  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    1/34

    ISPE Nordic 1

    Innovative Design &Innovative Design &

    Fast Track Project ImplementationFast Track Project Implementation

    JanJan LiljaLilja Director Director 

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    http://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    2/34

    2ISPE NordicPharmaceutical BiotechnologyMiddle East

    AgendaAgenda

    n Case Study: Turn-Key supply of a Modular Aseptic

    Manufacturing Facility in 17 months

    n Conclusions

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    http://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    3/34

    3ISPE NordicPharmaceutical BiotechnologyMiddle East

    The Modular ConceptThe Modular Concept – – An EnablingAn Enabling

    TechnologyTechnologynModular design and fabrication

    The term Modular  is a wide-ranging concept. In this case it meansturn-key supply of complete facilities including all installations,

    designed, built and IQ:ed off site.

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    4/34

    4ISPE NordicPharmaceutical BiotechnologyMiddle East

    The Modular ConceptThe Modular Concept – – An EnablingAn Enabling

    TechnologyTechnologyn The modular approach is today used for fast track, flexible

    and predictable turn-key project delivery

    - Global process-oriented design solutions (cGMP)

    - Customized standardization

    - Integrated validation approach from start of conceptual design

    - Off-site construction with higher productivity and predictability

    - Fabrication takes place in parallel with permitting and ground-

    breaking work

    - Same experienced fabrication team independent of final location

    - Allows for full installation and testing off-site

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    5/34

    5ISPE NordicPharmaceutical BiotechnologyMiddle East

    The Value of Fast Project ImplementationThe Value of Fast Project Implementation

    Conventional Project

    Fast Track Project

    Conventional Project

    Fast Track Project

    Fast Track Project

    Conventional Project

    Fast Track Project

    Conventional Project

    Fast Track Project

    Less risk at decision point- Clinical trials results

    - More info about market conditions

    - Better developed process

    Efficient use of financial resources

    Same Completion Date with Later Start

    Same Start with Earlier Completion Date

    Faster-to-Market

    Earlier return on investment

    Less use of resources Defined/known process

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    6/34

    6ISPE NordicPharmaceutical BiotechnologyMiddle East

    TheThe Modular Modular ConceptConcept – – A FlexibleA Flexible

    TechnologyTechnology

    n Future expansion

    Phased investment with minimal down-time (Baxter)

    n Technology Transfer 

    From Center of Excellence to local market

    Product transfer between identical facilities

    n Moving the facility

    Re-sale (Sweden to Grindeks, Latvia), (Vagos, Estonia to BMS,Moscow)

    Re-location (twice within Sweden, Astra Zeneca)

    Installation of long lead equipment at vendor s workshop (AstraZeneca, Genentech)

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    7/34

    7ISPE NordicPharmaceutical BiotechnologyMiddle East

    MovingMoving thethe facilityfacility

    n Cost of relocation

    Estimated cost for relocation isabout 10-15% of the initialinvestment (manufacturing

    building including process,clean utility and HVACequipment and systems)

    n Time schedule for relocation

    Estimated time required for 

    relocation is about 4-8 monthsincluding disassembly,transport, reassembly andrequalification (IQ/OQ)

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    8/34

    8ISPE NordicPharmaceutical BiotechnologyMiddle East

    Case Study: TurnCase Study: Turn--key supply of a Modular key supply of a Modular 

    Aseptic Manufacturing FacilityAseptic Manufacturing Facility

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    9/34

    9ISPE NordicPharmaceutical BiotechnologyMiddle East

    The CompanyThe Company’’s Project Requirementss Project Requirements

    n The investment should relieve demands on existing facilities andavoid potential delays/shutdown of operations

    n Design to higher seismic importance (2,5 in California, SanFrancisco)

    n Design for 1 batch fill every 24 hours

    n Install and start 1 pc 28 sqm lyo, prepare for addition of a second

    n Clean utility generation included in new facility, other utilities fromexisting site infrastructure

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    Cli k H & U d

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    10/34

    10ISPE NordicPharmaceutical BiotechnologyMiddle East

    The CompanyThe Company’’s Guiding Principless Guiding Principles

    n Minimize distraction on current projects and Operations

    Deliver the project using off-site modular facility technology withan integrated project approach

    Utilize off-site installation of long lead equipment

    n Utilize vendor standards (engineering, construction anddocumentation)

    n Small team that is empowered to make decisions and haveaccess to senior level management

    Clear and prompt decision making

    Decisions made within 24 hours

    n Leverage vendor validation capabilities

    Risk assessment based approach to validation

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    Click Here & Upgrade

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    11/34

    11ISPE NordicPharmaceutical BiotechnologyMiddle East

    Client Project ObjectivesClient Project Objectives

    n Deliver a manufacturing facility

    Cost to be equal to conventional alternative

    Speed is a critical success factor 

    On time, through tailor-made, flexible approach

    Licensed (Fda) in 28 months for $65 M

    Licensed for 1 liquid product

    Licensable for full product portfolio

    Prepared for future expansion

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    Click Here & Upgrade

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    12/34

    12ISPE NordicPharmaceutical BiotechnologyMiddle East

    Project ScopeProject Scope

    Size of facility 3,200 sqm, including process areas, mechanical areas for clean utilities and HVAC, lockers,cafeteria, goods receiving area with coldstorage

    - Water pre-treatment equipment (outside of modular building)

    - 1 WFI still- 1 Clean Steam Generator - 1 Vial washer and sterilizing tunnel- 1 Vial filler - 2 vial cappers- 1 lyophilizer 

    - 2 bulk-prep stations (including glycol cooling)- 1 CIP/SIP station for movable tanks

    - 6 air handling systems (including automation)- Information management system (batch data collection) GAMP

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    Click Here & Upgrade

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    13/34

    13ISPE NordicPharmaceutical BiotechnologyMiddle East

    17 months from start Detailed Design to17 months from start Detailed Design to

    OQ completeOQ completeID Task Name

    1 Revised Plan

    2 Project Budget Set

    3 Board approval

    4 Basic Design

    5 Detail Design

    6 Fabrication7 Fill Line testing

    8 Pack and ship Support

    9 Pack and ship process

    10 1st module arrivse on

    11 Permitting

    12 Foundation and Site W

    13 Erect modules

    14 Re-assembly and start

    15 Qualification through O

    16 PQ

    17 Media Fills

    18 Qaul Lots

    19 Stability

    20 FDA review and appro

    2/1

    2/8

    10/17

    1/9

    O N DeJaFeM ApM JuJuAuSeO N D JaF M ApM JuJuAuSeO N D JaFeM ApM Ju JuAu

    2005 2006 2007

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    Click Here & Upgrade

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    14/34

    14ISPE NordicPharmaceutical BiotechnologyMiddle East

    BatchBatch division of design anddivision of design and fabricationfabrication

    n Define and focus on critical areasof the facility

    n Building separated in support area

    and process area to allow for simplified access

    n Building divided into 7 batches

    n The lyophilization area treated as a

    separate batch to allow for earlydispatch of modules to the supplier of the lyophilizer 

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    Click Here & Upgrade

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    15/34

    15ISPE NordicPharmaceutical BiotechnologyMiddle East

    Divide building for simplified accessDivide building for simplified access

    Process Area

    Support Area

    DocumentsPDFComplete

    Click Here & Upgrade

    Expanded FeaturesUnlimited Pages

    Click Here & Upgrade

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    16/34

    16ISPE NordicPharmaceutical BiotechnologyMiddle East

    PrePre--assembled facility at modular assembled facility at modular 

    supplier supplier ’’s workshops workshop

    DocumentsPDFComplete

    C c e e & Upg ade

    Expanded FeaturesUnlimited Pages

    Click Here & Upgrade

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    17/34

    17ISPE NordicPharmaceutical BiotechnologyMiddle East

    Facility required to blend in withFacility required to blend in with

    surroundingssurroundings

    DocumentsPDFComplete

    pg

    Expanded FeaturesUnlimited Pages

    Click Here & Upgrade

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    18/34

    18ISPE NordicPharmaceutical Biotechnology

    Middle East

    StartStart--upup at theat the modular modular supplier supplier ’’ss

    workshopworkshopn The facility was assembled at the

    workshop (except lyo)

    n Start-up and FAT of the followingsystems:

    Filling line

    WFI system

    CIP system

    BAS system

    IMS system

    n Tests documented according toGDP to use for validation

    n Building and Fire officialinspections

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    19/34

    19ISPE NordicPharmaceutical Biotechnology

    Middle East

    Installation of the vial washer Installation of the vial washer 

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    20/34

    20ISPE NordicPharmaceutical Biotechnology

    Middle East

    StartStart--up of the filling machineup of the filling machine

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    E d d F t

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    21/34

    21ISPE NordicPharmaceutical Biotechnology

    Middle East

    Testing of the filling lineTesting of the filling line

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    E d d F t

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    22/34

    22ISPE NordicPharmaceutical Biotechnology

    Middle East

    Disassembly and preparation for Disassembly and preparation for 

    shipmentshipment

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    Expanded Features

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    23/34

    23ISPE NordicPharmaceutical Biotechnology

    Middle East

    Innovative approachInnovative approach

    n Move (part of) the facility to the vendor 

    Use experienced vendor resources

    Use workshop facilities

    Use commissioning capabilities (temporary utilities, etc.)

    Do a thorough debugging and start-up at vendor 

    Make IQ and part of OQ tests in final installation at vendor 

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    Expanded Features

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    24/34

    24ISPE NordicPharmaceutical Biotechnology

    Middle East

    LyoLyo in a boxin a box

    To shorten the time schedule and minimize

    risk and testing, a part of the building was

    sent to BOC Edwards.

    The complete lyophilizer system (chamber,condensor and Compressor skid) wasinstalled directly into the modules and alltesting was performed in their work shop.

    Meanwhile the rest of the building wasalready on its way to the clients site.

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    Expanded Features

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    25/34

    25ISPE NordicPharmaceutical Biotechnology

    Middle East

    Project Delivery GeographyProject Delivery Geography

    SwedenTonawanda

    San Francisco

    HollandSweden

    Tonawanda

    San Francisco

    Holland

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    Expanded Features

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    26/34

    26ISPE NordicPharmaceutical Biotechnology

    Middle East

    Modules atModules at lyolyo supplier supplier ’’s workshops workshop

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    Expanded Features

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    27/34

    27ISPE NordicPharmaceutical Biotechnology

    Middle East

    Modules stacked up withModules stacked up with lyolyo installedinstalled

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    Expanded Features

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    28/34

    28ISPE Nordic

    Pharmaceutical BiotechnologyMiddle East

    FacilityFacility on finalon final sitesite readyready for for dockingdocking of of 

    thethe

    lyolyo

    modulesmodules

    DocumentsPDFCompleteExpanded Features

    Unlimited Pages

    Click Here & Upgrade

    Expanded Features

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    29/34

    29ISPE Nordic

    Pharmaceutical BiotechnologyMiddle East

    Filling line on siteFilling line on site

    DocumentsPDFCompletepUnlimited Pages

    http://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    30/34

    Click Here & Upgrade

    Expanded Features

    http://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    31/34

    31ISPE Nordic

    Pharmaceutical BiotechnologyMiddle East

    AchievementsAchievements

    n  Able to absorb 3 months schedule delay in permits

    n Modular building including all process and clean utility equipment

    designed, fabricated and tested in 10 months

    n Substantial start up, commissioning and testing completed in theworkshops of Pharmadule and BOC Edwards

    n Training executed and operational documentation completed before

    shipment to site

    DocumentsPDFCompletepUnlimited Pages

    PDF

    Click Here & Upgrade

    Expanded Features

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    32/34

    32ISPE Nordic

    Pharmaceutical BiotechnologyMiddle East

    ConclusionsConclusions

    The Modular concept allows for different kinds of FLEXIBILITY

    OWNER:

    - Early finish or deferred start

    - Allocation period of capital expenditure optimized- Much faster depreciation possibilities of the facility (not fixed asset)

    DESIGN & FABRICATION:

    - Customized solution, standardized approach (20/80)

    - Off-site construction in several locations (executor, vendors)- Batch approach to fabrication (independent blocks)

    - Independent site preparation work (not on critical path)

    - Less disturbances for ongoing work on site

    DocumentsPDFCompleteUnlimited Pages

    PDF

    Click Here & Upgrade

    Expanded Features

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    33/34

    33ISPE Nordic

    Pharmaceutical BiotechnologyMiddle East

    ConclusionsConclusions

    The Modular concept allows for different kinds of FLEXIBILITY

    PROJECT TEAM

    - Less client resources required- Focus on core competences

    * Pharmadule (design, execution, validation)* Vendors (installation & testing)* Client (URS, process, PQ, manufacturing start-up)

    FUTURE

    - Built in flexibility for new equipment/processes- Ease of expansion with minimal down-time- Re-location at existing or to new site

    Result: FLEXIBLE & FAST(ER) PROJECT Implementation

    DocumentsPDFCompleteUnlimited Pages

    PDF

    Click Here & Upgrade

    Expanded FeaturesU li it d P

    http://www.pdfcomplete.com/1002/2001/upgrade.htmhttp://www.pdfcomplete.com/1002/2001/upgrade.htm

  • 8/13/2019 Innovative Design and Fast Trach Project Implementation

    34/34

    34ISPE Nordic

    Pharmaceutical BiotechnologyMiddle East

    Thank you for the attention!

    Questions?