Compendium of Infrastructure Projects in Uganda
1
COMPENDIUM OF INFRASTRUCTURE PROJECTS IN
TRANSPORT & ENERGY INVESTMENTS
Willy Mutenza Head Office: 12 Eric Wilkins House, Avondale Square Estate, Old Kent Road, London SE1 5ES Tel: +207 237 7317 Mob: +447790 647 089 - Email: [email protected] Website: www.mm2capital.com Skype: willymutenza ---------------------------------------------------- Services: MM2 Capital, the convergence focal point for Investors and Business Entrepreneurs.
Compendium of Infrastructure Projects in Uganda
2
TABLE OF CONTENTS
Transport projects……………………………………………………….….. 4 Roads Transport …………………………………….……………….…. 5 Alternative Route to Entebbe…………………………………………………….…… 6 Flyover between Jinja Road and Kibuye……………………………………….…… 7 Construction Equipment for Districts Roads…………………………………..…… .8 Kibuye - Busega - Mpigi Road……………………………………………………….. 9 Kampala Northern Bypass ………………………………………………………… 10 Kampala - Jinja ………………………………………………………………………11 Kampala (Zana) – Entebbe………………………………………………………… 12 Air Transport …………………………………………………….…. ….... 13 Commercial Free Zone…………………………………………………………… ….14 Cargo Center………………………………………………………...................... .....15 Rail Transport …………………………………………………..… ….... 16 Extension of Gulu Line to Juba………………………………………………………17 Reactivation of kampala – Kasese line and future extension of Rwanda and the Democratic Republic of Congo……………………………………………………….18 Water Transport ……………………………………………….………..... 19
Redevelopment of Portbell Port……………………………………………….…..…20
Energy projects………………………………………………….………. ….21
Karuma large hydro power site (200mw)………………………………………..….22 Isimba large hydro power project (87 mw)…………………………………….……23 Ayago north large hydro power project (304mw)…………………………….…….24 Ayago south large hydro power project…………………………………….……….25 Murchision large hydropower project (642mw)………………………….…………26 Bugumira large hydro power project (109mw)…………………………….……….27 Kakaka small hydro power project (7.2 mw)…………………………….…………28 Muyembe/sirimityo small hydro power project (9.0 mw)……………….…………29 Nyamabuye small hydro power project (2.2mw)……………………….………….30 Yerya, Mahoma confluence hydro power project (3.0 mw)………….…………..31 Siti small hydro power project (2.5 mw)…………………………………………….32 Sipi/chebonet small hydro power project (2.5mw)…………………………… … ..33
Compendium of Infrastructure Projects in Uganda
3
Mvepi small hydro power project (2.4mw)………………………………………… .34 Sogahi small hydro power project (2.0 mw)……………………………………….. 35 Ela small hydro power project (1.5 mw)……….…………………………………….36 Ririma small hydro power project (1.5mw)………………………………………….37 Haisesero small hydro power project (1.0 mw)……………………………… …..38 Nyahuka small hydro power project (0.65mw)…………………………………......39 Nkusi small hydro power project (0.6mw)…………………………………………..40 Rwizi small hydro power project (0.5mw)……………………………………… …41 Sezibwa small hydro power project (0.5mw)……………………………………….42 Rwigo small hydro power project (0.48mw)……………………………… ………..43 Narwodo small hydro power project (0.4mw)……………………………… ………44 Agoi small hydro power project (0.35mw)…………………………………………..45 Kitumba small hydro power project (0.2 mw)……………………………………….46 Tokwe small hydro power project (0.4mw)………………………… ……………..47 Amua small hydro power project (0.18mw)…………………………………………48 Ngiti small hydro power project (0.15mw)…………………………..………………49 Leya small hydro power project (0.12mw)…………………………………………..50 Nyakibale hydro power project (0.1mw)……………………………………… …..51 Miria adua small hydro power project (0.1mw)……………………………………..52 Nkusi small hydro power project (11mw)……………………………………………53 Esia hydro power project (1.0 mw)…………………………………………… ……54 Manafwa small hydro power project (0.15mw)………………………………… …55
Compendium of Infrastructure Projects in Uganda
4
TRANSPORT PROJECTS
A. ROADS B. AIR C. RAIL D. WATER
TOTAL NUMBER OF PROJECTS: 12 TOTAL ESTIMATED COST USD: 1,620,900,000
Compendium of Infrastructure Projects in Uganda
5
A) ROADS TRANSPORT
NUMBER OF PROJECTS: 07
PROJECT NAMES:
1) Alternative Route to Entebbe 2) Flyover between Jinja Road and Kibuye 3) Construction Equipment for Districts Roads 4) Kibuye – Busega – Mpigi Road 5) Kampala Northern By pass 6) Kampala – Jinja Road 7) Kampala (zana) - Entebbe
TOTAL ESTIMATED COST USD: 782.4 MILLION
Compendium of Infrastructure Projects in Uganda
6
1) ALTERNATIVE ROUTE TO ENTEBBE (40KM) Project Description/Scope
Feasibility Study Detailed Engineering Design Construction
Estimated Costs (US $)
50 Million Project Status
Feasibility Study and Detailed Engineering Design in progress
Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
7
2) FLYOVER BETWEEN JINJA ROAD AND KIBUYE (4.7KM)
Project Description/Scope
Feasibility Study Detailed Engineering Design Construction
Estimated Costs (US $)
75 Million Project Status
To be in place by year 2018 Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
8
3) SUPPLY OF CONSTRUCTION EQUIPMENT
FOR DISTRICT ROADS Project Description/Scope
Supply of Equipment After sales Service Managing Workshops Training Managers and operators
Estimated Costs (US $)
80 Million Project Status/Remarks
Government will meet the cost of constructing the mechanical workshops
Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
9
4) KIBUYE – BUSEGA – MPIGI (32 KMS) Project Description/Scope
Review of detailed studies Construction works for dualling the road and construction consultancy supervision services
Estimated Costs (US $)
128 Million Project Status
Procurement of consultancy services for the feasibility study, detailed engineering designs and other tender assistance is on course
Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
10
5) KAMPALA NORTHERN BY PASS (18.6 KMS) Project Description/Scope
Review of detailed studies Construction works for dualling the road and construction consultancy supervision services
Estimated Costs (US $)
74.4 Million Project Status
Procurement of consultancy services for the feasibility study, detailed engineering designs and other tender assistance is on course
Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
11
6) KAMPALA – JINJA (72 KMS) Project Description/Scope
Review of detailed studies Construction works for dualling the road and construction consultancy supervision services
Estimated Costs (US $)
288 Million Project Status
Procurement of consultancy services for the feasibility study, detailed engineering designs and other tender assistance is on course
Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
12
7) KAMPALA – (ZANA) ENTEBBE (32 KMS) Project Description/Scope
Review of detailed studies Construction works for dualling the road and construction consultancy supervision services
Estimated Costs (US $)
87 Million Project Status
Procurement of consultancy services for the feasibility study, detailed engineering designs and other tender assistance is on course
Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
13
B) AIR TRANSPORT
NUMBER OF PROJECTS: 02
PROJECT NAMES:
1) Commercial Free Zone 2) Cargo Center
TOTAL ESTIMATED COST USD: 55 MILLION
Compendium of Infrastructure Projects in Uganda
14
1) COMMERCIAL FREE ZONE Project Description/Scope
Feasibility Study Detailed Engineering Design Construction
Estimated Costs (US $)
30 Million Project Status/Remarks
Pre-feasibility already done Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
15
2) CARGO CENTRE Project Description/Scope
Feasibility Study Detailed Engineering Design Construction
Estimated Costs (US $)
25 Million Project Status/Remarks
To be in Place by year 2012 Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
16
C) RAIL TRANSPORT
NUMBER OF PROJECTS: 02
PROJECT NAMES:
1. Extension of Gulu line to Juba (320km) 2. Reactivation of Kampala-Kasese line (333km) and
future extension to Rwanda and the Democratic Republic of Congo
TOTAL ESTIMATED COST USD: 770 MILLION
Compendium of Infrastructure Projects in Uganda
17
1) EXTENSION OF GULU LINE TO JUBA (320KM) Project Description/Scope
Feasibility Study Detailed Engineering Design Construction
Estimated Costs (US $)
420 Million Project Status
The cost covers all the items listed in the project scope Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
18
2) REACTIVATION OF KAMPALA-KASES LINE (333KM) AND FUTURE EXTENSION OF LINE TO RWANDA AND THE DEMOCRATIC REPUBLIC OF CONGO
Project Description/Scope
Feasibility Study Detailed Engineering Design Construction
Estimated Costs (US $)
350 Million Project Status/Remarks
The cost only covers the rehabilitation of the existing line up to Kasese
Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
19
D) WATER TRANSPORT
NUMBER OF PROJECTS: 01
PROJECT NAME:
1. Redevelopment of Port Bell Port
TOTAL ESTIMATED COST USD: 13.5 MILLION
Compendium of Infrastructure Projects in Uganda
20
1) REDEVELOPMENT OF PORT BELL PORT Project Description/Scope
Feasibility Study Detailed Engineering Design Construction
Estimated Costs (US $)
420 Million Project Status/Remarks
The cost includes rehabilitation of the Port and terminal building facilities
Responsible Institution
Ministry of Works and Transport
Compendium of Infrastructure Projects in Uganda
21
ENERGY PROJECTS
A) LARGE HYDRO POWER PROJECTS - NUMBER OF PROJECTS - 06 B) SMALL HYDRO POWER PROJECTS
- NUMBER OF PROJECTS - 28
TOTAL NUMBER OF ENERGY PROJECTS: - 34
Compendium of Infrastructure Projects in Uganda
22
1) DEVELOPMENT OF KARUMA LARGE HYDRO POWER SITE (200MW)
Estimated Costs (US $)
300 - 700 Million1 Project Status/Remarks
To be developed as a Public Project Responsible Institution
Ministry of Energy and Mineral Development
1 Note: Hydro power project development costs in Uganda range between US$ 1.5 Million and US$ 3.5 Million per MW (Electricity Regulatory Authority)
Compendium of Infrastructure Projects in Uganda
23
2) DEVELOPMENT OF ISIMBA LARGE HYDRO POWER PROJECT (87 MW)
Estimated Costs (US $)
130 – 304.5 Million Project Status/Remarks
Preliminary Studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
24
3) DEVELOPMENT OF AYAGO NORTH LARGE HYDRO POWER PROJECT (304MW)
Estimated Costs (US $)
456 Million – 1.064 Billion Project Status/Remarks
Preliminary studies have been done and are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
25
4) DEVELOPMENT OF AYAGO SOUTH LARGE HYDRO POWER PROJECT
Estimated Costs (US $)
351- 819 Million Project Status/Remarks
Preliminary studies done and are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
26
5) DEVELOPMENT OF MURCHISION LARGE HYDROPOWER PROJECT (642MW)
Estimated Costs (US $)
963 Million – 2.247 Billion Project Status/Remarks
Preliminary Studies have been done and are available. Project has adverse environment effects
Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
27
6) DEVELOPMENT OF BUGUMIRA LARGE HYDRO POWER PROJECT (109MW)
Estimated Costs (US $)
163.5 – 381.5 Million Project Status/Remarks
Preliminary studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
28
7) DEVELOPMENT OF KAKAKA SMALL HYDRO POWER PROJECT (7.2 MW)
Estimated Costs (US $)
10.8 – 25.2 Million Project Status/Remarks
Preliminary technical studies carried out in 1999 and 2003
Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
29
8) DEVELOPMENT OF MUYEMBE/SIRIMITYO SMALL HYDRO POWER PROJECT (9.0 MW)
Estimated Costs (US $)
13.5 – 31.5 Million Project Status/Remarks
Pre feasibility technical studies carried out Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
30
9) DEVELOPMENT OF NYAMABUYE SMALL HYDRO POWER PROJECT (2.2MW)
Estimated Costs (US $)
3.3 – 7.7 Million Project Status/Remarks
Preliminary technical studies carried out. Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
31
10) DEVELOPMENT OF YERYA, MAHOMA CONFLUENCE HYDRO POWER PROJECT (3.0 MW)
Estimated Costs (US $)
4.5 – 10.5 Million Project Status/Remarks
Preliminary technical studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
32
11) DEVELOPMENT OF SITI SMALL HYDRO POWER PROJECT (2.5 MW)
Estimated Costs (US $)
3.75 – 8.75 Million Project Status/Remarks
Preliminary technical studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
33
12) DEVELOPMENT OF SIPI/CHEBONET SMALL HYDRO POWER PROJECT (2.5MW)
Estimated Costs (US $)
3.75 – 8.75 Million Project Status/Remarks
Preliminary studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
34
13) DEVELOPMENT OF MVEPI SMALL HYDRO POWER PROJECT (2.4MW)
Estimated Costs (US $)
3.6 – 8.4 Million Project Status/Remarks
No studies Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
35
14) DEVELOPMENT OF SOGAHI SMALL HYDRO POWER PROJECT (2.0 MW)
Estimated Costs (US $)
3.75 – 7 Million Project Status/Remarks
No studies. Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
36
15) DEVELOPMENT OF ELA SMALL HYDRO POWER PROJECT (1.5 MW)
Estimated Costs (US $)
2.25 – 5.25 Million Project Status/Remarks
Preliminary studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
37
16) DEVELOPMENT OF RIRIMA SMALL HYDRO POWER PROJECT (1.5MW)
Estimated Costs (US $)
2.25 – 5.25 Million Project Status/Remarks
Pre feasibility studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
38
17) DEVELOPMENT OF HAISESERO SMALL HYDRO POWER PROJECT (1.0 MW)
Estimated Costs (US $)
1.5 – 3.5 Million Project Status/Remarks
No studies Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
39
18) DEVELOPMENT OF NYAHUKA SMALL HYDRO POWER PROJECT (0.65MW)
Estimated Costs (US $)
0.975 – 2.275 Million Project Status/Remarks
Preliminary technical studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
40
19) DEVELOPMENT OF NKUSI SMALL HYDRO POWER PROJECT (0.6MW)
Estimated Costs (US $)
0.9 – 2.1 Million Project Status/Remarks
Preliminary technical studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
41
20) DEVELOPMENT OF RWIZI SMALL HYDRO POWER PROJECT (0.5MW)
Estimated Costs (US $)
0.75 – 1.75 Million Project Status/Remarks
Preliminary studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
42
21) DEVELOPMENT OF SEZIBWA SMALL HYDRO POWER PROJECT (0.5MW)
Estimated Costs (US $)
0.75 – 1.75 Million Project Status/Remarks
Preliminary technical studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
43
22) DEVELOPMENT OF RWIGO SMALL HYDRO POWER PROJECT (0.48MW)
Estimated Costs (US $)
0.72 – 1.68 Million Project Status/Remarks
No studies Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
44
23) DEVELOPMENT OF NARWODO SMALL HYDRO POWER PROJECT (0.4MW)
Estimated Costs (US $)
0.6 – 1.4 Million Project Status/Remarks
Preliminary studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
45
24) DEVELOPMENT OF AGOI SMALL HYDRO POWER PROJECT (0.35MW)
Estimated Costs (US $)
0.525 –1.225 Million Project Status/Remarks
No studies Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
46
25) DEVELOPMENT OF KITUMBA SMALL HYDRO POWER PROJECT (0.2 MW)
Estimated Costs (US $)
0.3 – 0.7 Million Project Status/Remarks
No studies Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
47
26) DEVELOPMENT OF TOKWE SMALL HYDRO POWER PROJECT (0.4MW)
Estimated Costs (US $)
0.6 –1.4 Million Project Status/Remarks
Preliminary technical studies Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
48
27) DEVELOPMENT OF AMUA SMALL HYDRO POWER PROJECT (0.18MW)
Estimated Costs (US $)
0.27 – 0.63 Million Project Status/Remarks
No studies Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
49
28) DEVELOPMENT OF NGITI SMALL HYDRO POWER PROJECT (0.15MW)
Estimated Costs (US $)
0.225 – 0.525 Million Project Status/Remarks
Preliminary technical studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
50
29) DEVELOPMENT OF LEYA SMALL HYDRO POWER PROJECT (0.12MW)
Estimated Costs (US $)
0.18 – 0.42 Million Project Status/Remarks
No studies Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
51
30) DEVELOPMENT OF NYAKIBALE HYDRO POWER PROJECT (0.1MW)
Estimated Costs (US $)
0.15 – 0.35 Million Project Status/Remarks
No studies Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
52
31) DEVELOPMENT OF MIRIA ADUA SMALL HYDRO POWER PROJECT (0.1MW)
Estimated Costs (US $)
0.15 – 0.35 Million Project Status/Remarks
Preliminary studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
53
32) DEVELOPMENT OF NKUSI SMALL HYDRO POWER PROJECT (11MW)
Estimated Costs (US $)
16.5 – 38.5 Million Project Status/Remarks
No studies Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
54
33) DEVELOPMENT OF ESIA HYDRO POWER PROJECT (1.0 MW)
Estimated Costs (US $)
1.5 – 3.5 Million Project Status/Remarks
Preliminary studies are available Responsible Institution
Ministry of Energy and Mineral Development
Compendium of Infrastructure Projects in Uganda
55
34) DEVELOPMENT OF MANAFWA SMALL HYDRO POWER PROJECT (0.15MW)
Estimated Costs (US $)
0.225 – 0.525 Million Project Status/Remarks
Preliminary technical studies carried out Responsible Institution
Ministry of Energy and Mineral Development