+ All Categories
Home > Documents > Inst Man FRB English

Inst Man FRB English

Date post: 04-Jun-2018
Category:
Upload: buiphucuong
View: 227 times
Download: 0 times
Share this document with a friend

of 22

Transcript
  • 8/14/2019 Inst Man FRB English

    1/22

    ooc

    ,lE?,rPPE !o

    !

    3 rrLrn r

    NtUN|.

    (S3N3HH {SH3NVN3(sAA'3c

    IVNCS dHncH

  • 8/14/2019 Inst Man FRB English

    2/22

    CONTENTS1.CAUTION OTES ORYOURSAFETY.....

    - 1 -

  • 8/14/2019 Inst Man FRB English

    3/22

  • 8/14/2019 Inst Man FRB English

    4/22

  • 8/14/2019 Inst Man FRB English

    5/22

    2. INTRODUCTIONThis NSTRUCTION,IANUALovers tandardypeot ;. BASICMODEL(F-V,A-V, &FA-type)

    . REVERSE TRCULATTONypE(R&RAiype). HIGH EMPERATURESoLATIoN YPE(B-type)Other ype/modeluch as HighTemperaturepplication oto(X, Y motor)etc.,needs ifferentnstruction anuals.Please heckyour ype/model nd f necessary, sk SalesRepresentative.Read arelullynddo notuse hepumpbefore ou horoughlynderstandllof the nstruction anual.Followhese nstructionhenoperatinghepump.(1) Do not unpump ry .(2) Completelyemoveoreignmaterialsrompiping ndsystem.(3) Prime ump ndcompletelyentair n motor ousing efore tarting.Reverse irculationinesmustbe ully penall heway o thesuctionank.Openallvalves n reverse irculationinebefore riming.(4) Do not un hepumpwithdischargealve losedor more hanone 1, mrnure.(5) Do notoperatehepump n a wrong otating irection.(6) ll pump s equipped ithcooling r heatingacket, o notoperatehe pumpwithout oolant r heatingmedia.(7) In caseol noise r vibralion,heck auses nd akesteps o correcl.(8) Do notkeep hepump unning henTRG Teikoku otary uardian)meter ndicates ED .(9) Whena protectionevicendicate roblem,heck hecausewithoutailandoperatehepump nlyafter heproblems corrected.(10) When iquidmay reeze r crystall izeuring ump top, akenecessaryrecautions.(11) Should ouneed o operatehepumpunder ifferentonditionsom he nit ial pecifications,lease onsultFactory r SalesRepresentative.

    3. BATING,SPECIFICATIONSNDPERFORMANCEThepump s manufacturedn accordance ithyourspecitiedequirements.efero "DrawingsforConfirmation"or th edetailsof ratingand specifications.lso efer o the inspection ertificates f performance.Please eep hismanual ith hedrawings nd nspectionertificates.

    Please ead e levant ages fterhaving ellunderstandingf theconstructionf basicmodel xplainedelow:4-1.Basic Model(F-V,FA-V,F&FA)

    Basicmodelshave wo typesof conskuctionhat havediflerent irculationlowpattern,he hollowshattconstruction ndthecirculationipe onstruction.onstructionsf thebasicmodelwith hehollow haft typeF-Vand FA-V) reshownnFigure1 and 2. Constructionsf basicmodelwith a circulationipeare shown n Figure3 and 4. Photo grapnsicomponentartot heFA-type reshown n Figure . Thepumpand squirrel-cagenduction) otor reassemblednon ehousingequiring odynamic eal.Thestator nd otor ssembly re hermeticallyealedwith heir ndividualans. hemotor s solatedrom hepumpedluid. n hehollow haft onstruction,umpediquidlows rom hedischargeideof he

    4, CONSTRUCTION

  • 8/14/2019 Inst Man FRB English

    6/22

    impellero the nlet f he mpellern he ollowingrder.Discharge ideol lmpeller@ - Holes n FrontBearingHousing@ (F-V ypel- cap between tatorCan@ an dRotorCan @- C"p between earingrear ide)@ andShaftSleeve@- R""|,Bearing ousing@ * C"nt"|.hole f Shaft@ - int"tot mpeller@Anotherlow uns rom:Holes l FrontBearing ousing@ * C"p between earing(fronride)@ andShaftSteeve@ - Orificeormed yFrontBearing ousing@ andhubof mpeller@) .In FA-V ype, iquidlows hrough oles l Adapter@ intogapbet\iveenearing(kontide)(E andShaltSleeve@and hen akes he same lowas mentioned bove. n the circulationipeconstruction,umpediquid lows rom hedischargeideof hecasingo the mpellern he ollowingrder.D i s c h a r g e f l a n g e o f C a s i n g @ * Fi l t e r @ * C i r c u l a t i o n P i p e @ *R e a r B e a r i n g H o u s i n g @ - ga p b e t w e e nBearing(rear ide)(@ and Shatt Sleeve@ * C"p betweenStalor Can @ and FtotorCan@ * cap betweenBearing(lrontide)@ andShaftSleeve@ - Balance ole f lmpeller@Thiscirculationlowworksas lubricantor Bearing@ (@ and as coolant or motor.So liquid ontained lurryorshortage t circulatinglow rate maycause koubles.The RotorAssembly@ is supported y Bearing@ , (D onbothsideol Shatt@ with mpeller@ mounted n he endol the shaft. n hisconstructionhere s noshatt ealF-typeand FA-typeOn heF'type hown n Figure and3, thepump s close-coupledo the motor.On he FA{ypes,hepump s mountedwithAdapterE9 .ln addition o the basicF and FA types,a varietyof modelscan be providedo meetwith a widerangeof applications .ollowingredescriptionsf modilied umps vailable.

    4-2.Reverse !I9!!9!!9! lypg@qlA-type)Reverse irculationype s shown n Fig.6& 7. In hispump, irculationlow,which ubricatesearing@ @ andcoolsmotor, uns o RearBearing ous'ng@ as n hehollow hatt onstruclionnd hengoesback o hesuctionank,nol o the n let f mpeller@ .Thiss o avoid eated irculatedluid omingnto he pump uction.n casewhere iquidsvaporize asily ndhave ittleNPSH,R or RA-typehould e used.Forgoodoperationl reverse irculationypecannedmotor ump, eep everse irculationlow ateat or withinhe specif iedange ll he imewhileoperation.he requiredflow ate s specifiedn hepump atasheet.

    4-3.High TemperaturesolationType(B-type)The B-type ump n shown n Figure ThispumphasAdapterQ9 and s designedo handle igh emperatureiquid,suchas hermal i lor hotwater. t contains high emperatureumphousing hich onsists f Casing@ and mpeer@ , anOa relativelyow temperaturemotorhousingwhich consistsof StatorAssembly@ and RotorAssembly@ .The iquid ill ing othhousing(casingnd motodishe sameandconnectedut hermallyeparated y an oriliceormedby Adapter@ and Spacer@ so as to preventmixingof the two. Theadapters designed o restrictheat ransferromthepumphousing.Thepumphas ollowinglows:. Main low(1)Suction Impeller@ - @ Discharge. Circulationlow(No.1)Auxiliary mpeller@ - Gap betweenStatorCan@ andRolorCan @ - C"p betweenront Bearing@ and Shaft

    - 5 -

  • 8/14/2019 Inst Man FRB English

    7/22

    Sleeve@ Heat Exchanger@ * RearBearingHousing@ - Centerholeof Shaft@ end.. Circulalion low(No.2)Auxiliarympeller@ - GapOetweenearBearing@ andShattSleeve@ - 6"n,"|' noleol Shafi@ end.Theholeon Adapter ! is providedo nduce ighpressurerom mpeller@ to motor ousing o hatAuxiliarympeler6 does not cavitate.

    5. INSTALLATION NDOPERATION5-l.lnstructionbefore nstallation(1) Avoid ough andli ng t he imeot ransportationndunloading.(2) Store n original acked ondit ion.(3) Check he specificationsndicated n the nameplateand estcertificate ttached o the pumpand comparewithyour equirementpecifcations.(4) Take arenot o damage irculationipe@ andhealexchangerssemory.5-2.lnstallationnd Wiring(1) Completelyemoveoreignmaterialsrompiping,ncludingirtor welding lag.(2) Disassemblease@ by aking utBolt@ .(3) Set he base o the anchorand astenblots.(4) Clean langes ndgaskets, l idehe pumpon he Base@ andalrgnhe pipingo thepump langes.(5) Insert askets nd astenlange olts.(6) Connect ipingo he ackets,l thepump s equipped i th ackets r heatexchanger.(7) After iping,astenHolder@ to tneease@ withBolt@ , PlateWasher@ andSpringWasner@ .(8) SomeR&RAlype umpsmayhaveorilice late o set n reverse irculationine.Theorilice late s setat heflange f CirculationipeQ9(9) Connectheeleclr icerminalser Drawingslor Conlirmation."

    - 6 -

  • 8/14/2019 Inst Man FRB English

    8/22

    zo o o oTD

    =IE

    I!!=(t4(l

    I!I3(,4(I

    E-=(,=l!

    (I

    =10_

    I=

    ccI=

    -=

    EI--o

    ITi3o

    IrI=o u,J o-0- 4 o (5

    ul

    z (,tt

    Efd

    (,aloIE

    (,=tt

    '(,4E

    I

    tL.il

    I

    IroFfIrIF

    CCoFoE

    d)

    ozIToo(I

    oFF

    od)4IlF

    (5z-oIc0Fzq a

    (EoI

    F F

    e e @ )1\ '..i \..

    f - - ' tl

    UJc

    tr=66.lt

    r\s-/-.-\//c\\y

    - 7 -

  • 8/14/2019 Inst Man FRB English

    9/22

    Fo o od)

    =(loF

    IIulI=(,-

    i=(,1Ir0.

    I=(,1IE

    III=o=(I

    cc==f

    E

    =(E

    =ccI=

    (I

    -lo

    (I=3o

    E=3o of 10-

    CC

    oF

    oo o o c0 9 , s c0

    z (,za(.)(I=

    o=loIcc

    (5zI (51(Id]

    F-Itl]aFI

    (!

    o(.)-cc-

    (Ioo(I

    (D

    EoFF

    zEoFot

    zCCoFF

    olD=cc

    EFco

    z ccooI o o F6d)

    I

    a\:/---..---.-_ _-

    \:-/

    uJ

    ttEo=9o.9,II

    ( 6 1..}J/.." /G\

    - 8 -

  • 8/14/2019 Inst Man FRB English

    10/22

    zFo Fo o od)

    Foc0

    =EF

    (I=3(,=Eo_

    i=(,=(I

    ccI=(,zIr0-

    ErEz EI=

    (II=

    IEI=

    EI=lo

    =Oo

    I=(.)o (,lo.

    Fzo:foo (5 (9

    o @ @ d] dl

    z ozIT= E

    o=foIcc

    (,1(I o11Id) I I

    rIOFlIF

    ccoFo(IoFF

    zGoo(I

    z(roFF

    ocozccF

    (,zc)loIc0

    ql)E

    Fzc ac0

    IrooI omd]

    9Ifi--l ulriILJuJ

    =Ioo.tt

    - 9 -

  • 8/14/2019 Inst Man FRB English

    11/22

    =zFo Fo

    =cc(IL]JI=(,4

    (I

    =(,4

    Ir-=(,=

    Ei=()=tl

    (!I= cc

    3I=

    I=

    (I==Fl

    ==()o

    EuJI=oo v (,l =

    Fz(Dloo

    (Io (,

    - (.)

    =z (,U)

    lo==oIE

    g= (9= - -

    I!olI

    (D

    (IooII

    Ft!

    IEoFF

    zoFo

    zIroFF

    o4EF

    F

    q

    fEzE 6c0

    IrI Fo Fo Fo od)

    o

    _l f

    /R\

    \s/

    ulo.Ftt)UJ=oaoit

    - 1 0 -

  • 8/14/2019 Inst Man FRB English

    12/22

    o - @l @

    29bL

    I

    ;s

    , . @f - \x lE'l l ee--l@ r : oc > @4&;a F:_ t - - : : " /O -9t- @r3l\ir,

    1 1 n @

    )

  • 8/14/2019 Inst Man FRB English

    13/22

    z(D Fo

    3E

    III=(51Ir

    (!I=o4Ir

    u.iI=(,=I!

    Ir-4 cc-=

    i=

    EI=

    (I-3Flo

    (rI3()o

    EI=o t o= =(L o

    F(!

    < c o o * < c 0 ( )

    =z o4cruJ

    ozfoIE

    d](t=EIo=E

    I I

    Eol(EI

    EoFoE

    I

    (!oFzOEooE

    zcco

    od)=E

    (9zlo-

    qo

    (I()

    EoI oCD o

    < @ (.)

    (tr)r- t I

    \ ,6-\tr/ \?/T

    i t,] IIJ

    uJo,FzotuJauJul

    iT

    - 12-

  • 8/14/2019 Inst Man FRB English

    14/22

    =zFod)

    Fo3F

    Er=(51tr

    I=(,cc

    {I

    =o4E

    (I

    =(,t!

    IrI=z IEuJI

    3I=

    IEI=

    cc=F=o

    IT-=o

    I3o (,l =

    E

    o (,.D o co

    z (,= :o.o1fo-E

    (5z(I (t1trd) I

    FI

    (I

    o()FlEr

    m

    EoFoEo

    zIEoo{T

    zOccoFF

    o(n4(!F

    o-o

    azal*ku lc0

    EoI Fo o o od)

    o

    - l]]

    IIt\ lu

    uJFzFollJoUJult-ll-

    - 1 3 -

  • 8/14/2019 Inst Man FRB English

    15/22

    zod] od] c0

    =(.)F

    ITi=(,4cc

    I=(5=(I

    I!I=(9zIE

    Er=o4E

    EI=a

    EI=

    (I

    =E

    3

    Ei=lo

    EI=o

    EI=o (,l ol =

    Fz(Dloo

    c.t! Fo o

    o .D o @ .D

    =z (,4E

    ozfoI(I

    (9ztr.D

    (,4Em

    FI

    lFI

    (I

    oFfEI

    ooca

    aEoF

    zIrooIr

    zoFF

    ==gl

    oz=(lF

    Iro

    (!zI

    I

    F;CEccoI o@ Fod) od)

    d)

    uJoUJzFJL=luF

    tt

    \:-_/i5-/

    r-

    .\c:/-'---i

    @)\:--/.\3/

    -

  • 8/14/2019 Inst Man FRB English

    16/22

    5-3.Preparationor OperationandTrialOperationFollowing evicesarerecommendedor protection f cannedmotorpump.. Overcurrenl elay . Leakcurrent heck elayWe can supply pecialowcurrent elay hat s useful or protectpumpspossibleo operateat no iquid onditions uchastankdrain ump.Checkwiring iagramn Drawingor Confirmationor hermostat iring.

    (1) Setting f overloadelayBecauseated urrent t normal utputn hecannedmotor s higherhan hat ngeneralmoto.s, etat he atedcurrent ndicated n the nameplate. t is etfective s a protecting evice or cannedmotors o set he overloadrelayat as low currentas possible.Generally,t is recommendedo set he relayat the following alue.Variationf voltage load s small ,...... ..OperatingcunentX 1.1Variationfvoltage load s big OperatingurrentX 1.25Whenoperating urrent s farbelowof ratedcurrent,t is recommendedo set he relaybasedon operatingcUrrent ot ratedcurrent.(2) Priming ndairventingComplete riminghould e carried ut n he ollowingrder.Open ent alve lowly ndpayattentionor iquid,speciallyor oxic r high emperatureiquid.1) Close ischargealve2) Open uction alve3) Opendischarge alve or a tewseonds ndclose t again.4) Bleed ir rom heairvenlvalveQ9 . ll handling dangerousiquid, ay ullattentiono airventing. orR andRA-type umps,here s no need orairventing. ul al lvalvesn reverse irculationiping hould e opened.(3) Utility ipingFor heating/coolingacketand heatexchanger, pecifiedmediaand capacity houldbe used.Unlessotherwisespecif ied,ollowingatashall e adopted.

    Table 1. COOLANTFORMOTOR ACKET& HEAT EXCHANGERBequiredCapacityof Coolanl

    lvlotor rameNumber lrotof Jacket Heat Exchanger200 5l/min rmore1.3GPM) 15 /min r more 4.0GPM)300 5l/min or more 1.3GPM) 20 /min r more 5.3GPM)400 10 /min r more 2.6GPM) 20 /min rmore 5.3GPM)500 12 min r more 3.0GPM) 25 l/min or more ( 6.6 GPM)600 15 /minor more 4.0GPt\4) 25 'min rmore 6.6GPM)740 15 /min or more (4.0GPI\,4) 50l/minor more 13.2GPM)

    Note: .Temperaturef coolant hould e ess han35"C(95'F).2. When acketpiping s made n seriesbetweenmotor acketand heatexchangerforB-type), oolantcapacityequireor heatexchangerhould e adopted nd tscoolant houldlow n he ollowingrder;- Motoracket Heatexchanger3. Motor rame umber 00means .., hat s allmotor rame rom200 o 299.Forexample 0 0 motorframemeans 16, 717,719,726,728and729.(4) Heating, eating perationHeating r heatingoperation l Blype are as lollows;

    - 1 5 -

  • 8/14/2019 Inst Man FRB English

    17/22

    1)Startheating r heating perationt iquidemperatureowerhan100'C. During eating peration,peratingcurrentmay be higher han rateddue o liquiddensityand viscosityncrease t low emperature. heckcurrentand f necessary djustvalveopening o keepcurrentunder ated.2) Less han50 "C/hris recommendedor emperaturehange. 50 Clhr is he maximum eating peed.Whenheatingpumps apidly, eformation ue o heatexpansionmay result eak romgaskets.3) For heating tand-by ump,suction alveshouldbe open and discharge alveshouldbe closed.

    (5) TrialOperation1 Ooensuction alve.2) Close ischargealve r slightly pen t.3) Check alvesn reverse irculationiping reopened.(tor andRA'type).4) Switch n hepump.5) Slightly pendischargealve.6) Check ischargeressure.7) CheckndicationfTRGmeterA. Meler verscale----..----..---Pumpotatesn reverse irection.Correct onnectionf electricerminals.

    B. Meter ndicates ELLOW r RED ---Checkcauses.C. Meter ndicate REEN ---------Normaloperatingondition.8) Altera fewminutes peration,top he pumpand eave t orseveralminuteslongerime or higher iscositytliouid).

    5-4.Operation(1) Begin perationndgraduallypen alveup o thespecil iedlow ate.Whena by-pass ipings provided,pe nitsvalve.For R andRA-type umps,adjustvalve o set reverse irculationlow at the specifiedlow rale.Checkhe ollowingoints uring perationlA. Operationurrents ess han he rated alue?B. Pressureaugendicateshe equiredalue?

    C. TRGmeter ndicates REEN?D. Anyabnormal oise r vibration?lf anyabnormalonditionsobserved,top hepumpandcheck or possibleausesn he ollowing anner.

    6. MAINTENANCE INSPECTION

    6-1 Disassembly(1) Fully lose alvesndischarge,uction ndutility iping.(2) Remove rainPlugq9 or opendrain alve o drain he iquidn hepump.Forquick rainage,lowly penAi rVentValve@ . Before pening irVentValve@ , check orhighpressure uild p n he pump.(3) RemoveCirculation ipe@ (F andFA-type)or eatexchange(B-type).(4) Sincepipingstressmay be loaded, nserta sleeperunderCasingE, .(5) RemoveixingBolt@ or @ ol Casing@ . Be careful ot o spillany emainingluidwhen emoving.(6) Remove olt@ which ixesHolder@ on o Base@ , andslide hepump ackward n he Base@ whilethe CasingE, attached o the piping s lettas it is.(7) As shown,n Figure , measurehegap g"belore urther is assembling.(8) Forpull ing ut mpeller@ . extend endot LockWasher@ , by which mpeller ott@ is ocked, ndremoveBolt@D . Payattention ot o losesmallparts,suchas key, bolt andwashers.

    - 1 6 -

  • 8/14/2019 Inst Man FRB English

    18/22

    (9) ForF andR-type umps, emove olt@ andFrontBearing ousing@ trom ne motor langewith heaidotjack-up crew.When he housings removed,he iquidmaintainedn hemotor ousing illflow ut.Pa yattentiono the iquid.WhenFrontBearing ousing@ is removed, earing@ canalsobe removed longwith he housing.Pay ull attention ot o damagebearing.For FAand RA-type umps,Adapter q9 is mounted nthe motor nstead f the rontbearing ousing. emovet n hesamemanner. orB-type ump, he langewhichconnectseatexchangerndconnectionipeshould edisconnectedirst.(10) Remove olt@D which ixes tearBearing ousing@ anddismantlehehousingn hesamemanner s above.(11) In aking utRotor ssembly[Q , takecarenot o damaget.The emovedotor hould e puton a clean loth oas not o damageRolorCan (at .(12) ShattSleeve@ on rearsidecan be removed y extending endof LockWasher(@ and unscrewing olt@which s LEFT-HANDED.hrust ollar 18) analsobe removed t this ime.

    6-2.lnspection(1)Bearins@) pCheck he ollowingoints;A. Sliding urface(Luster,cratches,tc.)B. Wear nsi de ore(ReferoTable )C. Wearand earon hrus t urlacelf replacementl bearings needed,emoveheSetScrew@ and akeoutbearing.n he ollowingable,wearlimit l bearings ndicated.

    Tabre . BEARTNG WEARLIMITMolorFrameNumber A B L

    1 1 0 0.3 mm (0.012Inches) 44.2mm (1.746 nches)210 0.4 mm (0.016 nches) 49.2mm (1.937 nches)310.220 0.4mm 0.016nches) 59.2mm (2.33i nches)

    410,320 0.4 mm (0.016nches) 69 2 mm (2.724 nches)510.420 0.5mm 0020 nches) 78.2mm (3.079nches)610,520 0.5mm (0.020nches) 113 mm (4 449 nches)710,62A 0 5 mrn 0020 nches) 119 mm (4.684 nches)

    724 0.6mm 0.023nches) 128.5 m 5.453nches)

    - 1 7

  • 8/14/2019 Inst Man FRB English

    19/22

    (2) Shaft leeve@ andThrustCollar@Check he ollowingoints:A. CorrosionB. Sliding urf ce(Luster,cratches)C. Wearand ear(3) rirrer@) , circulationipe@

    1 1 0

    (TBL ype)

    1.5 1.9mm 0.059-0.075ches)1.5 2.1mm 0.059-0.083nches)1.5 2.1mm (0.059-0.063 nches)

    ( r

    (3 )

    Are heynot blocked r clogged?(4) Are hereany othercontactmarksor wear?

    6-3.BeassemblingClean nddryparts.Reassemblyscarried ut n he reverse rder l dismantling.During ssembly,omeadjustment aybe required. ayattentiono the ollowing:On eachof heThrustCollars 9 the hardenedurlaces oneside hamferedmaller t he nside ore.Makesure hat he hardened urface acesBearings@ and (@ .Fit heKey6@ or Pin@ inplace hown n heFig-s.Make ure hat hesmaller t he nside ore.ShaftSleeve114engages he key or pin propedy.lnstall he rear ShattSleeve@ and ockwith he LockWasher@ properlv.

    Table3-1. PLAYINGGAPOF FOTOR N AXIALDlHEcTloN(SlandardypeMotorFrameNumber New Bearing

    1 1 0 0.7 - 1.9mm (0.028-0.075 nches)210 0.7 - 2.1 mm (0 028-0.083 nches)3 t 0 O.7 2.1 mn (0.028-0.083 nches)410.320 0.9 2.5mm 0.035-0 98 nches)

    5r0,420 1.1 2.9 mm (0.043-0.114 nches)610,520 1.2 3 0 mm (0.047-0.1 8 nches)710,624 1.4 3.4mm 0.055-0134nches)

    Table 3-2. PLAYINGGAPOF ROTOR N AXIAL DIRECTION

    l\,{otor rame Nurnber New Bearing

    2103 1 0

    410,320510,420610,520

    L9 - 2.5 mm (0.074-0.098 nches)i . 8 - 2 . 9m m 0 . 0 7 1 - 0 . 1 1 4 c h e s )2.1 3.0mm 0.083-0.118nches)2 5 - 3.4mm 0098-0.134nches)

    (4) Adjustmentf an axial layof the mpellerSeeFig-6)For hestandardype,under heconditionf he mpeller nd heRotor ssemblyulledorward,hegap 9"should ewithinhevalue hownn heTable . As o thegap 9"forTBL ype, djustmenthould e doneundertheconditionf the mpeller nd^the otor ssemblyushed ackwardhown n heFig9. AdiustmentanbemadewithAdjustingWashersQQ .

    - 1 8 -

  • 8/14/2019 Inst Man FRB English

    20/22

    Table4. ADJUSTINGVALUEOF GAP "9"Motor FrameNo. lmpller ize "9"adjusted

    1 1 0 4 mm (0.158nches)210 4 mm 0.158nches)T 4.2mm 0.165nches)

    3 1 0R , S 4 mm (0.158nches)T 4.2mm 0.165nches)

    4.7mm (0.185nches)

    4 10320B , S 4.2 mm (0.165nches)T 4.5 mm {0.177 nches)

    5 mm 0.197nches)6 mm 0.236nches)

    5 10420s 4.4mm 0.173nchesiT 4.6 mm (0.181 nches)

    5 mm 0.197nches)6 mrn (0.236 nches)

    6 1 0520

    S 4.4mm 0.173nches)T 4.6mm 0.181nches)

    5 mm 0.197nches)6 mm (0.236 nches)

    7 1 0 -620-T 4.8mm 0.189nches)

    5.4mm 0.213nches)6.4 mm 0.252nches)

    Figure 9(StandardType)9t0.1 (mm)(TBL ype)

    (5) Tightenhe lmpeller@ lrmly and ockon the hex.head Bolt @ with he Washer@ securety.(6) Makesure hat no dsfector flaw existson the Gasketsand heircontactsurfaces. nstall askets ttercleaned(7) Tellonsealing ape or nipples nd plugsshouldbe replaced y newone.

    Push \@

    FBhousing@orAdapterQ9g=0.510.1(mm)

    - 1 9 -

  • 8/14/2019 Inst Man FRB English

    21/22

    6-4.TroubleshootingTROUBLESHOOTING

    TROUBLESHOOTING

    MOTOR NOISE&VIBRATION

    z o o

    .9.E

    .56.9.goF

    .E

    ;6EEpz

    E

    t

    -E

    E

    '

    EE

    E'6

    l!E

    '6.E.96

    . 9'6E

    '6Eq.9z

    ooPoordrying ol co IRainwater omes nMotor izenolsuited c c c c

    f

    Corrosion D D D o D D DE E E E E E E EAbnormal hrust oadon bear nqDeformation l shaft G G G GlJnbalance l rotalingunitForeignmatler clogged I IPump rzenolsr.iited c c c c c

    zatozoozoF(ro

    Suclon loss Ls oo brg J J J J J J J JNPSHaverl . nolenoughDischarge oss s loo brq J J J JDischarge oss s loo small L L LForergnmanerclogged I i ILiquid ontains lurryS.G-is oo bigViscosily s loo high H flAir venling not completed N N N N N N NAir comes n fiom suclion o o o o o o o oShorlegeor cut ofl ot coo antPoorpiping o o o O o oSingle hase R R RAntr-phase s S sNot switchedon T T

    Table5A

    Table58Letler counlermeasuresSendback 0 ervce hopor dryinoB Repairgaskelsol termrnalbor or chanqe nlo pacKnq ype conduitendback omDletenrtor reolaonol wrth hecor.ect nh)hanoe materialalter havinoconsultaiionRepair r chanqewearparls,or hanoenaterialsCorlect reversecirculalion low in desiqnedor speciliedcapacity or R(or RA-type)lype { pump.For olher tvoe ol oumos-consult Js inlrmrna railedooiarin; condihons 'G ReDairhedetormatronH Please onsull sakeoul oreiqnmatler nd akemeasureso Dreventccurrencel thesame roubles)leanuppip ineandstrainers r revaewesion f DiDinaliouid evel and friclion oss n suclion side and ake measures Pleaseconsuh usReview esion f pipinq ndconsult sTal measuresnol slurrv mixed rn he houidor chanoe oumo w h slufiv tvoeN A n v en ii no s ho 'r ld b e d on e ad i n i n c dr ed m an ne r)heck auses nd akemeasuresrovide elay or coolanlcul ofl or increasecoolantcaDaciwwhn flucluationol llow rate s too biqCorrectpipinqR Corect nlo hree hases Correctonneclionf electdc iresT Check nd/oreoairwirino nd nstruments

  • 8/14/2019 Inst Man FRB English

    22/22

    REQUIREMENTSORPUMPS O BE RETURENEDORREPAIRFrom heviewpointsol pollution ontroland safetyof workmenwhenyouneed epairsand return hemical umpsto us.please ayspecial recautionso the emainingiquidn pumps ndmotors.1. Before oudispatch ump o us,please dvice s damaged onditions.hename l l iquid ndhandlingareol theliquidandso on andattach hem also o the pump.2. Almost areshould e aken or hepumpwhich andlesollowingluid.(1) Toxicmaterialistednthe awofwaterpollutionontrol.Cadmium(Cd)andtscompound,yanide(CN),rganic hosphoriccid ompound,ead(Pb)andtscompound,C(Vl)compound,rsenic(As)andtscompound(2) Coniaminantsisted n the lawof waterpollution ontroln-Hexane xtracts,henol, oppe(Cu), inc(Zn),issolvedron, issolved anganese,hromium(Cr),lurine(F)(3) Poisonousiquids

    (4) Explosiveiquids(5) Toxic asifyingiquids(6) Liquids ithbadsmell(7) Strongacidandalkali3. Pumpshandlinghe above luidsshouldbe treated n the ollowingmanner:(1) Completelyisassembleump ntoparts.(2) Washpumpcompletely ccordingo 4. Procedure f washing.(3) In case here s any possibilitiesl breakol casingacketor heatexchanger,hoseshalialso bewashedcompletely.(4) Re-assembleumpandsent o us.4. Proceduref washing(1) After iquid rain ing,isassembleump n accordanceith he nstruction anual.(2) Washout emainediquid ncasing,mpeller,otor ssembly ndbearing ousings.(3) Circulation ipeand ubesof heatexchanger hallbe washedout.(4) As forstatorassembly. ash all wettedparts n statorassemblyncluding olt holesand screws.(5) In casestatorcan s brokendue o corrosion nd/orwinding s spoiled. erminalbox shallbe removed irst.The

    terminal ox can beremoved rom he statorby using ackscrew.Theremightbe a case hatgasburstsoutwhen erminal ox s removed,o please o not ace o t duringhework.When iquids nstatorwinding.supply ashing ater rom heopeningor 1 to 2 hours ontinuously.tterwashings completed,rain l lwater.


Recommended