• Street Improvements• Bike Lane Installations• 3rd Court Water Main• Water Main Replacement (Various
Locations)• Ocean Park Green Street
Improvements
Infrastructure Improvements
www.SMConstruct.org
Current Street Resurfacing Program
www.SMConstruct.org
Street Paving and Bicycle Network Striping
Construction of New Gutters
Construction of New Gutter
Preparing Streets for Paving
Street Grinding
Asphalt Paving in Progress
Asphalt Paving
Bike Lane Striping
Complete Green Street Project
Construction In Progress
Ocean Park Blvd
Ocean Park Blvd Getting ready for Excavation
Ocean Park Blvd – Traffic Control
Ocean Park Blvd – New Curbs
Ocean Park BlvdBioSwale Construction
Ocean Park Blvd - Sidewalk widening
Ocean Park Blvd – Sidewalk widening
Ocean Park Blvd – New Curb construction
Construction In Progress
3rd Court - from Arizona to Wilshire is Complete
3rd Court Water Main Replacement
Water Main at 3rd and Arizona
3rd Court – New Water Main
3rd Court – Water Valve Installation
3rd CourtTrenching for New Water
Main
3rd Court – New Water Main
20TH and Cloverfield Improvements Pier Improvements California Incline Pico Library
www.SMConstruct.org