Individual Vessel Performance Dialogue November 2009 Performance Individual Vessel Performance Dashboards and Action Plans December 29 th , 2009
Transcript
Page 1: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

Individual Vessel Performance DialogueNovember 2009 Performance

Individual Vessel Performance Dashboards and Action PlansDecember 29th, 2009

Page 2: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

Session Owner Time

Team’s Updates Team1330 – 1415

Individual Vessel Performance – Own Fleet

Own Fleet & Oversight1415 – 1445

VESSEL PERFORMANCE DIALOGUE AGENDA

Individual vessel performance – Charter Fleet Charter1445 – 1530

2

Page 3: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

Session Owner Time

Team’s Updates Team1330 – 1415

Individual Vessel Performance – Own Fleet

Own Fleet & Oversight1415 – 1445

VESSEL PERFORMANCE DIALOGUE AGENDA

Individual vessel performance – Charter Fleet Charter1445 – 1530

3

Page 4: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

OVERVIEW PROSES EVALUASI KINERJA KAPAL (YTD NOVEMBER 2009)

81714,84814,031

-5.5%

�������������� ��

1,908

11620136

13,895

-99%

OT BBM

OT Crude

Slow Pumping

8771010412

Operation (BOC)

Charter, Own Fleet, Oversight

Operation (OT)*

� ��� �� � � ��� � �� �� � �� � �

4Source : PMS Team Analysis, OT, BOC, K&A

4,370 3,852

10,47810,179

Actual Un-Classified

Well Documented

2,939

Evaluated

3,720

Un-Claimable

6,159

Claimable

9,879

Un-Evaluated

-23%

156

1,908

11,96712,123-14%

Slow Speed/Over Bunker

R2 Loss

1176390270

ClaimableIn ProgressUn-Claimable

To Be Clarified

Not Yet Received

5,889

11041913323

Page 5: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

� � �� � � � �! ��� � �� � � � " ! "

# � $ % & � ��

�� �' �& � �

��(& �

� �� $ ���( '

��(& �

���()($ ��(�

* ������+ �����

�& , �� � �& � �

DETAIL OVERVIEW KELENGKAPAN DOKUMEN, EVALUASI, DAN PENINGKATAN KINERJA KAPAL (YTD NOVEMBER 2009)

- . - / - 0 - 1

41%Avg

97%M/C

11%TTS

Target 42.0

-47%

Target 100.0%

-11%OT BBM & BBK ����2# �� # (�3 % �( 4 ����& � �5 ��24 �� 3 ���6 �, ��

* ������7

����� � � �� � � � �� ���� � � �� � �� �

����� ��� �� � � � ����� � � � � � � �

����� � ����

����� � �� � �

5

11%TTS

14%L/A

38%Avg.

88%M/C

16%TTS

8%L/A

22.1Avg.

29.6SSOB

36.3R2 Loss

0.4Slow Pump

89.0%Avg.

76.7%SSOB

97.0%

Slow Pump 93.3%

R2 Loss

OT Crude, Black, & Petrochemical

� �� �� � �� � � � �� ! " �# �$ $ % �& � ��

�� �� � ����� # ��� �� ��' � ��(�� �� ��& � �� � ��

) � �� �� ' �� # ��� �� ��� ' � � ��' � ��(� �� �& � ��

� � � *�� � � �� � �

�(� *��� � �� ��� � + ��

��� *��� � , � ���� � �� & � � �

- (� � *�- � � �� + � ��� ' �

Source : PMS Team Analysis, OT, BOC, K&A, Kehand. Kapal

����� � �� � �

������ � ��

� � ���6 ���, �3 ��� 6 ( ��8�

Page 6: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

UNTUK MENDUKUNG PENINGKATAN KINERJA KAPAL, TIM TELAH MENYUSUN JADWAL KEGIATAN ANTAR FUNGSI SETIAP BULAN BERJALAN YANG SALING TERINTEGRASI

1 – 5 (Stretch)1 – 7 (Base)

Fungsi

Pengisiandata VMIS

OT

ISP AnalisaKinerja Kapal

28

PelaksanaanVPD

26 – 27

PersiapanMateri

15 – 2614 – 15 13 (Next Month)

EvaluasiProses

AnalisaOperasional

Monitor Operasional Kapal danPenyimpanan Data/Dokumen

6Source : PMS Team Analysis; Interview

BOC

Charter

Own Fleet

Oversight

AnalisaPotensi Klaim

PembuatanAction Plan

PembuatanAction Plan

PembuatanAction Plan

SindikasiPerhitungan

KlaimPemanggilan

Owner

ProsesKlaim

PerbaikanKapal

PerbaikanKapal

Page 7: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

1. VPD Improvement Process ISP2. Implementasi New Master Cable BOC, OT3. Klaim slow pumping terintegrasi dengan VMIS BOC4. Monitoring Klaim Out Operation BOC5. Review Jadwal Docking Oversight/OF

Initiatives Departement

TIM LINTAS FUNGSI TELAH MERUMUSKAN BEBERAPA INISIATIF YANG AKAN DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN UNTUK MENDUKUNG PENINGKATAN KINERJA KAPAL

7

5. Review Jadwal Docking Oversight/OF6. Review Fixture Note Oversight/OF7. Penerapan Planned Maintenance System Oversight/OF8. Pembuatan Database Rekapitulasi Klaim Charter9. Support Pembuatan Database Klaim IT – SSA10.Online Dokumen Operasional IT – SSA

Seluruh inisiatif tersebut akan dievaluasi pelaksanaannya dalam rapat bulanan yang dilaksanakansetiap tanggal 13 dikoordinasikan oleh fungsi Implementasi Strategi Perkapalan.

Source : PMS Team Analysis; Interview

Page 8: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

Original Plan

Revised plan (delayed)

Jul Aug Sep Oct Nov Dec Jan

Identification

• Identify VMIS system improvement (parameter, report interface).

• Identify process, data flow, SOP, and priority for improvement.

• Update VMIS System (calculations &

Activity

• Update process flow, data flow,master cable

System Update

VMIS IMPROVEMENT UPDATEVMIS – Suwandi & Team Revised plan (accelerated)

• �������� � �� ��������� ���

�� �������������������� �� ���

������� ����

Achievements

�������� ����� �������

12/29/09

• Set up new VMIS system

• Trial run, getting feedback and update

• Revise SOP if needed

Trial Run and Ongoing

• Update VMIS System (calculations & Algorithms)

• Link to MySAP process

• Remapping required information in theVMIS that need to link

• Upgrade data from old VMIS to new VMIS.

Link to MySAP

8

������ ��

! ���� � �������� ����� �������

����"���#�������

• ������������� �����$��������

%& '()

• *����� ��#�� �����

• +���������� �������'���

Help needed

Source : VMIS Team

Page 9: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

Session Owner Time

Team’s Updates Team1330 – 1415

Individual Vessel Performance – Own Fleet

Own Fleet & Oversight1415 – 1445

VESSEL PERFORMANCE DIALOGUE AGENDA

Individual vessel performance – Charter Fleet Charter1445 – 1530

9

Page 10: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –OWN BL

OWN BL NOVEMBER 2009 PERFORMANCE

No Vessel Name

S190

85

80

75

70

Average= 87

1 / (Age of vessel)

Poor performing high cost vessels

PMS Score *On a scale of 100 S1 PANDAN

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

10*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

0 2,500 5,000 7,500 10,000 12,500 15,000 17,500 20,000

70

65

60

55

50

Average= 11,448

Operating costs**IDR/LT/day

Page 11: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –OWN SM I

OWN SM I NOVEMBER 2009 PERFORMANCE

No Vessel Name

S6

S1

S2

S3S4S5

100

95

90

85

80

75

Average= 87

1 / (Age of vessel)

Poor performing high cost vessels

PMS Score *On a scale of 100 S1 MANGUN JAYA

S2 MELAHIN

S3 MENGGALA

S4 MERBAU

S5 MINAS

S6 MUNDU

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

11*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

0 2,500 5,000 7,500 10,000 12,500 15,000 17,500 20,000

75

70

65

60

55

50

Average= 9,495

Operating costs**IDR/LT/day

Page 12: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT MELAHIN

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 0.00 0.00 100.00 55.96

Comm. Days

65.70

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: LUWUK• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN SM I

9353.068442.09

PRELIMINARY

Type (& Ownership): SM I (OWN)Flag: INDWT: 3,500 LTYOB (Age): 1985 (24 years)Safety Ranking: Bunker Type: MDOCargo Type: WO

Programmer : PUTU D.(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

5

Customer feedback

Budget

PIC:HARRIE SETIARDJO

12

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

4792.84 9353.067476.67 8442.09

0

0

0

1

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(30.77)

Fleetave.

(11.0)

00

16

73

632

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 13: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

10 11 12MelahinR2 Loss : Berdasar data VMIS 8 call di atas 0,1%. Setelah di cek terhadap data SPR tidak terdapat loss di atas 0,1%. Setelah dibandingkan data VMIS dengan SPR, angkanilai SFAL pada VMIS sama dengan angka BL, sedangkan pada SPR tidak. Action Plan : perbaikan data, kirim nota pemberitahuan bila terjadi loss.

OT BBMBOCFleet Supp.

Vessel Speed : Berdasar data VMIS 8 call tercatat slow speed. Setelah dibandingkandengan data SPR untuk call tersebut memang terjadi slow speed. Pelayaran pada saatperiode tersebut berada di line timur dengan kondisi angin 4 skala beaufort. Action Plan : monitor pergerakan kapal.

OT BBMTech. FleetFleet Supp.

Activity Responsible

ACTION PLANDeadlinePrevious Month

13

Page 14: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –OWN SM II

OWN SM II NOVEMBER 2009 PERFORMANCE

No Vessel Name

A8

S1

S4

S5

S2

S6

S7100

95

90

85

80

75

Average= 84

1 / (Age of vessel)

Poor performing high cost vessels

PMS Score *On a scale of 100 S1 KATOMAS

S2 KETALING

S3 KLASOGUN

S4 KLAWOTONG

S5 KRASAK

S6 KUANG

S7 KURAU

A8 PLAJU

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

14*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

S3

0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000

75

70

65

60

55

50

Average= 10,409

Operating costs**IDR/LT/day

Page 15: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT KETALING

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 0.00 31.58 91.53 77.05

Comm. Days

74.19

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: TELUK SEMANGKA -

DEPOT• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN SM II

45897.9510842.2

PRELIMINARY

Type (& Ownership): SM II (OWN)Flag: PADWT: 6,500 LTYOB (Age): 1998 (11 years)Safety Ranking: Bunker Type: MDOCargo Type: BO

Programmer : ABIDIN S.(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

3

Customer feedback

Budget

PIC:LUKITO WIBOWO

15

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3226.67 45897.9514422.5310842.2

0

0

0

3

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(40.74074)

Fleetave.

(16.10113)

00

74

3

2034

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 16: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT KLASOGUN

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

94.28 90.91 23.66 4.91 61.25

Comm. Days

65.88

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: BENOA• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN SM II

45897.957467.92

PRELIMINARY

Type (& Ownership): SM II (OWN)Flag: PADWT: 6,500 LTYOB (Age): 1999 (10 years)Safety Ranking: Bunker Type: MDOCargo Type: WO

Programmer : HARI NUNU G. B.(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

4

Customer feedback

Budget

PIC:FERRY F.

16

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3226.67 45897.9514422.537467.92

0

0

0

1

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(40.74074)

Fleetave.

(16.10113)

02

11

141328

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 17: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT PLAJU

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 92.65 0.00 76.10 82.27

Comm. Days

79.56

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: KENDARI• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN SM II

3226.67 45897.9510466.83

PRELIMINARY

Type (& Ownership): SM II (OWN)Flag: PADWT: 6,500 LTYOB (Age): 2004 (5 years)Safety Ranking: Bunker Type: MDOCargo Type: AVTUR

Programmer : ASEP S.(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

9

Customer feedback

Budget

PIC:DWI M. ABDU

17

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3226.67 45897.9514422.5310466.83

0

0

0

2

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(40.74074)

Fleetave.

(16.10113)

00

8

64

1129

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 18: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

121110Activity

IT – SSABOCTech. FleetFleet Supp.

Vessel Speed : Berdasar data VMIS terdapat 5 call slow speed. Setelah di cek dengandata SPR untuk voyage tersebut memang terjadi slow speed namun dalam nilai yang sangat kecil. Pada data VMIS terjadi slow speed yang sangat besar akibat perbedaanjarak yang dicatat pada VMIS dengan SPR.

VMIS SPRttm - cam 184 195cam - twi 40 105

IT – SSAOT CrudeBOCOversight

Klasogun

Vessel Speed : terjadi slow speed yang besar saat perjalanan dari CLC ke DUM denganwaktu tempuh mencapai 3 hari (jarak tempuh CLC-DUM 997 Mil).Action Plan : perlu dicek kemungkinan terjadinya error jarak tempuh; analisa ulang dankirim pemberitahuan apabila masih terjadi slow speed.

BOCOversight

R2 Loss : terdapat 1 call dengan loss 0.97% saat bongkar cargo MFO di BTM (voy 29).Action Plan : akan dikirimkan nota pemberitahuan terjadinya loss.

KetalingResponsible

ACTION PLANDeadlinePrevious Month

BOCOversight

Vessel Speed : akibat masalah pada M/E cylinder liner.Action Plan : Saat ini Cylinder Liner telah diganti pada bulan Dec. 09 di TTW.

Plaju

OT BBMBOCTech. FleetFleet Supp.

Pumping Rate : Berdasar data VMIS terdapat 2 kejadian slow pump yaitu pada saatmelakukan pembongkaran di benoa dan ampenan karena kondisi tanki darat di benoatinggi dan jauh.Action Plan : Monitor kegiatan bongkar cargo di Benoa; koordinasi dengan Port danMarine untuk tindak lanjut perbaikan slow pump di Benoa.

cam - twi 40 105bno - amp 45 56Action Plan : Perbaikan data jarak dalam VMIS; cek ulang call yang mengalami slow speed setelah dilakukan perbaikan jarak dan kirimkan nota perbaikan.

18

Page 19: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –OWN GP

OWN GP NOVEMBER 2009 PERFORMANCE

No Vessel Name

S3

S4

S2S5

S6

100

95

90

85

80

75

Average= 85

1 / (Age of vessel)

Poor performing high cost vessels

PMS Score *On a scale of 100 S1 PALU SIPAT

S2 PALUH TABUHAN

S3 PEGADEN

S4 PELITA

S5 PEMATANG

S6 PUNGUT

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

19*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

S1

0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000

75

70

65

60

55

50

Average= 8,112

Operating costs**IDR/LT/day

Page 20: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT PALU SIPAT

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 0.00 41.67 0.00 100.00

Comm. Days

70.72

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: BALIKPAPAN• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN GP

12181.763631.04

PRELIMINARY

Type (& Ownership): GP (OWN)Flag: INDWT: 17,674 LTYOB (Age): 2000 (9 years)Safety Ranking: Bunker Type: MFO MDOCargo Type: BO

Programmer : ABIDIN S.(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

6

Customer feedback

Budget

PIC:LUKITO WIBOWO

20

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3320.48 12181.766247.57

0

0

0

0

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(55)

Fleetave.

(15.59555)

006

112

1434

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 21: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT PEGADEN

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 0.00 58.61 84.73 100.00

Comm. Days

82.83

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: TANJUNG WANGI• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN GP

12181.764766.23

PRELIMINARY

Type (& Ownership): GP (OWN)Flag: INDWT: 17,500 LTYOB (Age): 1988 (21 years)Safety Ranking: Bunker Type: MFO MDOCargo Type: WO

Programmer : KAMIL(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

7

Customer feedback

Budget

PIC:HERU HUTOMO

21

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3320.48 12181.766247.574766.23

0

0

0

0

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(55)

Fleetave.

(15.59555)

00

9

41

519

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 22: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT PELITA

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 0.00 0.00 77.54 100.00

Comm. Days

74.92

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: TANJUNG WANGI• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN GP

12181.76

PRELIMINARY

Type (& Ownership): GP (OWN)Flag: INDWT: 17,723 LTYOB (Age): 1981 (28 years)Safety Ranking: Bunker Type: MFO MDOCargo Type: BO

Programmer : ABIDIN S.(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

8

Customer feedback

Budget

PIC:LUKITO WIBOWO

22

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

12181.766247.573320.48

0

0

0

0

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(55)

Fleetave.

(15.59555)

004

8

6

1129

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 23: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

12109 11Activity

PegadenR2 Loss : terdapat 2 call dengan loss tinggi yaitu 0.80% saat bongkar cargo Premium di TTM (voy 28) dan 0.85% saat bongkar cargo Pertamax di SMR (voy 29)Action Plan : akan dikirimkan nota pemberitahuan terjadinya loss.

Pumping Rate : terjadi slow pump akibat posisi tanki darat yang tinggi menyebabkanBack pressure, namun dari sisi tekanan sudah mencapai standar (9 kg/cm2). Action Plan : monitor kegiatan kapal di pelabuhan.

BOCOversight

Pelita

Responsible

BOCOversight

Vessel Speed : slow speed terjadi akibat adanya masalah di Main Engine.Action Plan : akan dilakukan perbaikan saat melaksanakan dry dock.

OT BBMBOCOversight

BOCOversight

R2 Loss : 1 call dengan loss sebesar 0.78% saat bongkar MFO di BPP (voy 19).Action Plan : akan dikirimkan nota pemberitahuan terjadinya loss.

Palu Sipat

R2 Loss : Berdasar data VMIS terdapat 3 call dengan loss lebih dari 0,1%. Setelahdilakukan check terhadap data SPR ternyata tidak terdapat loss lebih dari 0,1%. Loss

OT Crude

ACTION PLANDeadlinePrevious Month

OT CrudeBOCTech FleetFleet Supp.

dilakukan check terhadap data SPR ternyata tidak terdapat loss lebih dari 0,1%. Loss lebih dari 0,1% kemungkinan disebabkan kesalahan input pada data VMIS, dimanaangka SFAL sama dengan BL. Action Plan : perbaikan data, kirim nota pemberitahuan bila terjadi loss.

BOCFleet Supp.

Vessel Speed : Berdasar data VMIS terdapat 4 call slow speed. Setelah dibandingkanterhadap data SPR memang terdapat slow speed untuk call tersebut. Sudah dilakukankonfirmasi pada OS bahwa memang slow speed terjadi karena penggumpalan kotorandi economizer sehingga aliran gas buang tidak lancar.Action Plan : Saat ini sedang dilakukan proses pembersihan hanya saja belum optimal mengingat kapal sangat mobile untuk memenuhi kebutuhan operasi

23

Page 24: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –OWN MR

OWN MR NOVEMBER 2009 PERFORMANCE

No Vessel Name

S3

S2

S5

S7

S6

R1

90

85

80

75

70

Average= 80

1 / (Age of vessel)

Poor performing high cost vessels

PMS Score *On a scale of 100 R1 CENDRAWASIH

S2 ENDURO

S3 FASTRON

S4 SANGA-SANGA

S5 SELE

S6 SEPINGGAN

S7 SERANG JAYA

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

24*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

S4

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000

70

65

60

55

50

Average= 3,406

Operating costs**IDR/LT/day

Page 25: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT SANGA-SANGA

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 91.79 0.00 40.11 50.00

Comm. Days

66.48

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: BALIKPAPAN• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN MR

4179.23

PRELIMINARY

Type (& Ownership): MR (OWN)Flag: INDWT: 29,944 LTYOB (Age): 1983 (26 years)Safety Ranking: Bunker Type: MFO MDOCargo Type: WO

Programmer : HARIS A. S.(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

10

Customer feedback

Budget

PIC:HERU HUTOMO

25

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

1902.87 4179.232840.01 2944.71

0

0

0

2

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(70.45454)

Fleetave.

(19.80107)00

6

46217

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 26: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT SELE

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 94.95 44.23 0.00 79.48

Comm. Days

75.33

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: BALONGAN• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN MR

4179.232240.88

PRELIMINARY

Type (& Ownership): MR (OWN)Flag: INDWT: 29,990 LTYOB (Age): 1983 (26 years)Safety Ranking: Bunker Type: MFO MDOCargo Type: WO

Programmer : HARIS A. S.(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

11

Customer feedback

Budget

PIC:HERU HUTOMO

26

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

1902.87 4179.232840.012240.88

0

0

0

3

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(70.45454)

Fleetave.

(19.80107)00

5

161627

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 27: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT SEPINGGAN

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 89.75 20.98 0.00 92.56

Comm. Days

75.52

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: SURABAYA• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN MR

4179.23

PRELIMINARY

Type (& Ownership): MR (OWN)Flag: INDWT: 29,941 LTYOB (Age): 1982 (27 years)Safety Ranking: Bunker Type: MFO MDOCargo Type: WO

Programmer : HARIS A. S.(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

12

Customer feedback

Budget

PIC:HERU HUTOMO

27

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

1902.87 4179.232840.01 4037.57

0

0

0

2

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(70.45454)

Fleetave.

(19.80107)00

2

132

926

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 28: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

117 8 9 10 12

BOCFleet Supp.Tech. Fleet

Activity Responsible

OT BBMBOCFleet Supp.Tech. Fleet

Sanga-SangaVessel Speed : terdapat 1 call yang mengalami slow speed saat perjalanan dari BAL keSBY dengan waktu tempuh hingga 5 hari dari yang seharusnya hanya +1 hari. Action Plan : perlu dilakukan pengecekan data VMIS, kemungkinan terjadi salah input; Namun bila terjadi slow speed, perlu dicek penyebab keterlambatan kapal.Pumping Rate : terdapat 3 call yang mengalami slow pump, antara lain saat bongkardi SBY cargo Solar dan BAL cargo Naptha (voy. 30), di JKT cargo Solar (Voy. 31).Action Plan : dicek data historis disch kapal Sanga-sanga dan akan dicari penyebabnya.SeleVessel Speed : Berdasar data VMIS terdapat 5 call slow speed. Berdasarkan data SPR hanya satu kali terjadi slow speed pada awal bulan dengan selisih yang tidak terlalu jauhdari target. Problem pada gyro repeater sehingga kemudi harus digerakkan manual.Action Plan : Akan segera dilakukan perbaikan Gyro repeater.

BOCFleet Supp.Tech. Fleet

Pumping Rate : dari data VMIS terdapat 3 kejadian slow pump. Berdasarkanpada SPR tidak terjadi kejadian slow pump. Kemungkinan pencatatan slow pump karena request

Fleet Supp.

ACTION PLANDeadlinePrevious Month

tidak terjadi kejadian slow pump. Kemungkinan pencatatan slow pump karena request pihak darat yang lebih rendah dan adanya temporary stop. Action Plan : meningkatkan kinerja kapal melalui koordinasi dengan Master kapal; monitor pergerakan kapal.

Tech. FleetOT BBM

Sepinggan : Vessel Speed : Berdasar data VMIS tercatat 4 call slow speed, setelah dibandingkanterhadap data SPR terdapat perbedaan jarak yang signifikan antara VMIS dengan SPR :clc - sby � data VMIS : 556 mil sedangkan SPR : 582 milxpn - ttw � data VMIS : 882 mil sedangkan SPR : 958 milAction Plan : perbaikan data jarak; apabila terdapat loss speed, akan dikirimkan nota pemberitahuan terjadinya slow speed.

IT PKPOT BBMBOCFleet Supp.

Pumping Rate : Berdasar data VMIS terdapat 2 kejadian slow pump. Setelah dilakukancheck terhadap data SPR tidak terdapat kejadian slow pump. Perbedaan kemungkinandisebabkan karena adanya perbedaan jumlah kargo yang dibongkar. Action Plan : konsolidasi data VMIS dan SPR untuk mencari perbedaan dan penyebabslow pumping; monitor pergerakan kapal.

OT BBMBOCFleet Supp.

28

Page 29: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –OWN LR

OWN LR NOVEMBER 2009 PERFORMANCE

No Vessel Name

R2

90

85

80

75

70

65

1 / (Age of vessel)

Poor performing high cost vessels

PMS Score *On a scale of 100 R1 GEBANG (FSO)

R2 GEUDONDONG

S3 GUNUNG KEMALA

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

29*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

R1

S3

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000

65

60

55

50

45

40

Average= 1,790

Average= 62

Operating costs**IDR/LT/day

Page 30: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT GUNUNG KEMALA

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 100.00 0.00 66.86 0.00

Comm. Days

57.02

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: DUMAI• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – OWN LR

7826.41

PRELIMINARY

Type (& Ownership): LR (OWN)Flag: INDWT: 86,962 LTYOB (Age): 1986 (23 years)Safety Ranking: Bunker Type: MFO MDOCargo Type: WO

Programmer : DACHLAN H.(If charter) Owner: PERTAMINA(If charter) Charter Type: M(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

2

Customer feedback

Budget

PIC:SISWOYO

30

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

1429.67 7826.413838.23 7826.41

0

0

0

0

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(20)

Fleetave.

(20.18072)00

1

31

510

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD -

Page 31: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

9 10 11 12

OT CrudeBOCFleet Supp.

Bunker Cons : dari total 3 call di bulan November 2009, 2 call data bunker ROB ATA danATD-nya masih belum terisi.Action Plan : lengkapi data ROB bunker, kirim nota pemberitahuan perbaikan apabila adaover consumption bunker.

ActivityGunung KemalaVessel Speed : Berdasar data VMIS terdapat 2 call slow speed. Kemungkinan karena adaperbedaan jarak standar dengan jarak aktual kapalAction Plan : koreksi angka jarak yang tercantum di VMIS; kirimkan pemberitahuan bilatetap terjadi kasus slow speed.

IT PKPBOCFleet Supp.

Responsible

ACTION PLANDeadlinePrevious Month

31

Page 32: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

Session Owner Time

Team’s Updates Team1330 – 1415

Individual Vessel Performance – Own Fleet

Own Fleet & Oversight1415 – 1445

VESSEL PERFORMANCE DIALOGUE AGENDA

Individual vessel performance – Charter Fleet Charter1445 – 1530

32

Page 33: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –CHARTER BL

CHARTER BL NOVEMBER 2009 PERFORMANCE

No Vessel Name

S9

S10S11 S1

S2

S3

S4

S7

S12

S13

S15

S16

100

95

90

85

80

75

70

Average= 77

Days to go before charter party expiry/renewalPoor performing high cost vessels

PMS Score *On a scale of 100 S1 ADHITAMA X

S2 CINTA BANGSA

S3 DUTA SELATAN

S4 HAIYIN III

S5 L. SINAR

S6 LAUTAN - I

S7 PELUMIN SATU

S8 PRIMA TANKER

S9 PUTERI DEWI SUB PUTERI JELITA

S10 PUTERI DUA

S11 PUTERI JELITA

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

33*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

S17S5

S8

S6

S14

0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000

70

65

60

55

50

45

40

Average= 18,569

Operating costs**IDR/LT/day

S12 PUTERI JUWITA

S13 SANTANA

S14 SATRIA SATU

S15 SOECHI CHEMICAL V

S16 TOWO ARYO

S17 TRIAKSA 15

Page 34: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT L. SINAR

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 51.93 0.00 100.00 20.23

Comm. Days

61.44

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: TANJUNG GEREM \

BOJONEGARA• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER BL

27298.9

PRELIMINARY

Type (& Ownership): BL (CHARTER)Flag: INDWT: 1,418 LTYOB (Age): 1992 (17 years)Safety Ranking: -Bunker Type: HSDCargo Type: WO

Programmer : HARRY T.(If charter) Owner: LAUTAN TERANG(If charter) Charter Type: TC(If charter) Charter Expiry: 18/Apr/10

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

16

Customer feedback

Budget

PIC:FERRY F.

34

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

10830.29 27298.918569.9 21624.77

6

0

0

2

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(39.74)

Fleetave.

(12.16)

00

64

4

924

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: 18/Apr/10(If charter) Mnth Chart. Rate: - USD 40,500

Page 35: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT LAUTAN - I

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 70.92 0.00 97.92 19.82

Comm. Days

63.05

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: PEKANBARU• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER BL

27298.9

PRELIMINARY

Type (& Ownership): BL (CHARTER)Flag: INDWT: 1,100 LTYOB (Age): 1981 (28 years)Safety Ranking: -Bunker Type: HSDCargo Type: WO

Programmer : A. WENAS(If charter) Owner: LAUTAN TERANG(If charter) Charter Type: TC(If charter) Charter Expiry: 1/Dec/09

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

17

Customer feedback

Budget

PIC:FERRY F.

35

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

10830.29 27298.918569.9

3

0

0

1

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(39.74)

Fleetave.

(12.16)

00

9

63

927

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: 1/Dec/09(If charter) Mnth Chart. Rate: - USD 31,800

Page 36: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT SATRIA SATU

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

77.67 56.97 0.00 100.00 0.00

Comm. Days

47.86

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: AMBON• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER BL

27298.9

PRELIMINARY

Type (& Ownership): BL (CHARTER)Flag: SIDWT: 1,857 LTYOB (Age): 1997 (12 years)Safety Ranking: -Bunker Type: MFO MDOCargo Type: WO

Programmer : PUTU D.(If charter) Owner: BUT. SATRIA

SAMUDRA(If charter) Charter Type: LTTC3

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

25

Customer feedback

Budget

PIC:HARRIE SETIARDJO

36

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

10830.29 27298.918569.9 24525.38

7

16

0

3

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(39.74)

Fleetave.

(12.16)

0

75

53

822

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: LTTC3(If charter) Charter Expiry: 1/Dec/09(If charter) Mnth Chart. Rate: - USD 54,755

Page 37: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT TOWO ARYO

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 43.72 28.10 100.00 46.52

Comm. Days

71.07

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: DUMAI• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER BL

27298.9

PRELIMINARY

Type (& Ownership): BL (CHARTER)Flag: INDWT: 1,530 LTYOB (Age): 1996 (13 years)Safety Ranking: -Bunker Type: HSDCargo Type: WO

Programmer : A. WENAS(If charter) Owner: PELUMIN PT.(If charter) Charter Type: LTTC2(If charter) Charter Expiry: 1/Dec/09

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

28

Customer feedback

Budget

PIC:FERRY F.

37

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

10830.29 27298.918569.9

5

0

0

2

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(39.74)

Fleetave.

(12.16)

00

13

72

1234

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: 1/Dec/09(If charter) Mnth Chart. Rate: - USD 71,700

Page 38: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT TRIAKSA 15

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 59.33 0.00 100.00 19.14

Comm. Days

61.91

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: DUMAI• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER BL

27298.9

PRELIMINARY

Type (& Ownership): BL (CHARTER)Flag: INDWT: 1,501 LTYOB (Age): 1993 (16 years)Safety Ranking: -Bunker Type: MDO HSDCargo Type: WO

Programmer : A. WENAS(If charter) Owner: TRIDARMA WAHANA

PT.(If charter) Charter Type: LTTC2

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

29

Customer feedback

Budget

PIC:FERRY F.

38

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

10830.29 27298.918569.9 24939.14

7

0

0

2

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(39.74)

Fleetave.

(12.16)

00

10

73

930

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: LTTC2(If charter) Charter Expiry: 1/May/10(If charter) Mnth Chart. Rate: - USD 66,000

Page 39: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

76 12111098L. SinarVessel Speed : terdapat 8 call mengalami slow speed; data sudah dianalisa namunbelum dapat diverifikasi dengan dokumen Master Cable.Action Plan : akan dilakukan verifikasi dan kemudian dikirimkan ke K&A.

BOCK&A/Pengad.

Bunker Cons : terdapat 13 call mengalami over bunker; data sudah dianalisa namunbelum dapat diverifikasi dengan dokumen Master Cable.Action Plan : akan dilakukan verifikasi dan kemudian dikirimkan ke K&A.

Lautan – I

Activity Responsible

Direncanakan akan dilakukan pemanggilan pada minggu 2-3 Januari 2010(sambil menunggu klarifikasi dari BOC)

BOCK&A/Pengad.

Bunker Cons : terdapat 9 call mengalami over bunker; data sudah dianalisa namunbelum dapat diverifikasi dengan dokumen Master Cable.Action Plan : akan dilakukan verifikasi dan kemudian dikirimkan ke K&A.

BOCK&A/Pengad.

Vessel Speed : terdapat 9 call mengalami slow speed; data sudah dianalisa namunSatria Satu

ACTION PLANDeadlinePrevious Month

Direncanakan akan dilakukan pemanggilan pada minggu 4 Desember 2009 atauawal tahun 2010 (sambil menunggu klarifikasi dari BOC)Towo AryoR2 Loss : Voy 74 rute TUB-PLB kargo ADO berpotensi R2 loss.Action Plan : saat ini dalam proses kalkulasi dan pengajuan klaim.

BOCK&A/Pengad.

Bunker Cons : telah dianalisa dan terdapat potensi 11 call mengalami over bunker.Action Plan : akan dilakukan check Master Cable dan kemudian dikirimkan ke K&A.

BOCK&A/Pengad.

Direncanakan akan dilakukan pemanggilan pada minggu 2-3 Januari 2010(sambil menunggu klarifikasi dari BOC)

BOCK&A/Pengad.

Bunker Cons : terdapat 9 call mengalami over bunker; data sudah dianalisa namunbelum dapat diverifikasi dengan dokumen Master Cable.Action Plan : akan dilakukan verifikasi dan kemudian dikirimkan ke K&A.

BOCK&A/Pengad.

Vessel Speed : terdapat 9 call mengalami slow speed; data sudah dianalisa namunbelum dapat diverifikasi dengan dokumen Master Cable.Action Plan : akan dilakukan verifikasi dan kemudian dikirimkan ke K&A.

39

Page 40: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

109876 1211

Triaksa 15

Bunker Cons : terdapat 15 call mengalami over bunker; data sudah dianalisa namunbelum dapat diverifikasi dengan dokumen Master Cable.Action Plan : akan dilakukan verifikasi dan kemudian dikirimkan ke K&A.

BOCK&A/Pengad

Activity Responsible

ACTION PLANDeadlinePrevious Month

40

Page 41: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –CHARTER SM I

CHARTER SM I NOVEMBER 2009 PERFORMANCE

No Vessel Name

S1

S10

S13

A8T2

R20

S11

A19A7

S9

S14

S3

S4

S15S16

S17

S18 A21

100

95

90

85

80

75

70

Average= 78

Days to go before charter party expiry/renewalPoor performing high cost vessels

PMS Score *On a scale of 100 S1 ANGELIA XVI

T2 ASIAN OIL I

S3 CAMAR MAS

S4 CAMAR SAKTI

S5 CITRA BINTANG EX PAN OIL IX

S6 DASA SAMUDERA

A7 DEWA YANI

A8 DEWI SRI

S9 EASTERN BRIGHT VI

S10 KERTA DUA

S11 LAJU PRAKARSA IV

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

41*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

A8

S5

S6

S12

0 2,500 5,000 7,500 10,000 12,500 15,000 17,500 20,000

70

65

60

55

50

45

40

Average= 14,323

Operating costs**IDR/LT/day

S11 LAJU PRAKARSA IV

S12 LAJU PRAKARSA V

S13 PAN CORAL

S14 PATRIA 68

S15 PATRIA 88

S16 PRIBUMI

S17 PUTERI ELOK

S18 SERENA II

A19 SHINTA

R20 SILVIA XII

A21 SOECHI PRESTASI

Page 42: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT ASIAN OIL I

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 31.85 42.40 0.00 82.02

Comm. Days

69.25

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: TANJUNG PRIOK• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM I

19222.23

PRELIMINARY

Type (& Ownership): SM I (CHARTER)Flag: SIDWT: 4,879 LTYOB (Age): 1991 (18 years)Safety Ranking: -Bunker Type: MDOCargo Type: NBBM

Programmer : ASEP S.(If charter) Owner: BUMI PERKASA

BAHTERA(If charter) Charter Type: TC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

5

Customer feedback

Budget

PIC:DWI M. ABDU

42

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

9343.03 19222.2314323.44 15533.8

3

0

20

1

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(43.78)

Fleetave.

(10.9)

00

6

141

728

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TC(If charter) Charter Expiry: 10/Apr/10(If charter) Mnth Chart. Rate: - USD 97,500

Page 43: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT CITRA BINTANG EX PAN OIL IX

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

79.71 53.89 42.49 0.00 17.50

Comm. Days

46.28

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: MERAUKE• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM I

19222.2314323.44

PRELIMINARY

Type (& Ownership): SM I (CHARTER)Flag: INDWT: 2,472 LTYOB (Age): 1981 (28 years)Safety Ranking: -Bunker Type: HSDCargo Type: WO

Programmer : PUTU D.(If charter) Owner: PAN MARITIM WIRA

PAWITRA(If charter) Charter Type: TC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

7

Customer feedback

Budget

PIC:HARRIE SETIARDJO

43

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

9343.03 19222.2314323.4415207.58

2

9

1

3

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(43.78)

Fleetave.

(10.9)

0

6741

1022

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TC(If charter) Charter Expiry: 1/Jan/10(If charter) Mnth Chart. Rate: - USD 34,434

Page 44: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT DASA SAMUDERA

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 12.69 10.30 0.00 0.00

Comm. Days

41.26

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: TANJUNG UBAN• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM I

19222.23

PRELIMINARY

Type (& Ownership): SM I (CHARTER)Flag: PADWT: 3,500 LTYOB (Age): 1998 (11 years)Safety Ranking: -Bunker Type: MDO HSDCargo Type: WO

Programmer : ASEP S.(If charter) Owner: HUMPUSS

INTERMODA TRANS(If charter) Charter Type: TC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

8

Customer feedback

Budget

PIC:DWI M. ABDU

44

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

9343.03 19222.2314323.44 16182.57

6

0

5

3

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(43.78)

Fleetave.

(10.9)

00

13

72728

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TC(If charter) Charter Expiry: 1/Dec/09(If charter) Mnth Chart. Rate: - USD 105,012

Page 45: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT DEWA YANI

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 13.92 45.52 38.58 82.26

Comm. Days

72.42

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: CILACAP• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM I

19222.2316191.33

PRELIMINARY

Type (& Ownership): SM I (CHARTER)Flag: PADWT: 3,542 LTYOB (Age): 1998 (11 years)Safety Ranking: -Bunker Type: MDOCargo Type: AVTUR

Programmer : ASEP S.(If charter) Owner: DEWAYANI MARITIME

Pte Ltd.(If charter) Charter Type: LTTC4

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

9

Customer feedback

Budget

PIC:DWI M. ABDU

45

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

9343.03 19222.2314323.4416191.33

9

0

4

1

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(43.78)

Fleetave.

(10.9)

00

6

102

1633

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: LTTC4(If charter) Charter Expiry: 2/Feb/10(If charter) Mnth Chart. Rate: - USD 119,791

Page 46: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT DEWI SRI

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 41.94 15.37 5.29 82.80

Comm. Days

67.88

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: BENOA• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM I

19222.2314715.68

PRELIMINARY

Type (& Ownership): SM I (CHARTER)Flag: PADWT: 3,542 LTYOB (Age): 1999 (10 years)Safety Ranking: -Bunker Type: MDO HSDCargo Type: AVTUR

Programmer : ASEP S.(If charter) Owner: DEWI SRI MARITIME

Pte Ltd.(If charter) Charter Type: LTTC4

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

10

Customer feedback

Budget

PIC:DWI M. ABDU

46

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

9343.03 19222.2314323.4414715.68

8

0

7

1

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(43.78)

Fleetave.

(10.9)

00

8

102

1030

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: LTTC4(If charter) Charter Expiry: 24/Apr/10(If charter) Mnth Chart. Rate: - USD 117,991

Page 47: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT PATRIA 68

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 58.19 67.70 0.00 64.25

Comm. Days

70.23

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: AMBON• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM I

19222.23

PRELIMINARY

Type (& Ownership): SM I (CHARTER)Flag: INDWT: 2,125 LTYOB (Age): 1980 (29 years)Safety Ranking: -Bunker Type: MDO HSDCargo Type: WO

Programmer : PUTU D.(If charter) Owner: SUMBER KENCANA

PATRIA PT.(If charter) Charter Type: TC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

20

Customer feedback

Budget

PIC:HARRIE SETIARDJO

47

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

9343.03 19222.2314323.44 18132.8

2

0

2

2

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(43.78)

Fleetave.

(10.9)

004

71

1628

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TC(If charter) Charter Expiry: 10/Jan/10(If charter) Mnth Chart. Rate: - USD 43,200

14323.44

Page 48: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT SHINTA

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 50.21 33.57 85.50 51.19

Comm. Days

71.94

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: BALIKPAPAN• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM I

19222.23

PRELIMINARY

Type (& Ownership): SM I (CHARTER)Flag: INDWT: 3,642 LTYOB (Age): 1997 (12 years)Safety Ranking: -Bunker Type: MDO HSDCargo Type: AVTUR

Programmer : ASEP S.(If charter) Owner: APOL CEMERLANG(If charter) Charter Type: LTTC3(If charter) Charter Expiry: 28/Feb/10

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

27

Customer feedback

Budget

PIC:DWI M. ABDU

48

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

9343.03 19222.2314323.44 18894.73

7

0

1

2

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(43.78)

Fleetave.

(10.9)

00

952

1128

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: 28/Feb/10(If charter) Mnth Chart. Rate: - USD 116,550

Page 49: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

96 7 10 11 128

Direncanakan akan dilakukan pemanggilan pada minggu 3-4 Desember 2009 atau awal Januari 2010 (sambil menunggu klarifikasi dari BOC)

Pumping Rate : telahdilakukan analisa yaitu terdapat 3 call potensi klaim slow pump, namun belum dapat diajukan karena masih butuh data pendukung.Action Plan : akan dilakukan pemberitahuan ke Marine Unit via fax.

BOCK&A/Pengad

Vessel Speed : telah diverifikasi, terdapat 5 call yang mengalami slow speed.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

Citra Bintang Ex Pan Oil IX

Asian Oil IR2 Loss : Voy 31 CLC-TPK cargo HVI 160S dan Voy 31 CLC-TPK cargo HVI 60terdapat potensi loss.Action Plan : saat ini dalam proses checking Master Cable

ResponsibleActivity

Pumping Rate : telah dianalisa dan terdapat 4 call yang potensi klaim slow pump. BOC

BOCK&A/Pengad

BOCK&A/Pengad.

Vessel Speed : telah diverifikasi, terdapat 2 call yang mengalami slow speed.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

BOCK&A/Pengad

ACTION PLANDeadlinePrevious Month

Vessel Speed : telah dilakukan analisa dan terdapat 5 call mengalami slow speed.Action Plan : akan diajukan sebagai klaim slow speed.

Shinta

Direncanakan akan dilakukan pemanggilan pada minggu 1-2 Januari 2010(sambil menunggu klarifikasi dari BOC)

Direncanakan akan dilakukan pemanggilan pada minggu 3-4 Januari 2010(sambil menunggu klarifikasi dari BOC)

Pumping Rate : telah dianalisa dan terdapat 4 call yang potensi klaim slow pump. Namun belum dapat diajukan klaimnya karena masih butuh data Pendukung.Action Plan : akan dilakukan permintaan data ke Marine Unit.

BOCK&A/Pengad

Pumping Rate : telah dilakukan kajian, terdapat 6 call berpotensi klaim.Action Plan : telah dikirimkan permintaan data pendukung ke Marine Unit.

BOCK&A/Pengad

Bunker Cons : telah diverifikasi, terdapat 4 call yang mengalami over bunker.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

BOCK&A/Pengad

Patria 68

BOCK&A/Pengad

49

Page 50: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

11 127 8 9 106

BOCK&A/Pengad

Dasa SamuderaR2 Loss : Voy 9 CLC-BNO Avtur berpotensi loss.Action Plan : saat ini dalam proses checking Master Cable

BOCK&A/Pengad.

Vessel Speed : telah diverifikasi, terdapat 5 call yang mengalami slow speed.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.Pumping Rate : telahdilakukan analisa yaitu terdapat 2 call potensi klaim slow pump, namun belum dapat diajukan karena masih butuh data pendukung.Action Plan : akan dilakukan pemberitahuan ke Marine Unit via fax.Bunker Cons : telah diverifikasi, terdapat 5 call yang mengalami over bunker.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.Dewa YaniR2 Loss : Voy 39 rute CLC-BNO Avtur dan Voy 41 Call 3 rute AMP-KUP berpotensiklaim R2 loss.Action Plan : dalam proses ditindaklanjuti ke dalam bentuk klaim.

BOCK&A/Pengad

Vessel Speed : telah dianalisa dan terdapat 5 call yang potensi klaim slow speed. BOC

BOCK&A/Pengad

BOCK&A/Pengad

ResponsibleActivity

ACTION PLANDeadlinePrevious Month

Dewi Sri

Vessel Speed : telah dianalisa dan terdapat 5 call yang potensi klaim slow speed. Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

BOCK&A/Pengad

Pumping Rate : telahdilakukan analisa yaitu terdapat 7 call potensi klaim slow pump, namun belum dapat diajukan karena masih butuh data pendukung.Action Plan : akan dilakukan pemberitahuan ke Marine Unit via fax.

R2 Loss : Voy 30 Call 1 dan 2 CLC-BNO-AMP Avtur dan Voy 31 CLC-BNO Avturterdapat potensi Loss . Adapun Data Disch Voy 32 CLC-BNO Avtur belum diinput.Action Plan : dalam proses pengajuan klaim, check Master Cable; input data padaVoy 32.

BOCK&A/Pengad

Vessel Speed : telah dilakukan analisa dan terdapat 7 call mengalami slow speed.Action Plan : akan diajukan sebagai klaim slow speed.

OT CrudeBOCK&A/Pengad

BOCK&A/Pengad

Pumping Rate : telahdilakukan analisa yaitu terdapat 5 call potensi klaim slow pump, namun belum dapat diajukan karena masih butuh data pendukung.Action Plan : akan dilakukan pemberitahuan ke Marine Unit via fax.

BOCK&A/Pengad

50

Page 51: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX – CHARTER SM I & SM II LPG

CHARTER SM I & SM II LPG NOVEMBER 2009 PERFORMANCE

No Vessel Name

G1

G4

G3

G2G6

100

95

90

85

80

75

70

Average= 76

Days to go before charter party expiry/renewalPoor performing high cost vessels

PMS Score *On a scale of 100 G1 ASIAN GAS

G2 ASIAN GAS II

G3 DEAUVILLE

G4 GAS INDONESIA

G5 GAS KALIMANTAN

G6 GAS MALUKU

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

51*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

G5

G2

0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000

70

65

60

55

50

45

40

Average= 24,662

Operating costs**IDR/LT/day

Page 52: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT ASIAN GAS II

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 0.00 97.63 0.00 80.66

Comm. Days

72.24

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: BALONGAN• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM I Gas

35034.48

PRELIMINARY

Type (& Ownership): SM I Gas (CHARTER)

Flag: MIDWT: 2,610 LTYOB (Age): 1995 (14 years)Safety Ranking: -Bunker Type: MFO MDOCargo Type: GAS

Programmer : AGUS P.(If charter) Owner: PERTAMINA(If charter) Charter Type: TC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

4

Customer feedback

Budget

PIC:DWI M. ABDU

52

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

16637.19 35034.4824662.26 29098.34

0

0

8

1

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(14.29)

Fleetave.(0.3)

00

14

70

1233

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TC(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD 187,500

Page 53: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

7 8 9 10 1211Asian Gas IIR2 Loss : terdapat 1 call pembongkaran di MKS cargo LPG sebesar.4.02% (voy 6). Action Plan : Perlu diteliti adanya kemungkinan kesalahan pengisian Master Cable.

OT Crude/BOCK&A/Pengad

Pumping Rate : telah dilakukan analisa dan terdapat 3 call slow pumping.Action Plan : masih terjadi dispute karena kekurangan data pendukung, tapi hinggasaat ini belum ada respon dari dari Marine Unit setempat.

BOCK&A/Pengad

Activity Responsible

ACTION PLANDeadlinePrevious Month

53

Page 54: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –CHARTER SM II

CHARTER SM II NOVEMBER 2009 PERFORMANCE

No Vessel Name

S11

S8 S1

S2

S5

T10A4

100

95

90

85

80

75

Average= 76

Days to go before charter party expiry/renewalPoor performing high cost vessels

PMS Score *On a scale of 100 S1 ANDHIKA ASHURA

S2 ASIAN OIL II

S3 BUDI MESRA

A4 DUTA BANGSA

S5 GOLDEN PEARL XIV

A6 JAYNE I

S7 JULIA I

S8 PELITA SAMUDRA

S9 SAPTA SAMUDRA

T10 SOECHI CHEMICAL VII

S11 SOECHI LESMANA

S12 SURYA CHANDRA

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

54*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

A6

S7 S9

S12

S3

0 2,500 5,000 7,500 10,000 12,500 15,000 17,500 20,000

75

70

65

60

55

50

Average= 11,559

Operating costs**IDR/LT/day

S12 SURYA CHANDRA

Page 55: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT JAYNE I

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 56.87 0.00 43.34 12.26

Comm. Days

53.06

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: MANOKWARI• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM II

16299.1

PRELIMINARY

Type (& Ownership): SM II (CHARTER)Flag: PADWT: 6,500 LTYOB (Age): 1999 (10 years)Safety Ranking: -Bunker Type: MFO MDOCargo Type: AVTUR

Programmer : PUTU D.(If charter) Owner: PT. BUMI

INTERNATIONAL TANKERS(If charter) Charter Type: LTTC4

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

13

Customer feedback

Budget

PIC:HARRIE SETIARDJO

55

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

8053.37 16299.111559.87 14461.64

27

0

6

8

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(39.66)

Fleetave.

(8.23)

005

95

1433

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: LTTC4(If charter) Charter Expiry: 12/Jan/10(If charter) Mnth Chart. Rate: - USD 159,120

11559.87 14461.64

Page 56: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT JULIA I

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 0.00 26.62 10.02 70.08

Comm. Days

62.02

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: TERNATE• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM II

16299.1

PRELIMINARY

Type (& Ownership): SM II (CHARTER)Flag: PADWT: 6,755 LTYOB (Age): 1998 (11 years)Safety Ranking: -Bunker Type: MDO HSDCargo Type: WO

Programmer : PUTU D.(If charter) Owner: LAYAR SENTOSA

SHIPPING(If charter) Charter Type: LTTC4

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

15

Customer feedback

Budget

PIC:HARRIE SETIARDJO

56

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

8053.37 16299.111559.87 14126.94

14

0

12

3

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(39.66)

Fleetave.

(8.23)

003

93

1429

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: LTTC4(If charter) Charter Expiry: 8/Jan/10(If charter) Mnth Chart. Rate: - USD 159,120

11559.87 14126.94

Page 57: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT SAPTA SAMUDRA

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 59.03 94.68 0.00 22.35

Comm. Days

62.26

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: PULAU SAMBU• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER SM II

16299.1

PRELIMINARY

Type (& Ownership): SM II (CHARTER)Flag: PADWT: 6,500 LTYOB (Age): 1994 (15 years)Safety Ranking: -Bunker Type: MFO MDOCargo Type: BO

Programmer : ABIDIN S.(If charter) Owner: HUMPUSS

INTERMODA TRANS(If charter) Charter Type: TC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

24

Customer feedback

Budget

PIC:LUKITO WIBOWO

57

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

8053.37 16299.111559.87 14833.45

1

0

16

6

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(39.66)

Fleetave.

(8.23)

002

40

1017

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TC(If charter) Charter Expiry: 1/Dec/09(If charter) Mnth Chart. Rate: - USD 162,000

11559.87

Page 58: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

12987 10 11

BOCK&A/Pengad

Bunker Cons : telah diverifikasi, terdapat 10 call yang mengalami over bunker.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

Julia I

BOCK&A/Pengad

Pumping Rate : terdapat 8 potensi klaim slow pumping; telah dilakukan kajiannamun belum dapat diklaim karena belum terdapat data pendukung yang akurat.Action Plan : akan menghubungi Marine Unit untuk verifikasi klaim tersebut ini.

Vessel Speed : telah diverifikasi, terdapat 10 call yang mengalami slow speed.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

Jayne I

Direncanakan akan dilakukan pemanggilan pada minggu 3-4 Desember 2009 atau awal Januari 2010 (sambil menunggu klarifikasi dari BOC)

BOCK&A/Pengad

Activity

BOCK&A/Pengad

Responsible

Vessel Speed : telah diverifikasi, terdapat 7 call yang mengalami slow speed.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

BOCK&A/Pengad

R2 Loss : Voy 27 Call 2 BTG-TNT, kargo Premium berpotensi klaim R2 Loss.Action Plan : saat ini dalam proses check data Master Cable dan kalkulasi klaim.

ACTION PLANDeadlinePrevious Month

Bunker Cons : telah diverifikasi, terdapat 4 call yang mengalami over bunker.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

Pumping Rate : terdapat 2 potensi klaim slow pumping; telah dilakukan kajiannamun belum dapat diklaim karena belum terdapat data pendukung yang akurat.Action Plan : akan menghubungi Marine Unit untuk verifikasi klaim tersebut ini.

BOCK&A/Pengad

BOCK&A/Pengad

Direncanakan akan dilakukan pemanggilan pada minggu 3-4 Desember 2009 atau awal Januari 2010 (sambil menunggu klarifikasi dari BOC)

Telah dilakukan diskusi dengan owner tanggal 23 Nov. ’09 untuk perbaikankinerja kapal. Saat ini sedang dilakukan monitoring untuk mengetahuiprogress perbaikan.

BOCK&A/Pengad

K&A/PengadAction Plan : akan ditindaklanjuti ke dalam bentuk klaim.Pumping Rate : terdapat 6 potensi klaim slow pumping; telah dilakukan kajiannamun belum dapat diklaim karena belum terdapat data pendukung yang akurat.Action Plan : akan menghubungi Marine Unit untuk verifikasi klaim tersebut ini.

Sapta Samudra

58

Page 59: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –CHARTER GP

CHARTER GP NOVEMBER 2009 PERFORMANCE

No Vessel Name

R2

S11R6

R15

S10S14

R4

S5

S7

S9

S12S17

S1

R3

100

95

90

85

80

75

Average= 84

Days to go before charter party expiry/renewalPoor performing high cost vessels

PMS Score *On a scale of 100 S1 AE PIONER

R2 ANDHIKA ADINUGRAHA

R3 ANDIKA ARSANTI EX BUMI NUSANTARA

R4 ASTA SAMUDRA

S5 BUDI JASA

R6 ETERNAL OIL I

S7 ETERNAL OIL II

S8 GRIYA ASMAT

S9 NEW GRACE

S10 OCEAN SEAL

S11 ONTARI

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

59*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

R2

A16

S7

S8

S13

0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000

75

70

65

60

55

50

Average= 8,601

Operating costs**IDR/LT/day

S11 ONTARI

S12 PRANEDYA TRITYA

S13 PROVIDENCE

S14 SAMUDERA BIRU

R15 SHARON

A16 SINAR EMAS

S17 TEMASEK

Page 60: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT ANDHIKA ADINUGRAHA

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 100.00 0.00 0.00 90.37

Comm. Days

73.46

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: BALIKPAPAN• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER GP

12630.07

PRELIMINARY

Type (& Ownership): GP (CHARTER)Flag: PADWT: 17,998 LTYOB (Age): 1998 (11 years)Safety Ranking: -Bunker Type: MFO MDOCargo Type: CO

Programmer : JISMAN S.(If charter) Owner: ADNYANA LINES PT.(If charter) Charter Type: LTTC3(If charter) Charter Expiry: 15/Jul/12

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

2

Customer feedback

Budget

PIC:SISWOYO

60

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3484.8 12630.078601.26 10076.4

51

0

29

2

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(24.06)

Fleetave.

(10.06)

00

5

94

1330

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: 15/Jul/12(If charter) Mnth Chart. Rate: - USD 400,956

Page 61: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT BUDI JASA

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 42.50 91.84 7.35 96.27

Comm. Days

81.03

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: BALIKPAPAN• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER GP

12630.07

PRELIMINARY

Type (& Ownership): GP (CHARTER)Flag: MADWT: 11,970 LTYOB (Age): 2006 (3 years)Safety Ranking: -Bunker Type: MFO HSDCargo Type: WO

Programmer : KAMIL(If charter) Owner: INDO MEGA MARITIM

PT.(If charter) Charter Type: TC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

6

Customer feedback

Budget

PIC:HERU HUTOMO

61

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3484.8 12630.078601.26 12630.07

2

0

14

0

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(24.06)

Fleetave.

(10.06)

00

6

110

825

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TC(If charter) Charter Expiry: 1/Dec/09(If charter) Mnth Chart. Rate: - USD 378,000

8601.26

Page 62: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT ETERNAL OIL II

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 0.00 74.53 0.00 100.00

Comm. Days

74.68

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: SURABAYA• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER GP

12630.07

PRELIMINARY

Type (& Ownership): GP (CHARTER)Flag: SIDWT: 18,500 LTYOB (Age): 1997 (12 years)Safety Ranking: -Bunker Type: MFO MDOCargo Type: BO

Programmer : ABIDIN S.(If charter) Owner: BUMI PERKASA

BAHTERA(If charter) Charter Type: TC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

11

Customer feedback

Budget

PIC:LUKITO WIBOWO

62

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3484.8 12630.078601.26 9496.74

9

0

37

0

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(24.06)

Fleetave.

(10.06)

00

10

91

1031

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TC(If charter) Charter Expiry: 1/Dec/09(If charter) Mnth Chart. Rate: - USD 410,250

Page 63: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT PROVIDENCE

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

62.14 95.87 0.00 87.02 89.11

Comm. Days

68.39

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: BITUNG• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER GP

12630.07

PRELIMINARY

Type (& Ownership): GP (CHARTER)Flag: SIDWT: 16,839 LTYOB (Age): 1986 (23 years)Safety Ranking: -Bunker Type: MFO HSDCargo Type: WO

Programmer : KAMIL(If charter) Owner: CAKRA BAHANA Ltd.(If charter) Charter Type: TC(If charter) Charter Expiry: 1/Dec/09

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

21

Customer feedback

Budget

PIC:HERU HUTOMO

63

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3484.8 12630.078601.26 9038.15

35

125

2

1

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(24.06)

Fleetave.

(10.06)

0

11

2

5

3

414

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: 1/Dec/09(If charter) Mnth Chart. Rate: - USD 205,058

Page 64: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

9 12111087 Responsible

BOCK&A/Pengad

Andhika AdinugrahaVessel Speed : telah diverifikasi, terdapat 4 call yang mengalami slow speed.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

BOCK&A/Pengad

Pumping Rate : terdapat 3 call mengalami slow pump; data sudah dianalisanamun belum diverifikasi dengan dokumen pendukung.Action Plan : akan menghubungi Marine Unit untuk verifikasi klaim tersebut ini.

OT BBM/BOCK&A/Pengad

Pumping Rate : terdapat 4 call berpotensi klaim namun belum ada info dariMarine Unit. Action Plan : melakukan koordinasi dan pemberitahuan ke unit via fax.

BOCK&A/Pengad

Eternal Oil II

Budi Jasa

R2 Loss : Voy 32 Call 2 TPK-SBY IFO dan Voy 33 Call 4 MKS-TTM IDO, adapotensi klaim R2 Loss.

BOC

R2 Loss : Data Disch Avtur Voy 32 BPP-SBY belum dimasukkan.Action Plan : lakukan input data ke dalam VMIS; klaim bila terdapat loss.

Activity

ACTION PLANDeadlinePrevious Month

Vessel Speed : telah diverifikasi, terdapat 6 call yang mengalami slow speed.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

BOCK&A/Pengad

Direncanakan akan dilakukan pemanggilan pada minggu 2-3 Februari 2010(sambil menunggu klarifikasi dari BOC)

potensi klaim R2 Loss.Action Plan : saat ini dalam proses cek Master Cable dan kalkulasi klaim.

K&A/Pengad

Pumping Rate : terdapat 2 call mengalami slow pump; data sudah dianalisanamun belum diverifikasi dengan dokumen pendukung.Action Plan : akan menghubungi Marine Unit untuk verifikasi klaim tersebut ini.

BOCK&A/Pengad

Providence

64

Page 65: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX – CHARTER GP & MR LPG

CHARTER GP & MR LPG NOVEMBER 2009 PERFORMANCE

No Vessel Name

G1

G4

G2

G3

G5

100

95

90

85

80

75

Average= 90

Days to go before charter party expiry/renewalPoor performing high cost vessels

S-

R-

S&D Vessel

Refining VesselPMS Score *On a scale of 100 G1 ERATAN EX HEBRIS

G2 MAHARSHI LABHATREYA

G3 MAHARSHI SHIVATREYA

G4 NAVIGATOR ARIES

G5 NAVIGATOR GEMINI

Poor performing low cost vessels

65*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

0 2,500 5,000 7,500 10,000 12,500 15,000 17,500 20,000

75

70

65

60

55

50

Average= 15,960

Operating costs**IDR/LT/day

Page 66: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –CHARTER MR

CHARTER MR NOVEMBER 2009 PERFORMANCE

No Vessel Name

R4

S3

S5

R1

S2

S8

R10

R12

R9S14

100

95

90

85

80

75

70

Average= 72

Days to go before charter party expiry/renewalPoor performing high cost vessels

PMS Score *On a scale of 100 R1 AGIASMA

S2 AKAMAS

S3 ALISA XVII

R4 DURGANDINI

S5 GANDARI

S6 GANDINI

R7 JELITA

S8 KAMPOS

R9 MARTHA PETROL

R10 MUTIARA

S11 MUTIARA MAS I

R12 OPAL

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

66*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

S15

R1

S6

S11

R13

R7

0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000

70

65

60

55

50

45

40

Average= 6,170

Operating costs**IDR/LT/day

R12 OPAL

R13 QUITO JAYA EX IBNU

S14 SUKSES XI (new)

S15 VIJAYANTI

Page 67: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT AGIASMA

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 86.84 38.74 100.00 12.04

Comm. Days

67.52

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: MISOOL• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER MR

8957.86

PRELIMINARY

Type (& Ownership): MR (CHARTER)Flag: INDWT: 29,996 LTYOB (Age): 1989 (20 years)Safety Ranking: -Bunker Type: MFO MDOCargo Type: CO

Programmer : JISMAN S.(If charter) Owner: MULTI JAYA

SAMUDRA(If charter) Charter Type: TCB

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

1

Customer feedback

Budget

PIC:SISWOYO

67

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3027.57 8957.866170.65 8300.14

23

0

0

18

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(48)

Fleetave.

(10.75)

003

52

1121

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TCB(If charter) Charter Expiry: 1/Dec/09(If charter) Mnth Chart. Rate: - USD 399,000

6170.65

Page 68: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT JELITA

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 98.43 90.34 0.00 21.29

Comm. Days

65.54

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: CILACAP• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER MR

8957.86

PRELIMINARY

Type (& Ownership): MR (CHARTER)Flag: PADWT: 29,516 LTYOB (Age): 1987 (22 years)Safety Ranking: -Bunker Type: MFO HSDCargo Type: NAPTHA

Programmer : HARIS A. S.(If charter) Owner: EMMA MARITIME

SERVICES PT.(If charter) Charter Type: TC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

14

Customer feedback

Budget

PIC:HERU HUTOMO

68

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3027.57 8957.866170.65

2

0

44

10

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(48)

Fleetave.

(10.75)

00

8

140

1032

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TC(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD 292,500

6170.65

Page 69: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT QUITO JAYA EX IBNU

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 72.76 0.00 21.22 1.15

Comm. Days

49.08

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: CILACAP• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER MR

8957.86

PRELIMINARY

Type (& Ownership): MR (CHARTER)Flag: INDWT: 35,601 LTYOB (Age): 1993 (16 years)Safety Ranking: -Bunker Type: MFO MDOCargo Type: CO

Programmer : JISMAN S.(If charter) Owner: ALTUS LINES

INDONESIA(If charter) Charter Type: LTTC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

22

Customer feedback

Budget

PIC:SISWOYO

69

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

3027.57 8957.866170.65 7748.74

37

0

30

15

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(48)

Fleetave.

(10.75)

004

92

924

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: LTTC(If charter) Charter Expiry: 1/Dec/09(If charter) Mnth Chart. Rate: - USD 473,250

6170.65 7748.74

Page 70: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

6 1210987 11

BOCK&A/Pengad

AgiasmaVessel Speed : telah dilakukan verifikasi, terdapat 4 call mengalami slow speed.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

BOCK&A/Pengad

Activity

BOCK&A/Pengad

BOCK&A/Pengad

Responsible

Bunker Cons : terdapat 4 call mengalami over bunker; data sudah dianalisa namunbelum diverifikasi dengan Master Cable/Log Abstract.Action Plan : dikoordinasikan bersama OT untuk verifikasi dengan Master Cable.

Bunker Cons : telah dilakukan verifikasi terdapat 4 call mengalami overbunker. Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

Pumping Rate : terdapat 3 call mengalami slow pump; data sudah dianalisa namunbelum diverifikasi dengan dokumen pendukung.Action Plan : menghubungi Marine Unit untuk verifikasi kejadian slow pumping ini.

Jelita

Telah dilakukan diskusi dengan owner tanggal 17 Nov. ’09 untuk perbaikankinerja kapal. Saat ini sedang dilakukan monitoring untuk mengetahui progress perbaikan.

ACTION PLANDeadlinePrevious Month

Pumping Rate : terdapat 4 call potensi claim slow pumping; masih dispute karenaDibutuhkan data pendukung tambahan.Action Plan : koordinasi dengan Marine Unit untuk permintaan data tambahan.

Telah dilakukan diskusi dengan owner tanggal 23 Nov. ’09 untuk perbaikankinerja kapal. Saat ini sedang dilakukan monitoring untuk mengetahui progress perbaikan.

Telah dilakukan diskusi dengan owner tanggal 19 Nov. ’09 untuk perbaikankinerja kapal. Saat ini sedang dilakukan monitoring untuk mengetahui progress perbaikan.

Bunker Cons : telah dilakukan verifikasi, terdapat 5 call yang mengalami over bunker.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

BOCK&A/Pengad

Action Plan : dikoordinasikan bersama OT untuk verifikasi dengan Master Cable.

Vessel Speed : telah dilakukan verifikasi, terdapat 5 call yang mengalami slow speed.Action Plan : akan ditindaklanjuti ke dalam bentuk klaim.

Quito Jaya Ex Ibnu

BOCK&A/Pengad

BOCK&A/Pengad

70

Page 71: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARY

VESSEL COST PERFORMANCE MATRIX –CHARTER LR

CHARTER LR NOVEMBER 2009 PERFORMANCE

No Vessel Name

R190

85

80

75

70

65Average= 65

Days to go before charter party expiry/renewalPoor performing high cost vessels

PMS Score *On a scale of 100 R1 BRAMANI

R2 MAGNITUDE SUB AGATE

R3 VALIANT SUB KOURION

S-

R-

S&D Vessel

Refining Vessel

Poor performing low cost vessels

71*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

R2

R3

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000

65

60

55

50

45

40

Average= 3,587

= 65

Operating costs**IDR/LT/day

Page 72: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT MAGNITUDE SUB AGATE

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 72.07 0.00 0.53 58.50

Comm. Days

62.03

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: CILACAP• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER LR

4242.41

PRELIMINARY

Type (& Ownership): LR (CHARTER)Flag: NRDWT: 93,136 LTYOB (Age): 1992 (17 years)Safety Ranking: -Bunker Type: MFOCargo Type: CO

Programmer : DACHLAN H.(If charter) Owner: NUR SALY PRATAMA(If charter) Charter Type: TC(If charter) Charter Expiry:

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

18

Customer feedback

Budget

PIC:SISWOYO

72

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

2725.55 4242.413587.35 3794.09

77

0

33

13

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(52.94)

Fleetave.

(21.29)00

4

84

1027

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD 630,000

Page 73: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

VESSEL MONTHLY PERFORMANCE REPORTMT VALIANT SUB KOURION

PMS ScoreOn a scale of 100

Vessel cost per day vsaverage in vessel classIDR/LT/Day

100.00 0.00 20.22 56.52 2.21

Comm. Days

48.46

R2 loss

Vessel speed

Pump rate

Bunker cons.

Vessel particulars

NOVEMBER 2009 PERFORMANCE

Specific vessel characteristics:• Op. area: PULAU SAMBU• Op. area characs:

-• Special design characs:

-

POOR PERFORMING VESSEL DASHBOARDS – CHARTER LR

4242.41

PRELIMINARY

Type (& Ownership): LR (CHARTER)Flag: LIDWT: 96,136 LTYOB (Age): 1992 (17 years)Safety Ranking: -Bunker Type: MFO HSDCargo Type: CO

Programmer : DACHLAN H.(If charter) Owner: VALIANT HOLDING

CORPORATION MONROVIA(If charter) Charter Type: TC

Score >= 8050<= Score < 80Score < 50

Vessel

MarketAverage

30

Customer feedback

Budget

PIC:SISWOYO

73

Vessel utilizationDays

0

20

40

60

80

100

0 20 40 60 80 100

Frequency of delay**Percent

Extent of delay*Percent

Vessel delays vs fleet average

* Extent of delays is computed by dividing total actual sea time by total allowed sea time** Frequency of delays is competed by dividing total number of delays by total number of calls Source: VMIS; charter parties; UKTs; Team analysis

Total Potential claims incurredUSD Thousands

2725.55 4242.413587.35

41

0

20

20

Slow Speed

Over Bunker

Off Hire

Slow Pumping

Fleet ave.(52.94)

Fleetave.

(21.29)00

3

62

920

Sea delay

Port delays

Sea Psg

Port time

Days avail.

Off-hire

Not accou-nted

Sea delays

Port delays

Not accounted

(If charter) Charter Type: TC(If charter) Charter Expiry: (If charter) Mnth Chart. Rate: - USD 690,000

Page 74: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

9 121110Activity ResponsibleMagnitude Sub Agate

Pumping Rate : data belum dapat dianalisa karena masih kurang data pendukung.Action Plan : menghubungi Marine Unit untuk klarifikasi kejadian slow pumping ini.

Vessel Speed : terdapat 4 call mengalami slow speed; data sudah dianalisa namunbelum dapat diverifikasi dengan dokumen Master Cable.Action Plan : akan dilakukan verifikasi dan kemudian dikirimkan ke K&A.

BOCK&A/Pengad

BOCK&A/Pengad

BOCK&A/Pengad.

Vessel Speed : terdapat 4 call mengalami slow speed; data sudah dianalisa namunbelum dapat diverifikasi dengan dokumen Master Cable.Action Plan : akan dilakukan verifikasi dan kemudian dikirimkan ke K&A.

Valiant Sub KourionR2 Loss : Voy 16 rute DUM-DUM, kargo Duri dan Sumatra belum diinput.Action Plan : data R2 Loss akan dilengkapi.

OT CrudeBOC

Bunker Cons : terdapat 4 call mengalami over bunker; data sudah dianalisa namunbelum dapat diverifikasi dengan dokumen Master Cable.Action Plan : akan dilakukan verifikasi dan kemudian dikirimkan ke K&A.

BOCK&A/Pengad

ACTION PLANDeadlinePrevious Month

Direncanakan akan dilakukan pemanggilan pada minggu 3-4 Februari 2010 (sambil menunggu klarifikasi dari BOC)

Action Plan : akan dilakukan verifikasi dan kemudian dikirimkan ke K&A.

74

Page 75: Individual Vessel Performance Dialogue November 2009 ... · Individual Vessel Performance Dialogue November 2009 Performance ... DILAKSANAKAN DI TAHUN 2010 SEBAGAI UPAYA LANJUTAN

PRELIMINARYVESSEL COST PERFORMANCE MATRIX –CHARTER VLCC

CHARTER VLCC NOVEMBER 2009 PERFORMANCE

No Vessel Name

R1

90

85

80

75

70

Average= 84

Days to go before charter party expiry/renewalPoor performing high cost vessels

S-

R-

S&D Vessel

Refining VesselPMS Score *On a scale of 100 R1 LYSAKER SUB KOLOSSI

75*PMS score is a weighted average of CD days, bunker consumption, speed loss, pump speed, R2 loss**Operating costs = [Daily Charter Rates + (Other op costs – dry dock costs – owed port chgs)] / (DWT * CD days)Source : November 2009 PMS scores; SAP; fleet procurement; charter team; team analysis

0 200 400 600 800 1,000 1,200 1,400 1,600

70

65

60

55

50

Average= 1,280

Operating costs**IDR/LT/day


Recommended