Industrial ControlsEngineering Department
SM18 Control Systems overview
Jeronimo ORTOLARoberto SPERONI
EN/ICE Technical Committee25th June 2015
Industrial ControlsEngineering Department
2
BACKGROUND
Development started ~ 2002 Many people involved. From C. Dehavay to D. Willeman All systems inherited Mainly protection systems but also process control Many small systems interconnected 20 PLCs under our responsibility 1500 I/Os
25th of June 2015 J. Ortola, R. Speroni (EN/ICE)
Industrial ControlsEngineering Department
3
SM18 Now
25th of June 2015 J. Ortola, R. Speroni (EN/ICE)
Industrial ControlsEngineering Department
4
HW layout
25th of June 2015 J. Ortola, R. Speroni (EN/ICE)
Industrial ControlsEngineering Department
5
Controls layout
25th of June 2015 J. Ortola, R. Speroni (EN/ICE)
Power ConvertersWater system
FRESCA2
HORIZONTAL TEST BENCH
BLOC4 (Cluster G)
LONG Cryostat
SC Link Station (Pipe)
DIODE Cryostat
SIETGAL Cryostat
POTAIN
MATRIX
PXI DAQ
POTAIN
MATRIX
PXI DAQ
POTAIN
MATRIX
PXI DAQ
POTAIN
MATRIX
PXI DAQ
POTAIN
MATRIX
PXI DAQ
HV Mobile Rack 2
HV Mobile Rack 1
EF
C B A
ARTC1
ARTC2
ARTB1
ARTB2
ARTA1
ARTA2
ARTF1
ARTF2
ARTE1
ARTE2
CU
CFBC2 CBFC1 CFBB2 CBFB1 CFBA2 CFBA1
CFBF2 CBFF1 CFBE2 CFBE1
CTH
HV1
HV2
SE-F SE-E
SE-C SE-B SE-A
FRESCA2
BLOC4
HFM Cryostat
Cluster D15 kA
Industrial ControlsEngineering Department
6
Control system status
25th of June 2015 J. Ortola, R. Speroni (EN/ICE)
FRESCA2 In operation 6 weeks a year Migrated to CPC6 (David Willeman) No major development foreseen
Industrial ControlsEngineering Department
7
Control system status
25th of June 2015 J. Ortola, R. Speroni (EN/ICE)
BLOC4 In operation Developed in CPC5 Migration to CPC6 ready Future HFM cryostat already in the control system. Future activities:
Risk Analysis Safety Instrumented System implementation CPC6 + Safety program
Industrial ControlsEngineering Department
8
Control system status
25th of June 2015 J. Ortola, R. Speroni (EN/ICE)
HORIZONTAL TEST BENCH Functional analysis Risk Analysis done Safety System implemented + CPC6 (Cluster C) PLC reorganization: from 6 PLCs (1 per cluster + CU) to 1. HV mobile rack refurbished. WinCCOA layer implemented Under commissioning
Industrial ControlsEngineering Department
9
Control system status
25th of June 2015 J. Ortola, R. Speroni (EN/ICE)
HORIZONTAL TEST BENCH Future activities:
Cluster A, B, E, F protection system implementation Safety consolidation in all clusters. CU integration in Safety PLC Improve data exchange across systems 10 ART PLCs to be migrated to CPC6 Improve documentation
Industrial ControlsEngineering Department
10
Control system status
25th of June 2015 J. Ortola, R. Speroni (EN/ICE)
Cluster D 2 possible solutions:
QPS + PIC Potain + Matrix + Safety PLC
Industrial ControlsEngineering Department
11
Controls layout
25th of June 2015 J. Ortola, R. Speroni (EN/ICE)
Power ConvertersWater system
FRESCA2
HORIZONTAL TEST BENCH
BLOC4 (Cluster G)
LONG Cryostat
SCLink (Pipe)
DIODE Cryostat
SIETGAL Cryostat
HFM Cryostat
POTAIN
MATRIX
PXI DAQ
POTAIN
MATRIX
PXI DAQ
POTAIN
MATRIX
PXI DAQ
POTAIN
MATRIX
PXI DAQ
POTAIN
MATRIX
PXI DAQ
HV Mobile Rack 2
HV Mobile Rack 1
EF
C B A
ARTC1
ARTC2
ARTB1
ARTB2
ARTA1
ARTA2
ARTF1
ARTF2
ARTE1
ARTE2
CU
CFBC2 CBFC1 CFBB2 CFBB1 CFBA2 CFBA1
CFBF2 CBFF1 CFBE2 CFBE1
CTH
HV1
HV2
SE-F SE-E
SE-C SE-B SE-A