LID, EE curriculum connections

Phase II: Initiate RiverSmart Schools Volunteer Maintenance Program

Page 57: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

This will depend on what type of school you are:

• DCPS: through OPEFM• DCPCS: thru an outside contractor• Parochial School: outside contactor• Private school: outside contractor

RiverSmart Schools Program (Process, con’t)

Page 58: Incorporating LID in D.C.’s RiverSmart Schools Program · D.C.’s RiverSmart Schools ... • RiverSmart Schools process and workplan. ... Demonstration projects funded by ...

THANK YOU!

P. Trinh [email protected](RiverSmart Schools Toolkit)