Confidential, Do Not Distribute
Innovation The purpose of the program is to use the fluctuations in the
Earth and convert it to the Electric Energy. Our technology will be capable to supply constantly electric
energy, with limited cost of maintenance.
No pollution No costly maintenance No costly initial setup
Confidential, Do Not Distribute
Description of the Technology
Confidential, Do Not Distribute
With our technology we can convert these fluctuations into the electric energy.
The shell of the earth is rapidly fluctuate (microns)There are the materials that when you press on them, potential difference is created, like quartz or composite.
We estimate : 10m² = 1KWattOur technology is allowing us to use a very small space and still reach to large amount of MWatt
Why We?
Our Technology Don’t have to reinstall any parts. Amount of work hours is 24/7. Cost of the installation up to 1.5M Euro for 1MgW/h.
(depends on structure and cost of the land) ROI is SMALLER – up to 3 years.
Confidential, Do Not Distribute
Photo – Voltaic ROI is 6-10 years. After 7 years you have to reinstall most of the silicon cells. Amount of sun hours is limited.Cost of the installation is 1.5-2.5 million Euro for 1MgW/h.
Advantages Our Technology Photo Voltaic Normal
Initial Setup Low cost Low Cost High Cost
Pollution NO NO HIGH
Maintenance Very Low Each 7 years Always
Stability High Medium LOW
Cost of operation Very Low Medium Very High
Safety
ROI 3 years 6-10 years Very Long
Confidential, Do Not Distribute
Our technology contributes to improving the security of Europe's energy supply
Program is in 4 Phases
Phase 1 – producing scheme – 1000 watt
Phase 2 – pilot version 100 Kwatt.
Phase 3 – production 1MgW.
Phase 4 – production 5-100 MgW.
Confidential, Do Not DistributeConfidential, Do Not Distribute
Confidential, Do Not Distribute
Phase 1 Development of a laboratory prototype , producing and storing
energy: 1, 10, 100, 1000 WATTS.
Objective – Developing a basic scheme and producing and storing electric energy.
Time : 1-2 years
Personal : 7 people.
Money needed : 1.5-3 Million Euros.
Confidential, Do Not Distribute
Phase 1 - Steps Building laboratory, hiring people Selecting the source of oscillations - electrical, mechanical,
hydraulic, magnetic ... Selection of the principle of converting vibration - piezo,
magnetic, ... Selecting the connection method of the system Selecting the method of accumulation of finished energy (batteries,
dry cells and so on) Selecting materials for energy conversion, for example : natural
(quartz), artificial (composite) Choosing the materials for energy transfer: metal, semiconductor,
…
Confidential, Do Not Distribute
Phase 1 – Steps Development of a test design product for testing schemes (schemes).
Selecting devices Choosing accessories Making drawings Manufacturing, assembly and choosing stand
Testing. Objective - to check the various circuit elements and their interaction.
Finalization of the scheme for pilot.
Confidential, Do Not Distribute
Phase 2 Development of pilot plants for electric energy storage and
production: 10 - 100 kWatts.
Objective – Developing a pilot version and producing and storing electric energy.
Time: Up to 1-2.5 years.
Personal: 8
Money needed: 1.5-3.5 Million Euros.
Confidential, Do Not Distribute
Phase 2 – Steps Selecting the location :
Collection of geophysical and geo-mechanical data. Collection of archaeological data.
Development of the design of the construction. Selection of the technological scheme. Selection of the control circuit. Selection of the basic equipment. Selection of the accessories. Selection of the devices. Creation of the drawings.
Confidential, Do Not Distribute
Phase 2 – Steps Production Setup
Manufacturing the parts of the installation. Building the installation, including the adaptation. Conducting pilot tests.
○ Objective – collection the data for development of a pilot plant for energy storage and production : 1 - 100 MgW.
Confidential, Do Not DistributeConfidential, Do Not Distribute
Phase 3 – Production Production of 1 MgWatt
Phase 4 – ProductionProduction of 5-100 MgWatt
Confidential, Do Not Distribute
Ready - Theoretical Model of working system (Algorithms, Mathematics, Formulas, Sketches)
Status of the Project
Algorithms
Mathematics
Formulas
Sketches
Confidential, Do Not Distribute
Team Abramov Alex – Project Leader. 33 years old. Alex has an
extensive knowledge in project management and company Business development. Alex now is managing director of Gazit Technologies, a start up company that sold it’s product and now acting as an outsourcing company in web development.http://www.linkedin.com/in/enigmatec
Shamuilov Boris – PhD in Physics and Chemistry. 59 years old. Boris has an extensive knowledge in R&D. Boris has 25 patents registered on him and on the group that it was developed.
Confidential, Do Not Distribute
Thank you
Contact us
Alex AbramovTel : +972 52 6408850