IE 271 OPERATION ANALYSIS AND DESIGN
Aşır SezgenEnsar EmiraliTugay Torun
AgendaAgenda
Company profileSystem descriptionSymptomsProblem definitionShort and medium term solutions proposalsConclusion
Example: Design of Profile “2042”
Current Flow Process Diagram
Layout of companyLayout of company
Long distances Long distances to transportto transport Places of machinesPlaces of machines
Material Handling
UnnecessaryUnnecessary loading /unloadingloading /unloading Cross trafficCross traffic
Material Handling
Wastage
Scraps and dustScraps and dust Defective profilesDefective profiles
Work andpsychological
conditions
Motivation Motivation of workersof workers
Health security Health security of workersof workers
ScrapsScraps
Improvement of StorageImprovement of Storage
Unused machinesUnused machines
Material HandlingMaterial Handling
Improvement of Painting DepartmentImprovement of Painting Department
Improvement of Cutting DepartmentImprovement of Cutting Department
Proposed Layout
ConclusionConclusion
As a result,we reduced the distance traveled from 356 meters to 89 meters which means 75% improvement and in the process time, there is reduction from 924 minutes to 692 minutes. The improvement rate for process time is 26.2%.
To sum up,in the light of all analysis and calculations, we proposed to the company to apply the solution which answers their immediate needs. With the help of our improvements, MorAl will reach the break-even point in 156 day and starts toprofit for each product.