+ All Categories
Home > Documents > Installation Instructions for Wasco® E-Class Skylights€¦ · Installation Instructions for...

Installation Instructions for Wasco® E-Class Skylights€¦ · Installation Instructions for...

Date post: 11-Oct-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
4
Installation Instructions for Wasco® E-Class Skylights EF EFHR EV EVM INSTALLATION VIDEO www.wascoskylights.com
Transcript
Page 1: Installation Instructions for Wasco® E-Class Skylights€¦ · Installation Instructions for Wasco® E-Class Skylight 3017501 STEP 4 At the top: Place shingles OVER the flexible

Installation Instructions for Wasco® E-Class Skylights

EFEFHR

EVEVM

INSTALLATION VIDEOwww.wascoskylights.com

Page 2: Installation Instructions for Wasco® E-Class Skylights€¦ · Installation Instructions for Wasco® E-Class Skylight 3017501 STEP 4 At the top: Place shingles OVER the flexible

Installation Instructions for Wasco® E-Class Skylight 3017501

STEP 1Snap the aluminum brackets (provided) in the groove found directly underneath the Ultraseal Flashing, spacing approximately 6" from corners (4" on 14" side) and in the middle of the side when 3 are used. Screw to deck with screws provided.

IMPORTANT• Use brackets and screws provided to attach

to roof. DO NOT use any mastic or cements.• DO NOT apply sticky side of ANY self-adhered

membrane to flexible flange. Apply sticky side to roof deck only.

• Keep nails no closer than 2-1/2" from skylight frame

STEP 2At the bottom: Place flange over shingles and nail the outer edge of the flexible Ultraseal Flashing down to the roof deck with roofing nails spaced about 6" apart. Then apply one nail to each top corner to hold unit in place. Ultraseal Flashing is self-sealing around nail penetrations.

You may wish to place shingles across the bottom edge of the flashing if you prefer that appearance.

IMPORTANTThe Ultraseal Flashing MUST be OVER the bottom row of shingles at this point in order for water to drain correctly onto the shingles below.

STEP 3At the sides: Place shingles over flat ribbed portion of flexible flange, then trim shingles as needed, and tuck UNDER L-Gasket and nail.

IMPORTANTTo properly secure shingles, nails may penetrate the Ultraseal flashing only in the area shown. Ultraseal Flashing is self-sealing around nail penetrations.

ANCHOR BRACKET AND INSERTION POINT

LIFT FLANGE

OPTIONAL COSMETIC SHINGLE

NAIL BOTTOM EDGE 6" APART

BOTTOM

TOP SHINGLE COVERS NAIL HEAD AS STANDARD

SHINGLE APPPLICATION

SIDE

SIDEBRACKETS PER SIDE

14" 222" 230" 238" 346" 3

Page 3: Installation Instructions for Wasco® E-Class Skylights€¦ · Installation Instructions for Wasco® E-Class Skylight 3017501 STEP 4 At the top: Place shingles OVER the flexible

Installation Instructions for Wasco® E-Class Skylight 3017501

STEP 4At the top: Place shingles OVER the flexible flange and the L-gasket as follows: First, nail an inverted shingle(s) across the width of the skylight (similar to use of starter shingle at roof edges). An inverted shingle would have bottom edge of shingle facing up the slope.

STEP 5Next, continue the shingles up from the sides of the skylight, and place the next top course of shingles over the first applied inverted shingle.

IMPORTANTBe sure that the shingles at the top (both the inverted and normal) are OVER the L-Gasket and approximately 3/4"–1" away from the frame. Ultraseal Flashing is self-sealing around nail penetrations.

STEP 6If necessary, notch shingle as shown. This notch will facilitate the transition from the side of the skylight where the shingles go under the L-Gasket, to the top where they go over it.

STEP 7Continue shingling to complete installation.

STEP 8 (Vent Unit Only)Attach the operator to the well framing with the two wood screws provided in the hardware kit.

Please visit our web site www.wascoskylights.com for:• Installation video• Light shaft suggestions and instructions• Wood shakes instructions• Instructions for installing side-by-side units• Metal roof instructions

Customer service can be reached at 800-388-0293.

KEEP BACK 3/4" – 1"

FIRST SHINGLE INVERTED

TOP

CUT SHINGLE HERE

NOTCH

1/4"

1"

Wasco Products, Inc.85 Spencer Drive, Unit AWells, ME [email protected]

NOTCHPLACE OVER L-GASKET

PLACE UNDER L-GASKET

Page 4: Installation Instructions for Wasco® E-Class Skylights€¦ · Installation Instructions for Wasco® E-Class Skylight 3017501 STEP 4 At the top: Place shingles OVER the flexible

Installation Instructions for Wasco® E-Class Skylight 3017501

VERTICAL CROSS-SECTION

FELT PAPER

ROOF DECK

WASCO ULTRASEAL FLASHING

FIRST SHINGLE INVERTED

PRIMARY WATER DIVERTER CHANNEL

“L" SHAPED GASKET

ANCHOR BRACKET

HEADER(S)

ROUGH OPENING

COSMETIC SHINGLE (OPTIONAL)

SHINGLE

NOTE: NAIL SHINGLES TO ROOF DECK NO CLOSER THAN 4" FROM SKYLIGHT FRAME

NAIL BOTTOM EDGE 6" APART

BOTTOM

TOP

KEEP BACK 3/4" – 1"

HORIZONTAL CROSS-SECTION

TO PROPERLY SECURE SHINGLES, NAILS MAY PENETRATE THE

ULTRASEAL FLASHING ONLY IN THE AREA SHOWN.

TOP SHINGLE COVERS NAIL HEAD AS STANDARD SHINGLE APPPLICATION

ROUGH OPENING

TOP SHINGLE COVERS NAIL HEAD AS STANDARD SHINGLE APPPLICATION

FELT PAPER

WASCO ULTRASEAL FLASHING

PRIMARY WATER DIVERTER CHANNEL

“L" SHAPED GASKET

ANCHOR BRACKET

VENT UNIT SASH REMOVAL

1. OPEN UNIT AND REMOVE GRENADE PIN

2. ROTATE SASH UP PAST 45°

3. EXTRUDED WATERGARD HINGE WILL DISCONNECT

INSTALLATION IS REVERSE OF REMOVAL


Recommended