+ All Categories
Home > Documents > Industrial Commission Update

Industrial Commission Update

Date post: 16-Oct-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
44
Industrial Commission Update June 20, 2019 Justin J. Kringstad Geological Engineer Director North Dakota Pipeline Authority
Transcript
Page 1: Industrial Commission Update

Industrial Commission Update

June 20, 2019

Justin J. KringstadGeological Engineer

Director

North Dakota Pipeline Authority

Page 2: Industrial Commission Update

2

Statewide Initial Oil Production Rates – 24hr

JJ Kringstad - North Dakota Pipeline Authority 2

Page 3: Industrial Commission Update

3

Bakken/Three Forks Initial Production Rate: 24hr

JJ Kringstad - North Dakota Pipeline Authority 3

Page 4: Industrial Commission Update

4

4,000+ BOPD 24hr Initial Production Rates

JJ Kringstad - North Dakota Pipeline Authority 4

Page 5: Industrial Commission Update

5

Statewide Gas Performance

JJ Kringstad - North Dakota Pipeline Authority 5Average BKN/TF Well Performance Statewide

~12% Improvement

Over 2017

Page 6: Industrial Commission Update

6

Statewide Initial Gas Production Rate: 24hr

JJ Kringstad - North Dakota Pipeline Authority 6

Page 7: Industrial Commission Update

Bakken and Three Forks Gas Performance

JJ Kringstad - North Dakota Pipeline Authority 7

Page 8: Industrial Commission Update

8JJ Kringstad - North Dakota Pipeline Authority 8

Top 20 IP Rates (Oil)

Page 9: Industrial Commission Update

9JJ Kringstad - North Dakota Pipeline Authority 9

Top 20 IP Rates (Oil)

Page 10: Industrial Commission Update

10JJ Kringstad - North Dakota Pipeline Authority 10

Top 20 IP Rates (Oil)

Page 11: Industrial Commission Update

11JJ Kringstad - North Dakota Pipeline Authority 11

Top 20 IP Rates (Oil)

Page 12: Industrial Commission Update

12JJ Kringstad - North Dakota Pipeline Authority 12

Top 20 IP Rates (Oil)

*Month “0” is a partial month with daily production calculated using “Days on production”. Months 1+ use calendar days to calculate daily rate.

Page 13: Industrial Commission Update

13JJ Kringstad - North Dakota Pipeline Authority 13

Top 20 IP Rates (Oil)Electrical Submersible Pump (ESP) Timeline

Page 14: Industrial Commission Update

14JJ Kringstad - North Dakota Pipeline Authority 14

Impact of ESP on Production ProfilesWell: SIBYL USA 44-19TFH (Mountrail County)

*Month “0” is a partial month with daily production calculated using “Days on production”. Months 1+ use calendar days to calculate daily rate.

Page 15: Industrial Commission Update

15JJ Kringstad - North Dakota Pipeline Authority 15

Impact of ESP on Production ProfilesAdditional Examples

*Month “0” is a partial month with daily production calculated using “Days on production”. Months 1+ use calendar days to calculate daily rate.

Well File: 32012 Well File: 33942

Page 16: Industrial Commission Update

16JJ Kringstad - North Dakota Pipeline Authority 16

High Initial Production (IP) Scenarios

“Typical” type curve used as a

comparison example for how

high IP wells may perform

over time.

In this example, the entire

production curve over time is

uplifted relative to a “typical”

well. Well economics and

EUR are both improved.

In this example, only the early

life of the well is higher

relative to a “typical” well.

Early well economics improve,

but uncertainty exists if EUR

will improve or suffer with the

high IP rate.

In this example, the early life

of the well is higher relative to

a “typical” well. Early well

economics improve along with

an incremental EUR

improvement.

Page 17: Industrial Commission Update

17JJ Kringstad - North Dakota Pipeline Authority 17

Oil IP Bin Comparison

*Month “0” is a partial month with daily production calculated using “Days on production”. Months 1+ use calendar days to calculate daily rate.

Page 18: Industrial Commission Update

18JJ Kringstad - North Dakota Pipeline Authority 18

Oil IP Bin Comparison

Page 19: Industrial Commission Update

19JJ Kringstad - North Dakota Pipeline Authority 19

Oil IP Bin Comparison – “Clean”

Page 20: Industrial Commission Update

20JJ Kringstad - North Dakota Pipeline Authority 20

Oil IP Bin Comparison – “Clean”

Page 21: Industrial Commission Update

21JJ Kringstad - North Dakota Pipeline Authority 21

Economic Incentive to Higher IP RatesExample: Payout Period Using $7 million well cost

Page 22: Industrial Commission Update

22JJ Kringstad - North Dakota Pipeline Authority 22

Economic Incentive to Higher IP RatesExample: Rate of Return Using $7 million well cost

Page 23: Industrial Commission Update

23JJ Kringstad - North Dakota Pipeline Authority 23

Economic Incentive to Higher IP RatesExample: Breakeven Pricing Using $7 million well cost

Page 24: Industrial Commission Update

Cushing $56.74

Brent $64.23WTI + $7.49

Crude Oil Prices – June 20, 2019

24JJ Kringstad - North Dakota Pipeline Authority

Pricing Data: Bloomberg &

CME (LLS-Argus)Houston WTIWTI + $6.81

JJ Kringstad - North Dakota Pipeline Authority 24

Page 25: Industrial Commission Update

North Dakota Oil Pricing

2525JJ Kringstad - North Dakota Pipeline Authority 25

Page 26: Industrial Commission Update

US Crude Oil Storage Volumes and Spot Prices

2626JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 26

Page 27: Industrial Commission Update

EIA Forecasted Oil Price

2727JJ Kringstad - North Dakota Pipeline Authority 27

Page 28: Industrial Commission Update

2828JJ Kringstad - North Dakota Pipeline Authority 28

North Dakota Oil Production Forecast Assumes Current Technology – Enhanced Oil Recovery Not Included

Page 29: Industrial Commission Update

2929JJ Kringstad - North Dakota Pipeline Authority 29

Major Oil Transmission Systems

Page 30: Industrial Commission Update
Page 31: Industrial Commission Update

Williston Basin Oil Production & Export Capacity, BOPDAssumes Current Technology – Enhanced Oil Recovery Not Included

Production forecast is for visual demonstration purposes only and should

not be considered accurate for any near or long term planning.

3131JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 31

Exact DAPL Expansion Timeline(s) Unavailable

Page 32: Industrial Commission Update

32JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 32

Upcoming or

Recent Plant

Expansion

WBI Transmission

Andeavor

Major Gas Pipeline and Processing Infrastructure

Page 33: Industrial Commission Update

WBI Energy – North Bakken Expansion Project

JJ Kringstad - North Dakota Pipeline Authority 33

Project Highlights

• 67 Miles - 20” Pipeline

• 19 Miles - 12” Pipeline

• $220+ Million

• 250,000 MCFD Capacity (expandable)

• Expandable to 375,000 MCFD

• End of 2021 Proposed Completion

• Residue Gas Service From North of

Lake Sakakawea to Northern Border

Pipeline in McKenzie County

Page 34: Industrial Commission Update

WBI Energy – North

Bakken Expansion Project

JJ Kringstad - North Dakota Pipeline Authority 34

Project Highlights

• 67 Miles - 20” Pipeline

• 19 Miles - 12” Pipeline

• $220+ Million

• 250,000 MCFD Capacity (expandable)

• Expandable to 375,000 MCFD

• End of 2021 Proposed Completion

• Residue Gas Service From North of

Lake Sakakawea to Northern Border

Pipeline in McKenzie County

Page 35: Industrial Commission Update

JJ Kringstad - North Dakota Pipeline Authority 35

Northern Border Pipeline

*Data Source: Northern Border IPS

• 42” Pipeline

• Carries Canadian (Port of Morgan) and Domestic Gas

• Receives Gas From ND Plants, WBI Transmission Interconnections, and WY Pipelines (Bison & Grasslands)

• Midcontinent Deliveries

Page 36: Industrial Commission Update

JJ Kringstad - North Dakota Pipeline Authority

Simplified Example NB CalculationsConclusion: IF no other gas export options open and all other deliveries on other pipelines stay static, ND

gas production could increase 0.82-1.12 BCFD (from April-19) before Northern Border is 100% Bakken

production. BTU management becomes increasingly important for Bakken residue gas.

36

Page 37: Industrial Commission Update

Northern Border Proposed Expansion Options

JJ Kringstad - North Dakota Pipeline Authority 37

Two Proposed Options:

Stateline/Watford City to Ventura

-580 Mdth Incremental (~525 MMCFD)

-Phase 1: Q3 2021

-Phase 2: Q4 2023

Stateline/Watford City to Cheyenne

-430 Mdth Incremental (~390 MMCFD)

-Phase 1: Q3 2021

-Phase 2: Q4 2022

Page 38: Industrial Commission Update

Simplified Example NB CalculationsConclusion: IF no other gas export options open and all other deliveries on other pipelines stay static, ND

gas production could increase 0.82-1.12 BCFD (from April-19) before Northern Border is 100% Bakken

production. BTU management becomes increasingly important for Bakken residue gas.

• Gas Plants With C2+ Capture

~1,010+ BTU Residue Gas

• Gas Plants With C3+ Capture

~1,150+ BTU Residue Gas

JJ Kringstad - North Dakota Pipeline Authority 38

Page 39: Industrial Commission Update

Bakken Natural Gas Infrastructure

3939JJ Kringstad - North Dakota Pipeline Authority 39

Page 40: Industrial Commission Update

Regional NGL Infrastructure

Kinder

JJ Kringstad - North Dakota Pipeline Authority 40

Page 41: Industrial Commission Update

North Dakota Captured* NGL’s

4141JJ Kringstad - North Dakota Pipeline Authority 41*Non-flared NGL’s & Assumes 10 GPM

Page 42: Industrial Commission Update

NGL Pipeline Takeaway Options

42

4242JJ Kringstad - North Dakota Pipeline Authority 42

Page 43: Industrial Commission Update

ONEOK Elk Creek NGL Pipeline

Project Highlights

• 900 Miles - 20” Pipeline

• $1.4 Billion

• 240,000 BPD Capacity

• Expandable to 400,000

BPD

• End of 2019 Proposed

Completion

• Y-Grade Transportation

JJ Kringstad - North Dakota Pipeline Authority 43

Page 44: Industrial Commission Update

Justin J. Kringstad, DirectorNorth Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405Bismarck, ND 58505-0840

Phone: (701)220-6227Fax: (701)328-2820

E-mail: [email protected]

Websites: www.pipeline.nd.gov

www.northdakotapipelines.com

Contact Information

JJ Kringstad - North Dakota Pipeline Authority 44


Recommended