CenPEEPCenPEEPInitiatives for Low Carbon Power GenerationIn India
S BandopadhyayGeneral Manager (CenPEEP) NTPC Ltd. India
CenPEEPCenPEEP
To implement Greenhouse Gas
PollutionPrevention (GEP)
Project
• NTPC• PSEB• WBPDCL• TNEB• Guj. GenCo• Maha GenCo• AP GenCo• UPRVUN• MPGENCO• IPGCL
• USDOE• NETL• USEA• EPRI• TVA • General Physics• Storm Tech• Structural Int. (SI)• Domain Experts
CenPEEP
Guided byGuided byAdvisory Board & Executive CommitteeAdvisory Board & Executive Committee
Consisting of NTPC, USAID, and representatives from Govt. of IndConsisting of NTPC, USAID, and representatives from Govt. of India, State & private power ia, State & private power utilities, industry associations, research institutes, etc.utilities, industry associations, research institutes, etc.
Indo-US Power Sector Initiative
Centre for Power Efficiency & Environmental Protection
CenPEEPCenPEEP
Methodology AdoptedMethodology AdoptedSelection of LowSelection of Low--Cost & HighCost & High--Benefit Benefit
technologytechnology
Technology, Technique & Practice Deployment
Training &Technology
Dissemination
TechnologyDemonstration
TechnologySelection &AcquisitionTechnology
Transfer
CenPEEPCenPEEP
CenPEEPCenPEEPIndian Power Sector: An Overview
Source: CEA, Power Sector at a Glance (31-01-2011)
Present Total Installed Capacity Mix: 170,229 MW
Thermal, 195167,
67%
Hydro, 38776, 13%
Nuclear, 27208,
9%
RES, 30850 ,
11%
Source: India Vision 2020, Planning Commission
Projected Total InstalledCapacity Mix: 292,000 MW
Thermal, 111294,
65%Hydro, 37368,
22%
Nuclear, 4780, 3%
RES, 16787,
10%
CenPEEPCenPEEP
6
NTPC’s Capacity Addition Plan
PLANNED PROJECTSKudgi I, Karnataka – 3x800 MW
Darlipali I, Orissa – 2x800 MWGajmara I, Orissa – 2x800 MWLara I, Chhattisgarh – 2x800 MW
Tanda‐II, U.P. – 2x660 MW
Gidderbaha, Punjab – 4x660 MW
Barethi, M.P. – 6x660 MW
PROJECTS UNDER CONSTRUCTION
3 x 660 MW Sipat STPP Stage‐I
3 x 660 MW Barh STPP Stage‐I
2 x 660 MW Barh STPP Stage –II
PROJECTS UNDER BULK TENDER
Meja, Uttar Pradesh – 2x660 MW
Solapur, Maharashtra – 2x660 MW
Mouda‐II, Maharashtra – 2x660MW
New Nabinagar, Bihar – 3x660 MW
Katwa, West Bengal – 2X800 MW
Khargone, M.P. ‐ 2X 660 MW
Dhuvaran I, Gujarat – 2X 660 MW
Bilhaur, Kanpur U.P. – 2X 660 MW
Adra (Railways JV) – 2X660 MW
Gadarwara I, M.P. – 2 X 660 MW
Super critical & Ultra super critical units
CenPEEPCenPEEP
75%
18%3% 3%1%
7
2010~ 33 GW2010
~ 33 GW
NTPC target - 128 GW with 28% from non-fossil sources by 2032
2032~ 128 GW
Coal Gas Nuclear Hydro Renewables
2017~ 75 GW2017
~ 75 GW
81%
19%
56%
16%
11%
8%9%
CenPEEPCenPEEPEnergy Efficiency
Policy Interventions• Upto10% improvement in LMZ machines - Targeting large no. of 210
MW Units which are completing their normal life • Energy Efficient R&M for Efficiency Improvement of Existing Units• Supercritical units – New units of 660/800 MW of higher efficiency• National Mission for Enhanced Energy Efficiency - A part of National
Action Plan on Climate Change (NAPCC)(Includes the initiative of ‘Perform, Achieve and Trade Scheme’ (PAT), a market based mechanism to enhance energy efficiency & provide incentives)
NTPC Initiatives for efficiency improvements & GHG reduction• Adoption of advanced cleaner and greener technologies• Establishment of CenPEEP • Suitable realignment of fuel mix• Systems to monitor & enhance plant efficiency
CenPEEPCenPEEP
Capacity Addition Portfolio of Renewable Energy
RENEWABLE ENERGY
WIND650 MW SOLAR
301 MWBIOMASS
15 MW
GEOTHERMAL
30 MW
SMALLHYDRO300 MW
• 300MW Solar projects by 2014• 1000MW capacity RE projects by 2017• 20000 MW by 2022 as per Jawahar Lal Nehru National Solar Mission
CenPEEPCenPEEP
Integrated Gasification Combined Cycle Plant (IGCC)
• Indian Coal have high ash, high fusion temperature, high reactivity and low sulfur content
• NTPC is making concerted efforts for induction of IGCC
Power 41%
Petro./ Ref. 14.5%
Others 19.50% Fertilizer 23%
Sector wise Gas Consumption (2010)
INDIA: GAS AVAILABILITY
• Gas Generation capacity: 17456 MW (31.01.2011)
• Additional 10,000 MW gas based capacity in 2011
• CEA has proposed new gas based capacity of ~ 25,000 MW during 2012-2017
CenPEEPCenPEEP
Nuclear Power in India
• Current installed capacity ~ 4780 MW
• Projected capacity upto 2020 ~ 21780 MW & 2030 ~ 63000 MW
• NPCIL has commenced construction of two plants (Rawatbhata and Kakrapar) - 2 x 700 MW each using indigenous technology
• Plans for setting up 5 nuclear parks of 6 X 1000 MW power plants with foreign collaborations
• NTPC has formed a Joint Venture Company with NPCIL for setting up Nuclear power plants.
• NTPC plans to add 2000 MW of nuclear capacity by 2017 and 15000 MW of nuclear capacity by 2030
CenPEEPCenPEEP
Thanks