+ All Categories
Home > Documents > Innovatecno - Demolición

Innovatecno - Demolición

Date post: 07-Mar-2016
Category:
Upload: carlos-gza
View: 220 times
Download: 2 times
Share this document with a friend
Description:
Innovatecno México FRACO
Popular Tags:
4
Reaching new levels of productivity in demolition DEMOLITION THE ULTIMATE MASTCLIMBER
Transcript
Page 1: Innovatecno - Demolición

Reaching new levels ofproductivity in demolition

DEMOLITIONTH

EULTI

MATE

MASTCLIMBER

Page 2: Innovatecno - Demolición

P.A.M. READYFraco’s work platforms can accommodate RNP Industries P.A.M.Concrete removal and preparation have never been so easy. The combination of both equipment providing effortless handling for workers and benefits are immediate. At Fraco, enhancing quality of life at work is another priority.

NEW METHODS OF DEMOLITION

No project is too big for Fraco’s work platforms.Whether it is for industrial chimneys demolition, or for building envelope rehabilitation, our mastclimbers offer a large workplace and a heavy payload capacity.Fraco brings new ways to complete demolition works.Our platforms can support excavators equipped with hydraulic hammer, crusher or shears and other robots and construction equipment.PRODUCTIVITY IS GUARANTEED

• Fit all structural configurations• Wide and safe working environment• Suitable for hydraulic equipment use• Heavy payload capacity• Straight deck for stable conditions

NEW SUCCESS KEYS!

Page 3: Innovatecno - Demolición

dustries P.A.M. system. en so easy. The combination or workers and benefits are work is another priority.

SECURINGHIGH LEVELS

Fraco’s 3-point anchoring system is quickly installed. It allows stability of the platform and does not interfere with its displacement. The anchoring system avoids any movement of the set-up during work phases. It can also be modified to suit angle walls.

A LARGER ANDSAFER WORKPLACE

The platform workplace is completely adjustable.With platform depths exceeding 15’ (4,57 m)there is plenty of room to store your material andtools. Fraco’s adjustability allows a free movement on the platform even when loaded with small equipment. This adjustability can adapt to straight and curved walls and even wrap around corners.

CESS KEYS!

Page 4: Innovatecno - Demolición

Fraco provides safe environment fordemolition and rehabilitation works.Whether it is for concrete removal

or surface preparations, for complete or partial demolition, our mast climbingwork platforms represent the perfectsolution to vertical access.

Fraco mastclimbers combine safety,power and flexibility for medium to large-size projects. They distinguishthemselves by their versatility and represent the best choice for generalcontractors and other specialized contractors.

USA 1-888-372-2648 CAN 1-800-267-0094 • 450-658-0094 WWW.FRACO.COM

©20

09.P

rinte

din

Cana

da


Recommended