Innovation CenterInnovation CenterInnovation CenterInnovation Center
A presentation of using GANTT charts with projects.
By Gary Lindahl
Innovation CenterInnovation CenterInnovation CenterInnovation Center
University of Illinois at Chicago (UIC)
Iowa State University (ISU)
UIC Electronic Visualization Lab
Innovation CenterInnovation CenterInnovation CenterInnovation Center
University of Illinois at Chicago (UIC)
Iowa State University (ISU)
ISU Virtual Reality Application Center
Innovation CenterInnovation CenterInnovation CenterInnovation Center
ISUISUISUISU UICUICUICUIC
Innovation CenterInnovation CenterInnovation CenterInnovation Center
Fakespace Systems – USA John Deere - USAChristie Digital Systems – USA TechViz - USABARCO – USA Consulting
Innovation CenterInnovation CenterInnovation CenterInnovation Center
CAVE™, HMD, Flat Tiled Displays, Curved Tiled Displays
Innovation CenterInnovation CenterInnovation CenterInnovation Center
Innovation CenterInnovation CenterInnovation CenterInnovation Center
Simple example.
Includes: List of task descriptions and a timeline.
Innovation CenterInnovation CenterInnovation CenterInnovation Center
It is an effective tool for planning and scheduling operations.
Useful to work with teams of people, managers, and customers.
Innovation CenterInnovation CenterInnovation CenterInnovation Center
Tool used internationally. Examples of professional solutions:Microsoft Project, SmartDraw, Oracle, Seimenshttp://en.wikipedia.org/wiki/List_of_project_management_software
Innovation CenterInnovation CenterInnovation CenterInnovation Center
The vertical line on the chart is the current-date indicator and indicates present and future status of the project as of that date.The bar is filled with two different colors to indicate progress and completion.
Innovation CenterInnovation CenterInnovation CenterInnovation Center
Conception, Preliminary Research, Project Development, Testing and Validation, Presentation and Demonstration
These sections are the different stages of the project related to a CDIO project.
Progress bar for the stage.
Innovation CenterInnovation CenterInnovation CenterInnovation Center
Tasks and Sub-tasks needed within each project stage.These will need to be updated based on the type of
project’s requirements.
These are the tasks identified within each stage of the project.
Progress bar for each task and sub-task
Innovation CenterInnovation CenterInnovation CenterInnovation Center
How should I Use?
Innovation CenterInnovation CenterInnovation CenterInnovation Center
1) Microsoft Excel Application.
2) Download template file.
3) Determine a student to lead in the group to manage and update this file.
4) Determine a student to lead as a manager to plan the needed tasks and schedule.
Innovation CenterInnovation CenterInnovation CenterInnovation Center
Download from the file server at this location.ftp://10.10.87.111/FORMS/PROJECT TOOLS/CDIOTemplate_2010_2011_ganttchart_rev_1.xls
Username: Anonymous No Password.
Innovation CenterInnovation CenterInnovation CenterInnovation Center
1)Enter once,
+ Project Name
Innovation CenterInnovation CenterInnovation CenterInnovation Center
1)Enter once,
+ Project Name
+ Project Student Lead
Innovation CenterInnovation CenterInnovation CenterInnovation Center
1)Enter once,
+ Project Name
+ Project Student Lead
+ Project Start Date
Innovation CenterInnovation CenterInnovation CenterInnovation Center
1)Enter once,
+ Project Name
+ Project Student Lead
+ Project Start Date
+ Today’s Date
Innovation CenterInnovation CenterInnovation CenterInnovation Center
1)Enter once,
+ Project Name
+ Project Student Lead
+ Project Start Date
+ Today’s Date
2)Task Name
Innovation CenterInnovation CenterInnovation CenterInnovation Center
1)Enter once,
+ Project Name
+ Project Student Lead
+ Project Start Date
+ Today’s Date
2)Task Name
3) Task Start Date
Innovation CenterInnovation CenterInnovation CenterInnovation Center
1)Enter once,
+ Project Name
+ Project Student Lead
+ Project Start Date
+ Today’s Date
2)Task Name
3) Task Start Date
4) Task Duration of Days
Innovation CenterInnovation CenterInnovation CenterInnovation Center
1)Enter once,
+ Project Name
+ Project Student Lead
+ Project Start Date
+ Today’s Date
2)Task Name
3) Task Start Date
4) Task Duration of Days
5) Percentage of Days Completed
Innovation CenterInnovation CenterInnovation CenterInnovation Center
1)Enter once,
+ Project Name
+ Project Student Lead
+ Project Start Date
+ Today’s Date
2)Task Name
3) Task Start Date
4) Task Duration of Days
5) Percentage of Days Completed
6) Assign Task Lead Student
Innovation CenterInnovation CenterInnovation CenterInnovation Center
Innovation CenterInnovation CenterInnovation CenterInnovation Center