WASIT PROJECTS DEPARTMENT WASIT SRU & UTILITIES PROJECT WASIT SAPMT SITE OFFICE SRU BLDG. ROOM # 07 SAUDI ARABIA DOCUMENT TRANSMITTAL 8-May-14 Contract No. 6600026171(IK) TO: Kee Nam (Kenney) Cho Contractor Representative SK Engineering & Construction Co Ltd Wasit Site Office FROM: TEL. NO.: FAX NO. : Mr. Ahmed A. Al-Awaji, Company Representative (IK) 679 - 7200 679-7286 SRU TRANSMITTAL NO.: WPD-WUC-T-0262-14 SK TRANSMITTAL NO.: SK/IK-US-T-S4240/2014 is transmitted herewith Documents EDiskettes Drawings E Disapproval EApproval Information 0Review 8, Comments Title: Pkg#3 Request for Interview Schedule to Instrument QC Inspector (Mr. Muhammad Talha Kaleem) - SKEC- Comments: COMPANY has approved without comments. 20 4.05. 1 2 SKEC WASIT PKG #3 . WASIT PKG # 3 PROJECT Dept Act. int, Dept Act int. PD HSE CD OC PM Admin SM Schedule CM Material MPCM Civil PCM Arch ...r PPD Mech PPM HVAC MFEM Piping FEM STUSTR Sub—con Elec/Inst Contract Paint H/0 C: C over Only ca.:.1intil 3pages ashy ORIGINATOR: Ahmed .Awa NMS IHT Or NOTE: RECEIVED BY: DATE: Attachments: Response Required: / N DUE DATE: cc: Note: COMPANY's review, revision, certification, acceptance or approval of documents in this correspondence shall not have the effect of amending, modifying or limiting, in any way the CONTRACTOR's obligations stipulated in Contract No.6600026172(00K) or 6600026171(IK). Deviation to project standards, procedures, specifications...etc. shall be raised independently as a waiver request and agreed according to contractual terms.
Transcript

WASIT PROJECTS DEPARTMENT WASIT SRU & UTILITIES PROJECT

WASIT SAPMT SITE OFFICE SRU BLDG. ROOM # 07 SAUDI ARABIA

DOCUMENT TRANSMITTAL

8-May-14

Contract No. 6600026171(IK)

TO: Kee Nam (Kenney) Cho Contractor Representative

SK Engineering & Construction Co Ltd

Wasit Site Office

FROM:

TEL. NO.:

FAX NO. :

Mr. Ahmed A. Al-Awaji, Company Representative (IK)

679 - 7200

679-7286

SRU TRANSMITTAL NO.: WPD-WUC-T-0262-14 SK TRANSMITTAL

NO.: SK/IK-US-T-S4240/2014

is transmitted herewith

Documents EDiskettes Drawings

EDisapproval EApproval

Information 0Review 8, Comments

Title: Pkg#3

Request for Interview Schedule to Instrument QC Inspector (Mr. Muhammad Talha Kaleem) - SKEC-

Comments:

COMPANY has approved without comments.

20 4.05. 1 2

SKEC WASIT PKG #3 .

WASIT PKG # 3 PROJECT Dept Act. int, Dept Act int.

PD HSE CD OC ✓

PM Admin SM Schedule CM Material MPCM Civil PCM Arch ...r PPD Mech PPM HVAC MFEM Piping FEM STUSTR Sub—con Elec/Inst Contract Paint H/0

C: C over Only ca.:.1intil 3pages

ashy

ORIGINATOR: Ahmed .Awa NMS IHT

Or NOTE:

RECEIVED BY: DATE:

Attachments:

Response Required: / N DUE DATE:

cc:

Note: COMPANY's review, revision, certification, acceptance or approval of documents in this correspondence shall not have the effect of amending, modifying or limiting, in any way the CONTRACTOR's obligations stipulated in Contract No.6600026172(00K) or 6600026171(IK). Deviation to project standards, procedures, specifications...etc. shall be raised independently as a waiver request and agreed according to contractual terms.

INSPECTION DEPARTMENT SOUTHERN AREA PROJECTS INSPECTION DIVISION

WASIT PROJECTS INSPECTION SECTION Room 03, PKG-3 SAPMT office building, WASIT

Tel: 679-7200; Fax: TBA

DOCUMENT REVIEW RESPONSE Response No.: WPIS-SRU-799-14

SUBMITTING ARAMCO ORGANIZATION

Representative r.) NAME:

DEPARTMENT:

ADDRESS:

TELEPHONE:

Ahmed A. Awaji, Company

SAPM 0 MAY 20V

SAPMT

679-7200

Project Description Wasit GAS program, SRU & Utilities Project (WUC)

BI/JO 10-00914-0004 Main Contractor: SK Engrg. & Const.

Reference Your Transmittal: WPD/WUC/PID/T-0148-14 Ref. No. SK/IK-US-T-S4240-14

Submitted Document INSTRUMENT QC INSPECTOR (Mr MUHAMMAD TALHA KALEEM)

REVIEW STATUS REVIEW DEFINITIONS

1 — Approved without comments 7 — Reviewed with comments 2 — Approved with comments 8 — Partially reviewed with comments 3 — Approved with JC Cards attached 9 — Review not required 4 — Partial approval 5 — Not approved 6 — Reviewed, no comments

COMMENTS

Status-1-Approved without comments.

Note:-

• PID reserves the right to re-evaluate and revoke expected level.

• Approval is for Pkg-3 Only.

this approval if his performance falls below the

Name of Signatory : Mohiddine Akkad-Salam Supervisor

Date: 05/08/2014

Initial by: kif\ n Project File : SRU-799

engineering engineering & construction

WASIT GAS PROGRAM, SRU & UTILITIES PROJECT (WUC)

TRANSMITTAL To, Mr, Ahmed A. AL -Awaji DATE : 07 / Apr / 2014

Company Representative (1K) TR. NO. : SK/IK-US-T-S4240/2014

Saudi Aramco CONTRACT NO. : 6600026171 (1K)

Saudi Aramco Oil Company 31311 REFERENCE : - Dhahran, Saudi Arabia

THE FOLLOWING • DRAWINGS in SPECIFICATION II PROCEDURE

• DATA SHEETS • CALCULATION III MATERIAL REQUITION

• TBE • VENDOR DOCUMENT ■ OTHERS

ARE TRANSMITTED ■ APPROVAL • REVIEW • INFORMATION

, IN RECORD • QUOTATION • CONSTRUCTION

THIS IS ■ ORIGINAL • REVISION • FINAL

DRAWINGS OR DOCUMENT NO. SIZE REV. NO. NO. OF COPIES DESCRIPTION OR TITLE

QCISKPCM-US-T-073712014 A4 A 3 Request for Interview Schedule to Instrument QC Inspector. (Mr, Muhammad Talha Kaleem) SKEC-Direct Team-Pkg #3.

ae Iklk

Signed :

Kwang Nam (Cavin) Youn / Site Manager

NOTE :

• RECEIPT NOT REQUIRED

RECEIPT REQUIRED (PLEASE ACKNOWLEDGE THE RECEIPT OF THE DUPLICATE AND RETURN BY FAX)

THE ABOVE DOCUMENT RECEIVED WITH ELECTRONIC COPY IN CD BY

SIGNATURE TITLE DATE


Recommended