+ All Categories
Home > Documents > Index by Project Name Section 8.1 - West Slope Road and ... 2... · 71345 U.S. 50/Silva Valley...

Index by Project Name Section 8.1 - West Slope Road and ... 2... · 71345 U.S. 50/Silva Valley...

Date post: 13-Mar-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
31
Project Number Project Description Page # 77123 Alder Drive at EID Canal - Bridge Replacement 2 66115 Bass Lake Frontage Improvements-Silver Springs 4 66109 Bass Lake Road Full Improvements - Phase 1A 6 GP166 Bass Lake Road Widening - U.S. 50 to Silver Springs Parkway, Phase 1B 8 77128 Bassi Road at Granite Creek - Bridge Replacement 10 77132 Bayne Road at Dutch Creek - Bridge Maintenance Project 12 77119 Blair Road at EID Canal - Bridge Replacement 14 77116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Rehabilitation 16 GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road 18 73150 Cameron Park Drive/Green Valley Road Intersection Improvements 20 72367 Cameron Park Widening - Durock Road to Coach Lane 22 72309 Class II Bikeway - Green Vally Road from Loch Way to Signalized Entrance to Pleasant Grove Middle School 24 77139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 26 77138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 28 73360 Cold Springs Road Realignment 30 77133 Cosumnes Mine Road at North Fork Cosumnes River - Bridge Maintenance 32 GP125 Country Club Drive Ext. - West Bass Lake Hills SP Boundary to Silver Dove Rd 34 GP124 Country Club Drive Extension - Silver Dove Road to Bass Lake Road 36 GP126 Country Club Drive Realignment - Bass Lake Road to east Bass Lake Hills Specific Plan Boundary 38 72375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 40 72334 Diamond Springs Parkway - Phase 1B 42 GP171 Durock Road Widening - Robin Lane to South Shingle Road 44 GP183 El Dorado Hills Boulevard Widening - Lassen Lane to Park Drive 46 72332 El Dorado Hills Boulevard/Francisco Drive Intersection Alignment 48 97012 El Dorado Trail - Los Trampas to Halcon 50 71358 Francisco Drive Right-Turn Pocket 52 77127 Green Valley Road at Indian Creek - Bridge Replacement 54 77136 Green Valley Road at Mound Springs Creek - Bridge Replacement 56 77109 Green Valley Road at Tennessee Creek - Bridge Replacement 58 77114 Green Valley Road at Weber Creek - Bridge Replacement 60 73151 Green Valley Road Traffic Signal Interconnect 62 GP179 Green Valley Road Widening - Deer Valley Road East to Lotus Road 64 GP178 Green Valley Road Widening - Francisco to Salmon Falls Road 66 GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road 68 76114 Green Valley Road/Deer Valley Road West Intersection Improvements 70 77137 Greenstone Road at Slate Creek - Bridge Replacement 72 77135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 74 77125 Hazel Valley Road at PG&E Canal - Bridge Replacement 76 71375 Headington Road Extension - Missouri Flat Road to El Dorado Road 78 72369 Hollow Oak Road Drainage 80 77131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 82 31202 Intelligent Transportation System (ITS) Improvements 84 66116 Latrobe Connection 86 73359 Latrobe Road North of Ryan Ranch Road (Milepost 7.0 - 7.35) 88 72350 Latrobe Road Widening (2 to 4 lanes) - Golden Foothill Parkway (south) to Investment Boulevard 90 GP154 Latrobe Road Widening (4 to 6 lanes) - White Rock Road to Carson Creek (Suncast Lane) 92 OP005 Metal Beam Guardrail Installation - Various Locations 94 GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd 96 GP165 Missouri Flat Road Widening, Headington Road to Prospector's Plaza 98 Section 8.1 - West Slope Road and Bridge Projects Index by Project Name 13-0082 3E 1 of 31
Transcript
  • Project

    Number Project Description Page #

    77123 Alder Drive at EID Canal - Bridge Replacement 266115 Bass Lake Frontage Improvements-Silver Springs 466109 Bass Lake Road Full Improvements - Phase 1A 6GP166 Bass Lake Road Widening - U.S. 50 to Silver Springs Parkway, Phase 1B 877128 Bassi Road at Granite Creek - Bridge Replacement 1077132 Bayne Road at Dutch Creek - Bridge Maintenance Project 1277119 Blair Road at EID Canal - Bridge Replacement 1477116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Rehabilitation 16GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road 1873150 Cameron Park Drive/Green Valley Road Intersection Improvements 2072367 Cameron Park Widening - Durock Road to Coach Lane 22

    72309

    Class II Bikeway - Green Vally Road from Loch Way to Signalized Entrance to

    Pleasant Grove Middle School 2477139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2677138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2873360 Cold Springs Road Realignment 3077133 Cosumnes Mine Road at North Fork Cosumnes River - Bridge Maintenance 32GP125 Country Club Drive Ext. - West Bass Lake Hills SP Boundary to Silver Dove Rd 34GP124 Country Club Drive Extension - Silver Dove Road to Bass Lake Road 36

    GP126

    Country Club Drive Realignment - Bass Lake Road to east Bass Lake Hills

    Specific Plan Boundary 3872375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4072334 Diamond Springs Parkway - Phase 1B 42GP171 Durock Road Widening - Robin Lane to South Shingle Road 44GP183 El Dorado Hills Boulevard Widening - Lassen Lane to Park Drive 4672332 El Dorado Hills Boulevard/Francisco Drive Intersection Alignment 4897012 El Dorado Trail - Los Trampas to Halcon 5071358 Francisco Drive Right-Turn Pocket 5277127 Green Valley Road at Indian Creek - Bridge Replacement 5477136 Green Valley Road at Mound Springs Creek - Bridge Replacement 5677109 Green Valley Road at Tennessee Creek - Bridge Replacement 5877114 Green Valley Road at Weber Creek - Bridge Replacement 6073151 Green Valley Road Traffic Signal Interconnect 62GP179 Green Valley Road Widening - Deer Valley Road East to Lotus Road 64GP178 Green Valley Road Widening - Francisco to Salmon Falls Road 66GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road 6876114 Green Valley Road/Deer Valley Road West Intersection Improvements 7077137 Greenstone Road at Slate Creek - Bridge Replacement 7277135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477125 Hazel Valley Road at PG&E Canal - Bridge Replacement 7671375 Headington Road Extension - Missouri Flat Road to El Dorado Road 7872369 Hollow Oak Road Drainage 8077131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8231202 Intelligent Transportation System (ITS) Improvements 8466116 Latrobe Connection 8673359 Latrobe Road North of Ryan Ranch Road (Milepost 7.0 - 7.35) 88

    72350

    Latrobe Road Widening (2 to 4 lanes) - Golden Foothill Parkway (south) to

    Investment Boulevard 90

    GP154

    Latrobe Road Widening (4 to 6 lanes) - White Rock Road to Carson Creek

    (Suncast Lane) 92OP005 Metal Beam Guardrail Installation - Various Locations 94GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd 96GP165 Missouri Flat Road Widening, Headington Road to Prospector's Plaza 98

    Section 8.1 - West Slope Road and Bridge Projects

    Index by Project Name

    13-0082 3E 1 of 31

  • 77126 Mosquito Road Bridge at South Fork American River 100GP155 Mother Lode Drive - Greenstone Road to Pleasant Valley Road 10273307 Mother Lode Drive/Pleasant Valley Road Intersection Improvements 10477129 Mount Murphy Road at South Fork American River - Bridge Replacement 10677130 Mt. Aukum Road at North Fork Cosumnes River - Bridge Maintenance Project 10877122 Newtown Road at South Fork of Weber Creek - Bridge Replacement 11072304 Northside School Class I Bike Path - Phase 1 (SR193) 11272306 Northside School Class I Bike Path - Phase 2 (SR49) 11477134 Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11673320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11873358 Pleasant Valley Road at Oak Hill Road Intersection Improvements 120

    GP173

    Pleasant Valley Road Widening - Pearl Place to Big Cut Road in Diamond

    Springs 122GP174 Pleasant Valley Road Widening from Big Cut Road to Cedar Ravine Road 124GP160 Pleasant Valley Road Widening from El Dorado Road to State Route 49 126GP175 Ponderosa Road Widening from North Shingle Road to Meder Road 12873152 Radar Signal Controller Upgrade at Intersection of El Dorado Hills 13077117 Rubicon Trail at Ellis Creek - Bridge Replacement 132GP130 Runnymeade Drive Realignment at El Dorado Road 13473362 Salmon Falls Road South of Glenesk Lane Realignment 13671324 Saratoga Way Extension - Phase 1 138GP147 Saratoga Way Extension - Phase 2 140GP182 Silva Valley Parkway/Golden Eagle Lane Intersection Signalization 14277124 Silver Fork Road at South Fork American River - Bridge Replacement 14476108 Silver Springs Pkwy to Bass Lake Rd (south segment) 14676107 Silver Springs Pkwy to Green Valley Rd (north segment)/Green Vly Rd 14877115 Sly Park Road at Clear Creek Crossing - Bridge Replacement 150

    GP177

    State Route 49 Passing Lanes from SR193 (in Cool) to the northern County

    Line 152GP176 State Route 49 Widening from Pleasant Valley Road to Missouri Flat Road 154

    TIM Prog TIM Fee Program Projects 156TSI Traffic Signal and Intersection Operational Improvements 158

    53118 Transit Service Improvements 160GP150 U.S. 50 Auxiliary Lane Eastbound - Cambridge to Ponderosa 162

    53115

    U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Empire Ranch

    Road 16453116 U.S. 50 HOV Lanes (Phase 3) - Ponderosa Road to Greenstone Road 16653124 U.S. 50 HOV Lanes Phase 0 16853120 U.S. 50 Mainline Widening at El Dorado Hills 17071330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 172GP148 U.S. 50/Bass Lake Road Interchange Improvements - Phase 2 17471332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 176GP149 U.S. 50/Cambridge Road Interchange Improvements - Phase 2 17872361 U.S. 50/Cameron Park Drive Interchange Improvements 18071319 U.S. 50/Camino Area Parallel Capacity/Safety Study 18271340 U.S. 50/El Dorado Hills Blvd Interchange - Pedestrian Overcrossing 18471323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 18671347 U.S. 50/El Dorado Road Interchange Improvements - Phase 1 18871376 U.S. 50/El Dorado Road Interchange Phase 2 19071359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 192

    71346

    U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian

    Restoration 19471338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 19671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 19871333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 20071328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 202

    71345

    U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary

    Lanes on U.S. 50 204

    13-0082 3E 2 of 31

  • 77118 Wentworth Springs Road at Gerle Creek - Bridge Replacement 206

    GP152

    White Rock Road Widening - 4 to 6 Lanes, Latrobe Road to US50/Silva Valley

    Parkway Interchange 212

    GP137

    White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento

    County Line 208

    72374

    White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva

    Valley Parkway Interchange 210

    95961 Abrasives Study 3

    73120 Apache Avenue/US 50 Intersection Signalization 4

    95153 Boulder Mountain Erosion Control Project 6

    95174 Chiapa Erosion Control Project 8

    95190 Christmas Valley Phase 2C Erosion Control Project 10

    95191 Country Club Heights Erosion Control Project 12

    95196 CSA # 5 Upper Area Erosion Control Project 14

    95157 CSA #5 Erosion Control Project 16

    95169 Echo View 2 Erosion Control Project 18

    95195 Forest View Water Quality Project 20

    95180 Glenridge Erosion Control Project 22

    95176 Golden Bear Erosion Control Project 24

    95708 Highway 89 Class 1 Trail 26

    95186 Lake Tahoe Boulevard Bike Trail Project 28

    95163 Lake Tahoe Boulevard Erosion Control Project 30

    95175 Lake Tahoe Boulevard SEZ Project 32

    95179 Meyers Erosion Control Project 34

    95155 Montgomery Estates Area 1A Erosion Control Project 36

    95193 Montgomery Estates Area 1B Erosion Control Project 38

    95170 Montgomery Estates Area 2 Erosion Control Project 40

    95172 Montgomery Estates Area 3 Erosion Control Project 42

    95166 North Upper Truckee SEZ Restoration Project 44

    95838 Passenger Facility 46

    95165 Sawmill 2A Bike Path & Erosion Control Project 48

    95192 Sawmill 2B Bike Path and Erosion Control Project 50

    95168 South Upper Truckee I Erosion Control Project 52

    95171 Tahoe Hills Erosion Control Project 54

    93523 Airport Layout Plan 2018 Update - Georgetown 293520 Construction of AWOS 4

    93535 Crack Seal and Remark Runway, Taxiways, Aprons and Tee Hanger Taxilanes 6

    93527

    Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & Tee Hanger

    Taxilanes; Change Runway End ID 8

    93533 Nested Hangars 1093528 Update Airport 2013 Layout Plan with Program Narrative Report 1293534 Update Pavement Maintenance/Management Program 1493531 West Access Road 1693525 West Side Development Phase 1 1893529 West Side Development Phase 2 2093524 West Taxiway Phase 1 22

    93532 West Taxiway Phase 2 24

    Section 8.2 - Tahoe EIP Projects

    Section 8.3A - Georgetown Airport Projects

    13-0082 3E 3 of 31

  • 93128 13 Unit Nested Tee Hangar 293132 Airport Layout Plan Update - Placerville 4

    93129

    Crack Seal and Remark Runway 5-23, Taxiways, Aprons and Tee Hanger

    Taxilanes 693130 Taxiway Edge Lights 893126 Tee Hangar Site Development Phase 2 1093131 Update Pavement Maintenance/Management Program 1293122 Water Line and Fire Hydrant to New Apron Area 14

    72186 Overlay - Francisco Drive 2Roadway

    Section 8.3B - Placerville Airport Projects

    Section 8.4 - CORP Projects

    13-0082 3E 4 of 31

  • Project

    Number Project Description Page #

    31202 Intelligent Transportation System (ITS) Improvements 84

    53115

    U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Empire Ranch

    Road 16453116 U.S. 50 HOV Lanes (Phase 3) - Ponderosa Road to Greenstone Road 16653118 Transit Service Improvements 16053120 U.S. 50 Mainline Widening at El Dorado Hills 17053124 U.S. 50 HOV Lanes Phase 0 16866109 Bass Lake Road Full Improvements - Phase 1A 666115 Bass Lake Frontage Improvements-Silver Springs 466116 Latrobe Connection 8671319 U.S. 50/Camino Area Parallel Capacity/Safety Study 18271323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 18671324 Saratoga Way Extension - Phase 1 13871328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 20271330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 17271332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 17671333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 20071338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 19671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 19871340 U.S. 50/El Dorado Hills Blvd Interchange - Pedestrian Overcrossing 184

    71345

    U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary

    Lanes on U.S. 50 204

    71346

    U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian

    Restoration 19471347 U.S. 50/El Dorado Road Interchange Improvements - Phase 1 18871358 Francisco Drive Right-Turn Pocket 5271359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 19271375 Headington Road Extension - Missouri Flat Road to El Dorado Road 7871376 U.S. 50/El Dorado Road Interchange Phase 2 19072304 Northside School Class I Bike Path - Phase 1 (SR193) 11272306 Northside School Class I Bike Path - Phase 2 (SR49) 114

    72309

    Class II Bikeway - Green Vally Road from Loch Way to Signalized Entrance to

    Pleasant Grove Middle School 2472332 El Dorado Hills Boulevard/Francisco Drive Intersection Alignment 4872334 Diamond Springs Parkway - Phase 1B 42

    72350

    Latrobe Road Widening (2 to 4 lanes) - Golden Foothill Parkway (south) to

    Investment Boulevard 9072361 U.S. 50/Cameron Park Drive Interchange Improvements 18072367 Cameron Park Widening - Durock Road to Coach Lane 2272369 Hollow Oak Road Drainage 80

    72374

    White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva

    Valley Parkway Interchange 21072375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4073150 Cameron Park Drive/Green Valley Road Intersection Improvements 2073151 Green Valley Road Traffic Signal Interconnect 6273152 Radar Signal Controller Upgrade at Intersection of El Dorado Hills 13073307 Mother Lode Drive/Pleasant Valley Road Intersection Improvements 10473320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11873358 Pleasant Valley Road at Oak Hill Road Intersection Improvements 12073359 Latrobe Road North of Ryan Ranch Road (Milepost 7.0 - 7.35) 8873360 Cold Springs Road Realignment 3073362 Salmon Falls Road South of Glenesk Lane Realignment 136

    Section 8.1 - West Slope Road and Bridge Projects

    Index by Project Number

    13-0082 3E 5 of 31

  • 76107 Silver Springs Pkwy to Green Valley Rd (north segment)/Green Vly Rd 14876108 Silver Springs Pkwy to Bass Lake Rd (south segment) 14676114 Green Valley Road/Deer Valley Road West Intersection Improvements 7077109 Green Valley Road at Tennessee Creek - Bridge Replacement 5877114 Green Valley Road at Weber Creek - Bridge Replacement 6077115 Sly Park Road at Clear Creek Crossing - Bridge Replacement 15077116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Rehabilitation 1677117 Rubicon Trail at Ellis Creek - Bridge Replacement 13277118 Wentworth Springs Road at Gerle Creek - Bridge Replacement 20677119 Blair Road at EID Canal - Bridge Replacement 1477122 Newtown Road at South Fork of Weber Creek - Bridge Replacement 11077123 Alder Drive at EID Canal - Bridge Replacement 277124 Silver Fork Road at South Fork American River - Bridge Replacement 14477125 Hazel Valley Road at PG&E Canal - Bridge Replacement 7677126 Mosquito Road Bridge at South Fork American River 10077127 Green Valley Road at Indian Creek - Bridge Replacement 5477128 Bassi Road at Granite Creek - Bridge Replacement 1077129 Mount Murphy Road at South Fork American River - Bridge Replacement 10677130 Mt. Aukum Road at North Fork Cosumnes River - Bridge Maintenance Project 10877131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8277132 Bayne Road at Dutch Creek - Bridge Maintenance Project 1277133 Cosumnes Mine Road at North Fork Cosumnes River - Bridge Maintenance 3277134 Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11677135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477136 Green Valley Road at Mound Springs Creek - Bridge Replacement 5677137 Greenstone Road at Slate Creek - Bridge Replacement 7277138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2877139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2697012 El Dorado Trail - Los Trampas to Halcon 50GP124 Country Club Drive Extension - Silver Dove Road to Bass Lake Road 36GP125 Country Club Drive Ext. - West Bass Lake Hills SP Boundary to Silver Dove Rd 34

    GP126

    Country Club Drive Realignment - Bass Lake Road to east Bass Lake Hills

    Specific Plan Boundary 38GP130 Runnymeade Drive Realignment at El Dorado Road 134

    GP137

    White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento

    County Line 208GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road 18GP147 Saratoga Way Extension - Phase 2 140GP148 U.S. 50/Bass Lake Road Interchange Improvements - Phase 2 174GP149 U.S. 50/Cambridge Road Interchange Improvements - Phase 2 178GP150 U.S. 50 Auxiliary Lane Eastbound - Cambridge to Ponderosa 162

    GP152

    White Rock Road Widening - 4 to 6 Lanes, Latrobe Road to US50/Silva Valley

    Parkway Interchange 212

    GP154

    Latrobe Road Widening (4 to 6 lanes) - White Rock Road to Carson Creek

    (Suncast Lane) 92GP155 Mother Lode Drive - Greenstone Road to Pleasant Valley Road 102GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road 68GP160 Pleasant Valley Road Widening from El Dorado Road to State Route 49 126GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd 96GP165 Missouri Flat Road Widening, Headington Road to Prospector's Plaza 98GP166 Bass Lake Road Widening - U.S. 50 to Silver Springs Parkway, Phase 1B 8GP171 Durock Road Widening - Robin Lane to South Shingle Road 44

    GP173

    Pleasant Valley Road Widening - Pearl Place to Big Cut Road in Diamond

    Springs 122GP174 Pleasant Valley Road Widening from Big Cut Road to Cedar Ravine Road 124GP175 Ponderosa Road Widening from North Shingle Road to Meder Road 128GP176 State Route 49 Widening from Pleasant Valley Road to Missouri Flat Road 154

    13-0082 3E 6 of 31

  • GP177

    State Route 49 Passing Lanes from SR193 (in Cool) to the northern County

    Line 152GP178 Green Valley Road Widening - Francisco to Salmon Falls Road 66GP179 Green Valley Road Widening - Deer Valley Road East to Lotus Road 64GP182 Silva Valley Parkway/Golden Eagle Lane Intersection Signalization 142GP183 El Dorado Hills Boulevard Widening - Lassen Lane to Park Drive 46OP005 Metal Beam Guardrail Installation - Various Locations 94

    TIM Prog TIM Fee Program Projects 156TSI Traffic Signal and Intersection Operational Improvements 158

    73120 Apache Avenue/US 50 Intersection Signalization 4

    95153 Boulder Mountain Erosion Control Project 6

    95155 Montgomery Estates Area 1A Erosion Control Project 36

    95157 CSA #5 Erosion Control Project 16

    95163 Lake Tahoe Boulevard Erosion Control Project 30

    95165 Sawmill 2A Bike Path & Erosion Control Project 48

    95166 North Upper Truckee SEZ Restoration Project 44

    95168 South Upper Truckee I Erosion Control Project 52

    95169 Echo View 2 Erosion Control Project 18

    95170 Montgomery Estates Area 2 Erosion Control Project 40

    95171 Tahoe Hills Erosion Control Project 54

    95172 Montgomery Estates Area 3 Erosion Control Project 42

    95174 Chiapa Erosion Control Project 8

    95175 Lake Tahoe Boulevard SEZ Project 32

    95176 Golden Bear Erosion Control Project 24

    95179 Meyers Erosion Control Project 34

    95180 Glenridge Erosion Control Project 22

    95186 Lake Tahoe Boulevard Bike Trail Project 28

    95190 Christmas Valley Phase 2C Erosion Control Project 10

    95191 Country Club Heights Erosion Control Project 12

    95192 Sawmill 2B Bike Path and Erosion Control Project 50

    95193 Montgomery Estates Area 1B Erosion Control Project 38

    95195 Forest View Water Quality Project 20

    95196 CSA # 5 Upper Area Erosion Control Project 14

    95708 Highway 89 Class 1 Trail 26

    95838 Passenger Facility 46

    95961 Abrasives Study 3

    93520 Construction of AWOS 493523 Airport Layout Plan 2018 Update - Georgetown 293524 West Taxiway Phase 1 2293525 West Side Development Phase 1 18

    93527

    Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & Tee Hanger

    Taxilanes; Change Runway End ID 893528 Update Airport 2013 Layout Plan with Program Narrative Report 1293529 West Side Development Phase 2 2093531 West Access Road 1693532 West Taxiway Phase 2 2493533 Nested Hangars 1093534 Update Pavement Maintenance/Management Program 14

    93535 Crack Seal and Remark Runway, Taxiways, Aprons and Tee Hanger Taxilanes 6

    Section 8.2 - Tahoe EIP Projects

    Section 8.3A - Georgetown Airport Projects

    13-0082 3E 7 of 31

  • 93128 13 Unit Nested Tee Hangar 293132 Airport Layout Plan Update - Placerville 4

    93129

    Crack Seal and Remark Runway 5-23, Taxiways, Aprons and Tee Hanger

    Taxilanes 693130 Taxiway Edge Lights 893126 Tee Hangar Site Development Phase 2 1093131 Update Pavement Maintenance/Management Program 1293122 Water Line and Fire Hydrant to New Apron Area 14

    72186 Overlay - Francisco Drive 2Roadway

    Section 8.3B - Placerville Airport Projects

    Section 8.4 - CORP Projects

    13-0082 3E 8 of 31

  • Project

    Number Project Description Page #

    77123 Alder Drive at EID Canal - Bridge Replacement 277128 Bassi Road at Granite Creek - Bridge Replacement 1077132 Bayne Road at Dutch Creek - Bridge Maintenance Project 1277119 Blair Road at EID Canal - Bridge Replacement 1477116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Rehabilitation 1677139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2677138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2877133 Cosumnes Mine Road at North Fork Cosumnes River - Bridge Maintenance 3277127 Green Valley Road at Indian Creek - Bridge Replacement 5477136 Green Valley Road at Mound Springs Creek - Bridge Replacement 5677109 Green Valley Road at Tennessee Creek - Bridge Replacement 5877114 Green Valley Road at Weber Creek - Bridge Replacement 6077137 Greenstone Road at Slate Creek - Bridge Replacement 7277135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477125 Hazel Valley Road at PG&E Canal - Bridge Replacement 7677131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8277126 Mosquito Road Bridge at South Fork American River 10077129 Mount Murphy Road at South Fork American River - Bridge Replacement 10677130 Mt. Aukum Road at North Fork Cosumnes River - Bridge Maintenance Project 10877122 Newtown Road at South Fork of Weber Creek - Bridge Replacement 11077134 Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11677117 Rubicon Trail at Ellis Creek - Bridge Replacement 13277124 Silver Fork Road at South Fork American River - Bridge Replacement 14477115 Sly Park Road at Clear Creek Crossing - Bridge Replacement 15077118 Wentworth Springs Road at Gerle Creek - Bridge Replacement 206

    72369 Hollow Oak Road Drainage 80

    TSI Traffic Signal and Intersection Operational Improvements 158GP150 U.S. 50 Auxiliary Lane Eastbound - Cambridge to Ponderosa 16253124 U.S. 50 HOV Lanes Phase 0 16871330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 172GP148 U.S. 50/Bass Lake Road Interchange Improvements - Phase 2 17471332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 176GP149 U.S. 50/Cambridge Road Interchange Improvements - Phase 2 17872361 U.S. 50/Cameron Park Drive Interchange Improvements 18071319 U.S. 50/Camino Area Parallel Capacity/Safety Study 18271323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 18671347 U.S. 50/El Dorado Road Interchange Improvements - Phase 1 18871376 U.S. 50/El Dorado Road Interchange Phase 2 190

    71346

    U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian

    Restoration 19471338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 19671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 20071333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 19671328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 198

    71345

    U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary

    Lanes on U.S. 50 204

    Section 8.1 - West Slope Road and Bridge Projects

    Index by Project Type

    Drainage

    Bridge

    Interchange

    13-0082 3E 9 of 31

  • 73150 Cameron Park Drive/Green Valley Road Intersection Improvements 2073151 Green Valley Road Traffic Signal Interconnect 6276114 Green Valley Road/Deer Valley Road West Intersection Improvements 6473307 Mother Lode Drive/Pleasant Valley Road Intersection Improvements 10473320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11873358 Pleasant Valley Road at Oak Hill Road Intersection Improvements 12073152 Radar Signal Controller Upgrade at Intersection of El Dorado Hills 130GP182 Silva Valley Parkway/Golden Eagle Lane Intersection Signalization 142

    97012 El Dorado Trail - Los Trampas to Halcon 50

    72309

    Class II Bikeway - Green Vally Road from Loch Way to Signalized Entrance to

    Pleasant Grove Middle School 2472304 Northside School Class I Bike Path - Phase 1 (SR193) 11272306 Northside School Class I Bike Path - Phase 2 (SR49) 11471340 U.S. 50/El Dorado Hills Blvd Interchange - Pedestrian Overcrossing 18471359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 192

    66115 Bass Lake Frontage Improvements-Silver Springs 466109 Bass Lake Road Full Improvements - Phase 1A 6GP166 Bass Lake Road Widening - U.S. 50 to Silver Springs Parkway, Phase 1B 8GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road 1872367 Cameron Park Widening - Durock Road to Coach Lane 2273360 Cold Springs Road Realignment 30GP125 Country Club Drive Ext. - West Bass Lake Hills SP Boundary to Silver Dove Rd 34GP124 Country Club Drive Extension - Silver Dove Road to Bass Lake Road 36

    GP126

    Country Club Drive Realignment - Bass Lake Road to east Bass Lake Hills

    Specific Plan Boundary 3872375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4072334 Diamond Springs Parkway - Phase 1B 42GP171 Durock Road Widening - Robin Lane to South Shingle Road 44GP183 El Dorado Hills Boulevard Widening - Lassen Lane to Park Drive 4672332 El Dorado Hills Boulevard/Francisco Drive Intersection Alignment 4871358 Francisco Drive Right-Turn Pocket 52GP179 Green Valley Road Widening - Deer Valley Road East to Lotus Road 64GP178 Green Valley Road Widening - Francisco to Salmon Falls Road 66GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road 6871375 Headington Road Extension - Missouri Flat Road to El Dorado Road 7866116 Latrobe Connection 8673359 Latrobe Road North of Ryan Ranch Road (Milepost 7.0 - 7.35) 88

    72350

    Latrobe Road Widening (2 to 4 lanes) - Golden Foothill Parkway (south) to

    Investment Boulevard 90

    GP154

    Latrobe Road Widening (4 to 6 lanes) - White Rock Road to Carson Creek

    (Suncast Lane) 92OP005 Metal Beam Guardrail Installation - Various Locations 94GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd 96GP165 Missouri Flat Road Widening, Headington Road to Prospector's Plaza 98GP155 Mother Lode Drive - Greenstone Road to Pleasant Valley Road 102GP173 Pleasant Valley Road Widening - Pearl Place to Big Cut Road in Diamond 122GP174 Pleasant Valley Road Widening from Big Cut Road to Cedar Ravine Road 124GP160 Pleasant Valley Road Widening from El Dorado Road to State Route 49 126GP175 Ponderosa Road Widening from North Shingle Road to Meder Road 128GP130 Runnymeade Drive Realignment at El Dorado Road 13473362 Salmon Falls Road South of Glenesk Lane Realignment 136

    Parks & Trails

    Pedestrian Way and Bike Path

    Roadway

    Intersection

    13-0082 3E 10 of 31

  • 71324 Saratoga Way Extension - Phase 1 138GP147 Saratoga Way Extension - Phase 2 14076108 Silver Springs Pkwy to Bass Lake Rd (south segment) 146

    76107

    Silver Springs Pkwy to Green Valley Rd (north segment)/Green Vly Rd

    Intersection Signalization 148GP177 State Route 49 Passing Lanes from SR193 (in Cool) to the northern County 152GP176 State Route 49 Widening from Pleasant Valley Road to Missouri Flat Road 154

    53115

    U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Empire Ranch

    Road 16453116 U.S. 50 HOV Lanes (Phase 3) - Ponderosa Road to Greenstone Road 16653120 U.S. 50 Mainline Widening at El Dorado Hills 170

    GP152

    White Rock Road Widening - 4 to 6 Lanes, Latrobe Road to US50/Silva Valley

    Parkway Interchange 212

    GP137

    White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento

    County Line 208

    72374

    White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva

    Valley Parkway Interchange 210

    31202 Intelligent Transportation System (ITS) Improvements 84TIM Prog TIM Fee Program Projects 156

    53118 Transit Service Improvements 160

    95153 Boulder Mountain Erosion Control Project 6

    95174 Chiapa Erosion Control Project 8

    95190 Christmas Valley Phase 2C Erosion Control Project 10

    95191 Country Club Heights Erosion Control Project 12

    95196 CSA # 5 Upper Area Erosion Control Project 14

    95157 CSA #5 Erosion Control Project 16

    95169 Echo View 2 Erosion Control Project 18

    95195 Forest View Water Quality Project 20

    95180 Glenridge Erosion Control Project 22

    95176 Golden Bear Erosion Control Project 24

    95708 Highway 89 Class 1 Trail 26

    95186 Lake Tahoe Boulevard Bike Trail Project 28

    95163 Lake Tahoe Boulevard Erosion Control Project 30

    95175 Lake Tahoe Boulevard SEZ Project 32

    95179 Meyers Erosion Control Project 34

    95155 Montgomery Estates Area 1A Erosion Control Project 36

    95193 Montgomery Estates Area 1B Erosion Control Project 38

    95170 Montgomery Estates Area 2 Erosion Control Project 40

    95172 Montgomery Estates Area 3 Erosion Control Project 42

    95166 North Upper Truckee SEZ Restoration Project 44

    95165 Sawmill 2A Bike Path & Erosion Control Project 48

    95192 Sawmill 2B Bike Path and Erosion Control Project 50

    95168 South Upper Truckee I Erosion Control Project 52

    95171 Tahoe Hills Erosion Control Project 54

    Intersection

    73120 Apache Avenue/US 50 Intersection Signalization 4

    Miscellaneous

    95961 Abrasives Study 3

    95838 Passenger Facility 46

    Miscellaneous

    Section 8.2 - Tahoe EIP Projects

    13-0082 3E 11 of 31

  • 93523 Airport Layout Plan 2018 Update - Georgetown 293520 Construction of AWOS 4

    93535 Crack Seal and Remark Runway, Taxiways, Aprons and Tee Hanger Taxilanes 6

    93527

    Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & Tee Hanger

    Taxilanes; Change Runway End ID 893533 Nested Hangars 1093528 Update Airport 2013 Layout Plan with Program Narrative Report 1293534 Update Pavement Maintenance/Management Program 1493531 West Access Road 1693525 West Side Development Phase 1 1893529 West Side Development Phase 2 2093524 West Taxiway Phase 1 2293532 West Taxiway Phase 2 24

    93128 13 Unit Nested Tee Hangar 293132 Airport Layout Plan Update - Placerville 4

    93129

    Crack Seal and Remark Runway 5-23, Taxiways, Aprons and Tee Hanger

    Taxilanes 693130 Taxiway Edge Lights 893126 Tee Hangar Site Development Phase 2 1093131 Update Pavement Maintenance/Management Program 1293122 Water Line and Fire Hydrant to New Apron Area 14

    72186 Overlay - Francisco Drive 2Roadway

    Section 8.3B - Placerville Airport Projects

    Section 8.3A - Georgetown Airport Projects

    Section 8.4 - CORP Projects

    13-0082 3E 12 of 31

  • Project # Description Total Cost

    Community Development Agency, Transportation Division

    Supervisor District 1 Projects2013 Capital Improvement Program

    CORP72186 Overlay - Francisco Drive $293,912

    West Slope31202 Intelligent Transportation System (ITS) Improvements $5,833,210

    53115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Empire Ranch Road $2,809,337

    53118 Transit Service Improvements $10,500,000

    53120 U.S. 50 Mainline Widening at El Dorado Hills $2,160,594

    53124 U.S. 50 HOV Lanes Phase 0 $18,592,350

    66109 Bass Lake Road Full Improvements - Phase 1A $7,432,542

    66115 Bass Lake Frontage Improvements-Silver Springs $1,501,316

    71323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B $5,904,434

    71324 Saratoga Way Extension - Phase 1 $11,541,347

    71328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 $56,817,376

    71330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 $16,532,164

    71332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 $7,842,722

    71340 U.S. 50/El Dorado Hills Blvd Interchange - Pedestrian Overcrossing $6,782,817

    71345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary Lanes on U.S. 50 $12,070,023

    71358 Francisco Drive Right-Turn Pocket $250,000

    72309 Class II Bikeway - Green Vally Road from Loch Way to Signalized Entrance to Pleasant Grove Middle $320,000

    72332 El Dorado Hills Boulevard/Francisco Drive Intersection Alignment $9,451,507

    72369 Hollow Oak Road Drainage $683,364

    73151 Green Valley Road Traffic Signal Interconnect $270,000

    73152 Radar Signal Controller Upgrade at Intersection of El Dorado Hills Boulevard/Saratoga Way $31,000

    76107 Silver Springs Pkwy to Green Valley Rd (north segment)/Green Vly Rd Intersection Signalization $7,638,695

    76108 Silver Springs Pkwy to Bass Lake Rd (south segment) $7,346,497

    76114 Green Valley Road/Deer Valley Road West Intersection Improvements $1,284,264

    Appr Reimb 2-Approved Reimbursement Agreements-El Dorado Hills TIM $13,126,948

    Appr Reimb 2-Approved Reimbursement Agreements-Silva Valley Interchange $24,670,000

    GP124 Country Club Drive Extension - Silver Dove Road to Bass Lake Road $1,121,110

    GP125 Country Club Drive Ext. - West Bass Lake Hills SP Boundary to Silver Dove Rd $5,413,400

    GP126 Country Club Drive Realignment - Bass Lake Road to east Bass Lake Hills Specific Plan Boundary $5,043,140

    GP137 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento County Line $3,317,000

    GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road $12,520,000

    GP147 Saratoga Way Extension - Phase 2 $4,638,000

    GP148 U.S. 50/Bass Lake Road Interchange Improvements - Phase 2 $19,063,000

    Friday, May 31, 2013 Page 1 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 13 of 31

  • Project # Description Total Cost

    Community Development Agency, Transportation Division

    Supervisor District 1 Projects2013 Capital Improvement Program

    GP154 Latrobe Road Widening (4 to 6 lanes) - White Rock Road to Carson Creek (Suncast Lane) $8,987,000

    GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road $12,578,000

    GP166 Bass Lake Road Widening - U.S. 50 to Silver Springs Parkway, Phase 1B $15,385,000

    GP178 Green Valley Road Widening - Francisco to Salmon Falls Road $1,898,000

    GP182 Silva Valley Parkway/Golden Eagle Lane Intersection Signalization $768,000

    GP183 El Dorado Hills Boulevard Widening - Lassen Lane to Park Drive $1,096,000

    OP005 Metal Beam Guardrail Installation - Various Locations $672,000

    Pend Reimb 3-Pending Reimbursement Agreements-El Dorado Hills TIM $19,816,140

    TIM Prog TIM Fee Program Projects $8,400,000

    Traffic Signal Traffic Signal and Intersection Operational Improvements $57,400,000

    Friday, May 31, 2013 Page 2 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 14 of 31

  • Project # Description Total Cost

    Community Development Agency, Transportation Division

    Supervisor District 2 Projects2013 Capital Improvement Program

    West Slope31202 Intelligent Transportation System (ITS) Improvements $5,833,210

    53115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Empire Ranch Road $2,809,337

    53116 U.S. 50 HOV Lanes (Phase 3) - Ponderosa Road to Greenstone Road $590,165

    53118 Transit Service Improvements $10,500,000

    66116 Latrobe Connection $19,445,008

    71328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 $56,817,376

    71330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 $16,532,164

    71332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 $7,842,722

    71333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements $16,338,606

    71338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment $7,151,600

    72350 Latrobe Road Widening (2 to 4 lanes) - Golden Foothill Parkway (south) to Investment Boulevard $3,516,394

    72367 Cameron Park Widening - Durock Road to Coach Lane $7,337,985

    72374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley Parkway Interch $19,067,872

    73358 Pleasant Valley Road at Oak Hill Road Intersection Improvements $1,178,996

    73359 Latrobe Road North of Ryan Ranch Road (Milepost 7.0 - 7.35) $2,033,366

    77115 Sly Park Road at Clear Creek Crossing - Bridge Replacement $5,380,292

    77116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Rehabilitation $4,842,065

    77130 Mt. Aukum Road at North Fork Cosumnes River - Bridge Maintenance Project $443,033

    77135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement $3,917,250

    77138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement $4,585,250

    77139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement $4,585,250

    Appr Reimb 2-Approved Reimbursement Agreements-El Dorado Hills TIM $13,126,948

    Appr Reimb 2-Approved Reimbursement Agreements-Silva Valley Interchange $24,670,000

    GP148 U.S. 50/Bass Lake Road Interchange Improvements - Phase 2 $19,063,000

    GP149 U.S. 50/Cambridge Road Interchange Improvements - Phase 2 $11,935,000

    GP150 U.S. 50 Auxiliary Lane Eastbound - Cambridge to Ponderosa $10,350,000

    GP152 White Rock Road Widening - 4 to 6 Lanes, Latrobe Road to US50/Silva Valley Parkway Interchange $6,058,000

    GP171 Durock Road Widening - Robin Lane to South Shingle Road $7,210,000

    OP005 Metal Beam Guardrail Installation - Various Locations $672,000

    Pend Reimb 3-Pending Reimbursement Agreements-El Dorado Hills TIM $19,816,140

    TIM Prog TIM Fee Program Projects $8,400,000

    Traffic Signal Traffic Signal and Intersection Operational Improvements $57,400,000

    Friday, May 31, 2013 Page 3 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 15 of 31

  • Project # Description Total Cost

    Community Development Agency, Transportation Division

    Supervisor District 3 Projects2013 Capital Improvement Program

    Airports-Placerville93122 Water Line and Fire Hydrant to New Apron Area $172,000

    93126 Tee Hangar Site Development Phase 2 $2,795,000

    93128 13 Unit Nested Tee Hangar $1,279,000

    93129 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and Tee Hanger Taxilanes $314,000

    93130 Taxiway Edge Lights $401,000

    93131 Update Pavement Maintenance/Management Program $30,000

    93132 Airport Layout Plan Update - Placerville $75,000

    West Slope31202 Intelligent Transportation System (ITS) Improvements $5,833,210

    53118 Transit Service Improvements $10,500,000

    71319 U.S. 50/Camino Area Parallel Capacity/Safety Study $2,000,000

    71346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian Restoration $1,768,238

    71347 U.S. 50/El Dorado Road Interchange Improvements - Phase 1 $2,891,532

    71359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 $3,550,000

    71375 Headington Road Extension - Missouri Flat Road to El Dorado Road $10,416,718

    72334 Diamond Springs Parkway - Phase 1B $27,335,675

    72375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment $6,009,046

    73307 Mother Lode Drive/Pleasant Valley Road Intersection Improvements $7,782,420

    73320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization $4,403,762

    77114 Green Valley Road at Weber Creek - Bridge Replacement $10,214,487

    77122 Newtown Road at South Fork of Weber Creek - Bridge Replacement $5,255,305

    77123 Alder Drive at EID Canal - Bridge Replacement $2,962,147

    77126 Mosquito Road Bridge at South Fork American River $30,584,369

    77127 Green Valley Road at Indian Creek - Bridge Replacement $4,500,000

    77134 Oak Hill Road at Squaw Hollow Creek - Bridge Replacement $3,960,250

    77135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement $3,917,250

    77137 Greenstone Road at Slate Creek - Bridge Replacement $3,512,875

    97012 El Dorado Trail - Los Trampas to Halcon $527,957

    Appr Reimb T 2-Approved Reimbursement Agreements-TIM Zones 1-7 $8,785,068

    GP130 Runnymeade Drive Realignment at El Dorado Road $1,902,000

    GP155 Mother Lode Drive - Greenstone Road to Pleasant Valley Road $3,893,000

    GP160 Pleasant Valley Road Widening from El Dorado Road to State Route 49 $1,099,000

    GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd $1,202,000

    GP165 Missouri Flat Road Widening, Headington Road to Prospector's Plaza $1,299,000

    Friday, May 31, 2013 Page 4 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 16 of 31

  • Project # Description Total Cost

    Community Development Agency, Transportation Division

    Supervisor District 3 Projects2013 Capital Improvement Program

    GP173 Pleasant Valley Road Widening - Pearl Place to Big Cut Road in Diamond Springs $2,710,000

    GP174 Pleasant Valley Road Widening from Big Cut Road to Cedar Ravine Road $2,291,000

    GP176 State Route 49 Widening from Pleasant Valley Road to Missouri Flat Road $7,879,000

    OP005 Metal Beam Guardrail Installation - Various Locations $672,000

    Pend Reimb 3-Pending Reimbursement Agreements-TIM Zones 1-7 $5,596,000

    TIM Prog TIM Fee Program Projects $8,400,000

    Traffic Signal Traffic Signal and Intersection Operational Improvements $57,400,000

    Friday, May 31, 2013 Page 5 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 17 of 31

  • Project # Description Total Cost

    Community Development Agency, Transportation Division

    Supervisor District 4 Projects2013 Capital Improvement Program

    Airports-Georgetown93520 Construction of AWOS $251,000

    93523 Airport Layout Plan 2018 Update - Georgetown $75,000

    93524 West Taxiway Phase 1 $131,000

    93525 West Side Development Phase 1 $1,853,000

    93527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & Tee Hanger Taxilanes; Change Runway $173,000

    93528 Update Airport 2013 Layout Plan with Program Narrative Report $75,000

    93529 West Side Development Phase 2 $1,484,000

    93531 West Access Road $1,330,000

    93532 West Taxiway Phase 2 $1,341,000

    93533 Nested Hangars $1,097,000

    93534 Update Pavement Maintenance/Management Program $40,000

    93535 Crack Seal and Remark Runway, Taxiways, Aprons and Tee Hanger Taxilanes $131,000

    West Slope31202 Intelligent Transportation System (ITS) Improvements $5,833,210

    53116 U.S. 50 HOV Lanes (Phase 3) - Ponderosa Road to Greenstone Road $590,165

    53118 Transit Service Improvements $10,500,000

    71333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements $16,338,606

    71339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment $5,020,254

    71375 Headington Road Extension - Missouri Flat Road to El Dorado Road $10,416,718

    71376 U.S. 50/El Dorado Road Interchange Phase 2 $5,870,000

    72304 Northside School Class I Bike Path - Phase 1 (SR193) $1,954,984

    72306 Northside School Class I Bike Path - Phase 2 (SR49) $2,040,390

    72361 U.S. 50/Cameron Park Drive Interchange Improvements $47,625,818

    73150 Cameron Park Drive/Green Valley Road Intersection Improvements $6,980,182

    73360 Cold Springs Road Realignment $1,744,416

    73362 Salmon Falls Road South of Glenesk Lane Realignment $1,315,789

    76114 Green Valley Road/Deer Valley Road West Intersection Improvements $1,284,264

    77109 Green Valley Road at Tennessee Creek - Bridge Replacement $6,448,549

    77117 Rubicon Trail at Ellis Creek - Bridge Replacement $1,512,677

    77118 Wentworth Springs Road at Gerle Creek - Bridge Replacement $1,579,975

    77126 Mosquito Road Bridge at South Fork American River $30,584,369

    77127 Green Valley Road at Indian Creek - Bridge Replacement $4,500,000

    77128 Bassi Road at Granite Creek - Bridge Replacement $4,003,610

    77129 Mount Murphy Road at South Fork American River - Bridge Replacement $8,462,335

    Friday, May 31, 2013 Page 6 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 18 of 31

  • Project # Description Total Cost

    Community Development Agency, Transportation Division

    Supervisor District 4 Projects2013 Capital Improvement Program

    77131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project $761,033

    77132 Bayne Road at Dutch Creek - Bridge Maintenance Project $157,033

    77136 Green Valley Road at Mound Springs Creek - Bridge Replacement $4,504,008

    77137 Greenstone Road at Slate Creek - Bridge Replacement $3,512,875

    Appr Reimb T 2-Approved Reimbursement Agreements-TIM Zones 1-7 $8,785,068

    GP144 Cameron Park Drive Widening - Palmer Drive to Meder Road $12,520,000

    GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road $12,578,000

    GP163 Missouri Flat Rd Two-Way Left Turn Lane - El Dorado Rd to Headington Rd $1,202,000

    GP175 Ponderosa Road Widening from North Shingle Road to Meder Road $2,798,000

    GP177 State Route 49 Passing Lanes from SR193 (in Cool) to the northern County Line $3,482,000

    GP179 Green Valley Road Widening - Deer Valley Road East to Lotus Road $4,784,000

    OP005 Metal Beam Guardrail Installation - Various Locations $672,000

    Pend Reimb 3-Pending Reimbursement Agreements-TIM Zones 1-7 $5,596,000

    TIM Prog TIM Fee Program Projects $8,400,000

    Traffic Signal Traffic Signal and Intersection Operational Improvements $57,400,000

    Friday, May 31, 2013 Page 7 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 19 of 31

  • Project # Description Total Cost

    Community Development Agency, Transportation Division

    Supervisor District 5 Projects2013 Capital Improvement Program

    Tahoe73120 Apache Avenue/US 50 Intersection Signalization $13,061,512

    95153 Boulder Mountain Erosion Control Project $1,069,285

    95155 Montgomery Estates Area 1A Erosion Control Project $1,900,756

    95157 CSA #5 Erosion Control Project $770,822

    95163 Lake Tahoe Boulevard Erosion Control Project $958,619

    95165 Sawmill 2A Bike Path & Erosion Control Project $2,663,849

    95166 North Upper Truckee SEZ Restoration Project $916,600

    95168 South Upper Truckee I Erosion Control Project $523,921

    95169 Echo View 2 Erosion Control Project $777,354

    95170 Montgomery Estates Area 2 Erosion Control Project $965,218

    95171 Tahoe Hills Erosion Control Project $788,929

    95172 Montgomery Estates Area 3 Erosion Control Project $348,197

    95174 Chiapa Erosion Control Project $2,083,600

    95175 Lake Tahoe Boulevard SEZ Project $1,119,869

    95176 Golden Bear Erosion Control Project $463,633

    95179 Meyers Erosion Control Project $967,795

    95180 Glenridge Erosion Control Project $2,832,300

    95186 Lake Tahoe Boulevard Bike Trail Project $1,756,928

    95190 Christmas Valley Phase 2C Erosion Control Project $1,305,342

    95191 Country Club Heights Erosion Control Project $695,500

    95192 Sawmill 2B Bike Path and Erosion Control Project $2,264,306

    95193 Montgomery Estates Area 1B Erosion Control Project $679,936

    95195 Forest View Water Quality Project $405,000

    95196 CSA # 5 Upper Area Erosion Control Project $395,000

    95708 Highway 89 Class 1 Trail $3,574,500

    95838 Passenger Facility $133,357

    95961 Abrasives Study $39,339

    West Slope31202 Intelligent Transportation System (ITS) Improvements $5,833,210

    53118 Transit Service Improvements $10,500,000

    77119 Blair Road at EID Canal - Bridge Replacement $3,682,985

    77124 Silver Fork Road at South Fork American River - Bridge Replacement $4,560,875

    77125 Hazel Valley Road at PG&E Canal - Bridge Replacement $2,634,407

    77133 Cosumnes Mine Road at North Fork Cosumnes River - Bridge Maintenance Project $267,500

    Friday, May 31, 2013 Page 8 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 20 of 31

  • Project # Description Total Cost

    Community Development Agency, Transportation Division

    Supervisor District 5 Projects2013 Capital Improvement Program

    OP005 Metal Beam Guardrail Installation - Various Locations $672,000

    TIM Prog TIM Fee Program Projects $8,400,000

    Friday, May 31, 2013 Page 9 of 9CIPProgram.mdb\ProjectsBySupervisorDistrics 13-0082 3E 21 of 31

  • Fig

    ure

    2-1

    13-0082 3E 22 of 31

  • Lake Tahoe

    Echo Lakes

    Lake of the Woods

    Angora Lakes

    Angora LakesLake Aloha

    Lily Lake

    Susie Lake

    Half Moon Lake Gilmore Lake

    Dicks Lake

    Fallen Leaf Lake

    Cascade Lake

    TAHOE KEYS

    TAHOE KEYS

    ALA W

    AI

    TAHOE MOUNTAI N

    IBACHE

    NADOWA

    WASHOAN

    WASH

    OAN

    MEEK

    S BAY

    LAKE TAHOE

    OSG

    OOD

    SKI R

    UN

    LIGHTHOUSE SHORES

    MOUNTAIN

    FRIANT

    POPE BEACH

    POPE BEACH

    HERITAGE

    TALLAC POINT VALHALLA

    VALH

    ALLA

    EDGEWOOD

    BOBBY GREY

    TWO RIN

    G

    SOUTH UPPER TRUCKEE

    CORNELI AN

    IROQU

    OIS

    PICKETT

    TAHOE KEYS

    FAIR MEADOW

    SUNN

    YVIEW

    GLENRIDGE

    C

    POOEWIN

    SAN JOSE

    ROYAL

    B

    STATE HWY 89

    STATE HWY 89

    STATE HWY

    89

    STATE HWY 89

    STATE HWY 89

    STATE HWY 89

    STATE HWY 89

    STATE HWY 89

    STATE HWY 89

    BELLEVUE

    RONTONI

    KODIAK

    MATTOLE

    US HWY 50

    US HWY 50

    US HWY 50

    US HWY 50

    KOKANEE

    KOKANEE

    DEL N

    ORTE

    BLACK BART

    PANKA

    LODI

    SIERRA

    MT R

    AINIER

    VIEW

    JICARILLASUSQUEHANA

    HEKPA

    HEKPA

    ROCKY POINT

    HEKP

    A

    ONNONTIOGA

    HUNKPAPA

    MINNICONJOU

    MARSHALL

    BONA

    NZA

    SI ERRA HOUSE

    COLD CREEK

    BLACK BART

    REGINA

    TALBOT

    COLD CREEKDEL NORTE

    DEL NORTE

    GOLDEN BEAR

    GOLDEN BEAR

    BLACK BART

    SHERMAN

    NEED

    LE PEAK

    KELLER

    ASPENWALD

    KELLER

    SADD

    LEMATHESON

    MATHESON

    FREMONT

    JOHNSON

    JOBS PEAK

    JUNI PER

    SONOMA

    CAPISTRANO

    MERCED

    OAKLAND

    AL TAHOE

    BROCKWAYRENO

    SIERRA

    STOCKTON

    LODI

    RIVER

    LODI

    STOCKTON

    RENO P

    INTER

    SIERRA

    CHARLES

    RENO

    LODI

    LODI

    WI LLIAM

    CONESTOGA

    SPRINGWOOD

    SPRINGWOOD

    COLLEGE

    JAMES

    PANTHER

    13TH

    PINE

    CIRU

    GU

    SANTA FE

    PLUMAS

    CHIAPA

    WEST SAN BERNARDINO

    WINTOON

    MEWUK

    KIOWA

    TEHAMA

    KIOWA

    MEWUKMEWUK

    KIOWA

    GRIZZLY MOUNTAIN

    CHIAPA

    MANDANSEMINOLE

    LAKE TAHOE

    MT RAINIER

    LAKE TAHOE

    VIEW

    LAKE TAHOE

    MODOC

    HOPI

    WASHOE

    BAKERSFIELD

    BAKERSFIELD

    COUNTRY CLUB

    VIEW

    VI EW

    ELKS CLUB

    TAMOSHANTER

    OFLYNG

    MANDAN

    EVELYN

    CELIO

    MANDAN

    OJIBWA

    MANDAN

    ZAPOTEC

    SKYLINE

    COTO

    GLEN EAGLES

    KELLER

    JUNEJUNE

    DAVID

    SONORA

    MOSS

    SONORA

    WILDWOOD

    FERN

    MONTREAL

    JANET

    WALKUP

    WOODBIN

    E

    TAMAR

    ACK

    VANDA LEE

    SADD

    LE

    SPRU

    CE

    SPRUCE

    WALKUP

    JANET

    RANCHO

    LOS ANGELES

    STATELINE

    FRIDAY

    PARK

    PARK

    HILL

    PARK

    MANZANITA

    PINE

    PINEAZURE

    AZURE

    MEADOW

    EL DORADO

    LOS ANGELES

    13TH

    GARDNER

    SAWMILL

    SAWMILL

    SAWMILL

    INDUSTRIAL

    TATA

    GLORENE

    15TH

    13TH EM

    ERALD

    BAY

    G

    13TH

    CLEMENT

    TATA

    TATA

    GLORE

    NE

    CLEMENT

    LAMOR

    ECHO VIEW

    3RD4

    TH

    LUKINS

    VENICE

    VENICE

    MELBA

    MELBA

    B

    MELBA

    4TH

    3RD

    3RD

    SOUTH

    BARTON

    SOUTH

    TRUCKEE

    ELOISE

    3RD

    LINDA

    TAHOE ISLAN

    D

    TAHO

    E VISTA

    TAHOE ISLAND

    ELOISEWYOMING

    TEXAS

    COLO

    RADO

    WASHINGTON

    BEAC

    H

    ALPINE

    MARCONI

    GARMISH

    VENICE

    CHRISTIE

    VENIC

    E

    SPRIN

    G CRE

    EK

    POMO

    POMO

    NICOLENO

    MATTOLE

    MATTOLE

    BOULDER MOUNTAIN

    NAHANE

    RAINBOW

    WASABE

    NAHANE

    WAILAKI

    MOHICAN

    APACHE

    APACHEC

    HEYEN

    NE

    IROQU

    OISCHIPPEWA

    JULIE

    D D

    DDD

    BB

    DEDI

    DEDI

    D

    B

    D

    B

    BONANZA

    BONANZA

    D

    FALLEN LEAF

    UPLANDS

    UPLAND

    S

    DUNDEE

    DUNDEE

    FALLEN LEAF

    FALLEN LEAF

    PRICE

    FALLEN LEAF

    WATERHOUSE

    FALLEN LEAF

    FALLEN LEAF

    SCENIC

    LUPINE

    BROOK

    MOUNTAIN

    LAKEVIEW

    LAKERIDGE

    SIERRA S

    IERRA

    BEACH

    SWEETWATER

    LAKEVIEW

    ALICE

    ALICE

    OAK

    ALDER

    HARRIS

    ALDERALDER

    NINTH

    NINTH

    PINE

    CHAMPLAIN

    TREEHAVEN

    ONE RIN

    G

    DE LISI

    LOG CABIN

    STATE HWY 89

    HAZELKONA

    LILY

    JACK BELL

    CATHEDRAL

    CATH

    EDRA

    L

    ERIE

    OSAGE

    JEWELL

    TOIYABE

    HIGH M

    EADO

    WS

    GOLDPAN

    PONCA

    TURNBACK

    H

    KYBURZ

    UTAH

    WARD

    BAL BIJOU

    CAVE ROCK

    LYONS

    MAPLE

    BILL

    PINECREST

    DEER

    TERRY

    YOKUT

    COCHISE

    LUCERNE

    BALBOA

    CATALINA

    MT TALLAC C

    LAKEVIEW

    HILO

    MC KINNEYSPRINGS

    CLIPPER

    CLIFF

    TAHOE MOUNTAIN

    PIONE

    ER

    PIONEER

    PIONEER

    PIONEER

    LAKE TAHOE

    LAKE TAHOE

    RAI NBOW

    COLUSA

    MEYERS

    US HWY 50

    KICKAPOO

    KICKAPOO

    SENECA

    KORU

    CAYU

    GA

    SHOS

    HONE

    ZUNI

    LOOKOUT POINT

    CHILIC

    OTHE

    CHOLULA

    OAXACO

    SHAWNEE

    SHOSHONE

    TETON

    PI NEWOOD

    LOST

    APACHE

    PEBBLE BEACH

    ONEIDAS

    PIONEER

    AZTE

    C

    PAWNEE

    APACHE

    ARIKA

    RA

    OGLALA

    ONEIDAS

    GALLO

    CRYSTAL AIR

    SKYLINE

    BEL AIRE

    MINK

    BOREN

    NOTTAWAY

    MINGWE

    LUPINE

    RIMROCK

    SIERRA

    GOLD DU

    ST

    HOMESTEAD

    PLATEAU

    CHINQUAPIN

    SADDLE

    STERLING

    SADDLE

    SADD

    LE

    SADDLE

    KELLER

    BIRC

    H

    PINE HILL

    REGINA

    RALPH

    PIONEER

    NORMA

    APRIL

    GLENWOOD

    SADDLE

    PRICE

    WOODLAN

    D

    LEWIS

    FAIRWAY

    WILDWOOD

    HAM

    DEER PARK

    STANFORD

    NEVADA

    FRESNO

    TALLAC

    LAKEVIEW

    PINE

    BEACH

    BEACH

    MODESTO

    TALLAC

    LAKEVIEW

    SAN FRANCISCO

    ALMA

    CARSON

    MARTIN

    KNOX

    BEECHER

    BLUE LAKE

    GARDNER

    JULIE

    JULIE

    JULIE

    TATA

    TATA

    TATA

    FFF

    TATA

    EE

    WI NNEMUCCA

    RUTH

    RAINBO

    WLAPHAM

    12TH

    PATRICIA

    ANITA

    ANITA

    ANITA

    15TH

    JAMESON BEACH

    LASSEN

    BEACH

    CARSON

    VENICE

    ANGORA RIDGE

    ANGORA RIDGE

    ANGORA RIDGE

    ANGORA RIDGE

    EMIGRANT

    EMIGRANT

    FALLEN LEAF

    UPPER CASCADE LAKE

    LOWER EMERALD BAY

    MT TALLAC A

    MT TA

    LLAC B

    MT TALLAC

    BALDWIN

    HUPA

    SMOKEY BEAR

    BAY VIEW

    GLENRIDG

    E

    QUIET W

    ALK

    FIRFIR

    WILSON

    FIFTH

    SI XTH

    FIR

    OAK

    PINE

    PLACER

    ANTELOPE

    PINEPINE

    Figure 2-2 13-0082 3E 23 of 31

  • Proj

    ect #

    Nam

    eTo

    tal

    Cos

    t($

    M)

    PD

    = R

    ight

    of W

    ayR

    C =

    Pla

    nnin

    g/E

    nviro

    nmen

    tal

    = D

    esig

    n =

    Con

    stru

    ctio

    n*

    = B

    ridge

    Pro

    ject

    s

    Proj

    ect S

    umm

    ary

    Tabl

    e -

    Wes

    t Slo

    pe

    13/1

    414

    /15

    15/1

    616

    /17

    17/1

    818

    /19-

    22/2

    323

    /24-

    32/3

    3

    5312

    4C

    U.S

    . 50

    HO

    V L

    anes

    Pha

    se 0

    18.5

    91

    7132

    8R

    CU

    .S. 5

    0/S

    ilva

    Val

    ley

    Par

    kway

    Inte

    rcha

    nge

    - Pha

    se 1

    CC

    C56

    .72

    271

    346

    CU

    .S. 5

    0/M

    isso

    uri F

    lat R

    oad

    Inte

    rcha

    nge

    Impr

    ovem

    ents

    - P

    hase

    1C

    Rip

    aria

    n R

    esto

    ratio

    n 1.

    603

    7135

    8D

    CFr

    anci

    sco

    Driv

    e R

    ight

    -Tur

    n P

    ocke

    t0.

    254

    7135

    9D

    RC

    U.S

    . 50/

    Mis

    sour

    i Fla

    t Roa

    d In

    terc

    hang

    e - P

    hase

    1B

    .2C

    3.55

    572

    304

    CN

    orth

    side

    Sch

    ool C

    lass

    I B

    ike

    Path

    - P

    hase

    1 (S

    R19

    3)1.

    956

    7230

    6C

    Nor

    thsi

    de S

    choo

    l Cla

    ss I

    Bik

    e Pa

    th -

    Pha

    se 2

    (SR

    49)

    2.04

    772

    309

    CC

    lass

    II B

    ikew

    ay -

    Gre

    en V

    ally

    Roa

    d fro

    m L

    och

    Way

    to S

    igna

    lized

    Ent

    ranc

    e to

    Ple

    asan

    t Gro

    ve

    0.32

    872

    369

    CH

    ollo

    w O

    ak R

    oad

    Dra

    inag

    e0.

    689

    7237

    5D

    RC

    Dia

    mon

    d S

    prin

    gs P

    arkw

    ay -

    Pha

    se 1

    A -

    SR

    -49

    Rea

    lignm

    ent

    C6.

    0110

    7315

    1P

    DC

    Gre

    en V

    alle

    y R

    oad

    Traf

    fic S

    igna

    l Int

    erco

    nnec

    t0.

    2711

    7315

    2C

    Rad

    ar S

    igna

    l Con

    trolle

    r Upg

    rade

    at I

    nter

    sect

    ion

    of E

    l Dor

    ado

    Hills

    Bou

    leva

    rd/S

    arat

    oga

    Way

    0.03

    1273

    320

    CP

    leas

    ant V

    alle

    y R

    oad

    (SR

    49)

    /Pat

    ters

    on D

    rive

    Inte

    rsec

    tion

    Sig

    naliz

    atio

    n4.

    4013

    7335

    8C

    Ple

    asan

    t Val

    ley

    Roa

    d at

    Oak

    Hill

    Roa

    d In

    ters

    ectio

    n Im

    prov

    emen

    ts1.

    1814

    7335

    9C

    Latro

    be R

    oad

    Nor

    th o

    f Rya

    n R

    anch

    Roa

    d (M

    ilepo

    st 7

    .0 -

    7.35

    )2.

    0315

    7336

    0D

    RC

    Col

    d S

    prin

    gs R

    oad

    Rea

    lignm

    ent

    C1.

    7416

    7336

    2D

    RC

    Sal

    mon

    Fal

    ls R

    oad

    Sou

    th o

    f Gle

    nesk

    Lan

    e R

    ealig

    nmen

    tC

    1.32

    1776

    107

    CS

    ilver

    Spr

    ings

    Pkw

    y to

    Gre

    en V

    alle

    y R

    d (n

    orth

    seg

    men

    t)/G

    reen

    Vly

    Rd

    Inte

    rsec

    tion

    Sig

    naliz

    atio

    7.64

    1876

    114

    CG

    reen

    Val

    ley

    Roa

    d/D

    eer V

    alle

    y R

    oad

    Wes

    t Int

    erse

    ctio

    n Im

    prov

    emen

    ts1.

    2819

    7711

    5*D

    RC

    Sly

    Par

    k R

    oad

    at C

    lear

    Cre

    ek C

    ross

    ing

    - Brid

    ge R

    epla

    cem

    ent

    CC

    5.38

    2077

    117*

    CR

    ubic

    on T

    rail

    at E

    llis C

    reek

    - B

    ridge

    Rep

    lace

    men

    t1.

    4821

    7713

    0*C

    Mt.

    Auk

    um R

    oad

    at N

    orth

    For

    k C

    osum

    nes

    Riv

    er -

    Brid

    ge M

    aint

    enan

    ce P

    roje

    ct0.

    4422

    7713

    3*D

    CC

    osum

    nes

    Min

    e R

    oad

    at N

    orth

    For

    k C

    osum

    nes

    Riv

    er -

    Brid

    ge M

    aint

    enan

    ce P

    roje

    ctC

    0.27

    2397

    012

    PD

    CE

    l Dor

    ado

    Trai

    l - L

    os T

    ram

    pas

    to H

    alco

    n0.

    5324

    7711

    4*D

    RG

    reen

    Val

    ley

    Roa

    d at

    Web

    er C

    reek

    - B

    ridge

    Rep

    lace

    men

    tC

    CC

    10.1

    525

    7712

    3*P

    DR

    Ald

    er D

    rive

    at E

    ID C

    anal

    - B

    ridge

    Rep

    lace

    men

    tD

    RC

    C2.

    9326

    7610

    8P

    DR

    Silv

    er S

    prin

    gs P

    kwy

    to B

    ass

    Lake

    Rd

    (sou

    th s

    egm

    ent)

    DR

    DR

    CC

    7.35

    2777

    116*

    PD

    RB

    ucks

    Bar

    Roa

    d at

    the

    Nor

    th F

    ork

    Cos

    umne

    s R

    iver

    - B

    ridge

    Reh

    abilit

    atio

    nD

    RD

    CC

    4.84

    2877

    119*

    PD

    Bla

    ir R

    oad

    at E

    ID C

    anal

    - B

    ridge

    Rep

    lace

    men

    tD

    RD

    RC

    C3.

    6529

    7712

    4*P

    DS

    ilver

    For

    k R

    oad

    at S

    outh

    For

    k A

    mer

    ican

    Riv

    er -

    Brid

    ge R

    epla

    cem

    ent

    DR

    CC

    4.56

    3077

    127*

    PD

    Gre

    en V

    alle

    y R

    oad

    at In

    dian

    Cre

    ek -

    Brid

    ge R

    epla

    cem

    ent

    PD

    RD

    RC

    C4.

    4731

    7713

    1*P

    DIc

    e H

    ouse

    Roa

    d at

    Jon

    es F

    ork

    Silv

    er C

    reek

    - B

    ridge

    Mai

    nten

    ance

    Pro

    ject

    DC

    0.76

    3277

    132*

    PD

    Bay

    ne R

    oad

    at D

    utch

    Cre

    ek -

    Brid

    ge M

    aint

    enan

    ce P

    roje

    ctD

    C0.

    1633

    7712

    2*P

    DN

    ewto

    wn

    Roa

    d at

    Sou

    th F

    ork

    of W

    eber

    Cre

    ek -

    Brid

    ge R

    epla

    cem

    ent

    PD

    RD

    RC

    C5.

    2334

    7712

    5*P

    DH

    azel

    Val

    ley

    Roa

    d at

    PG

    &E

    Can

    al -

    Brid

    ge R

    epla

    cem

    ent

    DR

    DR

    C2.

    6035

    7712

    8*P

    DB

    assi

    Roa

    d at

    Gra

    nite

    Cre

    ek -

    Brid

    ge R

    epla

    cem

    ent

    DR

    DR

    RC

    C3.

    9636

    7712

    9*P

    DM

    ount

    Mur

    phy

    Roa

    d at

    Sou

    th F

    ork

    Am

    eric

    an R

    iver

    - Br

    idge

    Rep

    lace

    men

    tP

    DD

    RC

    8.46

    3777

    136*

    PG

    reen

    Val

    ley

    Roa

    d at

    Mou

    nd S

    prin

    gs C

    reek

    - B

    ridge

    Rep

    lace

    men

    tP

    DD

    RD

    RC

    4.47

    3877

    138*

    PC

    lear

    Cre

    ek R

    oad

    at C

    lear

    Cre

    ek (P

    M 1

    .82)

    - Br

    idge

    Rep

    lace

    men

    tP

    DP

    DR

    DR

    C4.

    5639

    7713

    9*P

    Cle

    ar C

    reek

    Roa

    d at

    Cle

    ar C

    reek

    (PM

    0.2

    5) -

    Brid

    ge R

    epla

    cem

    ent

    PD

    PD

    RD

    RC

    4.56

    40

    CIP

    Pro

    gram

    .mdb

    /Pro

    ject

    Sum

    mar

    yGrid

    5/31

    /201

    3 12

    :32:

    37 P

    MP

    age

    1 of

    7

    13-0082 3E 24 of 31

  • Proj

    ect #

    Nam

    eTo

    tal

    Cos

    t($

    M)

    PD

    = R

    ight

    of W

    ayR

    C =

    Pla

    nnin

    g/E

    nviro

    nmen

    tal

    = D

    esig

    n =

    Con

    stru

    ctio

    n*

    = B

    ridge

    Pro

    ject

    s

    Proj

    ect S

    umm

    ary

    Tabl

    e -

    Wes

    t Slo

    pe

    13/1

    414

    /15

    15/1

    616

    /17

    17/1

    818

    /19-

    22/2

    323

    /24-

    32/3

    3

    7233

    4D

    RD

    iam

    ond

    Spr

    ings

    Par

    kway

    - P

    hase

    1B

    DR

    DR

    DR

    CC

    27.3

    041

    7712

    6*P

    Mos

    quito

    Roa

    d B

    ridge

    at S

    outh

    For

    k A

    mer

    ican

    Riv

    erP

    DP

    DD

    RC

    C30

    .58

    4277

    134*

    PD

    Oak

    Hill

    Roa

    d at

    Squ

    aw H

    ollo

    w C

    reek

    - B

    ridge

    Rep

    lace

    men

    tP

    DR

    PD

    RD

    RC

    3.93

    4377

    135*

    PD

    Han

    ks E

    xcha

    nge

    at S

    quaw

    Hol

    low

    Cre

    ek -

    Brid

    ge R

    epla

    cem

    ent

    PD

    RP

    DR

    DR

    CC

    3.89

    4477

    137*

    PD

    Gre

    enst

    one

    Roa

    d at

    Sla

    te C

    reek

    - B

    ridge

    Rep

    lace

    men

    tP

    DR

    PD

    RD

    RC

    3.48

    4531

    202

    Inte

    llige

    nt T

    rans

    porta

    tion

    Sys

    tem

    (ITS

    ) Im

    prov

    emen

    tsP

    DR

    C5.

    8346

    5311

    5U

    .S. 5

    0 A

    uxilia

    ry L

    ane

    Wes

    tbou

    nd -

    El D

    orad

    o H

    ills B

    oule

    vard

    to E

    mpi

    re R

    anch

    Roa

    dD

    RC

    2.81

    4753

    120

    U.S

    . 50

    Mai

    nlin

    e W

    iden

    ing

    at E

    l Dor

    ado

    Hills

    PD

    RC

    2.16

    4866

    109

    Bas

    s La

    ke R

    oad

    Full

    Impr

    ovem

    ents

    - P

    hase

    1A

    PD

    RC

    7.43

    4966

    115

    Bas

    s La

    ke F

    ront

    age

    Impr

    ovem

    ents

    -Silv

    er S

    prin

    gsP

    DR

    C1.

    5050

    6611

    6P

    Latro

    be C

    onne

    ctio

    nD

    RC

    19.4

    551

    7132

    3U

    .S. 5

    0/E

    l Dor

    ado

    Hills

    Bou

    leva

    rd In

    terc

    hang

    e Im

    prov

    emen

    ts -

    Pha

    se 2

    BD

    RC

    5.90

    5271

    324

    Sar

    atog

    a W

    ay E

    xten

    sion

    - P

    hase

    1D

    RC

    11.5

    453

    7133

    0U

    .S. 5

    0/B

    ass

    Lake

    Roa

    d In

    terc

    hang

    e Im

    prov

    emen

    ts -

    Pha

    se 1

    PD

    RC

    16.5

    354

    7133

    2U

    .S. 5

    0/C

    ambr

    idge

    Roa

    d In

    terc

    hang

    e Im

    prov

    emen

    ts -

    Pha

    se 1

    PD

    RC

    7.84

    5571

    333

    U.S

    . 50/

    Pon

    dero

    sa R

    d/S

    o. S

    hing

    le R

    d In

    terc

    hang

    e Im

    prov

    emen

    tsD

    RC

    16.3

    456

    7133

    8U

    .S. 5

    0/P

    onde

    rosa

    Rd

    Inte

    rcha

    nge

    - Dur

    ock

    Rd

    Rea

    lignm

    ent

    DR

    C7.

    1357

    7133

    9U

    .S. 5

    0/P

    onde

    rosa

    Rd

    Inte

    rcha

    nge

    - N. S

    hing

    le R

    d R

    ealig

    nmen

    tD

    RC

    4.96

    5871

    340

    U.S

    . 50/

    El D

    orad

    o H

    ills B

    lvd

    Inte

    rcha

    nge

    - Ped

    estri

    an O

    verc

    ross

    ing

    DR

    C6.

    7859

    7134

    5U

    .S. 5

    0/S

    ilva

    Val

    ley

    Par

    kway

    Inte

    rcha

    nge

    - Pha

    se 2

    - O

    n R

    amps

    and

    Aux

    iliary

    Lan

    es o

    n U

    .S. 5

    DR

    C12

    .07

    6071

    347

    U.S

    . 50/

    El D

    orad

    o R

    oad

    Inte

    rcha

    nge

    Impr

    ovem

    ents

    - P

    hase

    1P

    DR

    C2.

    8961

    7137

    5H

    eadi

    ngto

    n R

    oad

    Ext

    ensi

    on -

    Mis

    sour

    i Fla

    t Roa

    d to

    El D

    orad

    o R

    oad

    PD

    RC

    10.3

    662

    7137

    6U

    .S. 5

    0/E

    l Dor

    ado

    Roa

    d In

    terc

    hang

    e P

    hase

    2P

    DR

    C5.

    8763

    7233

    2E

    l Dor

    ado

    Hills

    Bou

    leva

    rd/F

    ranc

    isco

    Driv

    e In

    ters

    ectio

    n A

    lignm

    ent

    DR

    C9.

    4564

    7235

    0La

    trobe

    Roa

    d W

    iden

    ing

    (2 to

    4 la

    nes)

    - G

    olde

    n Fo

    othi

    ll P

    arkw

    ay (s

    outh

    ) to

    Inve

    stm

    ent B

    oule

    var

    DR

    C3.

    5265

    7236

    1U

    .S. 5

    0/C

    amer

    on P

    ark

    Driv

    e In

    terc

    hang

    e Im

    prov

    emen

    tsP

    DR

    C47

    .63

    6672

    367

    Cam

    eron

    Par

    k W

    iden

    ing

    - Dur

    ock

    Roa

    d to

    Coa

    ch L

    ane

    PD

    RC

    7.34

    6772

    374

    Whi

    te R

    ock

    Roa

    d W

    iden

    ing

    (2 to

    4 la

    nes)

    - M

    onte

    Ver

    de D

    rive

    to U

    S 5

    0/S

    ilva

    Val

    ley

    Par

    kway

    IP

    DR

    C19

    .07

    6873

    150

    Cam

    eron

    Par

    k D

    rive/

    Gre

    en V

    alle

    y R

    oad

    Inte

    rsec

    tion

    Impr

    ovem

    ents

    DR

    C6.

    9869

    7330

    7M

    othe

    r Lod

    e D

    rive/

    Ple

    asan

    t Val

    ley

    Roa

    d In

    ters

    ectio

    n Im

    prov

    emen

    tsP

    DR

    C7.

    7870

    GP

    124

    Cou

    ntry

    Clu

    b D

    rive

    Ext

    ensi

    on -

    Silv

    er D

    ove

    Roa

    d to

    Bas

    s La

    ke R

    oad

    DD

    RC

    1.12

    71G

    P12

    5C

    ount

    ry C

    lub

    Driv

    e E

    xt. -

    Wes

    t Bas

    s La

    ke H

    ills S

    P B

    ound

    ary

    to S

    ilver

    Dov

    e R

    dP

    DR

    C5.

    4172

    GP

    126

    Cou

    ntry

    Clu

    b D

    rive

    Rea

    lignm

    ent -

    Bas

    s La

    ke R

    oad

    to e

    ast B

    ass

    Lake

    Hills

    Spe

    cific

    Pla

    n B

    ound

    PD

    RC

    5.04

    73G

    P13

    0R

    unny

    mea

    de D

    rive

    Rea

    lignm

    ent a

    t El D

    orad

    o R

    oad

    DC

    1.90

    74G

    P13

    7W

    hite

    Roc

    k R

    oad

    Wid

    enin

    g (2

    to 4

    lane

    s) -

    Man

    ches

    ter D

    rive

    to S

    acra

    men

    to C

    ount

    y Li

    neP

    DR

    C3.

    3275

    GP

    144

    Cam

    eron

    Par

    k D

    rive

    Wid

    enin

    g - P

    alm

    er D

    rive

    to M

    eder

    Roa

    dP

    DR

    C12

    .52

    76G

    P14

    7S

    arat

    oga

    Way

    Ext

    ensi

    on -

    Pha

    se 2

    PD

    RC

    4.64

    77G

    P14

    8U

    .S. 5

    0/B

    ass

    Lake

    Roa

    d In

    terc

    hang

    e Im

    prov

    emen

    ts -

    Pha

    se 2

    PD

    RC

    19.0

    678

    GP

    149

    U.S

    . 50/

    Cam

    brid

    ge R

    oad

    Inte

    rcha

    nge

    Impr

    ovem

    ents

    - P

    hase

    2P

    DR

    C11

    .94

    79G

    P15

    0U

    .S. 5

    0 A

    uxilia

    ry L

    ane

    Eas

    tbou

    nd -

    Cam

    brid

    ge to

    Pon

    dero

    saP

    DR

    C10

    .35

    80

    CIP

    Pro

    gram

    .mdb

    /Pro

    ject

    Sum

    mar

    yGrid

    5/31

    /201

    3 12

    :32:

    38 P

    MP

    age

    2 of

    7

    13-0082 3E 25 of 31

  • Proj

    ect #

    Nam

    eTo

    tal

    Cos

    t($

    M)

    PD

    = R

    ight

    of W

    ayR

    C =

    Pla

    nnin

    g/E

    nviro

    nmen

    tal

    = D

    esig

    n =

    Con

    stru

    ctio

    n*

    = B

    ridge

    Pro

    ject

    s

    Proj

    ect S

    umm

    ary

    Tabl

    e -

    Wes

    t Slo

    pe

    13/1

    414

    /15

    15/1

    616

    /17

    17/1

    818

    /19-

    22/2

    323

    /24-

    32/3

    3

    GP

    152

    Whi

    te R

    ock

    Roa

    d W

    iden

    ing

    - 4 to

    6 L

    anes

    , Lat

    robe

    Roa

    d to

    US

    50/S

    ilva

    Val

    ley

    Par

    kway

    Inte

    rch

    PD

    RC

    6.06

    81G

    P15

    4La

    trobe

    Roa

    d W

    iden

    ing

    (4 to

    6 la

    nes)

    - W

    hite

    Roc

    k R

    oad

    to C

    arso

    n C

    reek

    (Sun

    cast

    Lan

    e)P

    DR

    C8.

    9982

    GP

    155

    Mot

    her L

    ode

    Driv

    e - G

    reen

    ston

    e R

    oad

    to P

    leas

    ant V

    alle

    y R

    oad

    PD

    RC

    3.89

    83G

    P15

    9G

    reen

    Val

    ley

    Roa

    d W

    iden

    ing

    from

    Sal

    mon

    Fal

    ls R

    oad

    to D

    eer V

    alle

    y R

    oad

    PD

    RC

    12.5

    884

    GP

    160

    Ple

    asan

    t Val

    ley

    Roa

    d W

    iden

    ing

    from

    El D

    orad

    o R

    oad

    to S

    tate

    Rou

    te 4

    9P

    DR

    C1.

    1085

    GP

    163

    Mis

    sour

    i Fla

    t Rd

    Two-

    Way

    Lef

    t Tur

    n La

    ne -

    El D

    orad

    o R

    d to

    Hea

    ding

    ton

    Rd

    PD

    RC

    1.20

    86G

    P16

    5M

    isso

    uri F

    lat R

    oad

    Wid

    enin

    g, H

    eadi

    ngto

    n R

    oad

    to P

    rosp

    ecto

    r's P

    laza

    PD

    RC

    1.30

    87G

    P16

    6B

    ass

    Lake

    Roa

    d W

    iden

    ing

    - U.S

    . 50

    to S

    ilver

    Spr

    ings

    Par

    kway

    , Pha

    se 1

    BP

    DR

    C15

    .39

    88G

    P17

    1D

    uroc

    k R

    oad

    Wid

    enin

    g - R

    obin

    Lan

    e to

    Sou

    th S

    hing

    le R

    oad

    PD

    RC

    7.21

    89G

    P17

    3P

    leas

    ant V

    alle

    y R

    oad

    Wid

    enin

    g - P

    earl

    Pla

    ce to

    Big

    Cut

    Roa

    d in

    Dia

    mon

    d S

    prin

    gsP

    DR

    C2.

    7190

    GP

    174

    Ple

    asan

    t Val

    ley

    Roa

    d W

    iden

    ing

    from

    Big

    Cut

    Roa

    d to

    Ced

    ar R

    avin

    e R

    oad

    PD

    RC

    2.29

    91G

    P17

    5P

    onde

    rosa

    Roa

    d W

    iden

    ing

    from

    Nor

    th S

    hing

    le R

    oad

    to M

    eder

    Roa

    dP

    DR

    C2.

    8092

    GP

    176

    Sta

    te R

    oute

    49

    Wid

    enin

    g fro

    m P

    leas

    ant V

    alle

    y R

    oad

    to M

    isso

    uri F

    lat R

    oad

    PD

    RC

    7.88

    93G

    P17

    7S

    tate

    Rou

    te 4

    9 P

    assi

    ng L

    anes

    from

    SR

    193

    (in C

    ool)

    to th

    e no

    rther

    n C

    ount

    y Li

    neP

    DR

    C3.

    4894

    GP

    178

    Gre

    en V

    alle

    y R

    oad

    Wid

    enin

    g - F

    ranc

    isco

    to S

    alm

    on F

    alls

    Roa

    dP

    DR

    C1.

    9095

    GP

    179

    Gre

    en V

    alle

    y R

    oad

    Wid

    enin

    g - D

    eer V

    alle

    y R

    oad

    Eas

    t to

    Lotu

    s R

    oad

    PD

    RC

    4.78

    96G

    P18

    2S

    ilva

    Val

    ley

    Par

    kway

    /Gol

    den

    Eag

    le L

    ane

    Inte

    rsec

    tion

    Sig

    naliz

    atio

    nP

    DR

    C0.

    7797

    GP

    183

    El D

    orad

    o H

    ills B

    oule

    vard

    Wid

    enin

    g - L

    asse

    n La

    ne to

    Par

    k D

    rive

    PD

    RC

    1.10

    98O

    P00

    5M

    etal

    Bea

    m G

    uard

    rail

    Inst

    alla

    tion

    - Var

    ious

    Loc

    atio

    nsD

    C0.

    6799

    5311

    6D

    U.S

    . 50

    HO

    V L

    anes

    (Pha

    se 3

    ) - P

    onde

    rosa

    Roa

    d to

    Gre

    enst

    one

    Roa

    d0.

    5910

    071

    319

    U.S

    . 50/

    Cam

    ino

    Are

    a P

    aral

    lel C

    apac

    ity/S

    afet

    y S

    tudy

    P2.

    0010

    177

    109*

    Gre

    en V

    alle

    y R

    oad

    at T

    enne

    ssee

    Cre

    ek -

    Brid

    ge R

    epla

    cem

    ent

    6.41

    102

    7711

    8*W

    entw

    orth

    Spr

    ings

    Roa

    d at

    Ger

    le C

    reek

    - B

    ridge

    Rep

    lace

    men

    t1.

    5510

    3

    *

    Not

    es: 1

    . Pro

    ject

    531

    18 -

    Tran

    sit S

    ervi

    ce Im

    prov

    emen

    ts: $

    10,5

    00 is

    incl

    uded

    in th

    e

    20-Y

    ear p

    rogr

    am fo

    r the

    pur

    chas

    e of

    bus

    es fo

    r the

    Com

    mut

    er B

    us

    P

    rogr

    am fr

    om P

    lace

    rvill

    e to

    Sac

    ram

    ento

    .

    2

    . Pro

    ject

    771

    09 -

    Gre

    en V

    alle

    y R

    oad

    at T

    enne

    ssee

    Cre

    ek -

    Brid

    ge R

    epla

    cem

    ent:

    P

    roje

    ct is

    con

    stru

    cted

    , and

    will

    be in

    the

    Env

    ironm

    enta

    l Mon

    itorin

    g st

    age

    in F

    Y 1

    3/14

    .

    3

    . Pro

    ject

    771

    18 -

    Wen

    twor

    th S

    prin

    gs R

    oad

    at G

    erle

    Cre

    ek -

    Brid

    ge R

    epla

    cem

    ent:

    P

    roje

    ct is

    con

    stru

    cted

    , and

    will

    be in

    the

    Env

    ironm

    enta

    l Mon

    itorin

    g st

    age

    in F

    Y 1

    3/14

    .

    CIP

    Pro

    gram

    .mdb

    /Pro

    ject

    Sum

    mar

    yGrid

    5/31

    /201

    3 12

    :32:

    38 P

    MP

    age

    3 of

    7

    13-0082 3E 26 of 31

  • Proj

    ect #

    Nam

    eTo

    tal

    Cos

    t($

    M)

    PD

    = R

    ight

    of W

    ayR

    C =

    Pla

    nnin

    g/E

    nviro

    nmen

    tal

    = D

    esig

    n =

    Con

    stru

    ctio

    n*

    = B

    ridge

    Pro

    ject

    s

    Proj

    ect S

    umm

    ary

    Tabl

    e -

    CO

    RP

    13/1

    414

    /15

    15/1

    616

    /17

    17/1

    818

    /19-

    22/2

    323

    /24-

    32/3

    3

    7218

    6C

    Ove

    rlay

    - Fra

    ncis

    co D

    rive

    0.29

    104

    CIP

    Pro

    gram

    .mdb

    /Pro

    ject

    Sum

    mar

    yGrid

    5/31

    /201

    3 12

    :32:

    39 P

    MP

    age

    4 of

    7

    13-0082 3E 27 of 31

  • Proj

    ect #

    Nam

    eTo

    tal

    Cos

    t($

    M)

    PD

    = R

    ight

    of W

    ayR

    C =

    Pla

    nnin

    g/E

    nviro

    nmen

    tal

    = D

    esig

    n =

    Con

    stru

    ctio

    n*

    = B

    ridge

    Pro

    ject

    s

    Proj

    ect S

    umm

    ary

    Tabl

    e -

    Airp

    orts

    -Pla

    cerv

    ille

    13/1

    414

    /15

    15/1

    616

    /17

    17/1

    818

    /19-

    22/2

    323

    /24-

    32/3

    3

    9312

    2D

    CW

    ater

    Lin

    e an

    d Fi

    re H

    ydra

    nt to

    New

    Apr

    on A

    rea

    0.17

    105

    9312

    9C

    Cra

    ck S

    eal a

    nd R

    emar

    k R

    unw

    ay 5

    -23,

    Tax

    iway

    s, A

    pron

    s an

    d Te

    e H

    ange

    r Tax

    ilane

    s0.

    3110

    693

    130

    Taxi

    way

    Edg

    e Li

    ghts

    PD

    C0.

    4010

    793

    128

    13 U

    nit N

    este

    d Te

    e H

    anga

    rD

    C1.

    2810

    893

    126

    Tee

    Han

    gar S

    ite D

    evel

    opm

    ent P

    hase

    2P

    DC

    2.80

    109

    9313

    1U

    pdat

    e P

    avem

    ent M

    aint

    enan

    ce/M

    anag

    emen

    t Pro

    gram

    D0.

    0311

    093

    132

    Airp

    ort L

    ayou

    t Pla

    n U

    pdat

    e - P

    lace

    rville

    D0.

    0811

    1

    CIP

    Pro

    gram

    .mdb

    /Pro

    ject

    Sum

    mar

    yGrid

    5/31

    /201

    3 12

    :32:

    39 P

    MP

    age

    5 of

    7

    13-0082 3E 28 of 31

  • Proj

    ect #

    Nam

    eTo

    tal

    Cos

    t($

    M)

    PD

    = R

    ight

    of W

    ayR

    C =

    Pla

    nnin

    g/E

    nviro

    nmen

    tal

    = D

    esig

    n =

    Con

    stru

    ctio

    n*

    = B

    ridge

    Pro

    ject

    s

    Proj

    ect S

    umm

    ary

    Tabl

    e -

    Airp

    orts

    -Geo

    rget

    own

    13/1

    414

    /15

    15/1

    616

    /17

    17/1

    818

    /19-

    22/2

    323

    /24-

    32/3

    3

    9352

    7D

    CC

    rack

    Sea

    l, Jo

    int S

    eal &

    Mar

    k R

    unw

    ay, T

    axiw

    ays,

    Apr

    ons

    & T

    ee H

    ange

    r Tax

    ilane

    s; C

    hang

    e R

    u0.

    1711

    293

    535

    Cra

    ck S

    eal a

    nd R

    emar

    k R

    unw

    ay, T

    axiw

    ays,

    Apr

    ons

    and

    Tee

    Han

    ger T

    axila

    nes

    DC

    0.13

    113

    9352

    0C

    onst

    ruct

    ion

    of A

    WO

    SD

    C0.

    2511

    493

    525

    Wes

    t Sid

    e D

    evel

    opm

    ent P

    hase

    1D

    C1.

    8511

    593

    529

    Wes

    t Sid

    e D

    evel

    opm

    ent P

    hase

    2P

    DC

    1.48

    116

    9353

    1W

    est A

    cces

    s R

    oad

    DC

    1.33

    117

    9353

    2W

    est T

    axiw

    ay P

    hase

    2P

    DC

    1.34

    118

    9353

    3N

    este

    d H

    anga

    rsP

    DC

    1.10

    119

    9352

    3A

    irpor

    t Lay

    out P

    lan

    2018

    Upd

    ate

    - Geo

    rget

    own

    D0.

    0812

    093

    524

    Wes

    t Tax

    iway

    Pha

    se 1

    D0.

    1312

    193

    528

    DU

    pdat

    e A

    irpor

    t 201

    3 La

    yout

    Pla

    n w

    ith P

    rogr

    am N

    arra

    tive

    Rep

    ort

    0.08

    122

    9353

    4U

    pdat

    e P

    avem

    ent M

    aint

    enan

    ce/M

    anag

    emen

    t Pro

    gram

    D0.

    0412

    3

    CIP

    Pro

    gram

    .mdb

    /Pro

    ject

    Sum

    mar

    yGrid

    5/31

    /201

    3 12

    :32:

    39 P

    MP

    age

    6 of

    7

    13-0082 3E 29 of 31

  • Proj

    ect #

    Nam

    eTo

    tal

    Cos

    t($

    M)

    PD

    = R

    ight

    of W

    ayR

    C =

    Pla

    nnin

    g/E

    nviro

    nmen

    tal

    = D

    esig

    n =

    Con

    stru

    ctio

    n*

    = B

    ridge

    Pro

    ject

    s

    Proj

    ect S

    umm

    ary

    Tabl

    e -

    Taho

    e

    13/1

    414

    /15

    15/1

    616

    /17

    17/1

    818

    /19-

    22/2

    323

    /24-

    32/3

    3


Recommended