+ All Categories
Home > Documents > Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM)...

Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM)...

Date post: 02-Oct-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
20
Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO
Transcript
Page 1: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 1 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)

TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO

Page 2: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 2 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

The content of the technical documentation is protected in accordance with the act dated on 4th February 1994 regarding Copyright and Related Rights (Journal of Laws of 2006. No. 90, item 631, as amended).

Any downloading and reproduction for further distribution all or part of the documentation, without the consent of Aluprof SA is illegal and will result in criminal and civil law.

Page 3: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 3 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

General recommendations

Roller shutter installation can only be performed by a trained installation team. It is necessary to comply with occupational health and safety regulations, in particular concerning the safety of electrical equipment and work at heights.

Before starting the installation works, it is necessary to carefully read these instruction and follow its recommendations. It contains essential information ensuring the proper installation and use of roller shutter SKT (OPOTERM).

The manufacturer recommends to transport, warehouse and store the roller shutters only in a HORIZONTAL POSITION, onaflatsurfaceandinacontainerprotectedfrompossibledamage. The roller shutters must be delivered to the site in a set in accordance with enclosed list of components.

Unloading and installation of roller shutters must be carried out with the necessary precautions.

NOTE: Installation instructions for roller shutters should be treated as an example.

Installation tools [1].

1

Page 4: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 4 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

ROLLER SHUTTERS IN TOP-MOUNTED SYSTEM SKT (OPOTERM)

1. Unpacking of the roller shutters.Prior to installation, unpack the goods and check them in terms of the quantitative and qualitative terms, and according to the at-tached list of components.

a) Roller shutter box type SKT (OPOTERM),aluminiumdoubleguidechannelswithseal,adaptingprofile[2],endcapstowin-dowframeconnectors,mountinganchors,screwstotightentheguidechannelsandtheendcapstowindowframeconnectors[3].

Outside strap box coiler (strap), strap grip [4],

Winch for strap, angle for rope and strap winch, handle [5].

4 5

2 3

Handle, Cardan joint 45° or 90° with hook for Cardan joint [6].

Handle, Cardan joint 45° or 90° with hook [7].

- in case of an electric drive drill the opening for the motor's wire in the place of the planned wiring.

b) Types of applied, manual drives (options):

6

7

Page 5: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 5 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

2. Installation sequence

a) Checkthedimensionsoftheconstruction'swidthandheight[8],[9].

b) Checkthedimensionsofthewindow'swidthandheight[10],[11].

98

12

c) Check the dimensions of guide channels, d) Mark the positions of the screws, which are dedicated to the installation of the guide channels on a window or door frame [13],[14],[15],accordingtothefollowingexample[12].

QUANTITYSCREWS =[(LENGTHGUIDE CHANNEL – 1000 mm) / 250 + 4] x guide channel quantity

- if the roller shutter will be installed on a PCV construction or woodwork the galvanized screws should be tightened directly to the frame. - if the roller shutter will be assembled on an aluminium construction the holes for the screws should be drilled with a Ø 2 - 2.5 mm drill.

30

ca.50 ca.250 ca.50

10 11

Page 6: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 6 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

13

19

16

14

20

17

15

21

18

e) Itisnecessarytomakesurethatthescrewsaretightenedinaparallellinetotheedge[16],theforceusedwhilescrewing should be appropriately adjusted, so that the head of the screw will not be deformed. Otherwise, it will be impossible to pull theguidechannelsonthescrews[17],[18].

f) Removedirtfromthetopofthewindowframewhichmaypreventinstallationoftheadaptingprofile. g) Beforetheadaptingprofilewillbebolted,itisrecommendedtosealtheupperpartoftheframewithanexpanding self-adhesive tape. The tape should be applied to the degreased surface of the frame. h) Placetheadaptingprofileagainstthewindowframeandensureisequalspacingonbothsides(approximately15 mm).

i) Marktheplacementoftheself-drilling,flatheadedscrews[19],[20]accordingtotheexamplebelow. QUANTITYSCREWS = [(LENGTH ADAPTING PROFILE – 1000) / 250] + 4 pcs.

Page 7: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 7 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

22

25

23

26

24

NOTE: Thelengthandtypeoftheself-drillingscrewswithaflatheadshouldbeadjustedaccordingtothethicknessofthe windowframe,sothatbothprofilesaresecurelyconnected.

j) Payspecialattentiontotherectilinearityandflatnessoftheadaptingprofile[21],andtheforceuseswhilescrewing should be appropriatelyadjusted,inordertopreventdeformationoftheprofile.Otherwise,itmightbeimpossibletopulltheshutterbox on the adapter. k) Theboltedadaptingprofileshouldbepreciselyattachedtotheexternaledgeoftheframe. l) In order to facilitate the installation of the shutter box it is recommended to spray the adapter snap locks with a silicone spray.

ł) Markthepositionsontheexternaledgesoftheadaptingprofile,wheretheguidechannelswilloverlapontheprofile. Thesepositionsshouldberemoved.Performtheseactionsbeforetheadaptingprofileisboltedtothewindowframe[22],[23]. m) Placethewindowverticallysothattheadaptingprofilewillbeontopofthewindowframe. n) Pulltheshutterboxontheadaptingprofilefromthesideorsnaptheshutterboxovertheentirelengthoftheadapting profile[24].

o) It is not acceptable to use hammers or other devices while the aforementioned action is carried out.

p) After the shutter box is assembled, it is necessary to check the brush seals in the guide channels and if necessary, protect them from automatically falling out (additionally attach), then pull the guide channels to the shutter box. Theguidechannelshavetocloselyadheretothebottomedgeoftheshutterbox[25],[26].

Page 8: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 8 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

q) Use galvanized screws WKR 4,2 x 16 to attach the window frame connectors LPB - RO [27]totheshutterboxendcaps.

27

30

33

28

31

34

29

32

35

r) Once the window frame connectors are screwed in, place the shutter box perpendicularly to the window frame and tighten, payattentiontothearrangementofbothelements.Theaforementionedscrewsorself-drillingscrewswithflatheadcanbe used depending on the thickness of the window frame, in order to achieve secure connection of the roller shutter with the window[28],[29].

s) The amount of montage angers KMOattachedtothebayintheupperprofileoftheshutterboxPSG[30],[31],[32]depends on how the with the roller shutter is connected to the lintel.

t) Installation of the window and the roller shutter should be performed in accordance with the current standards and engineering practices. Install the window with the roller shutter in the window opening using montage angers or screws inaccordancewiththewindowmanufacturer'srecommendations[33],[34],[35].

Page 9: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 9 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

36 37 38

u) In order to seal the joints between the roller shutter and the window opening it is necessary to use a low expandability foam sealant. Using other materials in excess can damage the roller shutter by deformation or excess swelling of the components and improper functioning.

v) Lowerthecurtainoftherollershutterwhenthelowexpandabilityfoamsealantdriesup,opentherevisionflap[36]andtake outtheinsulationcomponents[37],checktheconditionofconnectionsbetweenthebracketswiththeroundreelandthe curtain[38].

w) Takeoutthepins[39]andopenthecoiler[40]byleveringuponesideofthecasing.Usingscrews,fixthecoilertothe windowframe[41].Attachthestrap(rope)tothehook,firmlyholdingthespringenclosure,turnandreleasethelock[42]. Windup2-3coilsofstrap[43]whenthecoilerisinstalledandthecurtainisdropped.Closethecoilercasing[44].

39

42

40

43

41

44

Page 10: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 10 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

x) Checkifallconnectionsaremadeproperly.Testtherollershutter’soperation[45].

y) Fold the curtain of the roller shutter into the box, then put in the insulation elements, check for correct positioning of the curtain. Closetherevisionflapoftheshutterbox[46],[47]. Remove the protective foil from the shutter box and guide channels and from other elements. Train the user how to operate the roller shutter. Hand over the manual and maintenance instruction and warranty card to the user; sign the acceptance protocol.

3. Other remarks a) Installation of plaster foundation NT/XPS on the shutter box SKT OPOTERM

The plaster foundation NT/XPS is made of extruded polystyrene (XPS styrodur) covered on the one side with self-adhesive coating and on the other side with transverse grooves, which improve the adhesion of the plaster mortar. Beforethepanelisfixedcleananddegreasethesurfaceoftherollershutter[48],thencutthepanelinaccordancewith theheightandwidthoftheshutterbox.Performthecuttingofthepanelfromthesideoftheprotectivefoil.Inordertofix theplasterfoundationtotheshutterboxremovetheprotectivefoilsecuringtheprotectiveadhesivecoating[49]andthen evenlyapplyandpressfor10seconds[50].

NOTE: The plaster foundation NT/XPS is dedicated to thin-layer plaster in system ETICS or BSO. The plaster foundation should be built (plaster) according to the ETICS and BSO technology up to 3 months from the date of the plate exposure to atmospheric conditions (installation of roller shutters at the construction site).

45 46 47

504948

Page 11: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 11 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

51

40-50cm

52

40-50cm40-50cm

40-50cm

b) External housing of the roller shutter box SKT OPOTERM

Inthecourseofhousingtherollershutterbox(plasteringandinsulation)thesideprofileoftheshutterbox(front) should be secured against buckling. For this purpose before shutter box installation place the wedges (KLM) spaced at 40-50cmbetweenthesideprofileandthelowerprofileoftheshutterbox[51,52].Afterplasteringthewedgesshouldbe removed.

53

NOTE: Itisunacceptabletousetheexpandingtapebetweentheshutterboxhousingandsideprofileoftheshutterbox on the bottom edge of the shutter box [53].

Page 12: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 12 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

II ROLLER SHUTTERS in TOP-MOUNTED system SKT (OPOTERM) with MOSKITO.

1. Unpacking of the roller shutter.Prior to installation, unpack the goods and check them in terms of the quantitative and qualitative terms, and according to the attached list of components.

a) Roller shutter box type SKT (OPOTERM) with MKT,aluminiumdoubleguidechannelswithseal,adaptingprofile[54],endcapsto windowframeconnectors,mountinganchors,screwstotightentheguidechannelsandtheendcapstowindowframeconnectors[55].

Outside strap box coiler (strap), strap grip [56],

Winch for strap, angle for rope and strap winch, handle [57].

56 57

54 55

Handle, Cardan joint 45° or 90° with hook for Cardan joint [58].

Handle, Cardan joint 45° or 90° with hook [59].

- in case of an electric drive drill the opening for the motor's wire in the place of the planned wiring.

b) Types of applied, manual drives (options):

58

59

Page 13: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 13 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

2. Installation sequence

a) Checkthedimensionsoftheconstruction'swidthandheight[60],[61].

b) Checkthedimensionsofthewindow'swidthandheight[62],[63].

6160

64

c) Check the dimensions of guide channels, d) Mark the positions of the screws, which are dedicated to the installation of the guide channels on a window or door frame [65],[66],[67],accordingtothefollowingexample[64].

QUANTITYSCREWS = [(LENGTH GUIDE CHANNEL – 1000) / 250] + 4 x guide channel quantity

- if the roller shutter will be installed on a PCV construction or woodwork the galvanized screws should be tightened directly to the frame. - if the roller shutter will be assembled on an aluminium construction the holes for the screws should be drilled with a Ø 2 - 2.5 mm drill.

30

ca.50 ca.250 ca.50

62 63

Page 14: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 14 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

65

71

68

66

72

69

67

73

70

e) Itisnecessarytomakesurethatthescrewsaretightenedinaparallellinetotheedge[68],theforceusedwhilescrewing should be appropriately adjusted, so that the head of the screw will not be deformed. Otherwise, it will be impossible to pull theguidechannelsonthescrews[69],[70].

f) Removedirtfromthetopofthewindowframewhichmaypreventinstallationoftheadaptingprofile. g) Beforetheadaptingprofilewillbebolted,itisrecommendedtosealtheupperpartoftheframewithanexpanding self-adhesive tape. The tape should be applied to the degreased surface of the frame. h) Placetheadaptingprofileagainstthewindowframeandensureisequalspacingonbothsides(approximately 15 mm).

i) Marktheplacementoftheself-drilling,flatheadedscrews[65],[66]accordingtotheexamplebelow:

QUANTITYSCREWS = [(LENGTH ADAPTING PROFILE – 1000) / 250] + 4 pcs.

Page 15: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 15 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

74

77

75

78

76

Thelengthandtypeoftheself-drillingscrewswithaflatheadshouldbeadjustedaccordingtothethickness ofthewindowframe,sothatbothprofilesaresecurelyconnected.

j) Payspecialattentiontotherectilinearityandflatnessoftheadaptingprofile[73],andtheforceuseswhilescrewing shouldbeappropriatelyadjusted,inordertopreventdeformationoftheprofile.Otherwise,itmightbeimpossibletopullthe shutter box on the adapter. k) Theboltedadaptingprofileshouldbepreciselyattachedtotheexternaledgeoftheframe. l) In order to facilitate the installation of the shutter box it is recommended to spray the adapter snap locks with a silicone spray.

ł) Markthepositionsontheexternaledgesoftheadaptingprofile,wheretheguidechannelswilloverlapontheprofile. Thesepositionsshouldberemoved.Performtheseactionsbeforetheadaptingprofileisboltedtothewindowframe[74],[75]. m) Placethewindowverticallysothattheadaptingprofilewillbeontopofthewindowframe. n) Pulltheshutterboxontheadaptingprofilefromthesideorsnaptheshutterboxovertheentirelengthoftheadapting profile[76].

o) It is not acceptable to use hammers or other devices while the aforementioned action is carried out.

p) After the shutter box is assembled, it is necessary to check the brush seals in the guide channels and if necessary, protect them from automatically falling out (additionally attach), then pull the guide channels to the shutter box. Theguidechannelshavetocloselyadheretothebottomedgeoftheshutterbox[77],[78].

Page 16: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 16 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

q) Use galvanized screws WKR 4,2 x 16 to attach the window frame connectors LPB - RO [79] to the shutter box end caps.

79

82

85

80

83

86

81

84

87

r) Once the window frame connectors are screwed in, place the shutter box perpendicularly to the window frame and tighten, payattentiontothearrangementofbothelements.Theaforementionedscrewsorself-drillingscrewswithflatheadcanbe used depending on the thickness of the window frame, in order to achieve secure connection of the roller shutter with the window[80],[81].

s) The amount of montage angers KMOattachedtothebayintheupperprofileoftheshutterboxPSG[82],[83],[84]depends on how the with the roller shutter is connected to the lintel.

t) Installation of the window and the roller shutter should be performed in accordance with the current standards and engineering practices. Install the window with the roller shutter in the window opening using montage angers or screws in accordance with thewindowmanufacturer'srecommendations[85],[86],[87].

Page 17: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 17 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

88 89 90

u) In order to seal the joints between the roller shutter and the window opening it is necessary to use a low expandability foam sealant. Using other materials in excess can damage the roller shutter by deformation or excess swelling of the components and improper functioning.

v) Lowerthecurtainoftherollershutterwhenthelowexpandabilityfoamsealantdriesup,opentherevisionflap[88]andtakeouttheinsulationcomponents[89],checktheconditionofconnectionsbetweenthebracketswiththeroundreelandthecurtain[90].

w) Takeoutthepins[91]andopenthecoiler[92]byleveringuponesideofthecasing.Usingscrews,fixthecoilerto thewindowframe[93].Attachthestrap(rope)tothehook,firmlyholdingthespringenclosure,turnandreleasethelock[94]. Windup2-3coilsofstrap[95]whenthecoilerisinstalledandthecurtainisdropped.Closethecoilercasing[96].

91

94

92

95

93

96

Page 18: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 18 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

x) Checkifallconnectionsaremadeproperly.Testtherollershutter’soperation[97].

97 98 99

102101100

y) Fold the curtain of the roller shutter into the box, then put in the insulation elements, check for correct positioning of the curtain. Closetherevisionflapoftheshutterbox[98],[99]. Remove the protective foil from the shutter box and guide channels and from other elements. Train the user how to operate the roller shutter. Hand over the manual and maintenance instruction and warranty card to the user; sign the acceptance protocol.

3. Other remarks a) Installation of plaster foundation NT/XPS on the shutter box SKT OPOTERM

The plaster foundation NT/XPS is made of extruded polystyrene (XPS styrodur) covered on the one side with self-adhesive coating and on the other side with transverse grooves, which improve the adhesion of the plaster mortar. Beforethepanelisfixedcleananddegreasethesurfaceoftherollershutter[100],thencutthepanelinaccordancewith theheightandwidthoftheshutterbox.Performthecuttingofthepanelfromthesideoftheprotectivefoil.Inordertofix theplasterfoundationtotheshutterboxremovetheprotectivefoilsecuringtheprotectiveadhesivecoating[101]andthen evenlyapplyandpressfor10seconds[102].

NOTE: The plaster foundation NT/XPS is dedicated to thin-layer plaster in system ETICS or BSO. The plaster foundation should be built (plaster) according to the ETICS and BSO technology up to 3 months from the date of the plate exposure to atmospheric conditions (installation of roller shutters at the construction site).

Page 19: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 19 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

103

40-50cm

104

40-50cm40-50cm

40-50cm

105

NOTE: Itisunacceptabletousetheexpandingtapebetweentheshutterboxhousingandsideprofileoftheshutterbox on the bottom edge of the shutter box [105].

b) External housing of the roller shutter box SKT OPOTERM

Inthecourseofhousingtherollershutterbox(plasteringandinsulation)thesideprofileoftheshutterbox(front) should be secured against buckling. For this purpose before shutter box installation place the wedges (KLM) spaced at 40-50cmbetweenthesideprofileandthelowerprofileoftheshutterbox[103,104].Afterplasteringthewedgesshouldbe removed.

Page 20: Installation instruction for external roller shutters in ... · TOP-MOUNTED SYSTEM SKT (OPOTERM) TOP-MOUNTED SYSTEM SKT (OPOTERM) with MOSKITO SKT (OPOTERM)+moskitomuk We reserve

- 20 -

Installation instruction for external roller shutters in: TOP-MOUNTED SYSTEM SKT (OPOTERM)TOP-MOUNTED SYSTEM SKT (OPOTERM)

with MOSKITO

SK

T_ (O

PO

TER

M)_

+_m

oski

to_m

_uk

We

rese

rve

the

right

to a

ny te

chni

cal c

hang

e. A

s on

: 201

5-06

-12

SKT_ (OPOTERM)_+_moskito_m_ukWe reserve the right to any technical change. As on: 2015-06-12

Headquarters;ProductionplantinBielsko-Biała Warszawska153,43-300Bielsko-Biała,Poland tel.+48338195300,fax+48338220512

Production Plant in Opole ul.Gosławicka3,45-446Opole,Poland tel.+48774000000,fax+48774000006 e-mail: [email protected]

PN-EN 13659


Recommended