    Presented by:Amar Karam Chandani(091405)Ankit Shrivastava(091407)Himanshu Jha(091411)Aman Chaturvedi(091440)

  • 7/31/2019 Industrial Training 2012

    2/28

    Cost estimation is a specialised subject and aprofession in its own right. The design Engineer,however, needs to be able to make quick, rough, costestimates to decide between alternative designs and

    for project evaluation. Chemical plants are built tomake a profit, and an estimate of the investmentrequired and the cost of production are needed beforethe profitability of a project can be assessed.

  • 7/31/2019 Industrial Training 2012

    3/28

    ESTIMATION AT IOCL

    Preliminary cost estimate at IOCL is done manually using excel,where all the data is fed into the excel sheet and a X-Y scatterplot is generated then all the points which are distorting thecurve heavily are neglected as they will decrease the accuracy ofthe estimation. After generation of the plot a equation isobtained on excel and the preliminary new cost is estimatedusing the obtained equation. To this cost various factors areadded and the final cost is obtained.

    Problems with approach are following: -Arranging the massive amount of data present is a tedious job.Huge input of time is required.Wastage of valuable time is there and if the cost is requiredimmediately it will mean a lot of work.

  • 7/31/2019 Industrial Training 2012

    4/28

    Working steps of the program are following: -Takes input data from the user like size of heat exchanger, tagnumber etc.Then the program connects to the database and searches for allavailable data points.After obtaining the required data like base cost, base area.Then using the six tenth formulae it does capacity correctionand brings all the data into the required area.Then upgrades it to current time by using CEPCI index.The obtained cost is then multiplied with factors to take intoaccount MOC.

  • 7/31/2019 Industrial Training 2012

    5/28

  • 7/31/2019 Industrial Training 2012

    6/28

  • 7/31/2019 Industrial Training 2012

    7/28

    Bharat Oman Refineries has set up 6 million tonne per annumcapacity grass root refinery at Bina, Madhya Pradesh. It is dividedinto 3 major facilities as given below:

    Crude Import and Handling facilityCrude transfer and receiving facility through crosscountrypipelines and terminals

    Refining and related facilities.

    A 935 km pipeline from dispatch terminal of COT Vadinar, Gujaratbrings crude to the Receipt Terminal at Bina.

  • 7/31/2019 Industrial Training 2012

    8/28

    1.Primary Processing facilities:Crude Distillation Unit(CDU)

    Vacuum Distillation Unit(VDU)

    2. Secondary Processing Facilities.Motor Spirit Block(MSB)

    Hydrocracker Unit(HCU)

    Delayed Coker Unit(DCU)

    3. Treating Units:

    LPG Treating unit

    ATF Merox

    Diesel Hydrotreater

  • 7/31/2019 Industrial Training 2012

    9/28

    4.Sulphur Recovery Block(SRB)5.Hydrogen Generation Unit(HGU)

    6.Captive Power Plant(CPP)

    7.Utilities systems:Raw Water intake system

    Raw water treatment plant

    Cooling Tower and Cooling water treatment plantReverse Osmosis based Demineralization (RODM)

    Nitrogen plant and Effluent Water TreatmentPlant(ETP)

  • 7/31/2019 Industrial Training 2012

    10/28

    Fuel GasLiquefied Petroleum Gas(LPG)

    Naphtha

    Euro III Motor Spirit (MS)

    Euro IV Motor Spirit (MS)

    Aviation Turbine Fuel(ATF)

    Euro III HSD

    Euro IV HSDSulphur

    Pet Coke

  • 7/31/2019 Industrial Training 2012

    11/28

    The Delayed Coker Unit (DCU) is designed to process1,360,000 MT of Vacuum Residue based on Arab MixCrude

    This Unit is based on CB&I Lummus technology.

    Delayed Coking Process is a thermal cracking processfor upgrading heavy petroleum residues into lightergaseous & liquid products and solid Coke .

    The thermal cracking reaction starts in heater coils and

    provided residence time or Delayed for an extendedperiod in the Coke Drum for Polymerisation andCracking reactions to take place

  • 7/31/2019 Industrial Training 2012

    12/28

    For heating feed from 170oC to 200oC,we require a Shell & Tube Heat

    Exchanger of overall heat transfer areaof 1.77 m2

  • 7/31/2019 Industrial Training 2012

    13/28

    Coker gas

    LPG

    Coker Naphtha (C5-140C)

    Light Coker Gas Oil(140C-370C)

    Heavy Coker Gas Oil(370C plus)

    Coker Fuel Oil

    Pet Coke

  • 7/31/2019 Industrial Training 2012

    14/28

    DELAYED COKER

    UNIT (1.36

    MMTPA)

    Vacuum

    Residue fromCDU/VDU or

    Storage Tanks

    Coker Gas

    LPG (CDU)

    Coker Naphtha

    (HCU/DHT)

    Light Coker Gas Oil

    (HCU/DHT)

    Heavy Coker Gas Oil

    (HCU/DHT)

    Pet Coke to CPP

  • 7/31/2019 Industrial Training 2012

    15/28

  • 7/31/2019 Industrial Training 2012

    16/28

  • 7/31/2019 Industrial Training 2012

    17/28

    DCU HEATER(14-FF-00-101 A/B) CONFIGURATIONBalanced Draft, Twin Cell, Cabin Type,Horizontal Tubes Double Fired.

    Heat Absorption :- 17.2 MMKcal/HrNo of Tubes in Radiation Zone:- Total-64 (32 /Cell)

    No of Tubes in Convection Zone:-56

    No of Soot Blowers:-16/heater

    No of Burners:-32/heater

  • 7/31/2019 Industrial Training 2012

    18/28

  • 7/31/2019 Industrial Training 2012

    19/28

    The following measurements are to be made fordoing the energy balance in oil fired reheatingfurnaces (e.g. Heating Furnace)

    i) Weight of stock / Number of billets heated

    ii) Temperature of furnace walls, roof etc

    iii) Flue gas temperature

    iv) Flue gas analysis

    v) Fuel Oil consumption

  • 7/31/2019 Industrial Training 2012

    20/28

    USING APPROXIMATE METHOD:1.) WITH AIR PREHEATER: 89.55%

    2.) WITHOUT AIR PREHEATER: 82.05%

    B.)USING INDIRECT METHOD:

    1.) SENSIBLE HEAT LOSS DUE TO FLUE GAS: 6.45%

    2.)LOSSES DUE TO SKIN TEMPERATURE AND RADIATION: 3.01%OVERALL EFFICIENCY OF THE FURNACE: 90.5251%

  • 7/31/2019 Industrial Training 2012

    21/28

    KCFL began its operation in 1987 at Nimrani near Indore, WestMadhya Pradesh and has earned cash profits each and everyyear, since its inception, even though SSP Industry has gonethrough tumultuous times. Today KCFL has earned the

    distinction of being the largest manufacturer ofSSP in IndiaSSP manufactured and sold by Khaitan Chemicals & FertilizersLimited under the brand name "Khaitan Khad is amongst themost sought after brands in Western Madhya Pradesh andsurrounding areas. Being a straight fertilizer with easy

    application, low cost per bag and unique 12% sulphur contentmakes it very popular with the farmers. It is extensively used incrops like Oil Seeds, Groundnut, Potato etc. SSP is alsomanufactured in granulated form called GSSP

  • 7/31/2019 Industrial Training 2012

    22/28

    The Wet Gas compressor is a steam turbinedriven, 2-stage centrifugal compressor withvertically split casing supplied by M/s BHEL,Hyderabad.

    The wet gas compressor boosts the pressure ofCoker fractionator column overhead receivergas from 1.13 Kg/cm2 and is delivered to the

    absorber at a pressure of 15.92 Kg/cm2

    . Thefunction of the Wet Gas Compressor is tocompress Coker Fractionator overhead gases toa higher pressure for enhancing C3, C4 recovery.

  • 7/31/2019 Industrial Training 2012

    23/28

    The major components of WGC are:1. Casing

    2. Diaphragm

    3. Rotor4. Balancing Drum

    5. Bearings

    6. Internal Seal

  • 7/31/2019 Industrial Training 2012

    24/28

  • 7/31/2019 Industrial Training 2012

    25/28

  • 7/31/2019 Industrial Training 2012

    26/28

    n/(n-1) = EFp. k/(k-1)0.695 x 1.4 /(1.4-1) = 2.432

  • 7/31/2019 Industrial Training 2012

    27/28

    With number of impeller = 8 and 2 dimShrouded impeller, uncorrected efficiency =0.72

    Corrected efficiency become

    EFp = 0.72 x Co = 0.72 x 0.915 = 0.66 or 66% .