Operating in 39 countries, Harsco
Inrastructure specialises in twocore market sectors: providing
construction services and industrial
maintenance services.
Within the construction sector we
oer an innovative and engineered
range o scaolding, access,
powered access, ormwork, shoring
and site saety services. Available
or contracting, rental or sale, these
services are ideally suited to large
non-residential and inrastructure
projects where close coordinationwith major contractors and specialist
sub-contractors is critical.
For the industrial maintenance
market we work with major
acilities operators and contractors
to supply multi-disciplined services
on plant shutdowns, upgrades and
maintenance projects. Products
and services include the provision
o total access solutions, insulation,
painting, blasting, encapsulation
and cleaning.
app
Clients come to us or our
proven expertise and worldwide
capabilities in:
n Sae solutions or construction
and maintenance
n High productivity,
cost-eective solutions
n Engineering and applications
knowledge
With over 6,500 employees
worldwide, our knowledge,insight and experience are at the
heart o our customer service.
This is backed up by an industry-
leading range o products, and
the resources to ensure that
even the most complex project
requirements are sourced and
delivered on time.
G xp
Harsco Inrastructure is the
combination o three
long-established Harsco
companies: SGB and Hnnebeck
in Europe, the Middle and Far
East, and Patent in the Americas.
Together we oer almost 300
years o combined specialist
experience in our elds. We
have gained vast reservoirs o
expertise on construction sites
and industrial acilities aroundthe world, allowing us to develop
a range o services tailored to
the requirements o todays
international construction and
industrial clients.
cIndustrial services introduction 1Health and saety commitment 2s xpFood processing industry 4Oshore industry 5Petrochemicals industry 6Pharmaceutical industry 7Power industry 8Shipyards and oshore yards 9Steel industry 10
s Total access 12Blasting, painting and coating 13Acoustic insulation 14Thermal insulation and tracing 15Encapsulation and shelters 16Fireproong and re prevention 17New build and temporary works 18
c Centrica Energy 20Corus Steel Works 21The Forth Rail Bridge 22Langage Energy Centre 23Lignite Power Plant 24Lindsay Oil Renery 25Port Arthur Renery 26SABIC 27South Hook LNG Terminal 28
7/30/2019 INDUSTRIAL BROCHURE.pdf
3/32
1
i
Harsco Inrastructures extensive, international experience in the petrochemical, energy and
manuacturing sectors has enabled us to develop a range o specialist services to meet the individual
requirements and minimise maintenance and new build costs o each plant and acility.
shw
During a shutdown, it is vital that
many dierent actions are carried outbeore production can be started. In
a mandatory or necessary shutdown,
we have a clear coordination point
where we organise and manage all
activities, internally and externally,
to ensure that the various phases
are careully matched as downtime
can be expensive. We work with a
long-established maintenance team o
experienced employees and through
our structured and well-disciplined
approach, we can guarantee that a
task never takes longer than strictly
necessary.
Pg
Maintenance and ault isolation is
essential or preventing damage.
Together with the client, we develop
detailed long-term maintenance
plans to engineer the right solution.
The planned maintenance approachavoids ad hoc solutions, resulting in
manageable maintenance costs. Our
on time reporting capabilities highlight
the savings in energy consumption
costs and reduced risk Corrosion Under
Insulation (CUI).
nw
The construction o power stations,
processing plants and rening acilities
oten creates some o the most
complex building challenges in the
world. Working around live equipment
and constructing unusually high,
heavy or deep concrete structures
emphasises the importance o working
with a trusted supplier o ormwork,
shoring and access equipment. Backed
by our engineering expertise and global
experience o working on projects
where these situations are common,
we can help you build and also maintain
your industrial project all rom one
trusted supplier.
7/30/2019 INDUSTRIAL BROCHURE.pdf
4/32
n Saety is a line management
responsibility
n Working saely is an essential
element o employee perormance
n Line management has a
responsibility to train all employees
to work saely
n Saety adds value to Harsco
customers, stockholders and
employees
Hp hp y
I you would like help with any aspect
o saety management on your site,
or you would like urther saety
inormation about any o our products,
please contact us on 0844 335 8860
or visit www.harsco-i.co.uk
2
In health and saety, our record (AFR)
currently sets a standard or the
industry. This requires constant eort
in all aspects o risk management,
process control, training and
communication. Our responsibility
is to exercise saety leadership and
maintain a saety conscious working
environment at every level o our
operation. We are dedicated to making
this attitude part o our culture and
everyday activities.
Wkg php wh y
We work closely with our customers
to ensure that clear standards o
saety competence, cooperation and
communication are strictly observed
throughout a project. We conduct
regular saety reviews, checks and
inspections and work proactively with
customers and other contractors to
ensure we create a sae working
environment or everyone working
on or around our equipment. Working
saely is the best way o keeping to
budgets and deadlines.
th y ph
y pg
Harsco runs the access industrys most
comprehensive programme o saety
training. It is ongoing at all levels rom
site toolbox talks and saety workshops
to advanced saety management and
leadership courses.
Our saety communication plans
include a comprehensive saety manual
or managers and supervisors backed
up with product user guides and saety
notes, technical data sheets, a regular
in-house saety magazine and web-
based saety updates. Our range o
award winning lms including Thecost o accidents and In the real
world have also been widely used
throughout the construction industry.
Our core health and saety principles:
n All injuries and occupational illnesses
are preventable
n All construction and operating
exposures can be reasonably
saeguarded
Throughout Harsco Inrastructure the saety o our sta, our customers and the public is our highest
priority. It takes precedence over all other aspects o our business.
Hh y
7/30/2019 INDUSTRIAL BROCHURE.pdf
5/32
s xp
7/30/2019 INDUSTRIAL BROCHURE.pdf
6/32
4
Sector experience
pg y
Beore maintenance projects can
start, precautions have to be taken -
machines and production lines must
be physically shielded to prevent
contamination or parts and materials
getting into the production process. All
our materials and equipment, including
scaolds, are specially cleaned beore
delivery and installation, and all our
technicians wear protective clothing
while on site, such as dust-ree
overalls, masks and overshoes.
Air-fows, work-fows and waste-
fows are also considered in an eort
to reduce the impact on the working
environment.
One o the ood-industrys key
requirements is that dust ormationmust be prevented during insulation
work. To comply with this, all our
insulation and cladding is as ar as
possible pre-abricated, and only non
dust-orming materials are specied.
In terms o plant, machinery and
technology, the ood processing
industry is becoming more
sophisticated every day. Standards o
saety and hygiene are ollowing suit.
This is why Harsco Inrastructures
rst meeting with the customer is so
important in getting a detailed picture
o the company, what it produces, and
what the site specic requirements are
or sae and hygienic plant installation,
maintenance, review or repair. Our
industry knowledge and experience
help establish the compliance
parameters that will govern our
procedures, and choice o materials
and tools.
7/30/2019 INDUSTRIAL BROCHURE.pdf
7/32
5
Our Preventive Maintenance
Programme (PMP) solutions are
based on a multidisciplinary approach
to maintenance or wellhead,
compression, production and satellite
platorms. We pre-abricate insulation
materials and supply site-specic
scaolding systems based on minimal
components or ease o erection.
To optimise labour costs on oshore
platorms, our operatives are
multiunctional - besides their expertise
in scaolding and insulating, they are
qualied proessionals in painting,
welding, tracing and rope access.
In oshore emergencies, it is vital that
sta are appropriately trained to take
immediate action to ensure the security
o all crews as well as the plant. All
our operatives are thereore required
to complete specic oshore training
programmes, including courses in rst
aid and reghting.
Logistical planning is equally crucial
to cost-eective work on oshore
platorms. We bring considerable
experience in devising expert, site-
specic logistics, including scheduling
o fights to platorms, to ensure the
smooth implementation o solutions
that are thoroughly sae and make a
positive impact on lead time.
Oshore oil and gas production is
an ongoing operation, 24 hours a
day, 7 days a week, in some o the
worlds most hostile environments.
Hundreds o specially trained Harsco
Inrastructure operatives support
some o the worlds most renowned
companies in this eld, ensuring
that your operations continue saely,
smoothly and with minimum costly
downtime.
Sector experience
oh y
7/30/2019 INDUSTRIAL BROCHURE.pdf
8/32
6
At the start o each project, we work on
identiying customer specications and
carry out a risk-assessment, taking into
account the nature o the product being
generated at the site. Our extensive
experience with volatile substances
and working in hazardous environments
makes us a partner o choice or many
o the worlds biggest petrochemical
companies.
Scaolding erection, cladding,
insulation installation or removal, heat
exchanger cleaning and repairs are all
aspects o our work at petrochemical
plants. In addition to this we can also
inspect equipment, measure wall
thicknesses and undertake valve
expansion.
In a single production shutdown, any
combination o these may have to
be carried out beore production can
be restarted. Because downtime is
expensive, we take a tight and well-
disciplined approach, to guarantee that
no production stop ever takes longer
than strictly necessary.
Working together with our customers,
we develop long-term maintenance
schedules indicating priorities and
deadlines or months and years ahead.
The planning-based maintenance
approach prevents disruption and
expensive ad hoc solutions, resulting
in more controllable maintenance
costs. It also means reduced energy
consumption, while the pre-emptive
inspections or Corrosion Under
Insulation (CUI) reduce costs urther.
Harsco Inrastructure has proven
experience in new construction,
maintenance and turnarounds in
the petrochemical industry. Our
multidisciplinary approach enables us
to marshal and coordinate a whole
spectrum o skills, expertise and
operatives, and to guarantee the
timely implementation o scheduled
maintenance programmes. We
always work in close partnership with
operating management to provide
world-leading standards o saety.
Sector experience
Ph y
7/30/2019 INDUSTRIAL BROCHURE.pdf
9/32
7
Beore any project starts, our
experienced team will take additional
precautions ensuring we ully
understand and appreciate all o the site
dangers and risks. The maintenance
site location is isolated using a special
sealing unit and solution and kept under
constant pressure. This prevents dust
and minimises the risk o contamination
to the production process.
All our technicians wear hygienic, dust-
ree, protective clothing. We use only
In the pharmaceutical, chemical
and biotechnology industries, the
implications o contamination mean
that hygiene standards are even stricter
than in the ood industry. Operatives,
materials and tools must all meet clean-
room conditions. Harsco Inrastructure
has developed particular expertise
and experience in this eld, and our
teams are specically trained and
practiced in working in pharmaceutical
environments.
bre-ree and dust-proo insulation
materials, which are preabricated
o-site wherever possible. Air-fows,
work-fows and waste-fows are all
considered in an eort to reduce the
impact on the working environment.
We will work closely with you to
ensure that you continue to meet
Good Manuacturing Practices (GMP)
and that any production shutdowns or
outages can be resolved as quickly as
possible with our support.
Sector experience
Ph y
7/30/2019 INDUSTRIAL BROCHURE.pdf
10/32
8
Sector experience
Pw y
Power plant sites impose particular
demands or vigilance regarding
saety. Working in the vicinity o high-
voltage equipment, working at height,
and working in high-temperature
environments all require specic
training, which has to be continually
rereshed. All our operatives attend
sector-specic training programmes
and managers hold regular toolbox
talks to ensure the individual security
requirements o the customer and
the environment are respected and
understood.
Our highly trained teams use their work
at height experience to provide sae
scaolding and access solutions on
some o the worlds tallest stacks and
boilers as part o their daily routine. We
Despite increasingly stringent
environmental regulations and public
awareness, the worlds consumption
o energy is still rising. New power
plants are being developed and the
capacity o existing inrastructure is
being upgraded. Harsco Inrastructure
has comprehensive, international
experience and expertise in the
construction and maintenance o major
energy acilities. From low-rise gas-
red power plants and waste-to-energy
(WTE) incineration plants, to high-rise
nuclear, coal-red and biomass plants,
we have the experience required
throughout the energy market.
also pre-assemble and deliver a range
o high-quality insulating materials
designed to cope with extreme
temperatures.
Downtime or the power industry
is expensive, even when planned.Outages are also detrimental as
they impact instantly on the public.
Our global network o stock and
service centres o excellence enable
us to provide rapid responses or
both emergency shutdowns and
the scheduled turnarounds that
help prevent them. We are trained
in and committed to supporting the
plant through every phase o its
lie-cycle rom commissioning to
decommissioning and the lie o the
plant in between.
7/30/2019 INDUSTRIAL BROCHURE.pdf
11/32
9
Sector experience
shpy h y
Harsco Inrastructure is a recognised
partner in many large naval and
commercial shipyards, dockyards
and platorm maintenance docks and
we understand that our maritime
customers have unique requirements.
From speciying details such as
seawater resistant insulation and
cladding materials, to designing the
most cost-eective strategies or
getting back in the water, we have
the ingenuity and the resources to
handle it.
Naval construction projects, whether
or governments, companies or
individuals, impose very particular
demands. We work with special
shipbuilding scaolding systems that
enable the contours o a vessel to
be perectly tracked. The system can
also be constructed as reestanding
to comply, or example, with the
requirement or a race standard paint
nish in yachts. For specialist nishing
work we provide sealing solutions to
create dust ree working environments.
Floating oshore units brought in to
dry docks or repair, maintenance or
modication require particular expertise
in making workplaces accessible.
Our track record in this eld includes
the provision and installation o
specially-designed scaolding
throughout the unit, including the
deck and internal foating elements, to
acilitate replacement o equipment,
piping, cable tray systems and
ventilation ducts.
Oshore platorm design and the
spaces operatives sometimes have to
work in are getting more complicated
and compact. The pressure this creates
is urther complicated by the variety
o disciplines and trades all working
simultaneously during the construction
or maintenance project, not to mention
the strict schedule. Through years o
experience, we are well-attuned to
these scenarios and have a wealth
o advice to oer in minimising
ineciencies and risks.
7/30/2019 INDUSTRIAL BROCHURE.pdf
12/32
Sector experience
s y
Our teams are well aware o the
logistical challenges on any production
site and bring exceptional experience
in providing eective service. In
large industrial areas, there may
be considerable distances to cover
between the various plant sites,
including coke ovens, pellet and sinter
plants, blast urnaces, steel plants, hot
and cold strip mills and gas holders.
Our expertise in logistical planning
ensures the most eective and timely
delivery o materials and deployment o
operatives to dierent actories.
Working on steel production sites also
means that employees must be ully
aware o the operating requirements
o each plant. Our operatives are
Harsco Inrastructure is a major
supplier to the worlds steel industry.
We specialise in industrial insulation,
scaolding, tracing, reproong,
painting and blasting on raw material
processing acilities. 160 production
sites in over 30 countries employ
Harsco Metals, our sister company,
or their expertise in on site logistics
or raw materials, semi-nished and
nished products.
trained to work saely in dusty or dirty
environments and in environments
with extreme temperatures. Our
teams are also well-versed in the risks
o on site logistics, such as trains or
conveyors.
The experience we have o designing
and delivering solutions or high-
temperature environments impacts our
choice o materials. We only supply
and t high quality insulation capable
o withstanding temperatures up to
1000C. Our global network o stock
and service centres o excellence,
and our highly trained, expert teams,
enable us to provide rapid responses
or both scheduled turnarounds and
emergency shutdowns.
10
7/30/2019 INDUSTRIAL BROCHURE.pdf
13/32
s
7/30/2019 INDUSTRIAL BROCHURE.pdf
14/32
12
Service solutions
t
Our project management teams
will work with you to develop a
comprehensive access plan or yourindustrial new build, shut down or
maintenance programme. Selecting
the optimum combination o products
to provide an access solution which
ensures maximum on site productivity
without compromise to saety.
s
The fexibility o our product range
increases our versatility, and we are
adept at nding intelligent solutions or
the most complex projects, whether
working on the construction o a
new installation or a routine acilities
maintenance programme.
We are one o the worlds ew ully
integrated suppliers with the capability
to oer a total access solution. Based
on your project requirements, rather
than our catalogue, we develop abespoke access plan based on the
most appropriate access solution or
each elevation.
Whilst considering the sensitive,
high risk environments you work in,
our solutions can be based on any
combination o access and labour, rom
MASTCLIMBERS or MEWPs, to
scaolding, aluminium or GRP access
towers - all rom one supplier.
egg py
Our in-house engineers and designers
have in-depth knowledge o the specic
regulations, requirements, codes and
qualications required. In addition, they
have years o experience o working on
some o the worlds largest and most
complex projects, live environments
and multiphased projects, where thedesign o low-impact solutions are
critical to success.
Our engineers apply their ingenuity
and specialist expertise, along with
the latest sotware technologies to
design solutions that both solve/pre-
empt problems and save money or
you. Innovations can be new ways o
using old methods, new applications
or existing products, or something
completely radical.
Critical to our success are our
dedicated research and developments
teams, which are constantly striving to
develop more innovative and ecient
solutions to every day problems ound
by our customers.
Harsco Inrastructure has developed a unique multi-product approach to the provision o access
on each project, giving our customers an optimised solution. We have one o the most extensive
ranges o product options and solutions in the industry, rom traditional or systemised scaolding to
mechanical access.
7/30/2019 INDUSTRIAL BROCHURE.pdf
15/32
13
Service solutions
bg, pg g
s pp
We oer a range o surace preparation
solutions with varying work method
approaches according to the
specialities on site. This ranges rom
ne blast material such as glass bead
or the removal o residues rom highly
sensitive equipment, to chilled iron and
steel shot used mainly in areas where
reclamation and re-use can take place.
Hy g/uHP jg
Beore applying protective coatings,
standard high pressure water jetting is
an excellent solution or the removal
o contaminants rom almost every
industrial surace. Ultra High Pressure
(UHP) jetting is an ideal surace
preparation method or the removal
o substances such as old coatings
containing lead.
Our operatives are trained to the
highest standards through the
recognised governing body The Water
Jetting Association (WJA).
As with all work undertaken in this
environmentally sensitive area, we
ensure ull compliance with the Control
o Lead at Work Regulations.
sp g
We are able to oer high quality
solutions producing the ultimate
standards o protection or todayscorrosion requirements. An extensive
range o anti-corrosive resistant
primers, build up coats and nishes,
polyurethane and epoxy resins
are available to produce excellent
standards o protection or steel and
most metal suraces.
Harsco Inrastructures specialist surace preparation and protective coatings teams work to extremely
exacting standards, using the latest technology to deliver advanced solutions to our customers.
7/30/2019 INDUSTRIAL BROCHURE.pdf
16/32
14
Service solutions
a
s
We have various options to create a
relatively quiet working environment,
including the use o screens, dampers
and barriers. Which precise measures
are necessary to neutralise the source
o the noise is dependant on the
situation. The specialist expertise and
training o our employees helps us toprovide you with the right solution.
By combining various measures, we
are able to solve almost every acoustic
problem, even in special circumstances.
The prevention o noise through acoustic insulation across a wide range o applications is an important
specialist area o Harsco Inrastructure. Our acoustic insulation assists in creating a comortable
working environment around machines, construction operations, music and equipment, along with
meeting the strict health, saety and environmental regulations placed on limiting noise production.
7/30/2019 INDUSTRIAL BROCHURE.pdf
17/32
15
Service solutions
th g
Our specialist insulation teams have
years o experience abricating and
installing protective thermal insulationand cladding, including temperatures up
to 1000c, Corrosion Under Insulation
(CUI) and cryogenic applications.
Our products have been tested in the
harshest o conditions and have always
met the perormance lie and saety
criteria o the acilities we are servicing.
m-p pph
Harsco Inrastructure annually supplies
hundreds o kilometres o heat
control tracing (electric or steam) to
all industrial sectors, rom the ood to
petrochemical industries. This means
that we have a great deal o experience
in ormulating and implementing
ready made solutions. We nely tune
insulation and tracing to each other, so
that optimal temperature management
is guaranteed. In addition, we ensure
that every installation complies with
the relevant environmental, quality andsaety requirements.
th gh
We work with a range o thermal
insulation materials, rom mineral wool
to acrylic nitrile rubber, in combination
with aluminium, stainless and
galvanised steel claddings. We are able
to abricate or all types o equipment,
including vessels, pipe work, inline
ttings, columns and tanks working in a
variety o metals to suit the application.
Thermal insulation o industrial installations is one o the core activities o Harsco Inrastructure. In
many production processes it is essential to closely monitor the temperature. For example, enabling
people to work in the close vicinity o heat sources, maintaining the temperature o piping in a critical
production process or complying with specic legal requirements.
7/30/2019 INDUSTRIAL BROCHURE.pdf
18/32
16
Service solutions
ep h
By cladding the entire structure, you
can eliminate the unwanted eects o
changes in pressure and wind suctionthat are typical or traditional sheets
and netting. This allows work on the
project to continue, whereas traditional
methods may have delayed the
completion.
P g p
Meeting the latest legislation
requirements, and made rom an
adaptable, re resistant and waterproo
material, encapsulation can be applied to
even the most varied aades. Especially
useul in situations where work and
residue material could damage the
environment, cause material damage
to property or where adverse weather
could delay the project.
Encapsulation allows or the whole
work area to be completely covered,
preventing leakage o undesired materialrom the work area, whilst protecting
both workers and the inner structure.
Possible damage to the encapsulation
can be easily repaired and it is possible
to create sealed holes or run-through
structures.
Harsco Inrastructure oers a wide range o options or the encapsulation o your structure. Whether
you need weather protection or personnel or sensitive structures, or to protect the environment
rom noise, light, dust, umes, or contamination and containment, we will have a suitable solution or
your project.
7/30/2019 INDUSTRIAL BROCHURE.pdf
19/32
17
Service solutions
pfg f p
Our reproong system has been
specially developed to prevent the
risk o re spreading. We map out alltransits in a building and ensure the
correct level o insulation saety. Ater
this, an annual inspection is carried
out. During these checks, existing
transits are approved and upgraded
where necessary and new transits
are secured. We also take care oreproong by putting re resistant
mortar on plinths and weight-bearing
constructions.
Fire can cross over rom transits in cables, tubing and pipes into surrounding spaces. To ensure the
re saety o your sta, premises or project, it is necessary to cover all transits in walls, ceilings and
foors with non-fammable materials. Harsco Inrastructures reproong installations meet all the legal
requirements or re saety, and our annual inspections oer you piece o mind.
7/30/2019 INDUSTRIAL BROCHURE.pdf
20/32
18
Service solutions
nw py wk
a
Harsco Inrastructure is one o the
ew ully integrated suppliers in the
world with the capability to oer a total
access solution. Our unique system o
services complements our innovative
range and we are adept at nding
intelligent answers to even the most
complex projects.
We careully consider the sensitive,
high risk or public environments you
work in and can provide a complete
package including the hire, sale and
labour or a whole range o equipment
including MASTCLIMBERS,
suspended cradles, MEWPs,
scaolding and aluminium or GRP
access towers.
wk
When you are on complex nuclear,
power, or process plant projects you
need condence in the people you are
working with. By partnering with us
you can expect unrivalled engineering
expertise and application knowledge.
Our solutions can be based on any
combination o ormwork and shoring,
rom walls, slabs to climbing and edge
protection - all rom one supplier.
Based on your specic project
requirements, rather than our
catalogue, we develop a bespoke
temporary works plan based on the
most appropriate ormwork and
alsework solution or each and every
concrete pour.
s y
We provide help, advice, products
and solutions to help you work saely.
Our all-inclusive packages rom a
single source include leading edge,
all protection, all prevention, acoustic
noise protection screens, barriers and
worker protection systems.
tpy
We oer portable accommodation
that is secure, practical and durable,
whilst providing a pleasant and ecient
environment or your team. Our
fexibility means that you can utilise
even the most awkward space. We
also provide a range o environmentally
sustainable units that incorporate
sel-sustaining eatures and comply
with the latest regulations. Working
closely with you to assess your needs,
we can deliver the right building or you
with the minimum o disruption to
your operation.
7/30/2019 INDUSTRIAL BROCHURE.pdf
21/32
c
7/30/2019 INDUSTRIAL BROCHURE.pdf
22/32
20
Pj hg
Opened in 1993, Peterborough Power
Station owned by Centrica Energy, is
a medium sized, gas-red plant with
an output o approximately 360MW.
Like most modern power stations,
Peterborough has an air-cooled
condenser grid which avoids the need
or clean water rom the local supply
and reduces the use o chemicals in
protecting the boilers and steam turbine.
We were approached to devise an
access solution or painting the main
supply pipes to the cooling grid. Access
rom below is made dicult by the
ragile condenser panels which extend
out at an angle below the pipes. Heavy
scaolding was also impractical due to
the lightweight structure o the cooling
grid which cannot support heavy loads.
Case study
c egy, Pgh Pw s, uK
Our solution was a pair o specially-designed mobile steel gantries supporting
conventional powered cradles. The cradles move both vertically and horizontally
along the gantry, while the gantries can be winched along the pipes on guide
wires. The gantries are mounted on two sets o o-set, jack-up wheels which
allow them to ride over the pipe ribs. The cradles can be lowered to the walkway
at the base o the condenser panels or easy access. Once work on each pair o
pipes is complete the entire gantry/cradle assembly is craned to the next row.
The entire assembly, painting and re-positioning operation is designed to be
carried out without aecting the normal operation o the power station.
7/30/2019 INDUSTRIAL BROCHURE.pdf
23/32
21
Working with specialist abricator SBV Fabrications, we installed 11
MASTCLIMBERS. To access the 22 fat aces o the gas holder, we erected
single-masted platorms against each alternate ace and then re-erected them on
the remaining aces to complete the reurbishment.
Installation o the platorms was complicated by the presence o a large amount
o pipework, tanks and other obstacles at the base o the gas holder.
To overcome this, a 7m steel bridging structure was designed to transer the
weight o the masts to the ground. We also designed a special H-bracket to
tie the MASTCLIMBERS onto the gas holder without damaging the structure.
This is one o a number o term maintenance contracts which involves call outs
and shut downs either planned or emergency.
Steel giant Corus produced 3.5 million
tonnes o steel at its 3,000 acre Redcar
site every year and in the process
consumed high quantities o gas to
uel its urnaces. A crucial link in the
production cycle,the gas holder needed
to be periodically reurbished. We were
asked to devise an access solution to
allow grit blasting, panel replacement
and re-painting o the steel cladstructure.
Case study
c s Wk, r, uK
Pj hg
7/30/2019 INDUSTRIAL BROCHURE.pdf
24/32
22
Case study
th h r bg, s, uK
On 21st January 1890, two trains
rst crossed the Forth Rail Bridge,
travelling across two and a hal
thousand metres o track suspended
nearly 50 metres above the Firth
o Forth. This eat o engineering
remains an iconic structure and today
requires equal eats o
ingenuity to maintain. The exposed
location, the extraordinary structure,190 train movements per day and the
busy shipping lane below, make this
amous bridge one o the ultimate
access challenges.
Scaolding the bridge starts by reversing the conventional ground-up approach.
The evident complexity o the bridge, built with more curves than angles, means
that every scaolding member has to be individually designed, abricated and
suspended in position high above the Forth. Access platorms then have to be
encapsulated in plastic sheeting, to prevent old lead paint being shot-blasted into
the environment and to protect the new, glass fake epoxy paint rom the
weather while it dries.
The bridge is well over a 100 years old, but it takes 21st century technology
and expertise to keep it in sae use, making our experience on live industrial
maintenance invaluable. We have already supplied two and a hal thousand
tonnes o bespoke steel scaolding and at least another one thousand are
anticipated beore the project is complete.
Pj hg
7/30/2019 INDUSTRIAL BROCHURE.pdf
25/32
23
The 847 Megawatt Langage Energy
Centre near Plymouth is the rst gas
red power station to be constructed in
the South East o England or several
years. The 400 million combined-cycle
power plant is being built by main
contractor Alstom Power on behal o
Centrica Energy. We were asked to
supply a comprehensive portolio o
access equipment, based on our recordo delivering sae and eective solutions
that meet programme deadlines.
We have provided a total o 200 tonnes o CUPLOK system scaold, two
MASTCLIMBERS and two 27m high mobile elevating work platorms (MEWPs).
The equipment was used to provide access or exterior cladding as well as or
plant installation and tting out o the main Turbine Hall and Heat Recovery
Steam Generator Building. Several large birdcage scaolds were created using
CUPLOK system scaolding to provide access to the underside o the distinctive
curved, roo overhang.
Case study
lgg egy c, Pyh, uK
Pj hg
7/30/2019 INDUSTRIAL BROCHURE.pdf
26/32
24
Case study
lg Pw P, bxg, Gy
General contractor Strabag AG
approached us to develop an ecient
ormwork and scaolding solution with
prompt delivery o materials, including
various special ormwork solutions, or
this new power plant block.
The construction o the new Lignite Power Plant in Boxberg, is one o the
most challenging projects we have undertaken in recent years, both in terms o
ormwork and scaolding.
Sophisticated load bearing structures created rom our modular scaolding system
provided signicant savings in time and cost in the construction o the main
beams. Instead o bracing the building completely using rame scaold supports
at every level, orces were transerred using modular scaold towers arranged at
selected points. In this way it was possible to start other work on the lower levels
beore the nal storey was completed. Even where the production o the main
beams demanded a working platorm outside the building, this could be achieved
without diculty using system components.
Pj hg
7/30/2019 INDUSTRIAL BROCHURE.pdf
27/32
25
Case study
ly o rfy, igh, uK
Totals Lindsey Oil Renery at
Immingham is the UKs third-largest
renery, processing 200,000 barrels o
crude oil per day. For the construction o
their new Hydro Desulphurisation plant,
contractor Jacobs needed multi-purpose
access or all trades involved in this
complex project the largest o its type
currently under construction in the UK.
The project has involved the construction o approximately 10,000 scaold
structures utilising over 3,300 tonnes o scaolding equipment and up to
180 operatives. Key products employed were CUPLOK system scaolding,
conventional tube and ttings and a range o beams or larger spans.
Providing sae access or all trades, as well as the logistics o managing the supply
and welare o a large workorce in a relatively remote location, required careul
planning and constant liaison with all the project teams. Our solution included the
provision o a skilled, specialist management team based at our on-site compound
incorporating supervisors, administration, saety and logistics personnel.
Harsco Inrastructure now provides an access and insulation support service
which includes planned and unplanned outages.
Pj hg
7/30/2019 INDUSTRIAL BROCHURE.pdf
28/32
26
Case study
P ah rfy, tx, usa
A joint venture between Shell and
Saudi Aramco, the Motiva Enterprises
Renery in Port Arthur, Texas,
expanded to become the largest in
America and one o the top ten in
the world. As part o this project,
approximately 53 new renery
modules were assembled at
Cianbros Modular Manuacturing
Facility in Brewer, Maine, eachrequiring a vast amount o scaolding
to set all the various pipes and
structural beams in place.
With very little continuity in design, as each module diers rom the next, there is
only one-eighth o an inch margin or error, as all structural, piping and unctional
elements have to t precisely. The harsh winters in Maine add to the challenges
o working outside at this scale.
Harsco Inrastructures scaold system was chosen or its high levels o
adaptability, which means dierent lengths and heights can be accommodated
without interruption, and projected levels o productivity can be maintained.
Scaolding specications or this vast and complex project have, to date, drawn
on 90% o the component range. During winter assembly, some modules were
wrapped in more scaolding and plastic sheeting to provide shelter rom the
weather. Finally, ater each module was completed, they travelled by barge rom
Maine, around the Florida coast and then west to Texas. Once in Port Arthur, the
modules were assembled together to orm the renery. This mega-project will
increase the renerys current capacity o 275,000 barrels per day to more than
600,000 barrels per day.
Pj hg
7/30/2019 INDUSTRIAL BROCHURE.pdf
29/32
27
Case study
sabic, W, uK
SABIC, (Saudi Arabia Basic Industries
Corporation), is one o the worlds
leading manuacturers o chemicals,
ertilizers, plastics and metals. In Europe
they are a major producer o polymers,
chemicals and innovative plastics.
Their Wilton and North Tees chemical
complex in Teesside is one o the UKs
largest chemical plants, producing
ethylene, propylene and butadiene
as well as housing a major logistical
acility incorporating large scale storage
capacity, a cross-country pipelines
network and distribution and shipping
services.
To accommodate the maintenance
and upgrading o the plants Butadiene
Columns, SABIC required a 64m high
weatherproo access structure which
could accommodate the stripping,
cladding, painting and re-cladding o
these complex vessels whilst the towers
remained operational.
Working around live plant places heavy responsibility on designers, managers and
erectors and highlights our traditional strengths o saety, technical innovation and
attention to detail. To deliver the painting and insulation requirements rather than
opting or conventional tube and ttings scaold, we devised a solution using
CUPLOK system scaolding. Not only was this able to accommodate the many
pipe-runs connecting into the tower, it provided clear working platorms, ree rom
diagonal braces. It was also substantially quicker to erect the CUPLOK system,
saving the client time and money. The scaold structure was clad using the latest
breathable sheeting to allow or any plant leakage without compromising blasting
and painting operations, and topped with a ventilated roo structure spanningacross the towers.
Pj hg
7/30/2019 INDUSTRIAL BROCHURE.pdf
30/32
28
Case study
sh Hk, lnG t, W, uK
To create weatherproo access solutions
in a exposed coastal environment or
the new build o a regasication plant or
customer Taylor Woodrow.
For the construction o this major new regasication plant in West Wales, we
developed and erected a series o weatherproo access solutions or the installation
o insulation or the tanks and pipelines. The insulation work had to be carried out
under protected and dry conditions a particular challenge in view o the exposed
coastal position o the plant.
Our solution was developed using a modular aluminium roong system. Despite
its light weight, it was able to span large widths. The structure was covered with a
translucent covering, allowing all work to be carried out in daylight with ull protection
against the weather.
Pj hg
7/30/2019 INDUSTRIAL BROCHURE.pdf
31/32
All inormation in this brochure is correct at the time o going to press. Harsco Inrastructure reserves the right to change products details or
withdraw products at any time.
Harsco Corporation Trademarks Companies within the Harsco Group are the proprietors o, amongst others, the ollowing trading names
and trade marks: Harsco, Harsco Inrastructure, SGB, Huennebeck and Patent.
7/30/2019 INDUSTRIAL BROCHURE.pdf
32/32
For urther inormation on
Harsco Inrastructure,
please contact:
_@h.
Or visit us at:
www.h-..k
HarscoInfrastructureServicesLtd,
HarscoHouse,
RegentPark,
299KingstonRoad,
Leatherhead,
Surrey,
KT227SG,
UK.
0211/BCR/3k/H316