+ All Categories
Home > Documents > Inefficiëntie in de interne organisatie - LNG – Metrology for...

Inefficiëntie in de interne organisatie - LNG – Metrology for...

Date post: 24-Mar-2018
Category:
Upload: buidung
View: 215 times
Download: 3 times
Share this document with a friend
30
Imtech Industry International Together, Committed, Continuous Improvement page 1 Metrology for LNG conference, 17-18 th October 2013, Delft, the Netherlands Imtech quality reporting module iQRM Prepared by Ype Nugteren Metering Consultant
Transcript
Page 1: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 1

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Imtech quality reporting module

iQRM

– Prepared by

Ype Nugteren

Metering Consultant

Page 2: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 2

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Current Situation Report

Printer

Sampling

PLC

Batch Data /

Commands /

Flowrates

DCS

Sample Cylinder

Lab

GC Sampler

Page 3: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 3

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Situation with iQRM Report

Printer

Sampling

PLC

Batch Data /

Commands /

Flowrates

On-line

PGC

DCS

Composition

Sampler

Batch Data / Commands

Flowrates

Switch to

Validation /

Process

Composition

Page 4: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 4

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

iQRM Goal

Improve the determination and reporting of the average gas composition:

– Minimize human errors

– Undisputable Certificates of Quality (CoQ)

– Automated PGC Validation and statistical process control

Page 5: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 5

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

iQRM Main Features

■Automated generation of a Certificate of Quality (CoQ). ■CoQ is based on-line PGC Measurements

■Certification by an independent notified body.

■Synchronization with the LNG Sampler in the field

■Automated PGC validation

■Statistical Process Control

Page 6: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 6

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Platform

iQRM Hardware

FlowX/M flow computer module

■One module refers to one PGC.

■Multiple communication ports and

I/O connections.

■Runs iQRM application.

■NMi Approved / Certified Module.

Page 7: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 7

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Platform

iQRM Hardware

Panel mounted FlowX/P

■7” color touch screen.

■Sealed and secured system

■Multi-stream calculations

■Up to 4 FlowX/M modules per

FlowX/P

Page 8: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 8

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Platform

iQRM Software

■FlowX/P – User interface

– Extended Communication features

■FlowX/M – Application software for one PGC

– Compliant to international standards

Page 9: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 9

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Platform

iQRM Software Platform

■Certified standard application software ■Secured access ■Configurable to meet on site applications

Page 10: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 10

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

iQRM Functions

iQRM Software

■Loading

– Read PGC Measurements

– Evaluate measurement results

– Calculate flow weighted average composition

– Generate and print CoQ

Page 11: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 11

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

iQRM Functions

iQRM Software

■Single Point Validation

– Runs automatically

– Starts automatically (time based) or Manually.

– Evaluated validation results

– Generate and print validation report

Page 12: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 12

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

iQRM Functions

iQRM Software

■Perform a multi point validation session

– Semi automatic

– Not related to single point validations

– Not related to loadings

– Results can be uploaded for off-line PGC

performance evaluation

Page 13: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 13

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Product

Liquefied Natural Gas (LNG)

■Composition measured by PGC:

C1, C2, C3, iC4, nC4, iC5, nC5, C6+, N2 and CO2,

with C6+ representing C6 and heavier fractions. ■Other components can be added. (e.g. Argon)

■iQRM focus is currently on LNG (un)loading systems.

■iQRM version for 24/7 systems under investigation.

Page 14: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 14

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Single Point Validation

Validation Session ■An ongoing loading postpones starting a new validation.

■Configurable Validation time interval

■Configurable Validation validity period

■iQRM performs the validation automatically

■Validation sessions may FAIL or PASS

Page 15: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 15

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Single Point Validation

Evaluation

■Calculate mean and standard deviation of PGC

readings.

■Add results to Control Charts and apply Decision Rules

to determine validation result.

■A result is either “GOOD” or “BAD”

■iQRM can calculates GHV and RD values acc. ISO6967

or GPA2172:1996 and cross check with PGC values.

Page 16: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 16

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Single Point Validation

Control Charts ■Collection of mean and standard deviation results of the latest single point validations. ■Control Charts restarts when:

– Validation gas changes

– PGC is calibrated

– Number of validation readings changes

– Decision rules changes

Page 17: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 17

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Single Point Validation

Decision Rules

■Control Limit Check

■Warning Limit Check

■Half Warning Limit Check

■Offset Check

■Trend Check

-0,8

-0,6

-0,4

-0,2

0

0,2

0,4

0,6

0,8

0 1 2 3 4 5 6 7 8 9 10 11

MV CL WL HWL

Page 18: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 18

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Single Point Validation

Page 19: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 19

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Loading

Starting a Loading

■Trigger from DCS or other system.

■A loading prevails over a validation.

■A loading does not start when validation result is

“BAD”.

■A loading starts when validation result is “GOOD”,

even when the validation is expired.

Page 20: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 20

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Loading

Procedure

■Collect PGC from start to end of loading.

■PGC readings are marked as “Invalid” when:

– Loading is paused.

– LNG inlet vaporizer temperature too high.

– Sample temperature at accumulator too low.

Page 21: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 21

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Loading

Measurement Analysis

■Valid measurements undergo Grubbs outlier checks

on GHV.

■Average composition will be determined based on

valid measurements without outliers.

■Average calculation can be Time proportional and

Flow weighted.

Page 22: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 22

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Loading

Page 23: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 23

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Loading

Page 24: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 24

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Loading

Typical Certificate of Quality (CoQ) contains:

■Unique loading ID

■Reference to Last Validation

■Start and End loading date and time

■PGC measurement coverage of loading

■Average Composition, GHV and RD

■Number of used measurements, invalid

measurements, found outliers

Page 25: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 25

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

CoQ, printed automatically

Page 26: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 26

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Multi Point Validation

Purpose

■Off-line PGC performance evaluation over a certain

measurement range carried out by an independent third

party. (e.g. acc ISO-10723)

■iQRM supports up to 7 validation gas mixtures

■Results can be uploaded for off-line evaluation

■Results are not used within the iQRM

Page 27: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 27

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Reports

Main Reports ■ Single Point Validation report

■ Certificate of Quality

Additional Reports ■ Measurement table of loading

■ Multipoint Validation report

■ Controls Charts

■ Alarm and Event Log

■ Parameter Change report

■ Snapshot report

Page 28: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 28

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Security

Sealed off Hardware Switch

User levels secured with passwords ■ Guest

■ Operator

■ Engineer

■ Administrator

Page 29: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 29

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Benefits

■CoQ printed immediately after loading.

■No human interference.

■Standardized CoQ reports with uniform performance

evaluation.

■Traceability to validation report and SI standards.

■Secured platform with certified application.

■Parameter change traceability.

■Scheduled automatic validation.

■Uniform evaluation using control charts.

■Less laboratory resources required.

Page 30: Inefficiëntie in de interne organisatie - LNG – Metrology for LNGlng.justervesenet.no/wp-content/uploads/2015/04/Quality... ·  · 2015-04-14C1, C2, C3, iC4, nC4, iC5, nC5, C6+,

Imtech Industry International Together, Committed, Continuous Improvement page 30

Metrology for LNG conference, 17-18th October 2013, Delft, the Netherlands

Contact details Imtech Industry International B.V. Analyser Systems

Marquesweg 4, 4462 HD Goes, the Netherlands

P.O. Box 308, 4460 AS Goes, the Netherlands

T +31 (0)88 98 83 400 | F +31 (0)88 98 71 723

E-mail: [email protected]

Website: www.imtech.eu/analysersystems

iQRM Contact person

Mr. Ype Nugteren

E-mail: [email protected]


Recommended