Indian Heat Rate Alliance (IHRA). Working Groups Meeting August 12, 2014. Background. Heat Rate Business Case. In 2011-12, CEA found an average 11.49% deviation between operating heat rate with designed heat rate (ranging largely from 2-20%). - PowerPoint PPT Presentation
31
Indian Heat Rate Alliance (IHRA) Working Groups Meeting August 12, 2014
Transcript
Page 1: Indian Heat Rate Alliance (IHRA)

Indian Heat Rate Alliance (IHRA)

Working Groups MeetingAugust 12, 2014

Page 2: Indian Heat Rate Alliance (IHRA)

Background

Page 3: Indian Heat Rate Alliance (IHRA)

3

Savings• Annual coal

costs: Rs. 5 bn

• Annual GHG emission reduction: 3 mmt+ CO2e

Sustained heat rate improvement • 10 kcal/kWh

at 145 GW coal generation capacity at a PLF of 70%

Heat Rate Business Case

• In 2011-12, CEA found an average 11.49% deviation between operating heat rate with designed heat rate (ranging largely from 2-20%).

• PAT regulations under NMEEE expects144 thermal power plants (97 are coal-fired) designated consumers to save 3.1 mtoe (2.9 mtoe from coal-fired plants) during 2012-15

Page 4: Indian Heat Rate Alliance (IHRA)

4

Barriers to Heat Rate Improvement

Ecosystem Barriers

• No long term plan and absence of technology road-map

• Lack of financial incentives through policies and regulations to reduce fuel costs and CO2 emissions

• Lack of awareness about off-the-shelf services & solutions

• Absence of competitively priced solutions adapted to Indian context and skilled service providers

• Lack of financing mechanisms for capital investments to improve plant efficiency

• Insignificant research, training and knowledge sharing framework

Corporate Level Barriers

• Need for board level commitment for efficiency improvements

• Lack of dedicated outlays for efficiency improvements in annual O&M budgets

• Utilities irrespective of their size are not willing to afford costs and risks associated with solution development

Plant Level Barriers

• Absence of knowledge, skill-sets and dedicated teams to analyze and interpret the performance gaps

• Need for guidelines and tools to address performance gaps

Indian utilities are aware of heat rate opportunities and are now beginning to appreciate the role of solution developers, service

providers and skill/knowledge building

Page 5: Indian Heat Rate Alliance (IHRA)

5

Approaches to Address Barriers

• Pursue policy prescriptions and regulatory directives to incentivize efficiency improvements

• Facilitate market driven collaborative R&D to adapt & develop cost effective Heat Rate solutions

• Foster partnerships and establish an operative network between stakeholders

• Enlarge the support services market to meet the demand of an expanding sector through non-OEMs

By establishing an industry organization to address the above barriers on an exclusive basis, a

platform can be provided for a collective voice to all stakeholders

Page 6: Indian Heat Rate Alliance (IHRA)

Indian Heat Rate Alliance

Page 7: Indian Heat Rate Alliance (IHRA)

• Encourage the idea and cause of improved heat rate of thermal power plants on a continual basis & help in achieving heat rate at par with global standards

• Offer an autonomous, independent platform for reflecting on policies, regulations and salient topics concerning  heat rate improvement in utilities

• Provide technical assistance to utilities for acquiring appropriate technologies and solutions for their problems through collaborative research & development

• Act as a clearing-house of information and data bank • Facilitate technical and business partnerships between stakeholders • Engender a services sector to support the utilities and encourage tie-ups

between international companies and Indian entrepreneurs

7

Proposed Aims/Objectives of IHRA

Page 8: Indian Heat Rate Alliance (IHRA)

8

Stakeholder/Members

Utilities

Central utilities like NTPC, Damodar Valley

Corporation (DVC), Neyveli Lignite Corporation and

new entrants like National Hydro Power Corporation

(NHPC)

State utilities/ generation companies

Independent Power Producers like Tata Power,

Reliance Energy, Adani Power, Jindal Power,

CESC

Original Equipment

Manufacturers

Boiler-Turbine-Generator (BTG) manufacturers like

BHEL, L&T Power, Toshiba-JSW Turbine &

Generators, BGR Energy Systems, Thermax

Babcock & Wilcox Energy Solutions, Ansaldo Caldaie

Boilers India, Bharat Forge, Alstom, GE Power, Power Machines, China Power & Lighting and

Doosan Power Systems India. , Siemens

Plant Auxiliaries (Balance of Plant)

Service Providers

Asset management service providers like SKF, Bentley, Emerson, Alstom, Black &

Veatch, Lloyd Register

Process monitoring, analytics & optimization

providers like BHEL, Honeywell, Steag,

Emerson, General Physics, Smart Signal, Kalki Tech (PRISM), ABB, Siemens

Technology Innovators

Specialist Service Providers

Research & Educational Institutions

Specialized institutions like Central Power Research

Institute

Educational institutions like IITs, NITs, Indian Institute

of Science, National Power Training Institute (NPTI)

Financial Institutions

Banks as State Bank of India, ICICI Bank

NBFCs like Tata Capital CleanTech

Public financial institutions like Power Finance Corporation, India

Infrastructure Finance Corporation Limited, IFCI

Page 9: Indian Heat Rate Alliance (IHRA)

9

Utilties

• Knowledge on advanced technologies and management practices to improve heat rate to meet PAT targets through issues of guidelines & newsletters and organization of workshops & seminars

• High returns despite low investment through collaborative R&D

• Access to state-of-the-art research & training

• Access to competitively priced state-of-the-art services from the local market

• Improved organizational expertise and capabilities

OEMs & Service Providers

• Expand business opportunities to benefit from growing heat rate improvement market; demonstrate, test and adapt new technologies & practices

• Ability to offer knowledge and technology driven cost competitive quality services

• Participate in institutional alliances with utilities, OEMs, academia and research to deliver cost effective solutions

• Opportunities for international service providers to forge alliances with domestic entrepreneurs

Research & Education Institutions

• Expanded and real-life R&D platform

• Larger portfolio of technical training courses

• Improved organizational expertise and capabilities

Financial Institutions

• Opportunities to design & test new financing mechanisms

• Larger business development opportunities in the Indian market

• Improved organizational expertise and capabilities

Value Proposition for Members

Page 10: Indian Heat Rate Alliance (IHRA)

10

Governing Board

Executive Director

Applied Research & Technology

Council

Program Manager

Assistant Program Manager(s)

Business Development

Council

Program Manager

Assistant Program Manager(s)

Learning by Sharing Council

Program Manager

Assistant Program Manager(s)

Administration & Accounts

Manager

Accountant

Mentor

Organization Structure

Page 11: Indian Heat Rate Alliance (IHRA)

11

Applied Research & Technology Council

• Launch & manage Solution Development Program and Model Power Plant Program to facilitate applied research & demonstration • Collaborative research to

develop/adapt solutions• Promote interactions with

international research institutes

• Demonstrate services & solutions in Model Power Plant(s)

Business Development Council

• Launch & manage Service Provider Development Program to expand Indian network • Facilitate joint ventures

between international service/ solution providers and Indian entrepreneurs

• Promote Indian service/solution start-ups

• Organize service/solution providers workshop & showcase events

• Provide technical consulting & representative services

Learning by Sharing Council

• Launch manage a Learning by Sharing Program to create a common platform to facilitate sharing of best practices• Conduct missions to best

performing thermal power plants globally

• Organize training programs, focused workshops & webinars

• Develop online information bank

• Develop/update best practices manuals

• Publish quarterly news letter

• Organize annual Power Plant Conference

Activities of Councils

1 or 2 Working Groups under each Council will provide policy guidance and technical leadership to the IHRA and its members in the selection, design and

conduct of heat rate improvement strategies and solutions

Page 12: Indian Heat Rate Alliance (IHRA)

12

Targetted IHRA Deliverables as on Dec 31, 2016

Applied Research & Technology Council

• Facilitate collaborative research on 2-3 priority solutions

• Showcase solutions & services in at least 1 Model Power Plant

Business Development Council

• Facilitate at least 3 partnerships between international service/ solution providers and Indian entrepreneurs

• Showcase at least 2 Indian technology start-ups

• Organize 4 regional technology/ service providers showcase events

• Provide consulting services valuing at least Rs 50 lacs

Learning by Sharing Council

• Conduct 4 visits to Best Operating Power Plants

• Organize 7 training programs, focussed workshops & webinars

• Updating at least 1 best practices manual and technical manual

• Conduct 2 Annual Power Plant Conferences

• Publish 8 quarterly newsletters

Page 13: Indian Heat Rate Alliance (IHRA)

Solution Development Program

A Unique Revenue Stream for IHRA

Page 14: Indian Heat Rate Alliance (IHRA)

14

• IHRA’s flagship program• Implementation through collaborative R&D• Focus on creation of IPR for wide-scale deployment &

commercialization generating revenues for IHRA in the long term

Page 15: Indian Heat Rate Alliance (IHRA)

15

S.No Key Potential AreasPotential Quantum kCals/KWh at each

plant

National Coal Savings ( in million

tonnes)

National CO2 Savings ( in million

metric tonnes)

National Cost Savings (in Rs)

(assuming Coal costs Rs 2000/Tonne)

1 Dry Flue Gas 40 10 12.5 Rs. 2000

2Condenser & Cooling Tower

20 5 6.25 Rs. 1000

3 Combustion 10 2.5 3.17 Rs. 500

National coal savings and CO2

mitigation potential Showcase

The CO2 mitigation can also be achieved by introduction of advanced technologies like IGCC Oxy fuel combustion Carbon Sequestration

Page 16: Indian Heat Rate Alliance (IHRA)

16

1. High Loss category (40-80 kcal/kWh) Condenser and Cooling Tower Dry Flue Gas Loss HP / IP Turbine

2. Medium Loss category (20-40 kcal/kWh) RH Spray Unburnt Carbon Loss Unaccountable (LPT Efficiency, Hi Energy

drain passing, Insulation loss, etc)

3. Low Loss category (<20 kcal/kWh) MS & HRH Temperature deviations Feed water Temperature deviations

Key areas of efficiency improvement and cost saving potential at power utilities

35%

19%

22%

10%

7%

7%

Major Heat Rate Loss Areas

Condenser & CTs Turbine (HP/IP) Dry Flue Gas Loss

Unaccountables RH Spray Unburnt Carbon

Source: Efficiency Improvement at State Utilities – Challenges and Opportunities, CII Power Plant Summit, 2013

Page 17: Indian Heat Rate Alliance (IHRA)

17

Technology Transfer, Adaption and Indigenization

• Identification and implementation of best practices.• Reduction of air, steam and flue gas leakage.• Optimization of combustion through understanding of

coal quality and how it burns in the boiler, fine tuning operational parameters (air-to-fuel ratios), coal fineness, furnace cleanliness, etc.

• Use of low grade heat for coal drying.• Co-firing of boilers with multiple fuels.• Lowering of stack temperature.• Enhancing fuel flexibility in Indian Boilers.• New technology adaption in efficiency and

performance improvements including carbon capture & sequestration

O&M Practices & Technologies

• Optimization of processes using advanced computational tools.

• Conduct on-line, real time monitoring of performance. • Standardization of performance metrics.• Development of solutions for issues on seals on air

heaters, condensers, boilers, tube components, etc.• Use of variable speed motors,• Use of flue gas conditioning heat exchangers.• Implementation of intelligent soot blowing system.• Upgrading turbines. • Routine performance testing of critical equipment.• Improved performance of condenser, cooling tower,

boiler feed and CE pumps, FD&ID fans, ESP, etc.• Proactive maintenance.• Loading profile and impact on plant efficiency

Potential Priority Areas

First solution with IHRA IPR to be developed by end 2016 and commercialized by 2020

Page 18: Indian Heat Rate Alliance (IHRA)

18

Aims of Working Groups

• Identify, prioritize and select operational and technological/ engineering solutions for development and implementation in select Indian utilities.

• Foster partnerships between utilities, service providers, OEMs and other stakeholders in the planning and implementation of utility solutions.

• Guide the design, development and pilot testing of the utility heat rate improvement measures, practices and technological solutions.

• Monitor and evaluate the impact of the pilot projects on the utility’s technical and financial performance.

• Authorize and certify the progress report on the impact of the operational and design solutions on the utility’s performance; disseminate widely the findings of the pilot projects, and

• Provide strategic guidance and direction to the IHRA and members of the utility solution project consortium (eg. Service providers, OEMs, Utilities, R&D labs, etc.) on issues related to licensing and ownership of the Intellectual Property Rights (IPR)

Page 19: Indian Heat Rate Alliance (IHRA)

Model Power Plant Program

Demonstrations and Skills

Page 20: Indian Heat Rate Alliance (IHRA)

20

• Efficiency interventions follow an one-off, unit by unit approach. – Lessons take time to disseminate across the sector and, – Inaccessible to plant and personnel due to diversity among utilities

and the geographical expanse

There is thus, a need for a common model demonstration unit located at a relatively easily accessible thermal power station with in-plant facilities for training,

laboratory, communication and data-links as well as “on-line” demonstration of technologies.

Why Model Power Plants

Page 21: Indian Heat Rate Alliance (IHRA)

21

• Model Power Plants (MPP)– Monitoring & Diagnostic

(M&D) Center at Philadelphia Electric Power Company (PEPCO)

– Instrumentation and Controls (I&C) Center at TVA’s Kingston Plant,

– Heat Rate Improvement Center at Potomac Electric Power Company

• Functions of MPP– Venue for training and

workshops– Showcase of innovative

technologies and operational solutions;

– Testing, standardization and certification of processes and products;

– Site for market driven, collaborative R&D projects

– Hardware/tool lending facilities

EPRI Model

Page 22: Indian Heat Rate Alliance (IHRA)

22

• CEA estimated 490 thermal power plant units (as on Mar 31, 2012)

– 25 to 800 MW of capacity and have varied problems and solutions• 46% of units producing 46% of national generation have 195-250 MW capacity• 37% units producing only 15% of national generation have 25-150 MW capacity• 17% of units producing 39% of national generation have a capacity of 500 MW

or more• 67.7% of the total operating coal based thermal units have exceeded their mid-

life (> 15 years) while 46.2% have exceeded their operational life (> 25 years) • 52.4% of the total capacity (MW) of coal based power has exceeded their mid-

life (> 15 years) while 28.6% has exceeded the operational life (> 25 years)

Utility members will be requested to offer and earmark representative units with capacities of 210 MW, 250 MW, 500 MW and 660 MW to serve

as model power units

Profile of Power Plants in India

Page 23: Indian Heat Rate Alliance (IHRA)

23

Aims of Working Groups

• Identify, prioritize and select model power plants for heat rate technology and operational solutions demonstration.

• To assist in the program design and costing of the model power plant demonstration projects. Specifically, the WG will consult and deliberate on the following: – expectations from the proposed MPP unit as a site for pilots and for training & knowledge sharing– accrual of monetary benefits and resolution of IPR issues to the utility and its partners hosting the MPP.

• To advise on the methodology, criteria & number of selected stations and units. The Working Group will need to explore establishing multiple model units on the basis of capacity or choice of model units that have a functional focus similar to the approach followed in the US by EPRI.

• Discussions with utilities to secure buy-in for designating the identified units as MPPs; Selection of 3-6 units based upon the agreed criteria

• Determination of broad budgetary requirements for designated MPPs and funding mechanisms• Foster partnerships between utilities, service providers, OEMs, National Labs and other

stakeholders in the design and conduct of market driven consortia R&D projects. .• Guide the design, development and pilot testing of the utility heat rate improvement measures,

practices and technological solutions.• Monitor and evaluate the impact of the model power projects on the spread and dissemination of

best practices in the country• Provide strategic guidance and direction to the IHRA and members of the utility solution project

consortium (eg. Service providers, OEMs, Utilities, R&D labs, etc.) on issues related to licensing and ownership of the Intellectual Property Rights (IPR)

Page 24: Indian Heat Rate Alliance (IHRA)

Service Provider Development Program

Wide-scaling Run & Repair Services

Page 25: Indian Heat Rate Alliance (IHRA)

25

• Potential – CEA estimates that “run-repair-replace’ for R&M/LE during 2012-22

will require investments of Rs. 555-855 bn– Compliance of Perform Achieve Trade Scheme

• Significant challenges – Non availability of competitively priced, modern, state of the art

services and products• services are available internationally usually through small and medium scale

service providers at prices that are competitive in developed countries• such service providers do not typically exist in India• international service providers can be contracted by Indian utilities, the costs

are exhorbitant and therefore not financially viable in the Indian context

– BTG manufacturers/OEMs focus on on green-field capacity addition or replacements

“Run and repair” market remains small with a huge un-estimated potential

Potential & Challenges

Page 26: Indian Heat Rate Alliance (IHRA)

26

Conclusions from Round-table for Service Providers and Original Equipment Manufacturers

• MSMEs provide a range of thermal efficiency related services in the developed markets. – Many MSMEs established by former employees. India has very few such

service providers. They face significant barriers: • Lack of recognition by utilities and misconstrued competition by OEMs• Utility procurement practices that does not recognize start-ups/new enterprises

or have entry barriers like financial creditworthiness and/or proven institutional track record

• Lack of dedicated budget lines in utilities for promotion of efficiency

• Expanding the pool of heat-rate service providers needs a nurturing eco-system – Encouraging former employees to turn entrepreneurs and establish

enterprises– Facilitating partnerships or franchisee agreements between international

service providers and Indian entrepreneurs– Creation of a platform that can assist service providers to network and

market their skills and products

Page 27: Indian Heat Rate Alliance (IHRA)

27

• In discussion with utilities, identify and prioritize solution areas for which service providers are immediately required

• Identify priority solutions areas for which service providers are not available in India but are available abroad

• Initiate discussions with 3-5 international service providers on their plans to establish a base in India.

• Foster partnerships between these international service providers and Indian entrepreneurs for establishing indigenous enterprises/franchisees

• Create awareness amongst utilities on availability of indigenous service providers and the need to develop procurement frameworks to contract them

• Guide IHRA to develop model/standard documents for procurement and contracting of various services

Aims of Working Groups

Page 28: Indian Heat Rate Alliance (IHRA)

Finance & Sustainability

Page 29: Indian Heat Rate Alliance (IHRA)

Membership fee Seed money Participation fees for training programs Sponsorships for events Management fee for collaborative/ consortia research, Fees from consulting services, IPR and/or technology

commercialization

29

Potential sources of revenue

Page 30: Indian Heat Rate Alliance (IHRA)

30

IHRA expected to break even in year 6 Activities of Learning by Sharing & Business Development Councils will start generating a

surplus from year 1 itself Risks: Low

Solutions developed by Applied Research & Technology Council expected to be commercialized with IHRA revenues from year 5

Risks: High

IHRA’s sustainability Need for international collaboration and partnership for technology transfer Capacity building for the IHRA team both in terms of technical and managerial capability

through Understanding the functioning & focus areas of EPRI, VGB, Jcoal & similar organizations

internationally

Challenges & Support required for IHRA

Needs gap funding of nearly Rs. 3 Crores in the first 5 years

Will generate surplus of around Rs. 1 Crores in years 6-8

Page 31: Indian Heat Rate Alliance (IHRA)

Thank You