Information for asset operation. PAS 1192 Part 3. Rob Manning and Graeme Tappenden. BIS BIM Core Team.
Transcript

Information for asset operation.

PAS 1192 Part 3.

Rob Manning and Graeme Tappenden.

BIS BIM Core Team.

What is BIM (whole life)? !   A geometric representation of the components of an asset !   A process for collaboratively creating, operating & disposing of the asset !   The ability to access asset component information in-situ !   One view of data, documents & images !   A reliable and trusted enterprise asset information resource

Type  Data  Schema-c  

Performance  Data  O  &  M  Manuals  

UK  Government  Digital  Plan  of  Work  

RIBA  2013  vs  2007  –  construc4on,  infrastructure  &  project  management  convergence  

Flexible  contractor  engagement  Strategy  &  Strategic  Defini-on  Stage  added  

RIBA  2007  Tradi-onal  Project  Plan  of  Work  Sequen-al  Stages  

RIBA  2013  Plan  of  Work  Coordinated  across  industry  

Tender  Stages  Dislocated  from  sequence  

Extended  into  Use  to  gain  outcome  feedback  

RIBA  2013  Plan  of  Work  

PAS1192-­‐2  2013    What  Informa-on  do  I  need  &  in  what  format?  

Can  my  supply  chain  deliver  it?  

What  Informa-on  do  I  know  &  want?  

Who  delivers  what    and  when?  

Informa-on  Exchanges  

Client  Decisions  

Hand

over  

Posi-ve  Whole  Life  Outcomes  

Design   Construct   Operate  

Informa-on  grows  >>  

Capital  Project  Informa-on  

Start  the  Poject  

Graeme  Tappenden  

Contracted  Informa-on  

Exchange  Points  

The  Project  Informa-on  Model  in  the  asset  life  cycle?  

 The  document  provides  a  framework  and  approach  to  assist  an  asset  opera-ng  organisa-on  to  build  their  own  asset  informa-on  model.      The  PAS  defines  how  the  asset  informa-on  model  is  to  be  tailored  to  provide  the  opera-onal  data  to  inform  asset  management  decisions  in  support  of  their  organisa-onal  needs.      Where  the  asset  opera-ng  organisa-on  requires  new  construc-on  or  refurbishment  the  PAS  provides  a  framework  and  approach  to  integrate  the  data  from  a  project  informa-on  model  into  the  asset  informa-on  model.      The  PAS  defines  requirements  for  governance  and  for  ongoing  data  management.        Sponsor  –  CIC  on  behalf  of  the  BIM  Task  Group  Technical  Author  -­‐  BSRIA  

PAS  1192  Part  3  –  Publisher  Bri-sh  Standards  Ins-tute  

PAS1192-3:2014

PAS1192-2:2013

Asset  Management  (PAS  55/ISO55000)  

Create/  Acquire   Use   Maintain   Renew/Dispose  

PAS  1192  Part  3  Asset  

PAS  1192  Part  2  Project  

Essen-al  components  to  develop  the  model  diagram.    

Models  Requirements  

EXTERNAL OPERATOR

7

7 m m m m m m m m m m m

n nn nn n n n n n n n nn n n

Organisa4ons    Informa4on    Requirements  

Asset  Informa4on    Requirements  

Client  Side  Asset  Informa-on  Model  

Asset  Informa4on    Supply  Chain  

Opera-onal  Informa-on  

Client  Side  Asset  Informa-on  Model  The  source  of  informa-on  supply  for  Client  Decision  Points  

0

2

2

1

1

3

3

4

4

5

5

6

6

BRIEF CONCEPT DESIGN DEFINITION BUILD & COMMISSION

HANDOVER & CLOSEOUT

STR

ATE

GY

DESIGNER CONTRACTOR

HA

ND

OVE

R

EXTERNAL OPERATOR

7

7 m m m m m m m m m m m

n nn nn n n n n n n n nn n n

RENEW/DISPOSE

0

2

2

1

1

3

3

4

4

5

5

6

6

BRIEF CONCEPT DESIGN DEFINITION BUILD & COMMISSION

HANDOVER & CLOSEOUT

STR

ATE

GY

1

1

Asset  Informa4on  Model  

 Supply  Side  Project  Informa-on  Model  

 Supply  Side  Asset  Informa-on  Model  

 Supply  Side  Project  Informa-on  Model  

Whole  Life  Informa-on  PAS1192-­‐3  2014    

Supply    Chain  

Contract  Line  Informa-on  Exchanges  

Decision  Points  

Graeme  Tappenden  

PAS  55  drives  Asset  

Management    

Timing  of    Exchange  Points  &  Decision  Points  DOES    NOT  always  

align  

Whole  Life    Client  Side  Asset  Informa4on  

Model  

Governance:  Project  Informa-on  Model  CDE  

From  PAS1192-­‐2  

Ongoing input and output documents and data shared with Asset Management and Maintenance Team

Survey, Performance Evaluation and other input documents & data subject to validation and acceptance

Co-ordinated & validatedoutput documents & data published for management reporting and input to portfolio and other external partners or systems.

Asset document & data history maintainedfor knowledge, regulatory and legal requirements, and for historic asset information management & reporting.

Governance:  Asset  Informa-on  Model  CDE  

From  PAS1192  -­‐3  

Asset  Informa-on  Model:  Governance  Repor-ng  

Level  2  Files  Validated  &  Verified  with  RAG  Repor4ng  before  publishing  as  

Files  and  Data  

A  diagram  of  a  complete  Asset  Informa-on  Model  with  Governance    Provisions.  

Asset  Informa-on  Model  Informa-on  Flow  

PAS55/ISO5500  Standards  Compliant  

Defined  Organisa4onal  Informa4on  Requirements  

Project  Supply    Informa4on  

Service  Supply  Informa4on  

Asset  Informa4on  Model  (BIM)  

Enterprise    System  

Integra4on  

Integrated  Informa4on  Repor4ng  

Implica-ons  for  the  Supply  Chain  !   Clients  receive  and  manage  BIM  Informa-on  -­‐  Whole  Life    

!   Suppliers  to  provide  Asset  Informa4on  as  part  of  their  service  

!   Asset  (Employers)  Informa-on  Requirements  for  each  contract  

!   Works  within  PAS55/ISO55000  asset  management  environment  

!   PAS1192-­‐2  project  informa-on  model  outputs  incorporated  

!   Mul-ple  Facility  Supplier  Asset  Informa-on  inputs  

!   Mul-ple  Whole  Estate  Informa-on  Model(s)  managed  

!   Single  point  of  BIM  Asset  Informa-on  for  enterprise  consump-on  

!   Contract  outputs  poten-ally  in  agreed  Open  Standard  formats  

Reduced  costs  due  to  the  automated  transfer  of  informa-on  from  construc-on  to  opera-on.  Less  manual  input  of  informa-on.  More  complete  informa-on  reducing  management  costs.  Fewer  problems  and  costs  during  early  opera-on  because  of  the  availability  of  beaer  informa-on  about  the  asset.  The  opportunity  to  reduce  opera-on  and  maintenance  costs.  More  focus  on  long  term  opera-onal  performance  giving  beaer  informed  decisions  about  opera-onal  expenditure  and  capital  expenditure.  Reduced  remedial  costs  during  opera-on  brought  about  by  fewer  construc-on  defects.  Savings  from  life  cycle  decisions  informed  by  a  single,  integrated,  up-­‐to-­‐date  source  of  informa-on.  Beaer  modelling  of  resilience  and  risk  of  failure.    Improved  expenditure  decisions  enabled  by  improved  informa-on  to  enable  asset  investment  planning.  A  source  of  data  records  from  dynamic  metering  and  condi-on  sensors  to  iden-fy  poor  energy  performance,  faults  and  risk  of  impending  failure.  Organisa-on  ownership  of  asset  informa-on  for  procurement  purposes.              

Why  should  an  organiza-on  do  this?  Iden-fy  Poten-al  savings.    