Infrastructure Development Department
Projects with Investment Potential in Karnataka through PPP route
Agri Infrastructure
Energy
Education
Healthcare Transportation & LogisticsUrban & Municipal
Infrastructure
Industrial Infrastructure Tourism
August 2012
Developed by Dr Rajkumar Khatri, Secretary IDD–Direction & Guidance Mr R Ramesh, Director IDD – Implementation Mr Rabi Sahoo, PPP Expert, ADB – Concept & Design
Participating Government Agencies in KIT IDD, Education Dept., Health Dept. Commerce and Industry Dept., Energy Dept., PWD, Transport Dept., Tourism Dept., DMA, BDA, BBMP and DULT.
Consulting Firms Crisil, Deloitte, Feedback Infra, iMacs
Technical Assistance for Mainstreaming PPP in Infra Sector in India Department of Economic Affairs Asian Development Bank
C o n t e n t s
Background and Development of KIT 5
Program Status 8
Brief Summary of Projects 10
Way forward 13
Annexure
Annex-I : Summary of PPP Infra Projects under Pipeline / Implementation / Operation
Annex-Il : PPP Projects under Pipeline (including KIT Projects)
Annex-IIl : PPP Projects under Implementation / Construction
Annex- IV : PPP Projects under Operation
5
Infrastructure Transformation (KIT-1)
BackgroundVision 2020 for Karnataka seeks to propel a holistic growth by promoting equitable development of sectors and districts, by providing employment to all sections of people and regions of the State. Karnataka aims to grow its State GDP at 9%, which requires infrastructure investment of 9% year on year. Since the public funds may not be adequate, Planning Commission has articulated 50% of the fund requirement to come from the private sector. While studying the State Project Development Machinery, several constraints for developing PPP projects by state Dept./ agencies were noticed viz.:•LimitedCapacityinDept./Agenciestostartaprogram•Toofewideageneration•Poorprojectstudies•Highercostofundertakingeachpre-feasibilitystudy•Noobjectivewayofdecidingontakingprojectsforward•Handoverfornextstageisnotproper•UnfilledMISdatabase•NoStakeholdersConsultationindesignstage•InformationavailabilityonProjectstoInvestors•UnavailabilityofanyMasterPlanformostofthesector•Lackoffundsandideastostartthepojectdevelopment
in any sector
Strategy KarnatakahadidentifiedthattobringininvestmentinInfrastructure through PPP route, the State has to adopt a program based approach, given the huge demand for infra projects in various sectors. To overcome the above issues and to build sustainability in Infra Project Development in the State, Karnataka Infrastructure Transformation-1 (KIT-1) was designed with project shelf development, PPP institutionalisation, Initial Capacitybuilding,MISupdationandSectorinventoryandprofilepreparation.
Workshop forIdentification
TA Appoint5 Pre Feasibility Study in 3 places
Inventory Project Development
PPP Cell Formation
InvestorSector
Brochure investor
Capacity Building on Project
Management Information System
Procurement Plan from
KIT - 1
Apr 12 Jun 12 Jan 13Jan 12Sep 11
Appo
intm
ent o
f Con
sulta
nt
6
KIT-I program integrates Institutional Building, Capacity Building, Manage-ment Information Systems and Project Development to sustainability generate projects in the long term. KIT-I has the following seven components.•ConductingstakeholderWorkshoptogenerateideas•Undertakepre-feasibilitystudyfor5projecttypeslocatedin3placeseach•ProcurementPlanforTA/TechConsultantselection•CreatePPPcellineachoftheseDepartments/Agencies•CapacityBuildinginPPPcellpersonnelonstudies•UpdationofPPPMISdatabase•PreparationofSectorBrochureforGIM‘12
Consultant Departments / Agencies iMacs DMA, Education, Health Crisil BDA, Commerce and Industry Deloitte BBMP, Energy, DULT, PWD Feedback Infra Transport, IDD, Tourism
Key features of the ProgramThe PPP development cycle in the country is only evolving and has several issue and gaps. The KIT-I was designed to overcome these ills. The program has the following key features to its credit:
•1st Multi-sector Programme in the Country for scaling up to meet the infrastructure gap
•Highreplicabilityofanideainmultipleplaces helps to broad base infrastructure to different regions
•HighreplicabilityofthisprograminotherStates/Country•DemocratiseconsultingbyusingTApanelonalargescale•Integratedprojectdevelopment,institutionandcapacitybuilding
for sustainability of the program•Helpsinbottom-upreformsinasectortobringinefficiency•Theprogrammecovers8sectors,12Departments/agencies
4 Consultants have been selected for 12 departments to undertake this assignment spanning over 12 months
Key Features of the KIT-1
7
Benefits of the ProgramTheprogramhasgiventhefollowingbenefits:•Creationof120(approx.)projectsthroughoneprogrammeinaspanof
120 days•InitialInvestmentpotentialinthese120projectsareworth
` 1,01,206 crores•Creationof12PPPCellsleadingtosustainabilityofprocurement
through the PPP route•UpdatedMISsystemforthestateinfraprojects•Creationof12Sectorprofilestoshowcaseprojectstoinvestors
Value Proposition of the program to other stake holdersThe project offers different value proposition to different stakeholders as below:
•To People of Karnataka: With 120 projects under this program, atleast one project is envisaged to impact the life of each person in Karnataka
•To Nation: The model can be replicated to meet the target of generating $ 500 Bn investment in infra projects through PPP route
•To other States:EachStatecouldbenefitfrompossiblereplicationthrough various multipliers
•To DEA: As a nodal agency, it can use this model to replicate across States
•To ADB TA Project: Increase in contribution from ADB Technical Assistance and ADB can replicate across other geographies across Asia
KeyBenefitsofVariousStakeholders
Karnataka
Other States + Nation
DEA + ADB
•140Pojects,Rs.1LakhCroreInvestment•TouchinglivesofNearlyallKarnatakaCitizens
•ReplicabilityinotherStates•ReplicabilityinNationalProjects
•Programtobringin30-50%ofInvestmentthroughPPP•ProgramforotherAsianGeographies
8
Program Status•Theprogramgenerated120projectideasin4monthstimewithactivesupportandguidancefromChiefSecretary,EconomicAdvisortoHon’bleCM,
Principal Secretary-Finance, Secretary-IDD; and Head of the Departments/ entities in Education, Health, Commerce and Industry, Energy, PWD, Transport, Tourism, DMA, BDA, BBMP and DULT
•IDDhasconductednearly20nos.ofconsultationprogramstocollaboratebetweenconsultantsand12Departments/Agenciesandto shape these projects
•Initialprogresshasbeenmadeonthedeliverablesoftheprogramforthe12entitiesasbelow
It may be a good idea to employ the next multiplier, of repeating this exercise (KIT-1) every 2 years.
Program MultipliersIn order to achieve the current scale of projects and invetments, the program incorporates several multipliers as below:•Multiplesectorsunderthisprogram-8nos.•MultipleDepartments/Agenciesintheprogram-12&counting•Multiplepre-feasibilitiesineachDepartments/Agency-5-6 pre - feasibilities•Multipleplacesatypeofprojectwillbedeveloped:Forgeographicalspread of infrastructure, initially it was envisaged to develop a typical project in 3 places, but in certain projects, the replicability is much higher. (Eg. For MRIscanningmachine,thereplicabilitywillbeat20+placesinonego).
9
•AMulti-sectorPPPprogramlikeKIT-1wasmadepossiblewithassistanceofMulti-disciplinaryteamfromGoK&ADBtakingondifferentroles-Secretary,IDD(Overall Direction & Guidance), Executive Director, KSIIDC (Guidance), Director-IDD (Implementation), DGM, KSIIDC (Implimenation Guidance), ADB MIS Expert (MISplatform),DirectorProjectsBARL(Co-Design),andADBPPPExpert(ProgramConceptandDesign)etc.
Program Deliverable Status
Workshop •Consultants have conducted Workshop for each entity• Listof5-6pre-Feasibilitystudiesat3placesidentified• Inception report with sector inventory have been received
Pre-feasibilityReport(PFR) •Consultantshaveundertakenfieldvisits•Consultantshavedelivered36ofthe60Pre-feasibilityReports
Procurement Plan for the identifiedprojects
• PreparationofprocurementreportwithRFPforTA/TechConsultantsunderway
PPP cell creation & institutionalization
•Cell formation completed in 11 of a total of 12 entities
Capacity building of PPP cell persons
• To be started after posting of personnel in the PPP cells
Upgradation of PPP database •MIS updation is continuing for the 12 entities with addition of another 90 projects to the database
Preparation of sector brochure
•Delivery of sector brochures by 31stMay’12
10
•Transportation&Logistic,IndustrialInfrastructure,EnergyandEducationsectorshavethehighestinvestmentpotential.ThesectorwisebriefsummaryofallPPP Infra Projects at different stages of implementation (Pipeline / Construction / Operation) with investment potential are provided in Annexure I.
•21of120projectsarelonggestationinnatureorwillrequirepolicychanges.
Sector No. of projects
Estimated Project Cost (` in crore)
Transportation & Logistics 42 65553.5
Education 7 5450.0
Energy 9 5900.0
Health 13 84.4
Industrial Infrastructure 6 21420.0
Tourism 17 1111.0
Urban and Municipal Infrastructure
26 1687.0
Total 120 101205.9
Brief Summary of all PPP projects including KIT•TheKIT-1programhasgenerated120projectsspreadover7sectorsand12entities.SubjecttothefinalPFR,thetotalprojectvalueoftheseprojects
is ` 101206 crores.
11
Sector No of projects
Estimated Project Cost (` in crore)
Transportation & Logistics 81 126338.75
Agri Infrastructure 7 264.63
Education 7 5450.00
Energy 12 16400.00
Health 13 84.40
Industrial Infrastructure 14 54358.00
Tourism 23 1531.50
Urban and Municipal Infrastructure
32 5179.82
Total 189 200657.10
Sector No of projects
Estimated Project Cost (` in crore)
Transportation & Logistics 39 60835.25
Agri Infrastructure 7 264.63
Energy 3 10500.00
Industrial Infrastructure 8 23938.00
Tourism 6 420.50
Urban and Municipal Infrastructure
6 3492.82
Total 69 99451.20
•AsummaryofallPPPProjects(includingKIT-1andearlierprojects)underpipeline/projectdevelopment(Studies,Bidpreparation&ngetc.,)areasbelow:
•InadditiontotheprojectsgeneratedunderKIT-1,thereare69additionalearlierprojectsof` 99451 crores which are at various stages of development. The Sector wise details on these PPP infra projects are provided in Annexure II along with the KIT-I projects. A brief on these projects are provided in below table.
12
Sector Implementation Operation
Nos Value Nos Value
Transportation & Logistics
12 2023.26 4 3046.29
Agri Infrastructure 1 17.02 - -
Education - - 2 85
Health 3 3.27 - -
Tourism - - 1 32
Urban and Municipal Infrastructure
5 156.25 5 113.14
Total 21 2199.8 12 3276.43
The details of those projects under implementation and operation have been provided in Annexure III & IV respectively.
•ThedevelopmentofPPPProjectsinKarnatakastartedaround8yearsback.Butinthelast3-4years33ofthesehavegoneintoimplementationandoperation as given below.
13
Way ForwardThrough KIT-1 Karnataka has made a good beginning in identifying and going ahead with preparation of a shelf of 120 projects. However the following challenges remain to be addressed to bring these projects to bidding by investors:•Addressingthepolicyissuesforthelonggestationprojects-implementationofSpecialInvestmentRegionactforSIRs;amendmenttocurrentSolarPolicyto
accommodate solar rooftops; and Toll Policy for major bridges;•FunctioningofPPPcellswithpersonnelineachentityattheearliesttotaketheprogrammeforwards•ProcurementofTA/Techconsultantattheearliestfortakingforwardtheproject;•ProjectManagementplanforeachsub-programandprojectforgoingtothemarketforselectionofdeveloperattheearliest.
14
Annexure l : Summary of PPP projects under Pipeline / Implemental / Operation
SECTOR AND STAGE WISE STATUS OF PPP PROJECT IN THE STATE
Sector
CompletedUnder
Implementation / Construction
Under Planning/Pipeline Grand Total
Under KIT Other than KIT
PrefeasibilityProject
IdentificationProject
DevelopmentBid
PreparationBidding
Pipeline Total
No Cost (Cr.)
No Cost (Cr.)
No Cost (Cr.)
No Cost (Cr.)
No Cost (Cr.)
No Cost (Cr.)
No Cost (Cr.)
No Cost (Cr.)
No Cost (Cr.)
Agri Infra-structure
1 17.02 7 264.63 7 264.63 8 281.65
Education 2 85 7 5450 7 5450 9 5535
Energy 9 5900 3 10500 12 16400 12 16400
Healthcare 3 3.27 13 84.4 13 84.4 16 87.67
Industrial Infrastruc-ture
6 21420 2 23000 3 168 3 770 14 45358 14 45358
Tourism 1 32 17 1111 1 28 1 251 4 141.5 23 1531.5 24 1563.5
Transpor-tation & Logistics
4 3046.29 12 2023.26 42 65553.5 10 36230.41 20 13174.79 2 405 7 11025.05 81 126388.75 97 131458.3
Urban and Municipal Infrastruc-ture
5 113.14 5 156.25 26 1687 4 332.82 2 3160 32 5179.82 42 5449.21
Total 12 3276.43 21 2199.8 120 101205.9 11 36258.41 27 36758.61 7 3733 24 22701.18 189 200657.1 222 206133.33
The Sectors which do not have any data are : Irrigation, Public Markets
15
Annexure ll : PPP Projects under Pipeline including KIT
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
1 Logistics Park at Hassan Hassan 350.00 Infrastructure Development Department Pre-Feasibility - KIT
2 Logistics Park at Harohalli Bangalore 500.00 Infrastructure Development Department Pre-Feasibility - KIT
3 Logistics Park at Hubli Hubli 350.00 Infrastructure Development Department Pre-Feasibility - KIT
4 Warehouses Management System 3 Clusters 10.00 Infrastructure Development Department Pre-Feasibility - KIT
5 Captive port at Padubidri Udupi 200.00 Infrastructure Development Department Pre-Feasibility - KIT
6 Cruise Terminal Old Mangalore 150.00 Infrastructure Development Department Pre-Feasibility - KIT
7 Rail-Bijapur-Shahbad Bijapur 840.00 InfrastructureDevelopmentDepartment Pre-Feasibility-KIT
8 Rail-Dharwad-Belgaum Dharwad 560.00 InfrastructureDevelopmentDepartment Pre-Feasibility-KIT
9 Rail-Hubli-Ankola Hubli 2600.00 InfrastructureDevelopmentDepartment Pre-Feasibility-KIT
10 HighSpeedRailLinkfrom Trivandrum - Kasargod - Udupi Kasargod - Mangalore - Udupi 15000.00 Infrastructure Development Department & KHSRCL Pre-feasibilityby KHSRCL
11 HighSpeedRailfrom Bangalore to Mysore Bangalore - Mysore 19500.00 Infrastructure Development Department & MoR Pre-feasibilitybyMoR
12 PeripheralRingRoadfrom HosurRoadtoTumkurRoad BangaloreUrban 1750.00 BangaloreDevelopmentAuthority Pre-Feasibility-KIT
13 ElevatedRoadfrom CentralSilkBoardonNH-7to JayamahalRoad BangaloreUrban 1500.00 BangaloreDevelopmentAuthority Pre-Feasibility-KIT
14 ElevatedRoadfrom Gnanabharathi-Rajarajeshwari nagar on Mysore road to Varthurkodi Bangalore Urban 2800.00 Bangalore Development Authority Pre-Feasibility - KIT
16
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
15 ElevatedRoadfromBenniganahalli onNH4toMekhriCircle BangaloreUrban 1500.00 BangaloreDevelopmentAuthority Pre-Feasibility-KIT
16 DevelopmentofOuter-RingRoad at Belgaum on PPP basis Belgaum 986.00 Directorate of Urban Land Transport Pre-Feasibility - KIT
17 Development of Bus terminal cum Multi-modal Hub at Belgaum on PPP basis Belgaum 58.50 Directorate of Urban Land Transport Pre-Feasibility - KIT
18 “Development of Multi-Level Car Parking in 3 locations of Belgaum” Belgaum 44.00 Directorate of Urban Land Transport Pre-Feasibility - KIT
19 Implementation of Public Bi-cycle Sharing Scheme on PPP basis in Mysore Mysore 3.00 Directorate of Urban Land Transport Pre-Feasibility - KIT
20 Implementation of Intelligent Transportation System (ITS) for Public Transport Mangalore 110.00 Directorate of Urban Land Transport Pre-Feasibility - KIT
21 Implementation of Intelligent Transportation System (ITS) for Public Transport Belgaum 110.00 Directorate of Urban Land Transport Pre-Feasibility - KIT
22 Implementation of Intelligent Transportation System (ITS) for Public Transport Gulbarga 110.00 Directorate of Urban Land Transport Pre-Feasibility - KIT
23 Multi Level Parking Complex at Mahalakshmi Layout Bangalore 17.00 Bruhat Bengaluru Mahanagara Palike Pre-Feasibility - KIT
24 Multi Level Parking Complex at MillersRoad Bangalore 17.00 BruhatBengaluruMahanagaraPalike Pre-Feasibility-KIT
25 Multi Level Parking Complex at Russelmarket Bangalore 17.00 BruhatBengaluruMahanagaraPalike Pre-Feasibility-KIT
17
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
26 Sky Walks at 100 Locations Bangalore 200.00 Bruhat Bengaluru Mahanagara Palike Pre-Feasibility - KIT
27 Preparation of Perspective Development & Financing Plan for CorridorsidentifiedunderCore RoadNetworkwhichcan Be taken up for up gradation / rehabilitation under PPP
“Perspective plan for about 20,000 km Core RoadNetwork,covering financialpre-feasibility analysis of about 100 road stretches”
Pre-Feasibility - KIT50000.00 Public Works Department
28 “Pre-feasibility Study and Packaging of Major Bridges which canbetakenupforRehabilitation/ ReconstructiononPPP”
Analysis of about 30 Major Bridges, grouped into suitable packages 235.00
125.00
-
Public Works Department
Public Works Department
Transport Department
Pre-Feasibility - KIT
Pre-Feasibility - KIT
Pre-Feasibility - KIT
29 “Preparation of Perspective Development & Financing Plan forCorridorsidentifiedunder CoreRoadNetworkwhichcan Be taken up for Operation & Maintenance under PPP”
“Perspective plan and financialpre-feasibility of about 23 road projects covering 3,000 km on OMT basis”
30 Bus Terminal & commercial development for tier 1 cities - at Kalasipalayam
Bangalore Urban
31 Bus Terminal & commercial development for tier 1 cities - at Yelahanka 5th Phase Bangalore Urban 40.00 Transport Department Pre-Feasibility - KIT
32 Bus Terminal & commercial development for tier 1 cities - at Vijaynagar Stage III & IV Mysore 50.00 Transport Department Pre-Feasibility - KIT
18
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
33 Bus Terminal & Commercial development for tier 2 & 3 cities at Tumkur Tumkur 65.00 Transport Department Pre-Feasibility - KIT
34 Bus Terminal & Commercial development for tier 2 & 3 cities atRaichur Raichur 50.00 TransportDepartment Pre-Feasibility-KIT
35 Bus Terminal & Commercial development for tier 2 & 3 cities at Bagalkot Bagalkot 40.00 Transport Department Pre-Feasibility - KIT
36 Passenger Amenity Centre (PAC) at Chitradurga Chitradurga 35.00 Transport Department Pre-Feasibility - KIT
37 Passenger Amenity Centre (PAC) atSindhanur Raichur 25.00 TransportDepartment Pre-Feasibility-KIT
38 Passenger Amenity Centre (PAC) atLingsugur Raichur 25.00 TransportDepartment Pre-Feasibility-KIT
39 MidwayPlazaatNeliyadi DakshinaKannada 12.00 TransportDepartment Pre-Feasibility-KIT
40 Midway Plaza at Mannaekhelli Bidar 12.00 Transport Department Pre-Feasibility - KIT
41 Midway Plaza at Hattigudur Cross Yadgir 12.00 Transport Department Pre-Feasibility - KIT
42 Vehicle Fitness centre at Humnabad Bidar 15.00 Transport Department Pre-Feasibility - KIT
43 Vehicle Fitness centre at Dharwad Dharwad 15.00 Transport Department Pre-Feasibility - KIT
44 Vehicle Fitness centre at Mysore Mysore 15.00 Transport Department Pre-Feasibility - KIT
45 DevelopmentOfRoadfrom NH-63NearGinigere-Gangavathi toSindhanoor Bellary 132.00 KarnatakaRoadDevelopment Corporation Limited Pre-Feasibility
19
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
46 DevelopmentOfRoad(SH-20) from Devasgur - Chikkasugur RaichurKalmalatoLingsugur Raichur 135.44 KarnatakaRoadDevelopment Corporation Limited Pre-Feasibility
47 DevelopmentOfRoadfrom Shimoga-HonnalliToHarihara Shimoga 132.97 KarnatakaRoadDevelopment Corporation Limited Pre-Feasibility
48 Pre-feasibility study for Development of Intermodal Transit Hubs at Yeshwantpur, Bengaluru on PPP basis Bangalore Urban 45.00 KSIIDC -IL & FS Project Development Company Pre-Feasibility
49 Pre-feasibility study for Development of Intermodal Transit Hubs at Mysore road, Bengaluru on PPP basis Bangalore Urban 135.00 KSIIDC -IL & FS Project Development Company Pre-Feasibility
50 Pre-feasibility study for Development of Intermodal Transit Hubs at Peenya, Bengaluru on PPP basis Bangalore Urban 250.00 KSIIDC -IL & FS Project Development Company Pre-Feasibility
51 Pre-feasibility study for Development of Intermodal Transit Hubs at BIAAPA (Trumpet Interchange), Bengaluru on PPP basis Bangalore Urban 300.00 KSIIDC -IL & FS Project Development Company Pre-Feasibility
52 Development of Logistic Park in Bangalore Dabaspet, Bangalore 600.00 KSIIDC -IL & FS Project Development Company Pre-Feasibility
20
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
53 Talaguppa-HonnavarRailwayLine UttarKannada 997.00 InfrastructureDevelopmentDepartment ProjectDevelopment
54 ProvidingMonorail/MRTS/LRT fromJ.P.NagartoHebbaland fromToll-gatetoPPRon Magadiroad BangaloreUrban 5800.00 BangaloreAirportRailLink ProjectDevelopment
55 Monorail Project in Bangalore - SwissChallenge(15.7km) BangaloreUrban 2200.00 BangaloreAirportRailLink ProjectDevelopment
56 Development of Airstrip atRaichur,Chikkmangalore, Gadag&Bagalkot Raichur 145.45 KarnatakaHousingBoard ProjectDevelopment
57 Improvements to road from APBordertoYelahanka Kolar 208.00 KarnatakaRoadDevelopment Corporation Limited Project Development
58 Development of road Kudchi - Gataprabha(Kudchi-Raibagh- Gataprabha) Belgaum 100.00 KarnatakaRoadDevelopment Corporation Limited Project Development
59 DevelopmentofRoadfrom Jamkhandi to MH Border (Jamkandi-Asangi-Terdal-Kudachi- Mangsuli-MHBorder) Bijapur 158.00 KarnatakaRoadDevelopment Corporation Limited Project Development
60 DevelopmentofRoadfrom HirekerurtoRanebennur Chitradurga 116.00 KarnatakaRoadDevelopment Corporation Limited Project Development
61 DevelopmentofRoadfrom AfzalpurtoKajuri Gulbarga 148.00 KarnatakaRoadDevelopment Corporation Limited Project Development
21
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
62 DevelopmentofRoadfrom NelamangalatoChikballapur Chikkaballapur 118.00 KarnatakaRoadDevelopment Corporation Limited Project Development
63 DevelopmentofSH-96Roadfrom DevenahallitoKolar Kolar 148.50 KarnatakaRoadDevelopment Corporation Limited Project Development
64 Development of SH-04 from KamalnagartoGunahalli Bidar 88.90 KarnatakaRoadDevelopment Corporation Limited Project Development
65 Development of Gotur - Kagewad section of SH-12, SH-44 & SH-53 inKarnataka Belgaum 191.00 KarnatakaRoadDevelopment Corporation Limited Project Development
66 DevelopmentofSH-05Road connecting Bangarpet with Bagepalli Kolar 215.50 KarnatakaRoadDevelopment Corporation Limited Project Development
67 DevelopmentofSH-19Roadfrom Sindhnoor-Lingsugur Raichur 168.40 KarnatakaRoadDevelopment Corporation Limited Project Development
68 Improvements to SH-31 Jath-Jambotiroad Belgaum 271.60 KarnatakaRoadDevelopment Corporation Limited Project Development
69 Improvements to SH-51 BasavaKalyana-RaichurRoad fromGulbargatoWadi Gulbarga 135.44 KarnatakaRoadDevelopment Corporation Limited Project Development
70 Development of Commercial ComplexonNEKRTCsiteatBidar Bidar 28.00 KarnatakaStateIndustrialInvestment& Development Corporation Project Development
22
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
71 DevelopmentofKSRTCvacant land parcel at Chitradurga Chitradurga 37.00 KSIIDC -IL & FS Project Development Company Project Development
72 Development of Modern Sea Port at Haldipur in the Coast line of Karnataka (Swiss Challenge) Uttar Kannada 1900.00 Public Works Department Project Development
73 Development of Transport and Transit Management Center at Hebbal Bangalore Urban 250.00 Bangalore Metropolitan Transport Corporation Bid Preparation
74 DevelopmentofTrafficand Transit Management Center at Kathriguppe, Bangalore Bangalore Urban 155.00 Bangalore Metropolitan Transport Corporation Bid Preparation
75 HighSpeedRailLinkfrom Bangalore City to Bangalore InternationalAirport BangaloreUrban 6010.00 BangaloreAirportRailLink Bidding
76 DevelopmentofTrafficand Transit Management Center at Jayanagar 4th T Block Bangalore Urban 240.00 Bangalore Metropolitan Transport Corporation Bidding
77 Development of a Sea Prot at Tadadi Uttar Kannada 3000.00 Karnataka State Industrial Investment & Development Corporation Bidding
78 Development of Modern Bus Station & Commercial Complex at NWKRTCsiteatBelgaumunder PPP basis Belgaum 25.70 Karnataka State Industrial Investment & Development Corporation Bidding
23
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
79 Development of inter Modal TransitCentreatKGBS BangaloreUrban 1700.00 KarnatakaStateRoadTransportCorporation Bidding
80 Development of Modern Bus Station & Commercial Complex atNEKRTCsiteatGulbargaunder PPP basis Gulbarga 15.65 KSIIDC -IL & FS Project Development Company Bidding
81 Development of Modern Bus Station & Commercial Building on NWKRTCsiteatHubliBusStand Dharwad 33.70 KSIIDC-IL&FSProjectDevelopmentCompany Bidding
Sub - Total 81 126388.75
24
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
82 Development of Food Park atHarohalli,BangaloreRural District BangaloreRural 28.17 KarnatakaStateIndustrialInvestment& Development Corporation Bidding
83 Development of Food Park at Vasanthanarasapura in Tumkur District Tumkur 21.82 Karnataka State Industrial Investment & Development Corporation Bidding
84 Development of Spice Park at Byadagi In Haveri District Haveri 28.62 Karnataka State Industrial Investment & Development Corporation Bidding
85 Development of Food Park at Peeranavadi in Belgaum District Belgaum 44.70 Karnataka State Industrial Investment & Development Corporation Bidding
86 Development of Food Park at Telagi in Davangere District Davanagere 11.58 Karnataka State Industrial Investment & Development Corporation Bidding
87 Development of Food Park at Ittangihala in Bijapur District Bijapur 23.84 Karnataka State Industrial Investment & Development Corporation Bidding
88 Development of Modern Agricultural Market Complex Bangalore Urban 105.90 Agriculture Producers Marketing Corporation Bidding
Sub - Total 7 264.63
Agri Infrastructure
25
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
Education
89 Facility Management in Schools at 3 locations 100.00 Education Department Pre-Feasibility - KIT
90 Facility Management in Colleges at 3 locations 100.00 Education Department Pre-Feasibility - KIT
91 Delivering vocational training programme through three way PPPmodel–NSDC,Section25 company (promoted by Govt.) and Private sector at 3 locations 100.00 Education Department Pre-Feasibility - KIT
92 Establishment of knowledge city Kolar 3000.00 Education Department Pre-Feasibility - KIT
93 Establishment of knowledge city Shimoga 1000.00 Education Department Pre-Feasibility - KIT
94 Establishment of knowledge city Gulbarga 1000.00 Education Department Pre-Feasibility - KIT
95 PPP in sports development/ talent development at 3 locations 150.00 Education Department Pre-Feasibility - KIT Sub - Total 7 5450.00
26
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
96 Development of Solar park at Chittapur taluk, sanjayanagar Gulbarga 1250.00 Energy Department Pre-Feasibility - KIT
97 Development of Solar park at Hipparagi Bagalkot 1250.00 Energy Department Pre-Feasibility - KIT
98 Development of Solar park at Bedasura Bijapur 1250.00 Energy Department Pre-Feasibility - KIT
99 Development of Solar park at Tulasigere Bagalkot 1250.00 Energy Department Pre-Feasibility - KIT
100 Pre-feasibility for distribution franchisee models for select towns of GESCOM Gulbarga 100.00 Energy Department Pre-Feasibility - KIT
101 Pre-feasibility for distribution franchisee models for select towns of HESCOM Hubli 100.00 Energy Department Pre-Feasibility - KIT
102 Pre-feasibility for laying of 400kVlinefromRaichur toGutturonPPPbasis Raichur 500.00 EnergyDepartment Pre-Feasibility-KIT
103 Pre-feasibility for packaging of 400kV station work at Gadag & related line from Guduthahalli to Guttur and 200kV station at Hiremalanahole with related 220kV line from Talak Gadag 200.00 Energy Department Pre-Feasibility - KIT
104 Pre-feasibility for development of RoofTopSolarprogram in Karnataka - - Energy Department Pre-Feasibility - KIT
Energy
27
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
105 Setting up of 700MW Gas Based power project in Davanagere district Davanagere 3500.00 Power Company of Karnataka Limited Bidding
106 Setting up of 700MW Gas Based Power Project In Gadag District Gadag 3500.00 Power Company of Karnataka Limited Bidding
107 Setting up of 700MW Gas Based Power Project In Belgaum District Belgaum 3500.00 Power Company of Karnataka Limited Bidding
Sub - Total 12 16400.00
28
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
108 Facility Management of Hospital Premises -Jayanagar GH Bangalore 2.00 Health Department Pre-Feasibility - KIT
109 Facility Management of Hospital Premises - Malleshwaram GH Bangalore 2.00 Health Department Pre-Feasibility - KIT
110 Facility Management of Hospital Premises Bangalore 2.00 Health Department Pre-Feasibility - KIT
111 Diagnostic and Laboratory Services attached with District Hospital Gulbarga 6.00 Health Department Pre-Feasibility - KIT
112 Diagnostic and Laboratory Services attached with District Hospital Mysore 6.00 Health Department Pre-Feasibility - KIT
113 Diagnostic and Laboratory Services attached with District Hospital Belgaum 6.00 Health Department Pre-Feasibility - KIT
114 Operation of Dialysis Centre at Taluka Level Hospitals Bijapur 4.80 Health Department Pre-Feasibility - KIT
115 Operation of Dialysis Centre at Taluka Level Hospitals Gulbarga 5.60 Health Department Pre-Feasibility - KIT
116 Operation of Dialysis Centre at Taluka Level Hospitals Belgaum 8.00 Health Department Pre-Feasibility - KIT
117 Geriatric Clinics cum In patient atDistrictHospitalunderCSRMode Gulbarga 1.00 HealthDepartment Pre-Feasibility-KIT
118 Geriatric Clinics cum In patient atDistrictHospitalunderCSRMode UttaraKannada 1.00 HealthDepartment Pre-Feasibility-KIT
119 Geriatric Clinics cum In patient atDistrictHospitalunderCSRMode DakshinaKannada 1.00 HealthDepartment Pre-Feasibility-KIT
120 MRIScanMachineinstallation& operation on PPP at 3 locations 39.00 Health Department Pre-Feasibility - KIT
Sub - Total 13 84.40
Health
29
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
Industrial Infrastructure
121 Pharmaceutical SEZ/Park Yadgir 720.00 Commerce & Industries Pre-Feasibility - KIT
122 Best-use study for KSSIDC land parcel Bangalore Urban 300.00 Commerce & Industries Pre-Feasibility - KIT
123 Best use for theme based Industrial Area Hassan 400.00 Commerce & Industries Pre-Feasibility - KIT
124 SpecialInvestmentRegion Dharwad 10000.00 Commerce&Industries Pre-Feasibility - KIT
125 NationalInvestmentand Manufacturing Zone Tumkur/Sira/ VasantaNarsapur 5000.00 Commerce&Industries Pre-Feasibility - KIT
126 NationalInvestmentand Manufacturing Zone - VADA Bellary 5000.00 Commerce & Industries Pre-Feasibility - KIT
127 DevanahalliBusinessPark BangaloreRural 9000.00 KSIIDC-IL&FSProjectDevelopmentCompany ProjectDevelopment
128 Development of VADA in Bellary- Phase-1 Bellary 14000.00 Vijaynagar Area Development Authority Project Development
129 Marine Biotech Park, Mangalore Dakshina Kannada 54.00 Karnataka Biotechnology and Information Technology Services Bid Preparation
130 Animal Biotech Park, Bidar Bidar 54.00 Karnataka Biotechnology and Information Technology Services Bid Preparation
131 Agri & Biotech Park, Dharwad Dharwad 60.00 Karnataka Biotechnology and Information Technology Services Bid Preparation
132 Steel Ancillary Park in Bellary Bellary 145.00 Karnataka Industrial Area Development Board Bidding
133 Biotechnology Park at Electronic City, Bangalore Bangalore Urban 500.00 Karnataka Biotechnology and Information Technology Services Bidding
134 N2P2CentreofExcellenceand Park, Mysore Mysore 125.00 Karnataka Biotechnology and Information Technology Services Bidding
Sub - Total 14 45358.00
30
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
135 Convention centre at Pilukula Mangalore 200.00 Department of Tourism Pre-Feasibility - KIT
136 Convention centre Mysore 200.00 Department of Tourism Pre-Feasibility - KIT
137 Adventure Sports Complex at Shanthi Sagar Lake Shanthi Sagar Lake 75.00 Department of Tourism Pre-Feasibility - KIT
138 Adventure Sports Complex at Anekal Anekal 75.00 Department of Tourism Pre-Feasibility - KIT
139 Adventure Sports Complex at Kere Tonnur Kera Thonnur 75.00 Department of Tourism Pre-Feasibility - KIT
140 Adventure Sports Complex at Trasi Trasi 75.00 Department of Tourism Pre-Feasibility - KIT
141 Theme Based Parks at Hesaragatta Bangalore 200.00 Department of Tourism Pre-Feasibility - KIT
142 Wellness&RejuvenationatJog Shimoga 65.00 DepartmentofTourism Pre-Feasibility-KIT
143 Wellness&Rejuvenation at Sakaleshpur Hassan 65.00 Department of Tourism Pre-Feasibility - KIT
144 Boat House at Udupi Udupi 17.00 Department of Tourism Pre-Feasibility - KIT
145 Boat House at Bramhavar Udupi 17.00 Department of Tourism Pre-Feasibility - KIT
146 Boat House at Marawanthe Udupi 17.00 Department of Tourism Pre-Feasibility - KIT
147 Way side Amenities between Kalasa-Kuduremukha Chikkamagalur 6.00 Department of Tourism Pre-Feasibility - KIT
148 Way side Amenities between Chikmagalur-Sringeri Chikkamagalur 6.00 Department of Tourism Pre-Feasibility - KIT
149 Way side Amenities between Belgaum-Bijapur Belgaum 6.00 Department of Tourism Pre-Feasibility - KIT
150 Way side Amenities between Badami-Bijapur Bijapur 6.00 Department of Tourism Pre-Feasibility - KIT
Tourism
31
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
151 Way side Amenities between Mysore-Madikeri Madikeri - Mysore 6.00 Department of Tourism Pre-Feasibility - KIT
152 3 Star Category Hotel, Theme park, Restaurant,OrganisedRetail, Civic amenities Hassan 28.00 Karnataka State Industrial Investment & Development Corporation Pre-Feasibility
153 Development of Aquamarine Park on PPP basis Dakshina Kannada 251.00 Karnataka State Industrial Investment & Development Corporation Project Development
154 Development of Tourism facilities at Jog Falls Shimoga 12.00 Karnataka State Industrial Investment & Development Corporation Bidding
155 Development of Tourism facilities at Agumbe Shimoga 0.50 Karnataka State Industrial Investment & Development Corporation Bidding
156 Development of Tourism Infrastructure Project at Badami, Pattadakal, Aihole & Gokarna Bellary 21.00 Karnataka State Industrial Investment & Development Corporation Bidding
157 Development of 18 hole Golf Course &Allied facilities at Mangalore Dakshina Kannada 108.00 Karnataka State Industrial Investment & Development Corporation Bidding
Sub - Total 23 1531.50
32
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
158 RedevelopmentofMarket at Indiranagar Bangalore Urban 220.00 Bangalore Development Authority Pre-Feasibility - KIT
159 RedevelopmentofMarket atRTNagar BangaloreUrban 60.00 BangaloreDevelopmentAuthority Pre-Feasibility-KIT
160 RedevelopmentofMarket at Vijaynagar Bangalore Urban 80.00 Bangalore Development Authority Pre-Feasibility - KIT
161 Affordable housing - Thanisandra Bangalore Urban 150.00 Bangalore Development Authority Pre-Feasibility - KIT
162 Affordable housing- Byrathikane Bangalore Urban 150.00 Bangalore Development Authority Pre-Feasibility - KIT
163 Water Supply Distribution - Chitradurga town Chitradurga 25.00 Directorate of Municipal Administration Pre-Feasibility - KIT
164 Water Supply Distribution - Ramanagaram Ramanagar 25.00 DirectorateofMunicipalAdministration Pre-Feasibility-KIT
165 Water Supply Distribution - Channapatna Channapatna 25.00 Directorate of Municipal Administration Pre-Feasibility - KIT
166 Integrated Water supply and Sewerage Hoskote town 100.00 Directorate of Municipal Administration Pre-Feasibility - KIT
167 MSWM - Integrated SWM PPP Bijapur 17.00 Directorate of Municipal Administration Pre-Feasibility - KIT
168 MSWM - Integrated SWM PPP Davangere 17.00 Directorate of Municipal Administration Pre-Feasibility - KIT
169 MSWM - Integrated SWM PPP Bellary 17.00 Directorate of Municipal Administration Pre-Feasibility - KIT
170 EnergyEfficiencyimprovement through ESCO at 3 locations 50.00 Directorate of Municipal Administration Pre-Feasibility - KIT
171 Tertiary Treatment of sewage for industrial use Mysore 17.00 Directorate of Municipal Administration Pre-Feasibility - KIT
172 Tertiary Treatment of sewage for industrial use Tumkur 17.00 Directorate of Municipal Administration Pre-Feasibility - KIT
Urban and Municipal Infrastructure
33
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
173 Tertiary Treatment of sewage for industrial use Bellary 17.00 Directorate of Municipal Administration Pre-Feasibility
174 “Pre-feasibility for Development of Residentialaccommodationfor Legislators cum hotel At Belgaum on PPP” Belgaum 50.00 Public Works Department Pre-Feasibility - KIT
175 Pre-feasibility for Development of ResidentialandCommercialUnits at a land parcel in Bangalore on PPP Bangalore 535.00 Public Works Department Pre-Feasibility - KIT
176 Green Waste Processing Three main markets of Bangalore 50.00 Bruhat Bengaluru Mahanagara Palike Pre-Feasibility - KIT
177 “Development of Freedom Park with amphitheatre, café, library etc. facilities on PPP (O & M)” Bangalore Urban 5.00 Bruhat Bengaluru Mahanagara Palike Pre-Feasibility - KIT
178 “Development of Market on PPP-KRmarket” BangaloreUrban 10.00 BruhatBengaluruMahanagaraPalike Pre-Feasibility-KIT
179 “Development of Market on PPP - Yediyur Market“ Bangalore Urban 10.00 Bruhat Bengaluru Mahanagara Palike Pre-Feasibility - KIT
180 “Development of Market on PPP - Lakkasandra market“ Bangalore Urban 10.00 Bruhat Bengaluru Mahanagara Palike Pre-Feasibility - KIT
181 “Development of Market on PPP - Mavalli market“ Bangalore Urban 10.00 Bruhat Bengaluru Mahanagara Palike Pre-Feasibility - KIT
182 “Development of Market on PPP - Moore market“ Bangalore Urban 10.00 Bruhat Bengaluru Mahanagara Palike Pre-Feasibility - KIT
183 “Development of Market on PPP - Cox town market“ Bangalore Urban 10.00 Bruhat Bengaluru Mahanagara Palike Pre-Feasibility - KIT
184 DevelopmentofUrbanRecreation Centre in Mysore Mysore 192.70 Mysore City Corporation Project Development
34
Sl. No. Project Name Location / District
Estimated Project Cost
(` in crores) ` 5 crores = 1 Mn USD
Sponsoring Authority Stage Name
185 Development of Commercial Complex at Gadi chowk in Mysore City Mysore 9.70 Mysore City Corporation Project Development
186 Development of Mayura Commercial Complex, Mysore Mysore 107.02 Mysore City Corporation Project Development
187 Development of Commercial Complex in front of Main stand in Mysore City Mysore 23.40 Mysore City Corporation Project Development
188 Development of Integrated Drinking Water Supply project for Bijapur District (Package-1) Bijapur 885.00 Karnataka Urban Infrastructure Development & Finance Corporation Bid Preparation
189 Development of Integrated Drinking Water Supply Project for Chitradurga District (Package-II) Chitradurga 2275.00 Karnataka Urban Infrastructure Development & Finance Corporation Bid Preparation
Sub - Total 32 5179.82
Grand Total 189 200657.10
35
Annexure lll : PPP Projects under Implementation / Construction
Sl. No. Project Name District Name Sector Name Estimated Proj Cost
Sponsoring Authority Stage Name
1 Multilevel Parking & Commercial Complex at Mysore Zoo
Mysore Urban and Municipal Infrastructure
55.25 Mysore City Corporation Construction
2 Development of Food Park at Soganein Shimoga District
Shimoga Agri Infrastructure 17.02 Karnataka State Horticulture Development Agency Construction
3 Improvements to Chikkanayakanahalli - Tiptur -HassanRoad(PartlyMDRandPartlySH)foralength of 74.00 km on BOT basis 11/7
Tumkur Transportation & Logistics
241.76 KarnatakaRoadDevelopmentCorporationLimited Construction
4 ImprovementstoDharwad-Alnawar-Ramanagararoad on BOT –VGF (Toll) for a length of 60.40 Km
Dharwad Transportation & Logistics
237.60 KarnatakaRoadDevelopmentCorporationLimited Construction
5 Improvements to State Highway (SH-10) from Maharastra Border to Andhra Pradesh Border (Whagdhari-Ribbanpallyroad)
Gulbarga Transportation & Logistics
242.75 KarnatakaRoadDevelopmentCorporationLimited Construction
6 Development of SH 132 Connecting Bellary to Andhra Pradesh
Bellary Transportation & Logistics
169.33 Public Works Department Construction
7 DevelopmentofSNMarketProperty Shimoga Urban and Municipal Infrastructure
40.00 City Municipal Council Shimoga Construction
8 Development of integrated MSW treatment & disposal facility on DBOT basis
Gulbarga Urban and Municipal Infrastructure
10.00 Gulbarga City Corporation Construction
9 DevelopmentofSanitaryLandfill Mysore Urban and Municipal Infrastructure
11.00 Mysore City Corporation Construction
10 Shimoga Minor Airport Shimoga Transportation & Logistics
80.00 Infrastructure Development Corporation of Karnataka Construction
11 Gulbarga Minor Airport Gulbarga Transportation & Logistics
80.00 Infrastructure Development Corporation of Karnataka Construction
12 Development of Commercial Complex at Makka-jichowka, Mysore
Mysore Urban and Municipal Infrastructure
40.00 Mysore City Corporation Construction
13 Construction of Hassan Airport Hassan Transportation & Logistics
690.00 Infrastructure Development Corporation of Karnataka Construction
36
14 ConstructionofNewGreenfiedlAirportatBellary Bellary Transportation & Logistics
141.00 Infrastructure Development Corporation of Karnataka Construction
15 Development of Minor Airport at Bijapur Bijapur Transportation & Logistics
80.00 Infrastructure Development Corporation of Karnataka Construction
16 DevelopmentofKSRTCsiteatHassanunderPPP basis
Hassan Transportation & Logistics
32.80 KarnatakaStateRoadTransportCorporation Construction
17 DevelopmentofKSRTCsiteatMangaloreunderPPP basis
Dakshin Kannand Transportation & Logistics
20.70 KarnatakaStateRoadTransportCorporation Construction
18 DevelopmentofKSRTCsiteatPutturunderPPPbasis
Dakshin Kannand Transportation & Logistics
7.32 KarnatakaStateRoadTransportCorporation Construction
19 RegionalDiagnosticLaboratoryatBagalkoteDistrict Hospital
Bagalkot Healthcare 1.09 Heatlth and Family Welfare Construction
20 RegionalDiagnosticLaboratoryatTumkurDistrictHospital
Tumkur Healthcare 1.09 Heatlth and Family Welfare Construction
21 RegionalDiagnosticLaboratoryatChitradurgaDistrict Hospital
Chitradurga Healthcare 1.09 Heatlth and Family Welfare Construction
Total 2198.71
Sl. No.
Project Name District Name Sector Name Estimated Proj Cost
Sponsoring Authority Stage Name
37
Sl. No.
Project Name District Name
Sector Name Estimated Proj Cost
Sponsoring Authority Stage Name
1 Four Laning Of Bangalore-MysoreRoad(Bangalore-Maddur)
Mandya Transportation & Logistics 188.00 KarnatakaRoadDevelopmentCorporationLimited
Operation
2 Inertisationandlandfillfacility Shimoga
Shimoga Urban and Municipal Infrastructure
3.64 Directorate of Municipal Administration Operation
3 BypassRoadtoSandurTown Bellary Transportation & Logistics 40.00 Public Works Department Operation
4 Hassan - Mangalore Gaugue Conversion
Hassan Transportation & Logistics 348.00 Infrastructure Development Department Operation
5 SWM - O & M of Processing of facilities
Mysore Urban and Municipal Infrastructure
4.50 Mysore City Corporation Operation
6 Bangalore International Airport (BIAL)
Bangalore Urban Transportation & Logistics 2470.29 Karnataka State Industrial Investment & Development Corporation
Operation
7 Luxury Tourist Train Project Bangalore Urban Tourism 32.00 Infrastructure Development Corporation of Karnataka
Operation
8 SanitaryLandfillsInBangalore Bangalore Urban Urban and Municipal Infrastructure
30.00 Bruhat Bangalore Mahanagar Palike Operation
9 Madivala Commercial Plaza Bangalore Urban Urban and Municipal Infrastructure
35.00 Bruhat Bangalore Mahanagar Palike Operation
10 Integrated Municipal Solid Waste Treatment Kannahalli
Bangalore Urban Urban and Municipal Infrastructure
40.00 Bruhat Bangalore Mahanagar Palike Operation
11 Upgradation of Governemnt ITIs Through Public Private Partnership
38 Locations Education 42.00 Directorate of Employement and Training Operation
12 Upgradation of Governemnt ITIs Through Public Private Partnership
38 Locations Education 43.00 Directorate of Employement and Training Operation
Total 3276.43
Annexure IV : PPP Projects under Operation
38
Abbreviations Description
BBMP Bruhat Bangalore Mahanagara Bangalore
BDA Bangalore Development Authority
BESCOM Bangalore Electricity Supply Company
BMTC Bangalore Metropolitan Transport Corporation
BOOT Build Own Operate Transfer
CESCOM Chamundeshwari Electricity Supply Company
DMA Department of Municipal Administration
DULT Department of Urban and Transport
GAIL Gas Authority of India Limited
GESCOM Gulbarga Electricity Supply Company
ICD Inland Container Depot
IDD Infrastructure Development Department
IT, BT, S&T Information Technology, Biotechnology, Science & Technology Department
KBITS Karnataka Biotechnology & Information Tech-nology Services
KSRTC KarnatakaStateRoadTransportCorporation
KHSRCL KeralaHighSpeedRailCorporationLtd
KIADB Karnataka Industrial Area Development Board
Abbreviations Description
A B B R E V I A T I O N S
KIPDC KSIIDC & IL&FS Project Development Company
KRDCL KarnatakaRoadDevelopmentCorporationLimited
KSWC Karnataka State Warehousing Corporation
KSHIP Karnataka State Highway Improvement Project
KSIIDC Karnataka State Industrial Infrastructure Devel-opment Corporation
MCC Mysore City Corporation
MICE Complexes Meetings, Incentives, Conferences, Exhibitions.
MSWM Municipal Solid Waste Management
NEKRTC NorthEastKarnatakaRoadTransportCorpo-ration
NHAI NationalHighwayAuthorityofIndia
NWKRTC NorthWesternKarnatakaRoadTransportCorporation
PCKL Power Corporation of Karnataka Limited
PWD Public Works Department
UDD Urban Development Department
WMS Warehousing Management System
39
Note:
INFRASTRUCTURE DEVELOPMENT DEPARTMENTRoomNo.28,GroundFloor,VikasaSoudhaBangalore-560001.Karnataka.INDIAPh : +91 80 22035085 I Fax : +91 80 22280605E-mail: [email protected]
PUBLIC PRIVATE PARTNERSHIP CELLRoomNo.08,GroundFloor,VikasaSoudhaBangalore-560001.Karnataka.INDIAPh : +91 80 22034070 I Fax : +91 80 22281123E-mail: [email protected]
www.idd.kar.nic.inwww.advantagekarnataka.com