Independent Environmental Audit – SSD Construction Compliance Report LINDFIELD LEARNING VILLAGE MARCH 2019
Transcript
Page 1: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

IndependentEnvironmentalAudit–SSDConstructionComplianceReportLINDFIELDLEARNINGVILLAGEMARCH2019

Page 2: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

AspectProjectReference:0011030320

REVISIONSRevision Date Description Preparedby Reviewedby Approvedby0 16/01/2019 Issuedto

Savillsforreviewandcomment

NormanMcComb;RichardJohnson;CaitlinJohnson

RichardJohnson RichardJohnson

1 12/02/2019 FinalDraftReport

NormanMcComb;RichardJohnson;CaitlinJohnson

RichardJohnson RichardJohnson

2 20/03/2019 Final-UpdatedfollowingDoEandSavillsreview

NormanMcComb;RichardJohnson

RichardJohnson RichardJohnson

Page 3: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Limitation:ThisdocumenthasbeenpreparedbyAspectEnvironmentalPtyLimitedforSavills(Aust)PtyLtd(actingonbehalfofDepartmentofEducationNSW).Thedocumentandcontentsissubjectto,andissuedinaccordancewith,theprovisionsofthecontractbetweenAspectEnvironmentalPtyLimitedandSavills(Aust)PtyLtd.AspectEnvironmentalPtyLimitedacceptsnoliabilityorresponsibilitywhatsoeverfor,orinrespectof,anyuseof,orrelianceupon,thisdocumentbyanythirdparty.

Page 4: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx i

EXECUTIVESUMMARY

Conditions of Consent, issued in respect of the Partial Development Consent for Statesignificant development SSD 8114 (24 October, 2018) require, under condition B57,independentauditsofthedevelopmenttobecarriedout.Thisindependentenvironmentalauditreportsatisfiesthatrequirement.Theaudithasbeenconductedinaccordancewith:

• theIndependentAuditProgramsubmittedtotheDepartmentandtheCertifierunderConditionofConsentB56

• the requirements of an Independent Audit Methodology and Independent AuditreportintheIndependentAuditPostApprovalRequirements(DepartmentofPlanningandEnvironment,June2018)

• the processes and practice procedures identified in AS/NZS ISO 19011:2014 -GuidelinesforAuditingManagementSystems.

TheauditreportdocumentstheoutcomesofthereviewofcomplianceundertakenbyAspectEnvironmental Pty Limited (Aspect). The audit process comprised pre-site auditdocumentation review, opening meeting, site audit, closing meeting and post-site auditdocumentationreviewandfollowup.ThesiteauditwasconductedinDecember2018andJanuary2019,withsiteinspectionsandinterviewsundertakenonthe11thand13thofDecember2018aswellasthe4thJanuary2019.Findingsoftheauditarepresentedagainsttherequiredscopewithinthebodyofthisreport,theattachedAuditTable(AppendixB)andinthePhotoLogprovidedatAppendixC.Consultationwithotheragencieswasundertaken,namelyKu-ring-gaiCouncil;TransportforNewSouthWales(TfNSW);RoadsandMaritimeServices(RMS);SafeWorkNewSouthWales(SafeWork);DepartmentofEducation(DoE);andDepartmentofPlanningandEnvironment(DP&E).Noadjustmentwasmadetotheauditscopeand/oraudittableasaresultofthisconsultation.It was found that the site was generally compliant, and the project was generally beingmanaged in accordance with the requirements of the SSD 8114 consent. Of the 134conditionsofconsentrelevanttothecurrentaudit,thefollowingfindingsofcomplianceweremade:

• 103compliant• 5non-compliant• 26nottriggered

The timing constraints for theproject have required reliance tobeplacedon compliancebeingdemonstratedretrospectively.Asaresult,non-compliancescanbeattributedtoworkshaving commenced prior to documented Planning Secretary approval. Environmentalperformanceofthedevelopmentwasconsideredtobesatisfactorywithnodiscernibleoff-

Page 5: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx ii

siteimpactsatthetimeofaudit.Appropriatemitigationcontrolsimplementedonsitewereobservedthroughouttheaudit.As the initial constructionaudit for thedevelopment, and site as awhole, therewerenopreviousauditfindingstoreview.AreviewofperceivedimpactsandthesuggestedmitigationandmanagementmeasuresfromtheEISversustheactualimpactsandmitigationmeasuresimplementedontheprojectwasalso undertaken. The requirement for site activities and management plans and controldocumentation toaddress thepredicted impactswasevidencedhowever, someexpecteddocumentationwasnotidentified.Itwasdeterminedthatpredictedimpactsalignwiththenature,scaleandextentofworksobservedonsite.Noclearlyreferencedenvironmentalmanagementsystem(EMS)wasidentifiableforthesiteordevelopment.ThisauditisnotanassessmentofaconformingEMSunderISO14001,butthefindingsidentifiedanabsenceofimplementationofsomeofthecomponentsexpectedofanEMSthatwouldassistandinformsitemanagementactivities.Thisabsencecreatesagapinappreciationofmanagementofriskandchangemanagementpracticewhichinturnfeeds down to documentation, communication, training and monitoring and reportingrequirementsforthedevelopment.Thiswasparticularlynoticeableinrelationtobushfiremanagementpractices,whichwereprimarilyfocusedonmanagementofaninnerprotectionarea(IPA)andAssetProtectionZones(APZ),inaccordancewithCoCB5toB13,ratherthanincluding an appreciation and consideration of managing risk associated with hot worksduringthedeclaredbushfireseason.ThereviewedEnvironmentalManagementPlansandSub-planswereconsideredtogenerallybeadequateforthenatureofthesite.Improvementopportunitieswereidentifiedinrespectof:

• bushfiremanagementcontrolsandperformanceofhotworks;• floodevacuationconsiderationsforregionalroads(DelhiRoadandLadyGameDrive);• integrationofcomplaintsregisters;and• alignmentofmanagementplandocumentationtothecontentexpectationsoftheCoC

(e.g.sequencingofaddressofthesub-conditionrequirementsofaCoC)Improvementopportunitiesandobservationswereidentifiedpertainingto:

• documentinglegalrequirements;• documenting and referencing a risk-based approach to support compliance

demonstration;• aligningsitedocumentation(downtosite inductiondocumentation,site inspection

andtoolboxtalks)tobereflectiveoftheCoCandCEMPcontent;and• Clear integration of SSD requirements across management systems and work

practices,includingnominatedrolesandresponsibilities.TheauditprotocolandfindingsaresummarisedinSection3ofthereportandprovidedindetailinAppendixA.

Page 6: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx iii

TableofContentsEXECUTIVE SUMMARY ................................................................................................................................... I1. INTRODUCTION ........................................................................................................................................ 1

1.1. PROJECT BACKGROUND ........................................................................................................................ 11.2. PROJECT LOCATION ............................................................................................................................... 11.3. STATE SIGNIFICANT DEVELOPMENT ...................................................................................................... 21.4. AUDIT INTRODUCTION ........................................................................................................................... 31.5. AUDIT OBJECTIVES ................................................................................................................................ 31.6. AUDIT TEAM ......................................................................................................................................... 31.7. AUDIT CRITERIA .................................................................................................................................... 41.8. AUDIT SCOPE ......................................................................................................................................... 41.9. AUDIT PERIOD ....................................................................................................................................... 5

2. AUDIT METHODOLOGY ......................................................................................................................... 62.1. SELECTION AND ENDORSEMENT OF AUDIT TEAM ................................................................................. 62.2. INDEPENDENT AUDIT SCOPE DEVELOPMENT ........................................................................................ 62.3. COMPLIANCE EVALUATION ................................................................................................................... 72.4. SITE INTERVIEWS .................................................................................................................................. 82.5. SITE INSPECTIONS .................................................................................................................................. 82.6. CONSULTATION ..................................................................................................................................... 82.7. COMPLIANCE STATUS DESCRIPTORS ..................................................................................................... 92.8. OPENING MEETING ................................................................................................................................ 92.9. CLOSING MEETING – SITE AUDIT ........................................................................................................ 102.10. REVIEW AND RESPONSE TO DRAFT INDEPENDENT ENVIRONMENTAL AUDIT REPORT ........................ 11

3. AUDIT FINDINGS .................................................................................................................................... 233.1. PROJECT BOUNDARY AND SETTING ..................................................................................................... 233.2. APPROVAL AND DOCUMENT LIST ........................................................................................................ 233.3. OTHER APPROVALS ............................................................................................................................. 263.4. COMPLIANCE PERFORMANCE .............................................................................................................. 273.5. SUMMARY OF AGENCY NOTICES, ORDERS, PENALTY NOTICES OR PROSECUTIONS ............................ 273.6. AUDIT NON-COMPLIANCES .................................................................................................................. 283.7. PREVIOUS AUDIT RECOMMENDATIONS ............................................................................................... 313.8. EMP, SUB-PLANS AND POST APPROVAL DOCUMENTS ........................................................................ 313.9. ENVIRONMENTAL MANAGEMENT SYSTEM .......................................................................................... 313.10. ENVIRONMENTAL PERFORMANCE ....................................................................................................... 323.11. CONSULTATION OUTCOMES ................................................................................................................ 333.12. COMPLAINTS ....................................................................................................................................... 343.13. INCIDENTS ........................................................................................................................................... 353.14. ACTUAL VERSES PREDICTED ENVIRONMENTAL IMPACTS ................................................................... 353.15. SITE INSPECTION ................................................................................................................................. 383.16. SITE INTERVIEWS ................................................................................................................................ 383.17. PREVIOUS ANNUAL REVIEW OR COMPLIANCE REPORT RECOMMENDATIONS ..................................... 393.18. IMPROVEMENT OPPORTUNITIES .......................................................................................................... 393.19. KEY STRENGTHS ................................................................................................................................. 41

4. RECOMMENDATIONS ........................................................................................................................... 424.1. NON-COMPLIANCE RECOMMENDATIONS ............................................................................................ 424.2. IMPROVEMENT OPPORTUNITIES RECOMMENDATIONS ......................................................................... 42

5. CONCLUSION ........................................................................................................................................... 45APPENDIX A - AUDIT PROTOCOL AND FINDINGS ................................................................................. 47APPENDIX B – APPROVAL & DOCUMENT LIST ...................................................................................... 48

Page 7: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx iv

APPENDIX C - SITE AUDIT PHOTO LOG ................................................................................................... 51APPENDIX D - INDEPENDENT AUDIT DECLARATION FORM ............................................................ 52FiguresandTablesFigure1SiteLocation(Source:UrbisEnvironmentalImpactStatementJune2017).............................................2Figure2AerialPhotographofSiteShowingBoundaryofSSD8114(Source:UrbisEISJune2018).....................23 Table 1 Draft Report Findings and Additional information provided ..................................... 12Table 2 Approval and document list ........................................................................................ 24Table 3 Construction site document list ................................................................................... 25Table 4 Summary of SSD Compliance Findings ..................................................................... 27Table 5 Summary of Audit Non-Compliances ........................................................................ 28Table 6 EMS Component Audit Scope .................................................................................... 31Table 7 Environmental Aspect Audit Scope ............................................................................ 32Table 8 Agency consultation outcomes ................................................................................... 33Table 9 Actual Versus Predicted Environmental Impacts ....................................................... 36Table 10 Improvement Opportunities vs Prescribed CoCs ...................................................... 39Table 11 Improvement Opportunities VS EMS Components ................................................. 40Table 12 Improvement Opportunities vs Environmental Aspects ........................................... 41Table 13 Non-Compliance Classifications .............................................................................. 42Table 14 Improvement Opportunities Classifications ............................................................. 43

Page 8: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx v

Glossary

Audit Systematic,independentanddocumentedprocessforobtainingauditevidenceandevaluatingitobjectivelytodeterminetheextenttowhichtheauditcriteriaarefulfilled.

Auditcriteria Setofpolicies,proceduresorrequirementsAuditevidence Records,statementsoffactorotherinformation,whicharerelevantto

theauditcriteriaandverifiable.Auditevidencemaybequalitativeorquantitative

Auditfindings Resultsoftheevaluationofthecollectedauditevidenceagainsttheauditcriteria

Auditconclusion

Outcomeofanauditprovidedbytheauditteamafterconsiderationoftheauditobjectivesandallauditfindings

Auditclient OrganizationorpersonrequestinganauditAuditee OrganizationbeingauditedAuditor PersonwithcompetencetoconductanauditAuditteam Oneormoreauditorsconductinganaudit,supportedifneededby

technicalexperts.Oneauditoroftheauditteamisappointedastheauditteamleader.Theauditteammayincludeauditorsintraining.

Auditplan DescriptionoftheactivitiesandarrangementsforanauditAuditscope Extentandboundariesofanaudit.Compliant Theauditorhascollectedsufficientverifiableevidencetodemonstrate

thatallelementsoftherequirementhavebeencompliedwithwithinthescopeoftheaudit.

Improvementopportunity

Afindingresultingfromeithersiteinspectionordocumentreviewwhichenablestheauditeetoconsidertheadoptionofanactionorstrategythatwillenhanceenvironmentalperformanceagainsttheauditcriteria.

Non-Compliant Theauditorhasdeterminedthatoneormorespecificelementsoftheconditionsorrequirementshavenotbeencompliedwithwithinthescopeoftheaudit.

NotTriggered Arequirementhasanactivationortimingtriggerthathasnotbeenmetatthetimewhentheauditisundertaken,thereforeanassessmentofcomplianceisnotrelevant.

Observation Acommentonanenvironmentalaspect,valueormanagementcontrol,processorrecordthatisnotaspecificrequirementoftheauditcriteria.

Page 9: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 1

1. INTRODUCTION

1.1. ProjectBackground

The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100students from kindergarten to Year 12. The school will take enrolment pressure offsurroundingprimaryschoolsexceedingstudentcapacityandaccommodatefuturepopulationgrowthwithin the Ku-ring-gai Local Government Area (LGA). The schoolwill contain highquality classrooms, collaborative learning spaces, open play spaces, sports courts andassociatedfacilities.

Thedevelopment,asawhole,willinclude:• threenewhome-baseschoolswithintheexistingbuildings;• upgradestotheexistingtheatre;• upgradestotheexistingsportshall;• provisionofa40-spacechildcarefacility;and• high-qualitytechnicalspacesforscience,engineering,hospitality,visualand

performingarts,aswellasmusicandfilm.

Theprojectwillbedeliveredinthreestagestoallowtheschooltogrowwhilemeetingtheneedsofincreasingenrolments.

Theproject currently in Stage1, is tobe completedby the startof Term1,2019 (endofJanuary2019).Thisstageinvolvestherefurbishment/redevelopmentofexistingstructuretocreatelearningspacesandschoolfacilitiesforupto350students.Stage1isthesubjectofthisconstructionperiodIndependentEnvironmentalAuditundertheconditionsofconsent(CoC)issuedinrespectofStatesignificantdevelopment(SSD)8114.

Stage2,willinvolvetheexpansionoftheschoolfacilitiestoprovideadditionalcapacity.Finalworks will involve construction of further administration facilities and completing anyfinishingtouchesontheschoolfacilitiesandclassrooms.

1.2. ProjectLocation

Thesiteislocatedat100EtonRoad,LindfieldandislegallydescribedasLot2DP1151638.ThesiteiswithintheKu-ring-gaiLocalGovernmentArea(LGA)andcomprisesanirregular-shapedparceloflandwithatotalareaofapproximately3.6ha.

TheformerUniversityTechnologySydney(UTS)Ku-ring-gaiCampuscurrentlyoccupiesthesite and it is proposed to be refurbished to accommodate the new school. The buildingconsistsofasingleconcretestructureandhassixstoreyswithbasementandrooftopplantroomsandanastronomyobservationtower.

Page 10: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 2

Figure1SiteLocation(Source:UrbisEnvironmentalImpactStatementJune2017)

VehicularandpedestrianaccesstothecampusisavailableviaEtonRoad,withrowsofcarparkinglocatedtotheeastoftheexistingbuildingreflectingthetopographyofthesiteanddense pockets of native vegetation. A total of 184 marked parking spaces are currentlyavailablewithinthesite,including35spaceswithinthebasementand149at-gradespaces.ApedestrianfootbridgeoverDunstanGrovelinksthemaincampusbuildingtothegymnasium.

1.3. StateSignificantDevelopmentUnderthePartialDevelopmentConsentforSSD8114,thefollowingdevelopmentispermittedasPhase1orStage1:

• adaptivereuseoftheexistingbuildingtoconstructonehome-basefor350students;• constructionofalladministrativeandtechnicalspacestosupportafullyprimaryand

secondarycurriculumfor350students;• constructionofafiretrailforbushfiremanagementpurposes;• trafficandtransportinfrastructure;and• treeremovaltoestablisha100metreAssetProtectionZone(APZ)aroundthehome-

baseonthesite.TheconditionsoftheSSDPartialDevelopmentConsentarestructuredunderthefollowingcategoryheadings:

• AdministrativeConditions(ConditionsA1toA25)• PriortoCommencementofConstruction(ConditionsB1toB58)

Page 11: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 3

• DuringConstruction(ConditionsC1toC43)TheSSDinstrumentalsoprovidesdefinitionsforkeytermsusedwithintheconditions.

1.4. AuditIntroductionIndependentenvironmentalauditsarerequiredtobeundertakenunderCoCB57ofPartialDevelopmentConsentSSD8114.

ConditionB57identifiesthattheindependentauditmustbecarriedoutinaccordancewith:

(a) the Independent Audit Program submitted to the Department and the Certifier underconditionB56ofthisconsent;and(b)therequirementsforanIndependentAuditMethodologyandIndependentAuditReportintheIndependentAuditPostApprovalRequirements(Department2018).

The IndependentAudit Program (IAP)waspreparedbyAspect Environmental Pty LimitedsubmittedtotheDepartmentofPlanningandEnvironment(DP&E)on26October2018.TheIAPwasprepared inaccordancewith the IndependentAuditPostApprovalRequirements(IAPAR) (DP&E, 2018). This Independent Environmental Audit has been prepared inaccordance with the submitted IAP, inclusive of the documented Independent AuditMethodologywithintheIAP,andtheIAPAR.

1.5. AuditObjectivesTheobjectivesof the IndependentEnvironmentalAuditare to identify thecompliance,orotherwise, of the current (construction) phase of development of the Lindfield LearningVillage with the issued conditions of consent for SSD 8114 and to provide an objectiveevaluationofenvironmentalperformanceofthedevelopment.

1.6. AuditTeamTheauditteamconsistedof:

• RichardJohnson(LeadAuditor),DirectorofAspectEnvironmentalPtyLimited• NormanMcComb(Auditor),AssociateDirectoratAspectEnvironmentalPtyLimited• CaitlinJohnson(Audit-support),ConsultantatAspectEnvironmentalPtyLimited

This initial independentenvironmentalauditwasconductedbyRichardJohnsonofAspectEnvironmentalPtyLimited(Aspect)astheleadauditor.Richardhastertiaryqualificationsinscience (BSc) and law (Diploma in Law) and has 28 years of experience in environmentalassessmentandmanagement. RichardcompletedcertificationforenvironmentalauditingfromDetNorskeVeritasin1997.Astatementof independenceisprovidedatthebeginningofthisdocumenttoidentifynoactual or perceived conflict exists in the performance of the independent environmentalaudit.

Page 12: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 4

1.7. AuditCriteriaThe audit criteria for this audit are identified by the Partial Conditions of DevelopmentConsentforSSD8114andbytheexpectationsoftheIAPAR(DP&E,2018).TheAuditFindings(APPENDIXA)identifiestherelevantcriteriaandtheperformanceintermsofauditevidencecollectedorobservedagainstthecriteriatoverifycomplianceduringthecourseofconductingtheaudit.

1.8. AuditScope

Thescopeofauditingrequirementshasbeenbasedonconsiderationof:

• The project SSD EIS (Urbis, June 2017) and associated Response to Submissiondocumentation

• The compliance requirements typical of such developments, in this instancereferencedtotheCoCproceduralanddocumentationrequirements:

– Tosupporttheadministrativeconditions(PartA)

– Priortocommencementofconstruction(PartB)

– Duringconstruction(PartC)

• The independent auditing requirements and expectations specified in the IAPAR(2018).

Theauditscopeconsistedof:

• AnassessmentofcompliancewithConditionsofConsentandotherrelevantapprovalsandlicences;

• Anassessmentofenvironmentalperformanceofthedevelopment,including:

– Anassessmentofactualimpactscomparedtopredictedimpactsdocumentedintheenvironmentalimpactassessment;

– An assessment of incidents, non-compliances and complaints that haveoccurredontheproject;

– AnassessmentoffeedbackreceivedfromtheDepartment,andotheragenciesandstakeholders;and

– An assessment of the performance of the development having regard toagency policy and any particular environmental issues identified throughconsultationcarriedoutwhendevelopingthescopeoftheaudit.

• Identificationofthestatusofimplementationofpreviousauditfindings;

• Ahigh-levelreviewoftheProject’senvironmentalmanagementsystem(EMS);

Page 13: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 5

• Ahigh-levelassessmentoftheadequacyoftheProject’senvironmentalmanagementplansandsub-plans;and

• Any othermatters considered relevant (eg as identified through consultationwithrelevantagenciesandreviewofcomplaintsregisters).

Thisscopeisconsistentwiththat identifiedwithintheIAP(Aspect,October2018)andtheIAPAR.

1.9. AuditPeriodTheauditisconfinedintimetothestatusofthesitedocumentation,reviewedbetween27November2018and18January2019,andsiteoperationsatthetimeofthesiteinspections,undertakenbytheAuditteamon11thand13thDecember2018,and4thJanuary2019.

Page 14: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 6

2. AUDITMETHODOLOGY

2.1. SelectionandEndorsementofAuditTeamLeadAuditor:RichardJohnsonRichardholdstertiaryqualificationsinscience(BSc)andlaw(DiplomainLaw)andhas28yearsof experience in environmental assessment and management. Richard completedcertificationforenvironmentalauditingfromDetNorskeVeritasin1997.Auditor:NormanMcCombNormanholdstertiaryqualificationsinGeography(BSc,Hons)andEnvironmentalEngineering(MSc) and has 12 years of experience in environmental management, auditing andassessment.NormancompletedLeadAuditortrainingunderSAIGlobalin2013.Request forendorsementwas includedwithin the IndependentAuditProgram(Aspect26October2018)andprovidedbyemailtotheDP&EComplianceteamon6November2018.AsubsequentrequestfortheCVwasmadebyDP&Eon20December2018andrespondedtoon21December2018.AdditionalsupportinginformationwasprovidedtotheDP&Eon11January2019.TheDP&Eagreementtothenominatedleadauditorwasreceivedon17January2019andisincludedwiththeauditdeclarationatAppendixA.

2.2. IndependentAuditScopeDevelopment

TheDP&Esetsout theminimumrequirements tobemetwhenundertaking independentauditsinaccordancewithCoCandtheIndependentAuditPostApprovalRequirements(DP&E2018).TheserequirementsapplytoallSSDwhereanindependentauditisrequiredbytheCoC.

AnindependentauditprogrampreparedbyAspect(October2018)outlinedtheinitialscopeofauditingrequirementsfortheproject(aspresentedaboveinSection1.8).Thisauditscopewasdiscussedduringtheopeningmeetingon27November2018.Attendeesat themeetingwere EmmaViljoen (Savills), Sasha Serrao (Savills), Stephanie Edmondson(Savills),RichardJohnson(Aspect)andNormanMcComb(Aspect).Furtherdevelopmentofthescopeoftheauditwasconsideredthroughagencyconsultationandreviewofcomplaintsregistersandadditionallicence,permitorapprovalrequirements.

Page 15: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 7

Agency/StakeholderConsultation

Consultationwiththefollowingagencies/stakeholderswasundertakenbyAspect:• Ku-ring-gaiCouncil• TransportforNewSouthWales(TfNSW)• RoadsandMaritimeServices(RMS)• SafeWorkNewSouthWales(SafeWork)• DepartmentofEducation(DoE)• DepartmentofPlanningandEnvironment(DP&E)

BothSavillsandDoEhavehadongoingconsultationwiththefollowingagenciesthroughouttheproject:

• RegionalFireServices(RFS)• OfficeofEnvironmentandHeritage• StateEmergencyServices

Uponcompletionofconsultationwiththenominatedagencies,noamendmenttotheauditscopewasrequired.ReviewofComplaintsRegisters

Areviewofcomplaintsregistersidentifiedvariousmeansofregisteringacomplaintforthedevelopment.Complaints may be recorded via the project’s website to [email protected] or [email protected] oralternatively to the dedicated project 1300 Community Hotline number or to Taylors’Project/SiteManagementTeamdirectly(3potentialnumbers).Areviewofthevariouscomplaintsregistersidentifiedthat,althoughtherewasadisparityinthenumberandnatureofcomplaintsrecorded,thenatureofallcomplaintswasadequatelycoveredwithintheexistingscopeoftheauditandcouldbereferencedintermsofconsideringthegeneralenvironmentalperformanceofthesite,theadequacyofcontrolmeasures,andtheproject’sEMS.Noamendmentwasmadetotheauditscopefollowingreviewofthecomplaintsregisters.

2.3. ComplianceEvaluationThe audit findings are based on verifiable evidence either sighted, reviewed, collated orobserved. The followingmethodswereused toobtain verifiable evidence relevant to theauditscope:

• reviewofprojectrecords,documentationandreports;• interviewswithconstructionprojectpersonnel;• interviewswiththird-partystakeholders;and

Page 16: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 8

• siteinspections,includingcollectionofphotographicevidence.A review of verifiable evidence was undertaken against the identified audit criteria todeterminethelevelofcompliance.

2.4. SiteInterviewsSiteinterviewswereconductedonthe11thand13thDecember2018aswellasthe4thJanuary2018.Thefollowingpersonnelwereinterviewed:

• DeanFondas–SeniorProjectManager,TaylorsConstruction• BrentKendall–SiteManager,TaylorsConstruction• DanielDiab–SiteEngineer,TaylorsConstruction• ShaggyShen–ProjectSafetyAdvisor,TaylorsConstruction

Siteinterviewswereconductedwithinthesiteofficeenvironmentandduringthecourseofsiteinspections.

2.5. SiteInspectionsInspectionsoftheentireprojectsitewerecarriedoutoneachofthefollowingdates:

• 11thDecember2018• 13thDecember2018• 4thJanuary2019

All site inspections were accompanied by at least one representative of Taylors’ sitemanagementteam.Site inspections comprised awalkover of the defined construction footprint and includedinternalandexternalworkenvironments.

2.6. ConsultationThefollowingstakeholderswerecontactedduringtheauditperiod:

• Ku-ring-gaiCouncil• TransportforNewSouthWales(TfNSW)• RoadsandMaritimeServices(RMS)• SafeWorkNewSouthWales(SafeWork)• DepartmentofEducation(DoE)• DepartmentofPlanningandEnvironment(DP&E)

Asummaryoftheconsultationfindingswiththeabovestakeholdershasbeenprovided inTable5 in Section3.11of this report.Asa resultof this consultation,noadjustmentwasrequiredtotheauditscopeand/oraudittable.Consultation with SafeWork NSW regarding the form of asbestos labelling identified noprescribed form other than the general form provided within Code of Practice: How toManageandcontrolAsbestosintheWorkplace(SafeWorkNSW,September2016).

Page 17: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 9

2.7. ComplianceStatusDescriptorsCompliancefindingsresultingfromtheassessmentofauditevidencehavebeendividedintothreecategoriesasfollows:

• Compliant:Theauditorhascollectedsufficientverifiableevidencetodemonstratethatallelementsoftherequirementhavebeencompliedwithwithinthescopeoftheaudit.

• Non-compliant:Theauditorhasdeterminedthatoneormorespecificelementsoftheconditionsorrequirementshavenotbeencompliedwithwithinthescopeoftheaudit.

• Nottriggered:Arequirementhasanactivationortimingtriggerthathasnotbeenmetatthetimewhentheauditisundertaken,thereforeanassessmentofcomplianceisnotrelevant.

Someoftherecordedauditfindingsidentifyimprovementopportunitiesinrelationtoauditcriteria that have been identified as compliant, for consideration by the proponent. Theprovidedcountofcompliancesandnon-compliancesrepresentsthecountagainstconditionsofconsentonly. Non-complianceshavebeenrecordedagainstthehigh-levelEMSreview,however, this is not an assessment of a conforming EMS system under ISO 14001, butrepresentsanabsenceofimplementationofsomeofthecomponentsexpectedofanEMS.

2.8. OpeningMeetingTheauditcommencedwithanopeningmeetingon27November2018atSavills’offices.Duringtheopeningmeetingtheobjectivesoftheaudit,thescopeoftheaudit,theresourcesrequiredandmethodologytobeappliedwerediscussed.Thisopeningmeetingprecededcommencementofexistingdocumentreview.Attendeesatthemeetingwere:

• EmmaViljoen(SeniorProjectManager,Savills);• SashaSerrao(ProjectManager,Savills);• StephanieEdmondson(ProjectManager,Savills);• RichardJohnson(LeadAuditor,Aspect);and• NormanMcComb(Auditor,Aspect).

Theopeningmeetingformatandcontentwasrepeatedon-siteonthe11thDecember2018intheTaylors’projectofficeprecedingthesiteinterviewandinspectioncomponentoftheaudit.Attendeesatthismeetingwere:

• DeanFondas(SeniorProjectManager,Taylors);• BrentKendall(SiteManager,Taylors);• DanielDiab(SiteEngineer,Taylors);• ShaggyShen(ProjectSafetyAdvisor,Taylors);• SashaSerrao(ProjectManager,Savills);

Page 18: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 10

• RichardJohnson(LeadAuditor,Aspect);and• CaitlinJohnson(AuditSupport,Aspect).

Theon-siteopeningmeetingconfirmedtimingrequirements,auditmethodologyandresourcingneeds.Timingfortheon-sitecomponentoftheaudithadoriginallybeenintendedforthe11th–13thofDecember2018,inclusive.Duringdiscussionattheopeningmeetingitwasidentifiedthatvegetationremovalworkshadnotcommencedasyet.Itwasagreedtoadjustthedateoftheauditsitecomponenttocapturethisworkactivitywithintheaudittiming.Reviseddatesof13thDecember2018and4thJanuary2019wereconfirmed.

2.9. ClosingMeeting–SiteAuditThesiteauditclosingmeetingwasheldontheafternoonof4thJanuary2019.Thesiteauditclosingmeetingwasattendedby:

• DeanFondas(SeniorProjectManager,Taylors);• BrentKendall(SiteManager,Taylors);• DanielDiab(SiteEngineer,Taylors);• RichardJohnson(LeadAuditor,Aspect);and• NormanMcComb(Auditor,Aspect).

At thesiteaudit closingmeeting,preliminaryaudit findingswerepresentedwith relevantrecommendations.Theserelatedto:

• Initialfindings–nositeactivitynon-compliances,subjecttoreviewagainsttheexpresswordingoftheconditions.Itwasnotedthatthereneededtobeanincreasedfocusonmaintenanceoferosionandsedimentcontrolmeasures(i.e.sedimentfencingandsedimentcontrolsoverdrains).

• ObservedenvironmentalperformanceinrespectofmaintenanceofErSedcontrols,bushfire management controls in respect of hot works, and asbestos materialsmanagement/labelling.

• The content and expectationswithin site environmentalmanagement plans beingeffectivelycommunicatedtocontractorstaffonsiteandintegratedintotoolboxtalks.

It was identified that during the post-site audit phase further review of records anddocumentationwouldbeundertakenpriortoissueofthedraftauditfindings.ThisprocesswouldprovideSavillsandTaylorsswiththeabilitytoprovidefurtherevidenceforverification(if required/available) against the audit criteria that may not have been identified oraccessibleatthetimeofsiteaudit.Provisionofanysuchevidencewouldenablethecomplianceassessmenttobereviewedpriortoissueofthefinalauditfindings,althoughitwasidentifiedthatthereviewofsupplementaryevidencewouldnotautomaticallychangeanauditfinding.

Page 19: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 11

Uponissuingofadraftreport,afollowupmeetingwasheldwithSavillsandtheDepartmentof Educationon28th January2019. Thedraft audit findingswerepresentedwith relevantrecommendations.ThesearepresentedinSection4ofthisreport.

2.10. ReviewandResponsetoDraftIndependentEnvironmentalAuditReportThedraftAuditReportwasprovidedtoSavillsandTaylorsforreviewon16thJanuary2019toallowanopportunitytoprovideanyadditionalinformationbeforefinalisingtheAuditReport.A draft report finding would generally only be revised in instances where the auditor issatisfiedthattheadditionalinformationorevidenceprovidedissufficienttodeterminethatanerroroffactormisunderstandinghastakenplace,andthisisadequatelysupportedbytheprovisionof additionalobjective audit evidence thatwasnot available at the timeof siteaudit.Anyadditionalinformationprovidedbyaproponentinthisregardmustbenotedinthereportandtheauditor’sviewinrelationtoitrecorded.A follow up meeting to discuss the draft report findings was held with Savills and theDepartmentofEducationon28thJanuary2019.Thismeetingwasattendedby:

• DeanFondas(SeniorProjectManager,Taylors);• BrentKendall(SiteManager,Taylors);• SashaSerrao(ProjectManager,Savills);• RobertWalker(ProjectDirector,Savills)• AndrewKyriacou(ProjectDirector,DepartmentofEducation)• RebeccaWillott(ProjectManager,DepartmentofEducation)• JimLewis(ProjectDirector,DepartmentofEducation)• RichardJohnson(LeadAuditor,Aspect);and• NormanMcComb(Auditor,Aspect).

Anumberofconditionswereidentifiedas“Non-Compliant”and/or“Tobeconfirmed”duetoanabsenceininformationprovided,orabsenceofdocumentationatthetimeoftheaudit.Uponreviewofthedraftauditreportthefollowingadditionalinformationwasprovidedandfindingsupdatedaccordingly.

Page 20: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 12

Table1DraftReportFindingsandAdditionalinformationprovidedApprovalReference

DraftReportFindings AdditionalInformationProvided UpdatedFindings

A14Evidenceofconsultation

Consultationtrackerswereprovideddemonstratingconsultationwiththefollowingstakeholders:

• Ku-ring-gaiCouncil• StateEmergencyServices• RegionalFireServices• DepartmentofPlanningand

Environment• RoadsandMaritimeServices• TransportforNSW

Theseconsultationtables/trackersinadditiontotheAconexsystemdemonstratesthattheprojectisgenerallycompliantwiththiscondition.

General compliance withthis condition has beendemonstrated.

A18Demolition Demolition work has been carried out by PerfectContracting. No demonstration of submission ofwork plan and statement of compliance beingsubmittedtotheCertifierpriortocommencementofworkshasbeensighted.No correspondence or documentation visible onAconex.

DemolitionworksontheprojectwereincludedinReviewofEnvironmentalFactors(REF)asexemptworks.ExemptworkscoveredundertheREFapprovalwassighted.

Demolition works areexempt and thereforedefinedas‘NotTriggered’.

A23AccesstoInformation

NodocumentationpubliclyavailableonApplicant'swebsite (as accessed 8/1/19), except access tocomplaintsregisterandheritageinformation.Link is provided to SSD EIS and approvaldocumentation on DP&E website, but does notinclude strategies, plans and programs required

SavillshaddirectedAspecttotheprojectwebpageforreviewofrecentdocumentationadded.Requisiteinformationtobemadeavailableontheprojectwebpagehadstillnotbeensightedby31January2019.

Compliance with thiscondition has not beendemonstrated at time ofaudit.

Page 21: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 13

ApprovalReference

DraftReportFindings AdditionalInformationProvided UpdatedFindings

under the conditions of consent or otherdocumentation.Currentstageandprogressofthedevelopmentdoesnotprovideclear indicationofactualcurrentstageandprogress(asof8/1/19).Contact details are provided for feedback andenquiries.Complaints register (update dated 17/12/19) isaccessibleforreview.

B1NotificationofCommencement

This item was classified as “To be confirmed”,pendingprovisionoffurtherinformation.

NotificationofstagedcommencementofSSDworksfromDoEtoDP&Ewassighted.TheletterwasprovidedbyAndrewKyriacou(DoE),withSunday11thNovembernotedascommencementdate.

General compliance withthis condition has beendemonstrated.

B7Bushfire The Vegetation Management Pan is presented ascontent within the Landscape Management PlanpreparedbyKleinfelder(NCA18R82665,Rev4dated12/11/18).DP&E comments of 7/11/18 noted as identifyingconsultation effort as being demonstrated byobtaining and addressing responses anddocumentingasatable.Consultation table with RFS prepared by Savillssighted - identifies submission of the completeddocumentforRFSreviewratherthanconsultationinits preparation. Noting RFS correspondence of12/11/18indicatingnocommentsontheLMP.

ProjectcouldnotdemonstratethattheDepartmenthadapprovedtheLMP(astheVMP).AletterfromDP&Edated30/11/2018wassightedasconfirmingapprovalbyDP&EforthisCoC

General compliance withthis condition has beendemonstrated.

Page 22: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 14

ApprovalReference

DraftReportFindings AdditionalInformationProvided UpdatedFindings

Approval by Backash dated 13 November 2018"BushfireCertificateLandscapingandConditionB6,B7,B8,B10,B13".Project is required to demonstrate that theDepartmenthasapprovedtheLMP(astheVMP).

B11Bushfire Constructionidentifiedascommencing11/11/18.Executed Positive Covenant sighted (referenceAN894063G).NSWLRSreceiptdated29/11/18.Theinstrumentisdatedandregisteredon29/11/18.Both dates occur after the identifiedcommencementof construction. Theeffectof thecondition has been met, but not the timingrequirementsasspecifiedintheCondition.

Theprojectcouldnotdemonstratecomplianceinthefirstinstanceagainsttheidentifiedcommencementdateforconstruction.StagedcommencementofworkscommunicatedinaletterfromDoEtoDP&E(01LTRSINSWConditionB1_14Dec18[5].pdf)asagreedbyDP&Einnotificationletterissued2ndNovember,wassighted.Basedonthestagingdates,vegetationremovalcommenced12December2018.NSWLandRegistryServicereceiptdated29/11/18.

General compliance withthis condition has beendemonstrated.

B13Landscaping

Vegetationremovalcommenced12/12/18.ThelandscapemanagementplanhasbeenproducedbyKleinfelder.Theplan isoriginallydated24/8/18withthefinalversion(v4)dated12/11/18toreflectconsultation.

ApprovalfromDP&Ewasnotsightedduringthesiteaudit.AnapprovalletterfromDP&Edated7Decemberwassighted.ThislettersuggestedthattheBushfireLandscapeManagementPlanandsupportinginformationgenerallysatisfiesconditionrequirementsforthe

General compliance withthis condition has beendemonstrated.

Page 23: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 15

ApprovalReference

DraftReportFindings AdditionalInformationProvided UpdatedFindings

Approval by Backash dated 13 November 2018"BushfireCertificateLandscapingandConditionB6,B7,B8,B10,B13".LMP submitted by DoE to DP&E 1/11/18; 2/11/18and19/11/18 reflectiveof responses tocommentsreceived(DP&EandRFS).TheLMPhasbeendevelopedingeneralaccordancewithCoCB13andsatisfiessub-conditionsa,b,c,e,f,i, and l, however the following sections needaddressing:d: LMP is required to be updated to include theadditional information:provisionswithinCoCB5&B6g:LMPtobeupdatedwiththeinclusionofcontourlines.h:LMPneedstoreferenceprotectionmeasures.j & k: Design Inc Partial SchoolMaterials, FinishesandPlantingSchedules (DocNo. LA-T-1000) tobeprovidedm: Taylorss to provide evidence that all outdoorfencing is being constructed of non-combustiblematerial.n:Design IncPartial SchoolMaterials, FinishesandPlanting Schedules (Doc No. LA- T-1000) to beprovided.Also, the Project to demonstrate plan has beendeveloped to the satisfaction of the PlanningSecretary.

exceptionofamendmentsrequestedaspartofSchedule1ofthatletter.TheamendmentsrequestedaspartofSchedule1wereaskedtobeaddressedandsubmittedtotheDP&E.SavillsaddressedtheSchedule1itemsandsentevidencetotheDoE19December(AconexGCOR-001871).TheapprovalletterdoesnotrequestsubmissionofamendmentsforapprovalorconfirmationthatamendmentshavebeenmadetothesatisfactionoftheDP&E.

Page 24: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 16

ApprovalReference

DraftReportFindings AdditionalInformationProvided UpdatedFindings

Compliance with this condition has not beendemonstrated.

B16RemediationActionPlan

ARAPhasbeenproducedbyEIS.TheRAPisdated16August2018.Worksidentifiedinsiteinterviewascommencingonsite29October2018.AddendumtotheRAPwaspreparedbyEIS(reportref: E30259KMrpt3_RAP_Addendum, darted 21November2018).a:NomentionofCostBenefitAnalysis.Section5.2ofRAP"considerationofRemediationOptions".b:Novolumeestimatesc: RAP provides procedure for non-investigatedareas. Need to demonstrate how this will befollowed/implementedd:Noindicationthatthishasbeenmet?e:Seepointd.Sighted Interim Advice #11 from Accredited SiteAuditor,DrIanSwane,dated21November2018.DoEemaildated30/11/18identifiestheRAPupdateunder CoC B16 being submitted to DP&E on28/11/18.Updated RAP has not been submitted prior tocommencementofworks in general, but has been

ARAPhasbeenproducedbyEIS.TheRAPisdated16August2018.Worksidentifiedinsiteinterviewascommencingonsite29October2018.AddendumtotheRAPwaspreparedbyEIS(reportref:E30259KMrpt3_RAP_Addendum,darted21November2018).a:NomentionofCostBenefitAnalysis.Section5.2ofRAP"considerationofRemediationOptions".b:Novolumeestimatesc:RAPprovidesprocedurefornon-investigatedareas.Needtodemonstratehowthiswillbefollowed/implementedd:Noindicationthatthishasbeenmet?e:Seepointd.SightedInterimAdvice#11fromAccreditedSiteAuditor,DrIanSwane,dated21November2018.DoEemaildated30/11/18identifiestheRAPupdateunderCoCB16beingsubmittedtoDPEon28/11/18.

General compliance withthis condition has beendemonstrated.

Page 25: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 17

ApprovalReference

DraftReportFindings AdditionalInformationProvided UpdatedFindings

submitted toDP&E in advanceofworksdisturbingthesiteareasaddressedbythecondition.RAP addendum 21/11/18 addresses items (c) ; (d)and(e)ofthecondition,butnot(a)and(b).Item(c)oftheconditionidentifiestheprocedureforadditionalsiteinvestigationsbutnotthefindings.Acopy of the findings of the EIS investigationswererequestedduringsiteauditon4/1/19. IdentifiedinRFIresponse(4/1/19)asnotbeingrelevanttoACM.NomentionofPCBorleadhotspot.IfPCBcontaminatedmaterialhasbeenidentifiedonsite,ChemicalControlOrder (CCO)PolychlorinatedBiphenyl(PCB)ChemicalControlOrder1997,wouldneed to be adhered to. The keeping of PCBcontaminatedsoilson thepremiseswouldneedtosatisfySection6.3oftheCCO.

UpdatedRAPwasnotsubmittedpriortocommencementofworksingeneralbuthasbeensubmittedtoDP&Einadvanceofworksdisturbingthesiteareasaddressedbythecondition.RAPaddendum21/11/18addressesitems(c);(d)and(e)ofthecondition,butnot(a)and(b).Item(c)oftheconditionidentifiestheprocedureforadditionalsiteinvestigationsbutnotthefindings.AcopyofthefindingsoftheEISinvestigationswererequestedduringsiteauditon4/1/19.IdentifiedinRFIresponse(4/1/19)asnotbeingrelevanttoACM.NomentionofPCBorleadhotspot.ASiteAuditStatementdated25/01/2019wasprovidedasevidenceaspartoftheauditclosingmeetingsuggestingthattheSSDprojectsitehasbeeninvestigatedandremediatedsothatthesiteissuitableforitsintendedusewithouttheneedforanyotherconditions.

B29 TaylorssCEMPdated29/10/18,reference18236.Savills' letter of 31/10/18 to DoE identifiessubmission of the CEMP to the certifier for theiraction.

BCACertifierformallyacknowledgedreceiptandsatisfactionwiththeCEMP,aspertheBCACertifier’sletterdated31Oct2018[emailfromSavillstoAspect4Mar2019].

General compliance withthis condition has beendemonstrated.

Page 26: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 18

ApprovalReference

DraftReportFindings AdditionalInformationProvided UpdatedFindings

DoE correspondence to DPE dated 30/11/18identifiessubmissionofCEMPtoDPEon2/11/18.BCA Logic letter dated 10/12/18 certifies providedCEMPandCFFMPassatisfyingtherequirementsofthecondition.Constructioncommenced11/11/18.ThecontentoftheCEMPgenerallycomplieswiththerequirementsofsub-conditionsofCoCB29(a-i).Constructionworkscommenced11/11/18.The CEMP was not approved at time ofcommencementofworks.Compliancewiththisconditionhasnotbeenmet.

B35BushfireandFloodEmergencySubPlan

TheBFFERSP for theprojectwas sighted andhavebeendeveloped ingeneral compliancewith theallsub-conditionofCoCB35.Anon-siteBushfireEvacuationPlanA3,Taylorss,andSite Evacuation Plan A3, Taylorss, were sightedduringtheaudit(4/1/19).BCA Logic letter dated 1/11/18 affirms certifier'sconsiderationthatconditionissatisfiedbyreferencetoBlackashBushfireEmergencyResponseSub-PLan(Version 1.0 dated 11/10/18) and EWFW FloodEmergencyManagementPlanreferenceno.21151-

SavillsprovidedconsultationtrackertodemonstrateconsultationwithStateEmergencyServices.

General compliance withthis condition has beendemonstrated.

Page 27: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 19

ApprovalReference

DraftReportFindings AdditionalInformationProvided UpdatedFindings

001, dated 18/10/18) and Bushfire and FloodEvacuation Routes plan (Taylorss - as referencedabove).Savills' letter to DoE dated 19/10/18 identifiesdocumentationtobeforwardedtoRFSandNSWSESfor approvals. Additionally, plans are identified asbeingissuedtoPCAandCouncilforapproval,ratherthanforconsultationasperthecondition.RFS consultation table sighted, identifying nocommentmadeinrespectoftheevacuationplanasat12/11/18.Council consultation initiated by SchoolsInfrastructureNSW(SINSW)on27/9/18identifiedinCouncil Correspondence tracker identifyingwalkover of area on-site and evacuation footpathroute.NoindicationofconsultationwithNSWSES.…… Compliance with this condition has not beendemonstrated.

B48ConstructionandDemolitionWasteManagement

Truck routes have been provided as part of theCTPMSP(page11ofplandated02October2018).General compliance with this condition has beenmet. However, project is required to demonstratethat RMS has been notified to satisfy compliancewiththiscondition.

AdditionalevidenceprovideddemonstratesRMSnotificationviaemailon16October2018fromPerfectContracting.CommunicationwithbothRMSSpecialPermitsUnit(SPU)andRMSTransportManagementCentre(TMC)hasbeensighted.

General compliance withthis condition has beendemonstrated.

Page 28: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 20

ApprovalReference

DraftReportFindings AdditionalInformationProvided UpdatedFindings

B50Rainwaterharvesting

AconexreferencetoB50defaultstoB49.Conditioncompliancetobeconfirmed.

AconexLetterfromErbasstates:aColorbondsteelrainwatertankwithacapacityofapproximately1000literswillbeinstalledonlevelfour(4)totheNorthernsideofthebuildingdesignatedasZoneA,documentedonhydraulicdrawingSYD18152-LI-H-A105.Letteriscertifiedbyahydraulicengineer.

General compliance withthis condition has beendemonstrated.

B51&B52RoadworksandAccess

Email correspondenceSavills toKu-ring-gaiCouncil(Jim Turner) 23/10/18. Comments requested by26/10/18.ARUP Certification dated 30 October identifyingdesignmeetsthecondition.Noconfirmation identifiedofCouncil'ssatisfaction.Noted that the condition itself does not specify"priortocommencementofconstruction",however,theconditionsitsunderSchedule2PartB"PriortoCommencementofConstruction".Letter from BCA (1 November 2018) certifyingsatisfaction of condition sighted for CoC B52.CouncilapprovalforB52(f)notsighted.General compliance with B51 has beendemonstrated, however, "satisfaction of therelevantroadsauthority"hasnotbeenevidenced.General compliance with B52 has beendemonstrated,however,approvalforsub-condition(f)hasnotbeendemonstrated.

Drawing#TCI-6200&TCI-6201,issueB,preparedbyBirzulisConsultingStructural&CivilEngineers,dated15/10/2018anddisplayingcouncilstamp(5November2018)hasbeensighted.

General compliance withtheseconditionshasbeendemonstrated.

Page 29: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 21

ApprovalReference

DraftReportFindings AdditionalInformationProvided UpdatedFindings

C1HeritageInterpretationstrategy

Interpretationstrategynotsighted.Newhandrails-colourmatchedforcurrentstandardcomplianthandrailswereidentifiedandobserved.Some of the change room benches in zone Awereidentifiedtobere-used.Matchedreplacedwindowsdesigntobefireratingappropriate.Adocumentedheritageinterpretationstrategywasnotevidencedattimeofaudit.

AHeritageInterpretationStrategy(Urbis,28/11/2018)wasprovidedwithinfourweeksofcommencementofconstructionandhasbeensighted.

General compliance withthis condition has beendemonstrated.

C40IncidentNotification,ReportingandResponse

Asiteprojectincidentregisterwasprovidedaspartof the site audit. The register has two entries, themostrecent incident,“Drillingofasbestos inmusicroomfromMechanical”,datedDecember2018.Projecthasrecordedtwoincidentstodate.Thereisno evidence to suggest that the DP&E has beennotified nor the incidents reported in accordancewiththiscondition.Need to verify communications with DP&EComplianceteam.Generalcompliancewithrecordingofthisincidencehowever, there is a need to demonstrate incidentnotificationandreportinginlinewiththiscondition.Compliance with this condition has not beendemonstrated.

SavillsrequestedthatincidentnotificationtotheDP&Ebereviewed.UponreviewitwasestablishedthatDP&EComplianceTeamidentifyanincidentas:“anoccurrenceorasetofcircumstancesthatcausesorthreatenstocausematerialharm”.Basedonthisdefinition,theproponenthasnotidentifiedanyoccurrencesorasetofcircumstancesontheprojectrequiredtobereported.

General compliance withthis condition has beendemonstrated.

Page 30: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 22

The final audit findings are presented in Section 3 of this report and detailed findingspresentedinAPPENDIXA.Under SSD 8114 CoC B58, the Applicant is required to prepare a response to the finalIndependentAuditReportandsubmititsresponsetotheDepartmentandCertifierandtomaketheIndependentAuditReportandtheApplicant’sresponsepubliclyavailablewithin60daysofsubmission.

Page 31: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 23

3. AUDITFINDINGS

Thissectionoftheauditidentifiesthereportedauditfindingsbasedonareviewofavailableauditevidenceduringtheauditperiod,evaluatedagainstthedefinedauditcriteria.

3.1. ProjectBoundaryandSettingTheprojectboundaryisidentifiedbytheboundariesofSSD8114asshowninFigure2below.Theauditisconfinedintimetothestatusofsiteoperationsatthetimeofthesiteinspectioncomponentoftheaudit,being11thand13thDecember2018,and4thJanuary2019.Theauditprovidesarepresentativesnapshotofperformanceatthetimeofthesiteaudit.Documentationrelevanttotheauditscopewasmadeavailablepre-siteauditforinformationandreview.Follow-updocumentationwasprovidedpost-siteaudittoaddressquestionsoritemsraisedatthetimeofthesiteaudit,duringtheclosingmeetingoridentifiedinthedraftauditfindings.

Figure2AerialPhotographofSiteShowingBoundaryofSSD8114(Source:UrbisEISJune2018)

3.2. ApprovalandDocumentListDocumentsreferencedaspartofthisauditareprovidedinthetablesbelow.AlistofrelevantapprovaldocumentsisprovidedinTable2.Sitespecificregisters,proceduresandchecklistssightedaspartofthisauditareprovidedinTable3.

Page 32: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 24

Table2ApprovalanddocumentlistApprovalReference DocumentDetailsEnvironmentalImpactStatement LindfieldLearningVillageEISwasproducedbyURBISand

dated8thJune2017.StateSignificantDevelopment8114PartialDevelopmentConsent

SSD8114dated24thOctober2018.

B7VegetationManagementPlan(VMP)

AVMPwasnotreferencedduringaudit.ThecontentprovidedwithintheLandscapeManagementPlan(CoCB13)addressesVMPrequirements.

B13LandscapeManagementPlan ThelandscapemanagementplanhasbeenproducedbyKleinfelder.Theplanisdated24August2018.

B14ContaminatedSiteInvestigations

ThefollowingreportsandcorrespondencehavebeenviewedandsatisfiesCoCB14.

• VirginExcavatedNaturalMaterialAssessment,EIS,13November2018

• InterimAdvice#08forStatutorySiteAuditNo.279byDrIanSwane,ReviewofStagingofRAPforLindfieldLearningVillageProject,8thNovember2018

• InterimAdvice#11forStatutorySiteAuditNo.279byDrIanSwane,RAPAddendumforLindfieldLearningVillageProject,21stNovember2018

• AddendumtotheRAPwaspreparedbyEIS(reportref:E30259KMrpt3_RAP_Addendum,darted21November2018).

B17UnexpectedContaminationProcedure

AnunexpectedcontaminationprocedureisprovidedwithintheRAP.

B21CommunityCommunicationStrategy

ACommunityCommunicationStrategydatedOctober2018wasproducedbySchoolInfrastructureNSW.

B29ConstructionEnvironmentalManagementPlan

ZoicEnvironmentalproducedtheprojectCEMP.Theplanisdated29October2018.

B30TheConstructionTrafficandPedestrianManagementSub-Plan(CTPMSP)

CommercialTCproducedtheCTPMSP.Theplanisdated2October2018.

B31TheConstructionNoiseandVibrationManagementSub-Plan(CNVMSP)

TheCNVMSPwasproducedbyAcousticLogic.Theplanisdated5thOctober2018.

B32TheConstructionWasteManagementSub-Plan(CWMSP)

ThefollowingdocumentshavebeenpreparedtosatisfyCoCB32:

• DumpitBins,WasteandRecyclingProcess&Flow,Notdated

• ForesightEnvironmental-ConstructionandDemolitionWasteManagementPlan,27March2017

• PureContracting-AsbestosRemovalControlPlan,10August2018

Page 33: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 25

ApprovalReference DocumentDetailsB33ConstructionSoilandWaterManagementPlan(CSWMSP)

Aconstructionsoilandwatermanagementplanwasnotreviewedaspartoftheaudit.ThemanagementrequirementsassociatedwithCoCB33isaddressedinanumberofotherdocuments,theseinclude:

• CEMPSection3.2.1• Figures4-11,AppendixA.• Section13.2.3ofTheProjectEnvironmental

ManagementPlan(PEMP)• EWFWConsultingEngineersprovidedaCertificate

ofDesignErosionandSedimentControlPlansreferenceNos.C-011throughC-017revisionAalldated10/10/18

B34ConstructionFloraandFaunaManagementSub-Plan(FFMSP)

TheFFMSPhasbeenpreparedbyKleinfelder.TheplanisdatedOctober2018

B35BushFireandFloodEmergencyResponseSub-Plan(BFFERSP)

EWFWConsultingEngineersproducedtheBFFERSP.Theplanisdated18October2018

B42ConservationManagementPlan(CMP)

URBISproducedtheprojectCMP.Theplanisdated6November2018.

B43HeritageImplementationStrategy(HIS)

AHISwasproducedbyURBIS.Thestrategyisdated14November2018.

C1HeritageInterpretationStrategy

AHeritageInterpretationStrategywasproducedbyURBIS.Thestrategyisdated28November2019.

Table3ConstructionsitedocumentlistDocumentDetails DocumentDetails&ObservationsProjectIncidentRegister Twoeventsentered,mostrecententryDecember2018

relatingtodisturbanceofasbestoscontainingmaterialinthebuildingstructure.

LegalRequirementsRegister Providedlegalregisterdidnothaveanyentries.Taylorssgeneralregisterprovidedatfinalcloseoutmeeting.

SiteinductionSE-F-11 DatedJanuary2018,theinductionwasnotsignedonorhavethenamesoftheinductees.

SafetyDataSheet(SDS)RegisterSE-F-10(notdated)

Toolbox/DailyPre-StartTalkSE-F-20

Thefollowingtoolboxesweresightedduringthesiteaudit:• HighRiskWorks–TreeCutting03/01/2019• Toolboxesfor28&29November2018references

WetWeather• Toolboxfor7January2019makesreferenceto

excavationexclusionzonebelow1m,wetweathernotice,maintenanceofstormwaterprotection,and

Page 34: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 26

DocumentDetails DocumentDetails&Observationsageneralenvironmentalnoteregardinghousekeepingandstockpilemanagement.

SafeWorkMethodStatements(SWMS)

ThefollowingSWMSweresightedduringthesiteaudit:• KLFF&F03:VegetationQuadratSurveysand

CollectingVegetationSamples,August2018• KLF21:SWMS-UseofMulcher,September2018• SiteClearingWorks–AllPlantandOperations,Aura

Trees,2August2018BushfireEvacuationPlanA3 A3mapofbushfireevacuationroutesightedonofficewall.

Theplanwasnotdated.ItwasnotedthatthisplanwasnotprovidedaspartoftheBushFireandFloodEmergencyResponseSub-Plan(CoCB35)

ConstructionNoiseMonitoringReport06-13December2018

ReportpreparedbyMarshallDayanddated14December2018.

Deliveryschedule Adeliveryschedulefortrucksenteringthesiteforthe5thDecember2018wassighted.

EnvironmentalInspectionRecords AnenvironmentalweeklyChecklistforthe10th–15thDecember2018wassighted.

AsbestosManagement Thefollowingdocumentsregardingasbestosmanagementduringconstructionweresighted:

• TargetedAsbestosInvestigationandSampling,August2018

• AsbestosCoreSampling,Risktech,22august2018• Disposalof3.5TonneofAsbestosSheeting,Perfect

Contracting28September2018• AsbestosClearanceCertificate,Airsafe,2October

2018• AsbestosIdentificationAnalysis,Greencap,31

October2018• AsbestosClearanceCertificate,Risktech,10

December2018WasteDisposalRecords

WasteDisposalRecordsweresightedforAugust2018,September2018,andOctober2018.ThereportswerepreparedbyFreshStartAustralia

TreeRemovalRecords

• AtRiskTree–AboriculturalReportTree49,RainTreeConsulting,19November2018

• AtRiskTree–AboriculturalReportTree66,67&96,RainTreeConsulting,19November2018

• AtRiskTree–AboriculturalReportTree88,RainTreeConsulting,19November2018

3.3. OtherApprovalsDuringtheaudititwasidentifiedthattheprojecthasacquiredanadditionalapprovalfromKu-ring-gaiCouncilpertainingtofootpathandexternalprojectworks.Theapprovalsforthese

Page 35: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 27

workswereissuedbyKu-ring-gaionthe5thNovemberandpermitforsaidworksreceivedon19thNovember2018(ApplicationNoROP18/0272|LicenceNo.113536C).Anassessmentoftheproject’scomplianceregardingthisapprovalisprovidedinSection3.4.ofthereport.

3.4. CompliancePerformanceComplianceperformance isassessedagainstthenominatedauditcriteriaasappliedtotheauditscopeandareincludedindetailinAPPENDIXA.Findingsarebasedonanevaluationofthedocumentationandfield-basedobservations,presentedinsupportofcomplianceagainsttheauditrequirements.AphotologtosupportthefindingswascompiledduringthesiteauditispresentedinAPPENDIXCtothisreport.AsummaryofcompliancefindingsagainsttheSSDconditionsofconsentispresentedinthetablebelowTable4SummaryofSSDComplianceFindings

Non-complianceshavealsobeenidentifiedseparatelyforhighlevelreviewofProjectEMSimplementationwithinAPPENDIXAthatarenotrecordedinthetableaboveasthesereflectanabsenceofsomeimplementationcomponentsofanexpectedProjectEMS.DetailoftheevidenceandfindingsoftheauditareprovidedinAPPENDIXA.Compliancewithotherapprovals

- ApprovalofWorksinthePublicRoadUnderSection139RoadsAct1993,Ku-ring-gaiCouncil,November2018:Itwasdeterminedthattheprojectwascompliantwithprescribedconditionsofthisapproval.

3.5. SummaryofAgencyNotices,Orders,PenaltyNoticesorProsecutionsThe project has not been issued with any agency notices, orders, penalty notices orprosecutionstodate.

SSDCategory #Requirements

#Compliant #Non-Compliant

#NotTriggered

PartA-Administrative

28 14 1 13

PartB-PriortoCommencementofConstruction

59 55 4 0

PartC-DuringConstruction

47 34 0 13

Total 134 (103) (5) (26)

Page 36: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 28

3.6. AuditNon-compliancesOfthe134conditionsofconsentrelevanttothecurrentauditatotalof5Non-Complianceswereidentified.Themajorityofnon-compliancesrelatetoprojectworkshavingcommencedinabsenceofhavingdocumentedapprovalfromthePlanningSecretarypriortocommencementofworks.The remaining non-compliances relate to other administrative requirements such as nothavingallapprovedplanspublishedontheApplicant’spublicwebsite.Table5SummaryofAuditNon-CompliancesApproval(ID) AuditfindingsA23AccesstoInformation

NodocumentationpubliclyavailableonApplicant'swebsite(asaccessed8/1/19),exceptaccesstocomplaintsregisterandheritageinformation.https://www.schoolinfrastructure.nsw.gov.au/projects/l/lindfield-learning-village.htmlLinkisprovidedtoSSDEISandapprovaldocumentationonDP&Ewebsite,butdoesnotincludestrategies,plansandprogramsrequiredundertheconditionsofconsentorotherdocumentation.Currentstageandprogressofthedevelopmentdoesnotprovideclearindicationofactualcurrentstageandprogress(asof8/1/19).Contactdetailsareprovidedforfeedbackandenquiries.Complaintsregister(updatedated17/12/19)isaccessibleforreview.Documentationpublicationrequirementsoftheconditionarenotbeingfullymetattimeofaudit.Lineitem(a):(i)WebsitedoesnotprovidealldocumentslistedinA2ofSSDCoC.(iii)allapprovedstrategies,plansandprogramsrequiredundertheconditionsofthisconsent.FollowingCoCforapproveddocuments:B16RemediationActionPlan(RAP)B29ConstructionEnvironmentalManagementPlan

B21CommunityCommunicationStrategy

Commencementofworksonsiteidentifiedduringsiteinterviewas11/11/2018.AconexreferencesCommunityCommunicationStrategyinitiallyissuedtoDPEforapprovalon25/10/18andsubsequentrevisiondatedOctober2018respondingtoDPEcommentsof29October2018,issuedtoDoEon16/11/18.CopyoftheCCSnotsightedduringtheinitialaudit.

Page 37: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 29

Approval(ID) AuditfindingsDoEcorrespondencetoDPEdated30/11/18identifiesissueofCCStoDPEforapproval23/10/18andrevisedon19/11/18.ApprovalletterfromDPE7/12/2018.DPEhasconfirmedcomplianceofsubmitteddocumentationinaccordancewiththisrequirementinaletterdated7/12/2018.CopyofCCSprovidedaspartofclosingmeeting.CCSnotapprovedpriortocommencementofwork,thereforecompliancewithallcomponentsofthisconditionhasnotbeendemonstrated.

B55ComplianceReporting

AComplianceMonitoringandReportingProgram(CMRP)hasbeendevelopedfortheproject(AspectEnvironmentalPtyLimited,Reference0011021018,Rev2dated26/10/18).LetterfromBCA(1Novemberand10November2018)certifyingsatisfactionofconditionsightedforCoCB55.CorrespondencefromDoEtoDPEdated30/11/18identifiesissueoftheCMRPtotheDPEon26/10/18(reflectingupdatedconditionsofconsenttoSSD8114),and28/11/18(respondingtoDPE).ThesamecorrespondenceidentifiesissueoftheBCALogicCertifier'sletterofcompliancetotheDPEon1/11/18.NocompliancereportsaddressingtheentiretyofthepreparedCMRPcontenthavebeenidentifiedasbeingcompletedfortheproject.Apre-constructioncompliancereportwouldhaveordinarilybeenexpectedtobeundertakenforpre-constructionactivitiespriortocommencementofconstruction.TheCMRPwasissuedtoDPEon26/10/18,BCALogicpreparedacertificationassessmentofaddressofconditionsrequiringcertificationon1/11/18(whichwasissuedtotheDPE)andconstructioncommencedon4/11/18.Thetimingconstraintsfortheprojecthaveplacedrelianceforconsiderationofcomplianceforpre-constructiondemonstrateduponBCALogiccertifyingsatisfactoryaddressofconditionsandreviewofresidualitemsbeingpickedupintheindependentaudittoavoidduplicationofeffort.Generalcompliancewiththisconditionhasbeendemonstrated,however,theCMRPwasnotsubmittedtoDPEatleasttwoweeksinadvanceofconstructioncommencing.TheComplianceReportingPost-ApprovalRequirements(DPE2018)identifycompliancereportswhereaparticularphaseisrequiredtobenotifiedtotheDepartmentandincludessubmissionofapre-constructioncompliancereportwhereaconstructionphaseisrequiredtobenotified.Thetimingrequirement

Page 38: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 30

Approval(ID) Auditfindingsforapre-constructioncompliancereportisidentifiedasbeingrequiredtobesubmittedtothePlanningSecretarypriortocommencementofconstruction.TheBCALogicletterofcertificationrepresentsacompliancereviewandreportforthepre-constructionphase,however,isnotintheformofthesubmittedCMRPdocument.Compliancewiththisconditionhasnotbeenfullydemonstrated.

B56IndependentEnvironmentalAudit

AnIndependentAuditProgrampreparedinaccordancewiththeIndependentAuditPostApprovalRequirements(Department2018)hasbeenprepared(AspectEnvironmentalPtyLimited,Reference0011011018,Rev2,dated25/10/18).LetterfromBCA(1Novemberand10November2018)certifyingsatisfactionofconditionsightedforCoCB56.Savillsletterdated6NovembernotingIndependentAuditProgramsubmittedtoDPEon1November.Notecommencementofconstruction11November.Emaildated6/11/18fromSavillsnominatingIndependentauditortocompliance@planning.nsw.gov.ausighted.Generalcompliancewiththisconditionhasbeendemonstrated.However,theIndependentAuditProgramwasnotsubmittedtoDPEatleasttwoweeksinadvanceofconstructioncommencing.Compliancewiththisconditionhasnotbeendemonstrated.

B57IndependentEnvironmentalAudit

Addressedwithinthepreparationofthiscurrentindependentauditscope.TheIAPARidentifiesarequirementtosubmittheinitialindependentauditfinalAuditReportwithin16weeksofthecommencementofconstruction,makingthefinalAuditReportdueon25/2/19.Constructionisduetobecompletedby31/1/19.TheIndependentAuditProgramandauditornominationwereprovidedtotheDP&Eon6/11/18.On20/12/18DP&Erequestedtheauditor'sCVandaletterconfirmingindependencefromtheProject.ThiscontentwasoriginallyprovidedinSection6oftheIndependentAuditProgramsubmittedtotheDepartmenton26/10/18.ReplicateconfirmationwasprovidedbyAspectandtotheDepartmenton21/12/18.TheSiteAuditcommencedon11/12/18.Section3.1.3oftheIAPARidentifiesthatIndependentAuditsmustnotcommenceuntiltheproposedauditorhasbeenagreedtoinwritingbythePlanningSecretary.

Page 39: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 31

Approval(ID) AuditfindingsNowrittenagreementtotheproposedauditorhadbeenprovidedbythePlanningSecretaryatthetimeofauditcommencement.Generalcompliancewiththisconditionisdemonstratedbythisaudititself,however,theindependentaudithascommencedinadvanceofreceiptofwrittenagreementtothenominatedauditorbeingreceivedfromthePlanningSecretary.DPEreceivedconfirmationofbothauditorcompetenceandindependencefromtheprojectasof26/10/18.FollowupbyDPEon20/12/18byrequestofauditorCVandletterofindependenceandfurtherrequestforinformationon9/1/18.Compliancewiththisconditionhasnotbeendemonstrated.

3.7. PreviousAuditRecommendationsNopreviousauditswereidentifiedashavingbeencompletedfortheproject.

3.8. EMP,Sub-plansandPostApprovalDocumentsA list of the post approval EMP and Sub-plans has been provided in Section 4.1.DocumentationreviewedaspartofthesiteauditisprovidedinSection4.9.

3.9. EnvironmentalManagementSystemAhigh-levelreviewoftheEMSadequacywasundertakenaspartoftheprojectaudit.TheEMScomponentsreviewedaspartoftheauditscopeareprovidedinTable6:Table6EMSComponentAuditScope

EMSComponent RequirementLegalRequirementsRegister

Identificationofapplicablelegislativerequirements,applicablestandards,codesofpracticeandindustryguidelineswithdemonstrationofrelevancetotheprojectscope.

Aspects/ImpactsRegister

IdentificationoftheProjectsenvironmentalaspectsandimpactswithidentificationofthoseaspects/Impactsofhighsignificancetotheproject.

RolesandResponsibilities

Identificationandallocationofrolesandresponsibilitiestorelevantsiteandmanagementpersonneltoprovideeffectivesiteenvironmentalmanagementandperformance.

Training IdentificationofawarenessandvocationaltrainingrequirementsrelevanttothenatureofworkstobeperformedandassociatedenvironmentalvaluesorrequirementsidentifiedwithintheAspects/ImpactsandLegalRequirementsregister.

MonitoringandReview ProgramandprocessformonitoringandreviewoftheProjectEMStodemonstrateapplicability.

Page 40: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 32

Communications IdentificationofhowtheEMSisimplementedduringthecourseoftheproject,includingthecommunicationofchangeandaccesstoinformation.

Findings fromtheaudit concluded thatnoclearly referencedenvironmentalmanagementsystem (EMS) was identifiable for the construction site or the development project.Components of an EMSwere generally evidenced although not demonstrably integrated.Thesehavebeen identified separately in the audit findings andAPPENDIXA as four non-compliances,althoughtheyrepresentanon-conformancewithexpectationsofanintegratedEMS.Thisabsencecreatesagapinappreciationofmanagementofriskandchangemanagementpractice which in turn feeds down to documentation, communication, training andmonitoring and reporting requirements for the development. While there were variousappropriateenvironmentalmanagementplans(EMP)evidenced inplacefortheproject,asuiteofEMPsisnotinitselfanEMS.Withtheexceptionofthelegalrequirementsregisterpresentedattheclosingmeeting,therewasnoevidenceofaproject-tailoredEMSAcomprehensivesummaryofauditfindingsisprovidedwithinAPPENDIXA.

3.10. EnvironmentalPerformanceTheenvironmentalperformanceoftheprojectwasassessedoverthreesitevisitsonthefollowingEnvironmentalAspects(Table7):Table7EnvironmentalAspectAuditScope

EnvironmentalAspect RequirementAir Dustandotheremissionsarebeingmanagedonsiteandgenerally

confinedtosite.Recordofincidents/complaints.Noise Workhoursarewithinapprovedhours.Noisemitigationevident.

Recordofincidents/complaints.Land(ErSed) Sedimentanderosioncontrolsareperformingtocontrolsurface

erosionanddischargesfromsitewithinacceptablelimits.Recordofincidents/complaints.

Land(contam) Anyidentifiedcontaminantmaterialsareeffectivelycontained,controlledandremovedfromsitefortreatmentanddisposal.Recordofanyunexpectedfinds.

Water Sitesurfacewaterismanagedtopreventscouringofbanksofreceivingwaters.Cleanwaterisseparatedfromdirtywater(ieconstructionworkscontactwater).SpillNotifications.Recordofincidents/complaints.

Waste Containmentandappropriatesortingofwasteasappropriate.Recordofincidents/complaints.

Heritage Clearidentificationofheritageitemsanddemarcationwithintheconstructionsitetopreventaccidentalharm.

Traffic Trafficmanagement,accessandflowismaintained.Notrackingofsoil/mudsontopublicroads.Recordofincidents/complaints

Page 41: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 33

Flora/Fauna Pre-clearingchecksundertaken.Demarcationofno-gozones.Recordofincidents/complaints.

Environmentalcontrolsimplementedacrossthesiteweregenerallyadequateincontrollingenvironmental risks across the project site, controls in respect of “Heritage” were lessapparent.Althoughlabellingandstorageofheritageitemswasobservedontheprojecttherewasnoobservedevidenceofdemarcationorprotectionmeasurestoprotectinadvertentimpacttoin-situ heritage items. It is important to note, however, that theproject has not had anyreportedheritageincidentsontheprojectsattimeofaudit.Theprojectsitehasreportedlybeen separately inspected by officers of OEH on occasion, with no identified issue.Identificationofprotectionmeasurestoin-situheritageitems(i.e.seating)wasprovidedatthefinalclose-outmeetingwithobservationthattheseitemswereappropriatelycoveredandlabelled.Auditfindingsontheproject’senvironmentalaspectsisprovidedwithinAPPENDIXA.

3.11. ConsultationOutcomesStakeholdersidentifiedwithinSection2.6werecontactedbetweenthe7thDecember2018and29thJanuary2019,andfeedbacksoughtwithregardstoprojectperformance.AsummaryofthefeedbackreceivedisprovidedinTable8.Table8AgencyconsultationoutcomesAgency Contact Date Comment AuditScopeConsiderationKu-ring-gaiCouncil

JimTurner 7/12/2018 Thecontractorswereprofessionalintheirapproachtomanagingworksonsiteandthingsappearedtobemanagedwellduringsitevisitsfromcouncil.Thetemporaryimpactonparkingaroundthesoccerfieldwasconsideredtobetheonlynegativeimpactonthelocalcommunitywithregardsthedeliveryoftheproject(viaphonecall).

Allaspectsoftheconstructiondeliveryoftheproject.

TfNSW KenHo 7/12/2018 TfNSWweren’tawareofanyissueswithprojectcomplianceandgeneraldealingswiththeprojecthadbeengood(viaphonecall).

Impactoftheprojectonbusroutesandtimetables.

RMS AhsanulAmin 8/1/2019 RMSinformedthattheirinvolvementhasbeenminimalonStage1andtheywerenotawareofanyconcernsorissues

Impactoftheprojectonotherroadusersandtransportflows.

Page 42: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 34

Agency Contact Date Comment AuditScopeConsiderationassociatedwiththeproject(viaphonecall)

SafeWorkNSW

ThomasYeung 7/12/2018 SafeWorkwerenotawareofanycomplianceissueswiththeproject(viaphonecall)

Legislative compliance withSafeWork.

DoE Andrew Kyriacou&RebeccaWillot

11/01/201928/01/2019

MeetingbetweenDP&E,DoE,SavillsandAspectdiscussedtheapprovalandappointmentofRichardJohnson(Aspect)asIndependentAuditor.DuringthefinalauditmeetingDoEwererequestedtobringforwardanyissuesthatshouldbeconsideredwithintheindependentenvironmentalauditfortheLindfieldLearningVillagethatshouldbeaddedtothescopeoftheauditandrequiresubsequentadjustmenttotheauditscope.

Acceptanceandapproval ofRichard Johnson (Aspect) asIndependentAuditor.Impactonprojectcompliancewithconditionsofconsent.

DP&E AndrewBeattie 11/01/201929/01/2019

MeetingbetweenDP&E,DoE,SavillsandAspectdiscussedtheapprovalandappointmentofRichardJohnson(Aspect)asIndependentAuditor.Phonecallandemailfollow-uprequestingfeedbackonparticularareasthatshouldbeconsideredwithintheindependentenvironmentalauditfortheLindfieldLearningVillagethatshouldbeaddedtothescopeoftheauditandrequiresubsequentadjustmenttotheauditscope.

Acceptanceandapproval ofRichard Johnson (Aspect) asIndependentAuditor.Noadditionalscopeitemsidentified.Impactonprojectcompliancewithconditionsofconsent.

Based on consultationwith agencieswithin this audit scope, it can be reported that theprojecthasbeenoperatingwithinexpectationsofthoseindividualagencies.

3.12. ComplaintsAsiteprojectcomplaintregisterwithasingleentrywassightedon11thDecember2018.Theauditidentified4differentavenuesforregisteringacomplaint,theproject’swebsitetoeither [email protected] [email protected]

Page 43: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 35

alternatively to the dedicated project 1300 Community Hotline number or to Taylors’Project/SiteManagementTeamdirectly(3potentialnumbers).TheNSWDepartmentofEducation–SchoolInfrastructureComplaintsRegisterfortheprojectwas viewed online (last updated 17 December 2018). The register had a total of fourcomplaints, three of which are closed out and one remaining open and still underinvestigation.However,therewasnoevidenceofverifiedcloseoutwiththecomplainant.

3.13. IncidentsAsiteprojectincidentregisterwasprovidedaspartofthesiteaudit.Theregisterhastwoentries, themost recent incident dated December 2018. A summary of the incidents isprovidedbelow:Incident01:InjurytositestaffDate:25/10/2018Description:TravisfromWacoScaffoldingwaswalkingdownstairstolowercarpark,steppedinaholeinthestepandfelloverinjuringrightankle.Resolution:Gotsenttothedoctorandwasplacedonlightduties.Incident02:DisturbanceofAsbestosContainingMaterialDate:December2018(exactdatenotprovided)Description:DrillingofasbestosinmusicroomfromMechanical.Resolution:Areagotbarricadedoffandpurecontractingcametositeanddecontaminatedalltheworkers.Clothing&toolsgotdecontaminated.Workareais isolatedwithhardfencingandPVAcompressedplasticsheets.Airmonitoringwas inplace.Purecontractingdoneaninspectionetc.Resultscameback,andasbestoswasnegative.Closeoutdocumentationforeitherincidentorconfirmationofcommunication/reportingtoSavillsortheDepartmentEducationwasnotsightedduringtheaudit.PreviousdealingswiththeDP&EComplianceTeamhaveidentifiedthatanincidentisdefinedas:“anoccurrenceorasetofcircumstancesthatcausesorthreatenstocausematerialharm”.Based on this definition, the proponent has not identified any occurrences or a set ofcircumstancesontheprojectrequiredtobereported.

3.14. ActualVersesPredictedEnvironmentalImpactsThe following section addresses the perceived impacts and suggested mitigation andmanagement measures from the EIS versus actual impacts and mitigation measuresimplementedaspartoftheprojectdelivery.FollowingreviewoftheEISrecommendationsandfindingsoftheprojectaudit,ithasbeendeterminedthatpredictedimpactsalignwiththenaturescaleandextentofworksobservedonsite.

Page 44: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 36

Site activities and management plans / control documentation needed to address thepredicted impacts was evidenced, however, some expected documentation was notidentified i.e. a hazmat register for the building, procedures formanaging specialwastes(storage/disposal of Ardex™ chemical drums [refer to Appendix C Photolog], and PCBcontaminatedsoils),andidentificationandcommunicationofbushfireriskandperformanceofconstructionactivitiescomprisinghotworks.AmoredetailedsummaryisprovidedinTable9.Table9ActualVersusPredictedEnvironmentalImpactsEISComponent Approval

IDAssessmentofactualversusactualimpacts

Waste-EISSection3.5StateEnvironmentalPlanningPolicyNo.55–RemediationofLand(SEPP55)–EISSection5.4Construction&DemolitionWasteManagementPlan–AppendixT

B14,B15,B16,B29,C38

Section 3.5 of the EIS points to, but does not identify,Australian Standards, conditions of consent and measuresoutlined in the Construction & Demolition WasteManagement Plan (Appendix T) “to ensure all waste iscarefullyremoved,packagedandtransportedfromthesitetoan appropriate waste facility. This will minimise potentialcontactwiththewasteandreduceenvironmentalriskfromanaccidentalrelease.”.AppendixTidentifies407m3ofasbestosmaterialsinthesitedemolitionwastestream.Itfurtheridentifiesthat“aseparateasbestosmanagement planwill be produced”. There is noconsideration of hazardous materials waste managementotherthanforasbestos.APreliminaryEnvironmentalSiteAssessmentwasundertakenas part of the initial contamination assessment forconsiderationduring theEIS. The report concluded that:“Ahazardousbuildingmaterialassessmentshouldbeundertakenpriortoanyrefurbishmentworks.Anasbestosregisterforthebuildingsmayalreadyhavebeencompleted.”A hazardous materials building assessment report has notbeen sighted as part of this audit. Although an asbestosidentificationanalysisreportwassighted.NospecificproceduresforthemanagementofPCBwastesorwasteArdex™drumshavebeenidentifiedforconsideration.

Bushfire–EISSection7.11andTable8Section9

B35 ThepreparationofaBushFireEmergencyManagementandEvacuationPlanwassuggestedbytheEIS.A Bush Fire and Flood Emergency Response Sub-Plan waspreparedbyEWFWConsultingEngineerstosatisfyCoCB35.Althoughthecontentoftheplangenerallycomplieswiththe

Page 45: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 37

EISComponent ApprovalID

Assessmentofactualversusactualimpacts

requirementsofCoCB35,consultationwithSESwhichhadnotbeeninitiallyevidenced.ThepotentialimpactidentifiedintheEISisaccurate,however,it lacks a consideration of the potential impact forconstructionhotworkstobean ignitionsourceforbushfirewithin the site and therefore subsequent site controls areabsent, i.e. identification of bushfire risk on a daily basis,integration of this into pre-start risk advisory notices andinclusion on the site risk board as well as consideration ofelevationofcontrolsforperformanceofhotworksbasedonescalatingfireriskortotalfirebandays.

NoiseandVibration–EISSection7.10andTable8Section9

B31 The EIS concluded that aNoise andVibrationManagementPlanshouldbedevelopedfortheproject.A Construction Noise and Vibration Management Sub-PlanpreparedbyAcousticLogiccomplieswithCoCB31andnoisemonitoring results identified general compliance withoccasionalexceedancesandoccasionalnoisepeaksoutsideofapprovedconstructionhours.NorevieworanalysisoftheseresultstointerpretanysiteresponsewasprovidedaspartoftheMarshallDayreport.Elevatednoiselevelswererecordedontheprojectsitebeforeapproved construction start times on the following days:Friday 07 December (Logger 3) before 8am; Saturday 08December (Logger 2) before 7am; Saturday 08 December(Logger3)before7am;Sunday09December(Logger3)foraperiodbetween6amand7am(NBnoconstructionauthorisedonSundays); Monday10December(Logger4)before7am;Thursday13DecemberLogger4recordingwasdisturbedjustafter6amandresumedshortlybefore9am."HighlyNoiseAffected"levelsLAeq>75dB(A),werenotedtohaveoccurredonthefollowingdays:Saturday08Decemberat Logger 2, 6:30am - 7am; Wednesday 12 December atLogger 1, 8am - 10am and 12pm - 3pm; Thursday 13DecemberatLogger1,8am-3pm;andThursday13DecemberatLogger4,11am-3pm.Intheabsenceofanalysisoftherecordedresultsthereisnoconfirmationprovidedoflikelysourcesofnoisegeneratedoutofhours,andnoabilitytodemonstratenoisesourcesdidnotoriginatefromtheworksitewherethesitehasbeenaccessedoutsideofnominatedconstructioncommencementhours.

Page 46: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 38

3.15. SiteInspectionSiteinspectionsaspartoftheauditwereundertakenon11thand13thofDecemberaswellasthe4thJanuary2019.Duringthesiteinspections,observationsontheproject’senvironmentalperformance (Section 3.10) were made and captured by site photos. The reviewing ofdocumentation and EMS components, where available, was also undertaken to identifypotentialenvironmentalandoperationalrisks(Section3.9).Environmentalperformancewasobservedtobegenerallyacceptable.Reviewofdocumentationidentifiedanabsenceofchangemanagementprocessesandthetrackingandmonitoringofcorrectiveactionsacrosstheproject.Forinstance,anumberofErSedcontrolswereobservedonthe11thand13thDecemberrequiringcorrectiveactions.Onreturningtositeonthe4thofJanuarynocorrectiveactionshadbeenundertakentoaddresstheseobservations.

3.16. SiteInterviewsThepersonnellistedinSection3.4wereinterviewedduringthethreesitevisitstotheprojectsite.Siteinterviewsonthe11thand13thDecemberweregenerallystructuredaroundtheSSDCoCandhowtheprojectdemonstratescompliancewitheachofthoseconditions,andassessingunderstandingofenvironmentalriskandperformancemanagementrequirementsonsite,onthebasisofreviewedEIScontentandexpectedEMSelements(i.e.aspects/impactsregister).Followingreviewofinformationgatheredduringtheprevioussitevisitsonthe11thand13thDecember, the site interviews conducted on the 4th of January targeted specificdocumentationprocessesandsiteprocedurespertainingtoenvironmentalmanagementon-site.Overall, thesite interviewsdemonstratedthattheprojectpersonnelgenerallyhadagoodunderstanding of environmental risks and controls associated with the project with theexceptionofbushfiremanagement.Inthisinstance,staffinterviewedhadidentifiedthesiteasbeingtheirfirstconstructionsitewithasignificantbushfirerisk.ThesiteinterviewsalsoindicatedanabsenceinclarityofhowanEMSshouldbeimplementedatprojectlevelandits interrelationshipwithsiteEMPs.Thiswasparticularlyrelevantwithrespect tocommunicationandmanagementofchangewhere intervieweeswereaskedtodescribe a process to document/record, communicate, and assign managementmeasures/actionstomanagechangeontheproject.Whileprocessesweredescribed,theydid not link back to an integrated management system including reference to the legalrequirementsregisteroraspectsimpactsregistertoinformtheprocess.

Page 47: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 39

3.17. PreviousAnnualRevieworComplianceReportRecommendationsTherehasbeennopreviouscompliancereportsorannualreviewsfortheproject.

3.18. ImprovementOpportunitiesImprovement opportunities for 7 conditions of consent were identified during the audit.ThesearesummarisedinTable10(below).Considerationofthesesuggestionsmayenhancesiteenvironmentalperformance.Table10ImprovementOpportunitiesvsPrescribedCoCsConditionReference ImprovementOpportunityA21ApplicabilityofGuidelines

Referencetoguidelines,CodesofPractice,protocols,StandardsorpoliciesofparticularrelevancetothesiteandprojectshouldbedocumentedwithinaLegalRequirementsRegisterforeaseofreferencetobaselineversionsattimeofconsent.

AN1AdvisoryNotes Maintaininganup-to-datesite/projectfocussedlegalrequirementsregistertoenablemonitoringandperformanceassessmentagainstregulatoryobligations.

B26Biodiversity Thereisnoverificationofimplementationofthedocumentedprocesstodemonstratehowclearingactivitiesarebeingmonitoredandmanagedweektoweek.Sometreereportsidentifyapotentialchangetothetotalnumberoftreesremoved,butnoindicationofwherethisquantumistrackedorcommunicated.FinalreportbyKleinfelderexpectedtoprovidequantificationagainstCoCprescriptionof1.74ha,however,proactivechangemanagementidentifyinganyadditionalclearingrequirementsorlossofvegetation(iestormorsafetyrelated)andnotificationswouldbeofbenefitratherthanbeinglefttotheendofclearingreportwherespecificknowledgeoractualrecordmaybelost.

B30ConstructionTrafficandPedestrianManagementSub-Plan

NotedthatinCTPMSPSection1.5Objectivesincludes“tosatisfythekeylegalrequirementsrelatedtoTraffic,TransportandAccesstosite”andto“ensurecompliancewithrelevantspecificationandtheRMS–TrafficControlatWorkSitesHandbookVersion4”,yetthesearenotspecifiedfurtherandnotrecordedinalegalrequirementregisterforthesite/development.

B31ConstructionNoiseandVibrationManagementSub-Plan

Theprojecthasfouravenuesforcomplaints(Taylors’directly,1800number,SIFeedbackandLLVdirectemail).Thismayresultinnotallcomplaintsbeingdocumentedandeffectivelyclosedout.Taylors’complaintsregisterhasasinglecomplaintwhereastheSINSWcomplaintsregisteronlinehasfour.Allcomplaintsregisteredshouldbereviewedregularlytoenableconsolidationofallprojectcomplaintssotheycanbeefficientlymanagedandclosedoutandanycorrectiveactionssystemicallyimplementedacrossthesite.

C28ErosionandSedimentControl

Anapproachtodetail,recordandmonitortheimplementationandcloseoutofenvironmentalpreventiveandcorrectiveactionswouldbebeneficial.

Page 48: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 40

ConditionReference ImprovementOpportunityDuringthesiteauditson11thand13thDecember,anumberofErSedcontrolswereobservedrequiringattentionthatwerenotaddressedby4thJanuarydespiteexpectedidentificationwithindailywalkoversanddocumentedweeklysiteinspectionshavingbeenundertaken.

GeneralObservation Whereaplanordocumentisapprovedbutamendments/additionsarerequested,includetrackingtodemonstratetheamendment/additionhasbeeneffectedandcurrentdocumentisissuedforreference.

AsummaryofimprovementopportunitieswithrespecttotheimplementationofanEMSaresummarisedinthetablebelow(Table11).Table11ImprovementOpportunitiesVSEMSComponentsEMSComponent ImprovementOpportunityLegalRequirementsRegister

Acurrentandup-to-dateandcurrentlegalregistershouldbedevelopedspecifictothesiteandproject.

Aspects/ImpactsRegister

AcurrentAspect/Impactsregistershouldbedevelopedfortheprojecttosupportriskassessment,changemanagementandcommunicationsandtraining.

RolesandResponsibilities

ProjectshouldconsiderconsolidatingrolesandresponsibilitiesprovidedintheCEMPandPEMP,andbetterdefiningtherolesandresponsibilitiesassignedtositeenvironmentalmanagementactivitiesfortheproject.

Training Projectshouldconsidertheimplementationofaformaltrainingregisterthatcandemonstrateundertakingofenvironmentaltrainingontheproject.Particularlyinrespectofspecialistroles/responsibilities(egtreeclearingandhazardouswastemanagement/removal)

MonitoringandReview TheimplementationofaformalprogramorprocesstomonitorandreviewtheprojectEMS,updatestoEMPsandsiteenvironmentalperformanceinformation(egnoisemonitoringdata)shouldbeconsidered.

Communications Aprocesstoformallycommunicate,trackandmonitorcorrectiveactionsaswellasthecommunicationofchangemanagementshouldbeconsidered.Whiletheprojectdemonstratedthatregularenvironmentalsiteinspectionshavebeenundertakenitwasnotdemonstratedhowfollow-up/correctiveactionswerebeing,tracked,monitoredorcommunicatedatprojectandsystemicleveltoincreaseawareness,enhanceriskassessmentprocessesandpreventrecurrence.

Page 49: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 41

AsummaryofimprovementopportunitiesforEnvironmentalAspectsareprovidedinTable12(below).Table12ImprovementOpportunitiesvsEnvironmentalAspectsEnvironmentalAspect RequirementLand(ErSed) Anapproachtodetail,recordandmonitortheimplementationand

maintenanceofenvironmentalcontrolsaspreventativeandcorrectiveactionswouldbebeneficialtoenhancesiteperformance.

Land(contam) Aprocesstorecordunexpectedfindsneedstobeestablishedandupdatedforfuturereference.Thiscouldbeintheformofaregisterorsitemap.

Water AttentiontomaintenanceofErSedcontrolsisrequiredacrossthesite.

Waste Confirmationrecordsofanyspecialwastedisposalshouldbemaintainedseparately(i.e.PCBcontaminatedsoilsandArdexdrumsinaccordancewithPCBChemicalControlOrderorMSDSrespectively).

Heritage Aformalprocessforthetrackingandmonitoringtheconditionofheritageitemsremovedorremainingin-situontheprojectshouldbeconsidered.

3.19. KeyStrengthsThroughouttheauditprocessthesitedemonstratedagenerallygoodlevelofhousekeeping(site inspections). The key strengthdemonstratedat site levelwas theproject’s ability tocommunicateandmanagehigh-riskactivitiesbetweensimultaneousoperationsviathedailypre-startnotificationsandhigh-riskwhiteboard.Althoughsomeenvironmentalissueswereobservedrequiringcorrectiveactions,atnotimeduringthesiteinspectionswereunsafeactionsoractivitiesobserved.Thisisatestamenttothe diligence and attention provided by the project delivery team, given the acceleratedtimeframefacingthecontractorsandthedeliveryteamtoensureprojecthandoverforthemilestonedateattheendofJanuary.

Page 50: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 42

4. RECOMMENDATIONS

4.1. Non-ComplianceRecommendationsAtotalof5non-complianceswereassignedtotheproject.Thesenon-compliancescanbecategorisedintothreemainareas:

• Documentationandverificationofevidence• Commencementofconstructioninadvanceofinstrumentapproval• Commencementofinstrumentoutsideofdesignatednotificationperiod

Due to an accelerationproject delivery schedule, 4non-compliances canbe attributed totimingandcommencementofconstruction.Theothernon-compliancecanbeattributedtotheabsenceofdocumentedandverifiedevidence.AsummaryofthesemanagementareaswiththeassignedCoCisprovidedinTable13(below).Table13Non-ComplianceClassificationsApproval(ID) Managementarea/classificationA23AccesstoInformation

Documentationandverificationofevidence

B21CommunityCommunicationStrategy

Commencementofconstructioninadvanceofinstrumentapproval

B55ComplianceReporting

Commencementoutsideofdesignatedperiod/timeframe

B56IndependentEnvironmentalAudit

Commencementoutsideofdesignatedperiod/timeframe

B57IndependentEnvironmentalAudit

Commencementoutsideofdesignatedperiod/timeframe

It is key that the Project continues to document and confirm relevant certifications andapprovalswiththerelevantapprovalauthorityand/orcertifier.

4.2. ImprovementOpportunitiesRecommendationsAtotalof7improvementopportunitieswereassignedtotheproject’sperformanceagainsttheprescribedCoC.Fromasystemicperspective,theseimprovementopportunitiescanbebroadlyclassifiedintothefollowingmanagementareas:

• ImplementationofLegalRequirementsRegister;and• Monitoringandmeasurementofenvironmentalperformance

Page 51: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 43

These findings were further consolidated by the high-level EMS review which identifiedanother6improvementopportunities,pertainingto:

• ImplementationofLegalRequirementsRegister;• ImplementationofAspect/ImpactsRegister;• ConsolidationofRolesandResponsibilities;• Documentationoftrainingandinductionrecords;• Monitoringandmeasurementofenvironmentalperformance;and• ImplementationofChangeManagementProcess

A review of management measures implemented to manage risk associated withenvironmental aspects on the project, an additional 5 improvement opportunities wereidentified.Theseimprovementopportunitieswereattributedto:

• Monitoringandmeasurementofenvironmentalperformance;• DocumentationofTrainingandInduction;• ImplementationofChangeManagementProcess;and• DocumentationandMaintainingofRecords

AnoverviewoftheseimprovementopportunitiesisprovidedinTable14(below).Table14ImprovementOpportunitiesClassificationsApprovalID ImprovementopportunityclassificationA21ApplicabilityofGuidelines ImplementationofLegalRequirementsRegisterAN1AdvisoryNotes ImplementationofLegalRequirementsRegisterB26Biodiversity MonitoringandmeasurementofenvironmentalperformanceB30ConstructionTrafficandPedestrianManagementSub-Plan

ImplementationofLegalRequirementsRegister

B31ConstructionNoiseandVibrationManagementSub-Plan

Monitoringandmeasurementofenvironmentalperformance

C28ErosionandSedimentControl

Monitoringandmeasurementofenvironmentalperformance

C40IncidentNotification,ReportingandResponse

Monitoringandmeasurementofenvironmentalperformance

LegalRequirementsRegister(EMS)

ImplementationofLegalRequirementsRegister

Aspects/ImpactsRegister(EMS) ImplementationofAspect/ImpactsRegisterRolesandResponsibilities(EMS) ConsolidationofRolesandResponsibilitiesTraining(EMS) DocumentationoftrainingandinductionrecordsMonitoringandReview(EMS) MonitoringandmeasurementofenvironmentalperformanceCommunications(EMS) Monitoringandmeasurementofenvironmentalperformance

ImplementationofChangeManagementProcessLand(ErSed)(EnvironmentalAspect)

Monitoringandmeasurementofenvironmentalperformance

Page 52: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 44

ApprovalID ImprovementopportunityclassificationLand(contam)(EnvironmentalAspect)

DocumentationofTrainingandInductionMonitoringandmeasurementofenvironmentalperformanceImplementationofChangeManagementProcess

Water(EnvironmentalAspect) MonitoringandmeasurementofenvironmentalperformanceWaste(EnvironmentalAspect) DocumentationandMaintainingofRecordsHeritage(EnvironmentalAspect) Monitoringandmeasurementofenvironmentalperformance

Page 53: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 45

5. CONCLUSION

ThisIndependentAuditReportsatisfiestherequirementsofSSD8114conditionofconsentB57. The audit has been conducted in accordancewith theDepartment of Planning andEnvironment’s IndependentAuditPostApprovalRequirements(June2018)andtheAS/NZSISO19011:2014–GuidelinesforAuditingManagementSystems.Theauditreportdocumentsthe outcomes of the review of compliance undertaken by Aspect. The audit processcomprisedof:

• Apre-siteauditdocumentationreview,siteopeningmeetingandaudit(conductedonthe11thand13thofDecember2018andthe4thofJanuary2019);

• Post-siteauditdocumentationreviewandfollowupincludingclosingmeeting;• Issuingofdraftauditreport;• Post-DraftAuditreportreviewandprovisionofadditionaldocumentation;• IssuingofFinalReport(thisreport)

ItwasfoundthattheprojectwasgenerallycompliantwiththeCoCandconstructionactivitiesaregenerallybeingmanagedinaccordancewiththerequirementsoftheSSDinstrument.Non-complianceswereidentifiedinrespectof:

• Absenceofpublicationofdocumentation;• Commencementofconstructioninadvanceofsomeoftherequirementsunderthe

consent;and• Commencementofanactivityoutsideofprescribedperiod.

Improvementopportunitiesandobservationswereidentifiedpertainingto:

• Documentinglegalrequirements;• Documenting a risk-based approach to support compliance demonstration with

proceduralrequirementsoftheCEMP;• Needforprogressiverecordingofenvironmentalsiteperformanceandmanagement

of change as well as linking these both to a higher-level risk assessment (egaspects/impactsregister)andcommunicationofchange;

• Aligning site documentation to be reflective of the SSD 8114 prescribed contentexpectations;

• ProceduralrequirementsoftheCEMP,specificallythemanagementofhotworksonsiteandmanaging siteawarenessnotifications forbushfiredanger levels thatmayhaveimplicationsforconductofhigh-riskactivitiesonsite;

• ManagementandimplementationoftheAsbestosManagementPlanwithrespecttothe site structures / built-form, and consideration of statutory requirementspertainingtocommunication(i.e.labelling)andconsultationintheworkplace,andinadvanceofprojecthandover;

• Collationofthird-partyreferencedocumentation;and• Clear integrationof requirementsacrossmanagementsystemsandworkpractices,

includingnominatedrolesandresponsibilities.

Page 54: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 46

TheauditconcludesthattheLindfieldLearningVillageprojectisgenerallybeingundertakenincompliancewiththerequirementsofSSD8114.

Page 55: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 47

APPENDIXA-AUDITPROTOCOLANDFINDINGS

Page 56: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page1of27

DatesofAudit 11/12/18;13/12/18;4/1/19Auditors RichardJohnson;NormanMcCombLocation LindfieldLearningCentre,Ku-Ring-Gai

CompliantNon-

compliantNotTriggered

Air Dustandotheremissionsarebeingmangedonsiteandgenerallyconfinedtosite.Recordofincidents/complaints.

Anumberofminordustgeneratingoccurrenceswereobservedduringthesiteauditonthe13thDecember.Theseacivitiesincludedstockpilingandexcavatoractivities,althoughminorinnature.Duringthesitevisitonthe13thDecember,stockpiliesattotherearofthesitewereobservedtobecoveredbypolyandgeofabricsheeting.Thestockpileswereobservedtobedry.

Whilstmeasuresweretakentocontroldustemissionsfromstaticstockpilesbycovering,dustsupression(wettingdown)onloosedirtareasofthesitewasnotobserved.

Emissionsobservedtobeconfinedtosite.

Noise Workhoursarewithinapprovedhours.Noisemititgationevident.Recordofincidents/complaints.

Thesiteaccesslogbookwasobsevedtocontainsiteentriesbefore07:00am,howeveritwasidentifiedthatthisrepresentssiteentryandmakesallowanceforpre-startsandtoolboxtalksinadvanceofcommencementofactualsiteconstructionworks.

Thereisnorecordofincidentsorcomplaintsofexcessivenoisegeneratingactivitiesoutsidetheapprovedworkhours.

Land(ErSed) Sedimentanderosioncontrolsareperformingtocontrolsurfaceerosionanddischargesfromsitewihtinacceptablelimits.Recordofincidents/complaints.

AnumberofErSedcontrolsrequiringattentionandmaintenancewereobservedacrossthethreesiteauditvisits,on11and13December,and4thJanuary.Aweeklyenvironmentalinspectionchecklist(10-15December)referstosedimentcontrol"Areallsedimentcontrolmeasuresfollowed,aspersedimentcontrolplan?"

TherewasnoevidencetosuggestcorrectiveactionsweretakentoaddresstheErSedcontrolsidentifiedasneedingattentionwithinthesiteinspectioncomponentsoftheaudit.

WhilesomeErSedcontrolsinternaltothesitewereobservedtorequiremoreroutinemaintenancetomaintaintheirintegrity,therewerenoobservedsedimentdischargesfromsitethatwererelatedtoconstructionsurfacedisturbanceactivitiesthatwouldotherwisebeabovewhatwouldbeexpectedfromanaturalstormevent.Itwasnotedduringtheinspectionofthe4/1/19thatsomevegetationmanagementofstormaffectedtreeshadresultedinimpacttosomeoftheinternalsiteErSedcontrols.

Anapproachtodetail,recordandmonitortheimplementationandmaintenanceofenvironmentalcontrolsaspreventativeandcorrectiveactionswouldbebeneficialtoenhancesiteperformance.

Land(contam) Anyidentifiedcontaminantmaterialsareeffectivelycontained,controlledandremovedfromsitefortreatmentanddisposal.Recordofanyunexpectedfinds.

AnunexpectedfindsprocedureisprovidedwithintheRAPforthesite.WhereunexpectedcontaminationhasbeeencounteredTaylorshaveengagedaspecialistEnvironmentalConsultanttomonitorworksandprovideclearancecertificates.RecordssightedofEISfieldvalidationinspection(referenceEISJobNo:E30259KD,dated13/11/2018).Noindicationastohowthisinformationwasbeingrecordedorcontrolledwithintheprojectmanagementsystem.

Aprocesstorecordunexpectedfindsneedstobeestablishedandupdatedforfuturereference.Thiscouldbeintheformofaregisterorsitemap.

Water Sitesurfacewaterismanagedtopreventscouringofbanksofreceivingwaters.Cleanwaterisseparatedfromdirtywater(ieconstructionworkscontactwater).SpillNotifications.Recordofincidents/complaints.

Therewasnoevidenceofscouring,orrillerosionontheproject.

Theprojectdidnothaveanyreportedspillincidentsoranywaterrelatedincidents.

AttentiontomaintenanceofErSedcontrolsisrequiredacrossthesite.

Waste Containmentandappropriatesortingofwasteasappropriate.Recordofincidents/complaints. Allbinswereobservedonsitewerewellmaintainedandwasteappearedtobesegregatedappropriately.TheTaylors'projectteamreceivesmonthlyreportsonwastevolumesandclassfification.

Wastemanagementmeasuresforthesitearesatisfactory.Confirmationrecordsofanyspecialwastedisposalshouldbemaintainedseparately(iePCBcontaminatedsoilsandArdexdrumsinaccordancewithPCBChemicalControlOrderorMSDSrespectively).

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

AssessmentofEnvironmentalPerformance

EnvironmentalAspect

Page 57: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page2of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Heritage Clearidentificationofheritageitemsanddemarcationwithintheconstructionsitetopreventaccidentalharm.

Heritageitemstoberetainedhavebeenremovedandstoredinasecurelocation.

Remainingitemsin-situhavebeencolourcoded/taggedinaccordancewiththeirheritagestatus.

Therewasnoinitialobservedevidenceofdemarcationorprotectionmeasurestoprotectin-situheritageitemsduringtheaudit.

Demonstrationofrestrictionofaccesstoheritageitemsbymeansofcoverprotectiontoseatingwasdemonstratedbytheprojectteamduringthesiteclosuremeeting.

Asanimprovementopportunity,theprojectteamcouldtrackandmonitortheconditionofheritageitemsremovedorremainingin-situtoaffirmsuitabilityofprotectionmeasures.

Traffic Trafficmanagement,accessandflowismaintained.Notrackingofsoil/mudsontopublicroads.Recordofincidents/complaints

Thetrackingofsoil/mudstopublicroadswasnotobservedduringthesiteauditdates.

Theprojecthastrafficcontrolsubcontractorsmanagingtheflowofvehiclesaroundthesiteentryandlocalroads.

TheNSWDepartmentofEducation–SchoolInfrastructureonlinecomplaintsregisterhasaTrafficComplaintlogged12December.Thecomplaintisstillbeinginvestigated.

Adeliverylogdated5thDecember2018wassightedidentifyingcontrolofmaterialsdeliveryandsiteco-ordinationforreceptionofthedelivery.

Sitetrafficmeasuresforthesiteareconsideredsatisfactory

Flora/Fauna Pre-clearingchecksundertaken.Demarcationofno-gozones.Recordofincidents/complaints. ThisareaissolelymanagedbyKleinfelder.Treetaggingsandmarkingswereobservedacrosstheprojectsitethatidentifiedtreestoberetained,removedorcontainingnests.Demarcationofno-gozoningwasobservedintheareatothefrontandeasternsideofthemainschoolbuilding.Taggingalonewasusedfortreesintheeasterncarparkandtothesouthofthemainbuilding.

Controlmeasuresimplementedtomanagetheprojectrisksassociatedwithfloraandfaunaaregenerallyacceptable.Howver,therewereinstanceswhendemarcationofno-gozoiningwasinconsistentacrosstheproject.

LegalRequirementsRegister

Identificationofapplicablelegislativerequirements,applicablestandards,codesofpracticeandindustryguidelineswithdemonstrationofrelevancetotheprojectscope.

Alegalregisterfortheprojectwassightedbutthisdidnothaveanyentries.

Therewasnoclearindicationofalinkagebetweenon-siteactivitiesandchangemanagementprocessesandoverarchingEMSelements.ReliancewasontheprojectCEMPasthereferenceforsitecontrolmeasures.

ConditionsofapprovalcontainedinCouncilapprovalofworksinthepublicroad(s139RoadsAct),datedOctober2018andNovember2018respectively,shouldberecorded.

ALegalRegisterwasprovidedbyTaylorsduringtheclosingauditmeeting.Theexcelcopyoftheregisterwaslastupdated30/10/09(footer)althoughitdoesincludeProtectionoftheEnvironmentOperationsAmendment(ScheduledActivitiesandWaste)Regulation2008,2011amendment.

Anup-to-dateandcurrentlegalregistertailoredtotheprojectwasnotsightedduringtheaudit.

Someobservationsforupdateofthelegalregisterinclude:(i)RegisterreferencesDepartmentofEnvironmentandClimateChange(DECC).TheregistershouldreferenceNSWEPA;(ii)NomentionofRuralFiresAct;(iii)PesticidesActdoesn'treferencetheuseofherbicidesandassociatedcontrols;iv)identifiesasunlikleytheabilityforTaylortogenerateasbestosorPCBwastes.

Adequacyoftheproject'sperformanceinlinewiththisEMSmanagementareawasdemonstrated,notingthereareareasforimprovementinrespectofcurrencyofreferencesandapplicationtositespecifics.

Aspects/ImpactsRegister

IdentificationoftheProjectsenvironmentalaspectsandimpactswithidentificatonofthoseaspects/Impactsofhighsignificancetotheproject.

AnAspects/Impactsregisterwasnotsightedfortheproject.Adailyriskregisternoticeboardwasobservedoneachdayofauditing.Pre-workriskreviewswereindicatedasbeingundertakenandissuedtocontractorteamseachafternoontoinformtheirrespectiveToolboxtalksandpre-startsthefollowingday.

Itwasidentifiedthattherewasnoprovisionforreviewofbushfirerisklevelswithinthedeclaredbushfireseasonandassociatedcommunicationstocontractorstafftoenableadjustmentofsiteactivity.AtotalfirebanwasdeclaredforSydneyon2November2018.

Therewasnoclearindicationofalinkagebetweenon-siteactivitiesandchangemanagementprocessesandoverarchingEMSelements.ReliancewasontheprojectCEMPasthereferenceforsitecontrolmeasures.

Aprojectaspects/impactsregisterwhichfeedsintothesiteriskregistershouldbedevelopedthatreferencestheProject'ssignificantaspects/impacts.

AdequacyoftheProject'sperformanceinlinewiththisEMSmanagementareacannotbedemonstrated.

High-LevelReviewofProjectEMS

Page 58: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page3of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

RolesandResponsibilities

Identifcationandallocationofrolesandresponsibilitiestorelevantsiteandmanagementpersonneltoprovideeffectivesiteenvironmentalmanagementandperformance.

TheCEMPoutlinesrolesandresponsibilitiesof"variousprojectpersonnel"and"sitestaff"generally.SitesupervisorystaffandtheHSEOfficerareidentifiedasbeingresponsibleforweeklyenvironmentalchecklistcompletion.RolesandresponsibilitiesarealsooutlinedinTaylors'ProjectEMP(PEMP).

Anumberofdiscrepanciesofassignedrolesandresponsibilitiesbetweenthetwoplanswerenoted:(1)AddtionalpersonnelareincludedinthePEMP,TheChiefOperatingOfficer(COO)andGeneralManager(GM)forFitoutandRefurbishment.(2)It'snotapparentwherethePEMPresponsibilitiesrelatingtotheCOOandGMarepickedupintheCEMPandhowthesearecommunicatedatproject/sitelevel.(3)ResponsibilitiesassignedtotheConstructionManagerinthePEMPdiffersfromCEMP(preparedbyZoic)responsibilities.(4)ThePEMPreferstoProjectSafetyAdvisor,andtheCEMPreferstoSiteHSEOfficer.(5)Theresponsibilitiesassignedtothe'ProjectSafetyAdvisor'andthe'SiteHSEOfficer'vary,withlittleoverlapinresponsibilitiesassigned.

Duringthesiteaudittherewasnoclearindicationofalinkagebetweenon-siteactivitiesandchangemanagementresponsibilitiesassignedtoprojectpersonnel.

ThePEMPpreparedbyTaylorstalkstotheirinternalEMS.ThishasnotbeencapturedbytheCEMP.

ReliancewasontheprojectCEMP(preparedbyZoic)asthereferenceforsitecontrolmeasures,notthePEMP(preparedbyTaylors).

TherewasnomentionorrecognitionofEMS

AuditfindingswouldsuggestgeneralcompliancewiththisEMSmanagementareahowever,itwouldbebeneficialtohavebetterdefinedrolesandresponsibilitiesassignedtositeenvironmentalmanagementactivities.Thiswouldprovidemoreclarityandcertaintytoprojectandsitestaffandcontractors.

Training IdentificationofawarenessandvocationaltrainingrequirementsrelevanttothenatureofworkstobeperformedandassociatedenvironmentalvaluesorrequirementsidentifiedwithintheAspects/ImpactsandLegalRequirementsregister.

Nospecifictrainingrecordsweresighted.

NoAspects/Impactsregistersighted.

Legalrequirementsregisterwasblank.

Environmentalawarenesswasincludedinsiteinductionprocess(SE-F-11RevJanuary2018),howevertheenvironmentalinductionmaterialcontentwasnotprovided.EnvironmentalawarenessontheInductionformreferedtoControlofhazardoussubstancesenteringstorwaterdrainsandwaterways,AsbestosRemovaltobecarriedourbylicencedremovalists,BushfireDangerPeriod,andcompliancewith"CEMPplan"atalltimes.

AnimplementedEMSshouldprovidearelevantanduptodatelegalregisterandanAspects/Impactsregisterrelvantforsiteoperationsandactivities.

Thesiteinductionshouldatleastprovideanoverviewofenvironmentalrisksandcontrolsrelvanttotheprojectsite.Theinductiondoesnotrefertowastemanagementcontrols,potentialforgroundcontaminants,unexpectedfinds(heritageorcontaminants),erosionandsedimentcontrols,constructionworkhours,trackingofmud,treemanagementandbushfireawareness.

Therewasalsonoclearindicationofalinkagebetweenon-siteactivitiesandchangemanagementprocessesandoverarchingEMSelements,forinstancewhattodoforanenvironmentalincident.ReliancewasontheprojectCEMPasthereferenceforsitecontrolmeasures.Adequacyoftheproject'sperformanceinlinewiththisEMSmanagementareacannotbedemonstrated.

MonitoringandReview

ProgramandprocessformonitoringandreviewoftheProjectEMStodemonstrateapplicability.

Anenvironmentalmonitoringprogramwasnotsightedfortheproject.

Therewasnoclearindicationofalinkagebetweenon-siteactivitiesandchangemanagementprocessesandoverarchingEMSelements.ReliancewasontheprojectCEMPasthereferenceforsitecontrolmeasures.

TheprojecthasnotdemonstratedaformalorinformalprogramorprocessformonitoringandreviewoftheProjectEMS,.

Page 59: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page4of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Communications IdentificationofhowtheEMSisimplementedduringthecourseoftheproject,includingthecommunicationofchangeandaccesstoinformation.

TheprojectteamhasdemonstratedeffectiveretentionandaccessibilitytodocumentationofrecordsviatheimplementationoftheAconexsystem.Howevertheredoesn'tappeartobyanymeanstodocumentandtrackchangemanagementregardingenvironmentalrisksandenablingafeedbackloopintositecommunications,trainingandcontrols.

Therewasnoclearindicationofalinkagebetweenon-siteactivitiesandchangemanagementprocessesandoverarchingEMSelements.ReliancewasontheprojectCEMPasthereferenceforsitecontrolmeasuresbutnodemonstratedprocesstocheckonthetheimplementationofactionsonthefollow-upofsiteinspections.

Whiletheprojectdemonstratedthatregularenvironmentalsiteinspectionshavebeenundertakenandthatthesefeedintothedailypre-workbriefingstocontractors,itwasnotdemonstratedhowfollow-up/correctiveactionswerebeing,tracked,monitoredorcommunicatedatprojectleveltoinformsystemicaspect/impactriskassessmentsortodriveachangeinapproachtoreducerisk.

ObligationtoMinimiseHarmtotheEnvironmentSchedule2A1

Inadditiontomeetingthespecificperformancemeasuresandcriteriainthisconsent,allreasonableandfeasiblemeasuresmustbeimplementedtoprevent,andifpreventionisnotreasonableandfeasible,minimise,anymaterialharmtotheenvironmentthatmayresultfromtheconstructionandoperationofthedevelopment.

GeneralsiteenvironmentalcontrolsinaccordancewithCEMPandsub-plansareinplace.Noevidenceofmaterialharmonoroffistewasobservedduringthreeseparatesiteinspections

TermsofConsent

Schedule2A2

Thedevelopmentmayonlybecarriedout:(a)incompliancewiththeconditionsofthisconsent;(b)inaccordancewithallwrittendirectionsofthePlanningSecretary;(c)generallyinaccordancewiththeEIS(relatingtoPhase1),ResponsetoSubmissions(relatingtoPhase1)andSupplementaryResponsetoSubmissions;(d)inaccordancewiththeapprovedplansinthetablebelowidentifiedasPhase1:DA-100RevJSitePlan08/06/2018DA-102RevDPhase1SitePlan08/06/2018DA-112RevAPhase1ProposedFloorPlanLevel206/06/2018DA-113RevCPhase1ProposedFloorPlanLevel306/06/2018DA-114RevDPhase1ProposedFloorPlanLevel406/06/2018DA-115RevEPhase1ProposedFloorPlanLevel506/06.2018DA-116RevEPhase1ProposedFloorPlanLevel606/06/2018DA-117RevBPhase1ProposedFloorPlanLevel701/06/2018DA-118RevBPhase1ProposedFloorPlanRoofLevel07/05/2018DA-300RevJNorth&SouthBuildingElevation04/05/2018DA-301RevJEast&WestBuildingElevation04/05/2018DA-400RevHBuildingSections-Sheet104/052018DA-401RevHBuildingSections-Sheet204/05/2018

Items(a)to(c)verifiedthroughsiteobservationduringsiteauditinspectionson11/12/18;13/12/18;and4/1/19,siteinterviewsonthesamedateswithTaylors'supervisorystaffandHSEOfficer,interviewswithSavill'sProjectManagementteam(4/12/18)anddocumentreview.

Item(d)notverifiedatthisstageofthedevelopment.

Schedule2A3

Consistentwiththerequirementsinthisconsent,thePlanningSecretarymaymakewrittendirectionstotheApplicantinrelationto:(a)thecontentofanystrategy,study,system,plan,program,review,audit,notification,reportorcorrespondencesubmittedunderorotherwisemadeinrelationtothisconsent,includingthosethatarerequiredtobe,andhavebeen,approvedbythePlanningSecretary;and(b)theimplementationofanyactionsormeasurescontainedinanysuchdocumentreferredtoin(a)above.

N/A Nottriggered

Schedule2A4

TheconditionsofthisconsentanddirectionsofthePlanningSecretaryprevailtotheextentofanyinconsistency,ambiguityorconflictbetweenthemandadocumentlistedinconditionA2(c)(d).Intheeventofaninconsistency,ambiguityorconflictbetweenanyofthedocumentslistedinconditionA2(c)(d),themostrecentdocumentprevailstotheextentoftheinconsistency,ambiguityorconflict.

Noprojectchangesdocumentedtriggeringanaccordanceorconsistencyassessment.

Nottriggered

LimitsofConsentSchedule2A5

Thisconsentlapsesfiveyearsafterthedateofconsentunlesstheworksassociatedwiththedevelopmenthavephysicallycommenced.

N/A Nottriggered

StudentNumbers Schedule2A6

ThispartialconsentrelatestoPhase1ofthedevelopmentonly,whichistoaccommodate350enrolledstudents.

N/A Nottriggered

ArtificialSurfaces

PartAAdministrative

ConditionsofConsent-24/10/18

Page 60: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page5of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2A7

Theremustbenoexternaluseofartificialturforsyntheticplaysurfacesonthesite,unlessaStormwaterManagementPlanispreparedandapprovedbythePlanningSecretarydetailinghowstormwaterwillbetreatedpriortoitbeingdischargedintotheNationalPark.

Taylorsconfirmedartificialturforsyntheticplaysurfaceswillnotbeinstalledonsite.

DesignModificationsSchedule2A8

TherooftopCoveredOutdoorLearningAreaandassociatedscreensandplaygroundarenotapprovedandamendedplansmustbesubmittedtothePlanningSecretaryandCertifier.

N/A Nottriggered

Schedule2A9

ThefireisolatedstairextensiontotheeasternsideoftheexistingbuildingisnotapprovedandamendedplansmustbesubmittedtothePlanningSecretaryandCertifier.

N/A Nottriggered

PrescribedConditionsSchedule2A10

TheApplicantmustcomplywithallrelevantprescribedconditionsofdevelopmentconsentunderPart6,Division8AoftheEP&ARegulation.

Achievementdemonstratedbyfindingsofthisaudit.

PlanningSecretaryasModeratorSchedule2A11

IntheeventofadisputebetweentheApplicantandapublicauthority,inrelationtoanapplicablerequirementinthisapprovalorrelevantmatterrelatingtotheDevelopment,eitherpartymayreferthemattertothePlanningSecretaryforresolution.ThePlanningSecretary’sresolutionofthemattermustbebindingontheparties.

NodisputesrelatingtoStage1oftheprojecthavebeencommunicatedduringthisaudit.

Nottriggered

LongServiceLevySchedule2A12

Forworkcosting$25,000ormore,aLongServiceLevymustbepaid.ForfurtherinformationpleasecontacttheLongServicePaymentsCorporationHelplineon131441.

Documentationthatthelongservicelevyhasbeenpaidwassighted. Compliant

LegalNoticesSchedule2A13

AnyadviceornoticetotheconsentauthoritymustbeservedonthePlanningSecretary. N/A Nottriggered

EvidenceofConsultationSchedule2A14

Whereconditionsofthisconsentrequireconsultationwithanidentifiedparty,theApplicantmust:(a)consultwiththerelevantpartypriortosubmittingthesubjectdocumenttothePlanningSecretary/Certifierforinformation/approval;and(b)providedetailsoftheconsultationundertakenincluding:i)theoutcomeofthatconsultation,mattersresolvedandunresolved;andii)detailsofanydisagreementremainingbetweenthepartyconsultedandtheApplicantandhowtheApplicanthasaddressedthemattersnotresolved.

ConsultationwithidentifiedpartieshasbeenloggedbySavillsontheAconexsystem.

ConsultationwithidentifiedpartiesforanumberofindividualCoCswassightedincorrespondencefollowingtheclosingAuditmeeting.TheseconsultationtablesinadditiontotheAconexsystemdemonstratesthattheprojectisgenerallycompliantwiththiscondition.

Staging,CombiningandUpdatingStrategies,PlansorProgramsSchedule2A15

WiththeapprovalofthePlanningSecretary,theApplicantmay:(a)prepareandsubmitanystrategy,planorprogramrequiredbythisconsentonastagedbasis(ifacleardescriptionisprovidedastothespecificstageandscopeofthedevelopmenttowhichthestrategy,planorprogramapplies,therelationshipofthestagetoanyfuturestagesandthetriggerforupdatingthestrategy,planorprogram);(b)combineanystrategy,planorprogramrequiredbythisconsent(ifaclearrelationshipisdemonstratedbetweenthestrategies,plansorprogramsthatareproposedtobecombined);and(c)updateanystrategy,planorprogramrequiredbythisconsent(toensurethestrategies,plansandprogramsrequiredunderthisconsentareupdatedonaregularbasisandincorporateadditionalmeasuresoramendmentstoimprovetheenvironmentalperformanceofthedevelopment).

Nostrategyorplansidentifiedasbeingstaged.

Schedule2A16

IfthePlanningSecretaryagrees,astrategy,planorprogrammaybestagedorupdatedwithoutconsultationbeingundertakenwithallpartiesrequiredtobeconsultedintherelevantconditioninthisconsent.

Nostrategyorplansidentifiedasbeingstaged.

Schedule2A17

IfapprovedbythePlanningSecretary,updatedstrategies,plansorprogramssupersedethepreviousversionsofthemandmustbeimplementedinaccordancewiththeconditionthatrequiresthestrategy,planorprogram.

Nostrategyorplansidentifiedasbeingupdated.

DemolitionSchedule2A18

DemolitionworkmustcomplywithAustralianStandardAS2601-2001Thedemolitionofstructures(StandardsAustralia,2001).TheworkplansrequiredbyAS2601-2001mustbeaccompaniedbyawrittenstatementfromasuitablyqualifiedpersonthattheproposalscontainedintheworkplancomplywiththesafetyrequirementsoftheStandard.TheworkplansandthestatementofcompliancemustbesubmittedtotheCertifierbeforethecommencementofworks.

DemolitionworkswerecarriedoutundertheREFasexemptworks. Nottriggered

StructualAdequacySchedule2A19

Allnewbuildingsandstructures,andanyalterationsoradditionstoexistingbuildingsandstructures,thatarepartofthedevelopment,mustbeconstructedinaccordancewiththerelevantrequirementsoftheBCA.Notes:Part8oftheEP&ARegulationsetsouttherequirementsforthecertificationofthedevelopment.

LettersightedfromBCALogicdated1/11/18confirmingacceptanceofsubmitteddocumentationundertheSSDConditionsofConsentrequiringacceptancebytheCertifyingAuthority.

Page 61: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page6of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

ExternalWallsandCladdingSchedule2A20

TheexternalwallsofallbuildingsincludingadditionstoexistingbuildingsmustcomplywiththerelevantrequirementsoftheBCA.

LetterfromBCA(1November2018)forallapprovedconditionsrequringcertificationhasbeenacceptedbyapprovedcertifier.

ApplicabilityofGuidelinesSchedule2A21

Referencesintheconditionsofthisconsenttoanyguideline,protocol,AustralianStandardorpolicyaretosuchguidelines,protocols,Standardsorpoliciesintheformtheyareinasatthedateofthisconsent.However,consistentwiththeconditionsofthisconsentandwithoutalteringanylimitsorcriteriainthisconsent,thePlanningSecretarymay,whenissuingdirectionsunderthisconsentinrespectofongoingmonitoringandmanagementobligations,requirecompliancewithanupdatedorrevisedversionofsuchaguideline,protocol,Standardorpolicy,orareplacementofthem.

NodirectionsissuedbyPlanningSecretary. Referencetoguidelines,protocols,StandardsorpoliciesshouldbedocumentedwithinaLegalRequirementsRegisterforeaseofreferencetobaselineversionsattimeofconsentwouldbeofbenefit.

MonitoringandEnvironmentalAuditSchedule2A22

Anyconditionofthisconsentthatrequiresthecarryingoutofmonitoringoranenvironmentalaudit,whetherdirectlyorbywayofaplan,strategyorprogram,istakentobeaconditionrequiringmonitoringoranenvironmentalauditunderDivision9.4ofPart9oftheEP&AAct.Thisincludesconditionsinrespectofincidentnotification,reportingandresponse,non-compliancenotification,compliancereportingandindependentauditing.

N/A Nottriggered

AccesstoInformationSchedule2A23

Atleast48hoursbeforethecommencementofconstructionuntilthecompletionofallworksunderthisconsent,orsuchothertimeasagreedbythePlanningSecretary,theApplicantmust:(a)makethefollowinginformationanddocuments(astheyareobtainedorapproved)publiclyavailableonitswebsite:(i)thedocumentsreferredtoinconditionA2ofthisconsent;(ii)allcurrentstatutoryapprovalsforthedevelopment;(iii)allapprovedstrategies,plansandprogramsrequiredundertheconditionsofthisconsent;(iv)regularreportingontheenvironmentalperformanceofthedevelopmentinaccordancewiththereportingarrangementsinanyplansorprogramsapprovedundertheconditionsofthisconsent;(v)acomprehensivesummaryofthemonitoringresultsofthedevelopment,reportedinaccordancewiththespecificationsinanyconditionsofthisconsent,oranyapprovedplansandprograms;(vi)asummaryofthecurrentstageandprogressofthedevelopment;(vii)contactdetailstoenquireaboutthedevelopmentortomakeacomplaint;(viii)acomplaintsregister,updatedmonthly;(ix)auditreportspreparedaspartofanyindependentenvironmentalauditofthedevelopmentandtheApplicant’sresponsetotherecommendationsinanyauditreport;(x)anyothermatterrequiredbythePlanningSecretary;and(b)keepsuchinformationuptodate,tothesatisfactionofthePlanningSecretary.

NodocumentationpubliclyavailableonApplicant'swebsite(asaccessed8/1/19),exceptaccesstocomplaintsregisterandheritageinformation.

https://www.schoolinfrastructure.nsw.gov.au/projects/l/lindfield-learning-village.html

LinkisprovidedtoSSDEISandapprovaldocumentationonDP&Ewebsite,butdoesnotincludestrategies,plansandprogramsrequiredundertheconditionsofconsentorotherdocumentation.

Currentstageandprogressofthedevelopmentdoesnotprovideclearindicationofactualcurrentstageandprogress(asof8/1/19).

Contactdetailsareprovidedforfeedbackandenquiries.

Complaintsregister(updatedated17/12/19)isaccessibleforreview.

Documentationpublicationrequirementsoftheconditionarenotbeingfullymetattimeofaudit.Lineitem(a):(i)WebsitedoesnotprovidealldocumentslistedinA2ofSSDCoC.(iii)allapprovedstrategies,plansandprogramsrequiredundertheconditionsofthisconsent.FollowingCoCarereferencedforrelevantapproveddocuments:B16RemediationActionPlan(RAP)B29ConstructionEnvironmentalManagementPlan

SignageSchedule2A24

Buildingidentificationsignageisnotapprovedaspartofthisconsent N/A Nottriggered

HistoricHeritageSchedule2A25

Thefollowingheritageelementsmustberetained:(a)Extanttimberceilingoftheexistinglibraryarea;(b)Thespiralstairstowardsthesouthernboundaryofthebuilding;(c)Allinternalandexternalbuiltinbenchseatingincommunalareas;(d)Alloriginalsphericallightfittingsincommunal/publicareaswithinthesite;and(e)Planterboxesonroofterraces.

Items(a)to(d)observedasretainedduringsiteinspectioncomponentoftheaudit.Roofterracenotaccessedduringinspections.Identificationofitemstoberetainedandretainedinsituwereidentified.

AdvisoryNotes

Page 62: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page7of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2AN1

Alllicences,permits,approvalsandconsentsasrequiredbylawmustbeobtainedandmaintainedasrequiredforthedevelopment.Noconditionofthisconsentremovesanyobligationtoobtain,reneworcomplywithsuchlicences,permits,approvalsandconsents.

Legalrequirementsregisterprovidedandsighted,butnotpopulatedwhichwouldassistinmaintainingvisibilityofrenewal,reportingandcompliancerequirements.

ConditionsofapprovalcontainedinCouncilapprovalofworksinthepublicroad(s139RoadsAct)forFootpathworks(October2018)andexternalworks(November2018)shouldberecorded.

AuditconsultationwithCouncilre:siteperformancehasindicatedsatisfactionwithperformance.

Noreferencemadeduringsiteinterviewstoanover-archingEMSthatprovidesguidanceontypicallegalrequirementsforconstructionprojects.

Conditionisgenerallycompliant.

Therewouldbebenefitinmaintaininganuptodatelegalrequirementsregistertoenablemonitoringandperformanceassessmentagainstregulatoryobligations.

Schedule2AN2

Pursuanttosection4.16(4)(c)oftheAct,thispartialconsentisgrantedonlyforPhase1ofthedevelopmentreferredtointhedevelopmentapplication,ontheconditionssetoutinthisconsent.

N/A Nottriggered

Schedule2AN3

DevelopmentconsentisrequiredtocarryoutPhases2and3ofthedevelopmentreferredtointhedevelopmentapplication.

N/A Nottriggered

NotificationofCommencementSchedule2B1

TheDepartmentmustbenotifiedinwritingofthedatesofcommencementofphysicalworkandoperationatleast48hoursbeforethosedates.Iftheconstructionoroperationofthedevelopmentistobestaged,theDepartmentmustbenotifiedinwritingatleast48hoursbeforethecommencementofeachstage,ofthedateofcommencementandthedevelopmenttobecarriedoutinthatstage.

NotificationfromTaylorstoSavills(30/10/18)andSavillstoDoE(30/10/18)forthecommencementofworksinaccordancewithConditionsprovided.

DoEcorrespondencedated30/11/18identifiesissueofnoticetocommenceworksissuedtoDPEon2/11/18.

DateforcommencementofphysicalSSDworksisidentifiedas11/11/18.OfficialnotificationfromDoEtoDPEforstagedcommencementdate

Generalcompliancewiththisconditionhasbeendemonstrated.

CertifiedDrawingsSchedule2B2

Priortothecommencementofconstruction,theApplicantmustsubmittothesatisfactionoftheCertifierstructuraldrawingspreparedandsignedbyasuitablyqualifiedpractisingStructuralEngineerthatdemonstratescompliancewith:(a)therelevantclausesoftheBCA;and(b)thisdevelopmentconsent.

LettersfromBCA(31October2018,1November2018and10December2018)affirmingallapprovedconditionsrequringcertificationhavebeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

ExternalWallsandCladdingSchedule2B3

Priortothecommencementofconstruction,theApplicantmustprovidetheCertifierwithdocumentedevidencethattheproductsandsystemsproposedforuseintheconstructionofexternalwallsincludingfinishesandcladdingssuchassyntheticoraluminiumcompositepanelscomplywiththerequirementsoftheBCA.TheApplicantmustprovideacopyofthedocumentationgiventotheCertifiertothePlanningSecretarywithinsevendaysaftertheCertifieracceptsit.

LettersfromBCA(31October2018,1November2018and10December2018)affirmingallapprovedconditionsrequringcertificationhavebeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

ProtectionofPublicInfrastructureSchedule2B4

Beforethecommencementofconstruction,theApplicantmust:(a)consultwiththerelevantownerandproviderofservicesthatarelikelytobeaffectedbythedevelopmenttomakesuitablearrangementsforaccessto,diversion,protectionandsupportoftheaffectedinfrastructure;(b)prepareadilapidationreportidentifyingtheconditionofallpublicinfrastructureinthevicinityofthesite(includingroads,guttersandfootpaths);and(c)submitacopyofthedilapidationreporttothePlanningSecretary,CertifierandCouncil.

a:ConsultationdocumentedinSavillslettertoDoEdated6/11/18b:SavillslettertoDoEdated6/11/18identifiesdilapidationreportpreparedbyProjectSolutionsdated3/7/18c:LettersfromBCA(31October2018,1November2018and10December2018)forallapprovedconditionsrequringcertificationhasbeenacceptedbyapprovedcertifier.

Asreferencedinthesightedcorrespondence,compliancewiththeconditionhasbeenmet.Thedilapidationdocumentitselfwasnotsighted.

BushFire

PriortoCommencementofConstruction

Page 63: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page8of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B5

Priortothecommencementofconstruction,adetaileddesignfortheupgradeofexistingroadsbetweentheexistingbusstoploopandthesite(includinginternalroadswithinthesiteandexcludingDunstanGrove)mustbecertifiedbyanappropriatelyqualifiedpersonandsubmittedtothePlanningSecretary.Thedetaileddesignmustdemonstratecompliancewithsection4.2.7ofPlanningforBushFireProtection2006,including:(a)Internalroadsmustbetwo-wheeldrive,sealed,all-weatherroads;(b)Internalperimeterroadsmustbeprovidedwithatleasttwotrafficlanewidths(carriageway8metresminimumkerbtokerb)andshouldersoneachsideunlessanalternativesolutionisagreedbyRFS),allowingtraffictopassinoppositedirections;(c)Deadendroadsmustincorporateaminimum12metreouterradiusturningcircleandmustbeclearlysignpostedasadeadend;(d)Trafficmanagementdevicesmustbeconstructedtofacilitateaccessbyemergencyservicevehicles;(e)Aminimumverticalclearanceof4metrestoanyoverhangingobstruction,includingtreebranches,mustbeprovided;(f)Curvesmusthaveaminimuminnerradiusof6metresandmustbeminimalinnumbertoallowforrapidaccessandegress;(g)Theminimumdistancebetweentheinnerandoutercurvesmustbe6metres;(h)Maximumgradesmustnotexceed15degreesandaveragegradesmustnotbemorethan10degrees;(I)Roadsmustnottraversethroughlandpotentiallysubjecttoperiodicinundation(otherthanfloodorstormsurge);(j)Roadsmustbeclearlysignpostedandbridgesmustclearlyindicateloadratings;and(k)Theinternalroadsurfacesandbridgesmusthaveacapacitytocarryfully-loadedfirefightingvehicles(15tonnes).

LettersfromBCA(31October2018,1November2018and10December2018)forallapprovedconditionsrequringcertificationhasbeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2B6

Priortocommencementofconstruction,detailedfiretraildesignplansmustbecertifiedbyanappropriatelyqualifiedpersonandsubmittedtothePlanningSecretary.DesignsmustbegenerallyconsistentwithPhase1SitePlanpreparedbyDesignIncSydneyPtyLimiteddated08June2018(ReferenceProjectNo.P18-023andDrawingNo.DA-102)andbeinaccordancewithsection4.1.3(3)ofPlanningforBushfireProtection2006,NSWFireTrailStandardsandaddressthefollowing:(a)Noartificialturfshouldbeusedfortheproposedfiretrails;(b)Theproposedfiretrailmustavoidandminimisewherepossible,impactsonrockyoutcropsanddrainagelines;and(c)Suitablearrangementshallbeputinplacetoensuretheongoingmanagementandavailabilityoffiretrailsforfiremanagementpurposes.TheplansaretobecertifiedbyanappropriatelyqualifiedpersonandacopysubmittedtotheSecretary

LettersfromBCA(31October2018,1November2018and10December2018)affirmingallapprovedconditionsrequringcertificationhavebeenacceptedbyapprovedcertifier.

ApprovalbyBackashdated13November2018"BushfireCertificateLandscapingandConditionB6,B7,B8,B10,B13".

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2B7

Priortothecommencementofvegetationremoval,aVegetationManagementPlan(VMP)mustbepreparedinconsultationwithRFSfortheongoingmaintenanceoftheproposedAPZs,inaccordancewiththebushfirereportpreparedbyBlackashBushfireConsultingdatedAugust2018(ReferenceVersion1.3).TheVMPmustbesubmittedtothesatisfactionofthePlanningSecretary.

TheVegetationManagementPanispresentedascontentwithintheLandscapeManagementPlanpreparedbyKleinfelder(NCA18R82665,Rev4dated12/11/18)

DPEcommentsof7/11/18notedasidentifyingconsultationeffortasbeingdemonstratedbyobtainingandaddressingresponsesanddocumentingasatable.

ConsultationtablewithRFSpreparedbySavillssighted-identifiessubmissionofthecompleteddocumentforRFSreviewratherthanconsultationinitspreparation.NotingRFScorrespondenceof12/11/18indicatingnocommentsontheLMP.

ApprovalbyBackashdated13November2018"BushfireCertificateLandscapingandConditionB6,B7,B8,B10,B13".

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2B8

Priortothecommencementofvegetationremoval,detailedlandscapeplansfortheIPAmustbepreparedandcertifiedbyanappropriatelyqualifiedpersondemonstratingcompliancewithAppendix5ofPlanningforBushFireProtection2006 andacopysubmittedtothePlanningSecretary.

Approvallettersighted.ApprovalbyBackashdated13November2018"BushfireCertificateLandscapingandConditionB6,B7,B8,B10,B13" .

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2B9

WheretheAPZsarelocatedinslopesgreaterthan18degrees,theAPZmustbelandscapedormanaged(e.g.terracing)withsuitableaccessbeingprovidedtotheAPZtoensuretheongoingmaintenanceofthearea.

LettersfromBCA(31October2018,1November2018and10December2018)affirmingallapprovedconditionsrequringcertificationhavebeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

Page 64: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page9of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B10

TheentiresitemustbemanagedasanInnerProtectionArea(IPA)asindicatedinFigure6APZProvisionforPhase1SchoolinthebushfirereportpreparedbyBlackashBushfireConsultingdated9July2018(ReferenceVersion1.2).

TheIPAmustbemanagedasoutlinedinsection4.1.3andAppendix5ofPlanningforBushFireProtection2006andtheNSWRFSdocumentStandardsforassetprotectionzones.

CertificationprovidedbyBlackash(23/10/18)certifyingimplementationofLMPachievesCoCB10.

LettersfromBCA(31October2018,1November2018and10December2018)affirmingallapprovedconditionsrequringcertificationhavebeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2B11

Priortocommencementofconstruction,unlessotherwiseagreedbythePlanningSecretary,suitablywordedinstrumentsmustbedraftedpursuanttoSection88oftheConveyancingAct1919toensureongoingmanagementoftheproposedAPZswithinthesubjectsiteinperpetuityandinaccordancewithconditionB10.TheinstrumentmustbelodgedwithNSWLandRegistryServicesandevidenceofthelodgementsubmittedtothePlanningSecretary.TheNSWRFSmustnotbebeneficiarytothislegalinstrument.

Constructionidentifiedinsiteinterviewascommencing11/11/2018.

ExecutedPositiveCovenantsighted(referenceAN894063G).

NSWLRSreceiptdated29/11/18.Vegetationremovalcommenced12December2018.

Theinstrumentisdatedandregisteredon29/11/18,vegetationremovaldidnotcommenceuntil12december.

Compliancewiththisconditionahasbeenmet.

Schedule2B12

Priortothecommencementofconstructiondetailedplansmustbecertifiedbyanappropriatelyqualifiedpersondemonstratingthat;(a)Allelevationsandroofoftheexistingbuilding(s)willbeupgradedtocomplywithsections3and9(BushFireAttackLevel(BAL)FlameZone(FZ)ofAustralianStandardAS3959-2009ConstructionofbuildingsinbushfireproneareasorNASHStandard(1.7.14updated)NationalStandardSteelFramedConstructioninBushfireAreas–2014asappropriate.Exceptforwindows,flamingofthespecimenisnotpermittedandtheremustbenoexposedtimber;(b)NewconstructionmustcomplywithSections3and9(BAL-FZ)ofAustralianStandardAS3959-2009ConstructionofbuildingsInbushfireproneareasorNASHStandard(1.7.14updated)NationalStandardSteelFramedConstructioninBushfireAreas–2014asappropriate.Exceptforwindows,flamingofthespecimenisnotpermittedandtheremustbenoexposedtimber;and(c)Atwohourfireratedwallmustbeconstructedinternallyonproposedlevelsfour,fiveandsixalignedtothe100metreAPZasmeasuredfromthesouthernboundary,consistentwiththedrawingspreparedbyDesignIncdated8June2018(ProjectNumberP18-023)andtherecommendationsinsection12asindicatedonFigure6APZProvisionofPhase1SchoolinthebushfirereportpreparedbyBlackashBushfireConsultingdated9July2018(ReferenceVersion1.2).

LettersfromBCA(31October2018,1November2018and10December2018)forallapprovedconditionsrequringcertificationhasbeenacceptedbyapprovedcertifiercoversCoCitemsa-c.

Generalcompliancewiththisconditionhasbeendemonstrated.

Landscaping

Schedule2B13

Priortothecommencementofvegetationremoval,theApplicantmustprepareaLandscapeManagementPlantomanagetherevegetationandlandscapingworkson-site,tothesatisfactionofthePlanningSecretary.Theplanmust:(a)ensurenomorethan872treesareremovedfromthesite;(b)identifyallexistingtree/shrubspeciestoberetained(atleast228treesmustberetained);(c)haveregardtotheheritagesettingofthesite;(d)haveregardtothebushfireprotectionmeasures(B5-B6);(e)includetheentiretyofthesite(firetrails,footpaths,busstopetc);(f)identifyexistingnaturalfeaturessuchasrockoutcrops;(g)includecontourlinesandlevels;(h)includedetailsofterracingorotherslopestabilitymeasures;(i)includedetailsformanagingstormwaterrunoff;(j)includenativegrassesendemictothelocality;(k)detailthespeciestobeplantedon-site;(l)describethemonitoringandmaintenancemeasurestomanagerevegetationandlandscapingworks;and(m)includedetailsofallboundaryandinternalfencingconstructedofnon-combustiblematerials;(n)includedetailsofanylandscapefurniture/structuressuchasseating,lightingetc.

Vegetationremovalcommenced12/12/18.

ThelandscapemanagementplanhasbeenproducedbyKleinfelder.Theplanisoriginallydated24/8/18withthefinalversion(v4)dated12/11/18torefelctconsultation.

ApprovalbyBackashdated13November2018"BushfireCertificateLandscapingandConditionB6,B7,B8,B10,B13".

LMPsubmittedbyDoEtoDPE1/11/18;2/11/18and19/11/18reflectiveofresponsestocommentsreceived(DPEandRFS).

CorrespondencefromDPEtoSavillson7/12/2018suggeststhattheLMPsatisfiedconditionrequirementsfortheexceptionofoutstandingmattersreferencedwithinSchedule1ofthatletter.

SavillsaddressedtheSchedule1itemssenttoDoE19December(AconexGCOR-001871).

Generalcompliancewiththisconditionhasbeenmet.

SiteContaminationSchedule2B14

Priortothecommencementofexternalworksorvegetationclearing,additionalsiteinvestigationforcontaminantsacrosspreviouslyuntestedareasofthesitemustbeundertakeninaccordancewith:(a)NSWEPASamplingDesignGuidelines(b)GuidelinesfortheNSWSiteAuditorScheme(3rdedition)2017(c)https://www.epa.nsw.gov.au/publications/contaminatedland/17p0269-guidelines-for-the-nsw-site-auditor-scheme-third-edition(d)GuidelinesforConsultantsReportingonContaminatedSites,2011www.epa.nsw.gov.au/resources/clm/20110650consultantsglines.pdf(e)TheNationalEnvironmentProtection(assessmentofcontamination)Measures2013asamendedTestingmustincludeassessmentofboththesoilandgroundwaterprofile.

VegetationClearingworkscommenced12/12/18.

Thefollowingreportsandcorrespondencehavebeenviewed:-"WasteClassifictionmeeting"discussingapproachtoadditionalinvestigations,12November2018-VirginExcavatedNaturalMaterialAssessment,EIS,13November2018-InterimAdvice#08forStatutorySiteAuditNo.279byDrIanSwane,ReviewofStagingofRAPforLindfieldLearningVillageProject,8thNovember2018-InterimAdvice#11forStatutorySiteAuditNo.279byDrIanSwane,RAPAddendumforLindfieldLearningVillageProject,21stNovember2018

Thereportsandcorrespondencesatisifycomplianceinlinewiththiscondition.

Page 65: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page10of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B15

Priortocommencementofexternalworksorvegetationclearing,anunexplodedordinance(UXO),explodedordinance(EO)andexplodedordinancewaste(EOW)SiteAssessmentSurveymustbeundertakenbyanUXOcontractorlistedontheDefencePanelofsuitablyqualifiedUXOconsultantsandcontractorsandsubmittedtotheSecretary.Note:Incrementalvegetationclearingmaycommenceinareascertifiedasbeingeitherfreefromcontaminationorremediated(includingUXO,EOandEOW)bytheaccreditedsiteauditor.

AUXOfieldvalidationsurveydated29October2018wasundertakenbyG-tekAustraliaPtyLimitedwhoisamemberofthecurrentDepartmentofDefenceEnvironmentalandHeritagePanel.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2B16

TheRemediationActionPlanmustbeupdatedto:(a)includeacostbenefitanalysistocomparethedifferentremedialoptionsconsidered;(b)estimatesoflikelyvolumesofcontaminatedmaterialtoberemediatedorremovedfromsiteunderthepreferredoptions;(c)reflectthefindingsoftheadditionalsiteinvestigationrequiredbyconditionB14;(d)reflectthefindingsoftheUXO,EOandEOWSiteAssessmentSurveyrequiredbyconditionB15;and(e)includeaUXO,EOandEOWManagementPlan(ifrequired);TheupdatedRemediationActionPlanmustbeapprovedbyaNSWEPAAccreditedSiteAuditorandsubmittedtothePlanningSecretarypriortocommencementofworks.

ARAPhasbeenproducedbyEIS.TheRAPisdated16August2018.Worksidentifiedinsiteinterviewascommencingonsite11November2018.AddendumtotheRAPwaspreparedbyEIS(reportref:E30259KMrpt3_RAP_Addendum,dated21November2018).

a:NomentionofCostBenefitAnalysis.Section5.2ofRAP"considerationofRemediationOptions".b:Novolumeestimatesc:RAPprovidesprocedurefornon-investigatedareas.Needtodemonstratehowthiswillbefollowed/implementedd:Noindicationthatthishasbeenmet?e:Seepointd.

SightedInterimAdvice#11fromAcceditedSiteAuditor,DrIanSwane,dated21November2018.DoEemaildated30/11/18identifiestheRAPupdateunderCoCB16beingsubmittedtoDPEon28/11/18.

Item(c)oftheconditionidentifiestheprocedureforadditionalsiteinvestigationsbutnotthefindings.AcopyofthefindingsoftheEISinvestigationswererequestedduringsiteauditon4/1/19.IdentifiedinRFIresponse(4/1/19)asnotbeingrelevanttoACM.NomentionofPCBorleadhotspot.

ASiteAuditStatementdated25/01/2019wasprovidedasevidenceaspartoftheauditclosingmeetingidentifyingthattheSSDprojectsitehasbeeninvestigatedandremediatedsothatthesiteissuitableforitsintendedusewithouttheneedforanyotherconditions.

UpdatedRAPwasnotbeensubmittedpriortocommencementofworksingeneral,buthasbeensubmittedtoDPEinadvanceofworksdisturbingthesiteareasaddressedbythecondition.

RAPaddendum21/11/18addressesitems(c);(d)and(e)ofthecondition,butnot(a)and(b).

SiteAuditStatementprovidesconclusivefindingre:remediation.

UnexpectedContaminationProcedureSchedule2B17

Priortothecommencementofearthworks,theApplicantmustprepareanunexpectedcontaminationproceduretoensurethatpotentiallycontaminatedmaterialisappropriatelymanaged.TheproceduremustformpartoftheoftheCEMPinaccordancewithConditionB29andmustensureanymaterialidentifiedascontaminatedmustbedisposedoff-site,withthedisposallocationandresultsoftestingsubmittedtothePlanningSecretary,priortoitsremovalfromthesite.

RAPreferstoUnexpectedFindsinSection10.Section3.3.1ofCEMPreferstoCLMunexpectedfindsprocedure.AppendixJofCEMPprovidesUnexpectedFindsProtocol

Generalcompliancewiththisconditionhasbeendemonstrated.

UtilitiesandServicesSchedule2B18

Beforetheconstructionofanyutilityworksassociatedwiththedevelopment,theApplicantmustobtainrelevantapprovalsfromserviceproviders.

SydneyWaterapprovalsightedonAconex. Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2B19

Priortothecommencementofabovegroundworkswrittenadvicemustbeobtainedfromtheelectricitysupplyauthority,anapprovedtelecommunicationscarrierandanapprovedgascarrier(whererelevant)statingthatsatisfactoryarrangementshavebeenmadetoensureprovisionsofadequateservices.

ErbasEngineeringConsultantshavereviewedtheutilitydocumentsandcertifytheadequateprovisionofservicesfortheLindfieldLearningVillage.DocumentsightedonAconex.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2B20

Water,electricity,telecommunicationsandgasservicesmustbeprovidedorupgradedtocomplywithsections4.2.7and4.1.3ofPlanningforBushFireProtection2006.

LettersfromBCA(31October2018,1November2018and10December2018)forallapprovedconditionsrequringcertificationhasbeenacceptedbyapprovedcertifier.DocumentsightedonAconex

Generalcompliancewiththisconditionhasbeendemonstrated.

CommunityCommunicationStrategy

Page 66: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page11of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B21

ACommunityCommunicationStrategymustbepreparedtoprovidemechanismstofacilitatecommunicationbetweentheApplicant,therelevantCouncilandthecommunity(includingadjoiningaffectedlandownersandbusinesses,andothersdirectlyimpactedbythedevelopment),duringthedesignandconstructionofthedevelopmentandforaminimumof12monthsfollowingthecompletionofconstruction.TheCommunityCommunicationStrategymust:(a)identifypeopletobeconsultedduringthedesignandconstructionphases;(b)setoutproceduresandmechanismsfortheregulardistributionofaccessibleinformationaboutorrelevanttothedevelopment;(c)providefortheformationofcommunity-basedforums,ifrequired,thatfocusonkeyenvironmentalmanagementissuesforthedevelopment;(d)setoutproceduresandmechanisms:i)throughwhichthecommunitycandiscussorprovidefeedbacktotheApplicant;ii)throughwhichtheApplicantwillrespondtoenquiriesorfeedbackfromthecommunity;andiii)toresolveanyissuesandmediateanydisputesthatmayariseinrelationtoconstructionandoperationofthedevelopment,includingdisputesregardingrectificationorcompensation.TheCommunityCommunicationStrategymustbesubmittedtothePlanningSecretaryforapprovalnolaterthantwoweeksbeforethecommencementofanywork.WorkforthepurposesofthedevelopmentmustnotcommenceuntiltheCommunityCommunicationStrategyhasbeenapprovedbythePlanningSecretary,orwithinanothertimeframeagreedwiththePlanningSecretary.

Commencementofworksonsiteidentifiedduringsiteinterviewas11/11/2018.

AconexreferencesCommunityCommunicationStrategyinitiallyissuedtoDPEforapprovalon25/10/18andsubsequentrevisionrespondingtoDPEcommentsof29October2018,issuedtoDoEon16/11/18.

DoEcorrespondencetoDPEdated30/11/18identifiesissueofCCStoDPEforapproval23/10/18andrevisedon19/11/18.

ApprovalletterfromDPE7/12/2018

CopyoftheCCSprovidedatcloseoutmeeting.

DPEhasconfirmedcomplianceofsubmitteddocumentationinaccordancewiththisrequirementinaletterdated7/12/2018.

CCSnotapprovedpriortocommencementofwork.

ComplianceSchedule2B22

TheApplicantmustensurethatallofitsemployees,contractors(andtheirsub-contractors)aremadeawareof,andareinstructedtocomplywith,theconditionsofthisconsentrelevanttoactivitiestheycarryoutinrespectofthedevelopment.

Table2.2ofCEMPreferstoEPAAct1979."Worksmustproceedinaccordancewiththeconsentprovided,includinganyconditions".

SiteinductionforprojectpersonnelstatesthatworkstobeundertakeninaccordancewithallenvironmentalmitigationmeasuresintheCEMP.IdentifescopyavailableonsiteinTaylors'officeforreference.

Generalcompliancewiththisconditionhasbeendemonstrated.

EcologicallySustainableDevelopmentSchedule2B23

Priortothecommencementofconstruction,theApplicantmustsubmitdetailsofalldesignmeasurestotheCertifierdemonstratingthattheproposednewbuildingsincorporateecologicallysustainabledevelopmentinitiativesasoutlinedwithintheESDReportpreparedbyUMOWLAIConsultingEngineersdated20March2017comparabletoaninformal4-starGreenStar–Design&AsBuilttoolrating.

LettersfromBCA(31October2018,1November2018and10December2018)forallapprovedconditionsrequringcertificationhasbeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

OutdoorLightingSchedule2B24

Priortocommencementofconstruction,theApplicantmustsubmitdetailsofalloutdoorlightingwithinthesitetothesatisfactionoftheCertifierdemonstratingcompliancewithAS1158.3.1:2005Lightingforroadsandpublicspaces–Pedestrianarea(CategoryP)lighting–PerformanceanddesignrequirementsandAS4282-1997Controloftheobtrusiveeffectsofoutdoorlighting.

LettersfromBCA(31October2018,1November2018and10December2018)forallapprovedconditionsrequringcertificationhasbeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

AccessforPeoplewithDisabilitiesSchedule2B25

TheworksthatarethesubjectofthisapplicationmustbedesignedandconstructedtoprovideaccessandfacilitiesforpeoplewithadisabilityinaccordancewiththeBCA.Priortothecommencementofconstruction,theCertifiermustensurethatevidenceofcompliancewiththisconditionfromanappropriatelyqualifiedpersonisprovidedandthattherequirementsarereferencedonanycertifiedplans.

LettersfromBCA(31October2018,1November2018and10December2018)forallapprovedconditionsrequringcertificationhasbeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

Biodiversity

Page 67: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page12of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B26

TheApplicantmust:(a)Ensurethatnomorethan1.74hectaresofnativevegetationisaffectedbythedevelopment;and(b)Minimise:i)Theimpactsofthedevelopmentonhollow-bearingtrees;andii)Theclearingofnativevegetationandkeyhabitatwithintheapproveddisturbancefootprint.

LettersightedonAconexstating"KleinfelderastheprojectecologistswillensurewithreferencetoconditionB26,thatwewillfollowtheseconditionsasdocumentedontheapproveddrawings,theLandscapeManagementPlanandtheFloraandFaunaManagementSubplan" .

AnumberofatRisktreereportsweresightedfortheproject:-AtRiskTree–AboriculturalReportTree49,RainTreeConsulting,19November2018-AtRiskTree–AboriculturalReportTree66,67&96,RainTreeConsulting,19November2018-AtRiskTree–AboriculturalReportTree88,RainTreeConsulting,19November2018.

LMPidentifiespre-clearingsurveystoavoidaccidentalincursions.

LMPidentifiesaMonitoringDatasheet(includedinAppendix4oftheLMP-Kleinfelder,12/11/18)andadailylogcompletedwhichwouldbeprovidedinaletter/reportoncompletionofclearing.NeitheradailylogorAppendix4LandscapeandFuelMonitoringDatasheetweresightedduringtheaudit.

Clearingofvegetationnotcompletedasat4/1/19.

Thereisnoverificationofimplementationofthedocumentedprocesstodemonstratehowthisiscurrentlybeingmonitoredandmanagedweektoweek.

Risktreereportsidentifyapotentialchangetothetotalnumberoftreesremoved,butnoindicationofwherethisquantumistrackedorcommunicated.Similarly,norecordoftreesthatmayhavecomedowninstormeventsacrossNovember-Januaryduringsignificantstormevents.

FinalreportbyKleinfelderexpectedtoprovidequantificationagainstCoCprescriptionof1.74ha,however,proactivechangemanagementidentifyinganyadditionalclearingrequirments(iestormorsafetyrelated)andnotificationswouldbeofbenefitratherthanbeinglefttotheendofclearingreport.

Schedule2B27

Priortothecommencementofvegetationremoval,theApplicantmustretirebiodiversitycreditsofanumberandclassspecifiedinTable1andprovideevidencetothesatisfactionofthePlanningSecretary.TheretirementofcreditsmustbecarriedoutinaccordancewiththeNSWBiodiversityOffsetsPolicyforMajorProjects,andcanbeachievedby:(a)AcquiringorretiringcreditsundertheBiobankingschemeestablishedunderthethenThreatenedspeciesConservationAct1995;(b)makingpaymentsintoanoffsetfundthathasbeenestablishedbytheNSWGovernment;or(c)providingsuitablesupplementarymeasures.*SeeTable1EcosystemcreditrequirementsB27CoC

Vegetationremovalidentifiedduringsiteauditascommencing12/12/18.

DoEcorrespondencetoDPEdated30/11/18identifiesretirementofcreditsviapaymenttoBCFbyNSWDoEExecutiveDirectoron29/11/18.

Generalcompliancewiththisconditionhasbeendemonstrated.

EnvironmentalManagementPlanRequirementsSchedule2B28

Managementplansrequiredunderthisconsentmustbepreparedinaccordancewithrelevantguidelines,andinclude:(a)detailedbaselinedata;(b)detailsof:i)therelevantstatutoryrequirements(includinganyrelevantapproval,licenceorleaseconditions);ii)anyrelevantlimitsorperformancemeasuresandcriteria;andiii)thespecificperformanceindicatorsthatareproposedtobeusedtojudgetheperformanceof,orguidetheimplementationof,thedevelopmentoranymanagementmeasures;(c)adescriptionofthemeasurestobeimplementedtocomplywiththerelevantstatutoryrequirements,limits,orperformancemeasuresandcriteria;(d)aprogramtomonitorandreportonthe:i)impactsandenvironmentalperformanceofthedevelopment;ii)effectivenessofthemanagementmeasuressetoutpursuanttoparagraph(c)above;(e)acontingencyplantomanageanyunpredictedimpactsandtheirconsequencesandtoensurethatongoingimpactsreducetolevelsbelowrelevantimpactassessmentcriteriaasquicklyaspossible;(f)aprogramtoinvestigateandimplementwaystoimprovetheenvironmentalperformanceofthedevelopmentovertime;(g)aprotocolformanagingandreportingany:i)incidentandanynon-compliance(specificallyincludinganyexceedanceoftheimpactassessmentcriteriaandperformancecriteria);ii)complaint;iii)failuretocomplywithstatutoryrequirements;and(h)aprotocolforperiodicreviewoftheplan.

Projectmanagementplansreviewedaspartofthisauditinclude:B13LandscapeManagementPlan(Kleinfelder,24/8/18andrevisedv4dated12/11/18)B29ConstructionEnvironmentalManagementPlan(ZoicEnvironmental,29October2018).B30TheConstructionTrafficandPedestrianManagementSub-Plan(CTPMSP)(CommercialTC,2October2018).B31TheConstructionNoiseandVibrationManagementSub-Plan(CNVMSP(AcousticLogic,5thOctober2018).ThefollowingdocumentshavebeenpreparedtoaddressrequirementsofCoCB32TheConstructionWasteManagementSub-Plan(CWMSP):-DumpitBins,WasteandRecyclingProcess&Flow,Notdated-ForesightEnvironmental-ConstructionandDemolitionWasteManagementPlan,27March2017-PureContracting-AsbestosRemovalControlPlan,10August2018B34ConstructionFloraandFaunaManagementSub-Plan(FFMSP)(Kleinfelder,October2018)B35BushFireandFloodEmergencyResponseSub-Plan(BFFERSP)(EWFWConsultingEngineers,18October2018).B42ConservationManagementPlan(CMP)(URBIS,6November2018).ProjectEnvironmentalManagementPlan(PEMP)(Taylors,January2018).

Allprojectmanagementplansreviewedaspartoftheauditscopesatifythegeneralrequirementsofthiscondition.

ConstructionEnvironmentalManagementPlan

Page 68: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page13of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B29

Priortocommencementofconstruction,theApplicantmustprepareaConstructionEnvironmentalManagementPlan(CEMP)anditmustinclude,butnotbelimitedto,thefollowing:(a)Detailsof:i)hoursofwork;ii)24-hourcontactdetailsofsitemanager;iii)managementofdustandodourtoprotecttheamenityoftheneighbourhood;iv)stormwatercontrolanddischarge;v)measurestoensurethatsedimentandothermaterialsarenottrackedontotheroadwaybyvehiclesleavingthesite;vi)groundwatermanagementplanincludingmeasurestopreventgroundwatercontamination;vii)externallightingincompliancewithAS4282-1997Controloftheobtrusiveeffectsofoutdoorlighting;viii)communityconsultationandcomplaintshandling;(b)ConstructionTrafficandPedestrianManagementSub-Plan(seeConditionB30);(c)ConstructionNoiseandVibrationManagementSub-Plan(seeConditionB31);(d)ConstructionWasteManagementSub-Plan(seeConditionB32);(e)ConstructionSoilandWaterManagementSub-Plan(seeConditionB33);(f)ConstructionFloraandFaunaManagementSub-Plan(seeConditionB34);(g)BushFireandFloodEmergencyResponse(seeConditionB35);(h)AsbestosManagementPlan;and(i)unexpectedfindsprotocolsforcontamination,Aboriginalandnon-Aboriginalheritageandassociatedcommunicationsprocedure;TheApplicantmustnotcommenceconstructionofthedevelopmentuntiltheCEMPisapprovedbytheCertifierandacopysubmittedtothePlanningSecretary.

Taylors'CEMPdated29/10/18,reference18236.

Savills'letterof31/10/18toDoEidentifiessubmissionoftheCEMPtothecertifierfortheiraction.

BCALogicLetterdated31October2018[Ref:Ref:106808A]inadvanceofConstructionworkscommencingon11/11/18.

DoEcorrespondencetoDPEdated30/11/18identifiessubmissionofCEMPtoDPEon2/11/18.

Constructioncommenced11/11/18.

ThecontentoftheCEMPgenerallycomplieswiththerequirementsofsub-conditionsofCoCB29(a-i).

Compliancewithconditionhasbeendemonstrated.

Schedule2B30

TheConstructionTrafficandPedestrianManagementSub-Plan(CTPMSP)mustaddress,butnotbelimitedto,thefollowing:(a)bepreparedbyasuitablyqualifiedandexperiencedperson(s);(b)bepreparedinconsultationwithCouncilandRMS;(c)detailthemeasuresthataretobeimplementedtoensureroadsafetyandnetworkefficiencyduringconstructioninconsiderationofpotentialimpactsongeneraltraffic,cyclistsandpedestriansandbusservices;(d)detailheavyvehicleroutes,accessandparkingarrangements;(e)includeaDriverCodeofConductto:i)minimisetheimpactsofearthworksandconstructiononthelocalandregionalroadnetwork;ii)minimiseconflictswithotherroadusers;iii)minimiseroadtrafficnoise;andiv)ensuretruckdriversusespecifiedroutes;(f)includeaprogramtomonitortheeffectivenessofthesemeasures;and(g)ifnecessary,detailproceduresfornotifyingresidentsandthecommunity(includinglocalschools),ofanypotentialdisruptionstoroutes.

TMPpreparedbyCommercialTCPtyLimited(ref1829V2,dated2/10/18)

a:Conditionmetb:Section1.6"Priortoconstructionworks,thisCEMPistobeprovidedtoKu-ring-gaiCouncilandtotheSecretaryofDepartmentofPlanningandEnvironment(DP&E)forcomment" .Consultationneedstobedemonstrated.NomentionofRMS.c:SECTION10.PROPOSEDSTRATEGYOFTRAFFICMANAGEMENT-coversmeasurestobeimplemented.dAddressedinSection2ofthereporte:CodeofConductforDriversnotsighted-thisismanageddaytodayviathetrafficpersonnelandoncomingdriversviatwo-wayradioanddeliveryschedulingandco-ordinationbyTaylorssitesupervisor.f:Noprogramtoassessimplementationg:Section12inReportbody-Community&MotoristsConsultation/Notification

ProjectisrequiredtodemonstratethattheplanhasbeenpreparedinconsultationwithCouncilandRMS.However,correspondencefromCommercial(9/10/18)identifiesEtonroadisnotanRMSroadandthereforeRMSdonotneednotification.TruckarrivalroutesincludeM2,EppingRoad,PacificHighway,DelhiRoadandLadyGameDrivewhichwouldindicateRMSweretobeconsultedinTMPpreparation.

BCALogicletterdated1/11/18affirmscertifier'sconsiderationthatconditionissatisfied.

ThecontentoftheCTPMSPgenerallycomplieswiththerequirementsofsub-conditionsofCoCB30.

Notedthatsection1.5PlanObjectiveincludes"tosatisfythekeylegalrequirementsrelatedtoTraffic,TransportandAccesstosite"andto"ensurecompliancewithrelevantspecificationadntheRMS's-TrafficControlatWorkSitesHandbookVersion4",yetthesearenotspecifiedfurtherandnotrecordedinalegalrequirementsregisterforthesite/development.

Planreferences"Council'sapprovedDAsitehours".

Page 69: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page14of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B31

TheConstructionNoiseandVibrationManagementSub-Plan(CNVMSP)mustaddress,butnotbelimitedto,thefollowing:(a)bepreparedbyasuitablyqualifiedandexperiencednoiseexpert;(b)describeproceduresforachievingthenoisemanagementlevelsinEPA’sInterimConstructionNoiseGuideline(DECC,2009);(c)describethemeasurestobeimplementedtomanagehighnoisegeneratingworkssuchaspiling,incloseproximitytosensitivereceivers;(d)includestrategiesthathavebeendevelopedwiththecommunityformanaginghighnoisegeneratingworks;and(e)describethecommunityconsultationundertakentodevelopthestrategiesinconditionB31(d).(f)includeacomplaintsmanagementsystemthatwouldbeimplementedforthedurationoftheconstruction.

a:PreparedbyAcousticLogic.b:Reportidentifiesimpactonneabyreceptorsasnull,unlesscivilworkswithin40mofresidentialreceptors.Section6oftheNVMPaddressmitigationmeasures.c:SeepointB.d:Section6.1suggestionsnotificationtoimpactedreceptorswherenearbyreceptorsaretobeimpacted.e:letterdropstonearbyresidentshasoccuredinthepast.Theprojectwebpageprovidesprojectupdatesonupcomingactivities.f:Section6.3providescompliantprocedure.ComplaintsmanagementishandledbyDepartmentofEducation.

BCALogicletterdated1/11/18affirmscertifier'sconsiderationthatconditionissatisfied.

ThecontentoftheCNVMSPgenerallycomplieswiththerequirementsofCoCB31.

Thereappeartobefouravenuesforcomplaints(Taylordirectly,1800number,SIFeedbackandLLVdirectemail).Thismayresultinnotallcomplaintsbeingdocumentedandeffectivelyclosedout.Taylor'scompliantsregisterhasasinglecomplaintwhereastheSIcomplaintsregisteronlinehasfour.

Schedule2B32

TheConstructionWasteManagementSub-Plan(CWMSP)mustaddress,butnotbelimitedto,thefollowing:(a)detailthequantitiesofeachwastetypegeneratedduringconstructionandtheproposedreuse,recyclinganddisposallocations;(b)removalofhazardousmaterialsincludingasbestos,particularlythemethodofcontainmentandcontrolofemissionoffibrestotheair,anddisposalatanapprovedwastedisposalfacilityinaccordancewiththerequirementsoftherelevantlegislation,codes,standardsandguidelines,priortothecommencementofanybuildingworks;and(c)includedetailsforairqualitymonitoringduringremedialworks.

TheCWMSPconsistofthefollowingreports:-DumpitBins,WasteandRecyclingProcess&Flow,Notdated-ForesightEnvironmental-ConstructionandDemolitionWasteManagementPlan,27March2017-PureContracting-AsbestosRemovalControlPlan,10August2018

Specificwasteswithparticulardisposalrequirements(iePCB(asperPCBCCO)andArdexdrums(asperSDS))shouldbedocumented.

BCALogicletterdated1/11/18affirmscertifier'sconsiderationthatconditionissatisfied.

ThecontentoftheCWMSPgenerallycomplieswiththerequirementsofCoCB31.

Schedule2B33

TheApplicantmustprepareaConstructionSoilandWaterManagementPlan(CSWMSP)andtheplanmustaddress,butnotbelimitedtothefollowing:(a)bepreparedbyasuitablyqualifiedexpert,inconsultationwithCouncil;(b)besubmittedtotheapprovaloftheCertifyingAuthoritypriortothecommencementofconstruction;(c)describeallerosionandsedimentcontrolstobeimplementedduringconstruction;(d)provideaplanofhowallconstructionworkswillbemanagedinawet-weatherevents(i.e.storageofequipment,stabilisationoftheSite);(e)detailalloff-SiteflowsfromtheSite;(f)describethemeasuresthatmustbeimplementedtomanagestormwaterandfloodflowsforsmallandlargesizedevents,including,butnotlimitedto1in1-yearARI,1in5-yearARIand1in100-yearARI);(g)bepreparedinaccordancewiththedocumentManagingUrbanStormwater-Soils&ConstructionVolume1(2004)byLandcom.

CEMPSection3.2.1providesanoverviewoftypicalESCcontrolmeasures.Figures4-11,AppendixAofCEMPprovidesoverviewofwherecontrolsaretobeinstalled.TheProjectEnvironmentalManagementPlan(PEMP)producedbyTaylorsaddressessoilandwatermanagementinsection13.2.3.

CEMPstates:ThecontrolsshouldbeinspectedandapprovedbytheSiteHSEOfficerpriortothecommencementofworks.Thecontrolsshallbemaintainedingoodworkingorderandinspectedtoensuretheyareeffectiveincontrollingerosionandsedimentation.Accumulatedsedimentshallberemovedanddisposedofregularly,i.e.weeklyandafterrainevents.....

EWFWConsultingEngineersprovidedaCertificateofDesignErosionandSedimentControlPlansreferenceNos.C-011throughC-017revisionAalldated10/10/18.CertificationexcludesB33(d)-identifyingitascapturedwithintheCSWMP-whichcontentisactuallyintheCEMPandPEMP.CertifiesdesigniscompliantwithandconsistentwiththeDAapprovedstormwaterdrainageplans,conditionsofconsentandAS3500.3

BCALogicletterdated1/11/18affirmscertifier'sconsiderationthatconditionissatisfiedbyreferencetoCertificateofDesigndarted24/10/18.

ProvidedEWFWPlansC-011-A;C-012-A;C-013-A;C-014-A;C-015-A;C-016-A;andC-017-A(alldated12/10/18)arelabelledasbeing"Preliminary-notforConstruction".

GeneralcompliancewiththisconditionhasbeendemonstratedviatheCEMPandPEMPandassociatedErSedplans,

Documentcontrolandcross-referencingshouldbeconsistentandreflectfinalsitedesignplansratherthan"Preliminary"or"PreliminaryNotforConstruction".

CEMPidentifiesinspectionandmaintenanceofcontrolsweeklyandafterrainevent.Siteinspectionidentifiedmaintenanceofcontrolsrequiredadditionalattention.

Page 70: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page15of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B34

TheApplicantmustprepareaConstructionFloraandFaunaManagementSub-Plan(FFMSP)inconsultationwithOEH.Theplanmustaddress,butnotbelimitedto,thefollowing:(a)measurestominimisethelossofkeyfaunahabitat,includingtreehollows;(b)measurestominimisetheimpactsonfaunaonsite,includingconductingfaunapre-clearancesurveyspriortovegetationclearing,building/structuredemolition;(c)engagementofanappropriatelyqualitiedecologistwithexperienceincapturingnativewildlifetobeonsiteforallvegetationremovalactivities;(d)controllingweedsandferalpests;(e)anUnexpectedFindsProceduredetailingproceduresandmanagementmeasurestobeimplementedintheeventthatfloraandfaunaisuncoveredinanyareanotidentifiedintheupdatedBiodiversityAssessment(BAR);(f)measurestoensurebiodiversityvaluesnotintendedtobeimpactedareprotected,includingbarriersandmappingofprotected/’no-go’areas;and(g)aprogramtomonitortheeffectivenessofthemeasuresintheFFMSP.

TheupdatedFFMSPfortheproject(Version1.6Kleinfelder,December2018)wassightedandhasbeendevelopedingeneralcompliancewiththeallsub-conditionofCoCB34.

BCALogicletterdated1/11/18affirmscertifier'sconsiderationthatconditionissatisfiedforversion1.5dated28/11/18.Version1.6incorporatedcommentsfromDPEandwascompleted18/12/18.

DoEcorrespondenceof30/11/18identifiessubmissiontoDPEon26/10/18,15/11/18(responsetoDPE),and29/11/18(ResponsetoOEHasidentifiedinDPEletterdated7/12/18).

18/12/18version1.6identifiedasincorporatingDPEcomments.NotrequiredforsubmissiontoDPEforapproval.

Kleinfeldertoolboxtalk/SWMS/pre-startsreviewedtodemonstrateimplementationonsiteofFFMSPcontrolmeasures.Verificationdocumentationrequestedat4/1/19siteaudit.

ThecontentoftheFFMSPgenerallycomplieswiththerequirementsofCoCB34.

Schedule2B35

TheBushFireandFloodEmergencyResponseSub-Plan(BFFERSP)mustbepreparedinconsultationwiththeRFSandNSWSESandCouncilandaddress,butnotbelimitedto,thefollowing:(a)bepreparedbyasuitablyqualifiedandexperiencedperson(s);(b)addressthePlanningforBushfireProtection2006;(c)addresstheprovisionsoftheFloodplainRiskManagementGuideline(OEH,2007);(d)includedetailsof:i)thebushfireandfloodemergencyresponsesfortheconstructionphaseofthedevelopment;ii)predictedfloodlevels;iii)floodwarningtimeandfloodnotification;iv)assemblypointsandevacuationroutes;v)evacuationandrefugeprotocols;andvi)awarenesstrainingforemployeesandcontractors.

TheBFFERSPfortheprojectwassightedandhavebeendevelopedingeneralcompliancewiththeallsub-conditionofCoCB35.

Anon-siteBushfireEvacuationPlanA3,Taylors,andSiteEvacuationPlanA3,Taylors,weresightedduringtheaudit(4/1/19).

BCALogicletterdated1/11/18affirmscertifier'sconsiderationthatconditionissatisfiedbyreferencetoBlackashBushfireEmergencyResponseSub-PLan(Version1.0dated11/10/18)andEWFWFloodEmergencyManagementPlanreferenceno.21151-001,dated18/10/18)andBushfireandFloodEvacuationRoutesplan(taylors-asreferencedabove).

Savills'lettertoDoEdated19/10/18identifiesdocumentationtobeforwardedtoRFSandNSWSESforapprovals.AdditionallyplansareidentifiedasbeingissuedtoPCAandCouncilforapproval,ratherthanforconsultationasperthecondition.

RFSconsultationtablesighted,identifyingnocommentmadeinrespectoftheevacuationplanasat12/11/18.

CouncilconsultationinitiatedbySchoolsInfrastructureNSW(SINSW)on27/9/18identifiedinCouncilCorrespondencetrackeridentifyingwalkoverofareaon-siteandevacuationfootpathroute.NoindicationofconsultationwithNSWSES.

Section7oftheFEMSPmayhavethediscussiononfloorlevelsandfloodlevels(AHD)aroundthewrongway.

ConsultationwithSESwhichhasbeenevidencedinconsultationtable(excel)providedduringtheauditclosingmeeting.ConsultationwithSESiniatedwithSES11/12/2018.

TheBFFERSPshouldbeupdatedtoreflectprojectBushfireEvacuationandSiteEvacuationPlansobservedon-siteandtoensureconsistencyofassemblypoints.GiventheproximitytotheLaneCoveRivercauseway(atDelhiRoad)andthesusceptibilityofGrosvenorRoad,LadyGameDriveandDelhiRoadinthisvicintytoflooding,itwouldbebeneficialfortheEmergencyandevacuationplantohaveconsiderationoftheeffectsoftheseroadclosuresontriggeringevacuationresponseratherthanbeinglimitedtolocalised/siteflooding.ThisisapplicableinresponsetonominatedtravelroutesintheContructionTrafficManagementPlanandinconsiderationofaccess/egresstositeforparents/pupilsandpublictransportduringoperationofthesite.

TheprojectgenerallycomplieswiththerequirementsofCoCB35.

ConstructionParkingSchedule2B36

TheApplicantmustprovidesufficientparkingfacilitieson-site,includingforheavyvehiclesandforsitepersonnel,toensurethatconstructiontrafficassociatedwiththedevelopmentdoesnotutiliseon-streetparkingorpublicparkingfacilities.

AsitelayoutplanhasbeenviewedviaAconex(referenceTaylorsSiteHoardings/AccessPlan,identifiedasTaylorSiteEstablishmentPlan20/7/2018,dated20/7/18).Theplanindicatesthatparkingiswithinthesiteandisofsufficientcapacitytomeettheprojectdemands.

Heavyvehicleswereobservedtobecontainedwithinsiteboundariesandnoon-roadqueuingoridlingwasobserved.

Adjacentvacantlandhasbeenleasedtoprovideadditionalcarparkingforsitestaffandcontractors.

Generalcompliancewiththisconditionhasbeendemonstrated.

InfrastructureUpgrades

Page 71: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page16of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B37

Priortothecommencementofconstruction,theApplicantmustsubmitforapprovalbyCouncil’sDirectorofOperationsonbehalfofCouncilasaroadauthority,fulldesignengineeringplansandspecificationspreparedbyasuitablyqualifiedandexperiencedcivilengineerforthefollowinginfrastructureworks:(a)upgradeofpedestrianfacilities/connectionsbetweentheEtonRoadBusBayandthefront/mainentranceoftheschoolincluding:i)Areconfiguredintersection,approximately30msouthoftheEtonRoadintersectionwithDunstanGrove,toensurethepedestriancrossingisconsistentwithAustroadsrequirementsforpedestriancrossinglengths,vehicleandbicyclemovements;ii)Thepedestriancrossingmustbearaisedcrossingtomoderatevehiclespeedsandhighlightpedestrianpriorityatthisintersection;andiii)2.5mminimumwidthfootpaths.(b)constructionofnewfootpaths/footpathupgradesandassociatedpedestriancrossingsatnocosttoCouncilbetweenthesiteandLindfieldPublicSchoolincluding:i)FullsurveydetailsforthefulldistanceoftravelonthefootpathfromthesubjectpropertyallthewaytoLindfieldrailwaystation.Detailstoincludealongitudinalsectionandcross-sectionsevery5m,showingcompliancewithCouncil’sgradientrequirements;andii)AnArboristassessmentinrelationtotheimpactontreesfromtheconstructionofthefootpath/upgradestoexistingfootpaths.(c)constructionofaprioritisedraisedpedestriancrossingonGrosvenorRoadbetweenAustralRoadandBentStreet

Commencementofconstructionidentifiedonsiteas29/10/18.WorkssubjecttotheCouncilapprovalsspecified,identifiedasnothavingbeencommencedpriortoreceiptofapproval.

CouncilConditionsofapprovalforFootpaths(October2018)andExternalWorks(November2018)sighted.

ArupcertificationforConditionsB37,B38,B39,B51andB52dated22/10/18sighted-reference251272(notingreferencetoDraftCoC52and53).

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2B37(cont.)

TherequiredplansandspecificationsaretobedesignedinaccordancewiththeGeneralSpecificationfortheConstructionofRoadandDrainageWorksinKu-ring-gaiCouncil,datedNovember2014.Thedrawingsmustdetailexistingutilityservices(mainsandhouseconnections)andtreesaffectedbytheworks.ConstructionoftheworksmustproceedonlyinaccordancewithanyconditionsattachedtotheRoadsActapprovalissuedbyCouncil.Aminimumofthree(3)weekswillberequiredforCounciltoassesstheRoadsActsubmissions.Earlysubmissionisrecommendedtoavoiddelaysincommencingconstruction.ForthepurposeofinspectionscarriedoutbyCouncilEngineers,thecorrespondingfeessetoutinCouncil’scurrentFeesandChargesSchedulearepayabletoCouncilpriortoissueoftheapprovedplans.Anengineeringplanassessmentfeeisalsoapplicable.ApprovalmustbeobtainedfromKu-ring-gaiCouncilastheroadauthorityunderSection139RoadsAct1993foranyproposedworksinthepublicroadpriortothecommencementofconstruction.EvidenceofapprovalmustbesubmittedtothePlanningSecretarywithin8weeksofcommencementofconstruction.

ParkingRestrictionsSchedule2B38

Priortothecommencementofconstruction,theApplicantmustconsultwithTfNSWtodeterminewhetheradditional‘NoParking’signsarerequiredtoensuretwobusesareabletopasseachotheronallbusroutesinthevicinityoftheschool.

CorrespondencefromArupdated22October2018sightedonAconexcertifiyingcompliancewithconditionCoCB38.

ConsultationidentifiedashavingcommencedwithTfNSWinSavills'lettertoDoEdated23/10/18.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2B39

Priortothecommencementofconstruction,theApplicantmustsubmittoCouncil,forapprovalfromCouncil’sTrafficCommittee,documentationfortheinstallationof‘NoParking’restrictionsonthesouthernsideofEtonRoadbetween(approximately)76EtonRoadatthecurvewestofAustralAvenue.The‘NoParking’restrictionsaretoapplyonapart-timebasis(7:00am-9.30am,2.30pm-4.30pm,SchoolDaysonly).Additional‘NoParking’signsmayalsoberequiredtoensuretwobusesareabletopasseachotheronallbusroutesinthevicinityoftheschool.NotethataspartoftheTrafficCommitteeprocess,Councilwillconsultwithdirectlyaffectedresidentsontheproposaltoinstalltherestrictions.FeesassociatedwithreportingtotheKu-ring-gaiTrafficCommitteemustbepaidbytheApplicantpriortoprocessingtheapplication.TheinstallationofthesignsmustbeatnocosttoCouncil.EvidenceofapprovalmustbesubmittedtothePlanningSecretarywithin8weeksofcommencementofconstruction,unlessotherwiseagreedbythePlanningSecretary.

CorrespondencefromArupdated22October2018sightedonAconexcertifiyingcompliancewithconditionCoCB39.

CouncilConditionsofapprovalforFootpaths(October2018)andExternalWorks(November2018)sighted.

DoEissueofapprovalstoDPEidentifiedinDoEcorrespondenceof30/11/18identifyingtransmittalon9/11/18(within8weeksofcommencementofconstruction).

Generalcompliancewiththisconditionhasbeendemonstrated.

DesignofMechanicalPlantandEquipmentSchedule2B40

Priortocommencementofconstruction,plantandequipmentmustbeselectedanddesignedtoachievetherelevantintrusivenesscriteriasetoutinTable2ofthelettertitled‘LindfieldLearningVillage–ResponsetoEPAQueries’preparedbyAcousticLogic,dated13August2018.TheCertifiermustverifythatallreasonableandfeasiblenoisemitigationmeasureshavebeenincorporatedintothedesigntoensurethedevelopmentwillnotexceedtherecommendedoperationalnoiselevelsidentified.

CertifiedbyErbas22/10/2018-Aconex.

LetterfromBCA(1November2018)forallapprovedconditionsrequringcertificationhasbeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

NoteforrecordsmanagementandQA/QC-thecertificationletterisdated22/10/18andthesignatureisdated3/10/18.

Page 72: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page17of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B41

TheschoolPAsystemandbellsmustbedesignedinaccordancewiththedesigncriteriaoutlinedinthelettertitled‘LindfieldLearningVillage–ResponsetoEPAQueries’preparedbyAcousticLogic,dated13August2018andinstalledtofacilitateadjustmentinresponsetoanycomplaintsofoffencenoisethatmaybereceivedduringitsoperation.

CertifiedbyErbas26/10/2018-Aconex.

LetterfromBCA(1November2018)forallapprovedconditionsrequringcertificationhasbeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

HistoricHeritageSchedule2B42

Priortothecommencementofconstruction,aConservationManagementPlan(CMP)mustbepreparedinaccordancewiththerelevantguidelinesoftheNSWHeritageCouncil,inconsultationwiththeHeritageDivisionandsubmittedtothesatisfactionofthePlanningSecretary.TheCMPmustbepreparedbyanappropriatelyqualifiedandexperiencedheritageconsultant(s)andhaveappropriateskillsandexperienceinbothbuiltformandlandscapeheritagewithdocumentedexperienceinthepreparationandimplementationofCMPs.TheCMPmustinclude,butnotbelimitedto:(a)Asummaryofalreadydocumentedheritagevaluesofthesite;(b)Thedevelopmentofheritagedesignprinciplesfortheprojecttoretaintheheritagesignificanceofthesite;(c)Specificmitigationmeasuresforthesitetominimiseimpactandtoensurethefinalmeasuresselectedareappropriateandtheleastintrusiveoption;and(d)Changestothedetaileddesigntomitigateheritageimpacts.

TheprojectCMPproducedbyURBISanddated6November2018hasbeenreviewed.AconnexLetterB42:ItisnotedthattheconditionrequirestheCMPbeprepared“inconsultationwiththeHeritageDivision.”DuringthepreparationoftheCMP,UrbisHeritagemadecontactwiththeHeritageDivisionandwereunabletoconsultonthedevelopmentoftheCMPfortheLindfieldLearningVillage.a:ComprehensiveCMPthataddressesheritagevaluesofthesite.b:Sections8and9ofthisCMPprovideanoverviewofheritageopportunitiesandconstraintsspecifictotheproperty,aswellasconservationpoliciesandguidelinestoassistinthemanagementofthesite’sheritagevalues.Section8.8.2'DesignDevelopmentandResponsetoConstraints".c:Section9providedConservationpolicyoverviewforthesite.d:Section9.5referstomanagingchange.

DoEcorrespondenceof30/11/18identifiestransmittaloftheCMPtotheDPEon19/11/18.

HeritageConsultationTablepreparedbySavillsidentifiesconsultationattemptswithOEHandconfirmationfromFionaBinnsinlettertoDPE(16/11/18)thatOEHnotabletoconsultandtheCMPwaspreparedinaccordancewithB45(referencingdraftconditionreference),andrelevantguidelines.

ThecontentoftheCMPgenerallycomplieswiththerequirementsofCoCB42.

Schedule2B43

Priortothecommencementofconstruction,aHeritageImplementationStrategy(HIS)includingadetailedScheduleofConservationWorkspreparedbyasuitablyqualifiedheritageconsultantmustbeprepared.AcopymustbesubmittedtotheHeritageDivision,CouncilandthePlanningSecretaryandincludebutnotbelimitedto:(a)Retainingtheextanttimberceilingoftheexistinglibraryarea.Thismustincludeamethodologyfortheremovalandsalvageofceilinganditsreinstatementaftertheinstallationofservicesandincludemeasurestominimiseimpactsasaresultoftheinstallationofservices;(b)Significantfabricaffectedbytheinternalfirewall(includingparquetryfloorwithinthecafeteria)mustbesalvagedandstoredforreinstatement(c)Retainingthespiralstairstowardsthesouthernboundaryofthebuilding(forpossiblefuturereuse)andinstallinglockablegatestopreventaccessastheyarenotBCAcompliant;(d)Retainingallbuiltinbenchseatinginthecommunalareas(insideandoutside);(e)Alterationoradaptationofthespacesthatareaccesseddirectlyfromthemaincirculationspineshouldutilisetheexistingpatternsofblackanodisedglazing;(f)Retaining,replacinglike-for-likeorreinterpretingthegreencarpetinthemainentryandmaincirculationspace(s),andidentifyanyotherareasfornewfloorfinishes(epoxy,brightcolouredcarpet);(g)Retainingalloriginalsphericallightfittingsincommunal/publicareaswherepossible,andanyfittingsthatcannotberetained/upgradedinsitubesalvagedforreusewithinthebuilding;(h)Retainingplanterboxesonroofterraces;(i)Includeamethodologyformaintenanceandcleaningactivities(egconcretecleaning);and(j)Includedetaileddesignofanycolouredpanelstobeaffixedtoexternalsurfaces,playequipmentandshadestructures.

Commencementofconstructionworkscommenced29October2018.

AHISproducedbyUrbisanddated14November2018hasbeensighted.

TheScheduleofConservationWorkswasprovidedbyApexDiagnostics24Oct2018.

a:AddressedinSection2.1.2oftheHISb:2.1.3c:2.1.4d:2.1.5e:2.1.6f:2.1.7g:2.1.8h:2.1.9i:2.1.10j:2.1.11

DoEcorrespondenceof30/11/18identifiestransmittaloftheHISandScheduleofConservationWorkstotheDPEon15/11/18.

ThecontentoftheHISgenerallycomplieswiththerequirementsofCoCB43.

Schedule2B44

Priorthecommencementofanyinternalworkstotheexistingbuilding,theApplicantmustpreparedetailedplansinconsultationwithanappropriatelyqualifiedheritagespecialistdemonstratingtheapprovedfireseparationwallcanbereversiblewithnopermanentimpactonthefabricofthebuilding.DetailsendorsedbytheheritageconsultantmustbesubmittedtothePlanningSecretary.

ThisisaddressedwithinSection2.2oftheHIS.

DoEcorrespondenceof30/11/18identifiestransmittaloftheHISandScheduleofConservationWorkstotheDPEon15/11/18.

ThecontentoftheHISgenerallycomplieswiththerequirementsofCoCB44.

Schedule2B45

Newworkslikelytohaveanimpactonanysignificantheritagefabricoftheexistingbuilding(notincludingthelandscapesetting)mustbedesignedtobereversibleinthefuture.

ThisisaddressedwithinSection2.3oftheHIS ThecontentoftheHISgenerallycomplieswiththerequirementsofCoCB45.

Page 73: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page18of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B46

Priortothecommencementofanyexternalworkstotheexistingbuilding:(a)theApplicantmustpreparedetailedelevationandwindowplansinconsultationwithanappropriatelyqualifiedheritagespecialistdemonstratinghowfireprotectionmeasureswillbeinstalledtoensureheritageimpactswillbeminimisedtothegreatestextentpracticable;and(b)thedesignofanycolouredpanelstoexternalfacades,playequipmentandshadestructuresmustbeendorsedbyasuitablyqualifiedheritageconsultant.PlansendorsedbytheheritageconsultantmustbesubmittedtothePlanningSecretary

ThisisaddressedwithinSection2.4oftheHIS.

DoEcorrespondenceof30/11/18identifiestransmittaloftheHISandScheduleofConservationWorkstotheDPEon15/11/18.

ThecontentoftheHISgenerallycomplieswiththerequirementsofCoCB46.

Schedule2B47

Priortothecommencementofconstruction,photographicarchivalrecordingmustbeundertakenfortheexistingbuildingandlandscapestructures/featuresinaccordancewiththeHeritageDivisionPublicationsHowtopreparearchivalrecordsofheritageitemsandPhotographicRecordingofHeritageItemsusingFilmorDigitalCapture.AdigitalandhardcopymustbeprovidedtotheHeritageDivision,CouncilandthePlanningSecretary.

Constructionidentifiedtohavecommencedonsiteon29/10/18.

ArchivalRecordinghasbeenundertakenbyAlexMayesPhotography(notsightedduringaudit)andprovidedtoDPEon26Octoberand9November2018(Aconex)

DoEcorrespondenceof30/11/18identifiestransmittalototheDPEon26/10/18.

Generalcompliancewiththisconditionhasbeendemonstrated.

ConstructionandDemolitionWasteManagementSchedule2B48

TheApplicantmustnotifytheRMSTrafficManagementCentreofthetruckroute(s)tobefollowedbytruckstransportingwastematerialfromthesite,priortothecommencementoftheremovalofanywastematerialfromthesite.

TruckrouteshavebeenprovidedaspartoftheCTPMSP(page11ofplandated02October2018).

RMSnotifiedviaemailcorrespondance.ContactwasmadewithRMSon16October2018viaPerfectContracting.CommunicationwithbothRMSSpecialPermitsUnit(SPU)andRMSTransportManagementCentre(TMC).

Generalcompliancewiththisconditionhasbeendemonstrated

MechanicalVentilationSchedule2B49

AllmechanicalventilationsystemsmustbedesignedinaccordancewithPartF4.5oftheBCAandmustcomplywiththeAS1668.2-2012Theuseofair-conditioninginbuildings–MechanicalventilationinbuildingsandAS/NZS3666.1:2011Airhandlingandwatersystemsofbuildings–Microbialcontroltoensureadequatelevelsofhealthandamenitytotheoccupantsofthebuildingandtoensureenvironmentprotection.DetailsmustbesubmittedtothesatisfactionoftheCertifierpriortothecommencementofconstruction.

CertifiedbyErbas26/10/2018-sightedonAconex.

LettersfromBCA(31October2018,1November2018and10December2018)forallapprovedconditionsrequiringcertificationhasbeenacceptedbyapprovedcertifier.

Generalcompliancewiththisconditionhasbeendemonstrated.

RainwaterHarvestingSchedule2B50

Priortothecommencementofconstruction,theApplicantmustensurethatarainwaterreuse/harvestingsystemforthedevelopmentisdevelopedforthesite.Arainwaterre-useplanmustbepreparedandcertifiedbyanexperiencedhydraulicengineer.

AconexreferencesA50.LetterfromErbasstates:aColorbondsteelrainwatertankwithacapacityofapproximately1000literswillbeinstalledonlevelfour(4)totheNorthernsideofthebuildingdesignatedasZoneA,documentedonhydraulicdrawingSYD18152-LI-H-A105.

Generalcompliancewiththisconditionhasbeendemonstrated.

RoadworksandAccessSchedule2B51

TheApplicantmustsubmitdesignplanstothesatisfactionoftherelevantroadsauthoritywhichdemonstratethattheproposedaccessestothedevelopmentaredesignedtoaccommodatetheturningpathofthelongestvehicleenteringthesite.

EmailcorrespondenceSavillstoKu-ring-gaiCouncil(JimTurner)23/10/18.Commentsrequestedby26/10/18.

ARUPCertificationdated30Octoberidentifyingdesignmeetsthecondition.

Notedthattheconditionitselfdoesnotspecify"priortocommencementofconstruction",however,theconditionsitsunderSchedule2PartB"PriortoCommencementofConstruction".

CouncilPermit:CouncilPermittoOpeningaPublicPlace|RoadsAct1993Section101and102|ApplicationNo.:ROP18/0272|LicenceNo:113546C|Date:19November2018

Drawing#TCI-6200&TCI-6201,issueB,preparedbyBirzulisConsultingStructural&CivilEngineers,dated15/10/2018anddisplayingcouncilstamp(5November2018).

Generalcompliancewiththisconditionhasbeendemonstrated.

CarParkingandServiceVehicleLayout

Page 74: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page19of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B52

PlansdemonstratingcompliancewiththefollowingrequirementsmustbesubmittedtothesatisfactionoftheCertifyingAuthoritypriortothecommencementofbuildingworks:(a)minimumof65on-sitecarparkingspacesforuseduringoperationofthedevelopmentandconstructedinaccordancewiththelatestversionofAS2890.1;(b)alloperationalvehiclesaccessingtheSite,includingtheloadingdock,aretobelimitedtoMediumRigidVehiclesorsmalleronly,unlessotherwiseagreedbySecretary;(c)alldemolitionandconstructionvehicles(excludingworkervehicles)aretobecontainedwhollywithintheSiteandvehiclesmustentertheSitebeforestopping;(d)appropriatepedestrianadvisorysignsaretobeprovidedattheegresspointofthecarpark;(e)allworks/regulatorysignpostingassociatedwiththeproposeddevelopmentmustbeatnocosttotherelevantroadsauthority;(f)thesweptpathofthelongestvehicleenteringandexitingtheSiteinassociationwiththenewwork,aswellasmanoeuvrabilitythroughtheSite,mustbeinaccordancewithAUSTROADS.Inthisregard,aplanmustbesubmittedtoCouncilforapproval,whichshowsthattheproposeddevelopmentcomplieswiththisrequirement;and(g)thesafetyofvehiclesandpedestriansaccessingadjoiningproperties,wheresharedvehicleandpedestrianaccessoccurs,istobeaddressed.

LetterfromBCA(1November2018)certifyingsatisfactionofconditionsightedforCoCB52.

CouncilPermit:CouncilPermittoOpeningaPublicPlace|RoadsAct1993Section101and102|ApplicationNo.:ROP18/0272|LicenceNo:113546C|Date:19November2018

Drawing#TCI-6200&TCI-6201,issueB,preparedbyBirzulisConsultingStructural&CivilEngineers,dated15/10/2018anddisplayingcouncilstamp(5November2018).

Generalcompliancewiththisconditionhasbeendemonstrated.

BicycleParkingandEnd-of-TripFacilitiesSchedule2B53

Plansdemonstratingcompliancewiththefollowingrequirementsforsecurebicycleparkingandend-of-tripfacilitiesmustbesubmittedtothesatisfactionoftheCertifier:(a)theprovisionofaminimum42bicycleparkingspaces;(b)thelayout,designandsecurityofbicyclefacilitiesmustcomplywiththeminimumrequirementsofAS2890.3:2015Parkingfacilities-Bicycleparking,(includingprovisionforbothwheelsandtheframetobelockedtothebicyclerack)andbelocatedineasytoaccess,well-litareasthatincorporatepassivesurveillance;(c)theprovisionofend-of-tripfacilitiesforstaffinaccordancewiththeESDDesign&AsBuiltratingtool;(d)appropriatepedestrianandcyclistadvisorysignsaretobeprovided;and(e)allworks/regulatorysignpostingassociatedwiththeproposeddevelopmentsmustbeatnocosttotherelevantroadsauthority.

LetterfromBCA(10December2018)certifyingsatisfactionofconditionsightedforCoCB53.CertificationreferencesDesignIncdesigncertificate(24/10/18).

Generalcompliancewiththisconditionhasbeendemonstrated.

PublicDomainWorksSchedule2B54

Priortothecommencementofanyfootpathorpublicdomainworks,theApplicantmustconsultwithCouncilanddemonstratetotheCertifierthatthestreetscapedesignandtreatmentmeetstherequirementsofCouncil,includingaddressingpedestrianmanagement.TheApplicantmustsubmitdocumentationofapprovalforeachstagefromCounciltotheCertifier.

LetterfromBCA(10December2018)certifyingsatisfactionofconditionsightedforCoCB53.CertificationreferencesBirzulisConsutingStructuralandCivilEngineers,dated15/10/18)displayingKu-ring-gaiCouncilApprovalstamp.

Ku-ring-gaiCouncilConditionsofApprovalofWorkssighted,datedNovember2018)

Generalcompliancewiththisconditionhasbeendemonstrated.

ComplianceReporting

Page 75: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page20of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B55

Nolaterthantwoweeksbeforethedatenotifiedforthecommencementofconstruction,aComplianceMonitoringandReportingProgrampreparedinaccordancewiththeComplianceReportingPostApprovalRequirements(Department2018)mustbesubmittedtotheDepartmentandtheCertifier.

ComplianceReportsoftheprojectmustbecarriedoutinaccordancewiththeComplianceReportingPostApprovalRequirements(Department2018).TheApplicantmustmakeeachComplianceReportpubliclyavailable60daysaftersubmittingittotheDepartmentandnotifytheDepartmentandtheCertifierinwritingatleastsevendaysbeforethisisdone.

AComplianceMonitoringandReportingProgram(CMRP)hasbeendevelopedfortheproject(AspectEnvironmentalPtyLimited,Reference0011021018,Rev2dated26/10/18).

LetterfromBCA(1Novemberand10November2018)certifyingsatisfactionofconditionsightedforCoCB55.

CorrespondencefromDoEtoDPEdated30/11/18identifiesissueoftheCMRPtotheDPEon26/10/18(reflectingupdatedconditionsofconsenttoSSD8114),and28/11/18(respondingtoDPE).ThesamecorrespondencveidentifiesissueoftheBCALogicCertifier'sletterofcompliancetotheDPEon1/11/18.

NocompliancereportsaddressingtheentiretyofthepreparedCMRPcontenthavebeenidentifiedasbeingcompletedfortheproject.

Apre-constructioncompliancereportwouldhaveordinarilybeenexpectedtobeundertakenforpre-constructionactivitiespriortocommencementofconstruction.TheCMRPwasissuedtoDPEon26/10/18,BCALogicpreparedacertificationassesmentofaddressofconditionsrequiringcertificationon1/11/18(whichwasissuedtotheDPE)andconstructioncommencedon4/11/18.

Thetimingconstraintsfortheprojecthaveplacedrelianceforconsiderationofcomplianceforpre-constructiondemonstrateduponBCALogiccertifyingsatisfactoryaddressofconditionsandreviewofresidualitemsbeingpickedupintheindependentaudittoavoidduplicationofeffort.

Generalcompliancewiththisconditionhasbeendemonstrated,however,theCMRPwasnotsubmittedtoDPEatleasttwoweeksinadvanceofconstructioncommencing.

TheComplianceReportingPost-ApprovalRequirements(DPE2018)identifycompliancereportswhereaparticularphaseisrequiredtobenotifiedtotheDepartmentandincludessubmissionofapre-constructioncompliancereportwhereaconstrucitonphaseisrequiredtobenotified.Thetimingrequirementforapre-constructioncompliancereportisidentifiedasbeingrequiredtobesubmittedtothePlanningSecretarypriortocommencementofconstruction.

TheBCALogicletterofcertificationrepresentsacompliancereviewandreportforthepre-constructionphase,however,isnotintheformofthesubmittedCMRPdocument.

Compliancewiththisconditionhasnotbeenfullydemonstrated.

IndependentEnvironmentalAuditSchedule2B56

Nolaterthantwoweeksbeforethedatenotifiedforthecommencementofconstruction,anIndependentAuditProgrampreparedinaccordancewiththeIndependentAuditPostApprovalRequirements(Department2018)mustbesubmittedtotheDepartmentandtheCertifier.

AnIndependentAuditProgrampreparedinaccordancewiththeIndependentAuditPostApprovalRequirements(Department2018)hasbeenprepared(AspectEnvironmentalPtyLimited,Reference0011011018,Rev2,dated25/10/18).

LetterfromBCA(1Novemberand10November2018)certifyingsatisfactionofconditionsightedforCoCB56.

Savillsletterdated6NovembernotingIndependantAuditProgramsubmittedtoDPEon1November.Notecommencementofconstruction11November.

Emaildated6/11/18fromSavillsnominatingIndependentauditortocompliance@planning.nsw.gov.ausighted.

Generalcompliancewiththisconditionhasbeendemonstrated.However,theIndependentAuditProgramwasnotsubmittedtoDPEatleasttwoweeksinadvanceofconstructioncommencing.

Compliancewiththiscondtionhasnotbeendemonstrated.

Schedule2B57

IndependentAuditsofthedevelopmentmustbecarriedoutinaccordancewith:(a)theIndependentAuditProgramsubmittedtotheDepartmentandtheCertifierunderconditionB56ofthisconsent;and(b)therequirementsforanIndependentAuditMethodologyandIndependentAuditReportintheIndependentAuditPostApprovalRequirements(Department2018).

Addressedwithinthepreparationofthiscurrentindependentauditscope.

TheIAPARidentifiesarequirementtosubmittheinitialindependentauditfinalAuditReportwithin16weeksofthecommencementofconstruction,makingthefinalAuditReportdueon25/2/19.Constructionisduetobecompletedby31/1/19.

TheIndependentAuditProgramandauditornominationwereprovidedtotheDPEon6/11/18.On20/12/18DPErequestedtheauditor'sCVandaletterconfirmingindependencefromtheProject.ThiscontentwasoriginallyprovidedinSection6oftheIndependentAuditProgramsubmittedtotheDepartmenton26/10/18.ReplicateconfirmationwasprovidedbyAspectandtotheDepartmenton21/12/18.

TheSiteAuditcommencedon11/12/18.

Section3.1.3oftheIAPARidentifiesthatIndependentAuditsmustnotcommenceuntiltheproposedauditorhasbeenagreedtoinwritingbythePlanningSecretary.

NowrittenagreementtotheproposedauditorhasbeenprovidedbythePlannningSecretary.

Generalcompliancewiththisconditionisdemonstratedbythisaudititself,however,theindependentauditwascommencedinadvanceofreceiptofwrittenagreementtothenominatedauditorbeingreceivedfromthePlanningSecretary.

DPEreceivedconfirmationofbothauditorcompetenceandindependencefromtheprojectasof26/10/18.FollowupbyDPEdidnotcommenceuntil20/12/18byrequestofauditorCVandletterofindependenceandfurtherrequestforinformationon9/1/18.

Compliancewiththisconditionhasnotbeenfullydemonstrated.

Page 76: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page21of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2B58

InaccordancewiththespecificrequirementsintheIndependentAuditPostApprovalRequirements(Department2018),theApplicantmust:(a)reviewandrespondtoeachIndependentAuditReportpreparedunderconditionB57(b)ofthisconsent;(b)submittheresponsetotheDepartmentandtheCertifier;and(c)makeeachIndependentAuditReportandresponsetoitpubliclyavailablewithin60daysaftersubmissiontotheDepartmentandnotifytheDepartmentandtheCertifierinwritingwhenthishasbeendone.

Addressedaspartofthisauditscope.Applicant'sresponsetobeappendedtotheFinalAuditReport.

Compliancewithsubsequentelementsunabletobeverifiedpriortofinalisationofthisaudit.

Generalcompliancewiththisconditionisdemonstratedbythisaudititself.

InterpretationStrategySchedule2C1

Withinfourweeksofcommencementofconstruction,anInterpretationStrategyforthebuildingmustbepreparedtoguidehowinformationonthehistoryandsignificanceofthebuildingwillbeprovidedforthestudentsandthegeneralpublic.Thestrategyshouldidentifythetypesandlocationsofinterpretivemediathatwillbeinstalledaspartofthisproject.

Interpretationstrategynotinitiallysighted.

Newhandrails-colourmatchedforcurrentstandardcomplianthandrailswereidentifiedandobserved.SomeofthechangeroombenchesinzoneAwereidentifiedtobere-used.Matchedreplacedwindowsdesigntobefireratingappropriate.

Constructioncommencedon11/11/18.

InterpretationStrategybyURBISdated28/11/2018

SchoolBusPlanSchedule2C2

Withineightweeksofcommencementofconstruction,aSchoolBusPlanmustbepreparedinconsultationwithTfNSWandacopysubmittedtothePlanningSecretary.Theplanmusthaveregardtoexistingphysicalconstraints,integrationwithexistingservices,funding,availabilityofbusesandexpecteddemandforanyservicesbyschoolstudents

Constructioncommencementdateis11/11/18.ASchoolBusplanpreparedandcertifiedbyARUPdated30/11/18wassighted.

ConsultationwithTfNSWandTransdevdated4/12/18identifiedconsultationprocessfortheSchoolBusPlancommencing31/5/18andcontinuingwithmeetingson31/10/18andcorrespondence12/11/18and4/12/18.

Generalcompliancewiththisconditionhasbeendemonstrated.

ApprovedPlanstobeOn-siteSchedule2C3

Acopyoftheapprovedandcertifiedplans,specificationsanddocumentsincorporatingconditionsofapprovalandcertificationmustbekeptontheSiteatalltimesandmustbereadilyavailableforperusalbyanyofficeroftheDepartment,CouncilortheCertifier.

Copiesoftheapprovedandcertifiedplans,specificationsanddocumentsincorporatingconditionsofapprovalandcertificationcanbeaccessedviaAconexonsite.Hardcopiesofplanswerealsoidentifiedonsite(egCEMPandsiteplans)duringsiteauditinspections.

Generalcompliancewiththisconditionhasbeendemonstrated.

SiteNoticeSchedule2C4

Asitenotice(s):(a)mustbeprominentlydisplayedattheboundariesofthesiteforthepurposesofinformingthepublicofprojectdetailsincluding,butnotlimitedtothedetailsoftheBuilder,CertifierandStructuralEngineer.(b)istosatisfyallbutnotbelimitedto,thefollowingrequirements:i)minimumdimensionsofthenoticemustmeasure841mmx594mm(A1)withanytextonthenoticetobeaminimumof30-pointtypesize;ii)thenoticeistobedurableandweatherproofandistobedisplayedthroughouttheworksperiod;iii)theapprovedhoursofwork,thenameofthesite/projectmanager,theresponsiblemanagingcompany(ifany),itsaddressand24-hourcontactphonenumberforanyinquiries,includingconstruction/noisecomplaintmustbedisplayedonthesitenotice;andiv)thenotice(s)istobemountedateyelevelontheperimeterhoardings/fencingandistostatethatunauthorisedentrytothesiteisnotpermitted.

Projectsitenoticeswereobservedattheprojectsiteboundariesduringeachofthesitevisits.

Generalcompliancewiththisconditionhasbeendemonstrated.

OperationofPlantandEquipmentSchedule2C5

Allplantandequipmentusedonsite,ortomonitortheperformanceofthedevelopmentmustbe:(a)maintainedinaproperandefficientcondition;and(b)operatedinaproperandefficientmanner.

Allpalntandequipmentaresubjecttopre-mobilisationcheckspriortoarrivalonprojectsites.Taylors'plantandequipmentcertificationstickerswerealsoobservedonmultipleitemsofplant.

Dailypre-startlogbooksarefilledinforplantandequipmentontheproject.AlogbookwassightedforPlant#29duringsiteauditinspection.

Generalcompliancewiththisconditionhasbeendemonstrated.

DemolitionSchedule2C6

DemolitionworkmustcomplywithAustralianStandardAS2601-2001Thedemolitionofstructures(StandardsAustralia,2001).TheworkplansrequiredbyAS2601-2001mustbeaccompaniedbyawrittenstatementfromasuitablyqualifiedpersonthattheproposalscontainedintheworkplancomplywiththesafetyrequirementsoftheStandard.TheworkplansandthestatementofcompliancemustbesubmittedtotheCertifierbeforethecommencement

AlldemolitionworkhasbeenundertakenbyPerfectContracting.

Workplansandwrittenstatementofcompliancenotsighted.

Certifierverificationofworkplansandstatementofcompliancenotsighted.

NottriggeredasdemolitionworkswereidentifiedasbeingincludedinanearlyworkspackageapprovedasanREFandoutsidethescopeoftheSSDCoC

ConstructionHours

DuringConstruction

Page 77: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page22of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2C7

Construction,includingthedeliveryofmaterialstoandfromthesite,mayonlybecarriedoutbetweenthefollowinghours:(a)between7:00amand6:00pm,MondaystoFridaysinclusive;and(b)between8:00amand3:30pm,Saturdays.NoworkmaybecarriedoutonSundaysorpublicholidays.

Accesstotheprojectsiteoutsidetheapprovedtimeof07:00am(Mon-Fri)hasbeenobservedinthesecuritysign-insheet.Thereisnoindicationthatconstructionactivitiesarecommencingbeforetheapprovedconstructionhours.Withearlyaccessbeingundertakentoenablepre-startchecksandtoolboxtalksinpreparationofactualcommencementofworks.Analysisofnoisemonitoringtoverifyearlyaccessisnotcreatinganissuewouldbebeneficial.

Nocomplaintsre:worksoutsideofhourshavebeenidentified.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2C8

ActivitiesmaybeundertakenoutsideofthehoursinConditionC7ifrequired:(a)bythePoliceorapublicauthorityforthedeliveryofvehicles,plantormaterials;or(b)inanemergencytoavoidthelossoflife,damagetopropertyortopreventenvironmentalharm;or(c)wheretheworksareinaudibleatthenearestsensitivereceivers;or(d)whereavariationisapprovedinadvanceinwritingbytheSecretaryorhernomineeifappropriatejustificationisprovidedfortheworks.Notificationofsuchactivitiesmustbegiventoaffectedresidentsbeforeundertakingtheactivitiesorassoonasispracticalafterwards.

Fromsiteinterview,OutofHoursworkshasnotbeenundertakenontheprojecttodate.

Nocomplaintsre:worksoutsideofhourshavebeenidentified.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2C9

Rockbreaking,rockhammering,sheetpiling,piledrivingandsimilaractivitiesmayonlybecarriedoutbetweenthefollowinghours:(a)9amto12pm,MondaytoFriday;(b)2pmto5pmMondaytoFriday;and(c)9amto12pm,Saturday.

Arecordofrockbreakingactivitieswasnotprovided.Therehavebeennoreportedincidents/complaintspertainingtoexcessivenoiseorrockbreakingactivitiesontheprojecttodate.

Generalcompliancewiththisconditionhasbeendemonstrated.

ImplementationofManagementPlansSchedule2C10

TheApplicantmustcarryouttheconstructionofthedevelopmentinaccordancewiththemostrecentversionoftheapprovedCEMP(includingSub-Plans).

Adequacyofmitigationmeasuresimplementedfortheprojectisbeingassessedaspartofthisaudit.

NoevidencetosuggesttheconstructionofthedevelopmentisnotbeingcarriedoutinaccordancewiththeCEMPandSub-plans,albeitmaintenanceofsomecontrolmeasures(specificallysedimentfencingandfiltersarounddrains)couldbeimproved.

Generalcompliancewiththisconditionhasbeendemonstrated.

ConstructionTrafficSchedule2C11

Allconstructionvehicles(excludingworkervehicles)aretobecontainedwhollywithinthesite,exceptiflocatedinanapprovedon-streetworkzone,andvehiclesmustenterthesitebeforestopping.

Allconstructionvehicleswereobservedcontainedwithintheprojectsiteboundaryforthedurationofthesiteaudit.

Generalcompliancewiththisconditionhasbeendemonstrated.

RoadOccupancyLicenceSchedule2C12

ARoadOccupancyLicencemustbeobtainedfromtherelevantroadauthorityforanyworksthatimpactontrafficflowsduringconstructionactivities.

NoindicationoftheneedforaRoadOccupancyLicencewasidentifiedduringtheaudit.

Section10.oftheConstructionTrafficManagementPlanstatesthat"Theproposedworkswillnotrequireanyroadorlaneclosures".

Section13oftheConstructionTrafficManagementPlanstatesthat"ARoadOccupancyLicencewillnotberequiredforthisjobasvehiclesenter/exitingonWongaRoadwhichisnotanRMSroad".

Nottriggered.

SafeworkRequirementsSchedule2C13

Toprotectthesafetyofworkpersonnelandthepublic,theworksitemustbeadequatelysecuredtopreventaccessbyunauthorisedpersonnel,andworkmustbeconductedatalltimesinaccordancewithrelevantSafeWorkrequirements.

Thesitewasobservedtobewellsecured.Accesstothesitecanonlybegainedbyapprovedconstructionanddeliverypersonnelwithasign-inprocessinplacetorecordentryandexitfromsite.

Generalcompliancewiththisconditionhasbeendemonstrated.

HoardingRequirementsSchedule2C14

Thefollowinghoardingrequirementsmustbecompliedwith:(a)nothird-partyadvertisingispermittedtobedisplayedonthesubjecthoarding/fencing;(b)theconstructionsitemanagermustberesponsiblefortheremovalofallgraffitifromanyconstructionhoardingsorthelikewithintheconstructionareawithin48hoursofitsapplication;and(c)theApplicantmustsubmitahoardingapplicationtoCouncilfortheinstallationofanyhoardingsoverCouncilfootwaysorroadreserve.

Nothirdpartyadvertisingorgrafittiwereobservedonprojectsitehoarding.

NohoardingsinstalledoverCouncilfootwaysorroadreserves.

Generalcompliancewiththisconditionhasbeendemonstrated.

NoObstructionofPublicWay

Page 78: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page23of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2C15

Thepublicway(outsideofanyapprovedconstructionworkszone)mustnotbeobstructedbyanymaterials,vehicles,refuse,skipsorthelike,underandcircumstances.Non-compliancewiththisrequirementwillresultintheissueofanoticebytherelevantAuthoritytostopallworksonsite.

Allpublicwaysinproximityoftheprojectsitewereobservedtobefreeofobstructions.

Generalcompliancewiththisconditionhasbeendemonstrated.

ConstructionNoiseLimitsSchedule2C16

ThedevelopmentmustbeconstructedtoachievetheconstructionnoisemanagementlevelsdetailedintheInterimConstructionNoiseGuideline(DECC,2009).AllfeasibleandreasonablenoisemitigationmeasuresmustbeimplementedandanyactivitiesthatcouldexceedtheconstructionnoisemanagementlevelsmustbeidentifiedandmanagedinaccordancewiththemanagementandmitigationmeasuresidentifiedintheapprovedConstructionNoiseandVibrationManagementPlan.

DailyacousticmonitoringisundertakenandreportedbyMarshallDay.ConstructionNoiseMonitoringReportsfor06-13Decemberweresighted.

Noiseexceedanceforthisperiodwerenotreported.Nocomplaintshavebeenidentifiedasbeingrecievedfromlocalresidentsforanyperceivedexcessivenoisegeneratingactivitiesfromtheprojecttodate.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2C17

TheApplicantmustensureconstructionvehicles(includingconcreteagitatortrucks)donotarriveatthesiteorsurroundingresidentialprecinctsoutsideoftheconstructionhoursofworkoutlinedunderConditionC7.

Theprojectsitesecuritysign-insheetindicatesthatthesitehasbeenaccessedbefore07:00amon13December2018and4January2018.Thisindicatespersonnelaccessasopposedtoconstructionvehicles.ConstructionvehicleaccesswasidentifiedasbeingscheduledbyTaylors'sitesupervisorystaff.Runningsheetobservedfor05December2018.

Nocomplaintshavebeenidentifiedasbeingreceivedfromlocalresidentsforanyperceivedexcessivenoisegeneratingactivitiesoutsideoftheapprovedconstructionhours.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2C18

TheApplicantmustimplement,wherepracticableandwithoutcompromisingthesafetyofconstructionstafformembersofthepublic,theuseofaudiblemovementalarmsofatypethatwouldminimisenoiseimpactsonsurroundingnoisesensitivereceivers.

Nocomplaintshavebeenidentifiedasbeingreceivedfromlocalresidentsforanyperceivedexcessivenoisegeneratingactivitiesfromtheprojecttodate.

Variousalarmtypeswereobservedduringthesiteaudit,includingthenormalbeepingalarmsratherthansquawkers.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2C19

AnynoisegeneratedduringconstructionofthedevelopmentmustnotbeoffensivenoisewithinthemeaningoftheProtectionoftheEnvironmentOperationsAct1997orexceedapprovednoiselimitsforthesite.

UponreviewoftheMarshallDaynoisereports(6-13December2018)"HighlyNoiseAffected"levelsLAeq>75dB(A),werenotedtohaveoccuredonthefollowingdays:Saturday08DecemberatLogger2,6:30am-7amWednesday12DecemberatLogger1,8am-10amand12pm-3pm.Thursday13DecemberatLogger1,8am-3pmThursday13DecemberatLogger4,11am-3pm

Inadditontothis,elevatatednoiselevelswererecordedontheprojectsitebeforeapprovidedconstructionstarttimesonthefollowingdays:Friday07December(Logger3)before8amSaturday08December(Logger2)before7amSaturday08December(Logger3)before7amSunday09December(Logger3)foraperiodbetween6amand7am(NBnoconstructionauthorisedonSundays)Monday10December(Logger4)before7amThursday13DecemberLogger4recordingwasdisturbedjustafter6amandresumedshortlybefore9am.

Nocomplaintshavebeenidentifiedasbeingreceivedfromlocalresidentsforanyperceivedexcessivenoisegeneratingactivitiesfromtheprojecttodate.

Generalcompliancewiththisconditionhasbeendemonstrated.

Analysisofnoiseresultswouldbebeneficialtoenableatimelyandinformedresponsetoanycomplaintsreceivedtoidentifylikelynoisesources(onoroffsite).ThereIsnothingaccompanyingtheprovideddatatoconfirmnoisesourcesagainstrecordedresults.

VibrationCriteriaSchedule2C20

Vibrationcausedbyconstructionatanyresidenceorstructureoutsidethesitemustbelimitedto:(a)forstructuraldamage,thelatestversionofDIN4150-3(1992-02)Structuralvibration-Effectsofvibrationonstructures(GermanInstituteforStandardisation,1999);and(b)forhumanexposure,theacceptablevibrationvaluessetoutintheEnvironmentalNoiseManagementAssessingVibration:atechnicalguideline(DEC,2006)(asmaybeupdatedorreplacedfromtimetotime).

Therehasbeennoidentificationofrecordedincidentsorcomplaintsbylocalresidentsregardingperceivedvibrationimpactfromconstructionactivities.

Nomonitoringresultsforvibratoryequipmenthavebeenobserved.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2C21

Vibratorycompactorsmustnotbeusedcloserthan30metresfromresidentialbuildingsunlessvibrationmonitoringconfirmscompliancewiththevibrationcriteriaspecifiedinconditionC20.

Taylorshaveconfirmedthatvibratorycompactoractivitywithin30metresfromresidentialbuildingshasnotbeenundertakenontheproject.

Nocomplaintshavebeenidentifiedasbeingreceivedfromlocalresidentsforanyperceivedexcessivevibrationgeneratingactivitiesfromtheprojecttodate.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2C22

ThelimitsinconditionsC20andC21applyunlessotherwiseoutlinedinaConstructionNoiseandVibrationManagementPlan,approvedaspartoftheCEMPrequiredbyconditionB29ofthisconsent.

NA

TreeProtection

Page 79: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page24of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2C23

Forthedurationoftheconstructionworks:(a)streettreesmustnotbetrimmedorremovedunlessitformsapartofthisdevelopmentconsentorpriorwrittenapprovalfromCouncilisobtainedorisrequiredinanemergencytoavoidthelossoflifeordamagetoproperty;(b)allstreettreesmustbeprotectedatalltimesduringconstruction.Anytreeonthefootpath,whichisdamagedorremovedduringconstructionduetoanemergency,mustbereplaced,tothesatisfactionofCouncil;(c)alltreesonthesitethatarenotapprovedforremovalmustbesuitablyprotectedduringconstruction;and(d)ifaccesstotheareawithinanyprotectivebarrierisrequiredduringtheworks,itmustbecarriedoutunderthesupervisionofaqualifiedarborist.Alternativetreeprotectionmeasuresmustbeinstalled,asrequired.Theremovaloftreeprotectionmeasures,followingcompletionoftheworks,mustbecarriedoutunderthesupervisionofaqualifiedarboristandmustavoidbothdirectmechanicalinjurytothestructureofthetreeandsoilcompactionwithinthecanopyorthelimitoftheformerprotectivefencing,whicheveristhegreater.

Nostreettreeswereidentifiedforremoval.

Kleinfielder,workwithAuraTreeservicesandadvisethemwhatneedstocomedownandwhatisstaying.

Treeshavebeenmarkedtoidentifywhatstays,whathasanest&whathasn’tbeendecidedonyet.AuraTreesdon’tcutanytreesunlessinstructedbyKleinfielderwhoareonsitethedurationoftreeremovalactivities.

Kleinfeldermaintainadailylog(unsighted).AtthecompletionofworksKleinfielderwillprovideareportdocumentingclearingresultsinaccordancewithAppendix4oftheLandManagementPlan.

Inadditontomarking/tagging,barrierfencingwasobservedaroundtreesbeingretained,predominantlysmallclustersoftreesratherthanonanindividualbasis,notablyaroundhightrafficzonestothefrontofthesiteasopposedtothebottomareaofthesiteadjacentthespoilandmaterialsstockpiles.

Generalcompliancewiththisconditionhasbeendemonstrated.

RockOutcropsSchedule2C24

Rockoutcropsmustbeprotectedduringconstructionactivitiesandappropriatelyfenced. Anumberofrockoutcropslocatedacrosstheprojectsitewereobservedwithoutaphysicalformofprotectionduringthesiteaudit.Rockoutcropsweretypicallyobservedasnotbeingproximaetoareasofworkactivity,withtheexceptionofworksalongtheperimeteraccessroadandinthebottomcarparkarea,andareotherwiselocatedontheoutersideofsedimentfencingand/orsiteperimeterhoardingfencing

Unplannedimpacttorockoutcropsasaresultofconstructionactivitieson-sitewasnotidentifiedorobservedduringthesiteaudit.

Generalcompliancewiththisconditionhasbeendemonstrated.

DustMinimisationSchedule2C25

TheApplicantmusttakeallreasonablestepstominimisedustgeneratedduringallworksauthorisedbythisconsent.

Stockpilecoveringwasobservedonthestockpileslocatedtotherearoftheschoolbuildingduringthesiteaudit.Someminordustgeneratingactivitieswerenotedonthe13/12/18thatbeingthedumpingofconstructionmaterialtothestockpileandexcavationworkstothefrontoftheschool.Emissionsremainedlocalisedtotheactivityanddidnotleavesite.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2C26

Duringconstruction,theApplicantmustensurethat:(a)exposedsurfacesandstockpilesaresuppressedbyregularwatering;(b)alltrucksenteringorleavingthesitewithloadshavetheirloadscovered;(c)trucksassociatedwiththedevelopmentdonottrackdirtontothepublicroadnetwork;(d)publicroadsusedbythesetrucksarekeptclean;andlandstabilisationworksarecarriedoutprogressivelyonsitetominimiseexposedsurfaces.

Stockpilesonthesitewereobservedtobedryalthoughcoveredwithpolyandgeofabricsheeting.

Notruckswereobservedleavingsiteonanyoftheauditdays.

Therewasnovisiblemudtrackingfromtheprojectsiteontothepublicroadnetwork.Dirttrackingwasobservedon13/12/18butnottosignificantquantities.

Useofwaterasasupressantswasevidencedforlocalisedactivitieson11/12/18.Someminorlandstabilisationactivitieswereobserved.

Generalcompliancewiththisconditionhasbeendemonstrated.

AirQualityDischargesSchedule2C27

TheApplicantmustinstallandoperateequipmentinlinewithbestpracticetoensurethatthedevelopmentcomplieswithallloadlimits,airqualitycriteria/airemissionlimitsandairqualitymonitoringrequirementsasspecifiedintheEPLapplicabletothesite.

ThedailylogbookforPlandID#29wassightedon4thJanuary2019.Taylorsinpsectionofplantstickerswereobservedonmultiplepiecesofmobileplant.Nolowqualityemissionswereobservedduringthesiteauditfromexhaustsofplantorequipment.

Therehavebeennoreportsorincidentsregardingplantandequipmentemissionsontheprojecttodate.

Generalcompliancewiththisconditionhasbeendemonstrated.

ErosionandSedimentControl

Page 80: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page25of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2C28

Allerosionandsedimentcontrolmeasures,mustbeeffectivelyimplementedandmaintainedatorabovedesigncapacityforthedurationoftheconstructionworksanduntilsuchtimeasallgrounddisturbedbytheworkshavebeenstabilisedandrehabilitatedsothatitnolongeractsasasourceofsediment.

AnumberofErSedcontrolsrequiringattentionandmaintenancewereobservedacrossthethreesiteauditvisits,on11and13December,and4thJanuary.TherewasnoevidencetosuggestcorrectiveactionsweretakentoaddresstheErSedcontrolsneedingattentionwithintheauditperiod.Controlsrequiringmaintenanceweregenerallyatcapacity.

Aweeklyenvironmentalinspectionchecklistsighted(10-15December)referstosedimentcontrol"Areallsedimentcontrolmeasuresfollowed,aspersedimentcontrolplan?"whichaffirmativelyidentifiedallcontrolsbeingfollowed.

Generalcompliancewiththisconditionhasbeendemonstrated.However,anapproachtodetail,recordandmonitortheimplementationandcloseoutofenvironmentalpreventiveandcorrectiveactionswouldbebeneficial.

ImportedSoilSchedule2C29

TheApplicantmust:(a)ensurethatonlyVENM,ENM,orothermaterialapprovedinwritingbyEPAisbroughtontothesite;(b)keepaccuraterecordsofthevolumeandtypeoffilltobeused;and(c)maketheserecordsavailabletotheDepartmentand/orCertifieruponrequest.

Importationofsoilontotheprojectsitehasnotcommencedattimeofsiteaudit.

Nottriggered.

DisposalofSeepageandStormwaterSchedule2C30

Anyseepageorrainwatercollectedon-siteduringconstructionorgroundwatermustnotbepumpedtothestreetstormwatersystemunlessseparatepriorapprovalisgiveninwritingbytheEPAinaccordancewiththeProtectionoftheEnvironmentOperationsAct1997.

Externalworkareashavenotbeenimpactedbyrainwateringress. Generalcompliancewiththisconditionhasbeendemonstrated.

AboriginalCulturalHeritageSchedule2C31

ArepresentativeoftheLocalAboriginalLandCouncilmustbepresenttoobserveanyexcavationsgreaterthan1metreindepth.Intheeventthatanyunexpectedfindsbediscovered,anydirectionfromtheLocalAboriginalLandCouncilrepresentativeandtheproceduresoutlinedinConditionC32mustbefollowed.

Taylorshaveadvisedthatexcavationworksontheprojecthavenotexceeded1mindepthandnounexpectedfindshavebeenidentified.Section12.3.13ofTaylorsPEMPprovidesamethodologyformanagingriskassociatedwithheritageunexpectedfinds.

Therequirementoftheconditionisnottriggered.

UnexpectedFindsProtocol-AboriginalCulturalHeritageSchedule2C32

IntheeventthatsurfacedisturbanceidentifiesanewAboriginalobject,allworksmusthaltintheimmediateareatopreventanyfurtherimpactstotheobject(s).AsuitablyqualifiedarchaeologistandtheregisteredAboriginalrepresentativesmustbecontactedtodeterminethesignificanceoftheobjects.ThesiteistoberegisteredintheAboriginalHeritageInformationManagementSystem(AHIMS)whichismanagedbyOEHandthemanagementoutcomeforthesiteincludedintheinformationprovidedtoAHIMS.TheApplicantmustconsultwiththeAboriginalcommunityrepresentatives,thearchaeologistsandOEHtodevelopandimplementmanagementstrategiesforallobjects/sites.WorkscanonlyrecommencewiththewrittenapprovalofOEH.

AdviceprovidedduringsiteauditinterviewsisthattherehasbeennodiscoveryofnewAboriginalobjectsfromworksontheprojectsite.

Section12.3.13ofTaylorsPEMPprovidesamethodologyformanagingriskassociatedwithheritageunexpectedfinds.

Therequirementoftheconditionisnottriggered.

UnexpectedFindsProtocol-HistoricHeritageSchedule2C33

Ifanyunexpectedarchaeologicalrelicsareuncoveredduringthework,thenallworksmustceaseimmediatelyinthatareaandtheOEHHeritageDivisioncontacted.Dependingonthepossiblesignificanceoftherelics,anarchaeologicalassessmentandmanagementstrategymayberequiredbeforefurtherworkscancontinueinthatarea.WorksmayonlyrecommencewiththewrittenapprovalofHeritageDivisionoftheOEH.

Adviceprovidedduringsiteauditinterviewsisthattherehasbeennodiscoveryofunexpectedarchaeologicalrelicsfromworksontheprojectsite.

Section12.3.13ofTaylorsPEMPprovidesamethodologyformanagingriskassociatedwithheritageunexpectedfinds.

Therequirementoftheconditionisnottriggered.

WasteStorageandProcessingSchedule2C34

Wastemustbesecuredandmaintainedwithindesignatedwastestorageareasatalltimesandmustnotleavethesiteontoneighbouringpublicorprivateproperties.

Wastestorageareasacrossthesitewereobservedtobeingoodorderandwellmaintained.Wastegenerallycontainedwithinopenskipsorliddedbins.Occasionaltemporarywastestorageoutsideofdedicatedareaswasinfrequentlyobservedandwasnotobservedtobepersistentacrosssiteauditdates.

Aminoramountofdomesticlitterwasidentifiedonsite,however,thiswasfoundtobefrequentlyattendedtoanddidnotaccumulatebetweensiteinspectionsonthe11/12/18;13/12/18and4/1/19.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2C35

Allwastegeneratedduringconstructionmustbeassessed,classifiedandmanagedinaccordancewiththeWasteClassificationGuidelinesPart1:ClassifyingWaste(EPA,2014).

MonthlywasterecordsareprovidedfortheprojectsbyFreshStartAustralia.ProjectwastereportsforAugust2018,September2018,andOctober2018werereviewed.

Generalcompliancewiththisconditionhasbeendemonstrated.

Page 81: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page26of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2C36

Thebodyofanyvehicleortrailerusedtotransportwasteorexcavationspoilmustbecoveredbeforeleavingthepremisestopreventanyspillageorescapeofanydust,wasteofspoil.Mud,splatter,dustandothermateriallikelytofallfromorbecastoffthewheels,undersideorbodyofanyvehicle,trailerormotorisedplantleavingthesitemustberemovedbeforeleavingthepremises.

Notruckstransportingwasteorothermaterialswereobservedleavingorenteringsiteduringtheaudit.Minoramountsofdusttrackingwereobservedatthesitegate.

Norumblegridsorunderbodywashdownareaswereidenitifedonsite.

Therehasbeennoreportedincidentsorcomplaintswithrespecttounacceptabletransportofwasteorotherconstructionmalterialsontheprojecttodate.

Generalcompliancewiththisconditionhasbeendemonstrated.

Schedule2C37

TheApplicantmustensurethatconcretewasteandrinsewaterarenotdisposedofonthesiteandarepreventedfromenteringanynaturalofartificialwatercourse.

ConcretewasteiscollectedbyapumpanddumpContractor.Therehavebeennoreportedincidentsofconcretewasteorrinsewaterenteringstormwaterdrainsoranywatercourses.

Generalcompliancewiththisconditionhasbeendemonstrated.

HandlingofAsbestosSchedule2C38

TheApplicantistoconsultwithSafeWorkNSWconcerningthehandlingofanyasbestoswastethatmaybeencounteredduringconstruction.TherequirementsoftheProtectionoftheEnvironmentOperations(Waste)Regulation 2014withparticularreferencetoPart7–‘Transportationandmanagementofasbestoswaste’mustalsobecompliedwith.

Anumberofasbestosrelatedreportswerereviewedaspartofthetheausit.Theseincluded:-TargetedAsbestosInvestigationandSampling,August2018-AsbestosCoreSampling,Risktech,22august2018-Disposalof3.5TonneofAsbestosSheeting,PerfectContracting28September2018-AsbestosClearanceCertificate,Airsafe,2October2018-AsbestosIdentificationAnalysis,Greencap,31October2018-AsbestosClearanceCertificate,Risktech,10December2018

Generalcompliancewiththisconditionhasbeendemonstrated.

CommunityEngagementSchedule2C39

TheApplicantmustconsultwiththecommunityregularlythroughoutconstruction,includingconsultationwiththenearbysensitivereceivers,relevantregulatoryauthorities,RegisteredAboriginalPartiesandotherinterestedstakeholders.

Projectupdatesareprovidedtothecommunityviatheprojectinternetpage.https://www.schoolinfrastructure.nsw.gov.au/projects/l/lindfield-learning-village.htmlWhereconstructionactivitiescouldpossiblyimpactonneabyresidentsletterboxdropshavebeendeployedontheproject.

Generalcompliancewiththisconditionhasbeendemonstrated.

IncidentNotification,ReportingandResponseSchedule2C40

TheDepartmentmustbenotifiedinwritingtocompliance@planning.nsw.gov.auimmediatelyaftertheApplicantbecomesawareofanincident.Thenotificationmustidentifythedevelopment(includingthedevelopmentapplicationnumberandthenameofthedevelopmentifithasone),andsetoutthelocationandnatureoftheincident.SubsequentnotificationmustbegivenandreportssubmittedinaccordancewiththerequirementssetoutinAppendix1.

Asiteprojectincidentregisterwasprovidedaspartofthesiteaudit.Theregisterhastwoentries,themostrecentincident,“DrillingofasbestosinmusicroomfromMechanical”,datedDecember2018.

DP&EComplianceTeamidentifyanincidentas:“anoccurrenceorasetofcircumstancesthatcausesorthreatenstocausematerialharm”.

Basedonthisdefinition,theproponenthasnotidentifiedanyoccurrencesorasetofcircumstancesontheprojectrequiredtobereported.

Generalcompliancewiththisconditionhasbeendemonstrated.

Non-ComplianceNotificationSchedule2C41

TheDepartmentmustbenotifiedinwritingtocompliance@planning.nsw.gov.auwithinsevendaysaftertheApplicantbecomesawareofanynon-compliance.TheCertifiermustalsonotifytheDepartmentinwritingtocompliance@planning.nsw.gov.auwithinsevendaysaftertheyidentifyanynon-compliance.Thenotificationmustidentifythedevelopmentandtheapplicationnumberforit,setouttheconditionofconsentthatthedevelopmentisnon-compliantwith,thewayinwhichitdoesnotcomplyandthereasonsforthenon-compliance(ifknown)andwhatactionshavebeen,orwillbe,undertakentoaddressthenon-compliance.Anon-compliancewhichhasbeennotifiedasanincidentdoesnotneedtoalsobenotifiedasanon-compliance.

NonotificationsprovidedtoDP&Eattimeofaudit. Nottriggered

RevisionofStrategies,PlansandProgramsSchedule2C42

Withinthreemonthsof:(a)thesubmissionofacompliancereportunderconditionB55;(b)thesubmissionofanincidentreportunderconditionC36;(c)thesubmissionofanIndependentAuditunderconditionB56;(d)theissueofadirectionofthePlanningSecretaryunderconditionA2whichrequiresareview,Thestrategies,plansandprogramsrequiredunderthisconsentmustbereviewed,andtheDepartmentandtheCertifiermustbenotifiedinwritingthatareviewisbeingcarriedout.

Nottriggered.FirstcompliancereportwillbethePre-constructionComplianceReportwhichwouldtriggerthereviewunderC42inFebruary.

Nottriggered.

Page 82: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

Appendix A Construction Audit Table

Page27of27

CompliantNon-

compliantNotTriggered

EvidenceCollectedComplianceStatus

IndependentAuditFindingsandRecommendations

Approval(ID) Requirement

Schedule2C43

Ifnecessarytoeitherimprovetheenvironmentalperformanceofthedevelopment,caterforamodificationorcomplywithadirection,thestrategies,plansandprogramsrequiredunderthisconsentmustberevised,tothesatisfactionoftheCertifier.Whererevisionsarerequired,thereviseddocumentmustbesubmittedtotheCertifierforapprovalwithinsixweeksofthereview.Note:Thisistoensurestrategies,plansandprogramsareupdatedonaregularbasisandtoincorporateanyrecommendedmeasurestoimprovetheenvironmentalperformanceofthedevelopment.

DPErequestedrevisiontotheComplianceMonitoringandReportingProgramsubmitted26/10/18.Revision3oftheCMRPissuedbyAspecton11/1/19.

Noothertriggersfortheconditionhavebeenidentified.

Generalcompliancewiththeconditionhasbeendemonstrated.

Appendix1(1)

AwrittenincidentnotificationaddressingtherequirementssetoutbelowmustbeemailedtotheDepartmentatthefollowingaddress:compliance@planning.nsw.gov.auwithinsevendaysaftertheApplicantbecomesawareofanincident.NotificationisrequiredtobegivenunderthisconditioneveniftheApplicantfailstogivethenotificationrequiredunderconditionC41or,havinggivensuchnotification,subsequentlyformstheviewthatanincidenthasnotoccurred.

Nottriggered Nottriggered

Appendix1(2)

Writtennotificationofanincidentmust:a.identifythedevelopmentandapplicationnumber;b.providedetailsoftheincident(date,time,location,abriefdescriptionofwhatoccurredandwhyitisclassifiedasanincident);c.identifyhowtheincidentwasdetected;d.identifywhentheapplicantbecameawareoftheincident;e.identifyanyactualorpotentialnon-compliancewithconditionsofconsent;f.describewhatimmediatestepsweretakeninrelationtotheincident;g.identifyfurtheraction(s)thatwillbetakeninrelationtotheincident;andh.identifyaprojectcontactforfurthercommunicationregardingtheincident.

Nottriggered Nottriggered

Appendix1(3)

Within30daysofthedateonwhichtheincidentoccurredorasotherwiseagreedtobythePlanningSecretary,theApplicantmustprovidethePlanningSecretaryandanyrelevantpublicauthorities(asdeterminedbythePlanningSecretary)withadetailedreportontheincidentaddressingallrequirementsbelow,andsuchfurtherreportsasmayberequested.

Nottriggered Nottriggered

Appendix1(4)

TheIncidentReportmustinclude:a.asummaryoftheincident;b.outcomesofanincidentinvestigation,includingidentificationofthecauseoftheincident;c.detailsofthecorrectiveandpreventativeactionsthathavebeen,orwillbe,implementedtoaddresstheincidentandpreventrecurrence;andd.detailsofanycommunicationwithotherstakeholdersregardingtheincident.

Nottriggered Nottriggered

(B54)CouncilConditionsofConstructionforApprovalWorksinthePublicRoad

RoadsActSection138&139dated5November2018Drawing#TCI-6200&TCI-6201,issueB,preparedbyBirzulisConsultingStructural&CivilEngineers,dated15/10/2018anddisplayingcouncilstamp(5November2018).

PermitDetals:CouncilPermittoOpeningaPublicPlaceRoadsAct1993Section101and102ApplicationNo.:ROP18/0272LicenceNo:113546CDate:19November2018

Workshadnotyetcommecedattimeofsiteaudit11thand13thDecember.Onreturningtosite4thJanuary2019,workshadbeencompleted.

Nottriggeredattimeofaudit.

AdditionalApprovalsKu-ring-gaiCouncil

Appendix1:WrittenIncidentNotificationandReportingRequirements

Page 83: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 48

APPENDIXB–APPROVAL&DOCUMENTLISTB1.APPROVALANDDOCUMENTATIONLISTEnvironmentalImpactStatementLindfieldLearningVillageEISwasproducedbyURBISanddated8thJune2017.StateSignificantDevelopment8114–PartialDevelopmentConsentSSD8114dated24thOctober2018.B7VegetationManagementPlan(VMP)AVMPwasnotreferencedduringaudit.B13LandscapeManagementPlanThelandscapemanagementplanhasbeenproducedbyKleinfelder.Theplanisdated24August2018.B14ContaminatedSiteInvestigationsThefollowingreportsandcorrespondencehavebeenviewedandsatisfiesCoCB14.

• VirginExcavatedNaturalMaterialAssessment,EIS,13November2018• InterimAdvice#08forStatutorySiteAuditNo.279byDrIanSwane,Reviewof

StagingofRAPforLindfieldLearningVillageProject,8thNovember2018• InterimAdvice#11forStatutorySiteAuditNo.279byDrIanSwane,RAPAddendum

forLindfieldLearningVillageProject,21stNovember2018B16RemediationActionPlan(RAP)ARAPhasbeenproducedbyEIS.TheRAPisdated16August2018.B17UnexpectedContaminationProcedureAnunexpectedcontaminationprocedureisprovidedwithintheRAP.B21CommunityCommunicationStrategyACommunityCommunicationStrategydatedOctober2018wasproducedbyNAMEOFCONSULTANTB29ConstructionEnvironmentalManagementPlanZoicEnvironmentalproducedtheprojectCEMP.Theplanisdated29October2018.

Page 84: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 49

B30TheConstructionTrafficandPedestrianManagementSub-Plan(CTPMSP)CommercialTCproducedtheCTPMSP.Theplanisdated2October2018.B31TheConstructionNoiseandVibrationManagementSub-Plan(CNVMSP)TheCNVMSPwasproducedbyAcousticLogic.Theplanisdated5thOctober2018.B32TheConstructionWasteManagementSub-Plan(CWMSP)ThefollowingdocumentshavebeenpreparedtosatisfyCoCB32:

• DumpitBins,WasteandRecyclingProcess&Flow,Notdated• ForesightEnvironmental-ConstructionandDemolitionWasteManagementPlan,27

March2017• PureContracting-AsbestosRemovalControlPlan,10August2018

B33ConstructionSoilandWaterManagementPlan(CSWMSP)Aconstructionsoilandwatermanagementplanwasnotreviewedaspartoftheaudit.B34ConstructionFloraandFaunaManagementSub-Plan(FFMSP)TheFFMSPhasbeenpreparedbyKleinfelder.TheplanisdatedOctober2018B35BushFireandFloodEmergencyResponseSub-Plan(BFFERSP)EWFWConsultingEngineersproducedtheBFFERSP.Theplanisdated18October2018B42ConservationManagementPlan(CMP)URBISproducedtheprojectCMP.Theplanisdated6November2018.B43:HeritageImplementationStrategy(HIS)AHISwasproducedbyURBIS.Thestrategyisdated14November2018.C1HeritageInterpretationStrategy AHeritageInterpretationStrategywasproducedbyURBIS.Thestrategyisdated28November2019.B2.EMSandCEMPDOCUMENTATIONLISTThefollowingdocumentswerereferencedaspartoftheon-siteenvironmentalperformanceassessment:

• IncidentRegisterwithtwoevents,mostrecententryDecember2018• LegalRequirementsRegister,emptywithnoentries• SiteinductionSE-F-11,datedJanuary2018• SafetyDataSheet(SDS)RegisterSE-F-10(notdated)• Toolbox/DailyPre-StartTalkSE-F-20

§ HighRiskWorks–TreeCutting03/01/2019§ Toolboxesfor28&29November2018referencesWetWeather§ Toolboxfor7January2019makereferencetoexcavationexclusionzone

below1m,wetweathernotice,maintenanceofstormwaterprotection,andageneralenvironmentalnoteregardinghousekeepingandstockpilemanagement.

Page 85: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 50

• SafeWorkMethodStatements(SWMS)§ KLFF&F03:VegetationQuadratSurveysandCollectingVegetationSamples,

August2018§ KLF21:SWMS-UseofMulcher,September2018§ SiteClearingWorks–AllPlantandOperations,AuraTrees,2August2018

• BushfireEvacuationPlanA3,Taylors’,notdated• SiteEvacuationPlanA3,Taylors’,notdated• ConstructionNoiseMonitoring06-13December,MarshallDay,14December2018• Deliveryschedule(Trafficmanagement)for5December.• EnvironmentalInspectionRecords

§ WeeklyChecklist10th–15thDecember2018• AsbestosManagement

§ TargetedAsbestosInvestigationandSampling,August2018§ AsbestosCoreSampling,Risktech,22august2018§ Disposalof3.5TonneofAsbestosSheeting,PerfectContracting28

September2018§ AsbestosClearanceCertificate,Airsafe,2October2018§ AsbestosIdentificationAnalysis,Greencap,31October2018§ AsbestosClearanceCertificate,Risktech,10December2018

• WasteDisposalRecords§ RecordsforAugust2018,September2018,October2018,FreshStart

Australia• TreeRemovalRecords

§ AtRiskTree–AboriculturalReportTree49,RainTreeConsulting,19November2018

§ AtRiskTree–AboriculturalReportTree66,67&96,RainTreeConsulting,19November2018

§ AtRiskTree–AboriculturalReportTree88,RainTreeConsulting,19November2018

Page 86: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 51

APPENDIXC-SITEAUDITPHOTOLOG

Page 87: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

APPENDIXC-SITEAUDITPHOTOLOGDateofAudit 11,13Dec2018,4Jan2019

Auditors RichardJohnson;NormanMcComb Location LindfieldLearningCentre,Ku-Ring-Gai

AuditPhotoLogManagementArea BushfireRelevantCoCs:B5-B12Bushfire

Date:13/12/2018Description:Removedtreesobservedatboundaryfence

Date:13/12/2018Description:Areaoflandscapingaftertreeclearinginlowercarpark

Date:13/12/2018Description:Removedvegetationobservedtotherearoftheschoolhasthepotentialasfuelloadforbushfire

Date:13/12/2018Description:Generatorrunninglocatedondryvegetation

ManagementArea LandscapingRelevantCoCs:B13Landscaping

Date:11/12/2018Description:Densevegetationpre-treefellinginlowercarpark

Date:04/01/2019Description:Lowercarparkaftertreeandvegetationremoval

Date:04/01/2019Description:Mulchingactivitiestakingplacetorearoftheschool

Date:04/01/2019Description:Non-combustiblegalvanisedsteelfencebeinginstalled

ManagementArea ConstructionNoiseLimitsRelevantCoCs:B31ConstructionNoise&VibrationC16-C19ConstructionNoiseLimits

Date:04/01/2019Description:Noisemonitoringstationobserved

Date:04/01/2019Description:Noisemonitoringinlowercarpark

Page 88: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

APPENDIXC-SITEAUDITPHOTOLOG

ManagementArea ConstructionWasteManagementRelevantCoCs:B32ConstructionWasteManagementC34-C37WasteStorageandProcessing

Date:13/12/2018Description:Segregationofwasteandgoodhousekeepingobserved

Date:13/12/2018Description:Temporarystorageofgroutlocatedbesideastormwaterdrain

Date:04/01/2019Description:Rubblebagcontainingconcretewaste

Date:04/01/2019Description:Flammableliquidsstoredoutsideonawoodenpallet

ManagementArea ConstructionSoilandWaterManagementRelevantCoCs:B33ConstructionSoilandWaterManagementPlanC28ErosionandSedimentControl

Date:13/12/2018Description:Sedimentladengeotextiledraincover

Date:13/12/2018Description:Filtersocksandgeotextileobservedingoodcondition

Date:13/12/2018Description:Filtersocksremovedfromdrain

Date:04/01/2019Description:Sedimentfencebreachedbyfelledtrees

ManagementArea HeritageRelevantCoCs:B42-B47HistoricHeritageC1InterpretationStrategy

Date:04/01/2019Description:Newinstalledcomplianthandrailspaintedpinkinreferencetoheritagerequirements

Date:04/01/2019Description:Newinstalledcomplianthandrailspaintedpinkinreferencetoheritagerequirements

Page 89: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

APPENDIXC-SITEAUDITPHOTOLOG

ManagementArea SiteNotice&SafeworkRequirementsRelevantCoCs:C4SiteNoiceC13SafeorkRequirements

Date:13/12/2018Description:Sitenoticeswelldisplayed

Date:13/12/2018Description:Projectsiteissecureandsafe.

ManagementArea OperationofPlantandEquipmentRelevantCoCs:C5OperationofPlantandEquipment

Date:04/01/2019Description:Excavator#29log-booksightedfor04/01/2019

Date:04/01/2019Description:Excavator#29mobileplanttag

Date:04/01/2019Description:Excavator#67mobileplanttag

Date:04/01/2019Description:Excavator#29mobileplanttag

ManagementArea ConstructionHoursRelevantCoCs:C7-C9ConstructionHours

Date:13/12/2019Description:Siterecordsindicatepersonnelaccessingsitebefore7am

Date:04/01/2019Description:Siterecordsindicatepersonnelaccessingsitebefore7am

Whilesitemaybeaccessedpriortonominatedconstructionhoursitdoesnotindicatecommencementofworkspriortostarttime.Nocomplaintsrecordedofworksbeforehours.Itwouldbebeneficialtocorrelatenoisemonitoringwithworkhourstoenableverificationofnoisesourcesintheeventacomplaintisraisedatsomepoint.

Page 90: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

APPENDIXC-SITEAUDITPHOTOLOG

ManagementArea TreeProtectionRelevantCoCs:C23TreeProtection

Date:11/12/2018Description:Treeexclusionzoneobserved

Date:13/12/2018Description:Pinkandbluetreemarkingobservedinthelowercarpark

Date:13/12/2018Description:Treeexclusionzonestothefrontofthemainschoolbuilding

Date:13/12/2018Description:Yellowexclusionzonetapingobservedwithoutexclusionbarriers

ManagementArea RockOutcropsRelevantCoCs:C24RockOutcrops

Date:11/12/2018Description:Exposedrockoutcropswithnoprotectionmeasures

Date:11/12/2018Description:Constructionmaterialsstoredagainstexposedrockoutcrops

Date:13/12/2018Description:Exposedrockoutcropswithnoprotectionmeasures

Date:13/12/2018Description:Constructionmaterialsstoredagainstexposedrockoutcrops

ManagementArea DustMinimisation&AirQualityRelevantCoCs:C25&C26DustMinimisationC27AirQualityDischarges

Date:13/12/2018Description:Stockpilingactivitiesgeneratingdust

Date:13/12/2018Description:Stockpilecovering

Date:04/01/2019Description:Previousstockpileareacleared

Page 91: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

APPENDIXC-SITEAUDITPHOTOLOG

ManagementArea HandlingofAsbestosRelevantCoCs:C38HandlingofAsbestos

Date:13/12/2018Description:Non-conformingasbestossignageobserved

Date:04/01/2019Description:Non-conformingasbestossignageobserved

Date:04/01/2019Description:Alternativeasbestossignageobservedon-site.

Date:04/01/2019Description:Asbestosairmonitoringbeingundertakeninauditorium

Page 92: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 52

APPENDIXD-INDEPENDENTAUDITDECLARATIONFORM

Page 93: Independent Environmental Audit - School Infrastructure Home · The Lindfield Learning Village (the School) is proposed to ultimately accommodate 2,100 students from kindergarten

LindfieldLearningVillageFinalReportREV_3190320.docx 53

IndependentAuditDeclarationFormProjectName:LindfieldLearningVillageConsentNumber:SSD8114Description of Project: Refurbishment of the formerUniversity of Technology Sydney (UTS) Ku-ring-gaicampusintoanewschool.ProjectAddress:Lot2DP1151638,100EtonRd,LindfieldNSW2070Proponent:DepartmentofEducationTitleofAudit:IndependentEnvironmentalAudit–SSDConstructionComplianceReportDate:01/02/2019I declare that I have undertaken the Independent Audit and prepared the contents of the attachedIndependentAuditReportandtothebestofmyknowledge:

• the audit has been undertaken in accordance with relevant condition(s) of consent, theIndependentAuditPostApprovalRequirements(IAPAR,DP&E2018),andAS/NZSISO19011.2014–GuidelinesforAuditingManagementSystems;

• thefindingsoftheauditarereportedtruthfully,accuratelyandcompletely;• Ihaveexercisedduediligenceandprofessionaljudgementinconductingtheaudit;• Ihaveactedprofessionally,objectivelyandinanunbiasedmanner;• I amnot related to any proponent, owner or operator of the project neither as an employer,

businesspartner,employee,orbysharingacommonemployer,havingacontractualarrangementoutsidetheaudit,orbyrelationshipasspouse,partner,sibling,parent,orchild;

• Idonothaveanypecuniaryinterestintheauditedproject,includingwherethereisareasonablelikelihoodorexpectationoffinancialgainorlosstomeorspouse,partner,sibling,parent,orchild;

• neitherInormyemployerhaveprovidedconsultancyservicesfortheauditedprojectthatweresubjecttothisauditpriortotheaudit;and

• Ihavenotaccepted,norintendtoacceptanyinducement,commission,giftoranyotherbenefit(apartfrompaymentforauditingservices)fromanyproponent,owneroroperatoroftheproject,theiremployeesorany interestedparty. Ihavenotknowinglyallowed,nor intendtoallowmycolleaguestodoso.

Notes:(a)Undersection10.6oftheEnvironmentalPlanningandAssessmentAct1979apersonmustnotincludefalseormisleadinginformation(orprovideinformationforinclusionin)inareportofmonitoringdataoran audit report produced to the Minister in connection with an audit if the person knows that theinformationisfalseormisleadinginamaterialrespect.Theproponentofanapprovedprojectmustnotfail to includeinformation in(orprovide informationfor inclusion in)areportofmonitoringdataoranauditreportproducedtotheMinisterinconnectionwithanauditifthepersonknowsthattheinformationismateriallyrelevanttothemonitoringoraudit.Themaximumpenaltyis,inthecaseofacorporation,$1millionandforanindividual,$250,000;and(b)TheCrimesAct1900containsotheroffencesrelatingtofalseandmisleadinginformation:section307B(givingfalseormisleadinginformation–maximumpenalty2yearsimprisonmentor200penaltyunits,orboth) NameofAuditor:RichardJohnson

Signature:

Qualification:BSc;DipLaw

Company:AspectEnvironmentalPtyLtd