    DYCE/CN/I/MDU : Division Sub-dvision

    Contract certificate No.CC-33/XEN/MDU/

    Sanction for work: 2000/W1/GC/S/1 dt.9.1.2008.

    Name of Contractor:

    Mount Poonamallee Road, Manapakkam, chennai-89

    Contract Agt.No.and date: W.Order No.and date:

    Agt. No. 49/CN/2008 dt. 01.07.2008

    Date of commencement of work: 05.03.2008 Date of completion: In progress

    Voucher No. MDU / GC/ MDU - VPT / / II /2012 DT. .01.2012

    Upto date Since last certi ficate

    1 2 3 4 5 8 9

    Rs. Rs. P Rs. P

    Annexure-A

    10M3 0.000 1217.570 1) 102-b 326 39692.78 0.00

    10M3 0.000 901.251 3) 103-b 358 32264.79 0.00

    10M3 0.000 3895.806 4) 103-c 542 211152.69 0.00

    10M3 0.000 231.379 7) 106 230 5321.72 0.00

    10M3 0.000 4.980 8) 108 243 121.01 0.00

    M3 0.000 398.900 11)201 190 75791.00 0.00

    M3 0.000 1901.027 16) 401 103 195805.78 0.00

    M3 0.000 3129.920 17) 402 209 654153.28 0.00

    M3 0.000 66.724 19) 404 64 4270.34 0.00

    M3 0.000 472.514 20) 405 60 28350.84 0.00

    M3 0.000 303.866 21) 406 125 37983.25 0.00

    M3 0.000 49.845 25) 412 157 7825.67 0.00

    M3 0.000 624.357 36)504-a 606 378360.34 0.00

    M3 0.000 79.924 37)506-a 1064 85039.14 0.00

    M3 0.000 250.000 38)507-a 1212 303000.00 0.00

    M3 0.000 1690.986 39) 509-a(I) 772 1305441.19 0.00

    SOUTHERN RAILWAY

    XEN/GC/MDU

    Month of: 06.02.2012

    Name of work: Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli

    (Excluding) - Proposed construction of Bridges, station buildings, earth work, level

    crossings, platform shelters, circulating area, track linking, welding, supply of ballast,signal and telecommunication works and electrical works.(Reach-I)

    M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,

    Unit Quantity

    executed since

    last certificate

    Quantity

    executed

    u todate as er

    Items Rate Amount Reference to

    item number of

    the schedule of

    Remarks

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    2/162

    M3 0.000 150.032 40)511-a(I) 2798 419789.54 0.00

    M3 0.000 3638.851 41)511-b(I) 3087 11233133.04 0.00

    M3 0.000 24.870 42)511-c(I) 3337 82991.19 0.00

    M3 0.000 2917.092 43)511(d)I 2537 7400662.40 0.00

    M3 0.000 99.949 46)514i 1474 147324.83 0.00

    M3 0.000 99.949 50)515(d) 235 23488.02 0.00

    10m2 0.000 1.155 55)527-a 706 81.54 0.00

    10m2 0.000 1700.557 56)527-b 674 114617.54 0.00

    M3 0.000 173.985 58)602-d 912 158674.32 0.00

    M3 0.000 4.850 59)617 31 150.35 0.00

    M3 0.000 69.885 60)626-a 59 4123.22 0.00

    M3 0.000 10.410 61)626-b 38 395.58 0.00

    10M2 0.000 618.610 95)1002-a 217 13423.84 0.00

    10M2 0.000 41.921 106)1106 187 783.92 0.00

    10M2 0.000 59.025 115)1141(

    b)i

    2674 15783.29 0.00

    10M2 0.000 194.000 117)1217(

    a)ii

    606 11756.40 0.00

    10M2 0.000 194.000 118)1218(

    b)ii

    1666 32320.40 0.00

    Total of annexure-A 23024073.24 0.00

    5795159.23 0.00

    Total of annexure-A 28819232.47 0.00

    Annexue-B

    Mtr. 0.000 5336.740 1)Unaffected

    3400 18144916.00 0.00

    Mtr. 0.000 1414.575 2)Unaffected

    6000 8487450.00 0.00

    3) CN of

    precast

    concrete

    superstructur

    e with 'I'

    girder of a

    single track

    etc. for a

    span of

    12.20m.

    Span 0.000 32.000 1)Unaffected

    (at 15%)

    858000 4118400.00 0.00

    Add (+)25.17

  • 7/30/2019 Inoice Nov2012 Reach-1

    3/162

    Span 0.000 32.000 2-Unaffected -

    @ 15%

    858000 4118400.00 0.00

    Span 0.000 28.000 3- Onprocurement,

    testing and

    bringing to

    site of appd

    quality

    neoprene

    bearings (at5%)

    858000 1201200.00 0.00

    Span 0.000 35.000 4-Unaffected

    (at 5%)

    858000 1501500.00 0.00

    Span 0.000 32.000 5-Unaffected

    (at 25%)

    858000 6864000.00 0.00

    Span 0.000 32.000 6)Unaffected (

    at 10%)

    858000 2745600.00 0.00

    Span 0.000 26.000 7) Casting ofdiaphrams

    reqd for one

    span incldeck slab,

    RCC ballast

    retaines,

    wearing coat

    etc. ( at 15%)

    858000 3346200.00 0.00

    Each 0.000 5.000 12)Unaffected

    80000 400000.00 0.00

    Each 0.00 1.00 13)Unaffected

    1260 1260.00 0.00

    Each 0.00 23.00 14)Unaffected(A

    t 75%)

    13000 224250.00 0.00

    M3 0.000 1106.983 19)Unaffected

    3300 3653043.90 0.00

    M3 0.000 1068.323 20)Launching

    the precast

    RCC box

    segements

    for clear

    spans as

    reqd in

    convenient

    lengths etc.

    2500 2670807.50 0.00

    Span 0.000 18.000 21)Unaffected

    5000 90000.00 0.00

    Span 0.000 12.000 26)Unaffected

    30800 369600.00 0.00

    57936627.40 0.00

    24333383.51 0.00

    82270010.91 0.00

    Total of annexure-B

    Add (+)42%

    Total of annexure-B

    Annexure-C

  • 7/30/2019 Inoice Nov2012 Reach-1

    4/162

    10M3 16400 131860 1) E.W. informing bank

    for widening

    the exg MG

    formation o

    both sides to

    BG std incl

    yard etc

    1300 17141800.00 2132000.00

    10M3 0 30000 2)Unaffected

    150 450000.00 0.00

    10M3 5685.74 16000 4) Supply &spreading

    moorum /

    gravel for

    widening &

    regrading the

    exg MG

    formation to

    BG std with

    contr or other

    means incl

    excavation

    etc.

    3000 4800000.00 1705722.00

    10M3 0 13304.43 6)Unaffected

    1300 1729575.90 0.00

    24121375.90 3837722.00

    10130977.88 1611843.24

    34252353.78 5449565.24

    0.00 0.00

    Mtr. 0.000 2030018)

    Unaffected 30 609000.00 0.00

    Ten cum 0.000 12495.000 35)Salavaging

    an scooping

    out the exg

    old stone

    balast

    available

    with muck

    and dust in

    MG track

    etc.

    500 624750.00 0.00

    Total of annexure-C

    Add (+) 42%

    Total of annexure-C

    Annexure-D

    Total of annexure-D

    Annexure-E

  • 7/30/2019 Inoice Nov2012 Reach-1

    5/162

    Ten cum 0.000 2201.310 37) Leadingof 50mm

    size ballast

    from the

    stacks

    available

    alonag side

    the

    alignment

    with a max

    lead of 100mtr., l if t ,

    dumping the

    same etc.

    500 110065.50 0.00

    Ten cum 0.000 2087.430 38) Extraover item

    above for

    lead beyond

    100m and

    upto 1km.

    150 31311.45 0.00

    Ten cum 0.000 5236.470 39) Leadingof salvaged

    stone ballast

    from stacks

    available

    aongside the

    alignment

    etc.

    350 183276.45 0.00

    Total Ann 'E' 1558403.40 0.00

    Add (+)44% 685697.50 0.00

    2244100.90 0.00

    Tonne 0.000 218.008 1) Trans

    of rails,

    switches,

    crossings,

    tongue

    rails etc.

    by means

    of contr

    road

    vehcles

    etc. Upto

    100km,

    unloading

    and

    stacking

    etc.

    350 76302.80 0.00

    Tonnekilo

    metre

    0.00 21800.80 2) Extra

    over item

    above (1)

    for 100-

    200km

    lead

    2 43601.60 0.00

    Total of annexure-E

    Annexure-F

  • 7/30/2019 Inoice Nov2012 Reach-1

    6/162

    Mtr. 0.000 69585.00 3)Unaffected

    3.30 229630.50 0.00

    Tonne 0.000 3166.483 4) Trans ofCl-I & II rails

    upto 13m

    long

    switches,

    SEJs, Glued

    joints etc. for

    lead upto

    50km.

    255.00 807453.17 0.00

    Sleeper 0.000 51978 7) Trans ofBG PSC

    sleepers for

    lead upto

    100km

    80.00 4158240.00 0.00

    Sleerper

    per km

    0.000 130306 8)Unaffected

    0.46 59940.76 0.00

    Set 0.000 4.000 11) Trans ofPSC Pts &

    Xing 1 in 8

    1/2 - from

    factory to

    100km

    12000 48000.00 0.00

    Set 0.000 4.000 15) Trans ofPSC Pts &

    Xing 1 in 12 -

    from factory

    to 100km

    18000 72000.00 0.00

    5495168.83 0.00

    2857487.79 0.00

    8352656.62 0.00

    0.00 0.00

    1.Collecti

    on &

    supply of

    ballast at

    yard

    10M3 0.000 14677.110 a) 100%

    unaffecte

    d

    7000 10273977.00 0.00

    10M3 0.000 521.54 b)95%

    unaffecte

    d

    7000 346824.10 0.00

    10M3 0.000 256.07 c)90%unaffecte

    d

    7000 161324.10 0.00

    2. Along

    side

    collec-tion

    & supply

    of ballast

    10M3 0.000 28766.04 a)100% 7000 20136228.00 0.00

    Total of annexure-F

    Add (+)52%

    Annexure-G

    Total of annexure-G

    Annexure-H

  • 7/30/2019 Inoice Nov2012 Reach-1

    7/162

    10M3 0.000 0.000 b)95%

    unaffecte

    d

    7000 0.00 0.00

    10M3 0.000 0.000 c)90%

    unaffecte

    d

    7000 0.00 0.00

    30918353.20 0.00

    2720815.08 0.00

    Total 33639168.28 0.00

    0.00 0.00

    MT 0.000 6141.176 1) Supply ofordy portland

    cement

    grade 43/53

    confirming toIS 8112 etc.

    4400 27021174.40 0.00

    27021174.40 0.00

    5404234.88 0.00

    32425409.28 0.00

    MT 0.000 1440.536 02) Supplyof MS/TMT-

    Fe-415

    grade steelrods of

    various dia.

    A)

    75%stage

    payment

    36000 38894472.00 0.00

    MT 0.000 1440.536 B) 25%stage

    payment

    36000 12964824.00 0.00

    MT 0.000 79.695 C) 100%payment

    36000 2869020.00 0.00

    Total 54728316.00 0.00Add +5%

    as per agt.2736415.80 0.00

    57464731.80 0.00

    5356956.00 0.00

    Total for Ann-A 28819232.47 0.00

    Total for Ann-B 82270010.91 0.00

    Total of annexure-H

    Add (+) 8.80%

    Annexure-I

    Total of annexure-I

    Annexure-J

    Total of annexure-J

    Add (+)20%

    Total of annexure-J

    Annexure-K

    Total of annexure-K

    Annexure-L & M

    Total Annex. L & M

    ABSTRACT

  • 7/30/2019 Inoice Nov2012 Reach-1

    8/162

    Total for Ann-C 34252353.78 5449565.24

    Total for Ann-D 0.00 0.00

    Total for Ann-E 2244100.90 0.00

    Total for Ann-F 8352656.62 0.00

    Total for Ann-G 0.00 0.00

    Total for Ann-H 33639168.28 0.00

    Total for Ann-I 0.00 0.00

    Total for Ann-J 32425409.28 0.00

    Total for Ann-K 57464731.80 0.00

    Total for Ann-L 4755663.00 0.00

    Total for Ann-M 601293.00 0.00

    Grand total 284824620.04 5449565.24

    or say 284824620.00 5449565.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    9/162

    Upto date Since last

    Certificate

    Grand total 284824620.00 5449565.00

    284824620.00 5449565.00

    0.00 0.00

    Total value of work done 284824620.00 5449565.00

    Less value of work shown on last certificate vide CC-32 279375055.00 0.00

    Amount due 5449565.00 5449565.00

    XEN/CN/MDU

    Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

    Unit Qty. executedsince last

    certificate

    Qty. executed up-

    to-date as per

    M.Book

    Items Rate Amount Refer. To

    item No. of

    the SOR

    Remarks.

    Total value of work done including

    Deduct 10% on the schedule rates to become

    (Rupees Fifty Four Lakhs Forty Nine Thousand Five Hundred and Sixty Five Only)

    The measurements were made by JE/CN/W/MDU on 15.07.2011 from 04 to 08 and 14 of M.B. No. 4760 and

    on 06.07.2011 from 70 to 99 of M.B.No. 1732. (Restricted quantity now released)

    Dated 06.02.2012 Contractor XEN/CN/ MDU

    Certified that the foregoing claim is correct that the necessary measurements were taken by JE/CN/W/MDU on

    15.07.2011 from 04 to 08 and 14 of M.B. No. 4760 and on 06.07.2011 from 70 to 99 of M.B.No. 1732 and

    100% test check by me on 11.09.2011 vide page 88 and 97 of M.B. No. 1732 and on 7.10.2011 of M.B. No.

    4760 and that the work has been satisfatorily performed. (Restricted quantity now released)

    Dated 06.02.2012 Contractor XEN/CN/ MDU

    Certified that no materials the cost of which has not been recovered have been issued to the contractor except

    such as are specifically provided for in the agreement.

    Dated 06.02.2012 XEN/CN/ MDU

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    10/162

    Rs. P. Rs. P.

    284824620.00

    279375055.00

    0.00

    108991.00

    10899.00

    Educational cess 3% on IT & SC 3597.00

    108991.00

    0.00

    50.00

    By Cheque 5217037.00

    284824620.00 284824620.00

    Paid in my presence.

    Signature and Designation of Witnessing Officer.

    Dated :

    Chargeable to 105 14044 - 20 1431 03 Rs. 54,49,565 /- and to be included in the

    accounts for the month of February-2012. Payment by EFT.

    Sr.SO(A)/Dy.CE/CN/I/MDU Dy.CE/CN/I/MDU

    Memo of payments made

    Total value of work done

    Amount of previous payments from last

    Certificate No. CC-32

    Forwarded to Financial Adviser and Chief

    Security deposit at 10% of bill

    Income tax at 2%

    Sur charge at 10% on IT

    Sales tax @2% (VAT)

    Rec. towards hire charges

    Bill copy

    Grand total

    Recvied Rs.54,49,565 /- Rupees Fifty Four Lakhs Forty Nine Thousand Five Hundred and Sixty Five

    Only)

    STAMP

    Signature of Contractor

    Note: The Payees acknowledgement should be for the gross amount paid

  • 7/30/2019 Inoice Nov2012 Reach-1

    11/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    12/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    13/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    14/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    15/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    16/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    17/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    18/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    19/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    20/162

    5449565.00

    5449565.00

    5449565.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    21/162

    DYCE/CN/I/MDU : Division Sub-dvision

    Contract certificate No.CC-32/XEN/MDU/

    Sanction for work: 2000/W1/GC/S/1 dt.9.1.2008.

    Name of Contractor:

    Mount Poonamallee Road, Manapakkam, chennai-89

    Contract Agt.No.and date: W.Order No.and date:

    Agt. No. 49/CN/2008 dt. 01.07.2008

    Date of commencement of work: 05.03.2008 Date of completion: In progress

    Voucher No. MDU / GC/ MDU - VPT / / I /2012 DT. .01.2012

    Upto date Since last cert ifi cate

    1 2 3 4 5 8 9

    Rs. Rs. P Rs. P

    Annexure-A

    10M3 0.000 1217.570 1) 102-b 326 39692.78 0.00

    10M3 0.000 901.251 3) 103-b 358 32264.79 0.00

    10M3 0.000 3895.806 4) 103-c 542 211152.69 0.00

    10M3 0.000 231.379 7) 106 230 5321.72 0.00

    10M3 0.000 4.980 8) 108 243 121.01 0.00

    M3 0.000 398.900 11)201 190 75791.00 0.00

    M3 0.000 1901.027 16) 401 103 195805.78 0.00

    M3 0.000 3129.920 17) 402 209 654153.28 0.00

    M3 0.000 66.724 19) 404 64 4270.34 0.00

    M3 0.000 472.514 20) 405 60 28350.84 0.00

    M3 0.000 303.866 21) 406 125 37983.25 0.00

    M3 0.000 49.845 25) 412 157 7825.67 0.00

    M3 0.000 624.357 36)504-a 606 378360.34 0.00

    M3 0.000 79.924 37)506-a 1064 85039.14 0.00

    Reference to

    item number of

    the schedule of

    rates

    RemarksUnit Quantity

    executed since

    last certificate

    Quantity executed

    uptodate as per

    measu- rement

    book

    Items Rate Amount

    SOUTHERN RAILWAY

    XEN/GC/MDU

    Month of: 30.01.2012

    Name of work: Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli

    (Excluding) - Proposed construction of Bridges, station buildings, earth work, level

    crossings, platform shelters, circulating area, track linking, welding, supply of ballast,signal and telecommunication works and electrical works.(Reach-I)

    M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    22/162

    M3 0.000 250.000 38)507-a 1212 303000.00 0.00

    M3 0.000 1690.986 39) 509-a(I) 772 1305441.19 0.00

    M3 0.000 150.032 40)511-a(I 2798 419789.54 0.00

    M3 0.000 3638.851 41)511-b(I 3087 11233133.04 0.00

    M3 0.000 24.870 42)511-c(I 3337 82991.19 0.00

    M3 0.000 2917.092 43)511(d)I 2537 7400662.40 0.00

    M3 0.000 99.949 46)514i 1474 147324.83 0.00

    M3 0.000 99.949 50)515(d) 235 23488.02 0.00

    10m2 0.000 1.155 55)527-a 706 81.54 0.00

    10m2 0.000 1700.557 56)527-b 674 114617.54 0.00

    M3 0.000 173.985 58)602-d 912 158674.32 0.00

    M3 0.000 4.850 59)617 31 150.35 0.00

    M3 0.000 69.885 60)626-a 59 4123.22 0.00

    M3 0.000 10.410 61)626-b 38 395.58 0.00

    10M2 0.000 618.610 95)1002-a 217 13423.84 0.00

    10M2 0.000 41.921 106)1106 187 783.92 0.00

    10M2 0.000 59.025 115)1141(

    b)i

    2674 15783.29 0.00

    10M2 0.000 194.000 117)1217(

    a)ii

    606 11756.40 0.00

    10M2 0.000 194.000 118)1218(b)ii

    1666 32320.40 0.00

    Total of annexure-A 23024073.24 0.00

    5795159.23 0.00

    Total of annexure-A 28819232.47 0.00

    Annexue-B

    Mtr. 0.000 5336.740 1)Unaffected

    3400 18144916.00 0.00

    Mtr. 0.000 1414.575 2)

    Unaffected

    6000 8487450.00 0.00

    3) CN of

    precast

    concrete

    superstructur

    e with 'I'

    girder of a

    single track

    etc. for a

    span of

    12.20m.

    Add (+)25.17

  • 7/30/2019 Inoice Nov2012 Reach-1

    23/162

    Span 0.000 32.000 1)Unaffected

    (at 15%)

    858000 4118400.00 0.00

    Span 0.000 32.000 2-Unaffected -

    @ 15%

    858000 4118400.00 0.00

    Span 0.000 28.000 3- Onprocurement,

    testing and

    bringing to

    site of appd

    quality

    neoprene

    bearings (at

    5%)

    858000 1201200.00 0.00

    Span 0.000 35.000 4-Unaffected

    (at 5%)

    858000 1501500.00 0.00

    Span 0.000 32.000 5-Unaffected

    (at 25%)

    858000 6864000.00 0.00

    Span 0.000 32.000 6)Unaffected (

    at 10%)

    858000 2745600.00 0.00

    Span 0.000 26.000 7) Casting ofdiaphrams

    reqd for one

    span incl

    deck slab,

    RCC ballast

    retaines,

    wearing coat

    etc. ( at 15%)

    858000 3346200.00 0.00

    Each 0.000 5.000 12)Unaffected

    80000 400000.00 0.00

    Each 0.00 1.00 13)

    Unaffected

    1260 1260.00 0.00

    Each 0.00 23.00 14)Unaffected(A

    t 75%)

    13000 224250.00 0.00

    M3 0.000 1106.983 19)Unaffected

    3300 3653043.90 0.00

    M3 0.000 1068.323 20)Launching

    the precast

    RCC box

    segements

    for clear

    spans as

    reqd in

    convenient

    lengths etc.

    2500 2670807.50 0.00

    Span 0.000 18.000 21)Unaffected

    5000 90000.00 0.00

    Span 0.000 12.000 26)Unaffected

    30800 369600.00 0.00

    57936627.40 0.00

    24333383.51 0.00

    82270010.91 0.00

    Annexure-C

    Total of annexure-B

    Add (+)42%

    Total of annexure-B

  • 7/30/2019 Inoice Nov2012 Reach-1

    24/162

    10M3 0 115460 1)Unaffected

    1300 15009800.00 0.00

    10M3 0 30000 2)Unaffected

    150 450000.00 0.00

    10M3 0 10314.26 4)Unaffected

    3000 3094278.00 0.00

    10M3 0 13304.43 6)Unaffected

    1300 1729575.90 0.00

    20283653.90 0.00

    8519134.64 0.0028802788.54 0.00

    0.00 0.00

    Mtr. 0.000 20300 18)Unaffected

    30 609000.00 0.00

    Ten cum 0.000 12495.000 35)Salavaging

    an scooping

    out the exg

    old stone

    balast

    available

    with muck

    and dust in

    MG track

    etc.

    500 624750.00 0.00

    Ten cum 0.000 2201.310 37) Leadingof 50mm

    size ballast

    from the

    stacks

    available

    alonag side

    thealignment

    with a max

    lead of

    100mtr., l if t ,

    dumping the

    same etc.

    500 110065.50 0.00

    Ten cum 0.000 2087.430 38) Extraover item

    above for

    lead beyond

    100m and

    upto 1km.

    150 31311.45 0.00

    Ten cum 0.000 5236.470 39) Leadingof salvaged

    stone ballast

    from stacks

    available

    aongside the

    alignment

    etc.

    350 183276.45 0.00

    Annexure-E

    Total of annexure-C

    Add (+) 42%Total of annexure-C

    Annexure-D

    Total of annexure-D

  • 7/30/2019 Inoice Nov2012 Reach-1

    25/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    26/162

    5495168.83 0.00

    2857487.79 0.00

    8352656.62 0.00

    0.00 0.00

    1.Collecti

    on &

    supply of

    ballast at

    yard

    10M3 0.000 14677.110 a) 100%

    unaffecte

    d

    7000 10273977.00 0.00

    10M3 0.000 521.54 b)95%

    unaffecte

    d

    7000 346824.10 0.00

    10M3 0.000 256.07 c)90%

    unaffecte

    d

    7000 161324.10 0.00

    2. Along

    side

    collec-tion

    & supply

    of ballast

    10M3 988.980 28766.04 a)100% 7000 20136228.00 692286.00

    10M3 0.000 0.000 b)95%

    unaffecte

    d

    7000 0.00 0.00

    10M3 0.000 0.000 c)90%

    unaffecte

    d

    7000 0.00 0.00

    30918353.20 692286.00

    2720815.08 60921.17

    Total 33639168.28 753207.17

    0.00 0.00

    MT 0.000 6141.1761) Supply of

    ordy portland

    cement

    grade 43/53

    confirming to

    IS 8112 etc.

    4400 27021174.40 0.00

    27021174.40 0.00

    5404234.88 0.00

    32425409.28 0.00

    Annexure-J

    Total of annexure-J

    Add (+)20%

    Total of annexure-J

    Total of annexure-G

    Annexure-H

    Total of annexure-H

    Add (+) 8.80%

    Annexure-I

    Total of annexure-I

    Total of annexure-F

    Add (+)52%

    Annexure-G

  • 7/30/2019 Inoice Nov2012 Reach-1

    27/162

    MT 0.000 1440.536 02) Supplyof MS/TMT-

    Fe-415

    grade steel

    rods of

    various dia.

    A)

    75%stage

    payment

    36000 38894472.00 0.00

    MT 0.000 1440.536 B) 25%stage

    payment

    36000 12964824.00 0.00

    MT 0.000 79.695 C) 100%payment

    36000 2869020.00 0.00

    Total 54728316.00 0.00Add +5%

    as per agt.2736415.80 0.00

    57464731.80 0.00

    5356956.00 0.00

    Total for Ann-A 28819232.47 0.00

    Total for Ann-B 82270010.91 0.00

    Total for Ann-C 28802788.54 0.00

    Total for Ann-D 0.00 0.00

    Total for Ann-E 2244100.90 0.00

    Total for Ann-F 8352656.62 0.00

    Total for Ann-G 0.00 0.00

    Total for Ann-H 33639168.28 753207.17

    Total for Ann-I 0.00 0.00

    Total for Ann-J 32425409.28 0.00

    Total for Ann-K 57464731.80 0.00

    Total for Ann-L 4755663.00 0.00

    Total for Ann-M 601293.00 0.00

    Grand total 279375054.80 753207.17

    or say 279375055.00 753207.00

    Annexure-L & M

    Total Annex. L & M

    ABSTRACT

    Annexure-K

    Total of annexure-K

  • 7/30/2019 Inoice Nov2012 Reach-1

    28/162

    Upto date Since last

    Certificate

    Grand total 279375055.00 753207.00

    279375055.00 753207.00

    0.00 0.00

    Total value of work done 279375055.00 753207.00

    Less value of work shown on last certificate vide CC-31 278621848.00 0.00

    Amount due 753207.00 753207.00

    XEN/CN/MDU

    Test checked by me10.01.12 at 47 of MB. No. 705100

    Dy.CE / CN-I / MDU

    Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

    Certified that on materials the cost of which has not been recovered have been issued to the contractor except

    such as are specifically provided for in the agreement.

    Dated 30.01.2012 XEN/CN/ MDU

    Deduct 10% on the schedule rates to become

    (Rupees Seven Lakhs Fifty Three Thousand Two Hundred and Seven Only)

    The measurements were made by XEN/CN on 09.01.12 from 46 to 49 of M.B.No. 7051.

    Dated 30.01.2012 Contractor XEN/CN/ MDU

    Certified that the foregoing claim is correct that the necessary measurements were taken by me on 09.01.12

    from 46 to 49 of M.B.No. 7051 and test check by DYCE on 10.01.2012 and that the work has been satisfatorily

    performed.

    CNGC/ MDU

    Amount Refer. To

    item No. of

    the SOR

    Remarks.

    Total value of work done including prospective

    payment to 10% deductions.

    Unit Qty. executedsince last

    certificate

    Qty. executed up-

    to-date as per

    M.Book

    Items Rate

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    29/162

    Rs. P. Rs. P.

    279375055.00

    278621848.00

    0.00

    15064.00

    1506.00

    Educational cess 3% on IT & SC 497.00

    30128.00

    0.00

    50.00

    By Cheque 705962.00

    279375055.00 279375055.00

    Paid in my presence.

    Signature and Designation of Witnessing Officer.

    Dated :

    Bill copy

    Grand total

    Recvied Rs.7,53,207 /- Rupees Seven Lakhs Fifty Three Thousand Two Hundred and Seven Only)

    STAMP

    Signature of Contractor

    Note: The Payees acknowledgement should be for the gross amount paid

    Security deposit at 10% of bill

    Income tax at 2%

    Sur charge at 10% on IT

    Sales tax @2% (VAT)

    S.T at 4% - ballast - 7,53,207 /-

    Rec. towards hire charges

    Memo of payments made

    Total value of work done

    Amount of previous payments from last

    Certificate No. CC-31

    Forwarded to Financial Adviser and Chief

    Chargeable to 105 14044 - 20 1444 03 Rs. 7,53,207 /- and to be included in the

    accounts for the month of January-2012. Payment by EFT.

    Sr.SO(A)/Dy.CE/CN/I/MDU Dy.CE/CN/I/MDU

  • 7/30/2019 Inoice Nov2012 Reach-1

    30/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    31/162

    1854.63

  • 7/30/2019 Inoice Nov2012 Reach-1

    32/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    33/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    34/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    35/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    36/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    37/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    38/162

    753207.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    39/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    40/162

    M3 0.000 250.000 38)507-a 1212 303000.00 0.00

    M3 0.000 1690.986 39) 509-a(I) 772 1305441.19 0.00

    M3 0.000 150.032 40)511-a(I 2798 419789.54 0.00

    M3 133.601 3638.851 41)511-b(I 3087 11233133.04 412426.29

    M3 24.870 24.870 42)511-c(I) 3337 82991.19 82991.19

    M3 41.141 2917.092 43)511(d)I 2537 7400662.40 104374.72

    M3 0.000 99.949 46)514i 1474 147324.83 0.00

    M3 0.000 99.949 50)515(d) 235 23488.02 0.00

    10m2 0.000 1.155 55)527-a 706 81.54 0.00

    10m2 0.000 1700.557 56)527-b 674 114617.54 0.00

    M3 0.000 173.985 58)602-d 912 158674.32 0.00

    M3 0.000 4.850 59)617 31 150.35 0.00

    M3 0.000 69.885 60)626-a 59 4123.22 0.00

    M3 0.000 10.410 61)626-b 38 395.58 0.00

    10M2 0.000 618.610 95)1002-a 217 13423.84 0.00

    10M2 0.000 41.921 106)1106 187 783.92 0.00

    10M2 0.000 59.025 115)1141(

    b)i

    2674 15783.29 0.00

    10M2 0.000 194.000 117)1217(

    a)ii

    606 11756.40 0.00

    10M2 0.000 194.000 118)1218(b)ii

    1666 32320.40 0.00

    Total of annexure-A 23024073.24 599792.20

    5795159.23 150967.70

    Total of annexure-A 28819232.47 750759.90

    Annexue-B

    Mtr. 0.000 5336.740 1)Unaffected

    3400 18144916.00 0.00

    Mtr. 0.000 1414.575 2)

    Unaffected

    6000 8487450.00 0.00

    3) CN of

    precast

    concrete

    superstructur

    e with 'I'

    girder of a

    single track

    etc. for a

    span of

    12.20m.

    Add (+)25.17

  • 7/30/2019 Inoice Nov2012 Reach-1

    41/162

    Span 0.000 32.000 1)Unaffected

    (at 15%)

    858000 4118400.00 0.00

    Span 0.000 32.000 2-Unaffected -

    @ 15%

    858000 4118400.00 0.00

    Span 13.000 28.000 3- Onprocurement,

    testing and

    bringing to

    site of appd

    quality

    neoprene

    bearings (at

    5%)

    858000 1201200.00 557700.00

    Span 0.000 35.000 4-Unaffected

    (at 5%)

    858000 1501500.00 0.00

    Span 0.000 32.000 5-Unaffected

    (at 25%)

    858000 6864000.00 0.00

    Span 0.000 32.000 6)Unaffected (

    at 10%)

    858000 2745600.00 0.00

    Span 16.000 26.000 7) Casting ofdiaphramsreqd for one

    span incl

    deck slab,

    RCC ballast

    retaines,

    wearing coat

    etc. ( at 15%)

    858000 3346200.00 2059200.00

    Each 0.000 5.000 12)Unaffected

    80000 400000.00 0.00

    Each 0.00 1.00 13)Unaffected

    1260 1260.00 0.00

    Each 0.00 23.00 14)Unaffected(A

    t 75%)

    13000 224250.00 0.00

    M3 0.000 1106.983 19)Unaffected

    3300 3653043.90 0.00

    M3 448.023 1068.323 20)Launching

    the precast

    RCC box

    segements

    for clear

    spans as

    reqd in

    convenient

    lengths etc.

    2500 2670807.50 1120057.50

    Span 0.000 18.000 21)Unaffected

    5000 90000.00 0.00

    Span 0.000 12.000 26)Unaffected

    30800 369600.00 0.00

    57936627.40 3736957.50

    24333383.51 1569522.15

    82270010.91 5306479.65

    10M3 0 115460 1)Unaffected

    1300 15009800.00 0.00

    Annexure-C

    Total of annexure-B

    Add (+)42%

    Total of annexure-B

  • 7/30/2019 Inoice Nov2012 Reach-1

    42/162

    10M3 0 30000 2)Unaffected

    150 450000.00 0.00

    10M3 0 10314.26 4)Unaffected

    3000 3094278.00 0.00

    10M3 0 13304.43 6)Unaffected

    1300 1729575.90 0.00

    20283653.90 0.00

    8519134.64 0.00

    28802788.54 0.00

    0.00 0.00

    Mtr. 0.000 20300 18)Unaffected

    30 609000.00 0.00

    Ten cum 2232.630 12495.000 35)Salavaging

    an scooping

    out the exg

    old stone

    balast

    available

    with muck

    and dust in

    MG track

    etc.

    500 624750.00 111631.50

    Ten cum 2201.310 2201.310 37) Leadingof 50mm

    size ballast

    from the

    stacks

    available

    alonag side

    the

    alignment

    with a max

    lead of 100mtr., l if t ,

    dumping the

    same etc.

    500 110065.50 110065.50

    Ten cum 2087.430 2087.430 38) Extraover item

    above for

    lead beyond

    100m and

    upto 1km.

    150 31311.45 31311.45

    Ten cum 5236.470 5236.470 39) Leadingof salvaged

    stone ballast

    from stacksavailable

    aongside the

    alignment

    etc.

    350 183276.45 183276.45

    Total Ann 'E' 1558403.40 436284.90

    Add (+)44% 685697.50 191965.36

    2244100.90 628250.26

    Annexure-E

    Total of annexure-E

    Total of annexure-C

    Add (+) 42%

    Total of annexure-C

    Annexure-D

    Total of annexure-D

  • 7/30/2019 Inoice Nov2012 Reach-1

    43/162

    Tonne 29.800 218.008 1) Trans

    of rails,

    switches,

    crossings,

    tongue

    rails etc.by means

    of contr

    road

    vehcles

    etc. Upto

    100km,

    unloading

    and

    stacking

    etc.

    350 76302.80 10430.00

    Tonnekilo

    metre

    2980.00 21800.80 2) Extra

    over item

    above (1)

    for 100-

    200km

    lead

    2 43601.60 5960.00

    Mtr. 0.000 69585.00 3)Unaffected

    3.30 229630.50 0.00

    Tonne 666.423 3166.483 4) Trans ofCl-I & II rails

    upto 13m

    long

    switches,

    SEJs, Glued

    joints etc. for

    lead upto

    50km.

    255.00 807453.17 169937.87

    Sleeper 1178.000 51978 7) Trans ofBG PSCsleepers for

    lead upto

    100km

    80.00 4158240.00 94240.00

    Sleerper

    per km

    0.000 130306 8)Unaffected

    0.46 59940.76 0.00

    Set 4.000 4.000 11) Trans ofPSC Pts &

    Xing 1 in 8

    1/2 - from

    factory to

    100km

    12000 48000.00 48000.00

    Set 4.000 4.000 15) Trans ofPSC Pts &

    Xing 1 in 12 -from factory

    to 100km

    18000 72000.00 72000.00

    5495168.83 400567.87

    2857487.79 208295.29

    8352656.62 608863.16

    Annexure-F

    Total of annexure-F

    Add (+)52%

    Annexure-G

  • 7/30/2019 Inoice Nov2012 Reach-1

    44/162

    0.00 0.00

    1.Collecti

    on &

    supply of

    ballast at

    yard

    10M3 0.000 14677.110 a) 100%unaffecte

    7000 10273977.00 0.00

    10M3 0.000 521.54 b)95%

    unaffecte

    7000 346824.10 0.00

    10M3 0.000 256.07 c)90%

    unaffecte

    7000 161324.10 0.00

    2. Along

    side

    collec-tion

    & supply

    of ballast

    10M3 1860.770 27777.06 a)100% 7000 19443942.00 1302539.00

    10M3 0.000 0.000 b)95%

    unaffecte

    7000 0.00 0.00

    10M3 0.000 0.000 c)90%

    unaffecte

    7000 0.00 0.00

    30226067.20 1302539.00

    2659893.91 114623.43

    Total 32885961.11 1417162.43

    0.00 0.00

    MT 83.750 6141.176 1) Supply ofordy portland

    cement

    grade 43/53

    confirming to

    IS 8112 etc.

    4400 27021174.40 368500.00

    27021174.40 368500.00

    5404234.88 73700.00

    32425409.28 442200.00

    Annexure-J

    Total of annexure-J

    Add (+)20%

    Total of annexure-J

    Annexure-K

    Total of annexure-G

    Annexure-H

    Total of annexure-H

    Add (+) 8.80%

    Annexure-I

    Total of annexure-I

  • 7/30/2019 Inoice Nov2012 Reach-1

    45/162

    MT 0.000 1440.536 02) Supplyof MS/TMT-

    Fe-415

    grade steel

    rods of

    various dia.

    A)

    75%stage

    payment

    36000 38894472.00 0.00

    MT 0.000 1440.536 B) 25%stage

    payment

    36000 12964824.00 0.00

    MT 13.643 79.695 C) 100%payment

    36000 2869020.00 491148.00

    Total 54728316.00 491148.00Add +5%

    as per agt.2736415.80 24557.40

    57464731.80 515705.40

    5356956.00 0.00

    Total for Ann-A 28819232.47 750759.90

    Total for Ann-B 82270010.91 5306479.65

    Total for Ann-C 28802788.54 0.00

    Total for Ann-D 0.00 0.00

    Total for Ann-E 2244100.90 628250.26

    Total for Ann-F 8352656.62 608863.16

    Total for Ann-G 0.00 0.00

    Total for Ann-H 32885961.11 1417162.43

    Total for Ann-I 0.00 0.00

    Total for Ann-J 32425409.28 442200.00

    Total for Ann-K 57464731.80 515705.40

    Total for Ann-L 4755663.00 0.00

    Total for Ann-M 601293.00 0.00

    Grand total 278621847.63 9669420.80

    or say 278621848.00 9669421.00

    Annexure-L & M

    Total Annex. L & M

    ABSTRACT

    Total of annexure-K

  • 7/30/2019 Inoice Nov2012 Reach-1

    46/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    47/162

    Rs. P. Rs. P.

    278621848.00

    268952427.00

    0.00

    193388.00

    19339.00

    Educational cess 3% on IT & SC 6382.00

    165045.00

    56686.00

    0.00

    50.00

    By Cheque 9228531.00

    278621848.00 278621848.00

    Paid in my presence.

    Signature and Designation of Witnessing Officer.

    Dated :

    Bill copy

    Grand total

    Recvied Rs.96,69,421 /- Rupees Ninety Six Lakhs Sixty Nine Thousand Four Hundred and Twenty

    One Only)

    STAMP

    Signature of Contractor

    Note: The Payees acknowledgement should be for the gross amount paid

    Security deposit at 10% of bill

    Income tax at 2%

    Sur charge at 10% on IT

    Sales tax @2% (VAT)- Rs.82,52,259 /-

    S.T at 4% - ballast - 14,17,162 /-

    Rec. towards hire charges

    Memo of payments made

    Total value of work done

    Amount of previous payments from last

    Certificate No. CC-30

    Forwarded to Financial Adviser and Chief

    Chargeable to 105 14044 - 20 1444 03 Rs. 20,45,412 /- , 105-14044-20-1495 -

    Rs.6,08,863/- and 105 - 14044 - 20 - 1452 - 03 - Rs.70,15,146 /- and to be included in the

    accounts for the month of January-2012. Payment by EFT.

    Sr.SO(A)/Dy.CE/CN/I/MDU Dy.CE/CN/I/MDU

  • 7/30/2019 Inoice Nov2012 Reach-1

    48/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    49/162

    28068472.58

  • 7/30/2019 Inoice Nov2012 Reach-1

    50/162

    76963531.26

  • 7/30/2019 Inoice Nov2012 Reach-1

    51/162

    28802788.54

    1615850.64

  • 7/30/2019 Inoice Nov2012 Reach-1

    52/162

    7743793.46

  • 7/30/2019 Inoice Nov2012 Reach-1

    53/162

    31468798.68

    83.75

  • 7/30/2019 Inoice Nov2012 Reach-1

    54/162

    66.052

    1520.231

    268952427.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    55/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    56/162

    9669421.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    57/162

    DYCE/CN/II/MDU : Division Sub-dvision

    Contract certificate No.CC-29/XEN/MDU/

    Sanction for work: 2000/W1/GC/S/1 dt.9.1.2008.

    Name of Contractor:

    Mount Poonamallee Road, Manapakkam, chennai-89

    Contract Agt.No.and date: W.Order No.and date:

    Agt. No. 49/CN/2008 dt. 01.07.2008

    Date of commencement of work: 05.03.2008 Date of completion: In progress

    Voucher No. MDU / GC/ MDU - VPT / / XII /2011 DT. .12.2011

    Upto date Since last certi fi cate

    1 2 3 4 5 8 9

    Rs. Rs. P Rs. P

    Annexure-A

    10M3 0.000 1217.570 1) 102-b 326 39692.78 0.00

    10M3 0.000 901.251 3) 103-b 358 32264.79 0.00

    10M3 0.000 3895.806 4) 103-c 542 211152.69 0.00

    10M3 0.000 231.379 7) 106 230 5321.72 0.00

    10M3 0.000 4.980 8) 108 243 121.01 0.00

    M3 0.000 398.900 11)201 190 75791.00 0.00

    M3 0.000 1901.027 16) 401 103 195805.78 0.00

    M3 0.000 3129.920 17) 402 209 654153.28 0.00

    M3 0.000 66.724 19) 404 64 4270.34 0.00

    M3 0.000 472.514 20) 405 60 28350.84 0.00

    M3 0.000 303.866 21) 406 125 37983.25 0.00

    M3 0.000 49.845 25) 412 157 7825.67 0.00

    M3 0.000 624.357 36)504-a 606 378360.34 0.00

    M3 0.000 79.924 37)506-a 1064 85039.14 0.00

    M3 0.000 250.000 38)507-a 1212 303000.00 0.00

    M3 0.000 1690.986 39) 509-a(I) 772 1305441.19 0.00

    M3 0.000 150.032 40)511-a(I 2798 419789.54 0.00

    SOUTHERN RAILWAY

    XEN/GC/MDU

    Month of: 23.12.2011

    Name of work: Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli

    (Excluding) - Proposed construction of Bridges, station buildings, earth work, level

    crossings, platform shelters, circulating area, track linking, welding, supply of ballast,signal and telecommunication works and electrical works.(Reach-I)

    M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,

    Unit Quantity

    executed since

    last certificate

    Quantity

    executed

    uptodate as per

    measu- rement

    book

    Items Rate Amount Reference to

    item number

    of the

    schedule of

    rates

    Remarks

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    58/162

    M3 567.636 3505.250 41)511-b(I 3087 10820706.75 1752292.33

    M3 510.271 2875.951 43)511(d)I 2537 7296287.69 1294557.53

    M3 0.000 99.949 46)514i 1474 147324.83 0.00

    M3 0.000 99.949 50)515(d) 235 23488.02 0.00

    10m2 0.000 1.155 55)527-a 706 81.54 0.00

    10m2 156.765 1700.557 56)527-b 674 114617.54 10565.96

    M3 0.000 173.985 58)602-d 912 158674.32 0.00

    M3 0.000 4.850 59)617 31 150.35 0.00

    M3 0.000 69.885 60)626-a 59 4123.22 0.00

    M3 0.000 10.410 61)626-b 38 395.58 0.00

    10M2 0.000 618.610 95)1002-a 217 13423.84 0.00

    10M2 0.000 41.921 106)1106 187 783.92 0.00

    10M2 0.000 59.025 115)1141(

    b)i

    2674 15783.29 0.00

    10M2 0.000 194.000 117)1217(

    a)ii

    606 11756.40 0.00

    10M2 0.000 194.000 118)1218(

    b)ii

    1666 32320.40 0.00

    Total of annexure-A 22424281.05 3057415.82

    5644191.54 769551.56

    Total of annexure-A 28068472.59 3826967.38

    Annexue-B

    Mtr. 0.000 5336.740 1)Providingcast-in-situ

    bored piles

    1000mm diafor reqd

    depth with

    RCC of M35

    or higher

    specified mix

    with 12mm to

    20mm.

    3400 18144916.00 0.00

    Mtr. 0.000 1414.575 2) Supply,fabrication &

    placing in

    position MS

    liners incl

    cutting and

    bending with

    contr.'s 6mm

    thick MS

    sheets as

    necy for

    RCC pile of

    1000mm dia.

    6000 8487450.00 0.00

    Add (+)25.17

  • 7/30/2019 Inoice Nov2012 Reach-1

    59/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    60/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    61/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    62/162

    2649192.50 53827.49

    7743793.46 157341.89

    0.00 0.00

    1.Collection &

    supply of

    ballast at

    yard

    10M3 0.000 14677.110 a) 100%

    unaffecte

    d

    7000 10273977.00 0.00

    10M3 0.000 521.54 b)95%

    unaffecte

    d

    7000 346824.10 0.00

    10M3 0.000 256.07 c)90%

    unaffecte

    d

    7000 161324.10 0.00

    2. Along

    side

    collec-tion

    & supply

    of ballast

    10M3 2085.910 25916.29 a)100%

    unaffecte

    d

    7000 18141403.00 1460137.00

    10M3 0.000 0.000 b)95%

    unaffecte

    d

    7000 0.00 0.00

    10M3 0.000 0.000 c)90%

    unaffected

    7000 0.00 0.00

    28923528.20 1460137.00

    2545270.48 128492.06

    Total 31468798.68 1588629.06

    0.00 0.00

    MT 508.530 6057.426 1) Supply ofordy portland

    cement

    grade 43/53

    confirming to

    IS 8112 etc.

    4400 26652674.40 2237532.00

    26652674.40 2237532.00

    5330534.88 447506.40

    Add (+)52%

    Annexure-G

    Total of annexure-G

    Annexure-H

    Total of annexure-H

    Add (+) 8.80%

    Annexure-I

    Total of annexure-I

    Annexure-J

    Total of annexure-J

    Add (+)20%

  • 7/30/2019 Inoice Nov2012 Reach-1

    63/162

    31983209.28 2685038.40

    MT 0.000 1440.536 02) Supplyof MS/TMT-

    Fe-415

    grade steel

    rods of

    various dia.

    A)

    75%stage

    payment

    36000 38894472.00 0.00

    MT 37.852 1440.536 B) 25%stage

    payment

    36000 12964824.00 340668.00

    MT 66.052 66.052 C) 100%payment

    36000 2377872.00 2377872.00

    Total 54237168.00 2718540.00Add +5%

    as per agt.2711858.40 135927.00

    56949026.40 2854467.00

    4890412.00 0.00

    Total for Ann-A 28068472.59 3826967.38

    Total for Ann-B 76963531.26 0.00

    Total for Ann-C 28802788.54 0.00

    Total for Ann-D 0.00 0.00

    Total for Ann-E 1615850.64 738890.64

    Total for Ann-F 7743793.46 157341.89

    Total for Ann-G 0.00 0.00

    Total for Ann-H 31468798.68 1588629.06

    Total for Ann-I 0.00 0.00

    Total for Ann-J 31983209.28 2685038.40

    Total for Ann-K 56949026.40 2854467.00

    Total for Ann-L 4890412.00 0.00

    Grand total 268485882.85 11851334.37

    or say 268485883.00 11851334.00

    Total of annexure-J

    Annexure-K

    Total of annexure-K

    Annexure-L

    Total Annex. L

    ABSTRACT

  • 7/30/2019 Inoice Nov2012 Reach-1

    64/162

    Upto date Since last

    Certificate

    Grand total 268485883.00 11851334.00

    268485883.00 11851334.00

    0.00 0.00

    Total value of work done 268485883.00 11851334.00

    Less value of work shown on last certificate vide CC-28. 256634548.00 1.00

    Amount due 11851335.00 11851335.00

    XEN/GC/MDU

    Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

    Unit Qty. executedsince last

    certificate

    Qty. executed up-

    to-date as per

    M.Book

    Items Rate Amount Refer. To

    item No. of

    the SOR

    Remarks.

    Total value of work done including prospective

    Deduct 10% on the schedule rates to become

    (Rupees One Crore Eighteen Lakhs Fifty One Thousand Three Hundred and Thirty Five Only)

    The measurements were made by SE/JE/Works on 26.07, 10.8, 20.8, 29.8, 8.9, 14.9, 22.9, 3.10, 7.10,13.10,

    15.11.11 from 24 to 46 of M.B. No. 7070, SE/P.Way on 08.09.10, 09.08, 21.9, 01.11, 3.12.11 from 21 to 51 of

    M.B.No.7072, JE/W on 24.9, 30.9,01.10,07.10, 22.10, 3.11, 14.11, 27.11, 04.12.11 from 55 to 85 of M.B. 7057,

    17.6, 19.7, 22.8, 5.9.11 from 23 to 26 M.B.No. 1698, and by XEN/CN on 29.11 & 10.12.11 from 40 to 46 of

    M.B.No. 7051 and abstract pagr from 91 to 95 of M.B. 3209.

    Dated 23.12.2011 Contractor XEN/GC/ MDU

    Certified that the foregoing claim is correct that the necessary measurements were taken by SE/JE/Works on

    26.07, 10.8, 20.8, 29.8, 8.9, 14.9, 22.9, 3.10, 7.10,13.10, 15.11.11 from 24 to 46 of M.B. No. 7070, SE/P.Way

    on 08.09.10, 09.08, 21.9, 01.11, 3.12.11 from 21 to 51 of M.B.No.7072, JE/W on 24.9, 30.9,01.10,07.10, 22.10,

    3.11, 14.11, 27.11, 04.12.11 from 55 to 85 of M.B. 7057, 17.6, 19.7, 22.8, 5.9.11 from 23 to 26 M.B.No. 1698,

    and by me on 29.11 & 10.12.11 from 40 to 46 of M.B.No. 7051 and 100% test check by me on 14.03, 9.8,

    01.11, 8.8, 18.8, 26.8, 30.8, 5.9, 24.9, 30.9, 7.10, 8.10, 11.10, 22.10, 12.11, 14.11, 18.11, 29.11, 3.12, 8.12.11

    and that the work has been satisfatorily performed.

    Dated 23.12.2011 Contractor XEN/GC/ MDUCertified that on materials the cost of which has not been recovered have been issued to the contractor except

    such as are specifically provided for in the agreement.

    Test checked by then Dy.CE/CN-I/MDU on 06.12.11 and 19.12.11 on page no. 41 & 42 of MB. No. 705100

    Dated 23.12.2011 Dy.CE/CN-I/ MDU

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    65/162

    Rs. P. Rs. P.

    ###########

    256634548.00

    0.00

    237027.00

    23703.00

    Educational cess 3% on IT & SC 7822.00

    205254.00

    63545.00

    0.00

    50.00

    By Cheque 11313934.00

    268485883.00 ###########

    Paid in my presence.

    Signature and Designation of Witnessing Officer.

    Dated :

    Chargeable to 105 14044 - 20 1444 03 Rs. 15,88,629 /- , 105-14044-20-1495 -

    Rs.1,57,342/- and 105 - 14044 - 20 - 1452 - 03 - Rs.1,01,05,364 /- and to be included in

    the accounts for the month of December-2011. The cheque to be sent by post to M/s

    Larsen & Toubro Limited, No.1257-A,Rajeev Nagar. Sempatti post, Aruppukkottai-

    626 101, Virudhunagar District.

    Sr.SO(A)/Dy.CE/CN/I/MDU Dy.CE/CN/I/MDU

    Memo of payments made

    Total value of work done

    Amount of previous payments from last

    Certificate No. CC-28

    Forwarded to Financial Adviser and Chief

    Security deposit at 10% of bill

    Income tax at 2%

    Sur charge at 10% on IT

    Sales tax @2% (VAT)- Rs.1,02,62,706/-

    S.T at 4% - ballast - 15,88,629/-

    Rec. towards hire charges

    Bill copy

    Grand total

    STAMP

    Signature of Contractor

    Note: The Payees acknowledgement should be for the gross amount paid

    Recvied Rs.1,18,51,335 /- Rupees One Crore Eighteen Lakhs Fifty One Thousand Three Hundred

    and Thirty Five Only)

  • 7/30/2019 Inoice Nov2012 Reach-1

    66/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    67/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    68/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    69/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    70/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    71/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    72/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    73/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    74/162

    11851335.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    75/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    76/162

    M3 0.000 250.000 38)507-a 1212 303000.00 0.00

    M3 0.000 1690.986 39) 509-a(I) 772 1305441.19 0.00

    M3 0.000 150.032 40)511-a(I 2798 419789.54 0.00

    M3 0.000 2937.614 41)511-b(I 3087 9068414.42 0.00

    M3 0.000 2365.680 43)511(d)I 2537 6001730.16 0.00

    M3 0.000 99.949 46)514i 1474 147324.83 0.00

    M3 0.000 99.949 50)515(d) 235 23488.02 0.00

    10m2 0.000 1.155 55)527-a 706 81.54 0.00

    10m2 0.000 1543.792 56)527-b 674 104051.58 0.00

    M3 0.000 173.985 58)602-d 912 158674.32 0.00

    M3 0.000 4.850 59)617 31 150.35 0.00

    M3 0.000 69.885 60)626-a 59 4123.22 0.00

    M3 0.000 10.410 61)626-b 38 395.58 0.00

    10M2 0.000 618.610 95)1002-a 217 13423.84 0.00

    10M2 0.000 41.921 106)1106 187 783.92 0.00

    10M2 0.000 59.025 115)1141(

    b)i

    2674 15783.29 0.00

    10M2 0.000 194.000 117)1217(

    a)ii

    606 11756.40 0.00

    10M2 0.000 194.000 118)1218(

    b)ii

    1666 32320.40 0.00

    Total of annexure-A 19366865.23 0.00

    4874639.98 0.00

    Total of annexure-A 24241505.21 0.00

    Annexue-B

    Mtr. 0.000 5336.740 1)Providingcast-in-situ

    bored piles

    1000mm dia

    for reqd

    depth with

    RCC of M35

    or higher

    specified mix

    with 12mm to

    20mm.

    3400 18144916.00 0.00

    Add (+)25.17

  • 7/30/2019 Inoice Nov2012 Reach-1

    77/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    78/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    79/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    80/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    81/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    82/162

    Upto date Since last

    Certificate

    Grand total 256634548.00 7200925.00

    256634548.00 7200925.00

    0.00 0.00

    Total value of work done 256634548.00 7200925.00

    Less value of work shown on last certificate vide CC-27. 249433623.00 0.00

    Amount due 7200925.00 7200925.00

    XEN/GC/MDU

    Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

    Certified that on materials the cost of which has not been recovered have been issued to the contractor exceptsuch as are specifically provided for in the agreement.

    Dated 23.11.2011 XEN/GC/ MDU

    Total value of work done including

    Deduct 10% on the schedule rates to

    (Rupees Seventy Two Lakhs Nine Hundred and Twenty Five Only)

    The measurements were made by SE/JE/Works on 06.07, 08.07, 10.07, 15.07, 18.07 69 to 99 of M.B. No.

    1732 and at page 00 to 17 of M.B.4760 and measurement made by XEN on 22.07.11at page 38 to 39 of M.B.

    No. 7051 and abstract at page No. 83 to 85 of M.B. 3209.

    Dated 23.11.2011 Contractor XEN/GC/ MDU

    Certified that the foregoing claim is correct that the necessary measurements were taken by SE/JE/Works on

    06.07, 08.07, 10.07, 15.07, 18.07 at page 69 to 99 of M.B. No. 1732 and at page 00 to 17 of M.B. 4760 and

    measurement made by me on 22.07.11 at page 38 to 39 of M.B. No. 7051 and 100% test checked by me on

    07.07.11 at page 88 , at page 97 of M.B. 1732, on 07.10.11 at page 14 of M.B.No.4760 and test check by

    Dy.CE on 07.09.11 at page 39 of M.B. 7051 for ballast and that the work has been satisfatorily performed.

    Dated 23.11.2011 Contractor XEN/GC/ MDU

    Amount Refer. To

    item No. of

    the SOR

    Remarks.Unit Qty. executedsince last

    certificate

    Qty. executed

    up-to-date as

    per M.Book

    Items Rate

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    83/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    84/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    85/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    86/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    87/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    88/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    89/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    90/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    91/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    92/162

    7200925

    249433623.00

    7200925.00256634548.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    93/162

    DYCE/CN/II/MDU : Division Sub-dvision

    Contract certificate No.CC-23/XEN/MDU/1776

    Sanction for work: 2000/W1/GC/S/1 dt.9.1.2008.

    Name of Contractor:

    Mount Poonamallee Road, Manapakkam, chennai-89

    Contract Agt.No.and date: W.Order No.and date:

    Agt. No. 49/CN/2008 dt. 01.07.2008

    Date of commencement of work: 05.03.2008 Date of completion: In progress

    Voucher No. MDU / GC/ MDU - VPT / / III /2010 DT. .03.2011

    Upto date Since last certi ficate

    1 2 3 4 5 8 9

    Rs. Rs. P Rs. P

    Annexure-A

    10M3 0.000 1217.570 1) 102-b 326 39692.78 0.00

    10M3 0.000 448.108 3) 103-b 358 16042.27 0.00

    10M3 0.000 3895.806 4) 103-c 542 211152.69 0.00

    10M3 0.000 231.379 7) 106 230 5321.72 0.00

    10M3 0.000 4.980 8) 108 243 121.01 0.00

    M3 0.000 398.900 11)201 190 75791.00 0.00

    M3 0.000 1901.027 16) 401 103 195805.78 0.00

    M3 0.000 3129.920 17) 402 209 654153.28 0.00

    M3 0.000 66.724 19) 404 64 4270.34 0.00

    M3 0.000 472.514 20) 405 60 28350.84 0.00

    M3 0.000 303.866 21) 406 125 37983.25 0.00

    M3 0.000 49.845 25) 412 157 7825.67 0.00

    M3 0.000 624.357 36)504-a 606 378360.34 0.00

    M3 0.000 79.924 37)506-a 1064 85039.14 0.00

    M3 0.000 98.810 38)507-a 1212 119757.72 0.00

    M3 0.000 1690.986 39) 509-a(I 772 1305441.19 0.00

    M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,

    SOUTHERN RAILWAY

    XEN/GC/MDU

    Month of: 25.03.2011

    Name of work: Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli

    (Excluding) - Proposed construction of Bridges, station buildings, earth work, level

    crossings, platform shelters, circulating area, track linking, welding, supply of ballast,signal and telecommunication works and electrical works.(Reach-I)

    Unit Quantity

    executed since

    last certificate

    Quantity

    executed

    uptodate as per

    measu- rement

    book

    Items Rate Amount Reference to

    item number of

    the schedule of

    rates

    Remarks

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    94/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    95/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    96/162

    M3 0.000 1106.983 19)Unaffected

    3300 3653043.90 0.00

    M3 0.000 620.300 20)Unaffected

    2500 1550750.00 0.00

    Span 0.000 18.000 21)Unaffected

    5000 90000.00 0.00

    53605819.90 0.00

    22514444.36 0.00

    76120264.26 0.00

    10M3 26000 82460 1) E.W. informing

    bank for

    widening

    the exg MG

    formation

    on both

    sides to BG

    std incl

    yard with

    etc.

    1300 10719800.00 3380000.00

    10M3 30000 30000 2) Extra for compacting

    the earth

    mech with

    contr

    compacting

    equipment

    such as road

    roller as per

    relevant

    clause of spl

    condition of

    contract etc.

    150 450000.00 450000.00

    10M3 8856 8856 4) Supply &spreading

    moorum /

    gravel for

    widening &

    regarding the

    exg MG

    formation to

    BG std with

    contr or other

    means incl

    excavation

    etc.

    3000 2656800.00 2656800.00

    Add (+)42%

    Total of annexure-B

    Total of annexure-B

    Annexure-C

  • 7/30/2019 Inoice Nov2012 Reach-1

    97/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    98/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    99/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    100/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    101/162

    Rs. P. Rs. P.

    237973744.00

    225956568.00

    0.00

    240344.00

    24034.00

    Educational cess 3% on IT & SC 7931.00

    0.00

    0.00

    50.00

    By Cheque 11744817.00

    237973744.00 237973744.00

    Paid in my presence.

    Signature and Designation of Witnessing Officer.

    Dated :

    Chargeable to 146 14044 - 20 1431 03 Rs. 1,20,17,176 /- and to be included in

    the accounts for the month of March-2011. The cheque to be sent by post to M/s Larsen

    & Toubro Limited, No.1257-A,Rajeev Nagar. Sempatti post, Aruppukkottai- 626

    101, Virudhunagar District.

    Memo of payments made

    Rec. towards hire charges

    Total value of work done

    Amount of previous payments from last

    Forwarded to Financial Adviser and Chief

    Security deposit at 10% of bill

    Sur charge at 10% on IT

    Sales tax @2% (VAT)

    Sr.SO(A)/Dy.CE/CN/II/MDU Dy.CE/CN/II/MDU

    Signature of Contractor

    Note: The Payees acknowledgement should be for the gross amount paid

    Bill copy

    Grand total

    Recvied Rs.1,20,17,176 /- Rupees One Crore Twenty Lakhs Seventeen Thousand One Hundred Seventy Six

    Only)

    STAMP

    Income tax at 2%

  • 7/30/2019 Inoice Nov2012 Reach-1

    102/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    103/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    104/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    105/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    106/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    107/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    108/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    109/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    110/162

    12017176.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    111/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    112/162

    M3 11.921 144.522 40)511-a(I) 2798 404372.56 33354.96

    M3 131.833 2715.340 41)511-b(I) 3087 8382254.58 406968.47

    M3 65.208 2133.630 43)511(d)I 2537 5413019.31 165432.70

    10m2 0.000 1.155 55)527-a 706 81.54 0.00

    10m2 516.560 1387.687 56)527-b 674 93530.10 34816.14

    M3 0.000 81.800 58)602-d 912 74601.60 0.00

    M3 0.000 2.190 59)617 31 67.89 0.00

    M3 0.000 60.500 60)626-a 59 3569.50 0.00

    M3 0.000 10.410 61)626-b 38 395.58 0.00

    Total of annexure-A 17537001.68 857002.50

    4414063.32 215707.53

    Total of annexure-A 21951065.00 1072710.03

    Annexue-B

    Mtr. 0.000 5336.740 1)Providingcast-in-situ

    bored piles

    1000mm dia

    for reqd depth

    with RCC of

    M35 or higher

    specified mix

    with 12mm to

    20mm.

    3400 18144916.00 0.00

    Mtr. 0.000 1414.575 2) Supply,

    fabrication &placing in

    position MS

    liners incl

    cutting and

    bending with

    contr.'s 6mm

    thick MS

    sheets as

    necy for RCC

    pile of

    1000mm dia.

    6000 8487450.00 0.00

    3) CN of

    precast

    concrete

    superstructure

    with 'I' girder

    of a single

    track etc. for a

    span of

    12.20m.

    Add (+)25.17

  • 7/30/2019 Inoice Nov2012 Reach-1

    113/162

    Span 3.000 32.000 1)Procurement

    and bringing

    to the site

    reinforcement

    steel reqd (at

    15%)

    858000 4118400.00 386100.00

    Span 6.000 32.000 2- Unaffected -@ 15%

    858000 4118400.00 772200.00

    Span 0.000 15.000 3- Onprocurement

    of

    neoprenebear

    ings (at 5%)

    858000 643500.00 0.00

    Span 0.000 35.000 4-Procurement

    and bringing

    to the site

    appd quality

    metallic

    flexible

    sheeting and

    read

    anchroge

    cones (at 5%)

    858000 1501500.00 0.00

    Span 9.000 32.000 5- On castingof PSC 'I'

    girder in all

    respects reqd

    for one span

    in casting

    yard (at 25%)

    858000 6864000.00 1930500.00

    Span 24.000 32.000 6) On leadingto the site

    launching for

    erectin PSC 'I'

    girder in

    position ( at

    10%)

    858000 2745600.00 2059200.00

    Span 10.000 10.000 7) Casting ofdiaphragms

    reqd for one

    span incl deck

    slab etc. ( at

    15%)

    858000 1287000.00 1287000.00

    Each 0.000 5.00012) Vertical

    load testing of

    single bored

    pile for

    bridges

    80000 400000.00 0.00

    Each 0.00 1.00 13)Unaffected

    1260 1260.00 0.00

    M3 0.000 1106.983 19)Unaffected

    3300 3653043.90 0.00

    M3 0.000 620.300 20)Unaffected

    2500 1550750.00 0.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    114/162

    Span 0.000 18.000 21)Unaffected

    5000 90000.00 0.00

    53605819.90 6435000.00

    22514444.36 2702700.00

    76120264.26 9137700.00

    10M3 0 56460 1) E.W. informing

    bank forwidening the

    exg MG

    formation on

    both sides to

    BG std incl

    yard with

    etc.

    1300 7339800.00 0.00

    7339800.00 0.00

    3082716.00 0.00

    10422516.00 0.00

    0.00 0.00

    Mtr. 0 20300 18)Unaffected

    30 609000.00 0.00

    Total Ann 'E' 609000.00 0.00

    Add (+)44% 267960.00 0.00

    876960.00 0.00

    Mtr. 0.00 69585.00 3) Unaffected 3.30 229630.50 0.00

    Tonne 0 2500.06 4) Unaffected 255.00 637515.30 0.00

    Sleep

    er

    0 50800 7) Unaffected 80.00 4064000.00 0.00

    Sleerp

    er per

    km

    0 130306 8) Unaffected 0.46 59940.76 0.00

    4991086.56 0.00

    2595365.01 0.00

    7586451.57 0.00

    0.00 0.00Total of annexure-G

    Annexure-D

    Total of annexure-D

    Annexure-E

    Total of annexure-E

    Annexure-F

    Total of annexure-F

    Add (+)52%

    Annexure-G

    Total of annexure-B

    Add (+)42%

    Total of annexure-B

    Annexure-C

    Total of annexure-C

    Add (+) 42%

    Total of annexure-C

  • 7/30/2019 Inoice Nov2012 Reach-1

    115/162

    1.Collectio

    n & supply

    of ballast

    at yard

    10M3 0.000 13577.020 a) 100%

    unaffected

    7000 9503914.00 0.00

    10M3 0.000 521.54 b)95%

    unaffected

    7000 346824.10 0.00

    10M3 0.000 256.07 c)90%

    unaffected

    7000 161324.10 0.00

    2. Along

    side collec-

    tion &

    supply of

    ballast

    10M3 0.000 19211.64 a)100%

    unaffected

    7000 13448148.00 0.00

    10M3 0.000 0.000 b)95%

    unaffected

    7000 0.00 0.00

    10M3 0.000 0.000 c)90%

    unaffected

    7000 0.00 0.00

    23460210.20 0.00

    2064498.50 0.00

    Total 25524708.70 0.00

    0.00 0.00

    MT 150.753 5189.379 1) Supply ofordy portland

    cement grade

    43/53

    confirming to

    IS 8112 etc.

    4400 22833267.60 663313.20

    22833267.60 663313.20

    4566653.52 132662.64

    27399921.12 795975.84

    MT 0.000 1440.536 02) Supplyof MS/TMT-Fe-415

    grade steel

    rods of

    various dia.

    A)

    75%stage

    payment

    36000 38894472.00 0.00

    MT 35.916 1355.183 B) 25%stage

    payment

    36000 12196647.00 323244.00

    Add (+)20%

    Total of annexure-J

    Annexure-K

    Annexure-H

    Total of annexure-H

    Add (+) 8.80%

    Annexure-I

    Total of annexure-I

    Annexure-J

    Total of annexure-J

  • 7/30/2019 Inoice Nov2012 Reach-1

    116/162

    Total 51091119.00 323244.00

    Add +5% as

    per agt.2554555.95 16162.20

    53645674.95 339406.20

    2429006.00 0.00

    Total for Ann-A 21951065.00 1072710.03

    Total for Ann-B 76120264.26 9137700.00

    Total for Ann-C 10422516.00 0.00

    Total for Ann-D 0.00 0.00

    Total for Ann-E 876960.00 0.00

    Total for Ann-F 7586451.57 0.00

    Total for Ann-G 0.00 0.00

    Total for Ann-H 25524708.70 0.00

    Total for Ann-I 0.00 0.00

    Total for Ann-J 27399921.12 795975.84

    Total for Ann-K 53645674.95 339406.20

    Total for Ann-L 2429006.00 0.00

    Grand total 225956567.60 11345792.07

    or say 225956568.00 11345792.00

    Total of annexure-K

    Annexure-L

    Total Annex. L

    ABSTRACT

  • 7/30/2019 Inoice Nov2012 Reach-1

    117/162

    Upto date Since last

    Certificate

    Grand total 225956568.00 11345792.00

    225956568.00 11345792.00

    0.00 0.00

    Total value of work done 225956568.00 11345792.00

    Less value of work shown on last certificate vide CC-21. 214610776.00 0.00

    Amount due 11345792.00 11345792.00

    XEN/GC/MDU

    Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

    Dated 24.02.2011 XEN/GC/ MDU

    Total value of work done including

    Deduct 10% on the schedule rates to

    become due to the contractor on the

    (Rupees One Crore Thirteen Lakhs Forty Five Thousnad Seven Hundred and Nienty Two Only)

    The measurements were made by SE/Works on 13.01.11 at page No. 71 to 52 of MB No. 705600 and on

    19.01.11 at page No.40 to 44 of M.B. No. 705700, on abstract at page No. 42 to 46 of M.B. No. 320900,

    and by JE/W on 25.11.10 at page No.53 to 57 of M.B.No.161300, on and on 13.01.11 at page No.15 to

    21 of M.B.No. 169800, on 20.10.10 at page .22 to 24 of M.B No.707000 and on 29.01.11at page 35 to 37

    of M.B.161400.

    Dated 24.02.2011 Contractor XEN/GC/ MDU

    Certified that the foregoing claim is correct that the necessary measurements were taken by SE/Works on

    13.01.11 at page No. 71 to 52 of MB No. 705600 and on 19.01.11 at page No.40 to 44 of M.B. No.

    705700, on abstract at page No. 42 to 46 of M.B. No. 320900, and by JE/W on 25.11.10 at page No.53 to

    57 of M.B.No.161300, on and on 13.01.11 at page No.15 to 21 of M.B.No. 169800, on 20.10.10 at page

    .22 to 24 of M.B No.707000 and on 29.01.11at page 35 to 37 of M.B.161400 and test checked by me on

    21.02.11, .02.11, 25.11.10, 22.02.11, .02.11 and 31.01.11 and that the work has been satisfatorily

    performed.

    Dated 24.02.2011 Contractor XEN/GC/ MDU

    Certified that on materials the cost of which has not been recovered have been issued to the contractor

    except such as are specifically provided for in the agreement.

    Amount Refer. To

    item No. of

    the SOR

    Remarks.

    Certified that not less than the quantities

    paid for has actually been done at site and

    the quantity are approximately arrived asper plans and cross sections of item No.1

    of Annex 'C'.

    Unit Qty. executedsince last

    certificate

    Qty. executed

    up-to-date as

    per M.Book

    Items Rate

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    118/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    119/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    120/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    121/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    122/162

    90000.00

    47170819.90 42732419.90 ########

    66982564.26

    2431.38

    7586451.57

  • 7/30/2019 Inoice Nov2012 Reach-1

    123/162

    25524708.70

    26603945.28 26603945.28

    90000

  • 7/30/2019 Inoice Nov2012 Reach-1

    124/162

    53306268.75 53306268.75

    214610776.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    125/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    126/162

    11345792.00

    11345792.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    127/162

    DYCE/CN/II/MDU : Division Sub-dvision

    Contract certificate No.CC-21/XEN/MDU/

    Sanction for work: 2000/W1/GC/S/1 dt.9.1.2008.

    Name of Contractor:

    Mount Poonamallee Road, Manapakkam, chennai-89

    Contract Agt.No.and date: W.Order No.and date:

    Agt. No. 49/CN/2008 dt. 01.07.2008

    Date of commencement of work: 05.03.2008 Date of completion: In progress

    Voucher No. MDU / GC/ MDU - VPT / / XII /2010 DT. .12.2010

    Upto date Since last cer ti ficate

    1 2 3 4 5 8 9

    Rs. Rs. P Rs. P

    Annexure-A

    10M3 0.000 421.628 3) 103-b 358 15094.28 0.00

    10M3 40.724 3229.776 4) 103-c 542 175053.86 2207.24

    10M3 0.000 231.379 7) 106 230 5321.72 0.00

    M3 0.000 393.920 11)201 190 74844.80 0.00

    M3 0.000 1901.027 16) 401 103 195805.78 0.00

    M3 0.000 3129.920 17) 402 209 654153.28 0.00

    M3 0.000 66.724 19) 404 64 4270.34 0.00

    M3 0.000 472.514 20) 405 60 28350.84 0.00

    M3 0.000 303.866 21) 406 125 37983.25 0.00

    M3 0.000 49.845 25) 412 157 7825.67 0.00

    M3 5.270 612.619 36)504-a 606 371247.11 3193.62

    M3 4.444 79.924 37)506-a 1064 85039.14 4728.42

    M3 0.000 98.810 38)507-a 1212 119757.72 0.00

    M3 285.473 1520.636 39) 509-a(I) 772 1173930.99 220385.16

    M3 25.925 132.601 40)511-a(I) 2798 371017.60 72538.15

    Reference toitem number

    of the

    schedule of

    rates

    SOUTHERN RAILWAY

    XEN/GC/MDU

    Month of: 04.12.2010

    Name of work: Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli

    (Excluding) - Proposed construction of Bridges, station buildings, earth work, level

    crossings, platform shelters, circulating area, track linking, welding, supply of ballast,

    signal and telecommunication works and electrical works.(Reach-I)

    Remarks

    M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,

    Unit Quantityexecuted since

    last certificate

    Quantityexecuted

    uptodate as per

    measu- rement

    book

    Items Rate Amount

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    128/162

    M3 112.519 2583.507 41)511-b(I) 3087 7975286.11 347346.15

    M3 120.672 2068.422 43)511(d)I 2537 5247586.61 306144.86

    10m2 0.000 1.155 55)527-a 706 81.54 0.00

    10m2 128.260 871.127 56)527-b 674 58713.96 8644.72

    M3 50.090 81.800 58)602-d 912 74601.60 45682.08

    M3 2.190 2.190 59)617 31 67.89 67.89

    M3 50.090 60.500 60)626-a 59 3569.50 2955.31

    M3 0.000 10.410 61)626-b 38 395.58 0.00

    Total of annexure-A 16679999.17 1013893.60

    4198355.79 255197.02

    Total of annexure-A 20878354.96 1269090.62

    Annexue-B

    Mtr. 0.000 5336.740 1)Providingcast-in-situ

    bored piles

    1000mm dia

    for reqd depth

    with RCC of

    M35 or higher

    specified mix

    with 12mm to

    20mm.

    3400 18144916.00 0.00

    Mtr. 0.000 1414.575 2) Supply,fabrication &

    placing in

    position MS

    liners incl

    cutting and

    bending with

    contr.'s 6mm

    thick MS

    sheets as

    necy for RCC

    pile of

    1000mm dia.

    6000 8487450.00 0.00

    3) CN of

    precast

    concrete

    superstructure

    with 'I' girder

    of a single

    track etc. for aspan of

    12.20m.

    Span 0.000 29.000 1)Procurement

    and bringing

    to the site

    reinforcement

    steel reqd (at

    15%)

    858000 3732300.00 0.00

    Add (+)25.17

  • 7/30/2019 Inoice Nov2012 Reach-1

    129/162

    Span 0.000 26.000 2- Unaffected -@ 15%

    858000 3346200.00 0.00

    Span 0.000 15.000 3- Onprocurement

    of

    neoprenebear

    ings (at 5%)

    858000 643500.00 0.00

    Span 0.000 35.000 4-Procurement

    and bringing

    to the site

    appd quality

    metallic

    flexible

    sheeting and

    read

    anchroge

    cones (at 5%)

    858000 1501500.00 0.00

    Span 6.000 23.000 5- On castingof PSC 'I'

    girder in all

    respects reqd

    for one span

    in casting

    yard (at 25%)

    858000 4933500.00 1287000.00

    Span 3.000 8.000 6) On leadingto the site

    launching for

    erectin PSC 'I'

    girder in

    position ( at

    10%)

    858000 686400.00 257400.00

    Each 0.000 5.000 12) Verticalload testing of

    single bored

    pile for

    bridges

    80000 400000.00 0.00

    Each 0.00 1.00 13)Unaffected

    1260 1260.00 0.00

    M3 0.000 1106.983 19)Unaffected

    3300 3653043.90 0.00

    M3 0.000 620.300 20)Unaffected

    2500 1550750.00 0.00

    Span 0.000 18.000 21)Unaffected

    5000 90000.00 0.00

    47170819.90 1544400.00

    19811744.36 648648.0066982564.26 2193048.00

    Add (+)42%

    Annexure-C

    Total of annexure-B

    Total of annexure-B

  • 7/30/2019 Inoice Nov2012 Reach-1

    130/162

    10M3 21260 56460 1) E.W. informing

    bank for

    widening the

    exg MG

    formation on

    both sides to

    BG std incl

    yard with

    etc.

    1300 7339800.00 2763800.00

    7339800.00 2763800.00

    3082716.00 1160796.00

    10422516.00 3924596.00

    0.00 0.00

    Mtr. 0 2030018)

    Unaffected 30 609000.00 0.00

    Total Ann 'E' 609000.00 0.00Add (+)44% 267960.00 0.00

    876960.00 0.00

    Mtr. 0.00 69585.00 3) Unaffected 3.30 229630.50 0.00

    Tonne 0 2500.06 4) Unaffected 255.00 637515.30 0.00

    Sleep

    er

    0 50800 7) Unaffected 80.00 4064000.00 0.00

    Sleerp

    er per

    km

    0 130306 8) Unaffected 0.46 59940.76 0.00

    4991086.56 0.00

    2595365.01 0.00

    7586451.57 0.00

    0.00 0.00

    1.Collectio

    n & supply

    of ballast

    at yard

    10M3 0.000 13577.020 a) 100%

    unaffected

    7000 9503914.00 0.00

    Add (+) 42%

    Total of annexure-C

    Total of annexure-E

    Add (+)52%

    Annexure-G

    Total of annexure-G

    Annexure-H

    Total of annexure-C

    Annexure-D

    Total of annexure-D

    Annexure-E

    Annexure-F

    Total of annexure-F

  • 7/30/2019 Inoice Nov2012 Reach-1

    131/162

    10M3 0.000 521.54 b)95%

    unaffected

    7000 346824.10 0.00

    10M3 0.000 256.07 c)90%

    unaffected

    7000 161324.10 0.00

    2. Along

    side collec-

    tion &

    supply of

    ballast

    10M3 0.000 19211.64 a)100%unaffected

    7000 13448148.00 0.00

    10M3 0.000 0.000 b)95%

    unaffected

    7000 0.00 0.00

    10M3 0.000 0.000 c)90%

    unaffected

    7000 0.00 0.00

    23460210.20 0.00

    2064498.50 0.00

    Total 25524708.70 0.00

    0.00 0.00

    MT 215.484 5038.626 1) Supply ofordy portland

    cement grade

    43/53

    confirming to

    IS 8112 etc.

    4400 22169954.40 948129.60

    22169954.40 948129.60

    4433990.88 189625.9226603945.28 1137755.52

    MT 0.000 1440.536 02) Supplyof MS/TMT-

    Fe-415

    grade steel

    rods of

    various dia.

    A)

    75%stage

    payment

    36000 38894472.00 0.00

    MT 32.708 1319.267 B) 25%stage

    payment

    36000 11873403.00 294372.00

    Total 50767875.00 294372.00

    Add +5% as

    per agt.2538393.75 14718.60

    53306268.75 309090.60Total of annexure-K

    Total of annexure-I

    Annexure-J

    Total of annexure-J

    Add (+)20%Total of annexure-J

    Annexure-K

    Annexure-L

    Total of annexure-H

    Add (+) 8.80%

    Annexure-I

  • 7/30/2019 Inoice Nov2012 Reach-1

    132/162

    2429006.00 0.00

    Total for Ann-A 20878354.96 1269090.62

    Total for Ann-B 66982564.26 2193048.00

    Total for Ann-C 10422516.00 3924596.00

    Total for Ann-D 0.00 0.00

    Total for Ann-E 876960.00 0.00

    Total for Ann-F 7586451.57 0.00

    Total for Ann-G 0.00 0.00

    Total for Ann-H 25524708.70 0.00

    Total for Ann-I 0.00 0.00

    Total for Ann-J 26603945.28 1137755.52

    Total for Ann-K 53306268.75 309090.60

    Total for Ann-L 2429006.00 0.00

    Grand total 214610775.52 8833580.74

    or say 214610776.00 8833581.00

    ABSTRACT

    Total Annex. L

  • 7/30/2019 Inoice Nov2012 Reach-1

    133/162

    Upto date Since last

    Certificate

    Grand total 214610776.00 8833581.00

    214610776.00 8833581.00

    0.00 0.00

    Total value of work done 214610776.00 8833581.00

    Less value of work shown on last certificate vide CC-20. 205777195.00 0.00

    Amount due 8833581.00 8833581.00

    XEN/GC/MDU

    Note: Under three paise in the total will be dropped and three paise and over will recokned as Six paise.

    (Rupees Eighty Eight Lakhs Thirty Three Thousand Five Hundred and Eighty One Only)

    Dated 04.12.2010 Contractor XEN/GC/ MDU

    Certified that on materials the cost of which has not been recovered have been issued to the contractor

    except such as are specifically provided for in the agreement.

    Dated 04.12.2010 XEN/GCI/ MDU

    Items Remarks.

    Certified that not less than the quantities

    paid for has actually been done at site and

    the quantity are approximately arrived asper plans and cross sections of item No.1

    of Annex 'C'.

    Total value of work done including

    Deduct 10% on the schedule rates to

    become due to the contractor on the

    Rate

    The measurements were made by Shri Y.Ramesh, SE/Works on 16.11.2010 at page No. 68 to 70 of MB

    No. 705600 and on 16.11.2010 at page No.36 to 39 of M.B. No. 705700, on abstract at page No. 30 to 33

    of M.B. No. 320900, and by Shri.R.Anbazhagan, JE/W on 18.10.2010 at page No. 50 to 52 of

    M.B.No.161300, on and on 14.09.10 at page No.14 to 20 of M.B.No. 161500, by Shri M.Rajakumar, SE/W

    on 03.12.10 at page 13 of M.B No.173200.

    Dated 04.12.2010 Contractor XEN/GC/ MDU

    Certified that the foregoing claim is correct that the necessary measurements were taken by the Shri

    Y.Ramesh, SE/Works on 16.11.2010 at page No. 68 to 70 of MB No. 705600 and on 16.11.2010 at page

    No.36 to 39 of M.B. No. 705700, on abstract at page No. 30 to 33 of M.B. No. 320900, and by

    Shri.R.Anbazhagan, JE/W on 18.10.2010 at page No. 50 to 52 of M.B.No.161300, on and on 14.09.10 at

    page No.14 to 20 of M.B.No. 161500 and checked by XEN/GC/MDU on 25.11.10 at page No. 68 to 71 of

    M.B. No. 705600, on 25.11.10 at page No. 36 to 39 of M.B. No. 705700, 25.11.10 at page No. 51 to 53 of

    M.B. No. 161300, 25.11.10 at page No. 18 to 20 of M.B. No. 161500 and that the work has been

    satisfatorily performed.

    Amount Refer. To

    item No. of

    the SOR

    Unit Qty. executedsince last

    certificate

    Qty. executed

    up-to-date as

    per M.Book

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    134/162

    Rs. P. Rs. P.

    214610776.00

    205777195.00

    0.00

    176672.00

    17667.00

    Educational cess 3% on IT & SC 5830.00

    0.00

    50.00

    By Cheque 8633362.00

    214610776.00 214610776.00

    Paid in my presence.

    Signature and Designation of Witnessing Officer.

    Dated :

    Sur charge at 10% on IT

    Signature of Contractor

    Note: The Payees acknowledgement should be for the gross amount paid

    Bill copy

    Grand total

    (Rs.88,33,581 /- Rupees Eighty Eight Lakhs Thirty Three Thousand Five Hundred and Eighty One Only)

    STAMP

    Income tax at 2%

    Sr.SO(A)/Dy.CE/CN/II/MDU Dy.CE/CN/II/MDU

    Credit allocation : 146 - 14044 - 20 - 1452 - 03 : Rs.33,560

    Memo of payments made

    Sales tax @2% (VAT)

    Total value of work done

    Amount of previous payments from last

    Certificate No. CC-16

    Forwarded to Financial Adviser and ChiefAccounts Officer on

    Security deposit at 10% of bill

    Chargeable to 146 14044 - 20 1452 03 Rs. 49,08,985 /-, 1431 - 03 -

    Rs.39,24,596/- and to be included in the accounts for the month of December- 2010.

    The cheque to be sent by post to M/s Larsen & Toubro Limited, No.1257-A,Rajeev

    Nagar. Sempatti post, Aruppukkottai- 626 101, Virudhunagar District.

  • 7/30/2019 Inoice Nov2012 Reach-1

    135/162

  • 7/30/2019 Inoice Nov2012 Reach-1

    136/162

    15666105.57

    19609264.34

    18144916.00

    8487450.00

    0.00

    3732300.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    137/162

    3346200.00

    643500.00

    1501500.00

    3646500.00

    429000.00

    400000.00

    1260.00

    3653043.90

    1550750.00

    90000.00

    45626419.90 42732419.90 ########

    64789516.26

  • 7/30/2019 Inoice Nov2012 Reach-1

    138/162

    2431.38

    7586451.57

  • 7/30/2019 Inoice Nov2012 Reach-1

    139/162

    25524708.70

    25466189.76 25466189.76

    52997178.15 52997178.15

  • 7/30/2019 Inoice Nov2012 Reach-1

    140/162

    205777195.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    141/162

    0.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    142/162

    8833581.00

    8833581.00

  • 7/30/2019 Inoice Nov2012 Reach-1

    143/162

    DYCE/CN/II/MDU : Division Sub-dvision

    Contract certificate No.CC-19/XEN/MDU/1730

    Sanction for work: 2000/W1/GC/S/1 dt.9.1.2008.

    Name of Contractor:

    Mount Poonamallee Road, Manapakkam, chennai-89

    Contract Agt.No.and date: W.Order No.and date:

    Agt. No. 49/CN/2008 dt. 01.07.2008

    Date of commencement of work: 05.03.2008 Date of completion: In progress

    Voucher No. MDU / GC/ MDU - VPT / /VIII/2010 DT. .08.2010

    Upto date Since last cer ti ficate

    1 2 3 4 5 8 9

    Rs. Rs. P Rs. P

    Annexure-A

    10M3 0.000 421.628 3) 103-b 358 15094.28 0.00

    10M3 124.330 3042.062 4) 103-c 542 164879.76 6738.69

    10M3 0.000 221.335 7) 106 230 5090.71 0.00

    M3 0.000 393.920 11)201 190 74844.80 0.00

    M3 0.000 1901.027 16) 401 103 195805.78 0.00

    M3 0.000 3129.920 17) 402 209 654153.28 0.00

    M3 0.000 66.724 19) 404 64 4270.34 0.00

    M3 0.000 472.514 20) 405 60 28350.84 0.00

    M3 0.000 303.866 21) 406 125 37983.25 0.00

    M3 0.000 49.845 25) 412 157 7825.67 0.00

    M3 29.151 494.672 36)504-a 606 299771.23 17665.51

    M3 0.000 63.114 37)506-a 1064 67153.30 0.00

    M3 195.330 812.095 39) 509-a(I) 772 626937.34 150794.76

    M3 13.940 69.774 40)511-a(I) 2798 195227.65 39004.12

    M3 140.285 1948.973 41)511-b(I) 3087 6016479.65 433059.80

    Amount

    M/s. Larsen and Toubro Ltd., ECC Division, P.O.Box No. 979,

    SOUTHERN RAILWAY

    XEN/GC/MNM@MDU

    Month of: 20.08.2010

    Name of work: Manamadurai - Virudhunagar Gauge Conversion project : Manamadurai - Tiruchchuli

    (Excluding) - Proposed construction of Bridges, station buildings, earth work, level

    crossings, platform shelters, circulating area, track linking, welding, supply of ballast,

    signal and telecommunication works and electrical works.(Reach-I)

    Unit Quantityexecuted since

    last certificate

    Quantityexecuted

    uptodate as per

    measu- rement

    book

    Items Rate Reference toitem number

    of the

    schedule of

    rates

    Remarks

    mailto:XEN/GC/MNM@MDUmailto:XEN/GC/MNM@MDU
  • 7/30/2019 Inoice Nov2012 Reach-1

    144/162

    M3 91.050 1835.592 43)511(d)I 2537 4656896.90 230993.85

    10m2 0.000 1.155 55)527-a 706 81.54 0.00

    10m2 475.570 475.570 56)527-b 674 32053.42 32053.42

    M3 10.410 31.710 58)602-d 912 28919.52 9493.92

    M3 10.410 10.410 60)626-a 59 614.19 614.19

    M3 10.410 10.410 61)626-b 38 395.58 395.58

    Total of annexure-A 13112829.03 920813.84

    3300499.07 231768.84

    Total of annexure-A 16413328.10 1152582.68

    Annexue-B

    Mtr. 0.000 5336.740 1)Providingcast-in-situ

    bored piles

    1000mm dia

    for reqd depthwith RCC of

    M35 or higher

    specified mix

    with 12mm to

    20mm.

    3400 18144916.00 0.00

    Mtr. 0.000 1414.575 2) Supply,fabrication &

    placing in

    position MS

    liners incl

    cutting and

    bending with

    contr.'s 6mm

    thick MS

    sheets as

    necy for RCC

    pile of

    1000mm dia.

    6000 8487450.00 0.00

    3) CN of

    precast

    concrete

    superstructure

    with 'I' girder

    of a single

    track etc. for a

    span of

    12.20m.

    Span 5.000 24.000 1)Procurement

    and bringing

    to the site

    reinforcement

    steel reqd (at

    15%)

    858000 3088800.00 643500.00

    Span 0.000 26.000 2- Unaffected -@ 15%

    858000 3346200.00 0.00

    Add (+)25.17

  • 7/30/2019 Inoice Nov2012 Reach-1

    145/162

    Span 0.000 15.000 3- Onprocurement

    of

    neoprenebear

    ings (at 7%)

    858000 900900.00 0.00

    Span -15.000 -15.000 3 (1)procurement

    of neoprene

    bearings (at

    7%) to be

    deleted forPSC slab-

    already

    claimed as

    per page No.

    202 of Annex.

    858000 -900900.00 -900900.00

    Span 15.000 15.000 3 (2)procurement

    of neoprene

    bearings (at

    5%) to be

    claimed for

    PSC 'I' girder

    as per page

    No. 124 ofspl. Condition

    of contract

    858000 643500.00 643500.00

    Span 4.000 35.000 4-Procurement

    and bringing

    to the site

    appd quality

    metallic

    flexible

    sheeting and

    read

    anchroge

    cones (at 5%)

    858000 1501500.00 171600.00

    Span 10.000 10.000 5- On castingof PSC 'I'

    girder in all

    respects reqd

    for one span

    in casting

    yard (at 25%)

    858000 2145000.00 2145000.00

    Each 1.000 1.000 12) Verticalload testing of

    single bored

    pile for

    bridges

    80000 80000.00 80000.00

    Each 0.00 1.00 13)Unaffected

    1260 1260.00 0.00

    M3 0.000 1106.983 19)Unaffected

    3300 3653043.90 0.00

    M3 0.000 620.300 20)Unaffected

    2500 1550750.00 0.00

    Span 0.000 18.000 21)Unaffected

    5000 90000.00 0.00

    42732419.90 2782700.00

    17947616.36 1168734.00Add (+)42%

    Total of annexure-B

  • 7/30/2019 Inoice Nov2012 Reach-1

    146/162

    60680036.26 3951434.00

    0.00 0.00

    0.00 0.00

    Mtr. 0 20300 18)Unaffected

    30 609000.00 0.00

    Total Ann 'E' 609000.00 0.00

    Add (+)44% 267960.00 0.00

    876960.00 0.00

    Mtr. 0.00 69585.00 3) Unaffected 3.30 229630.50 0.00

    Tonne 0 2500.06 4) Unaffected 255.00 637515.30 0.00

    Sleep

    er

    0 50800 7) Unaffected 80.00 4064000.00 0.00

    Sleerp

    er per

    km

    0 130306 8) Unaffected 0.46 59940.76 0.00

    4991086.56 0.00

    2595365.01 0.00

    7586451.57 0.00

    0.00 0.00

    1.Collectio

    n & supply

    of ballast

    at yard

    10M3 0.000 15217.910 a-1)100%unaffected

    7000 10652537.00 0.00

    10M3 -15217.910 -15217.910 a-2)100%

    unaffected

    7000 -10652537.00 -10652537.00

    10M3 12078.290 12078.290 a-3)100%

    unaffected

    7000 8454803.00 8454803.00

    10M3 0.000 521.54 b)95%

    unaffected

    7000 346824.10 0.00

    10M3 256.070 256.07 c)90%

    unaffected

    7000 161324.10 161324.10

    Annexure-D

    Total of annexure-D

    Total of annexure-B

    Total of annexure-G

    Annexure-H

    Annexure-C

    Total of annexure-C

    Annexure-E

    Total of annexure-E

    Annexure-F

    Total of annexure-F

    Add (+)52%

    Annexure-G

  • 7/30/2019 Inoice Nov2012 Reach-1

    147/162

    2. Along

    side collec-

    tion &

    supply of

    ballast

    10M3 14075.520 14075.52 a)100%

    unaffected

    7000 9852864.00 9852864.00

    10M3 0.000 0.000 b)95%

    unaffected

    7000 0.00 0.00

    10M3 0.000 0.000 c)90%unaffected

    7000 0.00 0.00

    18815815.20 7816454.10

    1655791.74 687847.96

    Total 20471606.94 8504302.06

    0.00 0.00

    MT 179.260 4349.366 1) Supply ofordy portland

    cement grade

    43/53

    confirming to

    IS 8112 etc.

    4400 19137210.40 788744.00

    19137210.40 788744.0


Recommended