1 Ministry of Education Information and Communications Technology (ICT) Cabling Infrastructure: Policy and Standards for Schools Version 5.0 August 2020
Transcript
Page 1: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

1

Ministry of Education

Information and Communications Technology (ICT) Cabling

Infrastructure:

Policy and Standards for Schools

Version 5.0

August 2020

Page 2: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

2

Document Information

Acknowledgements

The Ministry of Education, New Zealand, acknowledges with thanks the assistance and

contribution of a number of organisations, institutions, statutory bodies, and individuals in the

preparation of these Standards. In particular, the assistance of the following parties is

acknowledged:

Standards upgrade leads

Torque IP and Nspire Technologies,

Ministry of Education approved manufacturers

J A Russell Ltd (Hubbell), CommScope and Schneider Electric (NZ) Ltd

With thanks for reviewing;

Terry Moes Blackyard Engineering

Neale Graham WSP

Don Mulder 22 Degrees

Page 3: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

Table of Contents

FOREWORD ............................................................................................................ 10

1. USING THIS DOCUMENT ................................................................................. 12

1.1 Interpretation of this document ......................................................... 12

Application of this document ...................................................................... 13

1.2 Definitions and abbreviations ............................................................ 15

2. STRUCTURED CABLING SYSTEMS: OVERVIEW .......................................... 19

2.1 ICT cabling background .................................................................... 19

2.2 Generic Cabling System (GCS) ........................................................ 19

2.3 General design requirements ............................................................ 20

2.3.1 Switching and Wireless System Works ............................................. 21

2.3.2 Switching and Wireless Systems: Design Standards ........................ 21

2.3.3 Switching and Wireless System: Installation Practices ..................... 21

2.3.4 Switching and Wireless Systems: Documentation ............................ 22

3. GENERAL CONDITIONS .................................................................................. 23

3.1 Ministry ICT Cabling requirements .................................................... 23

3.2 Cabling system works ....................................................................... 23

3.3 Standards and references ................................................................. 23

3.4 Security clearance and Police vetting ............................................... 23

3.5 Occupational Health and Safety (OSH) ............................................ 24

3.6 Advice ............................................................................................... 25

3.7 Site conditions................................................................................... 25

3.8 Contractual obligations ..................................................................... 26

3.9 Installer qualification ......................................................................... 26

3.10 Existing sites floor plans ................................................................... 26

3.11 Design by the installer ....................................................................... 26

3.12 Electrical installation works ............................................................... 27

3.13 Equipment locations .......................................................................... 27

3.14 Contract drawings ............................................................................. 28

3.15 Fit for purpose ................................................................................... 28

3.16 Final design approval ........................................................................ 28

3.17 Computer Aided Design (CAD) drawings .......................................... 28

3.18 Shop drawings .................................................................................. 29

Page 4: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

3.19 Time elapsed .................................................................................... 29

3.20 Construction documentation ............................................................. 30

3.21 Coordination with other services ....................................................... 30

3.22 Out of hours work .............................................................................. 31

3.23 Testing .............................................................................................. 31

3.24 Site reinstatement ............................................................................. 32

3.25 Cleaning ............................................................................................ 32

3.26 Removal of redundant materials ....................................................... 32

3.27 Practical completion .......................................................................... 33

3.28 Audits and inspections ...................................................................... 33

3.29 As-built drawings ............................................................................... 34

3.30 Warranties ........................................................................................ 35

3.31 Records and retention ....................................................................... 35

3.32 Intellectual property ........................................................................... 36

3.33 Confidentiality ................................................................................... 36

3.34 Training ............................................................................................. 36

4. DESIGN CRITERIA............................................................................................ 37

4.1 Criteria for use .................................................................................. 37

4.2 Associated systems and components ............................................... 37

4.3 Design exclusions ............................................................................. 37

4.4 Applications and cabling performance .............................................. 38

4.5 Category 6 and 6A (Cat 6A) F/UTP or F/STP cable and connecting hardware 40

4.6 Cabling lengths ................................................................................. 41

4.7 Cabling system architecture .............................................................. 42

4.8 Aesthetic design................................................................................ 43

4.9 Single vendor solutions ..................................................................... 44

4.10 Dimensioning .................................................................................... 45

4.11 Salt spray and corrosive environments ............................................. 45

4.12 Chemical corrosion ........................................................................... 45

4.13 Noise ................................................................................................. 46

4.14 Legacy systems ................................................................................ 46

4.15 Fire rating .......................................................................................... 48

4.16 Electrical installation works ............................................................... 48

Page 5: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

4.17 Electromagnetic compatibility ........................................................... 49

4.18 Power over ICT Cabling Infrastructure considerations ...................... 50

5. PATHWAYS AND SPACES ............................................................................... 53

5.1 General requirements ....................................................................... 53

5.2 Inter-building pathways ..................................................................... 55

5.3 Underground pathways ..................................................................... 56

5.4 Overhead pathways .......................................................................... 59

5.5 Tunnels ............................................................................................. 60

5.6 Intra-building pathways ..................................................................... 60

5.7 Horizontal cabling pathway components ........................................... 60

6. CABLING ........................................................................................................... 64

6.1 General ............................................................................................. 64

6.2 Backbone .......................................................................................... 66

6.3 Cabling Subsystem 1 (horizontal cabling) ......................................... 71

7. EQUIPMENT SPACES ...................................................................................... 75

7.1 Equipment rooms .............................................................................. 75

7.2 Equipment room design .................................................................... 75

7.3 Entrance facility................................................................................. 75

7.3.5.1 ICT specific wall mounted cabinet protection requirements ....... 78

7.3.5.2 ICT specific free standing cabinet requirements ........................ 78

7.4 Air conditioning and temperature control .......................................... 79

7.5 Enclosures and racks ........................................................................ 79

8. TERMINAL EQUIPMENT AREAS (TE) .............................................................. 85

8.1 Terminal equipment outlets (TEO) .................................................... 85

8.2 Floor boxes ....................................................................................... 86

8.3 Flush mounted faceplates ................................................................. 86

8.4 Radiators .......................................................................................... 86

9. EARTHING AND TRANSIENT PROTECTION .................................................. 87

9.1 Earthing ............................................................................................ 87

9.2 Transient protection .......................................................................... 87

9.3 Communications Earth System (CES) .............................................. 88

10. ELECTRICAL ..................................................................................................... 89

10.1 Electrical installation ......................................................................... 89

10.2 Electrical segregation ........................................................................ 89

Page 6: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

10.3 Guidance for installation of RCD protection in schools ..................... 89

10.4 Communications overvoltage or surge protection ............................. 89

11. WIRELESS ACCESS POINTS .......................................................................... 90

11.1 Wireless LAN Design ........................................................................ 90

11.2 Wireless LAN (WLAN) location ......................................................... 90

11.3 Wireless access points – installation and cabling ............................. 91

12. TESTING AND CERTIFICATION ...................................................................... 92

12.1 Testing, certification, and documentation .......................................... 92

12.2 Copper .............................................................................................. 93

12.3 Fibre .................................................................................................. 93

12.4 Warranty certification ........................................................................ 94

APPENDIX A – HERITAGE SITES .......................................................................... 95

APPENDIX B – APPROVED ICT CONTRATORS LIST ........................................... 97

APPENDIX C – CABLING WORK PRACTICES ....................................................... 98

APPENDIX D – LABELLING CONVENTION.......................................................... 100

APPENDIX E – TERMINAL EQUIPMENT OUTLET DESIGN – FIT FOR PURPOSE 103

APPENDIX F – AIR CONDITIONING AND TEMPERATURE CONTROL .............. 104

APPENDIX G – QUALITY PLAN – OPTICAL FIBRE CABLE TESTING (USING OTDR AND LSPM) ................................................................................................. 106

APPENDIX H – QUALITY PLAN – OPTICAL FIBRE CABLE TESTING (USING LIGHT SOURCE AND POWER METER) ............................................................... 110

APPENDIX I – QUALITY PLAN – BALANCED CABLING TESTING (WITH FIELD TESTERS) .............................................................................................................. 114

APPENDIX J – SAMPLE AS BUILT DOCUMENTATION ....................................... 119

Figures

Figure 1: Structure of generic cabling ....................................................................... 41

Figure 2: Conceptual cabling layout ......................................................................... 43

Figure 3: Cabling Subsystem 1 ................................................................................. 69

Figure 4: Communications earth system (CES) ...................................................... 887

Tables

Table 1: Optical fibre channel lengths ...................................................................... 41

Table 2: Acceptable sound levels ............................................................................. 46

Page 7: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

REFERENCED DOCUMENTS Reference is made in this document to the following: NEW ZEALAND STANDARDS NZS 3604:2011 Timber framed buildings NZS 4219:2009 Seismic performance of engineering systems NZS 6801:2008 Acoustics - Measurement of environmental sound NZS 6802:2008 Acoustics - Environmental noise

JOINT AUSTRALIAN/NEW ZEALAND STANDARDS AS/NZS ISO 717.1:2004

Acoustics – Rating of sound insulation in buildings and of building elements-airborne sound insulation

AS/NZS 1367:2016 Coaxial cable and optical fibre systems or the RF distribution of analogue and digital television and sound signals in single and multiple dwelling installations

AS/NZS 1768:2007 Lightning protection AS/NZS 2107:2016 Acoustics – Recommended design sound levels and

reverberation times for building interiors AS/NZS 3000 Electrical installations (known as the Australian/New

Zealand Wiring Rules). The cited version of AS/NZS 3000 as per the Electrical (Safety) Regulations 2010.

AS/NZS 1680 Interior and workplace lighting AS/NZS 11801-1:2019 Information technology — Generic cabling for customer

premises — Part 1: General requirements

AS/NZS 3084:2013 Telecommunications installations – Telecommunications pathways and spaces for commercial buildings

AS/NZS 3085.1:2004 Telecommunications installations – Basic requirements AS/NZS 4296:1995 Cabling trunking systems AS/NZS 61000.6.3:2012

Electromagnetic compatibility (EMC) - Part 6.3: Generic standards - Emission standard for residential, commercial and light-industrial environments

AS/NZS CISPR 22:2009

Information technology equipment - Radio disturbance characteristics - Limits and methods of measurement

AS/NZS 14763.3:2017 Telecommunications installations – Implementation and operation of customer premises cabling - Part 3: Testing of optical fibre cabling

AS/NZS IEC 61935.1:2012

Specification for the testing of balanced and coaxial information technology cabling – Part 1: Installed balanced cabling as specified in ISO/IEC 11801 and related standards

AUSTRALIAN STANDARDS AS 3996:2019 Access covers and grates AS 11801.2:2019 Information technology — Generic cabling for customer

premises — Part 2: Office premises AS 11801.3:2019 Information technology — Generic cabling for customer

premises — Part 3: Industrial premises

Page 8: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

AS 11801.6:2019

Information technology — Generic cabling for customer premises — Part 6: Distributed building services

AS ISO 140.4:2006 Acoustics – Measurement of sound insulation in buildings

and of building elements - Field measurements of airborne sound insulation between rooms

AS/CA S008:2019 Requirements for customer cabling products AS/CA S009:2019 Installation requirements for customer cabling (Wiring

Rules)

OTHER PUBLICATIONS New Zealand Building Code

Compliance document for New Zealand Building Code – Clause C Protection from Fire (including amendments 2 and 3) Compliance document for New Zealand Building Code – Clause E2 External Moisture (Third edition, including amendment 6) Compliance document for New Zealand Building Code – Clause G9 Electricity (including amendment 6)

Ministry of Education Designing Schools in New Zealand – Requirements and Guidelines. Version 1.0, October 2015

Ministry of Education Technology in Schools – Information and Communications Technology (ICT) Switching Infrastructure: Policy and Standards for Schools Version 2.0, October 2019

Ministry of Education Technology in Schools – Information and Communications Technology (ICT) Wireless LAN Infrastructure: Policy and Standards for Schools Version 1.0, July 2019

Ministry of Education Electrical Installations: Standard for Schools Version 1.6, October 2015

Building Industry Consulting Service International, Inc (BICSI)

Telecommunications Distribution Methods Manual (TDMM), 13th Edition

Page 9: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

ADDITIONAL MATERIAL The following publications and websites are not referenced in this document, but provide additional guidance for designers and installers. JOINT AUSTRALIAN/NEW ZEALAND STANDARDS AS/NZS 2967:2014 Optical fibre communication cabling systems safety AS/NZS 60079.10.1:2009

Explosive atmospheres – Classification of areas – Explosive gas atmospheres

INTERNATIONAL STANDARDS ISO/IEC 11801-2:2017 ISO/IEC 11801-3:2017 ISO/IEC 11801-4:2017 ISO/IEC 11801-5:2017 ISO/IEC 11801-6:2017

Information Technology – Generic cabling for customer premises – Part 2: Office premises Information Technology – Generic cabling for customer premises – Part 3: Industrial premises Information Technology – Generic cabling for customer premises – Part 4: Single Tenant Homes Information Technology – Generic cabling for customer premises – Part 5: Data Centres Information Technology – Generic cabling for customer premises – Part 6: Distributed Building Services

IEC 60268-16 Ed. 4.0 en_d(2011)

Sound system equipment – Part 16: Objective rating of speech intelligibility by speech transmission index

OTHER PUBLICATIONS Building Industry Consulting Service International, Inc (BICSI)

Outside Plant Design Reference Manual (OSPDRM), 6th Edition

WEBSITES http://www.legislation.govt.nz/ www.education.govt.nz/ http://www.telepermit.co.nz/PtcSpecs.html LATEST REVISIONS The users of this document should ensure that their copies of the above-mentioned New Zealand Standards and the New Zealand Building Code are the latest revisions. Amendments to referenced New Zealand and Joint Australian/New Zealand Standards can be found on http://www.standards.co.nz.

Page 10: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

FOREWORD The educational environment provides one of the most challenging frameworks for the operation of comprehensive structured information and communication technology (ICT) infrastructure solutions. It has exceptionally high requirements for reliability, fault-tolerance and service availability that exceed many other similar sized operating environments. Educational providers are frequently at the leading edge of the technology and application lifecycle with teaching systems often involving new and innovative applications, extensive use of graphical content, monitoring, and reviewing functions. They are also much more likely to involve the use of complementary technologies including wireless and cabled monitoring systems, audio-visual applications, presentation applications, multi-media content, metering and control requirements and collaborative developments than their commercial or government counterparts. The modern school infrastructure must address not only the standard applications of telephony and data connectivity, but must also support the unique requirements of heavy burst-oriented network traffic requirements over relatively shorter periods associated with educational systems, extensive use of multi-media technologies, and both wired and wireless networking. The goal of this Ministry of Education document, Information and Communications Technology (ICT) Cabling Infrastructure: Policy and Standards for Schools v5.0 is to provide a reference document for cost effective design and construction of cabling infrastructure for all facilities in New Zealand Schools. It has been prepared to outline the minimum standards required to ensure consistency and compatibility of all new and existing Ministry of Education schools Generic Cabling Systems (GCS) and network infrastructure systems. This document provides the technical standards and guidelines that shall be followed for the design and technical performance of any ICT cabling infrastructure in facilities owned by Ministry of Education schools is installed, maintained, certified and managed. It is updated regularly as Standards, school requirements and Ministry policy change. Prior to using this document the user should confirm that they have the latest version. The latest version of the document may be obtained from www.education.govt.nz/

Page 11: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

Purpose The document shall be used by schools and other organisations which participate in the design, installation, and operation of information and communications technology infrastructure and cabling systems for New Zealand schools. The document addresses information technology infrastructure in new schools, and is to be applied to existing schools planning significant installations, upgrades, and modifications to existing infrastructure. This document provides guidance on minimum technical standards in the following areas: a) Technical requirements for cabling systems b) Product selection c) Design, installation and testing d) Labelling, administration and documentation.

Document sponsor This document has been developed and is controlled by the Ministry of Education. All queries, errors, omissions or suggestions are to be directed to: The Group Manager Business Services Education Infrastructure Service PO Box 1666 Wellington 6140 Email: [email protected]

Outcome statement By using this document and relative standards, designers and installers will successfully meet the Ministry of Education minimum standards for the safety, design, installation and support of generic and structured cabling systems and information and communications technology environments that New Zealand schools manage and operate.

Page 12: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

12

1. USING THIS DOCUMENT

1.1 Interpretation of this document 1.1.1 Interpretation For the purposes of this document, use the key words "must", "must not", "required", "shall", "shall not", "should", "should not", "recommended", "not recommended", "may", and "optional". These are to be interpreted as described in RFC2119. RFC 2119 gives the following definitions: 1. must This word, or the terms "required" or "shall", mean that the definition is an absolute

requirement of the specification and mandatory.

2. must not This phrase, or the phrase "shall not", mean that the definition is an absolute prohibition

of the specification.

3. should This word, or the adjective "recommended", mean that there may exist valid reasons in

particular circumstances to ignore a particular item, but the full implications must be understood and

carefully weighed before choosing a different course.

4. should not This phrase, or the phrase "not recommended" mean that there may exist valid

reasons in particular circumstances when the particular behavior is acceptable or even useful, but

the full implications should be understood and the case carefully weighed before implementing any

behavior described with this label.

5. may This word, or the adjective "optional", mean that an item is truly optional. One vendor/ supplier

may choose to include the item because a particular marketplace requires it or because the vendor/

supplier feels that it enhances the product while another vendor/ supplier may omit the same item.

An implementation which does not include a particular option must be prepared to interoperate with

another implementation which does include the option, though perhaps with reduced functionality.

In the same vein an implementation which does include a particular option must be prepared to

interoperate with another implementation which does not include the option (except, of course, for

the feature the option provides.)

1.1.2 Scope of this document This document addresses the following areas: a) Generic Cabling System (GCS) comprised of balanced copper cabling and optical

fibre for use in New Zealand schools

b) Cable pathways and equipment spaces including equipment rooms, distribution

spaces and equipment mounting

c) Cabling for wireless networking systems.

1.1.3 Criteria for use All school Information and Communications Technology (ICT) installation and upgrade work shall be in accordance with this document. It is a requirement of the Ministry that all schools, designers and installers of networks for schools shall use this document, in order to allow the school to fully participate in the e-learning environment and protect the investment in the ICT cabled infrastructure.

Page 13: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

13

In addition to this document, the designer and installer should refer to other sources for detailed design and installation guidance, such as relevant mandatory legislation, publications outlined in this document, and manufacturer installation guidelines.

Application of this document 1.2.1 Regulations, codes, and Standards All cabling system works are to be carried out in accordance with the regulations, codes, and Standards listed at the beginning of this document. Where New Zealand and international Standards are referenced in this document the application of the Standard shall be, unless specifically stated elsewhere to the contrary, to the latest edition and amendments available on the date 30 calendar days prior to the issue of any request, quote, tender or proposal. Where design and construction of a new site spans multiple stages, each new stage shall comply with the requirements of this clause. Where design and tender is completed as a single stage, but construction spans multiple stages, the standard to which the first stage was initially designed shall remain the same throughout the rest of the build programme, unless a variation and instruction is issued to change by the Ministry of Education or their Project Manager. Where specifications or Standards, or any other references in this document refer in turn to other specifications, Standards or documents whether whole or in part, the strictest of those consequential references shall apply to this specification as if they were completely contained in the original reference. Regulatory requirements and Codes of Practice – cabling Other than for compliance with the Electrical Regulations and relevant New Zealand Codes of Practice, there are no regulatory requirements for telecommunications cabling components, design practices, or installation practices in New Zealand. The Telecommunications ACT 1987 gives Telecom and any other Network Operators the right to refuse connection or to disconnect unsatisfactory cabling and components from their network. For cabling connected to the national telecommunication network, compliance with Telecom PTC specifications is a contractual requirement. 1.2.2 Installation specific standards and requirements The designer and installer shall conform to all the requirements of this Standard. Designer and installer note: Where a school has site specific standards and requirements, for example product type or labelling schemes, and it is a) cost efficient; and b) does not have a material impact on the technical aspects of meeting this Standard, then these shall be followed if written agreement from the school and the Ministry is received.

Page 14: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

14

1.2.3 Variation from this document Compliance to the requirements of this document may, under some circumstances, not be practical, or cost effective, or an alternative solution may exist that better suits the conditions on site. The designer and installer are advised that, in the event that compliance to this document cannot be met, before undertaking the non-compliant works the designer or installer is to obtain written approval for a variation from: Director – EIS Business Services Business Services Education Infrastructure Service PO Box 1666 Wellington 6140 Email: [email protected] 1.2.4 Conflicts If a conflict exists between the Standards or with the Scope of Works then the installer shall notify the Project Manager or their representative of any conflicts and seek clarification prior to continuation. In general the order of precedence shall be: a) Statutory Codes and Regulations b) The Ministry of Education publication ICT Cabling Infrastructure: Policy and

Standards for Schools (this document) c) Standards and specifications within the tender or contract d) Referenced New Zealand and International Standards In situations where tender specific Standards, specifications, or both, exceed Ministry requirements, these shall take precedence. Where reference is made to a specification, the latest release available on the date 30 calendar days prior to the issue of any request, quote, tender or proposal shall apply. Conflicts in requirements or requests for variation from published documents that are identified by Schools, consultants, designers, tenderers, or installers shall be notified in writing to: Director – EIS Business Services Business Services Education Infrastructure Service PO Box 1666 Wellington 6140 Email: [email protected] Written confirmation from the Ministry is to be received before resolution.

Page 15: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

15

1.2 Definitions and abbreviations For the purposes of this document the following definitions and abbreviations shall apply. 1.3.1 Definitions

Term Definition

Application Specific Cabling

System manufacturers design

As-built Final set of drawings produced at the completion of a construction project, including all changes made to the original construction drawings

Building backbone cabling

Cable that connects the building distributor to a floor distributor

Campus A school, and includes the buildings and grounds in which a cabling system is installed

Campus backbone cabling

Cable that connects the campus distributor to the building distributor(s)

Campus distributor Distributor from which the campus backbone cabling starts

Category 5 (Cat 5) For the purposes of this document, cabling components which provide a permanent link that, when tested, do not meet AS/NZS 11801-1 Class D performance

Category 5e (Cat 5e) For the purposes of this document, cabling components which provide a permanent link that, when tested, meet AS/NZS 3080 [AS/NZS 11801-1] Class D performance

Category 6 (Cat 6) Category 6A (Cat 6A)

A definition of cabling components which provide AS/NZS 11801-1 Class E performance A definition of cabling components which provide AS/NZS 11801-1 Class EA performance

Catenary wire A wire supported at two points kept under mechanical tension to provide a support to which cabling may be fastened.

Channel End-to-end transmission path connecting two pieces of application specific equipment (includes patch leads and work areas cables)

Clear working spaces A ventilated working space allowing quick unrestricted egress or escape in the event of emergency

Page 16: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

16

Term Definition

Consolidation Point Connection point in the horizontal cabling subsystem between a floor distributor and a telecommunications outlet

Designer A person who plans the look, or workings, or both, of something prior to it being made, by preparing drawings or plans

Distributor The term used for a collection of components (such as patch panels, patch cords) used to connect cables

Enclosure A housing for accommodation of equipment and cabling that includes mounting rails and protective panels

Equipment footprints The vertical and horizontal planes occupied by a piece of equipment in normal operation

Generic cabling system

Structured telecommunications cabling system, capable of supporting a wide range of standardized applications. Standards based design

Horizontal cabling Cable connecting the floor distributor to the terminal equipment outlets

Installer A person that places or fixes equipment or machinery in position ready for use. The party(s) responsible for the supply, installation, testing and warranty of cabling systems

Manufacturer A person or company that makes cabling goods for sale

Power Over SCS or GCS cabling

Power over structured telecommunications cabling (application specific cabling) or Power over generic cabling (non-application specific cabling),

Permanent link Transmission path between the telecommunications outlet and the floor distributor

Single vendor system A system provided by a single vendor to help reduce operational, configuration, and management complexity

Site See Campus

Structured Cabling System

Specific cabling solution designed with a set of cabling and connectivity products that are constructed (engineered) according to standardised rules to facilitate specific connectivity requirements eg. Nurse Call (Staff Assist. Legacy design.

Suitably qualified person

A person with the professional qualifications and experience in the industry to undertake the design and supervision of the works

Velcro™ A proprietary form of Hook & Loop fastener/cable tie

Page 17: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

17

1.3.2 Abbreviations

AFFL Above Finished Floor Level ODF Optical Distribution Frame

BD Building Distributor OFCS Optical Fibre Communication Systems

BER Bit Error Rate PE Polyethylene

CAD Computer Aided Design PoE Power over Ethernet

CD Campus Distributor POL Passive Optical LAN

CES Communications Earth System RCBO Residual Current Breaker (with overcurrent protection)

CoC Certificate of Compliance RCD Residual Current Device (No overcurrent protection)

CP Consolidation Point RJ45 Registered Jack Number 45

DB Electrical Distribution Board RU Rack Unit

EMC

ES1

ES2

ES3

Electromagnetic Compatibility

Energy Source Class I

Energy Source Class II

Energy Source Class III

SCS

SCP

SD

Structured Cabling System

Service Concentration Point

Services Distributor

ESC Electrical Safety Certificate S/FTP Overall braid screened cable with foil screened twisted pairs (often referred to as STP or PiMF)

FD Floor Distributor SFF Small Form Factor

FOBOT Fibre Optic Break Out Termination SMOF Single Mode Optical Fibre

F/UTP Overall screened cable with unscreened twisted pairs (often referred to as FTP)

SO Service Outlet

GbE Gigabit (per second) Ethernet SPA School Property Advisor

GPO General Purpose Electrical Outlet SPD Surge Protection Device

GCS Generic Cabling System TEO Terminal Equipment Outlet

ICT Information and Communications Technology

TO Telecommunications Outlet

IDC Insulation Displacement Connection TR Telecommunications Room

IP Internet Protocol TRC Telecommunications Reference Conductor

LAN Local Area Network UPS Uninterruptible Power Supply

Page 18: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

18

LC A small form factor optical fibre connector type

uPVC Unplasticised polyvinyl chloride

MAC Moves Adds Changes UTP Unshielded Twisted Pair

MATV Master Antenna television UV Ultraviolet

MCB Miniature Circuit Breaker WA Work Area

MMOF Multimode Optical Fibre WAP Wireless Access Point

MCB

MPTL

Miniature Circuit Breaker

Modular Plug Termination Link

WLAN Wireless Local Area Network

MUTO Multi User Telecommunications Outlet

Page 19: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

19

2. STRUCTURED CABLING SYSTEMS: OVERVIEW

2.1 ICT cabling background The Information and Communications Technology (ICT) cabling system plays a critical role in telecommunications systems, providing the physical link between sources and destinations of information. Data, voice, video and control signals are transmitted over this infrastructure linking devices across the hall, throughout a building or across several buildings. Cabling systems range in size from small and simple, linking just a few nodes, to large and complex, linking several buildings with tens of thousands of nodes. The cabling system provides the physical link between active network equipment such as routers and switches, and the terminal equipment such as computers and telephones. New Generic Cabling Systems (GCS) are typically comprised of copper and optical fibre cabling. To facilitate the day-to-day operations of a normal school environment, a cabling system must enable the user to make additions, moves and changes, wherever and whenever necessary. Furthermore, the GCS must also be flexible and provide the capability to carry a wide variety of applications – from high-speed local area network (LAN) applications to voice and low speed data. As data throughput and transmission speeds continue to grow, greater demands are being placed on the ICT cabling infrastructure. Gigabit Ethernet, and other high bandwidth services, use “parallel transmission schemes” to transmit signals simultaneously over multiple copper pairs instead of one pair. Delivery of these new services requires increased performance from cabling plant.

2.2 Generic Cabling System (GCS) Generic cabling is a structured telecommunications cabling system capable of supporting a wide range of standardised applications such as voice, video and data. Cabling equipment manufacturers shall be Ministry approved and offer a minimum link performance warranty of 20 years if the installation uses approved components that are installed by an installer certified or accredited by the manufacturer. In the case of work undertaken to change or expand an existing cabling installation the following requirements shall be applied1: a) The new equipment shall be specified to ensure all existing warranties and

system performance are maintained or enhanced. b) The new equipment shall be matched as closely as possible to the existing

equipment unless a more up to date and cost effective solution is available or

1 This applies specifically to existing buildings and does not apply to new buildings on the same site

Page 20: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

20

such matching would conflict with occupational health and safety requirements or mandatory standards.

c) The number of differing types of equipment installed throughout a site shall be kept to a minimum.

In the case of cabling for new buildings added to a school, the cabling system shall comply with the requirements of this document unless such compliance would create compatibility or performance issues.

2.3 General design requirements Generic cabling systems are generally intended to serve for a long period of time. However, it is likely that transmission system requirements will change during the life of the cabling system. It is for this reason Cat 6 UTP and OM3 fibre in the previous standard (V4.0) shall now be superseded by Cat 6A shielded cabling (F/UTP or S/FTP) and OS2 fibre in this standard. For this reason it is important that the cabling system is designed to be flexible and scalable, to ensure longevity and accommodate future increased bandwidth requirements. This is particularly important where cabling is installed underground or in other locations where upgrades to plant can be expensive and disruptive. If the Ministry approved certified installer is not furnished with a design for switching and wireless by an independent ICT Switching and Wireless design specialist and have been engaged by the school or any other third party to design or install cabling at the school, then they shall ensure that they meet all the requirements of the following standards: https://www.education.govt.nz/assets/Documents/School/Running-a-school/Technology-in-schools/technical-info/MoE-Information-and-Communications-Technology-ICT-Switching-Infrastruc....pdf And https://www.education.govt.nz/assets/Documents/School/Running-a-school/Technology-in-schools/technical-info/MoE-Information-and-Communications-Technology-ICT-Wireless-LAN-Infrast....pdf All school ICT installation and upgrade work shall be in accordance with these documents. The Ministry requires that all schools, designers and installers of network and wireless systems in schools shall use these documents, in order to allow the school to fully participate in the e-learning environment and protect the investment in switching and wireless systems.

Page 21: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

21

2.3.1 Switching and Wireless System Works The scope of work for the provision of switching and wireless systems and equipment in schools typically includes design, supply, installation, testing, commissioning, and documentation. Any new design shall include an overarching document that covers all 5 stages of Safety in Design (SiDs).

2.3.2 Switching and Wireless Systems: Design Standards General Because of the diversity of school sizes, building layouts, and networking requirements, a range of common switching and wireless system architectures are described. Schools are encouraged to discuss their requirements with an independent designer or consultant prior to purchasing hardware. Determining Location of Wireless Access Points There are two methods for designing a WLAN solution, Predictive RF planning and Physical RF Mapping (Site Survey). Predictive allows a designer to provide a school with costs to deploy a wireless solution to meet the brief without a site visit or for buildings that are not yet constructed. Schools shall always request that any plan include at a minimum a predictive RF coverage map. This can then be tuned onsite with physical RF mapping, also referred to as a site survey. The design, installation and configuration of any network switching and wireless shall be completed by a suitably qualified person.

2.3.3 Switching and Wireless System: Installation Practices General The switching and wireless systems supplier/reseller or appropriately qualified designate that can supply all labour, materials and equipment required for installing, testing and commissioning the network. The supplier or designate shall include a copy of all relevant specifications, compliance reports, documentation and diagrams including the switch and wireless IP address assignments for installation in an “as-built” document manual. Safety PoE switching shall not exceed the designed remote powering capability of the cabling system, If PoE switches are installed in a cabinet for remote powering purposes and no remote powering label exists on the cabinet, then the network switch supplier or approved ICT Contractor when installing any new network switching shall install a warning label on the front, back and sides of the cabinet detailing the maximum permitted remote powering as per the cabling manufacturer’s warranty and recommendation. All ICT contractors and Integrators installing PoE switching or patching fibre optic cabling shall have completed the Ministry of Education’s ICT Cabling Infrastructure Policy and Standards for Schools approved contractors course to demonstrate competency in understanding the safety requirements for working with fibre optic

Page 22: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

22

cabling, Remote powered systems and any network providing connectivity to safety devices e.g. Lockdown, CCTV, Panic Alarms (Security Intrusion Detection Systems) etc. The contractor’s certificate shall remain valid for a period of two years from passing the exam. All contractors maintaining a network containing fibre optic cabling and interfaces shall ensure all locations containing this equipment have compliant labelling installed.

2.3.4 Switching and Wireless Systems: Documentation The contractor that has supplied and installed the WLAN and switching equipment shall produce both pre and post installation, a full network diagram with IP addresses and VLAN information detailed. Also required, within one week of the site visit, is a commissioning report and excel spreadsheet containing equipment serial numbers and a completed network switch and wireless site sign-off form from the school stating that the network and all existing services have been tested and are operational. It shall be the contractor’s responsibility to demonstrate operational status to the schools authorised point of contact. All WAPs installed shall be clearly and logically labelled and all newly installed WAPs shall be documented with evidential photographs indicating position within a designated space prior to the installer completing the commissioning. Refer to the Wireless standard for all commissioning requirements.

Page 23: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

23

3. GENERAL CONDITIONS

3.1 Ministry ICT Cabling requirements All works that include either new or upgraded ICT cabling shall: a) Be installed to comply with this Standard b) Have a minimum twenty (25) year performance warranty c) Have a minimum two (2) year installation warranty d) Be installed by a Ministry approved ICT contractor e) Be installed using a Ministry approved manufacturers product f) Have all relevant documentation submitted to the school and the Ministry.

3.2 Cabling system works The scope of work for the provision of ICT cabling systems in schools typically includes supply, installation, testing, commissioning, labelling and documentation. Installations shall only be carried out by Ministry approved ICT installers who hold current accreditation from the manufacturer of the cabling system and connecting hardware as qualified to perform the cabling work relevant to the performance standard of the particular cabling system. They shall also hold a current Ministry of Education ICT standards certification. Should any installer respond to a Request for Proposal (Price) (RFP), they shall provide evidence that they hold current Ministry Certification within their response.

3.3 Standards and references All works shall be carried out in accordance with the regulations, codes, and Standards referred to in the appropriate section of this document and the associated Scope of Works. In addition, all works involving product and equipment shall be carried out in accordance with the manufacturer’s product guidelines, instruction sheets and specifications. See 0 for more information. In all cases where Standards, documents and publications are referenced in this document the application of the Standards, documents and publication shall be, unless specifically stated elsewhere to the contrary, to the latest edition and amendments available on the date 30 calendar days prior to the issue of any request, quote, tender, proposal or scope document. If a conflict exists between the standards other documents, publications or scope of works, the installer shall notify the Ministry of Education or its representatives of any conflicts and seek clarification prior to continuation. It is the installer’s responsibility to obtain the latest editions of and familiarise themselves with these documents and publications.

3.4 Security clearance and Police vetting The Education Act requires that every installer, employee of an installer, or subcontractor engaged by an installer who has, or is likely to have, unsupervised access to students at the school or children during normal school hours or service opening hours must be Police vetted.

Page 24: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

24

Normal school hours are defined as the hours that the school is open for instruction. Police vetting shall be obtained before a person who is required to be vetted has, or is likely to have, unsupervised access to students or children. A Police vet is valid for up to 3 years – after 3 years a new Police vet must be

obtained and access approved/declined

A Ministry of Justice vet is not an acceptable substitute for a Police vet as it is less

thorough and does not meet the requirements of the Education Act

Because property-related projects do not involve working directly with children,

Police vetting requirements of the Education Act 1989 apply, not the Vulnerable

Children Act 2014

Many schools will also wish to induct visitors onto the site using the normal business practice of signing visitors into the school when they arrive and signing them out as they leave. Information typically required from visitors is: Name Company name Purpose of visit Time in and Time out Installers working at schools should wear an identification tag while in the school grounds, but at all times shall carry personal identification – for example, a driver’s license – and present it on request.

3.5 Occupational Health and Safety (OSH) The installer shall comply with all Acts and Regulations, Approved Codes of Practice, all relevant Standards, WorkSafe New Zealand (previously Department of Labour) Guidelines, Occupational Health and Safety requirements, accepted codes of practice, manufacturer’s instructions and any temporary rules and restrictions that may be in force at the time. The installer shall also comply with the school and Ministry of Education Health and Safety policy, guidelines and rules when engaged in work on Ministry of Education sites and equipment, and shall conform to all site specific requirements including safety requirements. Prior to the commencement of any design or construction work on school property involving access to grounds or buildings the installer shall ensure they have received: a) A copy of the school safety plan, including the location of school safety and first-

aid equipment b) A school vehicle access plan including safe access and parking for contractor and

delivery vehicles. c) Safety induction on site d) Copy of the schools Hazard Register

Page 25: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

25

e) Any specific school requirement The installer shall ensure that all its personnel working on Ministry of Education sites or working on Ministry of Education networks have undertaken appropriate training and have a recognised site safety accreditation for both the site and work to be undertaken. They shall supply and wear appropriate personal protective equipment (PPE) to carry out the work and contractor identification shall always be worn while onsite. Important notes about Health and Safety regarding an incident register:

All contractors must ensure incidents, accidents, injuries and near misses are recorded, reported to the Ministry and investigated.

Notifiable events must be notified to WorkSafe NZ.

For more information: https://www.education.govt.nz/school/property/health-and-safety-management/property-contractor-health-and-safety/ No open pits, holes, trenches, or access areas, are to be left unattended at any time. All are to be clearly marked and secured in accordance with OSH regulations and all ground or structural disturbances are to be secured and/or removed at the end of each day’s work in accordance with OSH regulations. The contractor shall be familiar with the safety in design register applicable to the work being undertaken.

3.6 Advice The installer shall advise the school and gain approval before undertaking any work that may or will result in voice, data, security or other ICT network service disruption or network downtime to existing network infrastructure. Any work that may result in network down time will require scheduling with school representatives.

3.7 Site conditions The installer shall familiarise themselves with the site conditions prior to undertaking or providing quote or estimate prices for any work. Specific conditions to be observed include school and Ministry of Education site access and entry requirements, Ministry of Education OSH requirements, qualification and identification of personnel and onsite legacy equipment and configurations. Installers are required to undertake all necessary investigations to fully inform themselves of the site conditions and other factors that could impact the cost and execution of works outlined in the design and scope of works. This includes but is not restricted to: a) Hazards that may be present at the school (such as asbestos) b) Heritage registration of buildings c) Environmental conditions including special precautions for the protection of flora

and fauna d) Local site conditions including weather hazards and cultural significance e) Easements

Page 26: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

26

f) Safety of students and staff with respect to pit covers and location g) Existing and projected underground services, note that site maps may not be

complete or available

3.8 Contractual obligations The installer shall complete all works in a manner consistent with the Ministry of Education objectives and requirements, and consistent with the detail contained in this specification and the Scope of Works for any work to be undertaken and detailed drawings and specification documentation that accompanies the Scope of Works. The installer shall also conform to all regulatory requirements applicable to the work being undertaken.

3.9 Installer qualification The contractor’s lead installer, site manager or site foreman shall have attended and passed the Ministry of Education ICT Cabling Standards training course and hold a valid certification from this course. All works need to have oversight by a person holding this certification. The size of the installation will determine the necessary time that this person shall be onsite during GCS construction and certification. The installer’s personnel undertaking any installation or remedial work on a Ministry site or facility ICT system are required to be trained by the manufacturer or it representatives on the product, system or components being installed. All workmanship shall be compliant with regulatory requirements and with manufacturer’s requirements and specifications. The installer shall ensure that all its personnel undertaking any prescribed work or work requiring a licence or accreditation are fully trained and accredited for the work being undertaken.

3.10 Existing sites floor plans For existing buildings, floor plans shall be provided by the Ministry or its representative for mark up by the installer. The installer shall mark up the drawings to reflect locations, numbering, and so on, and return them to the Ministry or its representative. Any identified additions or deletions to the plans will be required to be supplied to scale. Existing plan requests can be emailed to [email protected].

3.11 Design by the installer When the installer is required by the Scope of Works to develop the design shown on the contract drawings and detailed in the Scope of Works into fully detailed final design, the installer shall coordinate with the Ministry of Education or its representatives, and with other contractors to prepare design documents for construction purposes. The installer shall submit the design and documents to school representatives, or nominated Ministry of Education representatives for review and approval before work is undertaken

Page 27: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

27

3.12 Electrical installation works The installation of all electrical products and equipment shall be installed in accordance with manufacturer’s instructions, Electricity Safety Regulations and applicable standards by a registered electrician. See the ELECTRICAL section of this document and Ministry of Education Electrical Installation Standard for schools, for more information. Designer and installer note: It is important to note the Ministry of Education Electrical Installation: Standards for Schools, that require the installation of RCD (Residual Current Device) protection in schools. To the same requirements detailed in AS/NZS 3000:2018 section 2.6.3.3.1 – Residential Installations

3.13 Equipment locations Equipment and cable pathways shall be installed in accordance with approved drawings and plans. When deciding on a suitable location for equipment all factors in EQUIPMENT SPACES should be considered. The following factors, and not limited to, shall be considered when designing Equipment Spaces (i.e. Equipment Rooms, Entrance Facilities and Telecommunication Rooms etc.):

Door width and height

Door opening side

Equipment walls,

Floor loadings

Cable tray/basket entry and exit

Floor penetration locations

HVAC load and locations

Lighting levels and placement

Electrical Distribution boards and distribution inside the Telecommunications space

Security

Location in relation to EMI and RFI sources (i.e. lift motors and shafts, copier rooms etc.)

Location in relation to wet areas (toilets and kitchens etc.)

Fire stopping materials

Equipment room space acoustic treatment

Space and clearance requirements as per relevant standards and clause 7.3.1 “Sizing”

Etc. Additions or modifications to installed plant shall not be made without the written approval of the school. Such additions or modifications shall be detailed on drawings and plans.

Page 28: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

28

3.14 Contract drawings When contract drawings are diagrammatic or indicative only, they are not intended for construction purposes. In conjunction with the design requirements described in this specification, the contract drawings are used to show the general layout of the system and to describe the performance requirements. The quantity and specification of the equipment shown in diagrammatic contract drawings and the associated schedules are typically the minimum requirements only.

3.15 Fit for purpose The installer must provide all equipment that is required for a complete and working installation to attain the specified performance. All cable and equipment shall be new and selected to ensure satisfactory operation under the environmental conditions present at the site. Cables and equipment shall be delivered in the original packaging except where pre-installation commissioning, run-up and configuration may require equipment to be worked on off-site. All minor materials and fittings or any work which is necessary for the satisfactory installation and operation and efficient functioning of the installation, or which is generally provided in accordance with accepted trade practices shall be provided or carried out as part of the works even though such material or work may not be explicitly mentioned in this document, the installation specification, or shown on construction drawings.

3.16 Final design approval The design and proposals for all work shall be reviewed and approved by a person with a recognised industry certification with a minimum of 3-years relevant ICT experience prior to final signoff by the Ministry of Education or its representatives.

3.17 Computer Aided Design (CAD) drawings All drawings shall comply with the requirements using recognised symbols and graphics as identified in AS/NZS 3085.1 and be in Revit (2019 or R19 or later), AutoCAD RL2004 (or later version) .dwg with attribute blocks.

Drawings shall be issued as compressed and secured, if not distributed via the Main contractor portal i.e. Aconex, Procore, iTWOcx etc. (dependant on main contractor’s contract management use).

Page 29: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

29

3.18 Shop drawings Shop drawings shall be provided to the Ministry or its representative for written approval prior to commencement of site works. As a minimum the shop drawings shall provide the following: a) System type, manufacturer and warranty details b) Proposed site, building and floor location of all distributors and ICT cabinets c) Proposed ICT cabinet, rack or frame layouts showing dimensioned location of all

new and existing cabling d) Proposed site pathway plan showing locations for all pit, pipe, cable tray and

significant (more than 12 cables) catenary systems. e) Floor plans showing proposed location and numbering of all equipment rooms,

pathways and outlets f) Any proposed changes to the electrical systems and switchboards. g) The shop drawings shall take account of site dimensions, actual dimensions and

access issues for the installation, builder’s works penetrations and servicing of any equipment supplied. The drawings shall also correspond and detail coordination with the building structure, finishes and other services as set out in the design details. And they shall be compliant with any requirements from statutory authorities and network companies.

All shop drawings shall be provided and scaled, by the installer, to present the information within the drawing in a clear and easily viewable layout in .pdf, and either Revit, or AutoCAD format. That is, a drawing with a high density of TEO’s or SO’s shall be presented in a scale that allows for all information on each TEO or SO to be read easily without the need to zoom in on the electronic version of the drawing. All drawings will be to a scale that will be legible and easy to follow when reproduced on A3 paper i.e. a drawing scaled to an A1 or A2 drawing will be divided into 4 separate drawings. Equipment room spaces and high density areas i.e. AV spaces and AV walls, shall have call outs added to separate drawings i.e. the equipment rooms shall be a call out and added to a separate equipment room space layout drawing.

3.19 Time elapsed Due to the time elapsing between the release of new build tender specifications and the installation and construction works for the communications systems, it is anticipated that some of the equipment proposed will be superseded by later models by construction time. The installer is to review products and confirm the models of all equipment and products proposed with the engineer one month prior to the procurement and installation of the equipment including but not restricted to all Structured Cabling System components that is, Multimedia system.

Page 30: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

30

3.20 Construction documentation Installation shall be in accordance with approved construction drawings that shall be produced in accordance with the Ministry of Education – Designing Schools in New Zealand – Requirements and Guidelines. As built construction documentation shall be provided by the Ministry approved certified installer will typically include: a) Scaled site and building/floor location plans showing the location and size of

pathways and the cables to be installed therein, cable routes, pit locations and enclosure/distributor locations. Drawings will be to a reasonable accuracy, see Figure C1 of AS/NZS 3085.1

b) Schematic diagrams detailing the quantity and types of cables linking distributors (Backbones), see Figure C2 of AS/NZS 3085.1

c) Equipment room layouts d) Physical enclosure layouts, see Figure C3 and C4 of AS/NZS 3085.1 e) Schematic diagram detailing patch panel layout and port numbering f) Physical layout drawings of data and power outlet positions and identification

numbers g) Equipment lists detailing the equipment (type/make/model) installed including

racks, enclosures, patch panels, and outlets. Floor layout with all TEOs detailed and labelled

h) Identification of cable pathway routes and labelling i) Rack or cabinet layout at commissioning. For all new works, floor plans with terminal equipment outlet and service outlet locations and numbering shall be provided to the school and its representatives and agents in .pdf, and either Revit, or AutoCAD format. See APPENDIX J – Sample as built documentation for more information.

3.21 Coordination with other services The installer shall be responsible for coordination with Ministry of Education personnel and representatives and with other works and trades including civil, building, electrical, mechanical, fire and security where cabling work is dependent upon or carried out in conjunction with these works. For the Installers this includes but is not restricted to: a) Use of site and facilities b) Closure or restriction of access to site and facilities c) Scheduling of works and resources d) Segregation of services e) Site reinstatement f) Seismic design and installation

For ICT designers this includes but is not restricted to: a) Architectural services b) Electrical services c) Civil services d) Mechanical services

Page 31: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

31

e) Security services f) Fire services Civil contractor and civil designer shall include electrical, fire and communications cabling ducts and detail these on the civil design, and price to install under the civil contract, the civil designer shall coordinate with specialist ICT, electrical and fire designers for duct and pit sizing and location. Ducting shall share common trenches where possible. Segregation of services, coordination shall be made with Chorus for any new or relocated ultrafast fibre (UFB) connections and ducts. All UFB underground ducts and cable pits shall be of a chorus approved type. Fire contractor and fire designer shall include fire cabling ducts and provide this information to the civil designer, to price and install under the civil contract, the civil designer shall coordinate with specialist fire designer for duct and pit sizing and location. Ducting shall share common trenches where possible. Fire services shall not share communications ducts or pits. Electrical contractor and electrical designer shall include cable tray for communications cabling and detail these on the design, and price to install under the electrical contract, the electrical designer shall coordinate with specialist ICT designer for cable tray routes and sizing. Electrical contractor and electrical designer shall include cable tray for fire services cabling and detail these on the design, and price to install under the electrical contract, the electrical designer shall coordinate with specialist fire designer for cable tray routes and sizing. In Summary: Civil to install all ducts, pits external to the building envelope. Electrical to provide containment for Electrical, Communications and Fire services within the building envelope – where more than 12 cables share a common route.

3.22 Out of hours work Periodically, installers will be engaged to work at Ministry schools and facilities out of normal school hours. If required by the school, the installer shall arrange for school representatives to be present at all times when installers are engaged on the school site and facilities.

3.23 Testing See TESTING AND CERTIFICATION for more information.

Page 32: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

32

3.24 Site reinstatement For works undertaken as a refit or extension to existing installations, including all connections to existing site backbones and installation and patching at existing backbone distribution areas, all sites shall be reinstated to their original condition to the satisfaction of the Ministry of Education staff or their representatives. This shall be carried out as soon as practicable after works have been completed. For works undertaken as a refit (MCHF – Main contractor hard fit out or SHF – Sub contractor hard fit-out) or extension to existing installations, including all connections to existing site backbones and installation and patching at existing backbone distribution areas, all sites shall be reinstated to their original condition to the satisfaction of the Ministry of Education staff or their representatives. This shall be carried out as soon as practicable after works have been completed. Site reinstatement shall be considered part of the installation and shall include the removal of all packaging materials and waste, the painting and plastering of wall surfaces damaged during installation, and the reinstatement to original condition (Reinstate the integrity of the site infrastructure) of any ground surfaces damaged during earth works (OSP – Outside Plant works).

3.25 Cleaning The school or project manager shall be responsible for handing over the proposed work area in a clean and tidy state. The installer shall maintain a clean working environment minimising disruption to the school staff and students, and remove all packaging materials, off-cuts and materials left over from the installation of its product and leave the area clean on completion of all works. The installer shall maintain the underground ducts and cable pits free of building debris material and rain water by sealing the ends of the ducts.

3.26 Removal of redundant materials When refit, renovation, variation or Moves/Adds/Changes (MAC) work is required, the installer shall identify and remove any GCS cabling and cabling materials made redundant as a result of the work being undertaken. Cabling that is unused may be left in place if it is determined that it may be used at a later stage, or if removal of the cable may damage other services, or where removal is prohibitive. Written approval from the school or its representatives shall be obtained prior to the decision to retain any redundant cable can be made. Cabling left in place shall be tagged and labelled for future use and as-built documentation updated to show retained cabling and associated pathways.

Page 33: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

33

3.27 Practical completion The stage in the execution of the works under the contract where the Contract Works are complete. The following procedures shall be completed and provided in order to consider the installation work is completed:

All preliminary testing, pre-commissioning and commissioning of the installation shall be completed and accepted

Draft O&M manuals incorporating completed commissioning results together with DRAFT updated as-built drawings shall be provided and approved

Certificates of compliance are provided

Producer Statements PS3 construction provided

Equipment warranties shall be handed over to the client

Provide the Engineer notification in writing that the installation is considered to have reached Practical Completion.

3.28 Audits and inspections Construction, Commissioning and Operational Phases site visit audits, may be initiated by the Ministry of Education or its representatives from time to time to confirm compliance with Ministry standards, the specifications, and construction drawings. These audits and inspections will include, but not be limited to, written reviews of: a) Compliance with the Ministry of Education publication ICT Cabling Infrastructure:

Policy and Standards for Schools (this document) b) Installation practices to current regulatory requirements c) Installation techniques and OSH guidelines, for the safety of site users and

installation staff d) Test results e) Site reinstatement

i. All work completed is to the former condition and the school representative’s satisfaction

ii. All work completed as soon as practicable after the works are complete f) Required project documentation and warranties.

Page 34: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

34

3.29 As-built drawings The current drawings (Please refer to the attached responsibility matrix detailing the documentation required at each phase and the responsible party) shall include the following information: a) Site and building or floor location plans showing the location and size of pathways

and the cables installed, cable routes, pit locations and enclosure and distributor locations

b) Schematic diagrams detailing the quantity and types of cables linking distributors c) Equipment room layouts d) Physical enclosure layouts e) Schematics of patch panel layout and port numbering. f) Physical layout drawings detailing outlet positions (TOs, TEOs, SOs and GPOs)

and identification numbers g) When included with the scope of works, the locations and circuit identification of

all power socket outlets (GPOs) h) Description of the patching system and the labelling system used i) Equipment lists detailing the installed equipment (type/make/model) including

racks, enclosures, patch panels, and outlets j) Test reports detailing procedures, equipment configuration, and test results (in the

test equipment native format) for both balanced copper and optical fibre cable. As-built drawings shall be provided to the;

Ministry of Education via email to [email protected] should

files exceed 10Mb, then a link to Onedrive or other secure link shall be

provided for a minimum of 30 days to permit the Ministry to download the files

for storage.

Ministry Approved Cabling Manufacturer for warranty application purposes.

The Primary Contractor for inclusion into the O & M Manual

The Network for Learning via email to [email protected] should files exceed

10Mb, then a link to Onedrive or other secure link shall be provided for a

minimum of 30 days to permit N4L to download the files for storage.

The “holder” of the previous school as built information and the school.

To the design consultant for review and sign-off

Page 35: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

35

3.30 Warranties Warranties, Certificate of Compliance, Defect Periods and Guarantees shall be required as part of the Scope of Works for installation, maintenance and refit of facilities. Warranty periods shall commence at practical completion or, if not concurrent with practical completion, at acceptance of installation. The project will not be considered completed until all warranty documentation has been received by the Ministry of Education or its representative, and the school. Two types of warranties apply to Structured Communications System installations: a) Installation Warranty (Defect Liability Period) b) Manufacturer’s Warranty. 3.30.1 Installation Warranty The cabling system installer shall provide a Defect Liability Period warranty on its own work and workmanship for a minimum period of two (2) years. This includes any remedial work done to bring existing cabling up to the required Standard. 3.30.2 Manufacturer’s Warranty A manufacturer’s system performance warranty with a minimum of a twenty (25) year validity period is a mandatory requirement. In the event that the manufacturer’s requirements contradict those within this document, the installer is to bring those contradictions to the attention of the Ministry immediately. Retained cabling which has passed testing (Cat 5e and Cat 6 cables) and has been installed to the required standards is not required to be covered under the new warranty (but may be if negotiated with the manufacturer). Any additional cabling at the warranted premises must not compromise the existing warranty. All modifications and additions to already warranted cabling system shall be tested by a Ministry certified installer and warranted by the Ministry approved manufacturer. An updated warranty and system certification shall be provided at the completion of any additions.

3.31 Records and retention All records, warranties, test results in RAW format, guarantees and drawings relating to installation and maintenance work undertaken by the installer shall be maintained by the installer for a minimum period of one (1) year after the end of the warranty or guarantee period. Copies of all warranties, test results in RAW format, guarantees and other records relating to installation or maintenance and upgrade work are to be provided to the Ministry of Education or its representative within two weeks of practical completion.

Page 36: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

36

3.32 Intellectual property All submissions, drawings, schematics, policies and procedures related to the Ministry of Education network and its premises are the property of the Ministry of Education.

3.33 Confidentiality All drawings, specifications and other information, samples, models, patterns, and the like supplied by either the Ministry of Education, or by the designer or installer are regarded as confidential. The designer or installer shall not disclose any such information to a third party without the written consent of the Ministry.

3.34 Training The installer shall provide operator training and operational manuals as required for Ministry of Education personnel. Training shall be carried out not later than one week after and not earlier than 4 hours before practical completion.

Page 37: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

37

4. DESIGN CRITERIA

4.1 Criteria for use See 1.1.3. The designer and installer should refer to sources and publications outlined at the beginning of this document for general design guidance.

4.2 Associated systems and components a) Temperature control by forced ventilation or air conditioning in server and

communications rooms b) Fire Engineering design for alternatives to fire sprinklers in server and communications

rooms. ICT designer to coordinate with Fire Engineer the requirements. c) Wireless access points d) IP telephone systems e) Video conferencing f) IP cameras using existing switching (not on separate security network) g) Network for Learning (N4L) terminations and associated equipment. The following systems and peripheral components should be considered in conjunction with the design and implementation of the cabling system:

a) False floor (Raised Flooring) in server/communications rooms to facilitate cable routing

to floor mounted racks and cabinets b) Smoke detection (Fire detection and suppression) in server and communications

rooms c) UPS system capacity requirements, accommodation (Installation requirements),

battery maintenance and life span

4.3 Design exclusions 4.3.1 Building and electrical earths Building earth systems and electrical earth systems shall be provided as part of the building works (Main contractor works – Electrical works) Testing and commissioning shall be completed by the electrical contractor. Earthing and related works by the installer shall be limited to the following (in coordination with the electrical contractor and in compliance with AS/NZS 3000):

a) Provision of communications earth system (CES) where specified as part of the works

b) Provision of telecommunications reference conductor earthing system (TRC) where specified as part of the works.

The following is required, apart from abovementioned, as a minimum to be considered by the designer and installer:

Bonding to the electrical power system

Primary Protector

Bonding conductors

Busbar

Bonding connections

TMGB (Telecommunications Main Grounding Bus Bar) and TGB (Telecommunications Bus Bar)

Bonding equipment, racks and cabinets

Page 38: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

38

4.3.2 Existing cabling There is no requirement to modify existing cabling and related systems prior to the commencement of any new works, except where necessary to achieve a successful merger of old cabling with new works on the same site, or to bring the installation up to the required Standard. Cabling that has been provided in accordance with earlier Standards will generally be retained in service unless there is sufficient justification for replacement of the cabling as part of an upgrade or redevelopment, or if cabling performance is inadequate for new communications facilities. Any existing Class D or Class E cabling that is deemed to be retained by the school or project manager shall be tested to the appropriate class performance specification. If the link fails it shall be either: a) Replaced b) Brought up to this specification c) Removed from service if no longer required. 4.3.3 Other cabling or systems Related cabling or systems that are outside the scope of these Standards include:

a) Network equipment, such as servers and switches that are connected to the GCS

b) Master Antenna Television (MATV) cabling and equipment

c) Security systems d) Wireless LAN equipment e) Radio based carrier interface f) Patch by exception balance cable termination systems g) Audio visual equipment

4.4 Applications and cabling performance The Ministry’s minimum standard for new horizontal cabling installations shall be Cat 6A

shielded cabling components to provide a Class EA infrastructure performance which is guaranteed to transport 10 Gigabit Ethernet (10GbE) and allow for emerging technologies as they develop. The Ministry’s minimum standard for new backbone cabling installations shall be OS2 optical fibre cable. IEEE standards have been ratified for 10 Gigabit Ethernet (10GbE) on OS2 optical fibre to 2000m and it is likely that backbone infrastructure will be required to support greater than 10GbE transmission in the foreseeable future. School cabling systems shall be constructed to conform to AS/NZS 11801-1: Information technology — Generic cabling for customer premises — Part 1: General requirements AS/NZS 11801-1 specifies six performance classes (A, B, C, D, E and F) for balanced cabling channels. Only Class D, Class E and Class EA performances considered in this document. Balanced cable channel performance is classified according to the maximum frequency at which performance is specified. Class D is specified to 100 MHz, Class E is specified to 250 MHz and Class EA to 500MHz.

Page 39: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

39

Gigabit Ethernet (1000BASE-T) is supported by Class D and Class E (Class E system will support all Class D applications). Class EA supports Multimedia Distribution (IEEE 1911.2), Ethernet 2.5GBASE-T, Ethernet 5GBASE-T and 10GBASE-T. Refer to table below for cable frequencies and supported applications.

Application Specification reference Date

Additional name / reference

Class D 1995 (defined up to 100 Mhz)

Ethernet 100BASE-TX ISO/IEC/IEEE 8802-1:2017, Clause 25 a

2005 100M Ethernet over Twisted Pairs

PoE Type 1 ISO/IEC/IEEE 8802-1:2017, Clause 33 b

2015 Power over Ethernet

Class D 2002 (defined up to 100 Mhz)

Ethernet 1000BASE-T ISO/IEC/IEEE 8802-1:2017, Clause 40 a

2005 Gigabit Ethernet over Twisted Pairs

Firewire 100 Mbit/s IEEE 1394b 2002 Firewire / Category 5

PoE Type 2 ISO/IEC/IEEE 8802-1:2017, Clause 33 b

2015 Power over Ethernet

PoE Type 3 IEEE 802.3bt:2018, Clause 33 b 2018 Power over Ethernet, IEEE 802.3bt

PoE Type 4 IEEE 802.3bt:2018, Clause 33 b 2018 Power over Ethernet, IEEE 802.3bt

Class E 2002 (defined up to 250 Mhz)

Class EA 2008 (defined up to 500 Mhz)

Ethernet 2.5GBASE-T IEEE 802.3bz:2016, Clause

126 a

2016 2.5 Gigabit Ethernet over Twisted Pairs, IEEE 802.3bz

Ethernet 5GBASE-T IEEE 802.3bz:2016, Clause 126 a

2016 5 Gigabit Ethernet over Twisted Pairs, IEEE 802.3bz

Ethernet 10GBASE-T ISO/IEC/IEEE 8802-1:2017, Clause 55 b

2006 10 Gigabit Ethernet over Twisted Pairs

Multimedia distribution IEEE 1911.2 2015 HDBaseT a Including support for remote power feeding defined by ISO/IEC/IEEE 8802-3:2017, Clause 33 (Types 1 and 2)

and IEEE 802.3bt:2018 (Types 3 and 4) b For channels used to support applications requiring remote power, see ISO/IEC TS 29125

The maximum channel length is 100 metres for Class D, Class E and Class EA. The cable and components used within balanced cabling systems are classified according to category. Category 5 components collectively provide Class D performance while Cat 6 components collectively provide Class E performance. Category 6A components collectively provides Class EA. AS/NZS 11801-1 defines the maximum channel lengths supported by optical fibre applications for both multimode and single-mode optical fibre. These maximum distances over which supported applications shall operate are detailed in the Table 1 under section 4.6 Cable lengths, details the applicable wavelengths, distances and supported applications.

The defined optical fibre types are multimode 50/125m (OM3, OM4, OM5) and single-mode (OS1a - indoor, OS2 - outdoor). The M in this case signifies multimode while the S signifies single-mode. OM1 and OM2 will only be informative in the new AS/NZS 11801-1 standard.

Page 40: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

40

4.5 Category 6 and 6A (Cat 6A) F/UTP or F/STP cable and connecting hardware

Cat 6 and Cat 6A cables used within horizontal cabling subsystems, or as work cords, shall comply with Clause 9 of AS/NZS 11801-1. In the event that multiple signals share a cable the additional performance requirements of Clause 9.3 of AS/NZS 11801-1 shall be met. Cat 6 and Cat 6A connecting hardware used within horizontal cabling subsystems shall comply with Clause 10 of AS/NZS 11801-1. Cat 6 and CAT6A horizontal cabling shall be terminated with modular 8-pin (RJ45) outlets using the T568A arrangement. Cat 6 and CAT6A backbone balanced cabling shall be generally terminated with modular 8-pin (RJ45) outlets using the T568A arrangement. However, insulation displacement (IDC) punch-down blocks may be used to terminate outdoor balanced cables used within the voice backbone. 4.5.1 MPTL Distributed building services, which includes CCTV, BMS controllers, Video intercoms etc., shall be terminated as MPTL assemblies, where the cabling cannot be terminated in a standard 8P8C modular jack. The connectors shall be a tested as per AS/NZS 11801-1, Annex B, if no specific IEC standard testing is required by the manufacturer, to ensure the connectors allows for equivalent mechanical and environmental performance requirements, stated under the AS/NZS 11801-1. The following IEC standards are accepted: IEC 60603-7 (for unscreened cabling) and IEC 60603-7-1 (for screened cabling). The MPTL connectors shall also comply with Table B.1 (Standards for solderless connectors). Cable re-termination into a free MPTL is not allowed under schedule B.4 or B.6 of the AS/NZS 11801-1. Re-termination is only allowed for fixed MPTL units. The introduction of a MPTL shall not introduce more than 2.5 Ohms with the initial termination and more than 5 Ohms after the MPTL has been allowed to settle. The introduction of a MPTL unit shall not cause the overall generic cable channel to exceed 100m, unless the applications allows for it i.e. BMS sensors. MPTL assemblies shall not be implemented with ES3 applications. Field terminated assemblies will not be allowed to ensure that the cabling channel and permanent link will be covered under cabling warranty. IDC assemblies are allowed but not insulation piercing methodology (eg. Vampire tap). Any MPTL connections deployed as a part or the overall cabling solution shall be tested and warrantied as per the requirements of this standard.

Page 41: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

41

4.6 Cabling lengths The following table is taken from AS/NZS 11801-1, and may also be reproduced with permission granted by Standards New Zealand under licence 001075. Maximum channel lengths supported by optical fibre applications for multimode and single-mode optical fibre are as follows;

Network Application Nominal transmission

wavelength (nm)

Maximum channel

length 50/125m

Multimode

Maximum channel length

9/125m

Single-mode

100BASE-FX 1,300nm 2,000m 2,000m

1000BASE-SX 850nm 550m N/A

1000BASE-LX 1,300nm 550m 2000m

10GBASE-SR 850nm 300m N/A

10GBASE-LX4 1,300/1,310nm 300m N/A

10GBASE-LR/LW 1,310nm N/A 2000m

10GBASE-ER/EW 1550nm N/A 2000m

40GBASE-FR 1550nm N/A 2000m

100GBASE-ER4 1550nm N/A 2000m

100GBASE-LR4 1310nm N/A 2000m

100GBASE-ER4 1550nm N/A 2000m

ControlNET 1300nm 1514m N/A

ControlNET (OS1a) 1310nm N/A 8000m

ControlNET (OS2) 1310nm N/A 20,000m

Table 1: Optical fibre channel lengths

Page 42: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

42

4.7 Cabling system architecture The conceptual arrangement of a generic cabling system is illustrated below:

CC CC

CCONNECTOR I.E. PATCH PANEL JACK, PATCH LEAD JACK ETC.

CC CC CP

CP CONSOLIDATION POINT

TO

TO TELECOMMUNICATION OUTLET

C

DISTRIBUTOR 4 DISTRIBUTOR 3 DISTRIBUTOR 2 DISTRIBUTOR 1

Cabling subsystem 4

Cabling subsystem 3

Cabling subsystem 3

Cabling subsystem 1

Terminal Equipment (TE) Area

Cable Z Cable Y TE CORDSubsystem Cable 4

Subsystem Cable 3

Subsystem Cable 2

Figure 1: Structure of generic cabling

The distributors (Distributor1 – Distributor 4), with sub systems cabling 1 – 4, Cable Y and Cable Z, provide the means to construct different cabling system topologies such as ring or star, or a combination of these. Furthermore, the distributor function may be combined, and the consolidation point may or may not be included in the between the Telecommunications Outlet (TO) and the distributor.

Page 43: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

43

CC

Distributor 2

CC

Distributor 1

Block B

External Networks

CC

Distributor 4

CC

Distributor 3

Block A (Main Communications Room / Campus Distributor

CC

Distributor 5

TOs, SEOs and TEOs

TOs, SEOs and TEOs

Administration, Library or Similar Building

CC

Distributor 7

CC

Distributor 9

Temporary Building

TOs, SEOs and TEOsCC

Distributor 6

Block C

TOs, SEOs and TEOs

Campus Conceptual Layout

PABX,Servers,etc

Cabling Subsystem

3

Cabling Subsystem

3

Cabling Subsystem

9

CC

Distributor 8

PABX,Servers,etc

TOs, SEOs and TEOs

Cabling Subsystem

Cabling Subsystem

Cabling Subsystem

5

TOs, SEOs and TEOs

TOs, SEOs and TEOs

Figure 2: Conceptual cabling layout

The Structured Cabling System within a school will often combine the Building Distributor (BD) or Campus Distributor (CD) (Distributor 3 and Distributor 4 ) and Floor Distributor (FD) (Distributor 2 and 1) functions. A conceptual layout that could be typically applied at a school is illustrated Figure 2 above. The lead-in cable providing the interface to carrier services will normally be located at the building that is closest to the carrier infrastructure.

4.8 Aesthetic design In all cases the GCS shall be designed and installed in a manner that is suitable for the building and not in conflict with the environment at the particular school. 4.8.1 Heritage buildings Many schools contain buildings that have significant historical or cultural significance. Modification on work within these buildings may be difficult and the amount and nature of any refurbishment may be subject to specific controls and restrictions. Designers and installers are required to ensure that in the proposed construction activities do not compromise the restrictions imposed in these buildings. See APPENDIX A – HERITAGE SITES for more information.

Page 44: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

44

4.8.2 Exposed cabling The designer is expected to minimise the use of exposed conduit and capping and overhead connections. Where possible all cabling and cable pathways, including pits and external conduits, should be placed as unobtrusively as possible so as to be hidden from view and not attract attention. It is expected that where service pathways are provided in a school campus (walkway cavities are a perfect example), they will be used to distribute ICT Cabling Infrastructure around that campus – If for any reason this may not be practicable, then written agreement from BOTH the School’s authorised representative and the School SPA will be needed. When it is not possible to completely hide the cable pathways including overhead, conduits and capping, installers shall use materials and products that are the least obtrusive to view.

4.9 Single vendor solutions 4.9.1 New works 4.9.1.1 Systems All new cabling systems and work items within a specific building shall be a single-vendor system comprising both copper and fibre optic networking products and incorporating both the connectors, cables and mounting trays and panels. The Ministry of Education has reviewed and approved manufacturer’s products for use on its sites and facilities. All new works must utilise products from the approved vendor list provided and shall be installed by a Ministry Approved ICT Contractor, lists are located at; https://www.education.govt.nz/school/property-and-transport/suppliers/technical-information/responsibilities-of-an-ict-contractor/ Refer to Appendix B. 4.9.1.2 Warranty The cabling solution is to be supported with a single vendor’s warranty for a period of not less than 25 years. A “mix-and-match”, or “back-to-back” warranty structure using cabling and connector products and warranties from multiple vendors will not be accepted. The product exceptions to this are limited to (subject to these exceptions not conflicting with the manufacturer’s warranty): a) Cabinets and cable pathway products b) Cat 3/Voice-grade telecommunications cable only c) Patch cables and cable assemblies d) Fibre optic break out trays and unloaded patch-panels, consolidation points and

mounting hardware 4.9.2 Moves, adds and changes When moves, adds, and changes (MACs) are being undertaken on existing installations, and where a warranty is already in place for the existing installed system, MACs shall be consistent with the installed product and shall not, where possible, void an existing warranty. Where applicable the warranty for the existing system shall be extended to include the new works. 4.9.3 Existing infrastructure requiring maintenance If an existing Cat 6 link fails the Class E performance test as per AS/NZS 11801-1, and is not covered by current warranty it can be tested to Class D. If tested at Class D with a pass it can be retained, but marked on the as-built drawings, TO and horizontal distributor

Page 45: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

45

records accordingly. If it fails Class D performance tests, re-terminate the cable and test again. If it still fails the cable shall be replaced.

4.10 Dimensioning The network requirements and configuration in any given area or classroom is to be determined and confirmed by the school. Sufficient TOs and accompanying GPOs shall be installed in all areas to meet the Ministry design guidelines as per the specific scope documents and tender documents.

4.11 Salt spray and corrosive environments Particular care shall be taken for installations in coastal regions to minimise the exposure of equipment to salt. Equipment enclosures and distributors shall not be installed in open areas. Equipment room vents shall be fitted with filters to minimise salt spray ingress. See NZS 3604 for additional information.

4.12 Chemical corrosion 4.12.1 Equipment rooms Equipment rooms and distributors shall not be located near to corrosive atmospheric or environmental conditions. Equipment and plant located in geothermal environments such as Rotorua, Wairakei or corrosive industrial environments, shall have appropriate corrosion protective treatments as follows: 4.12.1.1 Protection of electrical equipment Main distribution boards, control panels, server racks for the BMS and ICT, etc. shall be co-located in an environmentally controlled room:

(a) All electrical, telecommunications, IT and AV equipment rooms shall be

pressurised with at least 2 air changes per hour positive pressure by a

mechanical supply system with “CamPure 8” molecular filters. A controlled spill

air path shall be provided. The ICT designer shall coordinate with the

Mechanical Engineer for the implementation of this requirement.

(b) All equipment shall be protected against the effects of H2S (Hydrogen

Sulphide). This includes all bare copper, steel etc including electronics such as

protection devices/cards, etc

(c) All electronics shall be H2S resistant and shall be coated with an H2S resistant

epoxy coating. All electronic circuit boards, including PLC modules and PT

modules, shall have conformal coating in compliance with IEC 60721-3-3.

Conformal coating shall be to Class 3C2 as a minimum.

4.12.1.2 Support steelwork (a) The use of electroplated or galvanized components in a geothermal

environment is not recommended, as zinc will undergo accelerated corrosion

resulting in its early breakdown.

(b) Any zinc-based coating should be coated with a suitable industrial paint system

ending with an epoxy barrier coat, and where exposed to sunlight, a

polyurethane top coat to provide UV protection to the epoxy and achieve the

required colour aesthetics.

(c) Alternatively, a sealed thermal aluminium metal spray could provide the

optimum protection in this environment.

Page 46: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

46

4.12.2 Storage areas Storage areas for cleaning solvents and other chemical products shall not be used to house cabling equipment and shall not be adjacent to equipment rooms or equipment room vents. 4.12.3 Wet areas Computer and networking equipment should not be installed in wet areas or rooms containing hot water cylinders, cleaner’s equipment, sinks or basins. If installation in a wet area is unavoidable, then approval must be received in writing from the Ministry and the school prior to commencement of installation.

4.13 Noise Equipment enclosure locations shall be selected such that noise levels in work areas arising from the enclosed equipment, when combined with other sources of work area noise, shall be maintained within the limits specified by AS/NZS 2107 Acoustics – Recommended design sound levels and reverberation times for building interiors. Recommended design sound levels for different areas of occupancy in buildings are given in Table 1 of AS/NZS 2107, from which the following design details are extracted and may also be reproduced with permission granted by Standards New Zealand under licence 001075.

Type of Occupancy / Design sound Level (LAeq dBA) Reverberation

Activity Satisfactory Maximum Time (s)

Art / Craft Studio 40 45 0.6 – 0.8

Computer Room – Teaching 40 45 0.4 – 0.6

Duplicating Rooms / Stores 45 50 0.6 – 0.8

Library – General Area 40 50 0.4 – 0.6

Library – Reading Area 40 45 0.4 – 0.6

Teaching Areas – Primary 35 45 0.4 – 0.5

Teaching Areas – Secondary 35 45 0.5 – 0.6

Table 2: Acceptable sound levels

Further information on acoustics can be found in NZS 6801, NZS 6802, AS ISO 140.4, and AS/NZS ISO 717.1.

4.14 Legacy systems The cabling system design shall consider the interface requirements of legacy equipment in existing installations. If any discrepancies are noted they should be highlighted in writing to the school or its representative. 4.14.1 Retention of legacy backbone cabling Existing Cat 6 UTP cables installed as backbone shall be replaced with OS2 fibre and OM3 fibre backbones shall be retained. See 6.2.5.2 for more information.

Installer note: If the backbone fibre is OM3 and is 300 metres or less, OM3 cabling can be retained if it would be more cost efficient.

Page 47: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

47

4.14.2 Retention of legacy horizontal cabling A decision should be made by the on-site auditor and installer if existing cabling infrastructure could be retained, and then this decision shall be documented and supplied to the Ministry or its representative and the school. The following is a guide to assist in this decision: a) Only Cat 6 and Cat 5e cables should be retained b) For a good existing standard of installation then channel performance testing shall be

carried out along with all other channel performance testing required at the completion of the installation

c) There is no requirement for existing cabling to be warranted retrospectively but some may already have an existing warranty

d) Retained cabling should be integrated into the new installation as best as possible, labelled consistently but clearly identified as being excluded from the new warranty

e) Poor quality installations not meeting this Standard should be removed or modified to meet this Standard, where tests have failed then cabling should be removed

f) If no additional TOs and power outlets are required in an area (or block) then the existing cabling shall be tested to the appropriate link class and retained if testing is passed. The labelling of the existing TO's must be consistent with the rest of the site

g) The system designer will need to make an economic decision as to whether to replace the old system or retain it.

Existing ICT infrastructure cabling that is not properly secured e.g. laying on the ground that is being retained within the scope of a specific project shall be supported to adhere as closely as possible to Ministry requirements pertaining to the supporting of cabling. 4.14.3 Cable removal All cabling that does not meet the required Standard should be removed from site prior to any new installation where practical. Consideration should be given to service continuity and ensuring a minimal service disruption period during installation. This includes associated pathways and the repair of any building structures as a result of the removal. 4.14.4 Cable management systems Existing cable management in an enclosure can be retained and used for new cabling in conjunction with new installations providing this does not compromise the manufacturer’s warranty.

Page 48: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

48

4.15 Fire rating All penetrations made by the Ministry Approved ICT Cabling Installer through fire rated walls shall maintain fire ratings where wiring goes through fire rated elements. This includes (but is not limited to): a) All penetrations, vertical and horizontal must be sealed utilising a system or product, or

both, that adheres to all requirements of the relevant specific building design, Standard, Ministry, Local Authority, and New Zealand Building Code regulations

b) All materials utilised for the sealing of the necessary fire rated risers and walls must be suitable for the purpose and comply with any Fire Safety Feature Reports that are issued and with all Local Authority regulations

c) Where fire rated walls are penetrated a suitable fire rated sleeve shall be utilised to reticulate the Telecommunications cabling through the opening and shall protrude to a maximum of 100mm either side of the penetration eg. Hilti sleeve

d) Vertical Risers and penetrations shall be sealed horizontally and utilise an easily removable solution that allows for future expansion and meets with necessary regulations

e) Photographic evidence shall be collected for each completed fire rated penetration. This shall include a time and date stamp, and form part of the completed handover documentation supplied to the Ministry of Education or its representative

f) If the installer identifies non-compliant firewall penetrations made by other trades or installers they shall notify the school or its representatives of the non-compliance immediately in writing.

g) Any penetrations uncovered by the ICT Contractor in existing firewalls that are not related to the work being carried out shall be notified in writing to the project manager, site owner and Ministry of Education via email to [email protected]. Repair work shall be outside the scope of the works being undertaken and shall be the responsibility school or their nominated project manager to organise and pay for the repair.

4.16 Electrical installation works ICT and networking installations may require electrical work to be carried out to complete the installation or programme of works. When electrical installation work is required as part of a network system upgrade the following shall apply: a) All electrical work shall be carried out by a registered electrician in accordance with the

Electricity Safety Regulations, applicable standards and the compliance document for New Zealand Building Code – Clause G8 Artificial light (for Equipment rooms and floor distribution locations) and Clause G9 Electricity

b) A special note should be taken of requirements for the installation of residual current devices (RCD) in New Zealand educational facilities, specifically the requirements laid out in AS/NZS 3000. Guidance on compliance options for schools is provided in the ELECTRICAL section of this document and in the Ministry of Education Electrical Installations: Standard for schools.

c) Electrical certification documents consisting of Certificates of Compliance (CoC) and/or Electrical Safety Certificates (ESC) and/or Records of Inspection (RoI) shall be issued for all relevant electrical work undertaken.

d) Electrical test results shall be recorded on CoCs or provided as supporting documents. e) Photographic evidence shall be collected for each completed fire rated

penetration, E2 penetration, cabinet fixing, main pathways and pit/duct installation. This shall include a time and date stamp, and form part of the completed handover documentation supplied to the Ministry of Education or its representative.

Page 49: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

49

f) Should the contractor identify non-compliant electrical installations, they shall notify the school or its representatives of the non-compliance immediately in writing.

4.17 Electromagnetic compatibility There are presently no EMC regulations covering cabling installations and systems. However, the following cabling installation practices are recommended to limit the risk of interference to other services and the risk of interference from unwanted external emissions. For unscreened cabling, the EMC performance of the installed cabling is controlled by its ‘balance’. Balance is a measure of the control exercised over the physical relationship of individual conductors inside the cable or connecting hardware and is, therefore, a critical parameter during the manufacture of the high performance cables and connecting hardware used in generic cabling. It is necessary to utilise installation methods that maintain the original balance of the cabling components: a) Transmission equipment shall meet the requirements of AS/NZS CISPR 22 b) Complete systems shall meet the requirements of AS/NZS 61000.6.3. To facilitate satisfactory EMC performance of the overall GCS the design of cable routes and pathways shall take due consideration of requirements detailed in AS/NZS 11801-1 and AS/NZS 3084. In general, it is required that manufacturers of transmission equipment take full account of the contribution of the cabling to the overall EMC of the transmission system. In this case it is necessary to ensure that the performance of the installed cabling channel is within the limits specified by the transmission equipment.

Page 50: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

50

4.18 Power over ICT Cabling Infrastructure considerations 4.18.1 General Overview Technologies requiring remote powering are no longer limited to PoE delivery to WAPs, VoIP handsets and IP CCTV cameras, remote powering has evolved to include may more innovative power delivery requirements including;

iii. Digital Power

iv. IoT devices

v. Lighting

vi. Security devices

vii. New single pair standard over 1000 metres

viii. etc

Systems or solutions therefore shall be labelled and designed to ensure a safe mode of operation and installation is implemented. 4.18.2 ES categories and comparison with previously known abbreviations The following is a summary of ES1, ES2 and ES3: The following table provides a summary of the ES1, ES2 and ES3 in relation to the previously used terminology of ELV, SELV, Limited Current Circuit, TNV and Hazardous Voltage:

Note 1: Refer to AS/NZS 62368.1 Table 4 for higher frequency applications

TNV (Telecoms network voltage)

SELV (Safety extra low voltage)

ELV (Extra Low Voltage)

ES1 ES2 ES3

V a.c Peak 71 42.4 42.4

V d.c Peak 120 60 60

Voltage limit 1hZ a.c (With no current limit) (Note 1)

30 (42.4 at Peak)

50 (70.7 at Peak)

Voltage limit 1hZ d.c (With no current limit) (Note 1)

60 120

Combination of AC and DC voltage present (AC Peak/71 and DC Peak/

< 1

Under fault conditions: V a.c Peak

71

Under fault conditions: V d.c Peak

120

Current limit (With no Voltage Limit) – d.c

2mA 25mA

Current limit (With no Voltage Limit) – a.c

0.5mA (0.707mA at Peak)

5mA (7.07mA at

Peak)

Class 1 device Yes

Class 2 device Yes

Class 3 device Yes

Same safety application as SELV

Yes

Same safety application as ELV

Yes

Same safety application as ELV

Yes

Page 51: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

51

4.18.3 Cable colour labelling of ES3 cabling and systems The generic cabling systems used for ES3 applications shall be clearly marked at the SD, SCP and SO locations. Generic cabling used for remote powering (RP) shall be insulated with PVC and comply with the Table 1 (PVC insulation requirements) and Table 2 (PVC sheath requirements) of AS/CA S008. Generic cabling used for RP and not insulated with PVC materials shall comply with the AS 1049

ES3 generic cabling shall have “Homebush Gold” sheath colour and shall be clearly labelled every 2 meters (in “Homebush Red” font and white label) as ES3. Homebush Gold (X26) and Homebush Red (R22) is details in AS 27001(10)

The following is an example of a label (providing the minimum required detail), to be included marking and identifying ES3 connection points:

WARNING

ES3 CIRCUIT

HAZARDOUS ENERGY SOURCE

QUALIFIED CABLERS ARE AUTHORISED

4.18.4 ES3 cabling separation

The ES3 applications cabling shall not use generic cabling and shall be separated from other services as follow:

1. 150mm from ELV and LV (Including ES1 and ES2 applications)

2. 450mm from HV

3. 150mm from oxygen or flammable gas, heating and compressed air, water or waste

4. 150mm from ES1 and ES2

4.18.5 ES1, 2 and E3 required cable and outlet characteristic Cable resistance: The number of connectors between the SD and the SO will be minimised to ensure that the cable (24AWG or 0.5mm cable) resistance (0.0938 ohms per meter at 20 degrees Celsius) will not exceed the required cable resistance as specified by the cable manufacturer.

Page 52: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

52

SO which service ES1, ES2 and ES3 applications, will have a mechanical cover to ensure it is not accessed by small children, or needs to be placed at a height deemed to be out of small children reach (1800mm AFFL or higher). Cable temperature and heat management: Cable bundles generates heat. 1No 24, 4 Pair CAT6A shielded cables generates heat of 5 degrees Celsius. Every additional bundle added to the cable tray generates on average another +- 2 degrees Celsius.

Item No of Bundles Heat generated in degrees Celsius

1 1 5

2 2 7

3 3 9

4 4 11

5 5 14

6 6 15

7 7 17

8 8 19

9 9 22

Closing air gaps between the cable bundles will assist reducing the heat generated. Using the following table illustrates how to reduce the heat by arranging 9 bundles of 24 4 Pair CAT6A cables. Current heat generated by 9No cable bundles = 22 degrees Celsius Closing the gaps between bundles and arranging 9No cable bundles into a cable basket = 22 x 0.53 = 11.66 degrees Celsius

Cable bundles : Cable Tray – Heat management

Width to height ratio to cable group

1:1 2:1 3:1 4:1 5:1 6:1 7:1 8:1 9:1 10:1

Multiplier 0.89 0.84 0.77 0.71 0.66 0.62 0.59 0.56 0.53 0.51

Cable temperature to be managed by implementing the following: a) Remain within the maximum operating cable temperature (sum of ambient temperature

and cable temperature rise) as specified by the cable manufacturer b) Consider the number of pairs used for RP and number of cables within a cable bundle c) Provide a minimum continuous operating temperature of 60 degrees Celsius Refer to ISO/IEC TS 29125 in determining the temperature rise above ambient in a generic cabling system 4.18.6 Cable testing Refer to the applicable cable testing section for the testing of structured cabling systems transmitting ES1, ES2 and ES3 power.

Page 53: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

53

5. PATHWAYS AND SPACES

5.1 General requirements 5.1.1 Fixings Fixings shall be entirely suitable for the situation in which they will be used: a) Where fixings are to be used externally or exposed to the weather stainless steel shall

be used. Plain and cadmium plated steel is not acceptable b) Where fixings are used internally, cadmium plated steel is acceptable. All fixings, fastenings and supports shall be of adequate strength and size and arranged to avoid mechanical failure under normal conditions prevailing in schools. Cables shall be held firmly by the securing device without undue pressure being exerted on the cable sheaths. Cable ties used externally shall be UV resistant. The use of plastic cable ties shall not be permitted even for temporary fastening or support of cables during the construction phase. All cables shall be tied to catenaries and any other pathway or cabling loom using VelcroTM ties. Cables shall not be secured to beams or any other structure by pin clips, staples, stapled cable ties or stapled VelcroTM ties. Where pathways are required, catenary wires, trays or trunking shall be provided. When transitioning from a tray or catenary wire less than two (2) metres from the outlet location, the use of one stapled VelcroTM tie for support is permissible. 5.1.2 Internal catenaries and above internal cable support systems Internal cabling supported by catenaries or above-cable trays shall be installed in accordance with AS/NZS 3084, and the following: a) A main cable route shall be chosen such that the cable path is accessible and

conforms to the segregation requirements b) Horizontal cabling and backbone cabling shall be installed on separate catenary wires c) The catenary wire shall be anchored at a maximum of 3m spans. Turnbuckles and

steel eyelets shall be used to tighten the catenaries so that there is no more than 150 mm sag between catenary supports when fully loaded

d) A maximum of 24 x 4 pair cables may be tied to a single catenary. All cables will be secured at regular intervals of approximately 300mm using VelcroTM ties

e) Any cable leaving the wire shall not have an unsupported length greater than one (1) metre before its next fixing, access, or dropping down a wall

f) Data and telephone services shall not be supported on catenary wires that are used for electrical services

g) Catenary wires shall be run square and true with no deviations to avoid other services. They shall be run parallel to the major axis of the building

h) Any cable runs under buildings shall use catenary wires or trays. Where cables transition from underground ducts to catenary wires the duct exit point shall be plugged or sealed using some form of removable material. Rodent resistant polyester insulation wool may be used for this. Expanding foam is not permitted

i) Cables installed under decks shall be installed in a conduit to protect the cable from the environmental elements

Page 54: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

54

j) Cables supported on catenary wires shall have a minimum ground clearance of 500mm where possible for serviceability and to reduce potential rodent damage. For all instances where 500mm clearance cannot be maintained from the natural ground level it shall be protected by a conduit, or external cable may be used

k) When vertical drops of cable exceed two (2) metres, catenary wire shall not be used as the means of support. The installer is to use tray or chain with appropriate fixings to prevent cable from slipping.

There is a need to address cable tray fill ratios to attend to cable bundle heat management on cable trays. Management of cabling on cable trays can ensure cable bundles do not overheat and avoid data loss in increasing the life cycle of cabling use. 5.1.3 Penetrations Fire rated elements and structural members shall not be penetrated without approval from the building architect, relevant Fire Authority, Structural engineer, and the New Zealand Building Code Compliance Clause C Protection from Fire shall be complied with. Where ladders or trays pass through ceilings, walls and floors provide neat, close fitting apertures. At openings through fire rated elements, terminate the ladders or trays both sides of the opening and provide holes for the cables only. All holes shall be fire-stopped with a proprietary product that exceeds the fire resistance of the materials being filled and is installed to the manufacturer’s specifications. Ducts that pass through walls, roofs, or floors shall be sealed to the manufacturer’s specification with an industry-standard duct sealing device to prevent the ingress of water. Where the cabling exits an external underground conduit and enters the structure, the penetration shall comply with the New Zealand Building Code Clause E2 External Moisture. Mechanical flashings shall be used to weather proof all external penetrations to the structure, with the use of sealant deemed a secondary means of weatherproofing. Any low level shroud used to protect a building penetration shall be constructed to ensure that the top surface is angled at approx 20 degrees. For low level building penetrations, the underground duct shall terminate in an appropriate weather proof enclosure of minimum L300mm x W200mm x D150mm. Cabling transitioning through the rear of the enclosure shall pass through a section of 50mm conduit inclined at a downwards angle of approx 10 degrees. All shrouds shall be manufactured from stainless or hot dip galvanised steel, and designed to meet the New Zealand Building Code Clause E2. Other materials may be used, with written approval for these from the school and the Ministry to be received prior to installation. Flashings shall aesthetically match the building as far as practicable (colour to be determined on site prior to ordering and installation). The installer shall ensure all installed flashings avoid health and safety issues, for example sharp edges, or pathway and access obstruction. 5.1.4 Metal pathways All metal pathways shall be bonded where required, as per AS/NZS 3000.

Page 55: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

55

5.2 Inter-building pathways 5.2.1 General Inter-building pathways shall be constructed to accommodate the cabling between buildings. Inter-building pathways may consist of underground, overhead, and aerial pathways. 5.2.2 Cost Due to the cost and intrusion of creating inter-building pathways installers are advised to confirm the requirements of other trades and where possible co-exist in pathway or trenches to minimise cost. 5.2.3 Specifications Underground pathways are preferred wherever practicable however above ground routes may be necessary in some circumstances. As detailed in 5.4.1: a) The pathway shall be fully covered and the cabling shall be installed within a

protective, correctly specified UV stabilised conduit or ducting for the entire external section of the cable route.

b) Externally rated cabling shall be used in all inter-building pathways. 5.2.4 Crawl space Open and unsecured crawl space under elevated buildings must be considered as an external environment and proper consideration shall be given to the choice of components used in this space. Cable pathways in this area shall be protected as per 5.7.4. 5.2.5 External pathways All external pathways including junction boxes, ducting, trunking and conduits entering a building shall be protected against damage or vandalism for their entire length to a minimum height of 2.0m above the ground. Protection shall be in the form of a robust metal flashing of minimum 1mm thickness. The flashing shall be constructed of either stainless or hot dip galvanised steel. Other materials may be used, with written approval for these from the school and the Ministry to be received prior to installation. If the duct or conduit then continues up under the eve of the building, then it shall be protected all the way to ensure aesthetics are maintained and that it blends into the existing building structure. Where the new duct to be protected is directly adjacent existing plastic cable ducts following the same path, these ducts shall also be covered within the flashing. 5.2.6 Damage resistance All inter-building pathways maybe prone to vandalism and shall be protected against identified risks. 5.2.7 Manufacturer’s approval All ICT cabling pathway components shall be approved by the GCS manufacturer as suitable and approved within the warranty requirements of the vendor’s system.

Page 56: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

56

5.3 Underground pathways 5.3.1 General design Underground pathways shall be designed and constructed in accordance with AS/NZS 3084. Where underground pathways enter into the interior of the building they shall be rodent proofed and sealed from the ingress of water to meet New Zealand Building Code Clause E2 External Moisture. 5.3.2 Trenches Trenches for communication cabling shall be constructed to provide a minimum depth of 450mm cover between the natural ground surface and the top surface of the communications conduit. Trenches shall be constructed such that installed conduits shall maintain a minimum longitudinal grade of 1 in 150 at all times. A longitudinal grade of 1 in 100 is preferred where practicable in accordance with AS/NZS 3084. Conduit may be installed by directional drilling providing the minimum cover to the natural ground surface can be maintained. A suitable warning marker tape shall be installed directly above conduit installed in a trench, at the appropriate level, for the entire length of the trench prior to backfilling to deter possible mechanical damage to data pathways by diggers. Backfilling shall be performed with due care to avoid distortion of the cable inspection pits and the conduit shall be supported firmly and evenly on all sides. Suitable fine grit material shall be used to surround pits and conduit prior to backfilling trenches. All trenches must be backfilled with fine grit up to the duct level and original excavated material removed from site or disposed of in accordance with the school’s requirements. 5.3.2.1 Fill ratios Fill ratios shall be approved by the designer, but shall not exceed 50% fill-rate on first installation, and 80% on subsequent MAC works, without the written authorisation of the Ministry or its representatives. Conduit For all conduits the following requirements shall be followed: a) A minimum diameter of 50mm for all newly installed conduits unless where otherwise

specified or approved in writing by the Ministry or its representatives b) Conduits and accessories should be UV stabilised and white, green or grey UPVC or

PE c) Conduits shall be installed in areas where there is a requirement for added protection

and/or to aid the ease of installation for any Telecommunications cabling d) If conduits are installed in exposed areas then they shall be installed on parallel paths

and change direction utilising appropriate bends and accessories required to form a right angle

e) Draw wires shall be installed in conduits that have spare capacity and also in conduits not currently in use. A minimum of 500mm of draw wire shall extrude from each conduit end and be fixed so as not to become unusable.

Underground conduits should be sized to accommodate backbone cables such that the conduit is not greater than 50% occupied at the time of installation. In addition:

Page 57: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

57

f) The conduit shall extend into the pit for a distance of approximately 50mm through a close fitting hole.

g) All conduits and accessories shall be suitably manufactured and coloured for telecommunication cabling use

h) Sweeping bends shall be used to allow for cable bending radii i) The minimum size of conduit shall be 50mm and it is strongly recommended that a

spare 50mm diameter, PVC, communications conduit be installed along the complete route of the underground inter-building pathway system for future installations. A single 100mm conduit may be considered an acceptable, and perhaps better, alternative to two 50mm conduits

j) All conduit used on site shall be UV stabilised. All conduits shall be installed with a draw wire consisting of a 1mm conduit wire, a 3mm nylon cord, or a 12mm nylon ribbon

k) Conduits shall be sized to ensure the haul tension of the cable is not exceeded under installation.

5.3.2.2 Underground conduit building access Underground conduit shall either: a) Continue up and be fixed to the outside wall of the building to enter the ceiling space

through the eave, or b) Finish above ground level and the cable(s) fastened to a vertical perforated cable tray

fixed to the outside wall of the building. The cable tray shall be continuous from the conduit top to an access hole at ceiling space level. The access hole shall be sealed with a moisture and fire retardant material as per 5.1.3. The perforated tray, access hole, and cable(s) shall be protected by a steel top hat section. Both conduit and top hat sections shall be painted to match other building fixtures such as down pipes. Where underground cable enters a building, access shall be fit for purpose, comply with New Zealand Building Code Clause E2 External Moisture, and be protected from damage. 5.3.2.3 Flexible conduit Flexible conduit is not recommended, however if this is required to achieve a smooth directional change the following conditions shall be met: a) The flexible conduit must be UV stabilised and of PVC construction b) The flexible conduit must be painted grey or to match the colour of the solid conduit

sections c) The paint used must be UV resistant. d) Flexible conduit sections shall not exceed 0.5m in length.

Page 58: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

58

5.3.3 Pits Pits shall be installed at suitable locations to facilitate installation and maintenance of cabling including: a) At distances not exceeding 50m along underground cable pathways b) Where a significant change of direction to the route occurs. The minimum pit dimensions shall be 450mm x 450mm x 600mm deep. All lids must be of solid construction and lockable. The locking mechanism shall be either a padlock or pit manufacturer method requiring a special tool to remove the lid. Any cable pit that requires access by Chorus shall have a minimum size of 600mm x 600mm x 600mm deep. Communications pits shall be of robust construction and suited to the conditions where they are installed. Pits shall have the following accessories: c) Secured and correctly rated (lockable) Pedestrian covers d) Secured and correctly rated (lockable) Trafficable covers where applicable e) Gaskets and seals (T-Dux or equivalent). Pits shall have non slip surfaces and should not be placed in or near designated play areas. Pits and pit covers shall be rated for their environment in accordance with AS 3996. Particular care must be taken when pits are in common walking areas or vehicle access roads. Where pits are installed in areas having traffic (this includes grass and field areas maintained by a grounds keeper using a tractor or similar), the correct approved strengthening ring for the pit lip shall be used. Pit lids shall have non-slip surfaces and be correctly rated for the expected exposure to heavy vehicles.

Page 59: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

59

5.4 Overhead pathways 5.4.1 Overhead support systems Overhead pathways may be considered where buildings are linked by covered walkways or gantries. For all fixed conduit pathways, the conduit shall not be greater than 50% occupied at the time of installation. For all new buildings, overhead pathways shall not be permitted. 5.4.1.1 Use of existing service ducts Existing service ducts housed in walkways that run between classrooms, that are designed for the purpose of routing services around the school unobtrusively, shall be used where they are present and when there is enough spare space. Catenary wire may be used where service duct is enclosed. Externally rated cabling shall be used, and it shall be supported by catenaries installed in accordance with AS/NZS 3084. 5.4.1.2 No existing service ducts Backbone and horizontal cabling may be installed within conduit of 50mm minimum diameter provided that the pathway is fully covered. The cabling shall be installed within protective conduit or ducting for the entire external section of the cable route. Externally rated cabling shall be utilised. All external pathways including junction boxes, ducting, trunking and conduits entering a building shall be protected against damage or vandalism for their entire length to a minimum height of 2.0m. Installer note: If the duct or conduit then continues up under the eve of the building, then it shall be protected all the way to ensure aesthetics are maintained and that it blends into the existing building structure.

Conduits or ducts installed under covered walkways shall be positioned to prevent anyone from swinging on them. Installer note: When multiple ducts or conduits are installed under covered walkways or within a building, an accessible and aesthetically pleasing boxing shall be installed around them and painted to blend the pathway into the surroundings.

Stainless steel full saddles and stainless steel screws shall be used for direct fixing of conduit and pathways to an external structure where applicable. Full saddles and fixings shall be spaced at no more than 1m apart.

Page 60: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

60

5.4.2 Aerial pathways In cases where underground or overhead pathways are not practicable, aerial pathways utilising catenary suspension systems may be employed. Aerial pathways shall meet the requirements of AS/NZS 3084, and the following: a) Aerial pathways shall be selected to avoid crossing power lines b) Where aerial pathways are indicated on the site plans, the GCS installer shall install

UV resistant, PVC-coated, flexible metal conduit between buildings. In this instance the length of conduit may be greater than 1m

c) The conduit shall be sized such that fill at the time of installation does not exceed 50% rated capacity

d) The catenary wires shall be terminated and sized to support the load of the conduit with 80% fill of cables under extreme weather conditions

e) Catenary wires shall be PVC coated galvanized steel and in no circumstances shall be less than 3.4mm diameter. Catenary wire shall be fixed to the buildings using eyelets and turnbuckles and bonded to the protective earth as required

f) The conduit shall be tied to the catenary with stainless steel cable ties.

5.5 Tunnels This Standard does not address the requirements for tunnels. In the event that tunnels are available or are required, the design and appropriate specifications shall be prepared by suitably qualified persons.

5.6 Intra-building pathways All pathways shall be installed with the expectation that they will be reused during the lifetime of the school. While it is accepted that the pathways inside the walls are more difficult to reuse, they can be made more accessible by ensuring cable is run vertically rather than horizontally. Intra-building pathways shall be constructed to accommodate the cabling within a building or blocks. In multi-storey installations, cabling between floors shall be routed via an approved communications cabling riser or duct. All ICT cabling pathway components shall be approved by the GCS/SCS manufacturer as suitable and approved within the warranty requirements of the vendor’s system. See 5.3.2.1 for fill ratios.

5.7 Horizontal cabling pathway components All ICT cabling pathway components shall be approved by the GCS/SCS manufacturer as suitable and approved within the warranty requirements of the vendor’s system. See 5.3.2.1 for fill ratios.

Page 61: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

61

5.7.1 Horizontal cabling supports Horizontal ICT cabling shall be supported by an approved method – for example, cable tray, catenary wire – from the cabinet to within one (1) metre horizontally of the vertical channels used to deliver the ICT cables to their telecommunications outlets. In addition: a) No more than 24 cables of any type shall be tied to a catenary wire b) Cables shall be tied to catenary wires at 300mm intervals using a hook and loop tape

(minimum of 12mm wide tape) c) Cables installed on cable trays shall be loosely laid and secured not more than every

1.5m using hook and loop tape d) Catenary wire shall be supported at a minimum of every 3m i.e. support raw bolts

hooks inserted in above building level floor slab. 5.7.2 Cable trays Cable trays shall be perforated galvanised mild steel sheet or Aluminium construction. Minimum steel thickness for cable tray shall be: a) 1.0mm for trays up to 150mm wide; and b) 1.2mm for trays up to 300mm wide. Trays shall have folded edges with minimum height of 20mm. Where cable trays transition from a horizontal to vertical positioning, an appropriate solution to avoid cable crimping shall be installed at the point of transition. Where the cable tray is used as an earthing medium, electrical continuity shall be maintained along its full length. Cable tray support brackets shall not be more than 1.5m apart. 5.7.3 Cable trunking Trunking is used primarily to provide a pathway and expansion for TEOs and GPOs. Outlets are to be installed externally to the trunking flush to the wall (where access into the wall is available). If outlets are to be installed directly into trunking due to mounting on a concrete or block wall, the trunking is to be installed 750mm above the floor where possible to allow desks to fit under it. When new trunking is required to provide a pathway for new TEOs or GPOs, any existing services that utilise this pathway and existing pathways shall be removed, for example, mini trunking or conduit. Where twin compartment trunking is utilised for mounting data and power outlets, the top compartment shall be used for GPOs and these are not to be installed directly above a TEO. All metal and plastic trunking must support the required bend radius for Cat 6, CAT6A and any fibre cable installed to ensure all products maintain their warranty and comply with AS/NZS 4296. All trunking bends, tees and elbows that are installed onsite shall be pre-fabricated by the manufacturer or be a factory manufactured part.

Page 62: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

62

Compliant plastic trunking must be paint absorbent, with a minimum UV stabilisation warranty of 10 years. Unless an alternative colour is stipulated by the school, the colour of the trunking will be white or similar. 5.7.3.1 Surface mounted trunking Surface mounted trunking shall be installed where alternative methods for concealment of cables are not possible. Twin compartment trunking shall be used to segregate power and data cabling. No exposed conduit or duct is to be used within buildings for feeding TEO’s or GPOs. Surface mounted trunking and ducting shall follow the natural vertical and horizontal lines of the room structure. It is preferable to install vertical trunking where possible in a corner if it is close to the outlet location or in a location to make it look as aesthetically pleasing as possible while maintaining expandability and flexibility. The fixing of surface mount trunking directly to the ceiling or other horizontal surface (lid facing down) should be avoided. Where this is necessary, VelcroTM ties shall be screwed within the trunking at maximum of 2 metre spacing to ensure that cables are retained when lids are removed. Alternatively, solid cross sections placed to hold the cable in place may be used. 5.7.3.2 Fixings Ducting shall be screw-fixed to walls using suitable fixings (for example cavity fasteners for cavity walls and masonry anchors for concrete walls) at approximately 1m intervals when run vertically and approximately 600mm intervals when run horizontally. Fixings shall not cause undue distortion to the ducting when tightened. 5.7.4 Under floor cabling Backbone and distribution cabling may be installed under floors when access permits. For all under floor cabling the following requirements are to be adhered to: a) Cables must be suitable for the environment in which they are installed b) Exposed standard distribution cables may be used when the under-floor space is dry

and not subject to spray or splashes. Cables should be installed clear of access and vent points

c) External grade cables (gel-filled or water-block) and rodent resistant cables should be considered when the cables are at risk. Alternatively, sealed conduits may be used to protect cables from damage by water or rodents

d) A minimum separation of 500mm shall be observed between fibre optic cabling and ground level. Where this cannot be achieved cabling shall be installed within plastic conduit of 50mm diameter

e) Where practical all internally rated copper cable shall maintain a minimum distance of 500mm from finished ground level, externally rated cabling may be used for cabling positioned between 200mm and 500mm from ground level

f) Any cabling installed within 200mm of ground level shall be provided with additional mechanical protection, that is, installed within 50mm plastic conduit maintaining the minimum bend radius and expansion requirements

g) In all cases the manufacturer shall be consulted to ensure the installation meets the specifications and requirements for warranty.

Page 63: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

63

Installer note: It is preferred that cabling be concealed by installation in ceiling, floor or wall cavities. However, it may be necessary to surface mount cabling within ducting where no cavity exists or where concealment would prove to be inordinately expensive, disruptive or impracticable. Two-compartment duct shall be used to segregate power and data cabling. All ducting shall be run in an inconspicuous manner. Excess cabling shall not be stored in the ducting. Where cable is run in a false (suspended) ceiling it shall be suspended from fixed non-movable structural features, purpose installed flat cable trays, or from catenary wires. Fixed, non-movable features exclude water pipes, sprinkler systems and trunked electrical power. Cables shall not be laid on ceilings or ceiling tiles or attached to any suspended ceiling support structures. Plastic capping should not be used in new installations and low profile ducting should be considered where cable numbers are low. Capping may: a) Be used at 2m above finished floor height b) Be used for no more than two cables; and c) Be retained if 2m above finished floor height and no change is required. All capping shall be UV rated.

Page 64: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

64

6. CABLING

6.1 General All cabling shall be installed in full accordance with the manufacturer’s recommendations. Cables shall be installed so that: a) Maximum permitted hauling tension is not exceeded b) Minimum bending radius of the cable is not exceeded c) Maximum permitted crush rating is not exceeded. Cable bundles shall not obstruct the installation and removal of equipment within equipment enclosures. Equipment and patch panels shall be laid out to minimise patch cord length. Patch cords shall follow clear paths to avoid patch field obstruction. 6.1.1 Balanced Cable Termination An RJ45 system shall be utilised at both the main communications centre and all remote cabinet locations. Cable termination onto a horizontal distribution panel or patch panel should be undertaken in a manner permitting additional cables to be terminated without unduly disturbing previously installed cables. Cabling termination to information outlets, patch cords, work area cords and patch panels is to be the T568A arrangement in accordance with AS/NZS 11801-1. The connecting hardware shall be installed to the manufacturer specification and to preserve wire twists as close as possible to the point of mechanical termination to minimise signal impairment. The amount of untwisting in a pair shall be as short as possible to permit the termination to the connecting hardware. To preserve the electrical characteristics of the balanced cable, the outer insulation of the cable shall not be stripped back more than recommended by the manufacturer for the purposes of termination. 6.1.2 Optical fibre cable termination The following fibre connector and adaptor colour codes shall be used for termination;

Multimode 50 m: Aqua

Single-mode PC: Blue

Single-mode APC: Green Multimode optical fibre cores shall be fusion spliced with LC terminated pig-tails. Single-mode optical fibre terminations shall be achieved by splicing LC pigtails to optical fibre cores using the manufacturer’s approved splicing techniques. Passive optical LAN (POL) solutions may use a combination of LC, SC and MPO connectors. Ministry of Education approval is required to implement a POL solution, if approved, the system designer shall be responsible for specifying the correct connectors required throughout their design. The cables shall terminate in fully enclosed, rodent proof 1-RU 12 port (24 fibre) or 24 port (48 fibre) LC duplex patch panels in the communications cabinets.

Page 65: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

65

All fibre cores specified shall be terminated at each end and presented at the patch panel. The number of points at which through patching of multimode backbone fibre occurs shall be kept to one (1) maximum. The number of points at which through patching of Single mode backbone fibre occurs shall be kept to three (3) maximum. Should through patching be implemented in a design, the link attenuation shall still support a minimum of 10Gbps Ethernet once through patched end to end. Fusion spliced connection of inbound and outbound fibre cores at a communications cabinet shall not be permitted, except in cases where through patching must occur more than once due to geographical or distance constraints or repair or re-routing of an existing fibre is required due to building alterations. All fibre ports (adapters) shall have shutters fitted to prevent the entry of dust and other contaminants. 6.1.3 Passive Optical LAN (POL) Cabling and Design This standard does not cover POL cabling and design, however should a school, the ministry or designer wish to deploy a POL solution within a school this shall be permitted providing it is signed off by the Ministry of Education representative detailed under section 1.2.4. The POL cabling infrastructure shall be deployed and comply with this standard. This shall include, but is not limited to the use of Approved Manufacturers, Approved installers, Warranty, Testing and Documentation requirements.

Page 66: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

66

6.1.4 Cabling type definitions The following definitions define the various cabling systems types as per AS/NZS 11801-1: a) Generic cabling systems: Structured telecommunications cabling system,

capable of supporting a wide range of standardised applications b) Service distribution cabling: Cabling connecting the service distributor to the

service outlets (SOs) of type A cabling or service concentration points (SCPs) of Type A and B cabling

i. Type A Generic cabling: Service distribution cabling between the service distributor and the service outlet

ii. Type B Generic cabling: Service distribution cabling between the service distributor and the SCP if a service outlet is not used

6.2 Backbone 6.2.1 Backbone cabling Backbone cabling includes both campus and building backbone cabling subsystems. The backbone cabling generally provides interconnection between active network equipment that may be within the same building or in separate buildings. All new campus and building backbone cabling shall be optical fibre. Any exception shall be approved in writing by the Ministry or its representative. See 6.2.5.2 for more information. Building backbone cabling runs within buildings and provides the interconnection between the floor distributors and building distributors, and in some cases between a campus distributor and building or floor distributors. Cabling requirements for voice communications depend on the technology used for voice switching. Internet Protocol (IP) Telephony systems transport voice signals as data over the common optical fibre backbone cabling. For the older (TDM) telephone systems dedicated balanced cabling will be required in the backbone. Installer note: Where backbone cables are run through ducting, sufficient slack of at least one loop must be retained in all inspection pits. All backbone cabling shall be labelled within pits using standard labelling conventions for the site.

6.2.2 Fibre optic backbone cables The increased bandwidth required by schools has resulted in optical fibre communication systems being implemented in a wide variety of environments to which both cabling practitioners and others might have access. The following specifications shall be followed:

Page 67: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

67

a) All fibre optic network design shall be based on the performance and distance restrictions identified in AS/NZS 11801-1. The link-loss budget of the fibre link must meet the performance limitations of this Standard

b) All pig-tails shall be colour matched to the fibre cable c) All fibre optic connections shall comprise fusion spliced pig-tails. Mechanical

splices and field termination are not acceptable d) A minimum of OS2 fibre shall be used for all new fibre backbone cabling

installations e) Optical fibre connecting hardware used within backbone cabling subsystems

shall comply with AS/NZS 3080 [AS/NZS 11801-1 ] f) OS2 optical fibre cables used within backbone cabling subsystems shall comply

with AS/NZS 11801-1 g) OS2 optical fibre connecting hardware used within backbone cabling

subsystems shall comply with AS/NZS 11801-1 h) All the fibre cores at both ends of each optical fibre cable run shall be terminated

using LC-duplex type fibre connectors. Unused cores shall not be left un-terminated

i) All fibre cables will be presented in appropriate sealed fibre trays or distributors with compression glands for protection from rodent damage

j) All fibre fusion spliced terminations shall be presented on an approved splice cassette, firmly fixed within the fibre tray

k) Fibre optic backbone cables shall be run from the main equipment room via backbone cabling subsystems. Cabling subsystems may include a Campus backbone cabling subsystem and/or Building backbone cabling subsystem to a floor distributor (AS 11801-2) or service distributor (AS 11801-6).These cables may traverse Distributors assuming that link loss budgets are adhered to

l) Fibre Optic Break Out Termination (FOBOT) patch panels shall be rack mountable, hinged or sliding, with eye safe front (including laser warning symbol) and shall have integrated patch cord management

m) All fibre optic backbone cables shall have a crossover as per AS/NZS 11801-1. The crossover shall be implemented at the down-stream end of the link (farthest end from the main equipment room)

n) Each optical fibre cable shall be installed with 5m spare length in the communications enclosure at the respective distributors. The spare cable shall be stored so that it does not interfere with the opening of cabinets, FOBOTS, or servicing of equipment within the cabinet

o) Optical fibre bending radius shall not be less than 10 times the cable diameter (not less than 30mm) or as specified by the cabling manufacturer whichever is greater under no load conditions and 20 times the cable diameter or as specified by the cabling manufacturer whichever is greater under load, that is, when being pulled through conduits and the like.

Refer to APPENDIX C – CABLING WORK PRACTICES for more information.

Page 68: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

68

6.2.3 Cable running or termination operations The following precautions shall be taken in these operations: a) Care shall be taken not to breach the cable’s protective sheath. b) Cables shall not be forced through openings that are too narrow or have sharp

or rough edges. c) Cables shall not be bent more than the manufacturer’s recommended minimum

bend radius. d) All building entry and cable pathway entry points shall be suitably sealed against

water ingress in a manner aligned with the New Zealand Building Code Document E2, with drip loops provided on cables where necessary.

6.2.4 Use of gel-filled cables Termination of gel filled cables into telecommunications cabinets shall be directed by the recommendations and warranty requirements of the system manufacturer.

Installer note: As there are no regulations or legislation that covers the use of gel-filled cables in New Zealand, the Ministry will not be restricted by a set distance for the entry of gel filled cables (copper or fibre) inside a building.

6.2.5 Campus and building subsystems For the purposes of the application of single vendor system warranties, all aspects of the campus backbone shall be considered part of the GCS and shall be included within warranties. The OSP campus network should be from the same vendor or manufacturer as the building systems vendor. 6.2.5.1 Installation Cables shall be: a) Rated for the environment in which they are installed b) Certified by the manufacturer for the environment in which they are installed.

External cables should be gel-filled water-resistant cables c) Installed in a manner that does not expose them to the elements and that

protects them from risk of damage or vandalism. Refer to 0 for more information on conduit sizing, fill rates and installation.

6.2.5.2 Channel length Fibre optic cables shall be used in all instances for backbones. In instances where Cat 6 UTP has been installed as a backbone link, it shall be retained to support existing services and a new fibre backbone installed as per this standard. An exception to this is only applicable where detailed within sections of this document, and approved in writing by the Ministry as per section 1.2.4. 6.2.6 Fibre optic terminations Fibre optic cable shall be terminated with LC UPC type fibre connectors.

Page 69: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

69

6.2.7 Fibre optic patch cords Fibre optic patch cords shall be provided as duplex LC to LC except where used to interface equipment using connectors to optical patch panels. Patch cords shall be matched to the AS/NZS 11801-1 optical fibre cable type of the cabling system in which they are used. Patch cords shall be provided in standard pre-manufactured lengths (e.g. 1m, 2m, etc) sufficient to interconnect the optical fibre termination unit and switch/router hardware while minimizing the need to manage excess cable. Patch cords shall employ the following colour scheme:

a) Orange for OM1 62.5/125m (expansion or upgrades only)

b) Aqua for OM3 or OM4 50/125m c) Yellow for OS1a or OS2 (single-mode) d) Yellow and orange or grey for mode conditioning patch cords (yellow for SMOF

element, orange or grey for MMOF element).

Mixing of optical fibre patch cords and cabling, for example 50/125m cabling with

62.5/125m patch cords and vice versa, shall be avoided. The following patch cord connector colour codes shall be used;

Multimode 50 m: Aqua

Single-mode PC: Blue

Single-mode APC: Green 6.2.8 Cabling within enclosures All cables shall terminate at the patch panels in the communications enclosures with an excess length of five (5) metres for optical fibre and not less than half (0.5) metres for other cables neatly placed out of sight prior to terminating. Excess cable shall not be stored in “coils” but shall be formed into a “loop back” generally contained at one side of the cabinet up against a wall. Any excess length cabling must be properly supported. Cables terminating at the enclosures shall be neatly loomed within the enclosure, utilising the cable management system specified in 7.5. Cables shall be loomed between the space on the outside of the mounting rails and the removable door. Cables loomed inside wall mounted cabinets shall be loomed in groups of a maximum of 12, to allow enough space for mounting active network equipment.

Page 70: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

70

6.2.9 Spare capacity A coil of cable (both fibre and copper) of at least 1m shall be left in each pit to allow for future expansion or maintenance purposes. All cables left coiled in the pits must be identified using water proof labels indicating the cabinets or points between which the backbone link is installed. At the distribution and work area ends of the horizontal cabling installation, provision should be allowed to house a certain amount of spare cable, for the requirement of re-termination or reconfiguration of the local cables. These spare cable capacity provisions are: a) Building distribution – half (0.5) metres b) Floor distribution – half (0.5) metres c) Work area (ceiling/floor) – one (1) metre d) Outlet (false wall) - three hundred (300) mm These spare cables should be stored in such a way as not to cause or induce any interference into the infrastructure, and so that it does not interfere with the opening of cabinets or servicing of equipment within the cabinet. 6.2.10 Copper (voice) building subsystem Gel filled copper backbone cables shall not be used in internal building risers. Internal grade Category 3 (Voice) can be terminated on either IDC modules or rack mounted patch panels as required. 6.2.11 Labelling convention The installer shall follow the labelling convention in use by the school. When this convention is inadequate or has conflicts, an alternative shall be provided. There is no requirement to re-label existing outlets. Refer to APPENDIX D – LABELLING CONVENTION for labelling convention and requirements.

Page 71: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

71

6.3 Cabling Subsystem 1 (horizontal cabling) Cabling Subsystem 1 extends from the Distributor 1 (Floor Distributor FD) to the Terminal Equipment Area (TE). The cabling subsystem 1, includes all cables, terminal equipment outlets, patch and jumper cords and may include Multi User Telecommunication Outlets (MUTO’s) and Consolidation Points (CPs).

C

FD

C TE

TO

C = connection

EQP = equipment

Channel

EQP C C C C

CP

CP Link

Permanent Link

Equipment

Cord

Patch Cord /

Jumper

Work Area

CordCP Cable

Horizontal Cabling

Figure 3: Cabling Subsystem 1

New horizontal cabling installed shall be at a minimum Cat 6A 4-pair 100ohm shielded balanced cable. New cable lengths shall not be less than fifteen (15) metres unless permitted by the GCS/SCS manufacturer and a passing test is achieved. If extending existing cabling then patch panel to the CP shall be a minimum of fifteen (15) metres and CP to TEO shall be a minimum of five (5) metres unless permitted by the GCS/SCS manufacturer and a passing test is achieved. The maximum channel length is one hundred (100) metres for Class D, Class E and Class EA. Exception to this is only applicable where directly referenced in sections of this document or specific Ministry scoping documents. 6.3.1 Cable selection All cabling subsystem 1 (horizontal cable) types shall comply with the relevant standards and shall be rated to equal the connecting hardware unless otherwise specified.

Page 72: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

72

6.3.2 Terminal Equipment Outlets Each terminal equipment outlet (TEO) shall incorporate a modular RJ45 socket designed for IDC termination and compliant with AS/NZS 11801-1. Terminal equipment outlets shall be equipped with unshuttered face plates. Where the TEO is positioned on existing trunking, modular type mounting enclosures shall be used. Blanking plugs shall be fitted where the apertures of the mounting enclosure is not filled with a RJ45 jack. Faceplates should match power outlets in appearance and manufacture. 6.3.3 Balanced twisted pair cabling The performance of balanced twisted pair cabling, in this standard, is referred to in terms of either its “Category” or “Class” and these terms are interchangeable. Irrespective of the term used the connecting plugs and sockets shall be an 8-way modular design. The Ministry’s minimum standard for all new horizontal cabling is Cat 6A shielded cable and connector components, installed and tested for Class-EA performance. 6.3.3.1 Outdoor cabling In the event that balanced cabling is used externally the cable shall meet the following requirements: a) For underground routes the cables shall be rated by the manufacturer for

external use, moisture resistant, and placed in a conduit b) For aerial and overhead routes the cables shall be rated by the manufacturer for

external use, moisture resistant, UV rated, and placed in a conduit c) The appropriate rated cable must be used for the outdoor application such that it

will be warranted by the manufacturer for a period of not less than 20 years d) When gel filled cables are used, care must be taken to follow the manufacturer’s

instructions with regard to termination on a patch panel. Refer to AS/CA S008 and AS/CA S009 for more information. 6.3.4 Wiring sequence All distribution frames, patch panels, telecommunications outlets shall be wired using the T568A pair assignments. 6.3.5 Untwist The amount of untwisting in a pair shall be as short as possible to permit the termination to the connecting hardware..

Page 73: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

73

6.3.6 Bend radius For legacy Cat 5e and Cat 6 cable, a bend radius of at least 25mm should be provided for hand cable placement. Installation bend radius must be at least 50mm. The bend radii for CAT6A shielded cable shall be a minimum of 8x the outer cable diameter installed or as stipulate by the Manufacturer.

Installer note: For terminations in locations where 8x the outer cable diameter bend radius is unable to be achieved, Manufacturers may offer a side terminable modular jack.

6.3.7 Copper Terminations The means of terminating balanced copper cabling shall be the modular 8-pin sockets (commonly known as RJ45) and plugs using the T568A arrangement. The method of termination at the RJ45 sockets will be by Insulation Displacement Connection (IDC). RJ45 sockets will be fitted to 24-port 19” rack mount patch panels at the Distributor and to flush plates, selected to match other electrical fittings in style and colour, at the TEO. 6.3.8 Existing cabling There is no requirement to modify existing cabling and related systems that was installed and completed prior to the commencement of any new works, except where necessary to achieve a successful merger of old cabling with new works on the same site or to bring the installation up to the required Standard. Any existing cabling being retained as part of a new installation that is not properly secured (for example, laying on the ground) shall be rectified – that is, supported to comply as much as possible with requirements pertaining to cable support detailed within this document. 6.3.9 Segregation Legacy Cat 5e UTP, Cat 6 UTP and newly installed Cat 6A 4-pair Shielded cables shall be kept in separate bundles from the multi-pair voice or fibre backbone cable. 6.3.10 Balanced cabling patch and terminal equipment area cords 6.3.10.1 General Patch cords and terminal equipment area cords shall be: a) Constructed of an 8 wire, stranded Cat 6 or Cat 6A cable terminated with RJ45

plug at both ends and complying with AS/NZS 11801-1. b) Factory assembled, terminated and certified by a Ministry Approved

Manufacturer. c) Fitted with moulded boots, unless snagless patch cords are used. Pin assignments and colour codes shall conform to the T568A arrangement. 6.3.10.2 Terminal Equipment area cords Terminal equipment area cord lengths shall not exceed five (5) metres.

Page 74: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

74

6.3.10.3 Patch Cords In no circumstances shall patch cord lengths exceed the distances set out in table 84 of AS/NZS 11801-1. The installer shall supply and install CAT6A patch and terminal equipment cords where a fully certified CAT6A cable channel is required.

Installer Note: Legacy and new installations not requiring 10Gbps performance do not need Cat6A patch cords installed, Cat 6 patch cords may be supplied and installed in a Cat 6A installation if 1Gbps performance only is currently required. Patch cords shall be from one of the approved Ministry manufacturers.

6.3.10.4 Cord colour scheme There is no mandated colour scheme for patch and work area cords but a colour scheme which positively and uniquely identifies each application is a useful management aid. The following colour scheme shall be used in school installations: a) Grey for general terminal equipment areas cords b) White for patch cords providing WAP connections and Power over Ethernet c) Blue for general patching d) Yellow for up-link connections e) Red for critical connection, for example, Internet Router, DHCP server, NVRs

etc. 6.3.11 Transportable classrooms Schools in New Zealand may utilise education transportable classrooms (also known as modular or relocatable classrooms), delivered to the site as a standalone unit or a cluster of units to provide a learning studio.

Unless it is the point of entry into the building, all cabling located underneath transportable classrooms shall not protrude below the floor joists to prevent cable damage if the building is relocated.

6.3.11.1 Cabling - New transportable installations Consolidation points may be used in new transportable installations, in specific cases where appropriate to provide ease of integration into an existing school network. 6.3.11.2 Cabling - Current transportable installations Where existing cabling in current transportable classrooms is appropriate to reuse, consolidation points shall be considered to meet the requirements of AS/NZS 11801-1. A consolidation point may be installed into an existing transportable classroom to maintain existing cable warranties. Installation of the consolidation point shall be made with consideration to allow future upgrade to a data cabinet. In all instances a consolidation point solution shall be approved in writing by the Ministry as per section 1.2.4.

Page 75: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

75

7. EQUIPMENT SPACES

7.1 Equipment rooms The Ministry recognises the following styles of equipment and plant rooms within its network and makes specific minimum performance and design requirements of each style of room. a) Entrance facility (EF) b) Equipment Room (ER) c) Telecommunications Rooms (TR)

7.2 Equipment room design The designer shall: a) Be responsible to inform the architect and electrical engineer of these

requirements and to do this early in the schematic design phase of the project; and

b) Where these design requirements cannot be met, the designer shall advise Ministry and develop an alternative set of requirements for approval.

7.3 Entrance facility An entrance point to a building or facility for both fibre optic and copper cabling, and the space made for cable transition (from external to internal grade cable) is referred to as an Entrance Facility (EF). Most Ministry of Education schools do not utilise an EF. If they do, then the cable entry shall be constructed to ensure that water ingress and damage will not occur to Ministry property. In addition: a) The EF shall not be used as a patching environment, cable types transition from

external to internal in the EF by jointing or splicing b) External installers and facilities personnel are likely to need access to the EF

therefore an EF shall not be collocated within an ER or TR which are secure environments.

7.3.1 Sizing AS/NZS 3084 provides generic sizing information for commercial facilities. These sizing’s may not be suitable for schools, therefore supporting documentation supporting a decision to deviate from AS/NZS 3084 shall be provided by the designer to the Ministry for approval as per section 1.2.4. Typical layouts below shall provide guidance for architects/ ICT designers to ensure adequate space for ICT equipment inside the TR spaces and shall provide safe access to equipment In general: a) The TR shall be sized to match the functionality and size of the location b) The TR shall not be shared with electrical installations other than those

necessary for telecommunications.

Page 76: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

76

The following schedule provides a summary of the required TR space sizes in relation to general guidelines for TR spaces sizing required serving following floor area sizes (m2):

Floor area size to be served by TR

TR space size required (Depth x Width) – TR space

entry is on the “Width” side of a TR space

TR space category

465m2 or less 3.2m x 2.4m Small Size TR space

466m2 to 743m2 3.2m x 2.74m Medium size TR space

744m2 x 929m2 3.2m x 3.4m Large Size TR space

The following schematics shows typical layouts and sizing of a TR based on the table above. These layouts shall provide allowance for the different services and features expected in a typical communication room:

Desiger/Installer Note: Distribution Boards required to service equipment located within the TR, as per AS/NZS3000 clause 2.10.2.2 shall have a minimum space of 1000mm or 600mm clear space from edge of switchboard board door when in its open position.

Page 77: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

77

Equipment and telecommunications rooms The telecommunications rooms are building distributors (BD) and floor distributors (FD) whose primary purpose is house equipment and the distribution of GCS/SCS cables, and shall generally be considered as telecommunications rooms. The final size of the ER/TR shall be determined after developing the ER/TR design that accounts for all equipment footprints and incorporates all the defined clear working spaces. The following process shall be followed: a) No clear working space requirements shall be eliminated or reduced. ER/TR

layouts with inadequate clear working space for equipment are not acceptable b) Use the ER/TR “base size” from the above calculation including the required

clear working spaces for all systems designated for the TR c) If the ER/TR door swings inward rather than outward, do not use the wall space

behind the door swing for mounting panels, or equipment d) If additional space is required to achieve a compliant layout, adjust the length or

width of the ER/TR, and if necessary, expand the number of square metres accordingly

e) The TR shall have a minimum height from floor to ceiling of 2.4 metres without obstructions. A minimum headroom access of three hundred (300) mm shall be maintained above cable raceways.

The final size of the TR shall not be calculated until an acceptable equipment layout is developed based on the criteria listed above. All designs shall include an equipment room layout, detailing all services installed within the room and shall include dimensions. 7.3.2 Location Horizontal cable lengths have the potential to exceed ninety (90) metres between the patch panel and the terminal equipment outlet in the terminal equipment area, including the service slack requirements at both ends of the cable as identified in other sections of this document. 7.3.3 Security In general, it shall be necessary to pass at least two points of restriction to access equipment and server rooms. This can be generally achieved by using lockable doors to rooms housing equipment enclosures, and providing lockable equipment enclosures. Open racks in lockable equipment rooms accessible from staff-only areas may also be acceptable. Where schools already have burglar alarms installed, server rooms shall be secured by electronic security systems (access control, intrusion detection alarms). The TR shall have lockable doors as a minimum.

Page 78: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

78

7.3.4 Lighting The TR average lighting level measured at one (1) metre AFFL between cabinets should be 500 lux in the horizontal plane and 200 lux in the vertical plane. Light fittings shall be mounted at least 2.4 metres AFFL, unless otherwise specified. Light fittings illuminating cabinets shall have a CRI of 90 or equivalent. Lighting installation shall comply with AS/NZS 3084 and AS/NZS 1680 Interior and workplace lighting requirements. 7.3.5 Power supply All cabinets shall have dedicated circuits installed and protected by a 30mA RCBO. 7.3.5.1 ICT specific wall mounted cabinet protection requirements Each wall mounted cabinet (less than 1.0kW input) shall have 1 x 10A dual GPO installed, supplied by a single dedicated RCD protected circuit. The dual GPO shall be mounted 150-200mm above the base of the cabinet. Surge protective devices (SPD) shall be installed at the switchboard to protect the entire phase supplying any dedicated communications cabinet circuits. A dedicated circuit breaker shall be installed to protect the SPD, and this circuit breaker shall not be used to protect any other sub circuits. All RCBOs protecting GPOs, the MCB protecting the SPD and the SPD itself shall be labelled at the switchboard, clearly referencing which cabinet they are protecting. 7.3.5.2 ICT specific free standing cabinet requirements Each cabinet (server & free standing greater than 1.0kW input) shall have 1 x 15A dual GPO & 1 x 10A dual GPO installed, with each having a separate dedicated circuit from the switchboard (on the same phase to mitigate 400v potential between GPOs). The power outlet shall be located on the wall placed low down inside the enclosure, approx 150-200mm from the bottom edge of the cabinet (single cabinet installation). For free standing enclosures, the power outlets shall be located on the wall either: a) 300mm above the floor behind the free standing enclosure; or b) 300mm above the floor inside the cabinet footprint. c) Mounted above the cabinet (side of cable tray). Individual 30mA RCBOs shall be installed for each dedicated circuit supplying cabinet GPOs. Surge protective devices (SPD) shall be installed at the switchboard to protect the entire phase supplying any dedicated communications cabinet circuits. A dedicated circuit breaker shall be installed to protect the SPD, and the SPD circuit breaker shall not be used to protect any other sub circuits.

Page 79: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

79

All RCBOs protecting GPOs, the MCB protecting the SPD and the SPD itself shall be labelled at the switchboard, clearly referencing which cabinet they are protecting.

Electrical Design Note: A schedule is required to ensure designers and installers will allow for the correct RCBO required for specific UPS loads to ensure the electrical circuits are not posing a safety risk or a risk of equipment failure due to over current. The RCBO selection shall also allow for any potential in rush current from a UPS post a power outage and charging of flat batteries.

7.4 Air conditioning and temperature control Equipment in the ICT rooms and cupboards will generate heat. The heat created in this environment will, unless moderated, cause the air temperature to rise. Servers and associated equipment operate reliably only within certain temperature and humidity ranges and may fail if operated outside of these specified ranges. The vendor may decline to honour the warranty if it can be established that the equipment was operated outside its specified environmental range. Each equipment space shall be evaluated in regards to potential heat output and environmentally conditioned accordingly. Advice shall be sought from a suitably qualified person, but, as a guide, room temperature should be maintained between ten (10) and twenty eight (28) degrees Celsius. . A humidity of 55%-60% needs to be maintained in the TR space to avoid room temperature reaching dew point. Air conditioning units shall not be placed directly above a cabinet. See APPENDIX F – AIR CONDITIONING AND TEMPERATURE CONTROL for more information.

7.5 Enclosures and racks Communication enclosures are used to house and restrict access to cabling, active network components and other communications hardware. Enclosures may be free-standing or wall-mounted, and are designed for 19” equipment mounting. Cabinets mounted side-on close to a wall (to conceal and contain vertical cable entry from above or below) shall not be secured to that wall. Enclosures and racks shall not be placed next to windows or areas subject to direct sunlight (UV). In situations where this is unavoidable, the window shall be tinted, covered or blanked off. All newly installed cabinets shall be no more than 60% loaded at time of first installation and provide a minimum of 0.9m clearance front and rear for adequate access.

Page 80: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

80

All cabling pathways into all cabinets must have rodent resistant polyester insulation installed to negate rodent access. 7.5.1 Cable management Racks shall be supplied with cable management panels to facilitate the support and organisation of patch cords between patch panels. For each 2RU of equipment in the rack there shall be a corresponding 1RU cable management panel which is deep enough to support 48 patch cords. Rear cable support systems are also required to offer strain relief for cables entering the rear of the rack and patch panels. 7.5.2 Balanced cabling patch panels Patch panels for balanced cabling shall be 24-way or 48-way modular socket (RJ45) with a port density of 24 ports per 1RU. The connecting hardware of the patch panels shall be rated to the AS/NZS 11801-1 Category 6A performance. New cable management shall be from the same manufacturer providing the performance warranty. 7.5.3 Optical fibre patch panels Optical fibre termination equipment shall provide cross-connect, interconnect or splicing capabilities. Optical fibre patch panels shall be combination type 1RU 12 or 24 port fitted with duplex LC couplers and cover plate. Patch panels shall be equipped with cable management facilities including splice trays. Patch panels shall be rack mountable, hinged or sliding, rodent proof, with eye safe front (including laser warning symbol) and shall have integrated patch cord management. All new fibres installed shall be terminated within this enclosure using manufacturer-approved fusion splice pigtails with LC connectors to maintain warranty. Terminated fibres shall be connected to LC connectors through shuttered adapters mounted on the faceplate of the optical fibre termination panels. Hardware shall minimise potential eye hazards from optical sources.

Page 81: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

81

7.5.4 Seismic bracing All enclosures and racks shall be seismically braced to current New Zealand standards, refer to NZS 4219 for more information. Floor loading needs to be investigated to ensure cabinet integrity and safety. For the Ministry of Education current importance levels (IL) refer to the following link; https://www.education.govt.nz/school/property-and-transport/maintenance-repairs-security/earthquake-resilience/design-levels/ Free standing cabinets shall be seismically braced and securely fixed to the floor as per NZS 4219. Fixing requirements shall be determined by a structural engineer to the appropriate IL rating. Floors, including floor slabs for upper levels – If cabinet is braced to the upper slabs, and wall structures, must be able to sustain a minimum distributed floor loading capacity of 7.2 kPa as per AS/NZS ISO/IEC 14763.2 or 735kg/m2. 7.5.5 Free standing cabinets To avoid thermal cross-contamination between multiple free standing cabinets bayed together, the internal cabinet panels should be left fitted with bushed cable entry holes provided top and bottom to allow cable reticulation between cabinets. The cabinets shall have the following as minimum requirements: a) Thirty seven (37) to forty five (45) rack units (RU) high b) Minimum six hundred (600) mm wide, (800mm preferred) to provide space for

vertical cable management and up to one thousand (1000) mm deep to allow for possible future mounting of nine hundred (900) mm deep servers or UPS’s

c) Front rails located one hundred and fifty (150) mm from the front of the cabinet d) Provide an earth bonding terminal e) Fully lockable, including fully removable side panels f) Baying kit g) Perforated doors h) Top of cabinet cabling access - for cable chimneys and so on. i) RU labelling – front and rear j) Two full length cable trays for cable management k) A facility for levelling adjustment l) Power rail providing not less than five (5) outlets for 24RU enclosures and not

less than 9 outlets for 37RU, 42RU or 45RU enclosures m) A minimum depth of 800mm, recommended depth 1000mm as per b) above

Page 82: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

82

7.5.6 Wall mounted enclosures Wall mounted enclosures should be located to avoid injury and follow relevant Standards and OSH requirements. Top of the enclosure should be no higher than two thousand (2000) mm AFFL and the bottom of the enclosure a minimum of five hundred (500) mm AFFL. If this requirement is unable to be met, then written approval from the school and the Ministry for an alternative installation shall be obtained prior to installation. Designer and Installer note: The servicing of cabinets that are installed outside the AFFL measurements outlined above may have future financial implications to the school, due to more stringent OSH requirements for working

at heights.

Cabinets may only be mounted above a maximum vertical footprint of two metres when: a) This is required to mitigate a potential OSH hazard, for example the risk of staff

or students being injured on the cabinet bottom edge or corners. b) Physical constraints such as permanently fixed building elements or services at

otherwise suitable locations prevent the mounting of the cabinet beneath the two metre limit.

In cases where the top edge of the cabinet will exceed the upper maximum footprint of two metres, the following shall be carried out: c) A visible laminated sign of no less than A4 size, is be fitted to the front bottom of

the cabinet door. The sign shall state that access to the cabinet must be achieved using an appropriate sized ladder. For transparent cabinet doors, fix the label to the inside of the door to prevent removal.

d) Where possible, plastic or rubber corner protectors must be fitted to minimise the risk of head injury.

e) The cabinet must be documented within the school’s OSH register indicating the cabinet identification, cabinet location and that an appropriately sized ladder must be used by suitable qualified personnel to access and service the cabinet.

f) Striped hazard tape may also be considered for the bottom edge of the cabinet where this can be applied in a permanent neat manner.

In addition the wall mounted enclosures shall: g) Be twelve (12) RU minimum and twenty four (24) RU high maximum. When

more space is required a floor mounted cabinet is preferred h) Include a swing frame which shall be a minimum of one hundred (100) mm deep

and rear mounted to the cabinet i) Measure six hundred (600) mm wide by six hundred (600) mm deep, including

the swing frame j) Provide an earth bonding terminal k) Be installed on a suitably sized AC grade plywood backboard which is attached

to a minimum of two wall studs top and bottom l) Be vented top and bottom to allow for airflow m) Have a perforated door to allow for airflow n) Be fully lockable

Page 83: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

83

o) Have front rails set back at least one hundred (100) millimetre’s from the open door

p) Have a power rail providing not less than five (5) outlets. 7.5.7 Open frame racks Open frame racks may be used for fully passive applications where only patch panels and distributors are mounted or for light-weight active equipment such as switches. Open frame racks shall be: a) Mechanically secure and supported at the base and top b) Provided as 38RU or 45RU. Open frame racks shall be fitted with: c) Horizontal and vertical cable tidy panels or loops, or both d) A vertical cable tray e) A power rail providing not less than five (5) outlets. Open frame racks shall not be used to support heavy equipment – free-standing (4-post) enclosures shall be used for such equipment. Open frame racks shall only be used in communications rooms where access is restricted by a locked door. 7.5.8 Enclosure maximum equipment load Equipment enclosures shall be constructed to support the maximum equipment loads as follows: a) 12RU Cabinet Wall Mount – 30kg b) 18RU Cabinet Wall Mount – 45kg c) 24RU Cabinet Wall Mount – 46kg. Consideration shall be given to load bearing capacity of the floor when selecting or specifying floor mounted enclosures. See 0. Installer note: Enclosure installation Communication enclosures shall be located to achieve maximum operator convenience. The space available for a communications cabinet is to be verified on site. The installer shall ensure that racks are arranged to permit installation of other equipment and enclosures with adequate access spaces for inspection, wire termination and patch field alterations. Enclosures shall be: a) Provided with sufficient clearance for installation and maintenance activity b) Installed plumb and square without twists in the frames or variations in level between adjacent

racks c) Be bonded to the protective earth system The vertical footprint for wall mount enclosures shall not extend above 2m or below 0.5m from the floor. Wall mount locations shall be selected to avoid risk of injury by walking past or rising from beneath the enclosure.

Page 84: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

84

Enclosures shall not be mounted on wheels or be moveable to allow for access. Equipment mounting rails at the front of the enclosure shall be set back so that doors may be closed without contacting equipment or connectors or distorting cable bends to ensure the minimum cable bend radius is maintained. Enclosure cable entry Cabling entering from the floor or ceiling space to enclosures shall be supported and concealed by a vertical cable support system. The vertical cable support system shall extend from the backbone/horizontal cable pathway to the enclosure. In the case of raised floors the vertical cable support system shall extend below the raised floor level. In the case of above ceiling pathways the vertical cable system shall extend above the ceiling level. The vertical cable system shall have a metal construction, colour and finish similar to the enclosure or interior building door. The vertical cable system includes two cable trays (power and data/voice).

Page 85: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

85

8. TERMINAL EQUIPMENT AREAS (TE)

8.1 Terminal equipment outlets (TEO) TEO’s shall be mounted at the same height and manner (vertically or horizontally) as existing outlets. If there are none, in office and administration areas they shall be mounted at 100mm above the desk or 500mm AFFL and, unless otherwise specified, mounted vertically or horizontally. Ceiling mounted outlets shall be mounted perpendicular to the building axis. The installer is responsible for informing the Ministry or its representative in writing (prior to completing any work) of any TEO’s scheduled for installation which do not have at least one GPO installed near or scheduled for mounting adjacent to or within one (1) metre of the new outlet. 8.1.1 Positioning terminal equipment outlets Where workbenches are fixed to the wall, outlets shall be installed above bench height. Where workbenches are positioned along a wall or benches have data distributed internally, a minimum of 800mm separation shall be maintained between the data outlets. Terminal equipment outlets shall be flush mounted wherever practicable. Mounting boxes, similar in style and colour to the flush plate, shall be used where flush mounting of communications outlets is not practicable. Outlets shall be located to avoid being obscured and terminal equipment cords being damaged by furniture and office equipment, and feet. The GPOs shall not be mounted in such a way that extension cords, multi boxes or power leads are required to cross access ways. TEOs and GPOs shall be mounted as close as possible to the areas requiring service. All cable pairs at the terminal equipment (TEO) or service outlets (SO) and at the distribution panels shall be terminated. Designer and Installer note: The designer shall design all cabling and service outlet (SO) locations required to support wireless throughout the entire installation as detailed in the Ministry wireless standards. Designers shall include in their design cabling to support AV devices installed in all spaces throughout the school. AV devices are defined as but not limited to; Projectors, TVs, Mobile TVs, Streaming media devices (Appletv, Chrome cast etc.), Video Conferencing, Display TVs, Video Walls and wayfinding etc. The designer shall determine the requirements and placement in consultation with the school.

Page 86: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

86

8.2 Floor boxes It is recommended that floor boxes should not be installed in schools. If floor boxes are to be installed, they shall be constructed from durable material capable of withstanding a 150kg load and have approximate dimensions: 245 mm square (or round) with a minimum depth sufficient to fit a standard TEO or GPO wall plate and to maintain the bend radius and performance requirements for a Cat 6A

cabling installation. The mounting of the floor box shall be such that it is flush with the floor and does not present a hazard to any user. A floor box with a carpet insert shall be used to allow the floor box to blend into the surroundings. Each floor box shall be able to accommodate a minimum of four GPOs and maximum of four TEOs. To prevent debris or foreign objects from damaging the outlets or presenting a hazard to the user, the mounting of GPOs and TOs shall be such that they are not facing directly upwards. Power and communication cables shall be provisioned such that separation is maintained. The floor box shall have sufficient capacity for four power cords and four work area patch cords and maintain separation with sufficient protection to prevent damage to cables. The floor box entry holes through which horizontal data and power cabling is passed shall be bushed to prevent cables being damaged on metal edges. Each new floor box shall be fed with a minimum of two 40 mm conduits when installed in a concrete slab. In order to ensure that circuits can be repaired, replaced and upgraded in future: a) There shall be no hard 90 degree corners used and all changes in direction will

be made using sweeping bends b) No conduit shall be more than 50 % full at completion of project. Earthing of floor boxes shall be carried out in accordance with the requirements of AS/NZS 3000.

8.3 Flush mounted faceplates All TEO's shall be flush mounted, where possible utilising the wall cavity. The TEO shall be located so that, after removing the faceplate, a user can disconnect and replace the terminal equipment area cable assembly. The TEO mounting support shall be suitably fire rated and protected if required, the slack or spare cable should be located at the next convenient access point. The terminal equipment area cable shall be installed in a suitable location, to ensure it can be easily replaced.

8.4 Radiators TEOs and trunking shall not be installed within 100mm of radiators in any direction.

Page 87: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

87

9. EARTHING AND TRANSIENT PROTECTION

9.1 Earthing A Telecommunications Reference Conductor (TRC) system performs a functional role only and shall not be used for protective earthing purposes. A TRC system is not generally required unless otherwise specified by design. All equipment racks and cabinets, cable trays, and metal duct systems shall be earthed in accordance with AS/NZS 3000 to the building protective earth system. Earth wires shall be used for the general earthing of metal structures (communications racks, catenary, cable tray, frames, and so on). Connection to catenaries shall be by way of a brass or copper line tap. Connections to cable tray or metal structures shall be via a suitably sized terminal lug, and serrated star washer, ensuring that any paint is scraped back to bare metal. The Ministry of Education has a preference for a single earth wire connect into each earth bar connection point for ease of long-term maintenance, however should a free standing cabinet be filled with shielded patch panel’s this may not be practical, so the contractor shall install no more than 3 earth wires into any one (1) earth bar connection point. Solder shall not be used as the primary connection method for earth connections. Each rack shall be directly earthed to the local earth bar. (It shall be possible to remove a rack without interruption to any other rack earth)

9.2 Transient protection Where available, applicable, and cost effective, transient protection equipment should be provided for protection of equipment connected to balanced copper outdoor cables where such equipment can be provided without compromising transmission performance.

Page 88: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

88

9.3 Communications Earth System (CES) A Communications Earth System (CES) performs a functional role and shall be compliant with the requirements in AS/NZS 3000.

To other distributors and

communications equipment

on the same floor

Electrical Distribution Board

Main Earth

Bar

To other distributors and

communications equipment

on the same floor

Gn/Y

Gn/Y

CET Gn/Y

Main Earthing

Conductor

Earthing Electrode

Figure 4: Communications earth system (CES)

A CES shall have a maximum resistance of 0.5Ω measured between the Communications Earth Terminal (CET) and any point on the system. The connection of the CES at the electrical distribution board (DB) shall be completed by a registered electrician. All communications racks, cabinets, enclosures, catenary wires, cable tray, metallic IDC frames and so on shall be earthed as per AS/NZS 3000. The resistance from any exposed metal element of the cabinet to the CET shall be less than 0.5Ω. The main earthing conductor from the CET shall be terminated at the earth bar of the DB or main switch board. This work shall be completed by a registered electrician. The earth wire used for this connection shall be green/yellow, minimum size 6mm2, provided that the resistance does not exceed 0.5Ω.

The CES shall be tested in accordance with AS/NZS 3000. The installer shall provide a test certificate demonstrating the measured resistance from each rack to the CES which complies with the requirements of AS/NZS 3000.

Page 89: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

89

10. ELECTRICAL

10.1 Electrical installation The installation of all electrical products and equipment shall be installed in accordance with manufacturer’s instructions, Electricity Safety Regulations and applicable standards by a registered electrician. Additionally, all electrical installations shall be in accordance with the ELECTRICAL section of this document and the Ministry of Education Electrical Installation Standard for schools.

10.2 Electrical segregation Cable pathways and cables shall be installed to achieve a minimum 50mm safety separation at all times between telecommunications cabling, fire alarm cabling and low voltage services as defined within AS/NZS 3000. Where this distance cannot be achieved, a durable plastic or earthed metal barrier shall be provided to achieve physical separation. Where specific manufacturer requirements exceed the minimum 50mm separation, the greater of the distances shall be observed.

10.3 Guidance for installation of RCD protection in schools RCD's shall to be installed in accordance with the requirements of AS/NZS 3000 and the Ministry of Education Electrical Installations Standard for Schools. Designer and installer note: To the same requirement as AS/NZS 3000:2018 section 2.6.3.3.1 – Residential Installations.

10.4 Communications overvoltage or surge protection Users and equipment shall be protected from communication system overvoltage that may exist between the operational environment and the communications facilities in that environment. Examples of overvoltage may include the following: a) Contact with (alternating current) mains power through customer equipment

failure or cabling faults b) Surge currents and induced voltages through power system faults or lightning c) Power feeding. 10.4.1 Surge protection devices (SPD) – Carrier or Voice grade services Over voltage (lightning) protection modules shall be fitted to all IDC 10 pair modules and frames directly connected to the lead-in cable, on the customer’s side of the network boundary, or other external copper cabling (for example, Inter-building tie cabling connections) that have or will have carrier or telephony present. Refer to AS/NZS 1768 for further information and guidelines Designer and installer note: Copper lead-in cables are being phased out and replaced with fibre. The designer and installer shall allow for alternative communications connectivity to fire panels, security panels and lift phones to ensure they maintain operation under power outage conditions.

Page 90: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

90

11. WIRELESS ACCESS POINTS

11.1 Wireless LAN Design The design and installation of a wireless LAN system within a school shall comply with the latest version of the Ministry of Education Information and Communications Technology (ICT) Wireless LAN Infrastructure: Standards for Schools Because of the diversity of school sizes, building layouts, and wireless connectivity requirements, recommended wireless system configuration parameters are described within the wireless standard. Schools are encouraged to discuss their requirements with an independent designer or ICT consultant prior to purchasing hardware. The installation and configuration of any wireless system shall be completed by a suitably qualified person. It shall be the responsibility of the ICT Consultant to design the cabling infrastructure required to provide the coverage and performance necessary to meet the Ministry of Education wireless standard for any new or refurbished school building.

11.2 Wireless LAN (WLAN) location While the wireless system is not considered to be a part of the Schools cabling infrastructure, the provisioning of the cable to support the wireless access points is and shall be designed into a new cabling installation as per the Ministry wireless standard. Industry best practice, is to use a specialist ICT Consultant to design the WAP placement and use predictive mapping tools to assist with placement and building structure obstacles.

The GCS installer shall be responsible for the installation of the cabling required to support the Access Points. For an existing installation, it is recommended a site survey be undertaken by a suitably qualified independent wireless designer to determine the optimum mounting locations for the wireless access points. All wireless systems shall be selected and installed to Ministry of Education wireless standards requirements.

Page 91: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

91

11.3 Wireless access points – installation and cabling The installation of wireless access points shall comply with the Ministry of Educations wireless standard. For all new cabling installations, there shall be a minimum of a dual Cat 6A shielded service outlet installed for every wireless access point. Permitted Exemptions;

1. The first exception to this shall be for relocatable or temporary classrooms fed

from an existing adjacent buildings cabinet, under this situation the installation

of a single externally rated Cat 6A gel filled shielded cable and Cat 6A Jack

shall be permissible to each wireless access point location.

2. The second exemption is for POL installations where the WAP is directly

connected to an ONT via a patch-cable, these may also be a single Cat 6

patch cord.

The SO’s that connect to the Wireless Access Points (WAP’s) shall be fixed to structural members of the building where possible, alternatively the use of manufacturer approved mounting fixtures can be used subject to Ministry approval (as per section 1.2.4). The SO’s shall be permanently and clearly identified and labelled. They shall be installed in a readily accessible location. Final placement of the WAP shall be achieved by the use of patch-cables. Patch-cables shall not be longer than 5m when connected to a SO. If the consultant has specified the use of MPTL connections, the patch-cable length may exceed 5m, but shall comply with the requirements under the MPTL section of this document. When a WAP is fitted on a ceiling tile, the SO’s may be installed above the ceiling tile as long as it can be readily accessed to allow the patch cables to be fitted. The ceiling grid shall be labelled with the SO numbers to indicate there are SO’s in the ceiling space above and make finding the SO and fault finding easier. The installer shall refer to the “Power over ICT Cabling Infrastructure” section of this document for additional labelling and testing requirements for remote powering. Any WAP fitted on a ceiling tile shall have an additional seismic safety chain (or nylon coated multi stranded steel wire harness rated at 50kg minimum) fitted and attached independently to the ceiling grid or beam above the ceiling tile.

Page 92: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

92

12. TESTING AND CERTIFICATION

12.1 Testing, certification, and documentation The installer shall provide test records for all cabling links installed under the Scope of Works using test equipment accepted and approved by the manufacturer of the single vendor solution as part of their performance warranty programme. 12.1.1 Permanent Link The permanent link is the transmission path of an installed cabling subsystem including the connecting hardware at the ends of the installed cable. In the horizontal cabling subsystem, the permanent link consists of the terminal equipment outlet, the horizontal cable, an optional CP and the termination of the horizontal cable at the floor distributor. The permanent link includes the connections at the ends of the installed cabling. 12.1.2 Channel The channel is the transmission path between equipment such as a LAN switch and the terminal equipment. A typical channel would consist of the horizontal subsystem together with terminal equipment area and equipment cords. For longer reach services the channel would be formed by the connection of two or more subsystems (including work area and equipment cords). The performance of the channel excludes the connections at the application-specific equipment. 12.1.3 Horizontal cabling For a new installation, the permanent link shall be a direct run, free of bridges, taps and splices. 12.1.4 Backbone cabling For a new installation, the backbone cable shall be a direct run, free of bridges, taps and splices. 12.1.5 Power over generic or structured cabling Each conductor in a cable assembly responsible for remote power delivery shall have the capacity to allow a continuous carrying capacity of 0.75A operating in temperatures up to 60 degrees Celsius. DC unbalanced testing is required as per AS/NZS 11801-1.

Page 93: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

93

12.2 Copper All links shall be tested using a Level-III (up to Class-E) and Level-IV (Class-EA) cable test device. The tests shall include the full set of tests required to confirm performance to AS/NZS IEC 61935.1 and AS/NZS 11801-1 Permanent Link specification. The tester shall: a) Have a certification of calibration current to within the tester manufacturer’s

specification b) Be running the latest version of the manufacturer’s firmware. Marginal Pass results (*PASS) are not acceptable in new installations and shall be rectified to ensure a clear Pass result. Marginal Pass results (*PASS) are acceptable in existing installations. Marginal Fail results (*FAIL) are not acceptable. Links with a Marginal Fail shall be rectified to ensure a clear Pass result. Test results shall: a) Be downloaded to a database using the utility provided by the cable tester

manufacturer b) Be supplied in the native format of the tester (for example, in .data, .fact, .low,

.mdb format) and are to be provided on CDROM with a copy of the tester manufacturers software to read the file.

Frequency sweep test results and plot data shall be provided. Text files and hard-copy of test results are not acceptable Refer to Appendix I: Testing of Installed Balanced Cabling (Using Field Testers).

12.3 Fibre All terminated links shall be tested using a Power Source/Light Meter that can provide stored test results in the original tester format. An optical time-domain reflectometer (OTDR) may only be used as an additional test. Fibre testing shall include the following test cycle;

1. One cord test method as per ISO/IEC 14763-3

2. Clean instrument input and output ports using one click dry cleaning method

3. Clean all test reference cords and fibre under test connections

4. Set reference correctly for one test cord method

5. Make the measurement and record the result in original electronic format.

The tests shall include the full set of tests required to confirm performance to ISO/IEC 14763-3 and AS/NZS 11801-1 specification. In addition: a) The tester shall have a certification of calibration current to within the tester

manufacturer’s specification and shall be validated at a maximum of 12 monthly.

Page 94: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

94

b) Multimode fibre shall be testing using the 1 test cord reference method using Encircled Flux (EF) launch controllers. Testing shall be undertaken in both directions at 850nm and 1300nm

c) Single-mode fibre shall be tested using the 1 test cord reference method. Testing shall be undertaken in both directions at 1310nm and 1500nm

d) Cable length shall be verified either by using an OTDR or it may be directly determined from the cable metre marking.

e) POL testing shall be as per the Manufacturer requirements to obtain a 20 year warranty following the requirements of IEC 61280-4-3. All main MPO-MPO POL trunk cables shall be inspected and tested using a Fluke FI-3000 FibreInspector Pro or equivalent. The images shall be captured and submitted with testing documentation.

Refer to Appendix G: Optical Fibre Cable Testing (Using an OTDR) and Appendix H: Optical Fibre Cable Testing (Using A Light Source and Power Meter)

12.4 Warranty certification Warranties and certification are a requirement for all new installations and for all MAC’s in existing installations. The project works are not considered complete until all warranty documentation is provided. In all cases, manufacturer warranty certificates shall be accompanied by documentation that clearly defines which cabling components, backbone connections and TOs are covered by the warranty provided. TOs and shall be referenced on a per cabinet basis detailing the number warranted e.g. AG1 001 - AG1 075. For backbone links the two cabinets shall be referenced between which the link(s) is installed e.g. AG1 - BG1 BF 01-06. The accredited installer shall be responsible for ensuring: a) The manufacturer provides a warranty covering all system components, system

performance and labour for a period of not less than twenty (20) years b) The original certificate confirming warranty and an electronic copy is forwarded to

the Ministry and their representatives. Hard copies of all warranties are required c) Electronic copies of test results and certificates required by the Ministry or its

representatives are stored for future reference. Electronic records shall: d) Be provided on WORM (Write-Once/Read-Many) CD/DVD media e) Include scanned copies of all warranties. Electronic records shall not be provided on USB stick, flash-cards or other types of removable read/write media.

Page 95: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

95

APPENDIX A – HERITAGE SITES (Informative)

A1. General Many older sites have objects such as buildings or trees that may have a heritage status, or be deemed as protected by a local or regional council. Information is often not easy to find and can be located in different places depending on the local or regional council. In addition to the heritage status and council designation the site may also be recognised as an archaeological site or one of significant Maori heritage. Often schools and SPAs are not aware themselves of heritage status of some of their buildings. If a building is suspected of heritage status the following information can be used to determine the any details

A2. Historical Sites Historic sites are registered in the New Zealand Historic Places Trust (NZHPT). The NZHPT has a regulatory role regarding protected historic places, archaeological sites and sites of importance to Maori and may prosecute under the Historic Places Act 1993 There is likely to be historic significance if the school was built pre-1930s. The auditor will need to search the Historic Trust’s register located at http://www.historic.org.nz/theregister. It’s useful to search the suburb or town to ensure that all historic places in the area are captured. Care needs to be taken when dealing with suspected historic places. Confirmation from the school or SPA is not sufficient and if heritage significance is suspected, confirmation in writing from the NZHPT must be received.

A3. Archaeological Sites An archaeological site is defined in the Historic Places Act 1993 as any place associated with pre-1900 human activity. Any works that may affect an archaeological site must have written authority from the NZHPT before work begins. Archaeological sites may be listed in the NZHPT register or, in a council district plan, or council database. If in doubt, contact the NZHPT at [email protected] AND the relevant council. References to archaeological sites can be found at: http://www.historic.org.nz/protectingourheritage/archaeology/digitallibrary.aspx

Page 96: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

96

Within this page there is a catalogue (in Excel format) of reports that have been completed. There are many schools listed in this index including some new schools recently built. The relevant report can then be requested at no cost2.

A4. Maori Heritage Māori heritage can be divided into the physical/tangible, natural and intangible. The NZHPT employs specialist Pouārahi (Māori Heritage Advisors) and other staff based in its offices in Kerikeri, Auckland, Tauranga, Christchurch and Wellington. If the site (or locations within the site) is suspected as of Maori Heritage then contact the NZHPT for advice on proceeding further. This may be necessary around a Marae (particularly if it is a very old site), or if old carvings are present, and so on.

A5. Council Designation The NZHPT does not manage all historic places and many of them are managed by the local or regional council. Councils have responsibilities under various pieces of legislation for heritage management and protection, notably the Resource Management Act, Historic Places Act, Building Act and Local Government Act. Sites may be protected under a council designation and each council and region has a difference database and method of accessing that database. Some councils only have these listed in their district plan and other councils may not have digital records or a searchable database.

2 This is only the list of reports; it is not necessarily the complete list of archaeological sites.

Page 97: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

97

APPENDIX B – APPROVED ICT CONTRATORS LIST (Normative)

B1. Approved ICT contractors list The Ministry, schools, and their agents (such as project managers or designers) shall select suppliers from the Ministry’s Approved ICT Contractors List for the following categories of ICT services and products: a) Structured cabling installation services b) Structured cabling product supply c) Wireless integration services. This requirement is to be followed whether the ICT work is undertaken by any Ministry programme of work, or independently by a school. Over time, the list is intended to be extended to include other types of ICT contractor. The list of approved ICT contractors can be found at; https://www.education.govt.nz/school/property-and-transport/suppliers/technical-information/responsibilities-of-an-ict-contractor/

Page 98: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

98

APPENDIX C – CABLING WORK PRACTICES (Normative)

C1. General safe work practices and responsibilities The installer shall ensure that all persons working on any Ministry school or facility that is under their control are protected from risk created by residual materials and workmanship associated with any construction works, including ensuring all areas are cleaned after fibre optic work to ensure no sharps or splinters of fibre remain, and the removal of all sharp and hazardous edges from fittings.

C2. Work areas Work areas for terminating copper and fibre optic cables, and splicing optical fibre cables shall: a) Have adequate lighting and ventilation b) Be kept free of debris and other contaminants c) Ensure optical fibre off-cuts are removed from site and disposed of in an

appropriate manner d) Ensure sharps and syringes used as part of optical fibre cabling are disposed of

in an appropriate sharps container and removed from site e) Ensure a medical waste or clinical waste container will meet the requirements of a

sharps container.

In addition: f) Sharps containers shall be disposed of by direct burial or incineration g) Sharps containers shall not be disposed of via domestic and standard industrial

collection services h) Sharps containers shall be disposed of off-site separately from other site waste i) Chemical waste shall be removed from site and disposed of in an appropriate

manner j) Washing of hands both before entering and after leaving the work area shall be

required for all persons working on the site k) Food or beverages shall not be consumed or brought into the work area.

C3. Fibre Optic - General Health and Safety The handling, installation, testing and operation of OFCS involve inherent risks that require safety precautions to be taken. Silicate optical fibre is very thin and is usually made of pure glass. The process of scoring or cleaving this type of material results in small glass shards that is difficult to see and avoid if left lying around the work area. Accidentally brushing a hand across a workbench can cause tiny shards to penetrate the skin and potentially migrate further into the body. These sharp particles can cause direct damage to the body and can also cause infections to set in.

Page 99: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

99

If the glass enters the eye, damage to eyesight, including blindness, can occur. Unlike wood slivers, these glass splinters will not degrade inside your skin. The signals transmitted over optical fibre commonly comprise high intensity infra-red light that is not visible to the human eye and can cause permanent tissue and eye damage when exposed to the human body. For all medical emergencies related to optical fibre installation and operation, immediate medical attention shall be sought. As a minimum the following emergency equipment shall be available on site or within a mobile work space when work involving fibre optic cable termination or splicing is being undertaken: a) Eye wash b) Tweezers c) Magnifying device d) First aid kit.

C4. Fusion splicing All fibre optic cables shall be fusion spliced. Fusion splicing is an effective method of joining optical fibres. However, it entails the melting of glass by electric arcing, which occurs at temperatures exceeding 1700ºC. The following precautions shall be observed: a) The use of fusion splicing in hazardous areas as defined in AS/NZS 2430.3.1

shall not be permitted without ensuring full compliance to all relevant standards and OSH requirements on site. Hazardous areas as defined in AS/NZS 2430.3.1 are all areas containing flammable gases or flammable liquids that may give off vapours and areas prone to potentially explosive dust clouds

b) Gloves, or barrier cream, or both, shall be used c) Material safety data sheets (MSDS) shall be provided for all optical fibre materials

involved and cable manufacturers’ warning and recommendations shall be observed.

Page 100: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

100

APPENDIX D – LABELLING CONVENTION (Normative)

D1. Approved cabling systems products All Terminal Equipment or Service Outlets, patch panels, enclosures, cables and conduits shall be systematically and permanently labelled. Labels may be computer generated by the Brother labelling system or equivalent industrial standard (for example Dymo Industrial Labellers using vinyl tape). Use of felt tipped pen and the like is not acceptable for outlet front cover plates and the fronts of patch panels. All horizontal subsystem cable ends at the rear of patch panels and behind TEOs or SOs shall be labelled with permanent marker. All fibre optic and copper backbone links shall be labelled on the cable using a permanent marker; the label shall clearly indicate the two cabinets or points between which the backbone link is installed. The label shall be applied as close as possible to the fibre tray or panel on which it terminates. The method of designation shall be in accordance with AS/NZS 3085.1 and as described below. For example, a backbone link between cabinet AG1 and BG1 when standing at cabinet AG1 shall be labelled: AG1-BG1. The same link when standing at cabinet BG1 shall be labelled: BG1-AG1. All retained cabling shall be labelled in a consistent manner to the new installation.

D2. Enclosures Each enclosure shall be labelled with a three character designation that is unique for the site: a) The first character shall be alphabetic and signify the building (for example A for

Administration, F for Block F, and so on) b) The second character shall be alphanumeric and signify the level within the

building (for example 1 for Level 1, G for Ground, B for Basement, and so on) c) The third character shall be a sequential numeral (1, 2, 3, and so on) signifying

the particular enclosure on the respective level. For example F24 would signify the fourth enclosure on Level 2 of Block F.

The labels shall be 100mm x 50mm, self-adhesive multi-layered laminate engraved with 15mm upper case lettering. The labels shall be located on the front centre of each rack or enclosure, near the top.

Page 101: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

101

D3. Patch panels Patch panel ports within the enclosure shall be designated as follows: a) Horizontal ports shall be sequentially numbered using three digits. Sequences

shall start at 001 for each enclosure b) Backbone balanced modular 8-pin ports shall be sequentially numbered using the

letter B followed by two digits. Sequences shall start at B01 for each enclosure. c) Backbone optical fibre ports shall be sequentially numbered using the letter F

followed by two digits. Sequences shall start at F01 for each enclosure. d) For all fibre optic and copper backbone links, a clearly visible label shall be

applied to indicate the two cabinets or points between which the backbone link is installed. For fibre trays the label shall be placed on the front face of the tray.

For example a 6 core fibre backbone link between cabinet AG1 and BG1 when standing at cabinet AG1 shall be labelled: AG1-BG1 BF01-06. The same link when standing at cabinet BG1 shall be labelled: BG1-AG1 BF01-06. Backbone IDC blocks (where used) shall be designated according to the particular installed configuration. Generally the blocks will be arranged in a number of verticals with pair numbering commencing at the top left of the respective vertical. Ports shall be designated as Xmno where X indicates the vertical and mno indicates the pair number.

D4. Horizontal cabling The horizontal wiring shall be labelled with the enclosure and patch panel port identifiers as specified above. For example A12-073 could signify horizontal port 73 from enclosure 2 on level 1 of the Administration building Labels shall be attached to the cable at both the rear of the telecommunications outlet and the rear of the patch panel by using the computer generated cable label. The size and length of the marking system carriers shall be sized to suit the cable size and the text required for proper identification.

D5. Labelling of outlets Each telecommunications outlet shall be labelled with the unique enclosure and patch panel port identifier. For example, the outlet designated A12-073 would be connected to patch socket 073 in cabinet A12. The label shall be clearly visible and securely mounted with the identical label provided on the back plate using permanent marker pen.

Page 102: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

102

D6. Underground ducts All underground ducts at the point of entering or exiting a building are to be labelled “Warning: Underground Communications Duct” with an arrow pointing down. The labels shall be 100mm x 50mm, Self-adhesive multi-layered laminate engraved with 10mm upper case lettering. They may also be riveted in place to offer additional mechanical bonding. The labels shall be located on the front centre of each flashing, shroud or enclosure, approximately 300mm above the natural ground level.

D7. General power outlets GPOs and DB’s associated with the TEO installation shall be labelled using an industrial grade labeller with vinyl tape face plates. Faceplates must be labelled at the front and on the back plate using permanent marker pen. For newly installed power circuits: All GPO’s of the circuit shall be marked with the applicable circuit identification. For new GPO's looped off existing power circuits: All GPO's of the circuit, both new and existing, shall be marked with the applicable circuit identification. All new GPOs installed shall be labelled ‘RCD protection’ with the applicable circuit identification. Note that there will be a maximum of 6 x dual GPO’s per circuit. All existing GPO’s that are paired with a new TEO shall be labelled “No RCD protection” and retained as GPOs. As-built drawings must have circuits marked on them, including the phase, circuit and distribution board they are fed from and an indication that it is RCD protected (if applicable). For example DB7-R17-RCD (Distribution Board 7, Red Phase, Circuit/Breaker 17, RCD Protected).

Page 103: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

103

APPENDIX E – TERMINAL EQUIPMENT OUTLET DESIGN – FIT FOR PURPOSE (Informative) The ICT designer shall conform to all the ICT and Electrical requirements of this document and in addition to this shall consult with the schools authorised point of contact and design a fit for purpose solution that shall encompass the sign off of the following applicable services;

a. Cabling to support Wireless System requirements and 5Ghz coverage

b. Printer/Copier Outlet requirements

c. Bell/Class change Outlet requirements

d. Public Address system and outlet requirements

e. Telephone/VoIP requirements

f. CCTV Cameras and outlet requirements

g. AV design and requirements for all spaces

h. HVAC interface requirements

i. Specialist ICT equipment interface requirements e.g. CNC machines, 3D

printers, Plasma Cutters etc

j. Desktop computer connectivity requirements eg. Computer Pods,

Computer Suites, office computers, workroom computers etc.

k. Hearing assist requirements

l. Passive Optical LAN design, including active equipment specification (If

applicable)

m. Security interface requirements

n. Fire Panel interface requirements

o. Lift Phone interface requirements

p. Smart Meter interface requirements

q. IoT interface and connectivity requirements

r. Etc.

Designer note:

It is important that the designer meet with the schools committee or authorised point of contact for ICT needs and create a functional brief. The functional brief should then be translated into the ICT Design requirements. The number and location of outlets to facilitate connectivity to the services outlined in the functional brief will vary from school to school and therefore in order to design a fit for purpose space the quantity and location of outlets cannot be stipulated, unless the design is a repeat of a Ministry referenced design e.g. Avalon, Canterbury or Nelson Block modernisation as detailed on the Ministry of Education website. At the completion of the design the designer shall obtain sign-off from the school that the design meets the Design Brief and is fit for purpose.

Page 104: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

APPENDIX F – AIR CONDITIONING AND TEMPERATURE CONTROL (Informative) Computer and networking equipment is designed to operate within a fairly narrow temperature range. To ensure reliable operation and the longest possible life from components the temperature must be kept within the range specified by the manufacturer. For new schools and schools undergoing extensive renovation the consulting engineers engaged on the project will be able to advise on the need for air conditioning to control the temperature in server rooms. For existing schools building a computer network and establishing an ICT main equipment room for the first time, and schools expanding an existing computer network, professional advice on the need for air conditioning might not be so readily available. The following may provide some guidance. Servers and other electrical and electronic equipment in the ICT equipment room generate heat. The heat created in the room, unless extracted, causes the air temperature to rise. Servers and associated equipment operate reliably only within certain temperature and humidity ranges and may fail if operated outside these specified ranges. Furthermore, the vendor may decline to honour the warranty if it can be established that the equipment was operated outside its specified environmental range. General recommendations suggest that the temperature should not go below 10°C or above 28°C. In larger equipment rooms (more than 2 free standing cabinets) the air temperature must be controlled by air conditioning and professional advice shall be sought. Although this seems a wide range these are the extremes and it is far more common to aim at maintaining the room temperature around 20-21°C. To do this reliably, dual redundant air conditioning units are essential. For a small school the operating and maintenance costs for an air conditioning unit may prove difficult to sustain and it may be possible to control the temperature of small server rooms by a simple, thermostatically controlled extractor fan. Servers, network switches, firewall appliances and routers are typically specified to work in temperatures up to about 35ºC but a margin for local hot spots must be allowed and 28ºC is a maximum safe air temperature at the extractor fan. Cold temperatures are unlikely to cause problems in New Zealand if a thermostatic fan switch is used. In principle it is easy to calculate the amount of cooling necessary for a server room by simply adding up the heat input and installing an appliance that can remove that much heat. In practice it is rather more complicated.

Page 105: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

Assuming good insulation, limited windows and doors, or an internal building space, solar heat input to the server room may be ignored. Small ICT equipment rooms will typically include the following heat generating equipment:

Equipment Heat in Watts

Server 400

Ethernet switch x 2 100

UPS 100

Lighting (only when door is open)

Total heat input 600

Given the specific heat capacity of air (1.2kJ/m3.ºK) it can be shown that for each kW of heat to be extracted, 50m3 of air must be pumped through the room per minute per 1ºC temperature rise between inlet and exhaust air. For example, to remove 600W of energy, using air at an ambient temperature of 20ºC and permitting the room temperature to rise to 28ºC maximum, would require a fan to pump 3.75m3 (say 4m3) of air per minute. This is equivalent to a complete air change in a 2mx2mx2.4m server room every 2.5 minutes.

Volume of air CWm 05.03

where W is heat in Watts and ºC is air temperature rise. This simple calculation ignores impedance to air flow and assumes minimal pressure drop between air inlet and extractor fan. A 250mm wall fan venting directly to outside can pump between 8-12m3 per minute providing there is unrestricted airflow into the room. The problem with forced ventilation becomes immediately obvious when higher ambient temperatures are encountered. At 26ºC ambient air temperature, not uncommon in some regions, the amount of air to be pumped increases to 15m3 per minute. The typical layout for a small server room might place an air inlet grill, of at least 1.5 times the fan area, low down on the door and the extractor fan high on opposite wall. In summary, the choice of extractor fan is important and if high ambient temperatures are common in summer or room heat loads are likely to exceed 1kW, professional advice on air conditioning should be sought.

Page 106: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

APPENDIX G – QUALITY PLAN – OPTICAL FIBRE CABLE TESTING (USING OTDR AND LSPM) (Normative)

G1. Optical Fibre Cable Testing Using an OTDR The following requirements apply to testing of installed optical fibre cabling using an Optical Time Domain Reflectometer for:

Conformance and acceptance of initial installations, and/or

Existing site upgrade

Acceptance of maintenance and repair activities.

G2. Testing – General (Applies to LSPM)

Standards AS/NZS 11801.1 and AS/NZS 14763.3

Test Configuration Link (fibre and connectors at both ends)

Optical Fibre Cabling Type Singlemode

Test methodology AS/NZS 14763.3

Test Equipment AS/NZS 14763.3

Direction of test Two directions per core

Wavelength of test SM: 1550 nm 1310 nm and 1550 nm

Tester Calibration Equipment shall be in calibration at time of test

G3. Testing – Optical Time Domain Reflectometer (OTDR)

Launch 500 CC Range longer than (cable + launch & tail test cords), But no more than 3 times longer

Pulse Width 10 nanoseconds (nS) (Shorter pulse is ok), but not exceeding 30 nS

Index of Refraction LSPM as well Values as per Table C.1 in AS/NZS 14763.3 Default values in OTDR tester Values in cable specification sheet

Averaging Time Not less than 15 seconds (S)

Event Threshold 0.10 dB Events reported at 0.10 – 0.20 dB are deemed conditionally compliant (acceptable)

SM Launch Conditions According to AS/NZS 14763-3 Clause 6.5, is by: Documented manufacturer’s claim or Compliance Statement from manufacturer

Page 107: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

Test Cord Verification Both Launch and Tail test cords with interfacing reference connectors:- shall be verified each time tester is started

Launch Cord At least 500 m (CC)

Tail Cord At least 100 m

Recorded Attenuation Result Average from bi-directional testing

Recorded ORL Result Lowest value, closest to zero, (not averaged)

G4. Acceptance Requirements for Optical Fibre Link Attenuation The attenuation acceptance requirements for optical fibre links shall be calculated, based on Table 1, for the optical loss/attention allowance for each component and cable utilised for the creation of the link.

Maximum Link Length in metres is < insert value > metres

Maximum Link Attenuation in dB is < insert value > dB

Maximum Channel length is < insert value > metres

0.65 dB for connector and spice 0.5db for mated connector 0.15dB

G5. Measurement Uncertainty Measurement Uncertainty is:

Stated in tester documentation by the tester manufacturer, or

Contained within the test data

Measurement Uncertainty for single direction testing is the agreed value < 0.90 > dB

The following elements of the extended test group are to be tested and against the standards and specific requirements of this quality plan.

Table 1: Allowable Budget Loss/Attenuation for Components

Extended Test Group

Test Project

Additional Project Requirements

AS/NSZ 14763.3

Permanent Link Attenuation

Channel Attenuation

Permanent Link Propagation Delay

Channel Propagation Delay

Optical Fibre Length X No more than 10 metre variation to LSPM results

Optical Fibre Attenuation

Local and remote interface connector attenuation X

Local and remote interface connector return Loss X

Embedded connecting hardware attenuation X

Embedded connecting hardware return loss X

Continuity X

Maintenance of Polarity X

Page 108: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

G6. Test Result Analysis For a PASS, the OTDR test results shall:

Clearly show the launch and tail cords on the traces for all fibres in the cable.

G7. Apparent Gains after Averaging Apparent gains over 0.09 dB shall be deemed unacceptable.

G8. Marginal Pass Results Marginal pass results shall be deemed unacceptable.

G9. Fail and Marginal Fail (Fail*) Results All Fail and Marginal Fail results shall be deemed unacceptable.

G10. Unacceptable Results or Activities All unacceptable results and/or activities shall be repaired and/or replaced and/or re-tested until such time as they achieve acceptance.

G11. Documentation of Test Results All optical fibre test results for each tested core of an optical fibre cable shall include at a minimum:

Optical fibre type

Cable ID (Identification)

Core ID (Identification)

Interface connector type at both ends of the link

Splices associated with interface connectors

MPO/MTP cassette associated with the interface connector

Embedded MPO/MTP cassette (not associated with interface connectors)

Embedded splices (not associated with interface connectors)

Embedded connectors (not associated with interface connectors)

Test Results o Attenuation Loss (dB) o Link Length (m) o Propagation Delay (ns, length x 5 ns) o ORL Optical Return Loss o Length to embedded events and event type

Page 109: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

G12. Additional Specified Requirements

1.12.1 Visual inspection of fibre end-faces When testing for transmission requirements, visual inspection of each fibre end-face shall be conducted in accordance with AS/NZS 14763.3 Annex B.

1.12.2 Test result verification All optical fibre results shall be verified by the manufacturer as compliant to the standards and requirements specified within this quality plan. The manufacturer shall supply a supporting letter that states all test results have be reviewed and are compliant with AS/NZS 14763.3 and AS/NZS 11801.1.

1.12.3 Quality Plan Approval This Quality Plan has been approved by the Project Manager and no variation shall be permitted by the contractor without written permission from the Project Manager.

Page 110: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

APPENDIX H – QUALITY PLAN – OPTICAL FIBRE CABLE TESTING (USING LIGHT SOURCE AND POWER METER) (Normative)

Optical Fibre Cable Testing Using Light Source and Power Meter The following requirements apply to testing of installed optical fibre cabling for:

Conformance and acceptance of initial installations, and/or

Acceptance of maintenance and repair activities.

H1. Testing – General (Applies to LSPM)

Standards AS/NZS 11801.1 and AS/NZS 14763.3

Test Configuration Link (fibre and connectors at both ends)

Optical Fibre Cabling Type OM3 OM4 OM5 OS1a OS2

Test methodology AS/NZS 14763.3

Test Equipment AS/NZS 14763.3

Direction of test One direction per core Two directions per core

Wavelength of test MM 850 nm 1300 nm 850 nm and 1300 nm SM 1310 nm 1550 nm 1310 nm and 1550 nm

Tester Calibration Equipment shall be in calibration at time of test

H2. Testing – Light Source and Power Meter (LSPM)

Reference Method One-test-cord method Enhanced Three-test-cord Method Three-test-cord Method

Test equipment LSPM Suitable for the type of fibre and connectors being tested

Page 111: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

MM Launch conditions Encircled Flux modal conditions in accordance to AS/NZS 14763.3 Annex A, achieved by: 1. Conditioner device in launch test cord; or 2. Documented manufacturer’s claim; or 3. Compliance Statement from manufacturer.

SM Launch Conditions 1. According to AS/NZS 14763-3 Clause 6.5; or 2. Documented manufacturer’s claim; or 3. Compliance Statement from manufacturer.

Recorded Result Highest loss result

H3. Acceptance Requirements for Optical Fibre Link Attenuation The attenuation acceptance requirements for optical fibre links shall be calculated, based on the optical attention allowance for each component and cable utilised for the creation of the link.

Component and Wavelength Project Attenuation (Loss) Maximum

AS/NZS 11801-1 Attenuation (Loss) Maximum

Mated Ref to Ref Connection MMF at 850 & 1300 nm SMF at 1310 & 1550 nm

0.10 dB 0.20 dB

Mated Ref to Non-Ref Connection MMF at 850 & 1300 nm SMF at 1310 & 1550 nm

0.50 dB 0.75 dB

Non-Ref to Non-Ref Connection At all wavelengths MMF SMF

0.75 dB 0.75 dB

Splice At all wavelength, MMF SMF

0.30 dB 0.30 dB

MMF Cable OM3, OM4 at 850 nm at 1300 nm

3.50 dB/km 1.50 dB/km

MMF Cable OM5 at 850 nm at 1300 nm

3.00 dB/km 1.50 dB/km

SMF Cable at 1310 & 1550 nm OS1a OS2

1.00 dB/km 0.40 dB/km

Table 2: Allowable Budget Attenuation for Components

Page 112: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

Ref = Reference Connector Non-Ref = Non-reference (Random) Connector

MMF Maximum Link Length in metres is: 290m MMF Maximum Link Attenuation in dB is: 1.6 dB MMF Maximum Channel length is: 300m

SMF Maximum Link Length in metres is: as per the design SMF Maximum Link Attenuation in dB is: as per the design SMF Maximum Channel length is: as per the design

H4. Measurement Uncertainty AS/NZS 14763.3 defines measurement uncertainty for optical fibre testing as follows:

Reference Method Measurement Uncertainty

1-Test-Cord SMF ± 0.24 dB MMF ± 0.27 dB when attenuation reading is ≤1.9 dB, and MMF ± (0.14 x attenuation) when attenuation is >1.9 dB

Table 2: Measurement Uncertainty Values

H5. The following tests shall be carried out

1.5.1 Transmission Basic verification: Polarity Transmission requirements:

Attenuation in dB (Non-Average for LSPM)

Length in meters

Propagation delay in nanoseconds

1.5.2 Test Result Analysis For a PASS, the LSPM test result shall not exceed the Loss Budget, calculated from the sum of all the components under test.

1.5.3 Apparent Gains Apparent gains greater than the level of uncertainty detailed in 11.5 above shall be deemed unacceptable.

Page 113: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

1.5.4 Marginal Pass (Pass*) Results Marginal pass or *pass results shall be deemed unacceptable.

1.5.5 Failed and Marginal Fail (Fail*) Results Fail and marginal failed results shall be deemed unacceptable. All unacceptable tests shall be repaired and/or replaced and re-tested until such time as they pass all applied tests, or the attached network equipment works.

H6. Documentation of Test Results All optical fibre test results for each tested core of an optical fibre cable shall include as a minimum:

Optical fibre type

Cable ID (Identification)

Core ID (Identification)

Interface connector type at both ends of the link

Splices associated with interface connectors

MPO/MTP cassette associated with the interface connector

Embedded MPO/MTP cassette (not associated with interface connectors)

Embedded splices (not associated with interface connectors)

Embedded connectors (not associated with interface connectors)

Test Results o Attenuation Loss (dB) o Link Length (m) o Propagation Delay (ns, length x 5 ns)

H7. Additional Specified Requirements

1.7.1 Visual inspection of fibre end-faces When testing for transmission requirements, visual inspection of each fibre end-face shall be conducted in accordance with AS/NZS 14763.3 Annex B.

1.7.2 Test result verification All optical fibre results shall be verified by the manufacturer as compliant to the standards and requirements specified within this quality plan. The manufacturer shall supply a supporting letter that states all test results have be reviewed and are compliant with AS/NZS 14763.3 and AS/NZS 11801.1.

1.7.3 Quality Plan Approval This Quality Plan has been approved by the Project Manager and no variation shall be permitted by the contractor without written permission from the Project Manager.

Page 114: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

APPENDIX I – QUALITY PLAN – BALANCED CABLING TESTING (WITH FIELD TESTERS) (Normative)

I1. Testing of Installed Balanced Cabling Using Field Testers The following requirements apply to the testing of installed balanced cabling: Conformance to AS/NZS 11801.1 and acceptance of initial installations, and/or:

AS 11801.2

AS 11801.3

AS 11801.4

AS 11801.5

AS 11801.6

Maintenance and repair activities. Link includes a permanent link and consists of a cable and a single (mated) connector at both ends. The version of any undated referenced standards within this document is that which is current at the date of the project document.

I2. Compatibility Compatibility of twisted pair cabling components shall be achieved by the utilization of one manufacturer’s product backed by a manufacturer’s warranty of 25 years minimum. Cabling system products shall be one of the following Ministry approved manufacturers;

- Commscope - Hubbell - Schneider

Patch leads shall be supplied from one of the above suppliers to ensure compatibility of the total system for remote powering of devices.

Page 115: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

I3. Testing Balanced Cabling – General

Standards AS/NZS 11801.1 and IEC 61935-1

Test Configuration Permanent Link Modular Plug Terminated Link

Cable Location Indoor or Underground

Balanced Cable Type Category 6A (Class EA) F/UTP or STP

Balanced Cabling Class: AS/NZS 11801.1 AS 11801.2 AS 11801.6

Minimum Class: Class EA Class EA Class EA

Test Methodology IEC 61935-1

Test Equipment Meeting IEC 61935-1 and cabling Class

Tester Manufacturer Fluke

Direction of test Two directions per cable

Tester Calibration* Equipment ‘in calibration’ at time of test as per this specification

*Refer to Test Equipment below

I4. Test Equipment Field Tester(s) The communications contractor shall utilise the following;

Make Model Test Result Format

Fluke Networks* DSX Series LinkWare PC format .flw

*The minimum software version shall be 6.4 or higher to support the testing of MPTL connections. The calibration date shall be provided embedded in the submitted .flw test results file.

Page 116: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

I5. The following minimum tests shall be performed; All Links shall be tested as noted for the following:

Basic Verification Test Requirement Sample Size

Wire Map X 100%

Continuity D.C. X 100%

Signal Conductors X 100%

Screen Conductors, if present X 100%

Short Circuit X 100%

Open Circuit X 100%

Alien (exogenous) Crosstalk Test Requirement Sample Size

Statement of Compliance X 100%

PS ANEXT X 100%

PS ANEXT Avg. X 100%

PS AACR-F X 100%

PS AACR-F Avg. X 100%

Optional Test Requirements Test Requirement Sample

Size

Length X 100%

Maximum Length (PL) 90m 100%

Minimum Length (PL) Manufacturer shall specify

100%

Direct Current (D.C.) resistance unbalanced with a pair X 100%

Direct Current (D.C.) resistance unbalanced between pairs X 100%

NEXT with minimum headroom xxx m

RL with minimum headroom xxx m

TCL Unbalance attenuation, near-end

ELTCTL Unbalance attenuation, far-end

Coupling Attenuation

Transmission Parameter Test Requirement Sample Size

Return Loss X 100%

Insertion Loss X 100%

Pair to Pair NEXT X 100%

PS NEXT X 100%

Pair to Pair ACR-N X 100%

PS ACR-N X 100%

Pair to Pair ACR-F X 100%

PS ACR-F X 100%

Direct Current (D.C.) Loop Resistance X 100%

Propagation Delay X 100%

Delay Skew X 100%

Page 117: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

1.5.1 Test Result Analysis Test results for each cable, in relation to the specified Class/Category, shall be reported as: PASS or Marginal PASS (*PASS) or FAIL or Marginal Fail (FAIL*)

1.5.2 Marginal Pass Results Marginal pass results shall be deemed unacceptable.

1.5.3 Fail and Marginal Fail (Fail*) Results All Fail and Marginal Fail results shall be deemed unacceptable.

1.5.4 Non-conforming test to the quality plan All unacceptable tests shall be repaired and/or Replaced and re-tested until such time as they pass all applied tests.

I6. Documentation of Test Results All test results shall be given in the native format of the tester manufacturer, including reader software capable of data analytics, when not publicly available at no charge. PDF, CSV, other Excel forms, Summary Results and Images of results are unacceptable and are deemed to be noncompliant. The documentation for each parameter shall include:

Test equipment: o Type and manufacturer o Serial number and calibration status o Level and software version

Details of cabling interface adaptors (type, reference number, manufacturer)

Details of cabling under test

Date and time of test

Any relevant environmental conditions

Tester operators’ names. Not the tester or installer company name.

Measured result of each parameter

Required result of each parameter for a PASS

I7. Additional Specified Requirements

1.7.1 Visual inspection of terminations A visual inspection of each termination shall be conducted to ensure the minimum untwist and bend radius is maintained.

Page 118: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

1.7.2 Test result verification All twisted pair test results shall be verified by the manufacturer as compliant to the standards and requirements specified within this quality plan. The manufacturer shall supply a supporting letter that states all test results have be reviewed and are compliant with AS/NZS 11801.1.

1.7.3 Non-specified parameters For the following examples, test results containing non-specified or incorrect requirements shall be deemed as acceptable or unacceptable as follows:

Item Unacceptable Acceptable Conditions

Test Standard - TIA X

Test Standard AS/NZS 11801 X

Test Standard ISO 11801 X Only acceptable if tester manufacturer has not released a software version that supports AS/NZS 11801. Supporting written information from the test equipment manufacturer shall be submitted along with the test results to substantiate

Wrong Cable Type X

Wrong Test Configuration X

Over-length Link X

Wrong Manufacturer NVP X

Under-length CP Link without Manufacturer substantiation

X Contractor shall have written manufacturer substantiation of link length compliance to meet performance and warranty requirements

1.7.4 Quality Plan Approval This Quality Plan has been approved by the Project Manager and no variation shall be permitted by the contractor without written permission from the Project Manager.

Page 119: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

APPENDIX J – SAMPLE AS BUILT DOCUMENTATION

J0. The following As built documentation shall be submitted in softcopy and in the O & M manual at a minimum;

1) Declaration of Conformity as per sample

2) As built of the project showing where the data outlets and cabinet are positioned and how they are specifically labelled for the site.

3) As built for all underground pathways showing depths and location guidance. Each pathway shall note what it contains (as per sample)

4) A backbone cable layout that shows how the new addition to the network is physically connected – including all new backbone labelling to show that all connections meet the standard.

5) Summary of all copper connection tests (PDF and .flw format) 6) Test detail for each copper connection (PDF and .flw format) 7) Summary of all fibre tests (PDF and .flw format) 8) Test detail for each fibre (PDF and .flw format) 9) Manufacturer’s warranty letter (Detailing all connections covered under the

warranty) 10) Manufacturer’s warranty certificate for both Fibre and Copper. 11) Inclusion of the following in the O&M Manual (If installed at the time of

practical completion). a) What switches are installed (Make, Model, S/N, location and IP

address). b) What wireless access points are installed (Make, Model, S/N,

location and IP address) and the number of WAP’s

Page 120: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J1. Ministry of Education Declaration of Conformity to Contracted Agreement Data Cabling Installation in a State or State Integrated School

Cabling Installation Company name _________________________________________ Conditions for installing data cabling in all State and State Integrated Schools

1. The above Cabling installation company is a current Ministry of Education Approved ICT Contractor as per the current list.

2. All cabling product installed as part of this contract will be from a current Ministry of Education

Approved Cabling Manufacturer as per the current list.

3. All cabling product installed as part of this contract have a minimum of a twenty five (25) year performance warranty provided by the Ministry of Education Approved Cabling Manufacturer.

4. This ICT Cabling installation will be installed to meet the current edition of the Ministry of

Education’s ICT Cabling Infrastructure: Policy and Standards for Schools.

5. The cabling installation as part of this contract has a minimum of a two (2) year installation warranty provided by the Ministry of Education Approved Cabling Installer.

6. Copies of all warranties, test results in PDF and RAW format, guarantees, As Built

documentation in PDF and DWG or Revit format and other records relating to installation or maintenance and upgrade work shall be provided to the Ministry of Education or its representative within two weeks of practical completion

Name of School cabling is being installed at ___________________________________ Name of Manufacturers Product used ___________________________________ Date of Practical completion ___________________________________ Signature of Cabling installer representative ___________________________________ Designation ___________________________________ Date signed ___________________________________ Name of Primary Contractor Company ___________________________________ Signature of Primary Contractor representative ___________________________________ Designation ___________________________________ Date signed ___________________________________

Signing this document confirms that the above conditions that are part of your organisations contractual obligations have all been met.

Please include a copy with your O&M Manual Documentation Please also e-mail a copy to [email protected]

Page 121: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J2. Pathway As Built (minimum requirements)

Location: ABC School

Contact: Joan Bloggs

Title:

ICT Infrastructure Wireless Access Point Locations

Designer: Certified Installer 1234

SIZE Release Date

DWG NO REV

A3 26 July 2020

ICT Infrastructure As-Built Documentation-1 V1.0

SCALE N/A

Job No. 1234 SHEET 1 of 6

Document History

File Name: [School Initials-Ministry of Education #-Job #, Rev]

Drn. DateReview Rev.

KH 24/07MK V1.0

Reason

Original As-Built

Underground Duct

Out of Scope Area

Trunking

Cable Tray

Pit: 600mm x 600mm x 600mm

X-Y

Above Ground Conduit

Underground Duct

5

CEBUS

BLO CK

LIBRARY

POOL

9

STAFF

ROOM

ADMIN

BLOCK

1

CANTERBURY

BLO CK

2

11

HALL

CANTERBURY

BLO CK

NORTH

PLAY

GROUND

PLAY

GROUND

SHADE

SAILS

BOILER

HOUSE

USB

PLAY

GROUND

DENTAL

CLINIC

7

Block C

Block B

Block H

Block A

Trunking

Cable Tray

Caternary wire with more than 12 cables

P1

Pit: 1200mm x 600mm x 600mmP2

HG1HWC 24RU

600mm Dp

AG1FSC 42RU

800mm x 1000mm

MER

Cabinet

X-Y

Key

Out of Scope Area

Cabinet – Patch Panel location

Wall mounted TEO or SO. X denotes Cabinet

outlet fed from and Y denotes the outlet number

Ceiling mounted TEO or SO. X denotes Cabinet

outlet fed from and Y denotes the outlet number

COVERED

WALKWAY

50MM Conduit

1x 6 Core OS2

1x Ext. Cat 6 UTP

1x 50MM Duct

450mm Deep

UFB Fibre

2x 100MM Duct

450mm Deep

2x 6 Core OS2

1x 12 Core OS2

3x Ext. Cat 6 UTP

Ceiling Catenary Wire

12x Cat 6A F/UTP

GG1HWC 12RU

600mm Dp

CG1FSC 42RU

600mm x 600mm

2x 100MM Duct

450mm Deep

1x 6 Core OS2

1x 12 Core OS2

2x Ext. Cat 6 UTP

2x 50MM Duct

450mm Deep

1x 6 Core OS2

1x Ext. Cat 6A F/UTP

2x 50MM Duct

450mm Deep

1x 6 Core OS2

1x Ext. Cat 6 UTP

2x Ext. Cat 6A F/UTP

BG1HWC 24RU

600mm Dp

1x 50MM Duct

450mm Deep

1x 6 Core OS2

1x Ext. Cat 6 UTP

2x 50MM Duct

450mm Deep

1x 12 Core OS2

1x Ext. Cat 6 UTP

1x 50MM Duct

450mm Deep

1x 6 Core OS2

1x Ext. Cat 6 UTP

DG1HWC 12RU

600mm Dp

Ceiling Catenary Wire

1x 6 Core OS2

1x Ext. Cat 6 UTP

80mm x 50mm Trunking

1x 6 Core OS2

1x Ext. Cat 6 UTP

80mm x 50mm Trunking

1x 6 Core OS2

1x Ext. Cat 6A F/UTP

12x Cat 6A F/UTP

1x 50MM Duct

450mm Deep

1x 6 Core OS2

1x Ext. Cat 6A F/UTP

3.2m

3.0m

0.5m

1.2m

11.0m

1.2m

19.5m

0.8m

9.1m

0.7m

0.5m

3.5m

0.5m

0.8m

1x 50MM Duct

450mm Deep

2x Ext. Cat 6A F/UTP

2x 100MM Duct

450mm Deep

Page 122: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J3. Data As Built (minimum requirements)

Location: ABC School

Contact: Joan Bloggs

Title:

ICT Infrastructure H Block - Hall

Designer: Certified Installer 1234

SIZE Release Date

DWG NO REV

A3 26 July 2020

ICT Infrastructure As-Built Documentation-1 V1.0

SCALE N/A

Job No. 1234 SHEET 1 of 6

Document History

File Name: [School Initials-Ministry of Education #-Job #, Rev]

Drn. DateReview Rev.

KH 24/07MK V1.0

Reason

Original As-Built

Underground Duct

Out of Scope Area

Trunking

Cable Tray

Pit: 600mm x 600mm x 600mm

X-Y

Above Ground Conduit

Underground DuctTrunking

Cable Tray

Caternary wire with more than 12 cables

P1

Pit: 1200mm x 600mm x 600mmP2

X-Y

Key

Out of Scope Area

Cabinet – Patch Panel location

Wall mounted TEO or SO. X denotes Cabinet

outlet fed from and Y denotes the outlet number

Ceiling mounted TEO or SO. X denotes Cabinet

outlet fed from and Y denotes the outlet number

DB

HG1

MIC

WAP - R610

WAP - R610

WAP - R610

Wall-mount

Projector

160" Projector

Screen

EXT-CCTV

EXT-CCTVEXT-CCTV

EXT-CCTV

EXT-WAP - R610

HL3000mm

HL3000mm

HL3000mm

HL3000mmHL3000mm

HL3000mm

HL3000mm

HL3000mm

HL3000mm

HL3000mm

HL3000mm

IR IR

Hearing Assist

HL3000mm

HL3000mm

HL3000mm

AB AB

Hearing Assist

HL3000mm

SEC

WAP - R610

HG1-001HG1-002

HG1-003HG1-004

HG1-005

HG1-006HG1-007HG1-008HG1-009HG1-010

HG1-011HG1-012

HG1-013HG1-014

HG1-015HG1-016

HG1-017HG1-018

HG1-019HG1-020

HG1-021HG1-022HG1-023HG1-024

HG1-025

LL500mm

HL1300mm

HL5000mm

HG1-026HG1-027HG1-028HG1-029

AV Control

AV Control

HG1-030HG1-031HG1-032HG1-033

Prj. Control

HL3000mm

HG1-034HG1-035

HG1-036HG1-037HG1-038

HG1-039

HG1-041

HG1-040HG1-042HG1-043

HG1-044HG1-045

AV

Location: ABC School

Contact: Joan Bloggs

Title:

ICT Infrastructure C Block

Designer: Certified Installer 1234

SIZE Release Date

DWG NO REV

A3 26 July 2020

ICT Infrastructure As-Built Documentation-1 V1.0

SCALE N/A

Job No. 1234 SHEET 1 of 6

Document History

File Name: [School Initials-Ministry of Education #-Job #, Rev]

Drn. DateReview Rev.

KH 24/07MK V1.0

Reason

Original As-Built

Underground Duct

Out of Scope Area

Trunking

Cable Tray

Pit: 600mm x 600mm x 600mm

X-Y

Above Ground Conduit

Underground DuctTrunking

Cable Tray

Caternary wire with more than 12 cables

P1

Pit: 1200mm x 600mm x 600mmP2

X-Y

Key

Out of Scope Area

Cabinet – Patch Panel location

Wall mounted TEO or SO. X denotes Cabinet

outlet fed from and Y denotes the outlet number

Ceiling mounted TEO or SO. X denotes Cabinet

outlet fed from and Y denotes the outlet number

DB

DB

HDMI

HDMI

CG1

SEC

WAP -

R610

WAP -

R610

WAP -

R610

WAP -

R610

WAP -

R610

WAP -

R610

WAP -

R610

EXT-CCTV EXT-CCTV

EXT-CCTVEXT-CCTV EXT-CCTV EXT-CCTV

EXT-WAP - R610

HL3000mm HL3000mm HL3000mm HL3000mm

HL3000mmHL3000mmHL3000mm

CG1-003CG1-004

CG1-001CG1-002

HDMI HDMI HDMI HDMI

CG1-005

CG1-006

CG1-007CG1-008

CG1-009CG1-010

CG1-011CG1-012

CG1-013CG1-014

CG1-015CG1-016

CG1-017CG1-018

CG1-020CG1-021

CG1-019

CG1-022CG1-023

CG1-024CG1-025

CG1-026CG1-027

CG1-028CG1-029

CG1-026CG1-027

CG1-030CG1-031

CG1-032CG1-033

CG1-034CG1-035

CG1-036CG1-037

CG1-038CG1-039

CG1-040CG1-041

CG1-042CG1-043

CG1-044CG1-045

CG1-046CG1-047

HDMI

HDMI

CG1-048CG1-049

CG1-050CG1-051

CG1-053

CG1-052

CG1-054CG1-055

CG1-056CG1-057

CG1-058CG1-059

CG1-060

CG1-061

CG1-062CG1-063CG1-064CG1-065

CG1-066

CG1-067

CG1-068

CG1-069

Page 123: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J4. Backbone Schematic As Built (minimum requirements)

Location: ABC School

Contact: Joan Bloggs

Title:

Existing ICT Infrastructure Backbone Cabling Schematic

Designer: Certified Installer 1234

SIZE Release Date

DWG NO REV

A3 26 July 2020

ICT Infrastructure As-Built Documentation-1 V1.0

SCALE N/A

Job No. 1234 SHEET 1 of 6

Document History

File Name: [School Initials-Ministry of Education #-Job #, Rev]

Key

Symbol Description

OS2 Fibre backbone link

Cat 6 Ext. UTP Copper Backbone link

Cabinet where ABC represents the Cabinet ID

BF-xx-yyBackbone fibre, xx - yy denotes the number of fibre cores

BC-xx Backbone copper, xx denotes quantity

TP Through patched at the next cabinet

Drn. DateReview Rev.

KH 24/07MK V1.0

Reason

Original As-Built

ABC

DG1 HG1

GG1TP

AG1Main Equipment Room

CG1

BG1

5

CEBUS

BLO CK

LIBRARY

POOL

9

STAFF

ROOM

ADMIN

BLOCK

1

CANTERBURY

BLO CK

2

11

HALL

CANTERBURY

BLO CK

NORTH

PLAY

PLAY

GROUND

SHADE

SAILS

BOILER

HOUSE

USB

PLAY

GROUND

DENTAL

CLINIC

Block C

Block B

Block H

Block A

COVERED

WALKWAY

Location: ABC School

Contact: Joan Bloggs

Title:

Logical Network Schematic

Designer: Certified Installer 1234

SIZE Release Date

DWG NO REV

A3 26 July 2020

ICT Infrastructure As-Built Documentation-1 V1.0

SCALE N/A

Job No. 1234 SHEET 1 of 6

Document History

File Name: [School Initials-Ministry of Education #-Job #, Rev]

File & Print Server

Drn. DateReview Rev.

KH 24/07MK V1.0

Reason

Original As-built

HG1AT 8000GS/24PoE

AG1AT x610/24SPs

Internet

Firewall

N4L Router

WIRELESS

CONTROLLER

ZD1200

Key

Symbol Description

1G 1 Gigabit Connection

10G 10 Gigabit Connection

Cat 6 Copper uplink

OS2 Fibre

Switch Layer 2 (Schematic)

Switch Layer 3 (Schematic)

LUP Local Uplink

UPL

STK Stacked

LAG Link Aggregated

Uplink to core

2x Type 5 , STK, LUP, LAG 1x Type 6, UPL, LAG

Type 5.

Type 6.

Type 6.

Link to the CORE

Example of Local Cabinet switch connections.

UPL

LAG LUP

STK

LAG

LUP

Link aggregation

AG1 - Main Equipment Room - Equipment

01. Dell 1RU Rack Mount Server R51002. N4L Router03. Ruckus Zone Director ZD120004. Core Switch – Allied Telesis AT x610/24SPs05. Edge Switch – Allied Telesis AT 8000GS/24 06. 2RU PA Amplifier07. PA Server (NUC installed on a shelf)08. 2RU 32 Channel CCTV NVR09. Firewall10. Chorus ONT11. 4Kw Hi wall heat pump12. 2x 6way Horizontal PDUs

BG12x AT 8000GS/24PoE

STK

GG1AT 8000GS/24PoE

CG12x AT 8000GS/24PoE

STK

DG1AT 8000GS/24PoE

AG1AT 8000GS/24PoE

Page 124: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J5. Summary of all copper tests (minimum requirements)

Page 125: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J6. Test detail for each copper connection (minimum requirements)

Page 126: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured
Page 127: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J7. Summary of all fibre tests (minimum requirements)

Page 128: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J8. Test detail for each fibre (minimum requirements)

Page 129: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J9. Manufacturer’s warranty letter (minimum requirements)

Page 130: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J10. Manufacturer’s warranty certificate for both Fibre and Copper (minimum requirements)

Page 131: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured
Page 132: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured
Page 133: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

J11. Inclusion of the following in the O&M Manual (minimum requirements).

a) What switches are installed (Make, Model, S/N and location). b) What wireless access points are installed (Make, Model, S/N, location)

and the number of WAP’s

Name Model Serial Number Cabinet

(location) Management

IP Gateway IP

RG1-x908-UNIT1 x908 a039004102100001 w RG1 192.168.40.1 192.168.40.1

LG1-9924Ts-UNIT1 9924Ts a03322m075100051 k LG1 192.168.40.19 192.168.40.1

RG1-8000GS-UNIT1 8000GS a03968g102500115 f RG1 192.168.40.2 192.168.40.1

RG1-8000GS-UNIT2 8000GS a03969g102300005 f RG1 192.168.40.2 192.168.40.1

RG1-8000GS-UNIT3 8000GS a03968g102500109 f RG1 192.168.40.2 192.168.40.1

RG1-8000GS-UNIT4 8000GS a03968g102500116 f RG1 192.168.40.2 192.168.40.1

RG1-8000GS-UNIT5 8000GS a03968g102500111 f RG1 192.168.40.2 192.168.40.1

AG1-8000GS-UNIT1 8000GS a03968g102300145 f AG1 192.168.40.3 192.168.40.1

AG1-8000GS-UNIT2 8000GS a03969g101900031 f AG1 192.168.40.3 192.168.40.1

AG1-8000GS-UNIT3 8000GS a03968g102300146 f AG1 192.168.40.3 192.168.40.1

AG1-8000GS-UNIT4 8000GS a03968g102300143 f AG1 192.168.40.3 192.168.40.1

Page 134: Information and Communications Technology (ICT) Cabling ... · services requires increased performance from cabling plant. 2.2 Generic Cabling System (GCS) Generic cabling is a structured

Ministry of Education 33 Bowen Street Wellington 6011 PO Box 1666, Thorndon 6140 New Zealand. www.education.govt.nz Copyright © Crown 2020 This publication is subject to copyright. Apart from any fair dealing for the purpose of private study, research, criticism or review, or permitted under the Copyright Act, no part may be reproduced without the permission of the Ministry of Education, New Zealand. ISBN 978-0-478-43906-9 (Web)