+ All Categories
Home > Documents > INSIDE 15/16-09-2014 MECHANICS UPDATES CHARIOT - NEW DESIGN COOLING PET DETECTOR G. GIRAUDOTORINO...

INSIDE 15/16-09-2014 MECHANICS UPDATES CHARIOT - NEW DESIGN COOLING PET DETECTOR G. GIRAUDOTORINO...

Date post: 26-Dec-2015
Category:
Upload: lauren-lamb
View: 214 times
Download: 0 times
Share this document with a friend
Popular Tags:
14
INSIDE 15/16-09-2014 MECHANICS UPDATES CHARIOT - NEW DESIGN COOLING PET DETECTOR G. GIRAUDO TORINO 15/16 - 09 -201
Transcript

INSIDE15/16-09-2014 MECHANICS UPDATES

• CHARIOT - NEW DESIGN• COOLING• PET DETECTOR

G. GIRAUDO TORINO 15/16 - 09 -2014

G. GIRAUDO TORINO 15/16 - 09 -2014

MECHANICS UPDATES

Not approved by CNAO

G. GIRAUDO TORINO 15/16 - 09 -2014

MECHANICS UPDATES ALL COMMERCIAL COMPONENTSARE CERTIFIED FOR MEDICAL

ENVIRONMENTS (CE)

G. GIRAUDO TORINO 15/16 - 09 -2014

MECHANICS UPDATES

PET

TRACKER

VERTICAL SLEDGES

LINEAR GUIDES NADELLA LM65-1200

GAS SPRINGSLIFT-O-MAT

WEELS TENTE

G. GIRAUDO TORINO 15/16 - 09 -2014

MECHANICS UPDATES

STRESS ANALISYS10 MPa (130 MPa)

G. GIRAUDO TORINO 15/16 - 09 -2014

MECHANICS UPDATES

G. GIRAUDO TORINO 15/16 - 09 -2014

MECHANICS UPDATES

STAUBLI RME09-7102-0

TO INSIDE

FROM INSIDE

MSC SRH 4110-03

MANIFOLD 1x4REG 1202

MANIFOLD 1x4

CHILLER SMC HRS012-AF-20-MT

G. GIRAUDO TORINO 15/16 - 09 -2014

MECHANICS UPDATES

G. GIRAUDO TORINO 15/16 - 09 -2014

MECHANICS UPDATES

The INSIDE support mechanics has been redesigned The structural FEM analysis ready/done The cooling system drawing is ready

• Patch Panel location to be decided• Chiller type to be decided

Report on mechanics/cooling to be submitted to CNAO ready soon

G. GIRAUDO TORINO 15/16 - 09 -2014

PET detector updates

G. GIRAUDO TORINO 15/16 - 09 -2014

PET detector updates

COOLING PLATE – NEW DESIGN

ALUMINIUM ALLOY AlSi7Mg T6 150 W/m∙KAISI 316 L 15 W/m∙K

Tube embedded in the melted plate

found an art foundry (ITALFOND) plate in order: minimum 8 pieces

G. GIRAUDO TORINO 15/16 - 09 -2014

PET detector updates

G. GIRAUDO TORINO 15/16 - 09 -2014

PET detector updates

G. GIRAUDO TORINO 15/16 - 09 -2014

PET detector updates

The INSIDE support mechanics has been redesigned The structural FEM analysis ready/done The cooling system drawing is ready

• Patch Panel location to be decided• Chiller type to be decided

Report on mechanics/cooling to be submitted to CNAO ready soon

Cooling plates has been redesigned• Cooling tube embedded in the melted plate

New drawing from Hamamatsu Reference mark locations have to be found


Recommended