+ All Categories
Home > Documents > Inman MS - Project Overview 01-21-14

Inman MS - Project Overview 01-21-14

Date post: 29-Dec-2015
Category:
Upload: huntarchbold
View: 767 times
Download: 5 times
Share this document with a friend
Popular Tags:
8
Inman Middle School 774 Virginia Avenue Project Overview March 25, 2010 Facilities Services Department January 21, 2014
Transcript

Inman Middle School774 Virginia Avenue

Project Overview

March 25, 2010

Facilities Services Department

January 21, 2014

Project Location

Aerial View of Existing Site

Project Description

• Grades: 6 – 8

• Site Size: +/- 4.2 acres (not including the Field of Dreams)

• Student Capacity: +/- 1,050 @ 25 students per classroom

• Core Classrooms: +/- 42

• Total Classrooms: +/- 62

• Approximate Size: +/- 186,428 sf (161,428 existing + +/-25,000 sf addition)

• Tentative Schedule: December 2014 – July 2016

• Construction of new Classrooms and support spaces

• Renovation of and expanded seating at Gymnasium

• Improved Administration Area and Entry Security

• Select Renovations in the Existing Building

• Reconfigured parking, drop-off and bus cueing areas

• Renovated Multi-Purpose Sports Field

• Fencing and hardscape improvements

• Site, storm water management and landscaping improvements

Site Plan

Proposed New Site Plan

Floor Plans

New Main Level Floor Plan

Floor Plans

New Upper Level Floor Plan

Project Timeline

• Select Architect: October 7, 2013

• Design Kick Off Meeting October 16, 2013

• Design Review Meeting November 11, 2013

• Project Committee Meeting #1: January 21, 2014

• Begin Draft Design Narrative January 21, 2014

• Preliminary Submittal to GDOE TBD

• Internal Design Review 1 TBD

• Project Committee Meeting #2 March 2014 (tentative)

• AUDC Submittal TBD

• Internal Design Review 2 TBD

• Project Committee Meeting #3 TBD

• Check Set Submittal to GDOE TBD

• Request for Proposal out to CMs TBD

• Final Submittal to GDOE TBD

• Recommend CM to Board TBD

• Project Committee Meeting #4 TBD

• Project Start December 2014 (tentative)

• Project Completion July 2016 (tentative)