+ All Categories
Home > Engineering > indian railways chittranjan locomotive works ppt

indian railways chittranjan locomotive works ppt

Date post: 17-Jan-2017
Category:
Upload: nandlal-prajapati
View: 664 times
Download: 11 times
Share this document with a friend
45
SUBMITTED BY:- NAND LAL PRAJAPATI MECHANICAL ENGG. ROLL NO:-7ME81 SUBMITTED TO:- M/S PUSHPA GUPTA MECHANICAL DEPT.
Transcript
Page 1: indian railways chittranjan locomotive works ppt

SUBMITTED BY:-NAND LAL PRAJAPATIMECHANICAL ENGG.ROLL NO:-7ME81

SUBMITTED TO:-M/S PUSHPA GUPTAMECHANICAL DEPT.

Page 2: indian railways chittranjan locomotive works ppt

TRAINING REPORT ON

CHITTRANJAN LOCOMOTIVE WORKS

GUIDED BY:-NAGESHWAR RAI.

Page 3: indian railways chittranjan locomotive works ppt

CONTENTS ACKNOWLEDGEMENT INTRODUCTION HISTORY OF CHITRANJAN LOCOMOTIVES BASIC INFORMATION ABOUT CLW SECTION VISITED DURING TRAINING BASIC INFORMATION ABOUT LOCOMOTIVE(TYPES OF TRACKS) BASIC INFORMATION ABOUT LOCOMOTIVE(NAMING SYMBOLS) ACTIONS ADOPTED LAYOUT OF CLW ROOF DRIVER CABIN MACHINE ROOM UNDERFRAME BOGIE ASSEMBLY ROOM PHOTO GALLERY QUALITY POLICY ENVIRONMENTAL POLICY TYPES OF LOCO(FREIGHT&PASSENGER) DEVELOPMENT OF 3-PHASE LOCO SHOP FLOOR ACTIVITIES THANK YOU

Page 4: indian railways chittranjan locomotive works ppt

ACKNOWLEDGEMENT

I feel satisfied in preparing the project on CLW. It was a great experience at CLW in training duration .I Nand Lal Prajapati student of JAIPUR NATIONAL UNIVERSITY, sincerely thanks various department of CLW for the assistance provided to me in preparing the report during industrial training. I thank to my department & college who has given permission to go for industrial training in CLW.

Thanking You

Page 5: indian railways chittranjan locomotive works ppt

INTRODUCTION It is the only major Electric Locomotive builder in the country.

It is situated just at the Border of West Bengal and Jharkhand and is at about 32 km from Asansol and 237 kms from Kolkata.

The Workshop has an area of 18.34 Sq . km. It have consists Workshops, Offices , Schools , College , Staff quarters , Cinema halls , hospital and Auditorium.

Land area under Workshop-893.373 Sq .m. CLW became the first production unit in the developing

countries ,Second in Asia and fifth in the world to manufacture elective locomotive works.

CLW has in houses facilities for Machining and Assembly of wheels sets ,Fabrication and Machining of bogies etc. The facilities including modern CNC Machines , plasma -cutting machines ,inert gas welding sets etc.

CLW is the dream of the nation’s visionaries, coming true. The loco works was initially established for production of 120

average sized steam locomotives with the capacity to manufacture 50 square boilers.

CLW produces one complete electric loco in each working days.

Page 6: indian railways chittranjan locomotive works ppt

DURING CONSTRUCTION

Page 7: indian railways chittranjan locomotive works ppt

HISTORY

LOKMANYA 5

Page 8: indian railways chittranjan locomotive works ppt

CLW ,located in the land of VISWA BHARTI ,a great educational & cultural seat in the world is the premier electric loco producer in this country. On the 9th january1948,survey of the proposal area was done. The production of Electric Locomotives commenced in 1961. In the process, fifteen versions of electric locomotives were produced by CLW and the latest in that series is the freight locomotive WAG-7 and passenger locomotive WAP-4. Pandit Jawaharlal Nehru, the first Prime Minister of India, commissioned the first 1500 V dc Locomotive named “LOKMANYA” on the 14th October, 1961.The production of 25 kV ac loco commenced on 16th November, 1963. The first Electric Loco turned out from CLW, christened as “BIDHAN” was a broad gauge 25 kV ac. Freight Locomotive (WAG-1) of 2840 hp withmaximum speed of 80 km/hr. Subsequently CLW gradually upgraded the horsepower of Electric Loco from 2840 hp to 6000 hp and maximum speed from 80 Km/h to 160 km/h. CLW also built 25 kV ac/1500 V dc, ac/dc Loco, WCAM-1 for hauling Mail / Express Trains from BRC to BCT on Western Railway. The loco works was initially established for production of 120 average sized steam locomotives with the capacity of manufacture 50 spare boilers.  

Page 9: indian railways chittranjan locomotive works ppt

h

Page 10: indian railways chittranjan locomotive works ppt
Page 11: indian railways chittranjan locomotive works ppt

k

Page 12: indian railways chittranjan locomotive works ppt

b

Page 13: indian railways chittranjan locomotive works ppt

LAYOUT OF CLW ROOF

DRIVER’S CABIN

MACHINE ROOM

BOGIE

Page 14: indian railways chittranjan locomotive works ppt

ROOF TRANSDUCER PANTOGRAPH ROOF LINE RESISTER HARMONIC FILTER

Page 15: indian railways chittranjan locomotive works ppt

TRANSDUCER

Click icon to add picture

Page 16: indian railways chittranjan locomotive works ppt

TRANSDUCER Transducer is a device that convert a

signal in one form of energy . Energy types includes electrical ,

mechanical , electro (include light) magnetic and thermal energy.

The term transducer implies the use of a sensor/detector , any device which converts energy can be considered a transducer.

Transducer are widely used in measuring instrument.

Page 17: indian railways chittranjan locomotive works ppt

PENTOGRAPH

Pantograph is an instrument used to reproduce to an enlarge or a reduce scale.A pantograph is mostly used for the reproduction of planes etc , on enlarge or reduced scales.A modified form of pantograph is used to collect power at the top of an electric locomotive.

Page 18: indian railways chittranjan locomotive works ppt

ROOF LINE

A roof line is used to describe the fascia , saffits , bargeboards and cladding that forms the frontage immediately below the roof and the eaves of most homes.Fascia is a term used in architecture to refers to a frieze or band running horizontally and situated vertically under the roof edge .

Page 19: indian railways chittranjan locomotive works ppt

RESISTER HORMONIC FILTER

The harmonic filter resister are used to eliminate the dangerous distortion(harmonics) generated inside the network due to connection of more and more number of electronic power convertor

Page 20: indian railways chittranjan locomotive works ppt

DRIVER’S CAVIN DRIVER DESK SHEAT DRIVER DESK ENERGY FLASHER LIGHTER PENUMATIC HORN HORN LEAVER WIPER MOTER PARK BRAKE GUAGE SPEEDOMETER EMERGENCY BRAKE GUAGE SWITCH-SANDING,BRAKE RELEASE

Page 21: indian railways chittranjan locomotive works ppt

PENUMATIC HORNLoco horn is an air horn Loco horns are operated by compressed air ,typically 8.6 to 9.6 bar and fed form a locomotive main air reservoir.The engineer open the horn valve , air flow through a supply line into the power chamber at the base of the horn.It passes through a narrow opening b/w a nozzle and circular metal diaphragm in chamber and vibrate and to produce sound.

Page 22: indian railways chittranjan locomotive works ppt

SPEEDOMETERIt is an instrument that measures the speed of locomotive.Some speedometer are round with numbers and a pointer like that of the hands on a clock face , through others are digital ,like mainly wrist watches.

Page 23: indian railways chittranjan locomotive works ppt

MACHINE ROOM RESEVOIR 450Lt. IN WAG-9/9H 240Lt-4 IN WAP-7/WAG5 TRACTION COVERTER 1&2 AUXILARY CONVERTER BOX 1&2 BLOWERS OIL COOLING UNIT AUXILARY COMPRESSOR

Page 24: indian railways chittranjan locomotive works ppt

BOGIE WHEEL SAND BOX BOGIE FRAME WHEEL SET SPRING—PRIMARY/SECONDERY BRAKE SET DAMPER—PRIMARY/SECONDARY/

HORIZONTAL/VERTICAL

Page 25: indian railways chittranjan locomotive works ppt

WHEELS OF LOCO

Page 26: indian railways chittranjan locomotive works ppt

SAND BOX OF LOCO

Page 27: indian railways chittranjan locomotive works ppt

BOGIE FRAME OF LOCO

Page 28: indian railways chittranjan locomotive works ppt

BRAKE SET OF LOCO

Page 29: indian railways chittranjan locomotive works ppt

ROOF LAYOUT

Page 30: indian railways chittranjan locomotive works ppt
Page 31: indian railways chittranjan locomotive works ppt
Page 32: indian railways chittranjan locomotive works ppt

ASSEMBLY ROOM

Page 33: indian railways chittranjan locomotive works ppt
Page 34: indian railways chittranjan locomotive works ppt

STEAM ENGINE DIESEL ENGINE

ELECTRIC ENGINE

Page 35: indian railways chittranjan locomotive works ppt

TYPES OF LOCO FREIGHT LOCO

PASSENGER LOCO

Page 36: indian railways chittranjan locomotive works ppt

FREIGHT LOCOMOTIVEWAG-

9

Page 37: indian railways chittranjan locomotive works ppt

Passenger Locomotive1.WAP-4

Page 38: indian railways chittranjan locomotive works ppt

2. WAP-5

Page 39: indian railways chittranjan locomotive works ppt

3. WAP-7

Page 40: indian railways chittranjan locomotive works ppt

QUALITY POLICY CLW is an ISO-9001 unit has a well-established

quality system. The loco works of CLW obtained its ISO-9001

certification on 13.07.1996 while the ISO- 9002:1994 certification for steel foundry was obtained on 08.08.1996.

Up gradation to ISO 9001:2001 for both Loco works and steel Foundry was complicated on 250.902003.

First surveillance Audit was conducted during 06.09.2005 to 09.09.2005.

Renewal audit was conducted from 28th August to 30th August,2006.

Page 41: indian railways chittranjan locomotive works ppt

ACTION ADOPTED Improved environmental management systems , prevention of

pollution and continuous improvement of environment performance. Conservation of natural resources and implementation of

fundamentals of waste management Waste generated in shops have been reduced by 5% from the

previous year by improvement of operational procedures. Air pollution control Device has been installed in integrated paint

shop to reduce air pollution. Dust collector has been installed in sand plant for reduction of air

pollution Consumption of electricity in plant and township has been reduced

by use of energy efficient lights ,installation of capacitor bank etc. 50,000 trees have been planted in the CLW townships .Another

50,000 trees will be planted during current year. Use of Poly bag has been totally banned inside the township.

Page 42: indian railways chittranjan locomotive works ppt

TRACTION MOTORS Cumulative production of Traction Motors

during the year 2007-08 has touched an all time high of 1225 Traction Motors.

This is the best ever in the 53 years history of CLW.

CLW has achieved the rare distinction of being only production unit in the country which can cross 10,000 Traction motors production mark in a year.

Page 43: indian railways chittranjan locomotive works ppt
Page 44: indian railways chittranjan locomotive works ppt
Page 45: indian railways chittranjan locomotive works ppt

Recommended