Europe83 94
LNG being pushed into Europe in 2020.Declining domestic production requiresincreasing LNG imports in the later years.
2017 2020 2030
Americas
211916AsiaMENA
33036
2017 2020 2030
Pipeline gas imports from US toMexico reduces LNG importrequirements, while the newerimporters such as Uruguay andColombia push up LNG demand.
2017 2020 20302017 2020 2030
Growing LNG demand as domesticgas production cannot keep up withrequirement. Potential new demandcreation during period of low prices.
Reform of subsidizeddomestic gas prices allowsfor further LNG imports.
Note: The above units are all in mmt of LNG.
10
19 21 199 233
53
LNG Demand Forecast
Source :FGE
3
Confidential – Do Not Circulate Slide
Established Asian Markets LNG
Demand Growth (base year 2016-17)
New Asian Markets LNG Demand
Growth (base year 2016-17) 50
60
50 40
4030
30
2020
10 10
00
-10
Thailand
Bangladesh
Malaysia
Vietnam
Indonesia
Pakistan
SingaporeJapan South Korea Taiwan India China
• •China and India account for the bulk ofincremental growth in established Asianmarkets.
In new Asian markets, incrementalgrowth is seen across the board, withPakistan and potential new entrantBangladesh driving it.
11
mm
t
mm
t
Asia LNG Demand Forecast
Source :FGE
4
Confidential – Do Not Circulate Slide
29.7 29.9 33.6 31 28.7 28.6 29.4 29
5.6 6.77.5
8.2 10.2 6 6.2 6
56.3 55.852 53.7 54.1
57.9 56.9 57
8.4 7.6 6.9 7.2 6.9 7.5 7.5 8
0
20
40
60
80
100
120
1990 1995 2000 2005 2010 2015 2016 2017
Others
Coal
Natural Gas
Oil
P*:Provisional
Gas share in India energy basket increased from 5.6% to 10.2% during 1990-2010;
However its share fell during 2010-2015
▪ Decline in domestic Gas production & high price of LNG
As per IEA, India gas demand growth is estimated @ 4.6% p.a. up to 2040
Gas share in India energy mix to rise to 20% by 2025 as per GOI vision 2030
5
mtoe252 316 394 541 685
Primary Energy Mix-India
Overview –Indian Gas Sector
195
Source : BP Stats 2017
730(P*)723
Confidential – Do Not Circulate Slide
Gas Demand & Supply
6
Bulk of gas demand is projected to be from the fertilizer sector, followed up by the power
sector. But Power sector demand is contingent on policy decision.
RLNG ( and thereby LNG imports) are imperative to bridge the demand supply deficit
Source : PPAC
Latent demand not captured
Confidential – Do Not Circulate Slide
LNG Imports Trend
7
Low Oil Prices
Source : IGU 2017/ PPAC
High Oil Prices
Low Oil Prices
0
5
10
15
20
25
2012 2013 2014 2015 2016 2017
(P)
mmtpa
High Oil Prices
Rising trend in Oil Prices
(P): Provisional
LNG / Gas Infrastructure
Confidential – Do Not Circulate Slide 9
Company Length (KM)Capacity
(MMSCMD)
GAIL 10977 206
Reliance RGTL 1469 80
GSPCL 2198 43
AGC 1000 6
IOCL 140 9.5
ONGC 24 6
RGPL 312 3.5
Total 16120 354
Existing Natural Gas Pipeline
Network
Company Length (KM)Capacity
(MMSCMD)
GAIL 5486 139
GITL 2035 78
GIGL 2777 119
APGDC 391 90
KEI-RSOS PEPL 250 36
Total 10939 462
Natural Gas Pipelines under
execution/construction
Gas Infrastructure
Dahej
Hazira
Swan
H-Energy
Dabhol
Kochi
Ennore
Dhamra
Mundra
Digha
Kakinada
S-HPCL
Confidential – Do Not Circulate Slide
Gas Infrastructure – LNG import Terminal
Sr No Terminal Capacity (MMTPA) Comment
1 PLL Dahej existing 15.0 Operational
2 Shell Hazira 5.0 Operational
3 RGPPL Dabhol 3.5 Operational
4 PLL Kochi 5.0 Operational
Sub Total 28.5
Under Execution / Expansion
1 Dahej Expansion 2.5 FY 19 Completion
2 GSPC LNG, Mundra 5.0 FY 18 Completion
3 IOC Ennore 5.0 FY 18 completion
4 HPCL Shapoorji Energy pvt.ltd., Chhara 5.0 FY 20 completion
5 Swan Energy-Jafrabad FSRU 5.0 FY 20 completion
6 H-Energy West coast terminal, Jaigarh 4.0 FY 20 completion
Sub Total 26.5
Expected Capacity by 2020 55
Proposed/Planned
1 GAIL, Kakinada 3.5 Prospective
2 East Coast terminal, Digha, 3.0 Prospective
3 Adani Enterprises, Dhamra 5.0 Prospective
4 Mumbai Port 5.0 Prospective
Sub Total 16.5
10
Key Issues
Confidential – Do Not Circulate Slide
Key Issues
12
Gas Market
Supply
Pricing
Competition
Infrastructure
Consumer
Regulation
▪ Inadequate pipeline grid▪ Location of LNG terminals▪ CNG stations inadequate▪ LNG dispensing Unit promotion▪ LCNG stations promotion
▪ Market driven Policies▪ Mandated use of Gas▪ Open access of Pipeline & Terminals▪ Rationalization of taxes, duties & levies - GST ▪ Review of City gas distribution contracts
▪ Unbundling of Gas-Sector▪ Provide incentives to
private player to enter
▪ Availability of Gas at Point of use
▪ Promotion of Gas in automotive sector
▪ Volatility of prices▪ Benchmark – HUB
based pricing
▪ Limited domestic Gas availability
▪ Dependence on LNG import