Enclosed Busways
Inspection and Test Procedures for Metal-Enclosed Busways
Content
1. Visua l and Mechanical Inspection
2. Electrical Tests
3. Test Values
1. Test Values – Visua l and Mechanical
2. Test Values – Electrical
4. Tables:
Yahoo Search
8/17/2019 Inspection and Test Procedures for Metal-Enclosed Busways _ EEP
http://slidepdf.com/reader/full/inspection-and-test-procedures-for-metal-enclosed-busways-eep 2/8
12/27/2013 Inspection and Test Procedures for Metal -Enclosed Busways | EEP
http://electrical-engineering-portal.com/inspection-and-test-procedures-for-metal-enclosed-busways#.Ur3NEfh-ygA.facebook
1. TABLE 100.12 – US Standard Fasteners Bolt-Torque Values for Electrical Connections
2. TABLE 100.1 – Insulat ion Resistance Test Values Electrical Apparatus and Systems
3. TABLE 100.17 – Dielectric Withstand Test Voltages for Metal-Enclosed Bus
1. Visual and Mechanical Inspection
1. Compare equipment nameplate datawith drawings and specifications.
2. Inspect physical and mechanical condition of busway system
3. Inspect anchorage, alignment, and grounding .
4. Verify correct connection in accordance with single-line diagram.
5. Inspect bolted electrical connections for high resistance using one or more of the following methods:
Use of a low-resistance ohmmeter in accordance with Section 2 (Electrical Tests).
Verify tightness of accessible bolted electrical connections and bus joints by calibrated torque-
wrench method in accordance with manufacturer’s publ ished data or Table 100.12 below.
Perform thermographic survey
( NOTE: Remove all necessary covers prior to thermographic inspection. Use appropriate
caution, safety devices, and personal protective equipment.)
6. Confirm physical orientation in accordance with manufacturer’s labels to insure adequate cooling.
7. Examine outdoor busway for removal of “weep-hole” plugs, if applicable, and the
correct installation of joint shield.
Go to Content ↑
2. Electrical Tests
1. Perform resistance measurements through bolted connections and busjoints with a low-resistance
ohmmeter, if applicable, in accordance with Section 1 (Visual and Mechanical Inspection).
2. Measure insulation resistance of each busway, phase-to-phase and phase-to-ground for one minute
in accordance with Table 100.1 below.
3. Perform a dielectric withstand voltage test on each busway, phase-to-ground with phases not unde
8/17/2019 Inspection and Test Procedures for Metal-Enclosed Busways _ EEP
http://slidepdf.com/reader/full/inspection-and-test-procedures-for-metal-enclosed-busways-eep 3/8
12/27/2013 Inspection and Test Procedures for Metal -Enclosed Busways | EEP
http://electrical-engineering-portal.com/inspection-and-test-procedures-for-metal-enclosed-busways#.Ur3NEfh-ygA.facebook
test grounded, in accordance with manufacturer’s published data. In the absence of manufacturer’s
published data, use Table 100.17.
Where no dc test value is shown in Table 100.17, ac value shall be used. The test voltage shall be
applied for one minute.
4. Perform a contact-resistance test on each connection point of uninsulated busway. On
insulated busway, measure resistance of assembled busway sections and compare values withadjacent phases.
5. Perform phasing test on each busway tie section energized by separate sources. Tests must
be performed from their permanent sources.
6. Verify operation of busway space heaters.
Go to Content ↑
3. Test Values
3.1 Test Values – Visual and Mechanical
1. Compare bolted connection resistance values to values of similar connections. Investigate values
which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
(7.4.1.5.1)
2. Bolt-torque levels should be in accordance withmanufacturer’s published data. In the absence of
manufacturer’s published data, use Table 100.12. (7.4.1.5.2)
3. Results of the thermographic survey shall be in accordance with Section 9. (7.4.1.5.3)
Go to Content ↑
3.2 Test Values – Electrical
1. Compare bolted connection resistance values to values of similar connections. Investigate values
which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
2. Insulation-resistance test voltages and resistance values shall be in accordance with manufacturer’s
published. In the absence of manufacturer’spublished data, use Table 100.1.
8/17/2019 Inspection and Test Procedures for Metal-Enclosed Busways _ EEP
http://slidepdf.com/reader/full/inspection-and-test-procedures-for-metal-enclosed-busways-eep 4/8
12/27/2013 Inspection and Test Procedures for Metal -Enclosed Busways | EEP
http://electrical-engineering-portal.com/inspection-and-test-procedures-for-metal-enclosed-busways#.Ur3NEfh-ygA.facebook
Minimum resistance values are for a nominal 1000-foot busway run. Use the following formula to
convert the measured resistance value to the 1000-foot nominal value:
Converted values of insulation resistance less
than those in Table 100.1 or
manufacturer’s minimum should be investigated.
Dielectric withstand voltage tests shall not
proceed until insulation-resistance levels are raised above minimum values.
3. If no evidence of distress or insulation failure is observed by the end of the total time of
voltage application during the die lectric withstand test, the test specimen is considered to have
passed the test.
4. Microhm or dc millivolt drop values shall not exceed the high levels of the normal range
as indicated in the manufacturer’s published data.
If manufacturer’s published data is not available, investigate values which deviate from those of similar bus connections and sections by more than 50 percent of the lowest value.
5. Phasing test results shall indicate the phase relationships are in accordance with system design.
6. Heaters shall be operational.
Go to Content ↑
Advertisement
TABLE 100.12
US Standard Fasteners – Bolt-Torque Values for Electrical
Connections
Table 100.12 .1 - Heat-Treated Steel - Cadmium or Zinc Pla ted
Table 100.12 .2 - Silicon Bronze Fasteners
Table 100.12 .3 - Aluminum Alloy Fasteners
8/17/2019 Inspection and Test Procedures for Metal-Enclosed Busways _ EEP
http://slidepdf.com/reader/full/inspection-and-test-procedures-for-metal-enclosed-busways-eep 5/8
12/27/2013 Inspection and Test Procedures for Metal -Enclosed Busways | EEP
http://electrical-engineering-portal.com/inspection-and-test-procedures-for-metal-enclosed-busways#.Ur3NEfh-ygA.facebook
Table 100.12 .4 - Stainless Steel Fasteners
8/17/2019 Inspection and Test Procedures for Metal-Enclosed Busways _ EEP
http://slidepdf.com/reader/full/inspection-and-test-procedures-for-metal-enclosed-busways-eep 6/8
12/27/2013 Inspection and Test Procedures for Metal -Enclosed Busways | EEP
http://electrical-engineering-portal.com/inspection-and-test-procedures-for-metal-enclosed-busways#.Ur3NEfh-ygA.facebook
a.
Consul
manufacturer for equipment supplied with metric fasteners.
b. This table is based on bronze alloy bolts having a minimum tensile strength of 70,000 pounds per
square inch.
c. This table is based on aluminum alloy bolts having a minimum tensile strength of 55,000 pounds
per square inch.
d.
This table is to be used for the following hardware types:
Bolts, cap screws, nuts, flat washers, locknuts (18–8 alloy)
Belleville washers (302 alloy).
Go to Content ↑
TABLE 100.1
Insulation Resistance Test Values Electrical Apparatus and Systems
8/17/2019 Inspection and Test Procedures for Metal-Enclosed Busways _ EEP
http://slidepdf.com/reader/full/inspection-and-test-procedures-for-metal-enclosed-busways-eep 7/8
12/27/2013 Inspection and Test Procedures for Metal -Enclosed Busways | EEP
http://electrical-engineering-portal.com/inspection-and-test-procedures-for-metal-enclosed-busways#.Ur3NEfh-ygA.facebook
Table 100.1 - Insula tion Resistance Test Values for Electrical Apparatus and Systems
Go to Content ↑
TABLE 100.17
Dielectric Withstand Test Voltages for Metal-Enclosed Bus
Table 100.17 - Dielectric Withstand Test Voltages for Metal-Enclosed Bus
Go to Content ↑
Resource: Acceptance Testing Specifications for Electrical Power Distribution Equipment and Systems – NETA
2003
Recommended EE articles
8/17/2019 Inspection and Test Procedures for Metal-Enclosed Busways _ EEP
http://slidepdf.com/reader/full/inspection-and-test-procedures-for-metal-enclosed-busways-eep 8/8
12/27/2013 Inspection and Test Procedures for Metal -Enclosed Busways | EEP
http://electrical-engineering-portal.com/inspection-and-test-procedures-for-metal-enclosed-busways#.Ur3NEfh-ygA.facebook
© 2013 EEP - Electrical Engineering Portal. All Rights Reserved | Privacy Policy | 39 queries in
1.142 seconds.
Powered by CsanyiGrou
Edvard - Electrical engineer, programmer and founder of EEP. Highly specialized fo
design of LV high power busbar trunking (<6300A) in power substations, buildings
and industry fascilities. Designing of LV/MV switchgears. Professional in AutoCAD
programming and web-design. Developer of awsome electrical design software
ePlusMenuCAD. Present on Google+.
Become EEP's Contributor and introduce yourself to 70k+ of our readers all across the web.
TOP
Get