Dragline Electrical Re- Design and Re-Location Project Overview Project BMA DRE41 Dragline Electrical Re-design and Re- locaon Locaon Blackwater Mine near Blackwater in Central Queensland. Infrastructure Three (3) x 3315 kW (4445 HP) Synchro- nous Motors Seven (7) FE 824 M Hoist motors Four (4) FE 824 M Drag Motors Two (2) FE 824 M Propel Motors Six (6) FE 820 M Swing Motors Project Scope Complete electrical project management including: Scope of Works Budgeng and cost control Scheduling Procurement Witness tests & factory acceptance tesng Commissioning planning and test registry Commissioning, boom raise and machine walk off Machine hand over and support Machine electrical supply: auxiliary electri- cal equipment The Project: In 2007 Inete was awarded the Engineers Australia Queensland Division Small Business Ventures/ Projects award for its work carried out on DRE41. Dragline Forty-One (DRE41) is an 8200 Marion dragline that was relocated from the USA for use at the BMACO Blackwater Mine, open cut pit, near the township of Blackwater in Central Queens- land. It is the second machine of this size to be introduced to the Blackwater pits. This is the sec- ond me this machine had been relocated. Originally moved once in the USA, it has for the second me been cut up and this me shipped across the Pacific Ocean to the port of Mackay for transport across the range to Blackwater. Electrically the machine is virtually brand new. Every- thing has been upgraded or enhanced from the MG-Sets, main DC Motors, PLC gear and PCR. The electrical components on this machine were replaced from the older style hardwired relay logic to a fully automated and enunciated control system. Inete was engaged directly by BMA to provide complete electrical project management, a A$20m contract within the overall A$92m relocaon and reassembly project. . The electrical project in- volved a total redesign of the draglines enre on-board electrical and control systems employing state-of-the art technology, equipment and soſtware. Inete Case Study : Inete Pty Ltd Trading as Integral Electric Technology Phone +61 7 3376 7214 Email [email protected]
Transcript
Page 1: Inete Case Study Dragline Electrical Re Design and Re Location · 2015-11-26 · Dragline Electrical Re-Design and Re-Location: Shutdown Works: The engineering task was to completely

Dragline

Electrical Re-

Design and

Re-Location

Project Overview

Project

BMA DRE41 Dragline Electrical Re-design and Re-location

Location

Blackwater Mine near Blackwater in Central Queensland.

Infrastructure

Three (3) x 3315 kW (4445 HP) Synchro-

nous Motors

Seven (7) FE 824 M Hoist motors

Four (4) FE 824 M Drag Motors

Two (2) FE 824 M Propel Motors

Six (6) FE 820 M Swing Motors

Project Scope Complete electrical project management including:

Scope of Works

Budgeting and cost control

Scheduling

Procurement

Witness tests & factory acceptance testing

Commissioning planning and test registry

Commissioning, boom raise and machine

walk off

Machine hand over and support

Machine electrical supply: auxiliary electri-

cal equipment

The Project: In 2007 Inete was awarded the Engineers Australia Queensland Division Small Business Ventures/

Projects award for its work carried out on DRE41.

Dragline Forty-One (DRE41) is an 8200 Marion dragline that was relocated from the USA for use at

the BMACO Blackwater Mine, open cut pit, near the township of Blackwater in Central Queens-

land. It is the second machine of this size to be introduced to the Blackwater pits. This is the sec-

ond time this machine had been relocated. Originally moved once in the USA, it has for the second

time been cut up and this time shipped across the Pacific Ocean to the port of Mackay for

transport across the range to Blackwater. Electrically the machine is virtually brand new. Every-

thing has been upgraded or enhanced from the MG-Sets, main DC Motors, PLC gear and PCR. The

electrical components on this machine were replaced from the older style hardwired relay logic to

a fully automated and enunciated control system.

Inete was engaged directly by BMA to provide complete electrical project management, a A$20m

contract within the overall A$92m relocation and reassembly project. . The electrical project in-

volved a total redesign of the dragline’s entire on-board electrical and control systems employing

state-of-the art technology, equipment and software.

Inete Case Study:

Inete Pty Ltd

Trading as Integral Electric Technology

Phone +61 7 3376 7214

Email [email protected]

Page 2: Inete Case Study Dragline Electrical Re Design and Re Location · 2015-11-26 · Dragline Electrical Re-Design and Re-Location: Shutdown Works: The engineering task was to completely

Dragline Electrical Re-Design and Re-Location:

Shutdown Works: The engineering task was to completely redesign DRE41’s on-board electrical, computer and control systems, to ensure compliance with Australian Stand-

ards and local Acts and Regulations governing such installations, and readying it for further automation.

The Inete contract with BMA required Inete to act as the Principal’s Representative and covered the scoping of all electrical work on the machine, budg-

eting and cost control, scheduling of procurement, manufacture, testing, installation and commissioning, tender management, procurement of all electrical

equipment, resource management, commissioning planning and control, software design and development, commissioning execution, shake down and

monitoring of the machine walk off and continuous improvement of its operation. Control of compliance with Australia Standards, Queensland Coal Mining

Act & Regulations and BMA Blackwater Mine Regulations were all the responsibility of Inete for the duration of the project, a very important role to ensure

proper conversion of the former U.S.A. 60 Hz electrics. Electrical safety on the machine; both during the installation and the final hand over and sign off by

BMA for site acceptance was the responsibility of Inete.

Key design features included a central programmable logic controller (PLC), the installation of more powerful DC motors and generators, comprehensive

and configurable data acquisition system, and a distribution system

designed to improve performance, reduce costs and enhance safety.

Project Close Out: Despite delays caused by the late delivery of the machine to Australia

in March 2006 - due to the effects of Hurricane Katrina in the U.S.A -

the electrical fit-out was completed on time and on budget in Decem-

ber 2006. Electrical staff were on-site for a further two months to

assist in testing while the mechanical contract was being completed

and to provide site support during the handover, training and initial

operational tuning period.

In 2007 Inete was awarded the Engineers Australia Queensland Divi-

sion Small Business Ventures/Projects award for its work carried out

on DRE41.

Inete Case Study:

Inete Pty Ltd

Trading as Integral Electric Technology

Phone +61 7 3376 7214

Email [email protected]

Dragline 41 Off Cab Side Aerial Shot Dragline 41 Front Aerial Shot