ANNUAL STATE OF LOCAL GOVERNANCE REPORT 2011 INFRASTRUCTURE DEVELOPMENT GOVERNMENT BUILDINGS, PROVINCIAL ROADS AND BRIDGES Name of Project Project Cost Source of fund Status of Implementation 1. Package I (EC Grant Project): Rehabilitation/Extension of Health Center, pob. 1, Adams; Improvement of Waterlines for Pancian-Pasaleng Waterlines at brgy. Pansioan and Pasaleng, Pagudpud; extension of Health Center, Pob. 2, Pagudpud 2,239,500.00 EC Grant 25.585% 2. Package II (EC Grant Project): Installation of Waterlines at Bangui; Improvement of Poblacion Water System, Poblacion, Burgos; Construction of One (1) Chamber Placenta Pit, Burgos, Ilocos Norte 2,021,777.91 EC Grant 100% 3. Package III (EC Grant Project) including Change Order No. 1: Rehabilitation of PHO Building, Laoag City; Construction of One (1) Chamber Placenta Pit, Vintar; Construction of One (1) Chamber Placenta Pit, Piddig; Expansion of Dingras RHU, Dingras, Ilocos Norte 4,466,366.08 EC Grant 93.696% 4. Package IV (EC Grant Project): Construction of One (1) Chamber Placenta Pit, Nueva Era, Paoay & Batac; Repair/Extension of RHU, Carasi, Ilocos Norte 557,619.19 EC Grant 100% 5. Improvement of Convention Center, Hotel Satellite Kitchen and covered walkway at the Plaza del Norte, Brgy. Balacad, Laoag City 4,971,011.08 Capital Outlay 100% 6. Repair/Improvement of Doña Josefa Edralin Marcos Memorial Hospital, Marcos, Ilocos Norte 7,109,711.54 Health Facilities Enhancement Program 40%
Transcript
Page 1: infrastructure development 2011

ANNUAL STATE OF LOCAL GOVERNANCE REPORT 2011

INFRASTRUCTURE DEVELOPMENT

GOVERNMENT BUILDINGS, PROVINCIAL ROADS AND BRIDGES

Name of Project Project Cost Source of fund Status of

Implementation

1. Package I (EC Grant Project): Rehabilitation/Extension of Health Center, pob. 1, Adams; Improvement of Waterlines for Pancian-Pasaleng Waterlines at brgy. Pansioan and Pasaleng, Pagudpud; extension of Health Center, Pob. 2, Pagudpud

2,239,500.00 EC Grant 25.585%

2. Package II (EC Grant Project): Installation of Waterlines at Bangui; Improvement of Poblacion Water System, Poblacion, Burgos; Construction of One (1) Chamber Placenta Pit, Burgos, Ilocos Norte

2,021,777.91 EC Grant 100%

3. Package III (EC Grant Project) including Change Order No. 1: Rehabilitation of PHO Building, Laoag City; Construction of One (1) Chamber Placenta Pit, Vintar; Construction of One (1) Chamber Placenta Pit, Piddig; Expansion of Dingras RHU, Dingras, Ilocos Norte

4,466,366.08 EC Grant 93.696%

4. Package IV (EC Grant Project): Construction of One (1) Chamber Placenta Pit, Nueva Era, Paoay & Batac; Repair/Extension of RHU, Carasi, Ilocos Norte

557,619.19 EC Grant 100%

5. Improvement of Convention Center, Hotel Satellite Kitchen and covered walkway at the Plaza del Norte, Brgy. Balacad, Laoag City

4,971,011.08 Capital Outlay 100%

6. Repair/Improvement of Doña Josefa Edralin Marcos Memorial Hospital, Marcos, Ilocos Norte

7,109,711.54 Health Facilities Enhancement

Program 40%

Page 2: infrastructure development 2011

ANNUAL STATE OF LOCAL GOVERNANCE REPORT 2011

7. Improvement of Water System at Bangui District Hospital, Bangui, Ilocos Norte

1,597,700.53 EC Grant 2009 Fixed Tranche

0%

8. Repair/Improvement of Piddig District Hospital, Piddig, Ilocos Norte

1,938,099.53 Health Facilities Enhancement

Program 0%

9. Construction of delivery Room Building and Repair of Main Building at Vintar District Hospital, Vintar, Ilocos Norte

4,800,391.55 Health Facilities Enhancement

Program 0%

10. Additional works of Package 3: Rehabilitation of PHO Building, Laoag City; Construction of One (1) Chamber Placenta Pit, Vintar; Construction of One (1) Chamber Placenta Pit, Piddig; Expansion of Dingras RHU, Dingras, Ilocos Norte

1,129,673.77 EC Grant 2007 Fixed Tranche

5%

11. Construction of Cafeteria; Improvement of Quarantine Building; Improvement of Commercial Space and Construction of Welcome arch at Badoc Gateway, Badoc, Ilocos Norte

4,336,317.43 SB #3 – Capital

Outlay 50%

12. Installation of Ceiling and Electrical Works at the East of west wing at the provincial capitol

688,678.30 Capital Outlay

of the Hon. Gov. 100%

13. Landscaping of the I locos Norte Convention Center, Bgy. Balacad, laoag Ctiy

1,965,295.24 Capital Outlay 100%

14. Improvement of Vice Governor Office Provincial Capitol Building, Laoag City

703,999.81 Capital Outlay 100%

15. Construction of Quarters for the Overseer of the Unesco Heritage Site and a Tourist Destination (Phase I) Paoay

1,281,623.24 Capital Outlay 100%

16. Installation of Food Court at the Centennial Arena, Laoag City

1,190,954.69 Capital Outlay 100%

17. Construction of Nagbacalan Viewdeck Bgy. Nagbacalan, Paoay, I.N.

528,871.48 100%

18. Installation of Machuca Tiles at East & West Lobby at Provincial Capitol, Laoag City

326,386.88 Capital Outlay 100%

19. Landscaping of Prov'l. Capitol, Laoag City 80,366.00 Capital Outlay 100%

20. Re-painting of Provincial Stage, Capitol, Laoag City 6,194.40 Capital Outlay 100%

Page 3: infrastructure development 2011

ANNUAL STATE OF LOCAL GOVERNANCE REPORT 2011

21. Construction/rehabilitation of two (2) units Comfort Rooms, Paoay Sand Dunes/Kapurpurawan, Burgos, I. Norte

35,571.60 Capital Outlay 100%

22. Const. of 4.80m x 8.65m Pontoon (bamboo float barge), Paoay Lake, Paoay, Ilocos Norte

84,921.20 Capital Outlay 100%

23. Improvement works (stone masonry; const. of canal & backfilling at Centennial Arena & improvement Of entrance of Rizal Amusement Park, Laoag City

68,763.80 Capital Outlay 100%

24. Improvement of Comfort Rooms & Shower Rooms, Rizal Amusement Park, Laoag City

63,405.50 Capital Outlay 100%

25. Fabrication of center stage stairs at Ilocos Norte Convention Center, Laoag City

4,885.00 Capital Outlay 100%

26. Repainting of Basketball Court Centennial Arena, Laoag City

80,513.00 Capital Outlay 100%

27. Fabrication of Green Wall and Construction of Pathwalk Provincial Capitol, Laoag City

17,904.00 Capital Outlay 100%

28. Partition Works at Museo Iloco 37,065.00 Capital Outlay 100%

29. Enclosure of Stair at the Provincial Accounting and Improvement of Entrance at Provincial Capitol

38,500.00 Capital Outlay 100%

30. Construction of 6 units hanging plant box at the provincial capitol

30,966.00 Capital Outlay 100%

31. Construction of East and West Wing Stair at provincial capitol

92,531.00 Capital Outlay 100%

32. Repair Works at the Provincial Capitol 149,346.50 Capital Outlay 100%

33. Construction of Septic Tank at Marcos Stadium Laoag City

13,351.50 Capital Outlay 100%

34. Construction of Dry Wall Mezzanine enclosure at the Provincial Capitol Building

50,354.20 Capital Outlay 100%

35. Repair of Leakage of Roofing and Concrete Gutter at the provincial capitol

9,977.60 Capital Outlay 100%

36. Improvement of Male & Female Comfort Room, Provincial Capitol, Laoag City

29,909.58 Capital Outlay 100%

Page 4: infrastructure development 2011

ANNUAL STATE OF LOCAL GOVERNANCE REPORT 2011

37. Installation/Fabrication of Partition Wall at Provincial Assessor's Office, Provincial Capitol, Laoag City

68,610.00 Capital Outlay 100%

38. Repainting of Moulding at Ilocos Norte Convention Center, Laoag City

14,938.00 Capital Outlay 100%

39. Improvement Of Ilocano Heroes Hall, Laoag City 30,421.00 Capital Outlay 100%

40. Fabrication/Installation of Partition Wall at I-Hub 7,613.50 Capital Outlay 100%

41. Painting of Ceiling at East lobby, Prov'l. Capitol, Laoag City 18,212.00 Capital Outlay 100%

42. Installation of False Beam infront of PTO and Administration Office/Downspout of Plant Box at Provincial Capitol, Laoag City

21,205.50 Capital Outlay 100%

43. Improvement of Prov'l. Capitol Stage, Laoag City 28,517.50 Capital Outlay 100%

44. Improvement of Stage at Ilocano Heroes Hall, Laoag City 31,417.75 Capital Outlay 100%

45. Const. of Museo Vivo de Ilocos, Prov'l. Capitol, Laoag City 23,662.25 Capital Outlay 100%

46. Fabrication of frame & floor booth for One Cebu Expo 10,516.00 Capital Outlay 100%

47. Repair of Provincial Library at Heroes Hall, Laoag City 61,433.48 Capital Outlay 100%

48. Improvement of Provincial Library, Laoag City 94,063.00 Capital Outlay 100%

49. Re-painting of CMO at Prov'l. Capitol, Laoag City 7,760.00 Capital Outlay 100%

50. Construction of Flower Clock at Provincial Capitol, Laoag City

140,134.00 Capital Outlay 100%

51. Construction of Tan-ok Stage at Marcos Stadium, Laoag City

169,888.00 Capital Outlay 100%

52. Construction of Parking Area, Provincial Capitol, Laoag City 58,017.50 Capital Outlay 100%

53. Fabrication of Computer Tables for the Sirib Laboratories at MMSU-CE, Laoag City and Sarrat National High School, Sarrat, Ilocos Norte

69,681.00 Capital Outlay 100%

54. Construction of Museo I locos Norte Food/ Retail Annex for Lease/Rental and Tourism Office, Phase II- 1 Museo Iloco Compound, Laoag City, Ilocos Norte

7,647,195.75 Capital Outlay 100.00%

55. Construction of Museo I locos Norte Food/ Retail Annex for Lease/Rental and Tourism Office, Phase III Museo Iloco Compound, Laoag City, Ilocos Norte

6,184,282.41 (negotiated)

85.00%

Page 5: infrastructure development 2011

ANNUAL STATE OF LOCAL GOVERNANCE REPORT 2011

56. Construction of Museo I locos Norte Food/ Retail Annex for Lease/Rental and Tourism Office, Phase II- 2 Museo Iloco Compound, Laoag City, Ilocos Norte

6,996,134.41 Capital Outlay

a. Variation Order # 1 - Construction of Museo I locos Norte Food/ Retail Annex for Lease/Rental and Tourism Office, Phase II- 2 Museo Iloco Compound, Laoag City, Ilocos Norte

698,550.09 7,694,684.50

(revised amount)

Capital Outlay 100.00%

57. Construction of Museo I locos Norte Food/ Retail Annex for Lease/Rental and Tourism Office, Phase III Museo Iloco Compound, Laoag City, Ilocos Norte

6,184,282.41 (negotiated)

85.00%

58. Construction of Erosion Control and Installation of Cross Drains along Currimao-Lang-ayan Brgy. Lioes Currimao, Ilocos Norte

350,600.05 S L R F 100.00%

59. Rehabilitation of Talatal-Bangsirit Provincial Road, Brgy. Teppang, Bacarra, Ilocos Norte

695,656.91 S L R F 100.00%

60. Rehabilitation of Nalasin Bridge Approach along Solsona-Talugtog Provincial Road , Brgy. Nalasin, Ilocos Norte

516,708.00/ 680,520.96 (by Adm.)

S L R F 100.00%

61. Construction of Vented Spillway along Pansian - Adams Provincial Road, Brgy. Pansian, Pagupud, Ilocos Norte

464,634.13 S L R F 100.00%

62. Rehabilitation of Tonoton Bridge Approach along Piddig - Tonoton - Mangitayag Prov'l. Road, Brgy. Tonoton, Piddig, Ilocos Norte

120,154.70 20% Dev't. Fund 100.00%

63. Repair of Box Culvert along jct. Paninaan - Tambidao-Bacarra Road, Brgy. Malampa, Vintar, Ilocos Norte

210,213.42 20% Dev't. Fund 100.00%

64. Rehabilitation of Vintar - Sarrat Provincial Road, Brgy. Margaay, Vintar, Ilocos Norte

486,546.60 20% Dev't. Fund 100.00%

65. Construction of Protection Wall and Re-Installation of RCPC along Piddig- Maababucay-Estancia Provincial Road, Brgy. Estancia, Piddig, Ilocos Norte

368,311.12 20% Dev't. Fund 100%

66. Construction of Protection Wall Caestebanan Bridge III along Banna-Caestebanan-Tunged Provincial Road, Banna, Ilocos Norte

357,517.09 20% Dev't. Fund 100%

67. Construction of Protection Wall Burgos- Agaga-Provincial Road, Burgos, Ilocos Norte

183,650.00 20% Dev't. Fund 100%

Page 6: infrastructure development 2011

ANNUAL STATE OF LOCAL GOVERNANCE REPORT 2011

68. Upgrading of Road link from Boao to Tamdagan Sitio Boaa, Brgy. Dipilat, Vintar, Ilocos Norte

1,294,662.25 20% Dev't. Fund 100%

69. Re-installation of RCPC along Vintar- Sarrat-Margaay Section and Erosion Control along Vintar-Tamdagan-Tungel Provincial Road

By. Admin. 20% Dev't. Fund 100%

70. Maintenance/Re-gravelling of Badoc-Nagrebcan and Tapao – Pagsanahan Alogoog Provincial Road, Badoc, Ilocos Norte

608,915.00 (by Adm.)

S L R F 100%

71. Rehabilitation of Monte Bridge, Paoay, Ilocos Norte 1,920,996.64 20% Dev't. Fund 85%

72. Construction of RCDG Bridge along Puyupuyan, Beach Road, Pasuquin, Ilocos Norte

2,352,840.49 20% Dev't. Fund 100%

73. Construction of Computer Center Brgy. Suba, Paoay, Ilocos Norte

328,396.83 RA 7171 100%

74. Construction of Bleachers at Brgy. Vira, Laoag City 416,474.28 RA 7171 100%

75. Construction of Malasin Box Culvert, Bangui, Ilocos Norte 248,724.06 RA 7171 100%

76. Construction of Covered Court, Brgy. Nagrebcan, Badoc, Ilocos Norte

496,154.77 RA 7171 100%

77. Construction of Covered Court, Brgy. Masikil, Bangui, Ilocos Norte

250,000.00 RA 7171 100%

78. Construction of Covered Court, Brgy. Gabut, Badoc, Ilocos Norte

496,154.77 RA 7171 100%

79. Construction of Portland Cement Concrete Pavement, Brgy. Estancia, Piddig, Ilocos Norte

2,900,438.21 RA 7171 50%

80. Maintenance/Patching of Various Provincial Road 20% Dev't. Fund 100%

81. Construction of Portland Cement Concrete Pavement, Brgy. Parparoroc, Vintar, Ilocos Norte

2,900,438.21 RA 7171 50%