18
August, 2019 Public and Private Initiative Projects INFRASTRUCTURE PROJECTS IN PERU
Transcript
Page 1: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

August, 2019

Public and PrivateInitiative Projects

INFRASTRUCTURE PROJECTS

IN PERU

Page 2: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

INDEX

PUBLIC INITIATIVE PROJECTS CALLED BY PROINVERSION

SELF-SUSTAINED PROJECTS

HYDROCARBONSMassive Use of Natural Gas – Natural Gas Pipeline Network across the Regions of Apurimac, Ayacucho, Huancavelica, Junin, Cusco, Puno and Ucayali

5

SANITATIONHeadwaters and Pipeline Works for Lima’s Potable Water Supply 5

CO-FINANCED PROJECTS

RAILWAYSHuancayo – Huancavelica Railway 6

REAL ESTATEOperation and Maintenance of the Lima Convention Center 6

ROADSLongitudinal de la Sierra Road - Section IV 6

PUBLIC INITIATIVE PROJECTS TO BE CALLED BY PROINVERSION

SANITATION AND WATER SYSTEMPuerto Maldonado’s new wastewater treatment plant 7New wastewater treatment plant for Huancayo, El Tambo and Chilca 7

RAILROADMetro Line 3 7

HEALTHNew High-Complexity Hospital in Lima 8

ELECTRICITYTingo María – Aguaytía 220 Kv Link, Substations, Lines And Associated Extensions; La Niña – Piura 500 Kv Link, Substations, Lines And Associated Extensions And Pariñas - Nueva Tumbes 220 Kv Link, Substations, Lines And Associated Extensions

8

500 Kv Piura Nueva – Frontera Substation Transmission Line 8

Page 3: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

Transmision Line 138 Kv Puerto Maldona-Iberia And Substation Valle Del Chira 220/60/23 Kv De 100 Mva

8

Chincha and Nazca 220/60/10 Kv New Sub Stations 9REAL ESTATE

Ancón Industrial Park 9

PRIVATE INITIATIVE PROJECTS

SELF-SUSTAINED PROJECTS

MINING

Algarrobo Mining Project 10

PORTSChimbote International Container Port Terminal 10San Juan de Marcona New Por Teminal 11

ELECTRICITYModernization of the Regional Utility Company, Electro Noroeste S.A. 11

SANITATIONSanitation for North Lima-Wastewater Treatment Plant 11Sanitation for South Lima-Wastewater Treatment Plant 11Desalination Plant Project for North Lima 11Desalination Plant Project for South Lima 12

CO-FINANCED PROJECTS

ROADSPeripheral Ring Road 12

SANITATIONWater consolidation system in the Ica valley 12Integral water system of the Chancay-Lambayeque Valley 12Wastewater Treatment For Final Disposal Or Reuse, Trujillo Province 13Wastewater Treatment For Final Disposal Or Re-Use, City Of Cajamarca 13Wastewater Treatment System For A Sustainable Chiclayo 13Wastewater Treatment For Final Disposal Or Re-Use, Cusco Province 13Wastewater Treatment For Final Disposal Or Re-Use, Cañete Province 13Wastewater Treatment For Final Disposal Or Re-Use, Chincha Province, Ica, Perú

13

Wastewater Treatment Plant For The City Of Tarapoto 14

Page 4: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

Wastewater Treatment Plant And Additional Infrastructure For The City Of Huaraz

14

Improvement And Expansion Of The Water Supply Service For Population Use In The City Of Cajamarca

14

HEALTHDesign, construction, equipment, finance, maintenance, non-hospital management and assignment of the Cayetano Heredia Hospital (HNCH)

14

Huaycán Hospital 14Design, Construction, Operation and Maintenance of the National Hospital Hipólito Unanue

15

Comprehensive Waste Management of Health Ministry (MINSA) Hospitals 15New Central Military Hospital 15

EDUCATIONConstruction, maintenance and operation of complementary services for educative centers in the Ayacucho area

15

Construction, maintenance and operation of complementary services for educative centers in the San Martin area – Zone 2

15

High-performance schools: COAR center region 16Reinforcement of infrastructure, equipment and maintenance of schools in Cuzco

16

New educational infrastructure for at risk schools in Lima. 16Construction, Implementation, Maintenance and Operation of complementary services of the Educational Public Centers located in Villa María del Triunfo

16

Intervention of school considered at risk as identified by MINEDU located in the districts of Ate and San Juan de Lurigancho (Lima)

16

Intervention of schools considered at risk as identified by MINEDU located in the districts of San Martín de Porres and Comas (Lima).

17

Cusco Schools Infrastructure Reinforcement, Equipment And Maintenance 17TOURISM

Improvement of tourism services in choquequirao archaeological park. Apurímac and cusco regions

17

Tourism Project Cable Car Lima Historic Centre- San Cristobal Hill 17IRRIGATION

Water Consolidation System In The Chancay – Lambayeque Valley 17

Page 5: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

5

SELF-SUSTAINED PROJECTS

HYDROCARBONS

Massive Use of Natural Gas – Natural Gas Pipeline Network across the Regions of Apurimac, Ayacucho, Huancavelica, Junin, Cusco, Puno and Ucayali (USD 236 Millions)

The project consists in the design, finance, construction, operation and maintenance of a natural gas distribution pipeline network in twelve cities of the referred Regions. The project will be supplied with natural gas as compressed natural gas, liquefied natural gas and/or via pipelines to a certain transport or production system.

Status: On May 28th, the fifth version of the contract was published. The award is expected during the second semester of 2019.

http://www.proyectosapp.pe/modulos/JER/PlantillaProyecto.aspx?ARE=1&PFL=2&JER=8123&SEC=30

SANITATION

Headwaters and Pipeline Works for Lima’s Potable Water Supply (Obras de Cabecera) (USD 700 Millions)

The Project consists on the design, finance, build, operate and maintain of: i) Enlargement of Pomacocha and Huallacocha Bajo dams (approx. 90 MCM), ii) Water intake and canals in Yauli river, iii) Pomacocha - Rio Blanco transfer works (approx. 10 km of trans-Andean tunnels), iv) Drinking water plant in Huachipa (5 m3/s) v) South branch conduction line (approx. 25,6 Km), vi) Complementary works (reservoirs and interconnection works)

Status: The award is expected during the second semester of 2020.

http://www.proyectosapp.pe/modulos/JER/PlantillaProyecto.aspx?ARE=1&PFL=2&JER=6836&SEC=32

PUBLICINITIATIVEPROJECTS

called by ProInversion

Page 6: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

6

CO-FINANCED PROJECTS

RAILWAYS

Huancayo – Huancavelica Railway (USD 271,82 Millions)

The project consists on the rehabilitation works of the Huancayo – Huancavelica Railway, and its following operating and maintenance services. The railway has a length of 128.7 Km. It begins its route in the city of Huancayo and ends in the city of Huancavelica, offering the population the services of transportation.

Status: The award is expected during the second semester of 2019.

On January 15th the seventh version of the contract was published.

The deadline to submit the envelope number 1 (prequalification credentials) will be until September 2019.

http ://www.proyectosapp.pe/modulos/JER/Plant i l laProyecto .aspx?ARE=1&PFL=2&JER=8166&SEC=30 http://www.proinversion.gob.pe/fhh

REAL ESTATE

Operation and Maintenance of the Lima Convention Center (TBD)

The project consists on the operation, exploitation, conservation and comprehensive maintenance of the Lima Convention Center.

Status: Estimated award date first semester 2020.

ROADS

Longitudinal de la Sierra Road - Section IV (USD 2,988 Millions)

The project consists on the rehabilitation and upgrade works of 117 km of roads, the regular initial maintenance of 280 km of roads and the operation and continuous maintenance of 970 km of roads in order to conserve the highway at established levels of service.

Status: The new schedule will be published by ProInversion. The award is expected during the first semester of 2020.

http://www.proyectosapp.pe/modulos/JER/PlantillaProyecto.aspx?ARE=1&PFL=2&JER=6848&SEC=32

Page 7: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

7

PUBLICINITIATIVEPROJECTSto be called by

ProInversion

SANITATION AND WATER SYSTEM

Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions)

The project will consist in the financing, construction, operation and maintenance of a wastewater installation in Puerto Marldonado.

Status: The award is expected during the second semester of 2020.

New wastewater treatment plant for Huancayo, El Tambo and Chilca (USD 90.25 Millions)

The project consist in the construction of a new treatment plant of 80,700 m3/h capacity, the installation of 4 stations for water pumping among other infrastructure.

Status: The award is expected during the first semester of 2021.

RAILROAD

Metro Line 3 (USD 3,749 Millions)

The project involves a North-South railroad of approximately 32 kilometers and will benefit 8 districts.

http://www.proyectosapp.pe/modulos/JER/PlantillaProyecto.aspx?ARE=0&PFL=2&JER=8162

Page 8: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

8

HEALTH

New High Complexity Hospital in Lima (USD 170 Millions)

The project consist in the design, construccion, equipment, operation and maintenance of complementary health services (“bata gris“) of a high-complexity hospital in Lima (“New Child and Adolescent health Institution”).

Status: The award is expected during the first semester of 2020.

ELECTRICITY

Tingo María – Aguaytía 220 Kv Link, Substations, Lines And Associated Extensions; La Niña – Piura 500 Kv Link, Substations, Lines And Associated Extensions And Pariñas - Nueva Tumbes 220 Kv Link, Substations, Lines And Associated Extensions

(USD 144 Millions)

The purpose of the project is to grant the concession for the construction of (i) The 220 kV Tingo María Nueva – Aguaytía transmission line (73 km) begins in the future Tingo María Nueva substation located in the Department of Huánuco and reaches the Aguaytía Substation, property of Aguaytía Energy, located in Department of Ucayali. (ii) The 500 kV La Niña – Piura transmission line will connect La Niña substation with the future Piura Nueva substation with an approximate length of 87 km. (iii) The 220 kV Pariñas - Nueva Tumbes transmission line (158 km) includes the branching of 220 kV L2280-Nueva Tumbes transmission line, the construction of Nueva Tumbes substation and extension of a cell in Pariñas substation for the exit to the Nueva Tumbes substation

Status: The award is expected during the second semester of 2019.

https://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PPT_CARTERA_Y_PROYECTOS/2019/Portafolio_ESP_17_08_19.pdf

500 Kv Piura Nueva – Frontera Substation Transmission Line

(USD 112 Millions)

The purpose of the project consists in the construction of a 500 kW Transmission Line that will link the Chorrillos Substation in Ecuador with the La Niña Substation in Peru (The Line).

Status: The award is expected during the first semester of 2020.

https://www.proyectosapp.pe/modulos/JER/PlantillaProyecto.aspx?ARE=1&PFL=2&JER=8661&SEC=30

Transmision Line 138 Kv Puerto Maldona-Iberia And Substation Valle Del Chira 220/60/23 Kv De 100 Mva

(USD 24 Millions)

The purpose of the project consists in supply the electricity to the city of Iberia, populations and industrial loads in the area, with energy from the National Interconnected Electric System (SEIN).

Status: The award is expected during the first semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PPT_CARTERA_Y_PROYECTOS/2019/Portafolio_ESP_17_08_19.pdf

Page 9: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

9

Chincha and Nazca 220/60/10 Kv New Sub Stations (USD 58 Millions)

Project’s bidding rules are under evaluation.

Status: The award is expected during the first semester of 2020.

REAL ESTATE

Ancón Industrial Park (USD 590 Millions)

The project consists in the creation of a modern space destined to industrial enterprises of diverse scale in Metropolitan Lima, that operates under international standards.

Status: The award is expected during the first semester of 2020.

http://www.proyectosapp.pe/modulos/JER/PlantillaProyecto.aspx?ARE=1&PFL=2&JER=8389&SEC=30

Page 10: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

10

PRIVATE INITIATIVEPROJECTS

SELF-SUSTAINED PROJECTS The following are the projects that are currently under evaluation:

MINING

Algarrobo Mining Project (USD 350 Millions)

The project will consist of the exploration, mining operation through an underground mine and processing a mineralized deposit located in the mining concessions Tambo Grande N° 4, Tambo Grande N° 5, Tambo Grande N° 9 and Tambo Grande N° 10, which form “El Algarrobo Project”.

Status: Estimated award date first semester 2020.

PORTS

Chimbote International Container Port Terminal (USD 110 Millions)

The project will consist of the design, construction, finance, preservation, exploitation and transfer of infrastructure of the new “container only” port terminal in the Port of Chimbote. The project aims to provide better services of stowage and unload of container shipments, as well as the transfer, handling and the stack of such shipments in the new terminal.

Status: The award is expected during the second semester of 2019.

https://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_AUTOSOSTENIBLE_EVALUACION/ficha%20IPA%20Chimbote.pdf

Page 11: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

11

San Juan de Marcona New Port Terminal (USD 540 Millions)

The project will consist of the design, construction, finance, preservation and exploitation of infrastructure of a new port terminal for public use, that will be specialized in the provision of storage and shipment of iron and copper loads, as well as the storage of supplies for mining production.

Status: The award is expected during the first semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_AUTOSOSTENIBLE_EVALUACION/Ficha%20IPA%20San%20Juan%20de%20Marcona.pdf

ELECTICITY

Modernization of the Regional Utility Company, Electro Noroeste S.A. (USD 104.69 millions)

The purpose of the project consists in modernize the management of electronoroeste s.a., through the acquisition of new shares in order to provide a better service to customers in its area of influence.

Status: the award is expected during the second semester of 2020.

https://www.proyectosapp.pe/repositorioaps/0/2/jer/ppt_cartera_y_proyectos/2019/portafolio_esp_17_08_19.pdf

SANITATION

Sanitation for North Lima- Wastewater Treatment Plant (USD 153 millions)

The purpose of the project consists in the design, financing, construction, operation and maintenance of a wastewater treatment system for the population of north lima.

Status: the award is expected during the first semester of 2021

https://www.proyectosapp.pe/repositorioaps/0/2/jer/ppt_cartera_y_proyectos/2019/portafolio_esp_17_08_19.pdf

Sanitation for South Lima- Wastewater Treatment Plant (USD 176 millions)

The purpose of the project consists in the design, financing, construction, operation and maintenance of a wastewater treatment system for the population of pachacamac and lurin.

Status: the award is expected during the first semester of 2021

https://www.proyectosapp.pe/repositorioaps/0/2/jer/ppt_cartera_y_proyectos/2019/portafolio_esp_17_08_19.pdf

Desalination Plant Project for North Lima (USD227 millions)

The purpose of the project consists in the design, construction, operation and maintenance of a 2m3 / sec desalination plant in the north of lima, to supply districts in the north of lima (ancon, santa rosa and ventanilla).

Status: the award is expected during the first semester of 2022.

https://www.proyectosapp.pe/repositorioaps/0/2/jer/ppt_cartera_y_proyectos/2019/portafolio_esp_17_08_19.pdf

Page 12: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

12

Desalination Plant Project for South Lima (USD 202 millions)

The purpose of the project consists in design, construction, operation and maintenance of a 2m3 / sec desalination plant in the south of lima, to supply districts in the south of lima (surco, chorrillos, villa el salvador and villa maría del triunfo).

Status: the award is expected during the first semester of 2022.

https://www.proyectosapp.pe/repositorioaps/0/2/jer/ppt_cartera_y_proyectos/2019/portafolio_esp_17_08_19.pdf

CO-FINANCED PROJECTS The following projects have being declared “of relevance and priority”, on March 21th, 2016, and according to the evaluation process, will be initiating the evaluation process in the National System of Public Investment (Sistema Nacional de Inversión Pública – SNIP) so the project can be declared viable.

ROADS

Peripheral Ring Road (estimated USD 2,049 Millions)

The project comprises of the construction of a highway of approximately 33.2 km between Elmer Faucett Avenue, Canta Callao Avenue and Circunvalacion Avenue.

Status: The award is expected during the second semester of 2020.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/IP-014-2013/IP_014_2013_ANILLO_VIAL.pdf

SANITATION

Water consolidation system in the valleys of Ica, Pisco and irrigable areas of the provinces of Huaytara and Castrovirreyna in Huancavelica (USD 520 Millions)

The project includes building three doms in the Tambo River, Ica River and Pisco River basins for water reinforcement of the Ica and Pisco Valleys, recharging Villacurí and Lonchas aquifers, and improving irrigable areas near Huaytará and Castrovirreyna provinces in Huancavelica.

Status: The award is expected during the first semester of 2022.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_EVALUACION/IPC%20Afianzamiento%20H%C3%ADdrico%20Valle%20de%20Ica.pdf

Integral water system of the Chancay-Lambayeque Valley (USD 619 Millions)

The purpose of the project is the design, construction and operation of an integral water system in the Chancay-Lambayeque Valle, through the construction of two levees and the execution of the accessory conductions. Also, it considers the maintenance of the existence infrastructure.

Status: The award is expected during the 2020.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_EVALUACION/IPC%20Chancay%20Lambayeque.pdf

Page 13: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

13

Wastewater Treatment For Final Disposal Or Reuse, Trujillo Province (USD 130.14 Millions)

The purpose of the project consists in the design, financing, construction, operation and maintenance of the sanitation infrastructure.

Status: The award is expected during the second semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/1/2/JER/IP_2018/IP-128-2018-TRUJILLO.pdf

Wastewater Treatment For Final Disposal Or Re-Use, City Of Cajamarca (USD 55.7 Millions)

The purpose of the project consists in the design, financing, construction, operation and maintenance of the sanitation infrastructure.

Status: The award is expected during the second semester of 2020

https://www.proyectosapp.pe/RepositorioAPS/1/2/JER/IP_130/IP-130-2018-CAJAMARCA(1).pdf

Wastewater Treatment System For A Sustainable Chiclayo (USD 48.39)

The purpose of the project consists in the design, finance, improve, expand and maintain the Wastewater Treatment Plants.

Status: The award is expected during the second semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/1/2/JER/IP_127/IP-127-2018-CHICLAYO.pdf

Wastewater Treatment For Final Disposal Or Re-Use, Cusco Province (USD 42.43 Millions)

The purpose of the project consists in the design, financing, construction, operation and maintenance of the sanitation infrastructure.

Status: The award is expected during the second semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/1/2/JER/IP_20181/IP-131-2018-CUSCO(2).pdf

Wastewater Treatment For Final Disposal Or Re-Use, Cañete Province (USD 34.71 Millions)

The purpose of the project consists in the design, financing, construction, operation and maintenance of the sanitation infrastructure.

Status: The award Is expected during the second semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/1/2/JER/IP_126/IP-126-2018-CANETE%20(3).pdf

Wastewater Treatment For Final Disposal Or Re-Use, Chincha Province, Ica, Perú (USD 34.55 Millions)

The purpose of the project consists in the design, financing, construction, operation and maintenance of the sanitation infrastructure.

Status: The award Is expected during the second semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/1/2/JER/IP_125/IP-125-2018-CHINCHA.pdf

Page 14: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

14

Wastewater Treatment Plant For The City Of Tarapoto (USD 27.15 Millions)

The purpose of the project consists in the design, financing, construction, operation and maintenance of the sanitation infrastructure.

Status: The award Is expected during the second semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/1/2/JER/IP_124/IP-124-2018-TARAPOTO.pdf

Wastewater Treatment Plant And Additional Infrastructure For The City Of Huaraz (USD 26.55 Millions)

The purpose of the project consists in the design, financing, construction, operation and maintenance of the sanitation infrastructure.

Status: The award Is expected during the second semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/1/2/JER/IP_129/IP-129-2018-HUARAZ.pdf

mprovement And Expansion Of The Water Supply Service For Population Use In The City Of Cajamarca (USD 71.5 Million)

The purpose of the project consists in the financing, design, construction and commissioning of the additional infrastructure and rehabilitation of the existing infrastructure, as well as operation and maintenance of these infrastructures to manage High water service in the city of Cajamarca, which includes the uptake components to primary reservoirs.

Status: The award Is expected during the second semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PPT_CARTERA_Y_PROYECTOS/2019/Portafolio_ESP_17_08_19.pdf

HEALTH

Design, construction, equipment, finance, maintenance, non-hospital management and assignment of the Cayetano Heredia Hospital (HNCH) (USD 186 Millions)

The purpose of the project is to provide the Cayetano Heredia Hospital with new infrastructure, technology and equipment necessary to provide the corresponding services to a Health Department III-1 category; ensure the availability and quality in the provision of general non-hospital services; and, improve the patients care, among others.

Status: The award is expected during the second semester of 2020.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_EVALUACION/IPC%20Hospital%20Cayetano%20Heredia.pdf

Huaycán Hospital (USD 119.6 Millions)

The project is located in the Huaycán Hospital, which is located in Ate Vitarte District; Department and Province of Lima and consists on the construction, maintenance and management of the Huaycán New Hospital, as well as the operation of general and complementary services of laundry, cleaning and management of hospital residues.

Status: The award is expected during the first semester of 2021.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_ADMITIDAS/IPC%20Hospital%20Huaycan.pdf

Page 15: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

15

Design, Construction, Operation and Maintenance of the National Hospital Hipólito Unanue (USD 250.2 Millions)

The project will include the design, construction, equipment, financing, maintenance and operation of the hospital to ensure the provision of the necessary services for the hospital function.

Status: The award is expected during the first semester of 2021.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_EVALUACION/Publicaci%C3%B3n%20web%20-%20Hospital%20Unanue%202.pdf

Comprehensive Waste Management of Health Ministry (MINSA) Hospitals (USD 35.15 Millions)

The purpose of the project consists on the construction, operation and maintenance of a treatment plant for hospital waste with the implementation of modern technology in order to manage all the wastes produced in hospitals and institutions of the Ministry of Health in Lima and Callao.

Status: The award is expected during the first semester of 2020.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/IP_022_2013/IP_022_2013_RESIDUOS_HOSPITALARIOS.pdf

New Central Military Hospital (USD 115.5 Millions)

The project will comprise the design, construction, operation and maintenance of the new central military hospital. The concession includes the performance and administration of general health services.

Status: The award is expected during the second semester of 2020.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_EVALUACION/IPC%20Hospital%20Militar%20Central.pdf

EDUCATION

Construction, maintenance and operation of complementary services for educative centers in the Ayacucho area (USD 16.66 Millions)

The purpose of the project is the construction, equipment, operation of the complementary services and maintenance of the infrastructure, for educational institutions of the Ayacucho, Carmen Alto, San Juan Bautista districts, Huamanga province, Ayacucho department.

Status: The award is expected during the first semester of 2021.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_EVALUACION/IPC%20Centros%20Educativos%20Ayacucho.pdf

Construction, maintenance and operation of complementary services for educative centers in the San Martin area – Zone 2 (USD 35.44 Millions)

The purpose of the project is the construction, equipment, operation of the complementary services and maintenance of the infrastructure, for three educational institutions of Tarapoto city, in the San Martin province.

Status: The award is expected during the first semester of 2021.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_EVALUACION/IPC%20San%20Mart%C3%ADn%20Zona%202.pdf

Page 16: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

16

High-performance schools: COAR center region (USD 58.74 Millions)

The project will consist of the construction, implementation, maintenance and operation of 4 high- performance schools (COAR) in the regions of Junín, Pasco, Huancavelica and Cusco.

Status: Estimated award date 1st semester 2020.

Reinforcement of infrastructure, equipment and maintenance of schools in Cuzco (USD 18.88 Millions)

The purpose of the project is the design, construction and/or rehabilitation of existence schools infrastructure and the equipment, maintenance and operation of five schools in Cuzco.

Status: The award is expected during the first semester of 2021.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_EVALUACION/IPC%20Colegios%20Cusco.pdf

New educational infrastructure for at risk schools in Lima (USD 79.8 Millions)

The project is located in the districts of Villa María del Triunfo, San Juan de Miraflores; and, San Martín de Porres and consists on the improvement of the educational infrastructure, equipment; and, maintenance of the twenty three public schools considered at risk, located in the districts of Villa María del Triunfo, San Juan de Miraflores, San Martín de Porres; and, Villa El Salvador.

Status: The award is expected during the second semester of 2020.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_ADMITIDAS/IPC%20Infraestructura%20Educativa%20Colegios%20en%20Riesgo%20LM.pdf

Construction, Implementation, Maintenance and Operation of complementary services of the Educational Public Centers located in Villa María del Triunfo (USD 16.97 Millions)

The project is located in the Villa María del Triunfo district, Lima, and would consist on the construction, implementation, maintenance and operation of the complementary services in the Educational Public Centers of five schools at risk, which are located on Villa María del Triunfo.

Status: The award is expected during the second semester of 2020.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_ADMITIDAS/IPC%20VMT.pdf

Intervention of school considered at risk as identified by MINEDU located in the districts of Ate and San Juan de Lurigancho (Lima) (USD 84.96 Millions)

The purpose of the project is the construction, equipment, operation of the complementary services and maintenance of the infrastructure, furniture, and equipment for educational institutions at risk in the districts of Ate and San Juan de Lurigancho in Lima.

Status: The award is expected during the second semester of 2020.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_EVALUACION/IPC%20Colegios%20MINEDU%20Ate%20SJL.pdf

Page 17: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

17

Intervention of schools considered at risk as identified by MINEDU located in the districts of San Martín de Porres and Comas (Lima). (USD 60.84 Millions)

The purpose of the project is the construction, equipment, operation of the complementary services and maintenance of the infrastructure, furniture, and equipment for educational institutions at risk in the districts of San Martin and Comas in Lima.

Status: The award is expected during the second semester of 2020.

http://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PROY_IP_COFINANCIADAS_EVALUACION/IPC%20Colegios%20MINEDU%20SMP%20Comas.pdf

Cusco Schools Infrastructure Reinforcement, Equipment And Maintenance (USD 18.88 Millions)

The purpose of the project consists in the construction, maintenance and operation of the complementary services of 3 schools.

Status: The award is expected during the first semester of 2021.

https://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PPT_CARTERA_Y_PROYECTOS/2019/Portafolio_ESP_17_08_19.pdf

TOURISM

Improvement of tourism services in choquequirao archaeological park. Apurímac and cusco regions (USD 221 Millions)

The purpose of the project is to grant the Concession for the design, financing, construction, equipment, operation and maintenance of tourist accessibility means to the Archaeological Park of Choquequirao; includes cable transport systems, road networks, and trekking routes.

Status: The award is expected during the second semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PPT_CARTERA_Y_PROYECTOS/2019/Portafolio_ESP_17_08_19.pdf

Tourism Project Cable Car Lima Historic Centre - San Cristobal Hill (USD 12.64 Millions)

The purpose of the project is to grant the Concession for the design, financing, construction, equipment, operation and maintenance of tourist accessibility means to the San Cristobal Hill, through cable transport.

Status: The award is expected during the first semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/0/2/JER/IP_133_2019/IP_133_2019.pdf

IRRIGATION

Water Consolidation System In The Chancay – Lambayeque Valley (USD 619 Millions)

The purpose of the project consists in the design, construction and operation of the integral water system in the Chancay-Lambayeque valley, through the construction of two dams (La Montería and Sicán) and the execution of conduction and distribution works to irrigate 33,200 new hectares.

Status: The award is expected during the first semester of 2020.

https://www.proyectosapp.pe/RepositorioAPS/0/2/JER/PPT_CARTERA_Y_PROYECTOS/2019/Portafolio_ESP_17_08_19.pdf

(*) Information published in the publication “Plan Nacional de Infraestructura 2016-2025”

elaborated by Asociación para el Fomento de la Infraestructura Nacional –AFIN.

Page 18: INFRASTRUCTURE PROJECTS IN PERU - rubio.pe€¦ · ProInversion SANITATION AND WATER SYSTEM Puerto Maldonado’s new wastewater treatment plant (USD 18.79 Millions) The project will

Milagros Maraví

Partner Administrative Practice AreaTel: +511 208 [email protected]

Carlos Arata

Partner Corporate Practice Area

Tel: +511 208 [email protected]

Av. Dos de Mayo 1321San Isidro, Lima – Peru

http:// www.rubio.pe T: (511) 208 3000F: (511) 442 3511

CONTACT INFORMATION

Daniela García Belaunde

Partner Energy Practice AreaTel: +511 208 [email protected]