Inspiring Solutions for Clean Technology Applications
Transcript

Inspiring Solutions for Clean Technology Applications

Outline» Deerns … who we are» International Clean Technology Practice … what we deliver» Why Deerns …» References

Strong History and Reputation

» Privately owned, since 1928» Fully independent» Largest M&E engineering consultancy of Europe» Long-term health has priority over short-term profit

Subject Data

In Business 85 years

Specialists 550 Wordwide

Turnover 2012 €55,000,000

Project Value €10,000,000,000

Repeat Business 70% of customers

Global Focus on Specific Clients

20 Offices Worldwide

Service Portfolio

Concept Development Design Budgeting Contracting Building

Supervision

Maintenance & Retrofit

Planning & Programming

…brings concepts to life by» Focus on client’s business» Combining worldclass technical consultancy and

engineering with innovative solutions and proven technologies

» Delivering lowest TCO design solutions based on realized projects

1) Office and mixed-use buildings, leisure and entertainment

2) Residential buildings

3) Health Care institutions

4) Airports5) Mission-Critical facilities -

Data Centres, Clean Rooms and Research Laboratories

Market Segments

» Regulatory environment of FDA, EU, WHO, PICschemeincl. complete validation services and support

» Process environment and process flow of API, pharmaceutical and biotech biosafety manufacturing and laboratories

» 3D design of process, facilities and utilities» Project management and supervision» Certification and Facility management consulting

Our Services: 5D Design and Integration of

Processes

Pharmaceutical Processes» Bulk Chemicals» Bulk Biotechnology» Solid Dosage Forms » Semi Solid Dosage » Parenterals, Ophthalmica and Freeze Drying» Aerosols and Sprays

Risk Analysis Criteria for Production Processes» Normal Products» High Potent Materials» Radioactive Materials» Steroid Products» DNS/RNS Critical Materials» Cancerogenic Products

Services

Biosafety and Biosecurity Laboratories and Manufacturing» BSL 1 S 1» BSL 2 S 2» BSL 3 S 3» BSL 4 S 4Human, Animal, Aquatic, and Plant Applications

Risk Analysis» Bio Risk» Chemical Risks» Radioactive Risks» DNS/RNS Risk» Cancerogenic RiskBio Risk Manuals, Biosafety Compliance, Training

Life Cycle of a Pharmaceutical Product

F & E - Phase

TIME

Development - Phase Launch - Phase Productions - Phase

Patent Affiliation

Clinical phase I, II und III GalenicEnd of Patent

Concept

Design

Construction Operation

Idea

Life Cycle of a Project100%

Time0%

Definition Phase Pharmacist

Concept Phase Pharmacist and/or Consultant

Construction

Operation / Production

Design Phase Expert/Engineering/Consultant

With CAQ, integrated design and installed facility management and assetmanagement more than 15 % of costs can be cut off.

Development of Costs

Operating Costsafter 3-4 years

Operating Costsafter 8 – 10 years

Investment Costs

ProjectDevelopment

Design Construction Operation

Deg

ree

of In

fluen

ce

Cost of Design

Already after 3 to 4 years the operating costs equal the investments !

Engineering Qualification

Parallel Process of Qualification/Validation and Engineering

Design Qualification (DQ)

Installation Qualification (IQ)

Operational Qualification (OQ)

Performance Qualification (PQ)

URS

Concept-Design

Basic Design

Detail Design

Construction

Start Up

Turnover

Qualification-Design

QualificationMaster Plan

DQ

IQ

OQ

PQ

Summary Report

Milestone Approach

Concept DesignFeasibility Study

CostEstimate± 25 %

BasicEngineering

Cost Estimate± 15 %

Governmentaland Regulatory

Aspects

DetailEngineering

CostEstimate± 10 %

ConceptQualification

GMP-Review

FDAPreapproval

Validation Master PlanMaster Qualification PlanDesign Qualification

VMP-MQP

DQ

InstallationQualificationFactory Acceptance TestSite Acceptance Test

FATSAT

IQ

Concept/Development/Site Selction

Milestone Approach

Construction

Readiness

Certification

Certification

After Sales SupportService & MaintenFacilityManagement

OperationalQualification

PerformanceQualification

PQ

End Report

TurnoverProcess

ValidationCleaning

Validation

OQ

Qualification Validation Process

Design Qualification (DQ)

Installation Qualification (IQ)

Operation Qualification (OQ)

Performance Qualification (PQ)

Qualification Plan -

Development

Execution

Approval

Computerized

System

Validation

End Report

Process Validation - Cleaning Validation

Ishikawa Diagram of a Solid Dosage Form Production

Validation Life Cycle

International Clean Technology Practice

Core team members each with more than 25 years’ experience in design, build and realization of cleanroom research, pilot and production lines

» Taiwan : TSMC / Macronix / Winbond / Vanguard / ASML» Germany : NXP / IBM / Siemens / Wacker / Bayer / Shering» China : Hua Hong / ASMC / Motorola » Singapore : Chartered» Netherlands : Philips / ASML / Universities / DSM / MSD» Belgium : IMEC / Upjohn / Janssen» Italy : Texas Instruments / STM / Thales» Ireland : Intel

Clean Technology Task Force

GeorgePollock

HorstWeiβsieker

EricStuiver

BarryWeisscher

SheilahBain

Aad Hofstede

WimButers

Develop and deliver tailor made cleanroom solutions

for professional clients within Clean Technology Applications...

...made by Passion

Integrated solutions for complex technical environments

» Electronics » Life Sciences » Solar » Containment» Health Care » R&D Laboratories

ICTP Mission

Project Samples - Electronics

• ASML Netherlands, Veldhoven

• ASML Taiwan, Linkou

• Space Research Organisation, Utrecht

• Thales Alenia Italy, l’Aquilia

Project Samples - Life Sciences

• Crucell, Leiden

• MSD, Haarlem

• Banner Pharmacaps, Tilburg

• Philips, Molecular Medicine

Project Samples - High Containment

• Spronck lab, Bilthoven

• RIVM Polio, Bilthoven

• ML III Lab, Groningen

• Erasmus Medical Centre,Rotterdam

Project Samples - Health Care

• Martini Hospital, Groningen

• NKI, Amsterdam

• Erasmus Medical Center, Rotterdam

• Reinier de Graaf Hospital, Delft

Project Samples - Laboratories

• Danone, Utrecht

• DSM, Delft

• FOM Institute, Amsterdam

• Philips, High Tech Campus, Eindhoven

Deerns is involved in four out of five facilities of NanoLab NL, an investmentprogram of high-tech, state-of-the-art nanotechnology infrastructure that isaccessible to NanoNed and the Dutch research community as a whole.

Project Samples - Nano Facilities

Key services Feasibility, programming, design, commissioning, supervision and qualification

» Continuously serving clients in state-of-the-art cleanroom facilities

Our Clients

» Extensive expertise and experience in designing and delivering cleanrooms to international standards (ISO, GMP, BSL, FDA) > 45 Specialized Consultants > 150.000 m2 of delivered cleanroom area

» In-depth understanding of all requirements of the latest process equipment, ensuring all performance criteria are met and smooth hook-up and startup is achieved. This is regarding: Cleanroom / particle requirements (ISO, GMP) Chemical contamination (<5 ng/l organic) Electromagnetic contamination (EMC e.g. 10 nT) Vibrations (down to VC-F and VC-G)

» Proven capabilities within all clean technology applications: electronics including semiconductor, aerospace and solar life sciences regulatory including validation barrier technologies for containment (up to BSL4) full range of laboratories (generic <> specific)

» Full integration (design, commissioning) with sustainability requirements including LEED, BREEAM

ICTP Value Proposition

Clean Technology - Top Down <> Bottom Up

Top -down

Bottom - up203020131960

0.1 nm

Biofysica

Self assemblyQuantum computing

Bio-elektronica

10,000 nm

100 nm

10 nm

1 nm

Clean Technology - Trend

Ballroom

Tunnel

Mini-Environment

Clean machine

1970

1980

1990

2000

Nano clean

2010

BioNano clean

2020

ISO 3 - 5

ISO 5 - 8

‘Nano clean’

‘BioNano clean’

» Diversification and reduction in ‘critical’ cleanroom area

» Project Programming Consultancy

» Project Management

» Design and Engineering

» Construction Supervision

» Testing, Qualification and Validation

» Hook-Up

» Operational Support

Services, what we deliver• Definition of the project starting points including process/research equipment

lists, process utilities requirements, conceptual and functional layouts, logistic flow schemes etc.

• Preparation of the Technical Program of Requirements / User Requirements Specifications.

• Preparation, implementation and monitoring of the project plan• Coordination of the parties involved in the design and construction

management• Time control (compliance with target time frame)• Cost control (compliance with target budget)• Quality control (compliance with target specification)• Arrange for progress and review meetings• Reporting to the Client.

• Preparation of complete design documents for general building systems and process critical systems

• In close conjunction with the Architect the development of engineering and tender documents for HVAC & Cleanroom, Electrical & Control, Central & Process Utilities, Environmental & Safety Systems and Sustainability Measures

• Site organization, coordination and direction of contractors/suppliers• Definition, implementation and monitoring of procedures and instructions• Safety management on-site• Time, cost and quality monitoring• Coordination and verification of test & acceptance procedures of

(sub)systems• Coordination and support of hand-over procedures to Client• Arrange for coordination meetings and reporting to project managementX

• Set-up of the Validation Master Plan• Development and support of the execution of the Installation Qualification (IQ)• Development and support of the execution of the Operation Qualification (OQ)

and the Performance Qualification (PQ) of the facility and its installationsXX

• Preparation of detailed design documents for utility requirements, system interconnect and space management

• Preparation of macro and micro layouts for process and support areas• Definition and design of mini-environments and associated construction

documents• Design coordination of floor and wall penetrations and appropriate shop drawings• Coordination and direction of contractors/suppliers• Time, cost and quality monitoring• Coordination and verification of test & acceptance procedures• Coordination of hand-over procedures to Client

Con

tam

inat

ion

Con

trolle

d Fa

cilit

ies

Approach, how we deliver

OPERATION

Quality Assurance

Construction Supervision

Inspection

Field Engineering

Commissioning

Quality Assurance

Basic DesignFinal DesignBid PackagesTender DocumentsBid Evaluation

Feasibility Study

Project Definition

URS - PoR

Cost Estimates

Technical Surveys

Cost Engineering

Assessment Analysis

START-UPPROJECTIMPLEMENTATION

PROJECTDESIGN

PROJECTPREPARATION

PROCESSINGFIT-OUTHOOK-UP

CHANGEMANAGEMENT

FLEXIBILITYCHANGEABILITY

LOGISTICS LAYOUTS

Maintenance Planning

Testing

Validation

Operations Support

Maintenance Planning

PROJECTPLANNING

TECHNOLOGYEQUIPMENTPROGRAM

FACILITIES

PROCESS TECHNOLOGY

» Seamless integration of processes, equipment, buildings & installations

» Focus on added value not volume

» Services based on client / project needs

Organization, with whom we (can) deliver

» Project cost analysis : continuously exchange of international benchmarks and figures

1. Tendering Design & Build Contract2. Budget Control3. Client Hand-Over

Cost Control

€ 1.300.000€ 2.350.000

€ 1.700.000

€ 16.250.000

Buildings & Installations

Hook-Up

Equipment & Furniture

Management & Design Fee

Why Deerns…

» Highly skilled and specialised staff each with more than 25 years’ experience in planning, designing and delivering contamination controlled research/production facilities and laboratories to international standards (ISO, VDI, GMP, BSL, FDA)

» Continuous involvement at the leading-edge of new process and research technologies

» Thorough understanding of client’s critical business & technology processes

» In-depth understanding of all requirements of the latest process equipment, ensuring all performance criteria are met to guarantee that smooth hook-up and startup is achieved

» Independent cost expertise & benchmarking

» Extensive experience in all type of projects including greenfield, brownfield, relocation, extension, modification and live upgrade projects

» World’s most energy efficient, reliable and flexible cleanroom and laboratory concepts for a wide range of applications (physical, chemical, biological, radiological, electromagnetically shielded)

» Full integration (design, commissioning) with sustainability requirements including LEED, BREEAM

» Deerns proprietary TCO, Energy & CFD modelling tools

Why Deerns?

Clean Technology References

Clean Technology References (1)

Client / Project Features Services

TU TwenteCleanroom

RIVM BilthovenLaboratoria

KLM SchipholCatering

Knorr, LoosdrechtFood IndustryConimex, BaarnFood Industry

Bio IntermediairGroningen, Farma

Gist-Brocades, DelftTest Center

Cordis EuropeUpgrade Building 5

1990

Year

R & DMicroelectronics

VaccinsLaboratoria

Preparation andPacking

Preparation andPackingTest en SimulationProduction line

Production LabFarmaceutical

Peniciline

Production and TestMedical equipment

3.800 m2

Class 100-10.000

2.600 m2

Class 100-100.000

25.000 m2

28.000 m2

2.100 m2

Class 1.000-100.000

1.500 m2

Class 1.000

3.000 m2

Class 100.000

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

1992

1993

1994

1995

Clean Technology References (2)

Client / Project Features Services

CPRO-DLO,WageningenClimat cells

Centocor, LeidenFarmaceutical

ASML, VeldhovenAssembly & Test

TU/e, EindhovenCascade building

KU Nijmegen

TU/e, EindhovenTechnology Building

Philips Research, E’hovenBuilding WAG

RIVM, BilthovenMDL

1996

Year

Microbiological

PharmaceuticalsDiagnostics

Steppers, Scanners

Faculty PhysicsLaboratoria

Faculty PhysicsLaboratoria

R & D Fotonics

R & D Semiconductors

BiotechnologyLaboratories

1.800 m2

Class 100-100.000

2.800 m2

Class 100-10.000

7.000 m2

Class 100-100.000

3.500 m2

12.000 m2

2.000 m2

Class 100-10.000

1.600 m2

Class 10.000

1.200 m2

BSL3, BSL4

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

Design

1998

2000

2002

Clean Technology References (3)

Client / Project Features Services

Philips ElectronicsBuilding WDX

LouwersGlass and Ceramics

NMiTechnópolis

TU Twente, MESA+

NanoLab

Mead JohnsonNijmegen

SRON, UtrechtUpgrade

TNO, TU DelftNANOSCIENCE

RIVM, BilthovenUpgrade gebouw U4

ASML, VeldhovenWorkcenters

2003

Year

Physical & ChemicalLaboratories, Cleanroom

Micro-mechanicsCleanroom

Physical & ChemicalLabs & Cleanroom

Physical LaboratoriesCleanroom

Microbiological &Chemical Laboratories

Microelectronics Micro-mechanics

Microelectronics,Labs & Cleanroom

BiotechnologyVaccin production

Microelectronics,Steppers, scanners

14.500 m2

200 m2

Class 10.000

3.500 m2

Class 100.000

1.500 m2

Class 10.000

530 m2

ML2, ML3

1.000 m2

Class 10.000-100

8.500 m2

Class 10.000-100

2.000 m2

BSL2, BSL3

3.100 m2Class 10.000

Design, ConstructionCoordination

Design, ConstructionCoordination

Design, ConstructionCoordination

Programming, Design,Supervison

Design, ConstructionCoordination

Programming, Design,Supervison

Design, ConstructionCoordination

Programming, Design

Design, ConstructionCoordination

2004

2005

Clean Technology References (4)

Client / Project Features Services

DBF BiofarmaHelmond

TU DelftFaculty of Sciences

ASML, VeldhovenProduction Phase 1

ASML ACETaiwan

PhotovoltechBelgium

IMECBelgium

ASML, VeldhovenApplication Lab

Philips ElectronicsBuilding WB

2006

Year

CleanroomFacility Upgrade

Physical, Bio LabsCleanroom

MicroelectronicsScanners

Microelectronics Training / Refurb.

Solar CellCleanroom Facility

Microelectronics300mm Cleanroom

Microelectronics,Scanners

Physical & ChemicalLaboratories, Cleanroom

5.000 m2

35.000 m2

Class 100.000

5.000 m2

Class 10.000

20.000 m2

Class 10.000

5.000 m2

5.000 m2

1.500 m2Class 10.000

14.500 m2

Design, ConstructionCoordination

Programming

Programming, DesignConstruction

Programming, DesignConstruction

Design clean utilities

Design clean utilities

Design, ConstructionCoordination

Design, ConstructionCoordination

2007

Clean Technology References (5)

Client / Project Features Services

Erasmus Medical CentreRotterdam

Philips, EindhovenBioresearch

ASML, VeldhovenProduction Phase 2

DBF BiofarmaHelmond

TU EindhovenSpectrum

Philips ResearchEindhoven

BronkhorstRuurlo

Neways, EindhovenWorkcenters

2007

Year

High containmentLaboratories

Bio & ChemicalLabs & Cleanroom

MicroelectronicsScanners

PharmaceuticalsCleanroom

Microelectronics Upgrades

Labs & Cleanroom

Microelectronics Assembly

MicroelectronicsCleanroom

500 m2

12.000 m2

Class 10.000

5.000 m2

Class 10.000

500 m2

Class 10.000

1.000 m2

Class 10.000-100

8.500 m2

Class 10.000

1.000 m2

Class 10.000

1.000 m2Class 10.000

Programming, Design, Coordination

Design, ConstructionCoordination

Programming, Design,Construction

Design, ConstructionCoordination

Design, ConstructionCoordination

Programming

Programming, Design

Programming, Design

2008

Clean Technology References (6)

Client / Project Features Services

SRONUtrecht

ASML, VeldhovenProduction EUV

ASML, VeldhovenExisting Facilities

TNO, DelftNanoScience

VieCurieVenlo

TU EindhovenSpectrum

SRONUtrecht

ASML, VeldhovenProduction EUV

TU EindhovenSpectrum

2009

Year

MicroelectronicsMicromechanics

MicroelectronicsScanners

MicroelectronicsScanners

Nano-electronics

HealthcarePharmacie

Microelectronics Upgrades

MicroelectronicsMicromechanics

MicroelectronicsScanners

Microelectronics

1.000 m2

Class 10.000-100

25.000 m2

Class 10.000

20.000 m2

Class 10.000-100

2.500 m2

Class 10.000-100

500 m2

Class 10.000

1.000 m2

Class 10.000-100

1.000 m2

Class 10.000-100

5.000 m2

Class 10.000-100

1.000 m2

Class 10.000-100

Operational Support

Programming

Masterplan

Hook-up

Validation, Design

Hook-up

URS New Facility

Design

Retrofits

2010

Clean Technology References (7)

Client / Project Features Services

MSDOss

ASML, VeldhovenExisting Facilities

TU EindhovenSpectrum

ASML, VeldhovenFacility Planning

Neways, EindhovenHose Bundles

ASML. VeldhovenExtension

BronkhorstRuurlo

Flexplant

LouwersGlass & Ceramics

2010

Year

Pharmaceutical

MicroelectronicsScanners

MicroelectronicsMOVPE

Microelectronics

Microelectronics

Microelectronics

MicroelectronicsAssembly

PharmaceuticsBiotechnology

Micromechanics

1.000 m2

Class 10.000

25.000 m2

Class 10.000

1.000 m2

Class 1.000

25.000 m2

Class 10.000

MaterialsClass 10.000

7.000 m2

Class 10.000-100

1.000 m2

Class 10.000

Confidential

1.000 m2

Upgrade

Retrofits & Upgrades

Hook-Up

BusinessProgramming

Selection, Qualificationand Training

ConstructionSupervision

Upgrade

Design

Design

2011

Clean Technology References (8)

Client / Project Features Services

FOM DIFFEREindhoven

ASML, VeldhovenExisting Facilities

DSM, DelftGMP Laboratories

RIVM, BilthovenMDL

University UtrechtAnimal Facilities

SRONAmsterdam

IMECLeuven

ASML, Veldhoven450mm EUV

TSC Solar

2012

Year

Solar Fusion

MicroelectronicsGas Yard

Bio/Food research

BiotechnologyLaboratories

Animal ResearchLaboratories

Microelectronics

Microelectronics

Microelectronics

Solar Production

1.000 m2

Class 100.000

2.500 m2

20.000 m2

Class 10.000

1.200 m2

BSL3, BSL4

35.000 m2

Class 10.000

15.000 m2

Class 10.000-100

10.000 m2

Class 10.000-100

10.000 m2

Class 10.000-100

6.000 m2

Design

Design, Supervisionand Commissioning

Design

Validation

Design

PoR

Upgrades

Design, Supervisionand Commissioning

PoR

2013

Clean Technology References (9)

Client / Project Features Services

DERU BerlinHamburg

Metallux LeutenbachStuttgart

University, DelftQuantum Lab

University, E’hovenMagnetic Lab

Banner PharmacapsTilburg

BioLab IzmirTurkey

2013

Year

Metrology Lab

Microelectronics

ResearchLaboratories

ResearchLaboratories

UpgradeLaboratories

New Laboratories

500 m2

5.000 m2

Class 10.000

1.000 m2

800 m2

1.000 m2

Class 100.000

20.000 m2

BSL 2/3

Consultancy, Design

Consultancy, Design

PoR, Design, Supervision

PoR, Design, Supervision

Consultancy, Design

Consultancy, Supervision

Deerns Raadgevende Ingenieurs bvP.P. Box 1211 | NL-2280 CE RijswijkT +31 88 374000 0F +31 88 37400 10E [email protected]

Deerns Deutschland GmbHHelmholtzstraße 2-9 | 10587 BerlinT +49 30 3980192 0F +49 30 3980192 9E [email protected]

Deerns Deutschland GmbH | NL KölnGraeffstraße 5 | 50823 KölnT +49 221 5741 0F +49 221 5741 206E [email protected]