+ All Categories
Home > Business > Indicator Ppt 090116

Indicator Ppt 090116

Date post: 28-Nov-2014
Category:
Upload: christopher-r-anderson
View: 1,907 times
Download: 9 times
Share this document with a friend
Description:
 
18
The Future of Diamond Exploration .
Transcript
Page 1: Indicator Ppt 090116

The Future of Diamond Exploration

.

Page 2: Indicator Ppt 090116

What Does Indicator Offer the Investor?

Technical depthSophisticated approach to businessTechnical depthSophisticated approach to businessSophisticated approach to business Well managed treasury

High-quality projectsSt j i t t t hi

Sophisticated approach to business Well managed treasury

High-quality projectsSt j i t t t hiStrong joint venture partnerships

Active explorerFour drill programs planned

Strong joint venture partnerships

Active explorerFour drill programs plannedFour drill programs planned

Innovative strategic alliance with Munic Gems, Antwerp’s largest

Four drill programs planned

Innovative strategic alliance with Munic Gems, Antwerp’s largest diamond exporterdiamond exporter

IME:TSX-V

Page 3: Indicator Ppt 090116

Extensive Management Experience

Bruce Counts President & CEO

David Kelsch VP Exploration

Bruce Counts President & CEO

David Kelsch VP ExplorationDavid Kelsch VP Exploration

Louis Blom CFO

Grant Lockhart Senior Technical Consultant

Magnus Haglund N B i D l t

David Kelsch VP Exploration

Louis Blom CFO

Grant Lockhart Senior Technical Consultant

Magnus Haglund N B i D l tMagnus Haglund New Business DevelopmentMagnus Haglund New Business Development

Over 75 years of diamond exploration experience

Involved in discovery, development and marketing of Canada’s first 2 diamond mines: Ekati and Diavik

Over 75 years of diamond exploration experience

Involved in discovery, development and marketing of Canada’s first 2 diamond mines: Ekati and Diavik

Directly involved in the discovery of more than 250 kimberlites on 4 continentsDirectly involved in the discovery of more than 250 kimberlites on 4 continents

IME:TSX-V

Page 4: Indicator Ppt 090116

Diamond Market Outlook is Bright

Increasing demand - Declining supply

New markets emergingg gChina and India - demand rising at 15% per annum

No new large diamond mines on the horizon

Existing production decliningExisting production decliningMajor mines: Ekati, Venetia and Udachnaya production tails off beyond 2011

IME:TSX-V

Source: WWW International Diamond Consultants, BMO Capital Markets

Page 5: Indicator Ppt 090116

Diamond Market Outlook is Bright

While the current challenging economic conditions have had a negative impacton diamond demand and diamond prices the medium to long-term outlook fordiamonds remains robust

RBC Capital Markets Diamond Day - London, May 2008

A rough diamond supply shortfall of US$3 Billion isA rough diamond supply shortfall of US$3 Billion is estimated by 2011.

Continued positive outlook for rough diamond prices

Majors such as De Beers and Rio Tinto continuing toMajors, such as De Beers and Rio Tinto, continuing to devote large budgets exploring for new sources of production

Canadian exploration and development projects remain an important potential source of rough diamonds

IME:TSX-V

Sources: WWW International Diamond Consultants, BMO Capital Markets, De Beers, RBC Capital Markets

Page 6: Indicator Ppt 090116

The Discovery Process

Area Selection Sampling Geophysics Drilling Evaluationp g p y g

• Archons /Cratons

• Till• Streams• Beaches

• Mag/EM• Gravity

• Core• RC

• Micro-diamond Analysis

Staking

Permitting

Isolation of KIM Source Area

Target Identification

Kimberlite Discovery

• Prospecting

> 1 stone per kilo

IME:TSX-V

Page 7: Indicator Ppt 090116

Key Projects

NORTHEAST ARCTICMAIN PROJECTS

SEPTEMBER 2008

NORTHEAST ARCTICMAIN PROJECTS

SEPTEMBER 2008

NORTHEAST ARCTIC

KEY PROJECTS

IME:TSX-V

Page 8: Indicator Ppt 090116

Nanuq North – Project Highlights

High Potential for Diamond Discovery

Adjacent to new diamond bearing kimberlite areaAdjacent to new diamond bearing kimberlite area

Distinct indicator mineral trains terminate at property

Numerous high confidence geophysical targets

Accessible Location

Cl t tid tClose to tide-water

Share infrastructure and support with adjacent Nanuq Project

JV with Peregrine Diamonds Ltd.

IME:TSX-V

Area Selection Sampling Geophysics Drilling

Page 9: Indicator Ppt 090116

Nanuq North – Drill hole NQN-001

August 2008: First kimberlite discovered

Geophysical target up-ice of KIM train

200 m

Large 4.5 hectare pipe

150 kg sample sent for analysisg p y

Results due in January 2009

IME:TSX-V

Page 10: Indicator Ppt 090116

Nanuq North – KIM Dispersion

KIM dispersion at Nanuq North

cannot be explained by NQN-001

Undiscovered kimberlites likely

occur inside property boundaries

IME:TSX-V

Page 11: Indicator Ppt 090116

Nanuq North – Untested Targets

More than 10 untested high

priority targets

Target NQN-024 is more than

12 ha at surface and is

located up-ice of highly

anomalous till samples

IME:TSX-V

Page 12: Indicator Ppt 090116

Darby – Project Highlights

Under Option to Teck Cominco LimitedSpend $14 million by June 2010 to earn 51%p $ yMust carry Indicator’s remaining 29% to production

9 Kimberlites Discovered5 diamond bearing5 diamond bearingLarge pipes up to 11 hectares at surface

Continued Discovery in 2008Kimberlite boulders discovered in two new areas

Numerous kimberlite targets

IME:TSX-V

Area Selection Sampling Geophysics Drilling Evaluation

Page 13: Indicator Ppt 090116

Darby – 2008 Program

$2.1 million budget

16,000 line-km of airborne geophysics entire property now covered

Kimberlite boulders discoveredKimberlite boulders discovered now indicates three clusters

Mid-season budget increasedgto $2.5 million by Teck Cominco

Diamond results due early 2009

IME:TSX-V

Page 14: Indicator Ppt 090116

Darby – 2008 Program

DDN

Known KimberliteCluster at Darby

New Potential Clusters

IME:TSX-V

Page 15: Indicator Ppt 090116

Borden – Project Highlights

Kimberlite float discovery

Abundant KIMs isolated to aAbundant KIMs isolated to a discrete area of the project

58,000 acres of mineral claims stakedstaked

Airborne geophysical survey completed

Drilling planned for 2009

Area Selection Sampling Geophysics Drilling

IME:TSX-V

Area Selection Sampling Geophysics Drilling

Page 16: Indicator Ppt 090116

Borden – 2008 Kimberlite Float Discovery

Late field season kimberlite float discovery

Float located immediately down-ice ofFloat located immediately down ice of priority geophysical anomaly identified in preliminary data

Kimberlite contains visible altered olivineKimberlite contains visible altered olivine and rimmed garnet

Recovered amounts too small for meaningful microdiamond testsg

Final geophysical interpretation to confirm number of drill targets

IME:TSX-V

Page 17: Indicator Ppt 090116

Grail – Project Highlights

80% Indicator/20% Hunter Exploration

800,000 acres on Boothia Peninsula

High diamond potential chemistry20% of garnets are G10s~20% of garnets are G10s

Limestone cover → Extremely quiet magnetics

Recently completed airborne survey revealed superb targets in chemistry source area

Drill ready for 2009Drill ready for 2009

IME:TSX-V

Area Selection Sampling Geophysics Drilling

Page 18: Indicator Ppt 090116

Corporate Structure

Indicator represents an outstanding opportunity for investment

Shares Issued and Outstanding 63.9 millionShares Issued and Outstanding 63.9 million

Fully Diluted 76.1 millionFully Diluted 76.1 million

52 Week High / Low $0.37 / $0.01

Market Cap ($0 05 per share) $3 2 million

52 Week High / Low $0.37 / $0.01

Market Cap ($0 05 per share) $3 2 millionMarket Cap. ($0.05 per share) $3.2 millionMarket Cap. ($0.05 per share) $3.2 million

IME:TSX-V


Recommended