Greening The Network Bali, 24 April 2013 Yogi Rizkian Bahar Head of Power System Design TELKOMSEL 1
Transcript
Page 1: Indonesia ina002 1366765311

Greening The Network

Bali, 24 April 2013

Yogi Rizkian BaharHead of Power System Design TELKOMSEL

1

Page 2: Indonesia ina002 1366765311

• Emission of Fossil Energy (Global Warming Issue)

• Unbalanced Fossil Energy Supply and Demand

• Scarcity and Limitation of Fossil Energy Reserves

• Pros and Cons of Nuclear Power

2

TODAY’S WORLD ENERGY ISSUES

Page 3: Indonesia ina002 1366765311

No NON-RENEWABLE ENERGY SOURCES (FOSSIL ENERGY) RESERVE PRODUCTION

PER YEARRESERVE TO

PRODUCTION RATIO

1 Oil 4.0 billion barrels 347 million barrels 11 years

2 Gas 104.71 TSCF 3212 BSCF 32 years

3 Coal 28 billion tons 329 million tons 85 years

Note: - The Reserves-to-production ratio (RPR or R/P) is the remaining amount of a non-renewable resource, expressed in

years - TSCF = Trillion Standard Cubic Feet- BSCF = Billion Standard Cubic Feet

Source: KESDM (Indonesian Ministry of Energy and Mineral Resources)

3

Indonesia Fossil Energy Reserves

Page 4: Indonesia ina002 1366765311

4

Indonesia Carbon Emission

Page 5: Indonesia ina002 1366765311

Through new renewable energy development and

energy conservation implementation in all

sectors

President Commitment in G-20 Pittsburgh and COP15 to reduce greenhouse gasses (GHG) emission by 2020

and Presidential Regulation Number 61 Year 2011 concerning on National Action Plan for

Reducing Greenhouse Gas Emissions

26%(767 Mton)

41%Domestic

efforts

Domestic efforts and international

support

Forestry, Agriculture 680 Mton

Energi 30 Mton

Waste 48 Mton

Industry &Transportation 9 Mton

5

Source: KESDM

NATIONAL COMMITMENT TO REDUCE GREENHOUSE GASSES

Page 6: Indonesia ina002 1366765311

NO RENEWABLE ENERGY SOURCES

RESOURCES(SD)

INSTALLED CAPACITY (KT)

RATIO KT/SD(%)

1 2 3 4 5 = 4/3

1 Hydro power 75,670 MW 5,705.29 MW 7.54

2 Geothermal 29,038 MW 1,189 MW 4.00

3 Mini/Micro Hydro 769.69 MW 217.89 MW 28.31

4 Biomass (al: Biogas) 49,810 MW 1,618.40 MW 3.25

5 Solar 4.80 kWh/m2/day 13.5 MWp -

6 Wind 3 – 6 m/s 1.87 MW -

Source: KESDM (Indonesian Ministry of Energy and Mineral Resources)

6

Note: Telkomsel total solarcell BTS (Macro) installed capacity: 2.1 MWp

National Renewable Energy Sources

Page 7: Indonesia ina002 1366765311

What Should TELKOMSEL Do?

7

Page 8: Indonesia ina002 1366765311

Macro Micro Pico Femto

Architecture of Energy Efficiency Analysis8

Reducing Energy Consumption by Adopting Green Technology

Page 9: Indonesia ina002 1366765311

Telkomsel Energy Master Plan (2011 – 2015)

9

Solarcell: deployment

Micohydro: deployment

Fuelcell : deployment

Genset biomass/biofuel : deployment

Solar cooling: design,trial & potential deploymentSolarcell: deploymentMicrohydro: deploymentGenset biomass/biofuel : deployment

Solarcell: deploymentMicrohydro: deploymentGenset biomass/biofuel : deploymentEnergy storage: feasibility studyMagnetic generator: feasibility study

Solarcell: deploymentMicrohydro: deploymentGenset biomass/biofuel : deploymentSolar cooling: potential deploymentMagnetic generator: potential deploymentEnergy storage: potential deployment

Page 10: Indonesia ina002 1366765311

DRIVERS (from Strategic Plan, Assessment, Market Trend, Technology Plan)

ENVIRONMENT

Adopt new, more efficient technologies to reduce TCO

Renewable energies developing & deployment: photovoltaic, wind, micro hydro & fuel cell system

Reliable network and quality of service

• High quantity off-grid sites and unrealiable PLN grid (Sumatera, Kalimantan, East Indonesia)• Primary energies costs increase and fuel delivery costs are expensive for remote sites• High potential New Renewable Energy (NRE) e.g Solar, hydro, geothermal, biofuel, and biomass

• Monitoring and control tools for energy efficiency purposes

• Thermal/Cooling system management (hot/cold aisle, displacement, free cooling, hot spot management)

• Power systems optimization• Implement hybrid renewable energy (solar/wind)• Implement microhydro power plant• Introducing Fuel Cell solution for offgrid site• Feasibility study for Biofuel/Biomass to replace diesel.• Feasibility study for energy storage, magnetic

generator.

10

TELKOMSEL

Target ArchitectureNetwork Evolution & Transformation of Power Facilities

Page 11: Indonesia ina002 1366765311

• total installed solarcell (Macro BTS) : 2,1 MWp• total installed microhydro : 82 kW• total installed fuelcell : 22 kW• total pico solar-powered BTS : 3688 sites

Reduce greenhouse gas : 3,000 ton CO2

2003 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 20200

100

200

300

400

500

600

700

800

900

1000

0

20000

40000

60000

80000

100000

120000

1 4 7

80

137164

199220

263

323

393

473

563

663

773

893

0 0 0 0 0 0 2 7 14 24 36 51 6888

110135

0 0 0 0 0 7 7 7 7 7 7 7 7 7 7 7

Solarcell Microhydro Fuelcell Total tCO2

Sit

e

11

TELKOMSEL GREEN POWER FIGURES

Page 12: Indonesia ina002 1366765311

(Optional)

OR

Site: Liukang Tupabiring-Sulsel

12

One line diagram: solarcell system

Page 13: Indonesia ina002 1366765311

Telkomsel Solarcell Green Powered BTS

P.Tongkeng,Kep.Seribu

Ponu

Besikama

Eilogo

Marunggela

Wulandoni

Pulau pinang

Sarang Baung

Kasia

Liukang Tupabiring

Baruppu Tompira

Lamango

Atedei

Pasimasunggu Timur

Pasimaranu

Pasilambena

Apan

Bade (Mappi)

Selat nasikPongok

Sipora

Maratua

Tenateke

Naikliu

Rep. ApuiBaranus

a

Loang

Site TanjungBatu

Site SungaiBoh

Site VegaSite LanjakBadau

Site Serawai

Site Melayu Baru

Site Sungai Laur

Site Airupas

Site Sekunau

Site Nyabu

Site Tumbang Senamang

Site Marabatuan

Site Sapeken

Site Bawean Tambak

Site Karimun Jawa

Site Bastem

Site Enggano

Site Suoh

Site BukitMandeh

Site Siak Gasib

Site Kuala BangkaSite Hilimbosi

Site Pulau Lamun

Site Bawoziono

Site Lakhene

Site Pulau Babi

Site Tanjung Aru

Caturmukti GMN PWU EID

Site Ganting

Site Air Pinang

Site Pulau KampaiSite Alafan

Kebun Nyiur

Kondur/Mata airPulau Numbing

Gn HalatGn Sesubang

Hariff

Gn Mumbun

Gn Pagar

Page 14: Indonesia ina002 1366765311

Microhydro SUMPUR KUDUS• capacity : 10 kW• community : 0.9 kW• position : Sijunjung - Sumbar• demography: +/- 7.5hr from Padang• operational : Aug’12

14

Page 15: Indonesia ina002 1366765311

• Need for National RET (Renewable Energy

Technology) standardization.

• Limited data and information about ready-to-be-

implemented RES (Renewable Energy Source)

• Need for fiscal incentives for using RET

• CDM (Clean Development Mechanism) simplification

procedures to attain CER (Certified Energy

Reduction) credits.

15

MATTERS OF CONCERN