Proposal for PIKITUP JOHANNESBURG (Pty) Ltd for INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT VARIOUS PIKITUP (PTY) LTD SITES Tender no: PR 70/2007 November 2007 Supplied by
Transcript
Page 1: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Proposal for PIKITUP JOHANNESBURG (Pty) Ltd

for

INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT VARIOUS PIKITUP

(PTY) LTD SITES

Tender no: PR 70/2007

November 2007

Supplied by

Page 2: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 2 Printed 12/2/2007

TTAABBLLEE OOFF CCOONNTTEENNTTSS 1 Executive Summary ....................................................................................................... 8

2 Description of Requirement ..........................................................................................12

2.1 Background ............................................................................................................12 2.2 Scope .....................................................................................................................13 2.3 Weigh Bridge specifications ...................................................................................15

! Weighbridges ...............................................................................................................15

! Weighbridge Integrated Systems ..................................................................................15

2.4 Back Office System ................................................................................................15 3 Issues for Consideration ...............................................................................................16

4 BID AS REQUESTED: FIXED PRICING .......................................................................19

4.1 ROBINSON SITE ...................................................................................................20 4.2 MARIE LOUISE SITE .............................................................................................24

4.2.1 GOUDKOPPIES SITE .....................................................................................28 4.3 ENNERDALE SITE ................................................................................................32 4.4 PANORAMA SITE ..................................................................................................36

5 ALTERNATIVE BID: RENTAL ......................................................................................43

6 ALTERNATIVE BID: COST PER TRANSACTION ........................................................44

6.1.1 Transaction Management ................................................................................44 6.1.2 Weigh Bridge Processing System ...................................................................44 6.1.3 Registered Reference Entity ............................................................................45 6.1.4 Reporting ........................................................................................................45 6.1.5 Financial Model ...............................................................................................46 6.1.6 Transaction fee ...............................................................................................46

7 Solution Proposed ........................................................................................................47

7.1 Solution Components .............................................................................................47 7.1.1 Equipment .......................................................................................................47 7.1.2 Backroom Services .........................................................................................48 7.1.3 Additional technology ......................................................................................49 7.1.4 Transaction Capacity Parameters ...................................................................52

7.2 Solution Design Considerations .............................................................................54 7.2.1 Booms .............................................................................................................54 7.2.2 Maintenance ...................................................................................................56 7.2.3 Digital Images .................................................................................................58 7.2.4 Data download ................................................................................................58 7.2.5 Training ...........................................................................................................58

7.3 Customer Responsibilities ......................................................................................59 8 Additional considerations for future deployment ............................................................60

8.1 Average Speed Determination (ASD) .....................................................................60 Overview ......................................................................................................................60

Page 3: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 3 Printed 12/2/2007

Travel Map ...................................................................................................................60 Travel Time tabular display ...........................................................................................61 Special vehicles Travel time .........................................................................................61 Status: LPR unit status .................................................................................................61 Settings 62

8.2 Travel Time Calculations ........................................................................................62 Travel time ........................................................................................................................62 Average Travel time .........................................................................................................62 Comparison Accuracy ......................................................................................................63 Storage and export of Results ..........................................................................................63 8.3 INFORMATION ON WIM (WEIGH IN MOTION) for PIKITUP-JHB .........................63

8.3.1 High Speed Weigh-in-Motion Apparatus (Piezo Quartz Sensor/Type Lineas 9195E) 63 8.3.2 Capacity ..........................................................................................................63 8.3.3 Accuracy .........................................................................................................64 8.3.4 Capacity ..........................................................................................................64 8.3.5 Installation and Mounting ................................................................................65 8.3.6 Exact Position .................................................................................................65 8.3.7 Video Camera with violators recording capability ............................................68 8.3.8 Permanent WIM Operations ............................................................................69

" Flat (no horizontal or vertical curves) ............................................................................69

" Smooth (no bumps or other surface conditions that increase dynamic vehicle motion) .69

" Strong (to reduce pavement flex underneath the WIM sensor), and .............................69

" In good condition. .........................................................................................................69

WIM site principle checklist ...............................................................................................70 8.3.9 SITE SELECTION ...........................................................................................71

GEOMETRIC DESIGN .....................................................................................................71 Horizontal Curvature .....................................................................................................71 Roadway Grade ............................................................................................................71 Cross Slope ..................................................................................................................71

PAVEMENT CONDITION .................................................................................................72 SITE LOCATION ..............................................................................................................72 Availability of Access to Power and Phone .......................................................................72 Adequate Location for Controller Cabinet .........................................................................72 8.4 Terms and Conditions of Supply ............................................................................73

8.4.2 4. Installation of 1 WIM station ........................................................................76 8.4.3 The other systems can be installed by your educated personal to reduce the costs � following preparation works must be provided before: ......................................76

9 Implementation Schedule .............................................................................................78

10 Additional considerations ..............................................................................................81

10.1 Company profile .....................................................................................................81 10.2 Social Investment ...................................................................................................81

10.2.1 Jobs created ...................................................................................................81 10.2.2 Use of affirmative business enterprises ...........................................................81 10.2.3 Investment in the community ...........................................................................81 10.2.4 Local content ...................................................................................................82 10.2.5 Use of SMMEs ................................................................................................82

11 Definitions, acronyms and abbreviations.......................................................................83

Page 4: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 4 Printed 12/2/2007

12 Supporting documentation ............................................................................................86

12.1 Technology References .........................................................................................86 12.1.1 List of countries where the equipment is being used .......................................86 12.1.2 List of users in Southern Africa ........................................................................86 12.1.3 List of current users in South Africa .................................................................87

12.2 REFERENCE SITES: Record of Similar Projects Completed .................................88 12.3 KEY COMPANY PERSONAL PROFILE .................................................................95

A. Refereed Journals ...................................................................................................95 B. Papers Presented at Professional Meetings ............................................................96

12.4 LPR Spec Sheet ................................................................................................... 101 12.4.1 Overview ....................................................................................................... 101 12.4.2 System description: ....................................................................................... 102 12.4.3 Block Diagram ............................................................................................... 104

12.5 SITE LOCATION .................................................................................................. 105 12.5.1 Site Layout: Installation ................................................................................. 107 12.5.2 ON WEIGH BRIDGE BEAMS ........................................................................ 109 12.5.3 TRAFFIC LOGGING ..................................................................................... 109 12.5.4 System Architecture: Overview ..................................................................... 110

LPR units ....................................................................................................................... 111 LPR unit Windows Main Display ............................................................................... 112 12.5.5 LPR Client ................................................................................................... 113

Network ......................................................................................................................... 114 12.5.6 Data Output ................................................................................................... 116 12.5.7 OCR Engine .................................................................................................. 118 12.5.8 SEE DATA .................................................................................................... 118 12.5.9 Client-Server Architecture ............................................................................. 118 12.5.10 Events data ................................................................................................... 118 12.5.11 LOG OF EVENTS ......................................................................................... 120 12.5.12 ALARM GENERATION ................................................................................. 121 12.5.13 System stability ............................................................................................. 121 12.5.14 Redundancy .................................................................................................. 122

12.6 Spec Sheet .......................................................................................................... 127 12.7 SABS Approval .................................................................................................... 130

13 SERVICE LEVEL AGREEMENT ................................................................................ 135

Hereinafter referred to as Sub Saharah Scales .............................................................. 135 13.1.2 On Behalf of the Customer ............................................................................ 143 On Behalf of Sub Saharah Scales .............................................................................. 143

13.2 ISO Certification ................................................................................................... 147 13.3 TAE Accreditation ................................................................................................ 149 13.4 NQA Certification ................................................................................................. 154 13.5 Warranty .............................................................................................................. 156

APPENDIX: ADDITIONAL INFO: ....................................................................................... 159

13.6 MANUALS ............................................................................................................ 160 13.7 SA REFERENCE SITES ...................................................................................... 161 13.8 PRODUCT SPECIFICATIONS ............................................................................. 161

Page 5: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 5 Printed 12/2/2007

Page 6: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 6 Printed 12/2/2007

TTAABBLLEE OOFF FFIIGGUURREESS Figure 41 Typical Waste Watch Solution ..............................................................................12

Figure 68 Dashboard ............................................................................................................46

Figure 4-1 Access Control Enrolment system .......................................................................50

Figure 4-2 Editor Type Menu - Showing types of users already catered for ..........................50

Figure 4-3 Image of the access control unit ..........................................................................50

Figure 4-4 Types of waste being costed on the weigh bridge ...............................................50

Figure 4-5 Pie Chart Report .................................................................................................50

Figure 4-6 Weigh Bridge Report ...........................................................................................51

Figure 4-7 Processed vehicles showing numbers of vehicles still on site ..............................51

Figure 4-8 Bar Chart report showing number of transactions per site ...................................51

Figure 62 ISO 9001 Certification ..........................................................................................57

Figure 63 Products certified to FCC15, CE, UL, GS and IEC60825-1 ...................................57

Figure 7-1 Sample Weigh Bridge Project Plan ......................................................................80

Figure 40 Trucks speeding on the M4 towards the airport ....................................................88

Figure 41 Visitors to Durban who obey the rules of the road.................................................88

Figure 42 M4 Durban Demo of ASD .....................................................................................89

Figure 2 Elements making up See Lane ............................................................................. 103

Figure 3 See Lane Connectivity .......................................................................................... 104

Figure 6 Site 1 Eastbound Lane Front Camera View .......................................................... 105

Figure 10 Site 7 Front Camera View ................................................................................... 105

Figure 11 Site 8 Front Camera View ................................................................................... 105

Figure 12 Site 8 A Front Camera View ............................................................................... 106

Figure 13 Site 8 C Front Camera View ............................................................................... 106

Figure 14 Site 8 D Front Camera View ............................................................................... 107

Figure 15 Rear camera and Site PC layout ........................................................................ 107

Figure 16 Rear camera wiring and layout ........................................................................... 108

Figure 17 Layout for a rear camera .................................................................................... 108

Figure 18 SeeCarFlow illustration (Site A of N sites, with control room) ............................. 110

Figure 19 Image Capture and OCR .................................................................................... 111

Figure 20 LPR unit Architecture .......................................................................................... 112

Page 7: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 7 Printed 12/2/2007

Figure 21 Example of LPR application main view ............................................................... 113

Figure 22 Personalised Plates are recognised using LPR .................................................. 113

Figure 23 Data flow of the Recognition results ................................................................... 114

Figure 24 Networked LPR Sites ......................................................................................... 115

Figure 25 Front end of the LPR solution ............................................................................. 117

Figure 26 See Data ............................................................................................................ 118

Figure 27 Rear LPR capture and recognition with alarm ..................................................... 119

Figure 28 Log of the data and images from each site ......................................................... 120

Figure 29 Vehicle Logged ................................................................................................... 120

Figure 30 Alarm on vehicle detected .................................................................................. 121

Figure 70 ASD on the N3 ................................................................................................... 161

Copyright and Confidentiality Notice

Material contained in this document is proprietary and is to be treated confidentially by all recipients. Acceptance of delivery

of this material constitutes acknowledgment of the confidential relationship under which disclosure and delivery are made.

No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical,

including photocopy, recording, or any information storage and retrieval system without permission in writing.

Page 8: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 8 Printed 12/2/2007

11 EExxeeccuuttiivvee SSuummmmaarryy We have pleasure in submitting our proposal for the INSTALLATION AND MAINTENANCE OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT VARIOUS PIKITUP (PTY) LTD SITES, namely; Robinson Landfill Site, Marie Louise Landfill Site, Goudkoppies Landfill Site,

Ennerdale Landfill Site, Panorama Compost Plant Site, and Incinerator Plant Site

(incorporated into Robinson Landfill Site in our documentation). Through the rollout of the

Weighbridge Systems on offer in this proposal we will ensure a cost effective reliable and

efficient solution with limited but effective maintenance and costs for Pikitup � JHB. Our

optimal goal is to achieve availability beyond 99.95%.

Sub Saharah Scales is committed to provide superior service to our clients. The leadership

status we have already achieved in most sectors of industry is a result of our dedication to

service excellence. With the combination of our extensive experience, knowledge and

management skills in the industrial fields, and international affiliate and partner support

available to us, Sub Saharah Scales is well positioned to provide the most innovative and

cost effective service to our clients. In developing this proposal we have comprehensively

analysed the requirements for each site and ascertained that the following will be the correct

solution for Pikitup-JHB;

Robinson Landfill Site Phase 1 � the existing 3 (three) weighbridges at the entrance gates

will not require immediate replacement but rather upgrading. These upgrades will be both

electronic and mechanical repairs. The Incinerator Weighbridge only requires the office

equipment as Indicator, etc.. Back Office link up to be phased immediately thereafter. Time

frame to operational status to SABS Specification � 14-20 work days from tender award.

Phase 2 – new weighbridge installation will be phased in over the next 3 months and will

include if required 3 new weighbridges at the front entrances, but the incinerator weighbridge

will not be replaced. Phase 3 – back office installation, tire shredders, booms, integration,

camera systems etc. will be phased in from Phase 1 starting date.

Marie Louise Landfill Site Phase 1 � the existing 2 (two) weighbridges at the entrance

gates will not require immediate replacement but rather upgrading. These upgrades will be

both electronic and mechanical repair. Back Office link up to be phased immediately

Page 9: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 9 Printed 12/2/2007

thereafter. Time frame to operational status to SABS Specification � 15-25 work days from

tender award. This includes an additional extra 2 load cells per weighbridge, which will be

used as spares or on a third weighbridge once the 2 weighbridges have been shortened to

12x3M each. Phase 2 – new weighbridge installation will be phased in over the next 3

months and will include if required 2 new weighbridges at the front entrances. Phase 3 –

back office installation, tire shredders, booms, integration, camera systems etc. will be

phased in from Phase 1 starting date.

Goudkoppies Landfill Site Phase 1 � the existing 2 (two) weighbridges at the entrance

gates will not require immediate replacement but rather upgrading. These upgrades will be

both electronic and mechanical repair. Back Office link up to be phased immediately

thereafter. Time frame to operational status to SABS Specification � 15-25 work days from

tender awar. Phase 2 – new weighbridge installation will be phased in over the next 3

months and will include if required 2 new weighbridges at the front entrances. Phase 3 – back office installation, tire shredders, booms, integration, camera systems etc. will be

phased in from Phase 1 starting date.

Ennerdale Landfill Site Phase 1 � the existing weighbridge at the entrance gates will not

require immediate replacement but rather upgrading. These upgrades will be both electronic

and mechanical repair. Back Office link up to be phased immediately thereafter. Time frame

to operational status to SABS Specification � 12-23 work days from tender award. The

current situation requires immediate emergency repair on a loadcell to become fully

operational, whereafter Phase 1 should commence. Phase 2 – new weighbridge installation

will be phased in over the next 3 months and will include if required a new weighbridge at the

front entrance. Phase 3 – back office installation, tire shredders, booms, integration, camera

systems etc. will be phased in from Phase 1 starting date.

Panorama Compost Site Phase 1 � the existing weighbridge at the entrance gates will not

require immediate replacement but rather upgrading. These upgrades will be both electronic

and mechanical repair. Back Office link up to be phased immediately thereafter. Time frame

to operational status to SABS Specification � 5-10 work days from tender award. Phase 2 – new weighbridge installation will not be required at all unless the weighbridge is too small or

short whereby an extension will be required for 6M and an electronics upgrade. Phase 3 – back office installation, tire shredders, booms, integration, camera systems etc. will be

phased in from Phase 1 starting date.

Page 10: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 10 Printed 12/2/2007

This proposal is based on a three-year contract period, after which, the contract is negotiable

for renewal or could be terminated upon which a closure cost is determined and recovered

as deems fit and agreed to by both parties as WIP (Work In Progress) will have to be taken

into consideration.

We have selected the following three sites as reference sites and referrals:

1. Independent Freight Carriers � Pretoria Heavy Haulage & Transportation Sector

Contact: Martin De Beer - 083 453 1203

Consists of 2 weighbridges handling up to 250 payloads/day

2. Vriesland Saai Kudde � Vryburg Construction Sector

Contact: Jop Fourie � 082 777 7491

Consists of 4 weighbridges used for brick weighing

3. MC Engineering � Harrismith Diversified Agricultural Sector

Contact: Mikkie Coetzee � 082 773 9995

Consists of 13 weighbridges which are installed throughout South Africa, and

are handling about 1000 transactions per day.

At all these sites we have obtained experience which could benefit Pikitup, as volume

flows over the weighbridges are very similar.

Sub Sahara Scales is a multifaceted company with global interests and support to

accommodate this project. We have numerous projects which are ongoing at

different locations with credible clients as MacDonald�s Transport (R200k and

ongoing), MBFI Mozambique (R1,2M and ongoing), ACSA (R4,5M), Wonderboom

Airport (R2,7M), Jacobs Equipment, Blue Chip Snacks, Okiep Mine, Limpopo Scrap

Metals, etc.. Sub Saharah Scales has strategic partners in associated businesses

wherein we are confident that we can improve the utilization of the current

weighbridge systems. In addition and in the spirit of partnership, Sub Saharah Scales

jointly with Pikitup, can facilitate third party work for HDI, BEE or similar entities, for

example a cleaning service at the weighbridge sites, to name but one example.

Page 11: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 11 Printed 12/2/2007

Sub Saharah Scales has identified the market requirement for specialized

maintenance technology and services and we have grown this into one of our core

businesses. Sub saharah Scales has become a leader in the field of providing �One-

Stop-Maintenance� solutions in the weigh and mass sectors, and has affiliation and

support from other scale companies as SASCO Africa, Scales Incorporated, etc.. for

whom Sub Saharah Scales provide maintenance support and services. This market

exposure has enabled Sub Saharah Scales to continuously improve our experience

base and provide us with the ability to measure our practices and procedures under

�best practice principles�. We are able to structure our services to harness this

experience base and to provide our workforce with a growth and development path,

international exposure and job security.

Sub Saharah Scales has found that the maintenance activities cannot be treated as a

separate entity as it has direct influence on the effectiveness of the core business. In

view of this we base our development of the maintenance on your business goals

where your operational requirements are considered.

We guarantee that we will add value to your concern, which will result in a mutually

beneficial partnership to both organizations.

The financial offering for the advanced weigh bridge solution is provided

as:

- A once off capital amount and monthly fully comprehensive maintenance plan

OR - An alterative bid 1: rental option

OR - An alternative bid 2: cost per transaction solution

Page 12: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 12 Printed 12/2/2007

22 DDeessccrriippttiioonn ooff RReeqquuiirreemmeenntt

2.1 Background

PIKITUP has a number of facilities that accept a wide range of different types of waste from both the

local and extended area. The proposed WASTE WATCH solution is designed to log all transactions,

obtain the required weight and bill the owner of the vehicle, to ensure that businesses meet the proper

costs of disposing of their waste. The "WASTE WATCH" System supplies a cost-effective means of

managing and enforcing the legal disposal of waste by:

• Using Automatic Number Plate Recognition ANPR to record the number of times a vehicle uses a recycling centre/s

• Providing a central database that will store all vehicle records

• Providing an automated method of issuing permits/vouchers via the internet

• Providing an automated method for commercial companies to pay for permits/vouchers via the Internet

• Freeing staff at waste sites from having to check the credentials of suspect vehicles - valid permit holders being alerted to staff via SMS message or equivalent

• Providing a 'Managed System' reducing cost and management overhead

• Giving the ability to share data between local authorities, preventing companies from illegally obtaining permits/vouchers

• Providing optional monitoring cameras for the detection of illegal 'fly tipping'

• Providing enforcement software for the prosecution of fly tippers

Figure 1 Typical Waste Watch Solution

PIKITUP will be provided with a fully functional, integrated weighbridge system which will:

Enrol existing & new customers by name, access card, finger print, account no., billing

details, vehicle license plate, and tare weight. The proposed Waste Watch solution will

provide for the integration of access card hardware to electronically capture tare weights of

vehicles, removing an manual intervention. A wide range of communication links (GPRS,

Page 13: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 13 Printed 12/2/2007

Wireless, Ethernet and fibre) between the local weighbridge�s and the other sites is provided,

linking to Pikitup�s HO IT systems. These communication links allow over 99.95% availability

to automated database update in real time for accurate and reliable billing purposes. This is

essential for the provision for a block out system; ensure non paying customers are

prevented from having access.

The database provides standardised weighbridge tariffs of Rx per 1000 kg inclusive of VAT

and integrates with Pikitup�s current Venus Financial system / SAP. The database stores

tare weights of the accountholder vehicles and allows real time update of all data as

required. The ability to identify outside parameter tare weights and force the vehicle to be

reweighed ensures no illegal tare weights are permitted (where a tare weight is obtained with

a vehicle filled with water). The database allows for the determination of an unlimited waste

characterisation by allowing for a multiple of different waste categories to be captured. A

wide range of automated reports for ease of analysis and reporting can be created and is

demonstrated.

The fully automated boom gates are opened via license plate recognition or with an

electronic access enabled once customer has swiped the electronic access card reader or a

PIN code or a finger print. All linked to tyre slashes preventing drive through and enabling a

cashless operation. The type of waste is recorded and displayed to the operator, along with

recording real time tonnages (data) with tare weight deduction. The ability to operate each

weigh bridge in both directions facilities weigh bridge access efficiencies, along with free exit

once off loaded.

2.2 Scope

The integrated, comprehensive solution proposed includes either an upgrade or a new weigh

bridge per site. All weigh bridges will be installed with software which will monitor the status

of the weigh bridge. SYSTEM OPERATION: NEW USER Enrol using the Pikitup�s web site or on arrival on site or at the HO. Provide billing details,

license plate no�s of vehicles, name, contact details, no of vehicles etc. Select how to pay

(debit from credit card) or on account or cash etc. User selects how they want to receive the

account, weekly, monthly, on exit, by SMS or via the web site or via E-Mail. Field created for

an image of the vehicle, plus driver image, weight, etc. User selects if they wish to use an

Page 14: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 14 Printed 12/2/2007

access card (cost for this) or fingerprint (free) linked to a code or all 3 access control

systems.

EXISTING USER Enters site, load is captured and recorded (if an open vehicle). If closed, records an image of

the vehicle. Approaches weigh bridge; 6M from the boom vehicle license plate is captured

from both front and rear. The license plate number is sent to the database. If no license

plate is present, an image of the vehicle is sent to the database. Driver stops at the access

control reader. If a car, uses lower point. If a truck, uses higher access reader. Driver could

then, swipe a card OR enter a pin (account no) OR place his finger on the reader or do a

combination of all three. If allowed to proceed (account paid) boom opens, grippa bars

retract and driver moves forward onto the weigh bridge. Once the weight of the vehicle is

captured and the type of waste determined, boom on the exit open and driver can enter the

site.

On exit, if the vehicle tare weight is in the system, deduction occurs automatically and the

vehicle does not need to exit over the weigh bridge. The driver would approach the exit lane.

6M from the boom vehicle license plate is captured from both front and rear. The license

plate number is sent to the database. If no license plate is present, an image of the vehicle

is sent to the database. Driver stops at the access control reader. If a car, uses lower point.

If a truck, uses higher access reader. Driver could then, swipe a card OR enter a pin

(account no) OR place his finger on the reader or do a combination of all three. If allowed to

proceed (account paid) boom opens, grippa bars retract and driver moves forward and exits

site. The invoice can be collected at that time or e-mailed or an SMS can be sent to the

driver / owner.

On exit, if the vehicle tare weight is NOT in the system vehicle is required to exit over the

weigh bridge. The driver would approach the exit weigh bridge lane. 6M from the boom

vehicle license plate is captured from both front and rear. The license plate number is sent

to the database. If no license plate is present, an image of the vehicle is sent to the

database. Driver stops at the access control reader. If a car, uses lower point. If a truck,

uses higher access reader. Driver could then, swipe a card OR enter a pin (account no) OR

place his finger on the reader or do a combination of all three. If allowed to proceed (account

paid) boom opens, grippa bars retract and driver moves forward and onto the weigh bridge.

Weigh calculated and entered into the system automatically. The invoice can be collected at

that time or e-mailed, printed off the web site or an SMS can be sent to the driver / owner.

Page 15: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 15 Printed 12/2/2007

USER WITH OVERDUE ACCOUNT No access is granted and user can settle account on site before proceeding.

2.3 Weigh Bridge specifications

!! WWeeiigghhbbrriiddggeess Axle Weighbridges, Composite (Concrete & Steel), Road Rail Combination, Multi

Platform, Portable weighing –in- motion pads, Modular units (4, 6 & 8 m modules),

Analogue & Digital Applications

!! WWeeiigghhbbrriiddggee IInntteeggrraatteedd SSyysstteemmss LAN & WAN applications, Integrated Access Control (Manned or Unmanned

Stations), Integrated CCTV and real or time based visual backup recordings.

Sub Saharah Scales with support from …

Affiliated with Phungo IT, I3, RTS, Kistler, Combine Communications, MC Engineering, Inher SA, YS Scales, Richter Scales, Mass Africa, ScaleRite, etc..

2.4 Back Office System

The proposed back office system is a complete weighbridge Internet Data hosting and

reporting portal specifically designed for the waste disposal and waste management industry.

An unlimited number of sites data can be transmitted to a central server where the data is

made available in real time. If the data lines go down, up to 100 000 transactions can be

stored locally, until the central server is available. The data lines which can be provided are

leased lines, wireless, GPRS and ADSL, any TCP/IP connection. The reports that can be

generated include: Uptime and site availability;

- Month end statements and customer reports;

- Vehicle number per site, average time on site, average weight, etc.;

- Waste category and allowed type of waste per site;

- Operator reports and no of vehicles handled per operator.

- A wide range of other reports as required.

All the above are available via SMS, E-Mail, Internet web sites, printed or self service kiosks.

Page 16: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 16 Printed 12/2/2007

33 IIssssuueess ffoorr CCoonnssiiddeerraattiioonn A comprehensive solution is proposed which will ensure all transaction are captured and

billed at the suitable rate. Both users and staff will be forced to adhere to best practice,

making the landfill a safer place for all. Illegal dumping will no longer be tolerated, as the

equipment to capture this activity will be provided. The same solution will ensure the right

price is paid for the correct material.

In compiling this quotation we have endeavoured to provide you with the best value solution

fit. Our offer includes available solutions of either an upgrade of the existing system, an LTD

weighbridge, a Steel Sasmont weighbridge and a Sasmont Concrete option, for Robinson,

Ennerdale, Goudkoppies, Marie Louise, and Panorama Sites. A recommended price for a

solution is then supplied at the end of each Site for each site.

Detail on different weighbridge solutions in provided in the following order: (1) Phase 1 - Upgrade of existing Electronics to SABS specification (includes load cells, indicator, cables

and computer system with appropriate software), (2) Phase 2 – All SABS Approved Options - Option 1 - New LTD steel design weighbridge, Best fit for Purpose Electronics as

in (1) above, Option 2 � Sasmont Steel Deck weighbridge, Best fit for Purpose Electronics

as in (1) above, and Option 3 � Sasmont Concrete Weighbridge, Best fit for Purpose

Electronics as in (1) above

Our proposal is based on the following enclosed documents:

Covering letter

History of the Company & Differentiating Factors

Executive Summary

Response to your bid document � as is with supporting documentation

Qualification of Proposal Document

Schedule of pricing

Contractual agreement

Appendices and other documentation as diagrams, etc. not included above.

Page 17: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 17 Printed 12/2/2007

Sub Saharah Scales with support from …

Affiliated with Phungo IT, I3, RTS, Kistler, Combine Communications, MC Engineering, Inher SA, YS Scales, Richter Scales, Mass Africa, ScaleRite, etc..

History - Sub Saharah Scales CC

Sub Saharah Scales is committed to the continuous and exclusive supply of high quality

mass or weighing equipment, spare parts and service. We have been supplying weighing

equipment of the highest calibre to the African Continent. We have established teams of

after-sales service, unequalled in South Africa and Africa comprising committed individuals

and agents, readily available to tend to you�re weighing requirements.

Differentiating Factors

Sub Saharah Scales has achieved the following during its inception:

We are a leading measurement company in Africa, covering South Africa, Southern Africa,

Sub Saharan Africa, and Australasia & South America with systems from Australasia to

Nigeria.

Our products are locally manufactured, licensed and approved

The first company to provide a 5 (five) year electronics and a 10 (ten) year steel renewable

warranty

We provide a 360 degree 24 hour support throughout the year

Sub Saharah Scales prides itself in Ultimate Response times with Service Level Agreements

categorized as Silver, Gold or Platinum.

Agreements in place to support multiple vendor systems throughout Sub Sahara Africa

Provide a One-Stop-Solution to scales whether multiple vendor, electronics, steel, concrete

or software related.

Page 18: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 18 Printed 12/2/2007

New Weigh In Motion (WIM) Quartz Crystal Technolgy for dynamic weighing applications

and traffic screening, with a Mean Time To Failure (MTTF) of 171 years � virtually

maintenance free and available 99,99%

The first company to dynamically weigh aviation transport

The first company to build weighbars / beams for scales that are 100% water proof.

The first company to provide Pikitup with the ultimate solution

For years Sub Saharah Scales has built a range of weighbridges that are becoming the

performance benchmark for quality, reliability, low maintenance and performance in both light

and heavy use applications. Our capability is based on a continuous supply of equipment,

incorporating improvements in technology, design, material and workmanship, which have

been gained by our group of committed affiliates, representatives and agents over a period of

more than 200 years of specialized weighing experience.

Page 19: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 19 Printed 12/2/2007

44 BBIIDD AASS RREEQQUUEESSTTEEDD:: FFIIXXEEDD PPRRIICCIINNGG In compiling this quotation we have endeavoured to provide you with the best value solution

fit. Our offer includes available solutions of either an upgrade of the existing system, an LTD

weighbridge, a Steel Sasmont weighbridge and a Sasmont Concrete option, for Robinson,

Ennerdale, Goudkoppies, Marie Louise, and Panorama Sites. A recommended price for a

solution is then supplied at the end of each Site for each site.

PIKITUP SITES

CAPITAL VAT TOTAL BEE/HDI/COMMUNITY PORTION

TOTAL % of project

SITE

ROBINSON R 2,418,670.09 R 338,613.81 R 2,757,283.90 R 1,136,293.30 46.98

ENNERDALE R 1,026,605.21 R 143,724.73 R 1,170,329.94 R 508,014.70 49.48

PANORAMA R 1,001,521.87 R 140,213.06 R 1,141,734.93 R 497,697.47 49.69

GOUDKOPPIES R 1,450,919.23 R 203,128.69 R 1,654,047.92 R 734,108.88 50.60

MARIE LOUISE R 1,629,904.86 R 228,186.68 R 1,858,091.54 R 756,108.88 46.39

GRAND TOTALS R 7,527,621.26 R 1,053,866.98 R 8,581,488.24 R 3,632,223.23 AVERAGE 48.64%

As mentioned above in our offer we have provided detail on different weighbridge solutions in

the following order: (1) Phase 1 - Upgrade of existing Electronics to SABS specification

(includes load cells, indicator, cables and computer system with appropriate software), (2)

Phase 2 – All SABS Approved Options - Option 1 - New

LTD steel design weighbridge, Best fit for Purpose Electronics

as in (1) above, Option 2 � Sasmont Steel Deck weighbridge,

Best fit for Purpose Electronics as in (1) above, and Option 3

� Sasmont Concrete Weighbridge, Best fit for Purpose

Electronics as in (1) above

Phase 2 options 2 & 3 are included for price evaluation

purposes only, and where possible we use Phase 2 option 1 first as it is the least costly. Our

preferences are as follows; Phase 1 upgrade, then Phase 2 Option1, which can be upgraded

to either Phase 2 options 2 or 3 at a later stage.

Page 20: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 20 Printed 12/2/2007

The WIM (Weigh in Motion) is included to show INTEROPERABILITY TECHNOLOGY shift

away from clandestine metal/concrete weighbridges. This is definitely the future movement of

high volume dense mass weighing applications as Landfill sites, and we strongly recommend

the consideration of WIM Quartz for future expansion.

4.1 ROBINSON SITE

Summary

Based on our experience and site visits at Robinson the following is proposed:

As Per Tender Document

1. New Weighbridges may only be required at a later date and we recommend achieving an operational status of all 4 weighbridges at Robinson within 20 working days of tender award, whereafter, if Pikitup should desire, only the front three weighbridges could be phased in for replacement with new weighbridges.

2. Innovative Software Solutions have been offered and will operate on an open database, such that future expansion or integration is not impeded or limited. The software will link the license plate recognition, CCTV recording of the load, card access control, PIN code, finger print, invoice, billing, weigh bridge info, tare weight and other information as obtained per transaction into a meaningful, real-time record.

3. Communications Links for real time up date and interfacing to the financial systems (Venus and SAP at a later date) has been catered for and can be accommodated. Existing integration to SAP is currently available.

4. Automated Database is virtual real time based for billing purposes with scale information, which includes, but is not limited to tare weights, real time tonnages, product type, transporters information, vendor/supplier number, etc., and will integrate to Venus and SAP.

5. The lightning protection was found to be good, but not up to the high standard which is required to support the expensive electronics. Thus an upgrade to an improved lightning protection system is recommended.

6. Load Cell replacements/upgrades – Sub Saharah Scales will firstly strive to achieve an availability of 95% plus with the current infrastructure of the existing weighbridges within 15 working days of order or resolution with Pikitup, by doing the following : (1) fix the existing system by commissioning and repair to achieve an SABS operational status, then ; (2) upgrade the electronics on the existing weighbridges if necessary ; then (3) upgrade each weighbridge to a recommended

Page 21: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 21 Printed 12/2/2007

fit for purpose application. This may/or may not include new weighbridges, and this will only be done in consultation with Pikitup Management and staff. Please note that the Load cells and indicators for the upgrade and new weighbridges will be directly compatible in type, quantity and application, thus there will be extra revenue charges for the electronics.

7. Electronic Access Control - Speed Control will be exercised by the installation of tire slashers/shredders before the weighbridges on entrance and exit to each weighbridge, and at the exit to the site, giving a total of two per Weigh Bridge and an extra one for free exit, required per site. Each weighbridge will have automatically controlled booms gates at the entrance and the exit to the weighbridge and the site. Access card readers are included as an option, allowing entry via a card, finger print and or a PIN. Account holders or staff would be enrolled on site, at head office or at other locations where payment detailes could be captured. Our offer includes Image & Text recognition on the number plates, company emblems, and if Pikitup so wish a Pikitup self-generated Text Number can also be applied to each vehicle at a specific location. It is there fore possible to enable access based on one, some or all of the following: License plate, finger print, access card, PIN code or account number.

8. The system will include real time Block-Out of financial or malicious

offenders. It is there possible to restrict access based on one, some or all of the following: License plate, finger print, access card, PIN code or account number.

9. Commissioning and Installation to SABS Approved Standards – The systems (both Upgrade & New – where applicable) will comply to relevant SABS Standards under SABS Certification 1396 (SA420 Instrument), or 1382 (ESIT ART Instrument), or 1300 (M&D Instrument).

10. Training – ongoing training will be provided for minimum of 2 days per month for the first year, 1 day per month thereafter for the Pikitup Group.

11. Maintenance Plan – a fully comprehensive Service Level Agreement has been included to accommodate this for a minimum of 3 years.

Page 22: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 22 Printed 12/2/2007

12.

Description of Product and/or Service COST No Total Exc VATWeigh Bridge Upgrade Existing Phase 1 R 44,808.00 3 R 134,424.00Incinerator Weighbridge Upgrade Phase 1 R 29,460.00 1 R 29,460.00Weigh Bridge (NEW) Phase 2 R 88,254.00 3 R 264,762.00Weigh Bridge Software Phase 1 R 6,600.00 4 R 26,400.00Camera to record vehicle load, with viewing at all weigh bridge offices R 19,750.00 1 R 19,750.00Access Control Unit (Card, PIN & Biometrics) R 12,389.00 10 R 123,890.00Booms and TALON TYRE‐SPIKE BARRIERS R 24,175.00 10 R 241,750.00civil work and delivery & installation ‐‐ for one Talon Tyre‐Spike Barrier R 11,000.00 10 R 110,000.00Traffic Robots (Red / Green) R 2,070.00 10 R 20,700.00Safety / Closing loops R 750.00 10 R 7,500.00Infra RED Beams R 485.33 16 R 7,765.28Installation Material R 1,638.89 4 R 6,555.56

Weigh Bridge Printer (Dot Matrix Duplicate) Phase 1 R 4,195.00 5 R 20,975.00Setup backoffice R 7,500.00 15 R 112,500.00IBM Compact Cash Drawer R 992.00 5 R 4,960.00POS Software R 5,000.00 5 R 25,000.00IBM Distributed Character Display R 1,710.00 5 R 8,550.00Integration to SAP / Exisiting Database R 193,000.00 1 R 193,000.00

ADSL Setup R 4,000.00 1 R 4,000.003G / iBurst Comms (Alternative link) R 3,000.00 1 R 3,000.00Local Wireless Network R 2,000.00 7 R 14,000.00ProSafe 802.11G Wireless Access Point. WG102IS R 958.10 7 R 6,706.70dBi Patch Panel Antenna ANT 24D18 R 1,401.40 7 R 9,809.80Netgear Antenna Cable 10M R 291.50 7 R 2,040.50POE Adapters R 308.00 7 R 2,156.00Brackets and Steelworks R 3,500.00 7 R 24,500.00External Connectror Box R 350.00 7 R 2,450.00Labour, Config and Travel for Wireless R 6,500.00 7 R 45,500.008 port 1G POE (4) Switchs R 1,975.43 5 R 9,877.15CAT 5E Network Points R 444.44 7 R 3,111.08

LH3000: 3000VA Double conversion online pure sine wave UPS system with shutdown software and extended battery Bat 950 x 570 x 760 UPS 700x770 x 555 21,869.40 21,869.40 3 R 65,608.20Surge Protection for Weigh Bridge Phase 1 R 9,145.00 4 R 36,580.00

Signs R 750.00 10 R 7,500.00

PC's ‐ Work Station (Xeon Quad Core, E5320 Monitor, M, KB) Phase 1 R 11,050.00 5 R 55,250.00PC's ‐ SERVER (Xeon Quad Core, Monitor, M, KB, 1 TB HD, 4 GB Mem) R 17,953.00 2 R 35,906.009U Swing Frames Cabinets Complete R 2,086.39 7 R 14,604.73Bruch Pannels R 1,536.60 7 R 10,756.20Microsoft Windows 2003 Server + 5 CAL R 4,989.00 2 R 9,978.00BitDefender Windows File Server 1 R 2,027.00 2 R 4,054.00

4 Core Indoor Fibre MM R 25.00 450 R 11,250.00Install Fibre Optic Cable R 4.44 450 R 1,998.00Fibre Splace Tray ST R 250.83 7 R 1,755.81Pigtrail ST 1m Simplex (MM) R 55.00 21 R 1,155.00Midcouplers ST R 12.58 21 R 264.18Fibre Patchleads ST‐ST R 172.77 14 R 2,418.78Fibre Fusion Splicing R 177.78 21 R 3,733.38Fibre Sundries Upats, Screws, Cable Ties,Etc R 1,111.11 3 R 3,333.33

LPR Camera IR Pulsed R 26,500.00 10 R 265,000.00Galvanised Pole for Camera Protection / mounting (filled with concrete) R 1,750.00 16 R 28,000.005‐50mm VF A/I Video drive Lense R 1,198.37 10 R 11,983.70

VideoWise Camera Housing Medium Outdoor Aluminum Side Opening Housing, Concealed Cable Entry, Sun Shield, IP65, (L375xH117x138W). Use with GL‐208 Bracket R 344.78 10 R 3,447.80

VideoWise Housing Bracket Indoor / Outdoor Beige, Wall Mount, Cable Managed, 10kg (Use with GL618, GL‐619 Housing) R 232.40 10 R 2,324.00Dehngaurd : 230 Volts surge protection R 1,210.95 5 R 6,054.75Camera installation incuding back box , rawbolts, focusing and setup R 450.00 10 R 4,500.00CAT6 per M installed R 7.80 950 R 7,410.00Cable Cabtyre 3 core 2.5mm per M installed R 14.00 350 R 4,900.00Camera PS & Surge Protection R 1,780.58 10 R 17,805.80LPR SW R 129,038.00 1 R 129,038.00

Tarred Road Cross and Repair R 319.44 70 R 22,360.80Trenching Soft Rock 500mm DEEP R 52.39 240 R 12,573.60Paving Open and Repair R 83.06 35 R 2,907.10Tarred Road Pole 11M R 830.56 5 R 4,152.8025MM Gal Pipe Under Ground R 44.72 120 R 5,366.4025MM PVC Pipe Under Ground R 19.17 60 R 1,150.20Power points R 255.56 21 R 5,366.76

Civils Phase 2 R 30,000.00 3 R 90,000.00Commissioning Certification & Delivery R 8,800.00 3 R 26,400.00Other R 16,689.70 1 R 16,689.70

TOTAL CAPEX AMOUNT FOR ROBINSON SITE INCLUDING THE INCINERATOR R 2,418,670.09

MONTHLY RENT TO OWN ON ABOVE OVER 36 MONTHS/CONTRACT DURATION RENT TO OWN R 86,951.19

MONTHLY Rental R 8,000.00 1 R 8,000.00Support Person R 12,000.00 1 R 12,000.00ADSL R 5,000.00 1 R 5,000.00Other R 15,000.00 1 R 15,000.003G / iBurst Comms (Alternative link) R 2,000.00 1 R 2,000.00Equipment Warrenty R 3,628.01 1 R 3,628.01Software cover Support R 100.00 10 R 1,000.00Training R 2,500.00 1 R 2,500.00CAPITAL COST R 86,951.19 1 R 86,951.19

OTHER ANNUAL COSTS COVERED OVER 12 MONTHSWeigh Bridge Calibration R 5,800.00 4 R 1,933.33

TOTAL R 138,012.53

VAT R 19,321.75

TOTAL WITH VAT R 157,334.28

R 2,418,670.09R 303,089.00R 381,162.00

R 1,734,419.09R 138,012.53

R 86,951.19R 1,136,293.30

LEGENDTotal Capital/Capex Cost/Amount for sitePhase 1 Amount /CostPhase 2 Amount/CostPhase 3 Amount/CostMonthly Amount/Cost which includes rent to own, and monthly aboveRental to own monthly amount which is subject to Financier Terms & ConditionsBEE/HDI/COMMUNITY DEVELOPMENT PORTION

PIKITUP ROBINSON SITE ‐ (Includes Robinson & Incinerator)Refer to Legend below sheet for color coding

ROBINSON & INCINERATORCOST SUMMARIES EXC VAT

PROJECT Capital TotalPhase 1Phase 2Phase 3 Monthly including rent to ownRENT TO OWN MONTHLYBEE/HDI/COMMUNITY PORTION

Page 23: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 23 Printed 12/2/2007

Other Issues Not Mentioned

13. Mechanical conditions of the weighbridges will still support a minimum of 15-20 years operation should major maintenance now be carried out. This would include resurfacing and painting of all 4 weighbridges with a SABS approved Epoxy paint which is Acid, Alkali, or Bio Chemical Resistant.

14. Provision of rodent prevention & protection to all cabling.

15. Rewelding of all appropriate joins on all the 3 entrance weighbridges.

16. The plinths of all 3 entrance weighbridges with associated ramps to be raised by a minimum of 250mm to allow sufficient clearance to facilitate daily cleaning and inspection of the weighbridge below the platform.

17. Railings/guide rails around the existing weighbridges at the front have been found to be sufficient and only requires repair. There is none around the incinerator weighbridge, and it is recommended that these be installed.

18. Drainage around the weighbridges to be re-assessed.

19. Printer systems to be upgraded to a later technology, which is inexpensive and simple to operate or replace.

20. Lighting around all weighbridges to be re-assessed to accommodate camera use in the evenings.

21. Site Support – Our offer includes site support for a minimum of 3 years, during which period we wish to empower and train personnel at PIKITUP to become self-sufficient to maintain and calibrate all their relevant weighbridge systems.

22. Cleaning Service and Apparatus – It our intention to ensure availability, cleanliness and pride at the weighbridges by using existing cleaning equipment to maintain clean & clear drainage and weighbridges and sites, thus reducing rodent & vermin infestation, which could damage the weighbridge cables and electronics. This option should be explored at a later date and costs are not included.

PHASE 1 & 2 - breakdown

Page 24: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 24 Printed 12/2/2007

Robinson Landfill Site Phase 1 � the existing 3 (three) weighbridges at the entrance gates

will not require immediate replacement but rather upgrading. These upgrades will be both

electronic and mechanical repairs. The Incinerator Weighbridge only requires the office

equipment as Indicator, etc.. Back Office link up to be phased immediately thereafter. Time

frame to operational status to SABS Specification � 15-20 work days from tender award.

Phase 2 – new weighbridge installation will be phased in over the next 3 months and will

include if required 3 new weighbridges at the front entrances, but the incinerator weighbridge

will not be replaced.

Phase 3 – back office installation, tire shredders, booms, integration, camera systems etc.

will be phased in from Phase 1 starting date.

4.2 MARIE LOUISE SITE

Summary

Based on our exposure and site visits at Marie Louise the following is prevalent:

As Per Tender Document

1. New Weighbridges may only be required at a later date and we recommend achieving operational status of the weighbridge by 15 January 2008, whereafter, if Pikitup should desire, a new weighbridge could be phased in.

2. Innovative Software Solutions have been offered and will operate on an open database, such that future expansion or integration is not impeded or limited.

3. Communications Links for real time up date and interfacing to the financial systems (Venus and SAP at a later date) has been catered for and can be accomodated. Existing integration to SAP is currently available.

4. Automated Database is virtual real time based for billing purposes with scale information, which includes, but is not limited to tare weights, real time tonnages, product type, transporter information, vendor/supplier number, etc., and will integrate to Venus and SAP.

5. The lightning protection was found to be good, but not up to the high standard which is required to support the expensive electronics. Thus an upgrade to an improved lightning protection system is recommended.

6. Load Cell replacements/upgrades – Sub Saharah Scales will firstly strive to achieve an availability of 95% plus with the current infrastructure of the existing

Page 25: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 25 Printed 12/2/2007

weighbridges within 15 working days of order or resolution with Pikitup, by doing the following : (1) fix the existing system by commissioning and repair to achieve an SABS operational status, then ; (2) upgrade the electronics on the existing weighbridges if necessary ; then (3) upgrade the weighbridge to a recommended fit for purpose application. This may/or may not include a new weighbridge, and this will only be done in consultation with Pikitup Management and staff. Please note that the Load cells and indicators for the upgrade and new weighbridges will be directly compatible in type, quantity and application, thus there will be extra revenue charges for the electronics.

7. Electronic Access Control - Speed Control will be excercised by the installation of tire slashers/shredders before the weighbridge on entrance and exit to the weighbridge, and at the exit to the site, giving a total of 3 required. The Existing Slasher may be re-used. The weighbridge will have automatically controlled booms gates at the entrance and the exit to the weighbridge and the site. Access card readers are included as an option, and our offer includes Image & Text recognition on the number plates, company emblems, and if Pikitup so wish a Pikitup self-generated Text Number can also be applied to each vehicle at a specific location. The system will include real time Block-Out of financial or malicious offenders.

8. Commissioning and Installation to SABS Approved Standards – The systems (both Upgrade & New – where applicable) will comply to relevant SABS Standards under SABS Certification 1396 (SA420 Instrument), or 1382 (ESIT ART Instrument), or 1300 (M&D Instrument).

9. Training – ongoing training will be provided for minimum of 2 days per month for the first year, 1 day per month thereafter.

10. Maintenance Plan – a fully comprehensive Service Level Agreement has been included to accomodate this for a minimum of 3 years.

Other Issues Not Mentioned

11. Mechanical condition of the weighbridge will still support a minimum of 15-20 years operation should major maintenance now be carried out. This would include resurfacing and painting of the weighbridge with a SABS approved Epoxy paint which is Acid, Alkali, or Bio Chemical Resistant.

12. Provision of rodent prevention & protection to all cabling.

13. Rewelding of all appropriate joins on all the weighbridge.

Page 26: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 26 Printed 12/2/2007

14. The plinths of the weighbridge with associated ramps to be raised by a minimum of 250mm to allow sufficient clearance to facilitate daily cleaning and inspection of the weighbridge below the platform.

15. Railings/guide rails around the existing weighbridges at the front have been found to be sufficient and only requires repair.

16. Drainage around the weighbridge to be re-assessed.

17. Printer system to be upgraded to a later technology , which is inexpensive and simple to operate or replace.

18. Lighting around all weighbridge to be re-assessed to accomodate camera use in the evenings.

19. Site Support – Our offer includes site support for a minimum of 3 years, during which period we wish to empowerand train personnel at Pikitup to become self-sufficient to maintain and calibrate all their relevant weighbridge systems.

20. Cleaning Service and Apparatus – It our intention to ensure availability, cleanliness and pride at the weighbridges by using existing cleaning equipment to maintain clean & clear drainage and weighbridges and sites, thus reducing rodent & vermin infestation, which could damage the weighbridge cables and electronics. This option should be explored at a later date and costs are not included.

Marie Louise Landfill Site Phase 1 � the existing 2 (two) weighbridges at the entrance

gates will not require immediate replacement but rather upgrading. These upgrades will be

both electronic and mechanical repair. Back Office link up to be phased immediately

thereafter. Time frame to operational status to SABS Specification � 5-15 work days from

tender award � includes an additional extra

2 load cells per weighbridge, which will be used as spares or on a third weighbridge once the

2 weighbridges have been shortened to 12x3M each and installation & commissioning.

Phase 2 – new weighbridge installation will be phased in over the next 3 months and will

include if required 2 new weighbridges at the front entrances

Phase 3 – back office installation, tire shredders, booms, integration, camera systems etc.

will be phased in from Phase 1 starting date.

Page 27: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 27 Printed 12/2/2007

Description of Product and/or Service COST No Total Exc VATWeigh Bridge Upgrade Existing Phase 1 R 44,808.00 2 R 89,616.00Weigh Bridge (NEW) Phase 2 R 88,254.00 2 R 176,508.00Weigh Bridge Software Phase 1 R 6,600.00 2 R 13,200.00Camera to record vehicle load, with viewing at all weigh bridge offices R 19,750.00 1 R 19,750.00Access Control Unit (Card, PIN & Biometrics) R 12,389.00 8 R 99,112.00Booms and TALON TYRE‐SPIKE BARRIERS R 24,175.00 8 R 193,400.00civil work and delivery & installation ‐‐ for one Talon Tyre‐Spike Barrier R 11,000.00 8 R 88,000.00Traffic Robots (Red / Green) R 2,070.00 8 R 16,560.00Safety / Closing loops R 750.00 8 R 6,000.00Infra RED Beams R 485.33 12 R 5,823.96Installation Material R 1,638.89 3 R 4,916.67

Weigh Bridge Printer (Dot Matrix Duplicate) Phase 1 R 4,195.00 3 R 12,585.00Setup backoffice R 7,500.00 5 R 37,500.00IBM Compact Cash Drawer R 992.00 3 R 2,976.00POS Software R 5,000.00 3 R 15,000.00IBM Distributed Character Display R 1,710.00 3 R 5,130.00Integration to SAP / Exisiting Database R 193,000.00 1 R 193,000.00

ADSL Setup R 4,000.00 1 R 4,000.003G / iBurst Comms (Alternative link) R 3,000.00 1 R 3,000.00Local Wireless Network R 2,000.00 2 R 4,000.00

ProSafe 802.11G Wireless Access Point. WG102IS R 958.10 3 R 2,874.30dBi Patch Panel Antenna ANT 24D18 R 1,401.40 3 R 4,204.20Netgear Antenna Cable 10M R 291.50 3 R 874.50POE Adapters R 308.00 3 R 924.00Brackets and Steelworks R 3,500.00 3 R 10,500.00External Connector Box R 350.00 3 R 1,050.00Labour, Config and Travel for Wireless R 6,500.00 3 R 19,500.008 port 1G POE (4) Switchs R 1,975.00 2 R 3,950.00CAT 5E Network Points R 444.44 2 R 888.88

LH3000: 3000VA Double conversion online pure sine wave UPS system with shutdown software and extended battery Bat 950 x 570 x 760 UPS 700x770 x 555 21,869.40

21,869.40 1 R 21,869.40

Surge Protection for Weigh Bridge Phase 1 R 9,145.00 3 R 27,435.00Signs R 750.00 6 R 4,500.00

PC's ‐ Work Station (Xeon Quad Core, E5320 Monitor, M, KB) Phase 1 R 11,050.00 3 R 33,150.00PC's ‐ SERVER (Xeon Quad Core, Monitor, M, KB, 1 TB HD, 4 GB Mem) R 17,953.00 1 R 17,953.009U Swing Frames Cabinets Complete R 2,086.39 4 R 8,345.56Bruch Pannels R 1,536.60 4 R 6,146.40Microsoft Windows 2003 Server + 5 CAL R 4,989.00 1 R 4,989.00BitDefender Windows File Server 1 R 2,027.00 1 R 2,027.00

4 Core Indoor Fibre MM R 25.00 300 R 7,500.00Install Fibre Optic Cable R 4.44 300 R 1,332.00Fibre Splace Tray ST R 250.83 3 R 752.49Pigtrail ST 1m Simplex (MM) R 55.00 9 R 495.00Midcouplers ST R 12.58 9 R 113.22Fibre Patchleads ST‐ST R 172.77 6 R 1,036.62Fibre Fusion Splicing R 177.78 9 R 1,600.02Fibre Sundries Upats, Screws, Cable Ties,Etc R 1,111.11 1 R 1,111.11

LPR Camera IR Pulsed R 26,500.00 8 R 212,000.00Galvanised Pole for Camera Protection / mounting (filled with concrete) R 1,750.00 16 R 28,000.005‐50mm VF A/I Video drive Lense R 1,198.37 8 R 9,586.96

VideoWise Camera Housing Medium Outdoor Aluminum Side Opening Housing, Concealed Cable Entry, Sun Shield, IP65,(L375xH117x138W). Use with GL‐208 Bracket R 344.78 8 R 2,758.24VideoWise Housing BracketIndoor / Outdoor Beige, Wall Mount, Cable Managed, 10kg (Use with GL618, GL‐619 Housing) R 232.40 8 R 1,859.20Dehngaurd : 230 Volts surge protection R 1,210.95 5 R 6,054.75Camera installation incuding back box , rawbolts, focusing and setup R 350.00 9 R 3,150.00CAT6 per M installed R 7.80 150 R 1,170.00Cable Cabtyre 3 core 2.5mm per M installed R 14.00 75 R 1,050.00Camera PS & Surge Protection R 1,780.58 9 R 16,025.22LPR SW R 69,500.00 1 R 69,500.00

Tarred Road Cross and Repair R 319.44 21 R 6,708.24Trenching Soft Rock 500mm DEEP R 52.39 60 R 3,143.40Paving Open and Repair R 83.06 15 R 1,245.90Tarred Road Pole 11M R 830.56 3 R 2,491.6825MM Gal Pipe Under Ground R 44.72 40 R 1,788.8025MM PVC Pipe Under Ground R 19.17 20 R 383.40Power points R 255.56 9 R 2,300.04

Civils Phase 2 R 30,000.00 2 R 60,000.00Commissioning Certification & DeliveryPhase 2 R 8,800.00 1 R 8,800.00Other R 16,689.70 1 R 16,689.70

TOTAL CAPEX AMOUNT FOR PANORAMA R 1,629,904.86 R 58,595.08

MONTHLY RENT TO OWN ON ABOVE OVER 36 MONTHS/CONTRACT DURATION RENT TO OWN R 58,595.08

MONTHLY Rental R 8,000.00 1 R 8,000.00Support Person R 12,000.00 1 R 12,000.00ADSL R 5,000.00 1 R 5,000.00Other R 15,000.00 1 R 15,000.003G / iBurst Comms (Alternative link) R 2,000.00 1 R 2,000.00Equipment Warrenty R 2,444.86 1 R 2,444.86Training R 2,500.00 1 R 2,500.00CAPITAL COST R 58,595.08 1 R 58,595.08Software cover Support R 100.00 2 R 200.00

OTHER ANNUAL COSTS COVERED OVER 12 MONTHSWeigh Bridge Calibration R 5,800.00 2 R 966.67

TOTAL R 106,706.60

VAT R 14,938.92

TOTAL WITH VAT R 121,645.53

R 1,629,904.86R 327,376.00R 220,246.80

R 1,082,282.06R 106,706.60

R 58,595.08R 756,108.88

LEGENDTotal Capital/Capex Cost/Amount for sitePhase 1 Amount /CostPhase 2 Amount/CostPhase 3 Amount/CostMonthly Amount/Cost which includes rent to own, and monthly aboveRental to own monthly amount which is subject to Financier Terms & ConditionsBEE/HDI/COMMUNITY DEVELOPMENT PORTION

MARIE LOUISE SITE

MARIE LOUISECOST SUMMARIES EXC VAT

PROJECT Capital TotalPhase 1Phase 2Phase 3 Monthly including rent to ownRENT TO OWN MONTHLYBEE/HDI/COMMUNITY PORTION

Refer to Legend below sheet for color coding

Page 28: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 28 Printed 12/2/2007

4.2.1 GOUDKOPPIES SITE

Summary

Based on our exposure and site visits at Goudkoppies the following is prevalent :

As Per Tender Document

1. New Weighbridges may only be required at a later date and we recommend achieving operational status of all 2 weighbridges at Goudkoppies by 15 January 2008, whereafter, if Pikitup should desire, the two weighbridges could be phased in for replacements with new weighbridges.

2. Innovative Software Solutions have been offered and will operate on an open database, such that future expansion or integration is not impeded or limited.

3. Communications Links for real time up date and interfacing to the financial systems (Venus and SAP at a later date) has been catered for and can be accomodated. Existing integration to SAP is currently available.

4. Automated Database is virtual real time based for billing purposes with scale information, which includes, but is not limited to tare weights, real time tonnages, product type, transporter information, vendor/supplier number, etc., and will integrate to Venus and SAP.

5. The lightning protection was found to be good, but not up to the high standard which is required to support the expensive electronics. Thus an upgrade to an improved lightning protection system is recommended.

6. Load Cell replacements/upgrades – Sub Saharah Scales will firstly strive to achieve an availability of 95% plus with the current infrastructure of the existing weighbridges within 15 working days of order or resolution with Pikitup, by doing the following : (1) fix the existing system by commissioning and repair to achieve an SABS operational status, then ; (2) upgrade the electronics on the existing weighbridges if necessary ; then (3) upgrade each weighbridge to a recommended fit for purpose application. This may/or may not include new weighbridges, and this will only be done in consultation with Pikitup Management and staff. Please note that the Load cells and indicators for the upgrade and new weighbridges will be directly compatible in type, quantity and application, thus there will be extra revenue charges for the electronics.

7. Electronic Access Control - Speed Control will be excercised by the installation of tire slashers/shredders before the weighbridges on entrance to each weighbridge, and at the exit to the site, giving a total of 3 required. Each

Page 29: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 29 Printed 12/2/2007

weighbridge will have automatically controlled booms gates at the entrance and the exit to the weighbridge and the site. Access card readers are included as an option, and our offer includes Image & Text recognition on the number plates, company emblems, and if Pikitup so wish a Pikitup self-generated Text Number can also be applied to each vehicle at a specific location. The system will include real time Block-Out of financial or malicious offenders.

8. Commissioning and Installation to SABS Approved Standards – The systems (both Upgrade & New – where applicable) will comply to relevant SABS Standards under SABS Certification 1396 (SA420 Instrument), or 1382 (ESIT ART Instrument), or 1300 (M&D Instrument).

9. Training – ongoing training will be provided for minimum of 2 days per month for the first year, 1 day per month thereafter.

10. Maintenance Plan – a fully comprehensive Service Level Agreement has been included to accomodate this for a minimum of 3 years.

Other Issues Not Mentioned

11. Mechanical conditions of the weighbridges will still support a minimum of 15-20 years operation should major maintenance now be carried out. This would include resurfacing and painting of all 2 weighbridges with a SABS approved Epoxy paint which is Acid, Alkali, or Bio Chemical Resistant.

12. Provision of rodent prevention & protection to all cabling.

13. Rewelding of all appropriate joins on both the weighbridges..

14. The plinths of both the weighbridges with associated ramps to be raised by a minimum of 250mm to allow sufficient clearance to facilitate daily cleaning and inspection of the weighbridge below the platform.

15. Railings/guide rails around the existing weighbridges at the front have been found to be sufficient and only requires repair.

16. Drainage around the weighbridges to be re-assessed.

17. Printer systems to be upgraded to a later technology , which is inexpensive and simple to operate or replace.

Page 30: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 30 Printed 12/2/2007

18. Lighting around all weighbridges to be re-assessed to accomodate camera use in the evenings.

19. Site Support – Our offer includes site support for a minimum of 3 years, during which period we wish to empowerand train personnel at Pikitup to become self-sufficient to maintain and calibrate all their relevant weighbridge systems.

20. Cleaning Service and Apparatus – It our intention to ensure availability, cleanliness and pride at the weighbridges by using existing cleaning equipment to maintain clean & clear drainage and weighbridges and sites, thus reducing rodent & vermin infestation, which could damage the weighbridge cables and electronics. This option should be explored at a later date and costs are not included.

Phase 1 & 2 Breakdown

Goudkoppies Landfill Site Phase 1 � the existing 2 (two) weighbridges at the

entrance gates will not require immediate replacement but rather upgrading.

These upgrades will be both electronic and mechanical repair. Back Office link

up to be phased immediately thereafter. Time frame to operational status to

SABS Specification � 5-15 work days from tender award

Phase 2 – new weighbridge installation will be phased in over the next 3

months and will include if required 2 new weighbridges at the front entrances, at

an additional

Phase 3 – back office installation, tire shredders, booms, integration, camera

systems etc. will be phased in from Phase 1 starting date.

Page 31: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 31 Printed 12/2/2007

Description of Product and/or Service COST No Total Exc VATWeigh Bridge Upgrade Existing Phase 1 R 44,808.00 2 R 89,616.00Weigh Bridge (NEW) Phase 2 R 88,254.00 2 R 176,508.00Weigh Bridge Software Phase 1 R 6,600.00 2 R 13,200.00Camera to record vehicle load, with viewing at all weigh bridge offices R 19,750.00 1 R 19,750.00Access Control Unit (Card, PIN & Biometrics) R 12,389.00 6 R 74,334.00Booms and TALON TYRE‐SPIKE BARRIERS R 24,175.00 6 R 145,050.00civil work and delivery & installation ‐‐ for one Talon Tyre‐Spike Barrier R 11,000.00 6 R 66,000.00Traffic Robots (Red / Green) R 2,070.00 6 R 12,420.00Safety / Closing loops R 750.00 6 R 4,500.00Infra RED Beams R 485.33 4 R 1,941.32Installation Material R 1,638.89 2 R 3,277.78

Weigh Bridge Printer (Dot Matrix Duplicate) Phase 1 R 4,195.00 3 R 12,585.00Setup backoffice R 7,500.00 5 R 37,500.00IBM Compact Cash Drawer R 992.00 3 R 2,976.00POS Software R 5,000.00 3 R 15,000.00IBM Distributed Character Display R 1,710.00 3 R 5,130.00Integration to SAP / Exisiting Database R 193,000.00 1 R 193,000.00

ADSL Setup R 4,000.00 1 R 4,000.003G / iBurst Comms (Alternative link) R 3,000.00 1 R 3,000.00Local Wireless Network R 2,000.00 2 R 4,000.00

ProSafe 802.11G Wireless Access Point. WG102IS R 958.10 3 R 2,874.30dBi Patch Panel Antenna ANT 24D18 R 1,401.40 3 R 4,204.20Netgear Antenna Cable 10M R 291.50 3 R 874.50POE Adapters R 308.00 3 R 924.00Brackets and Steelworks R 3,500.00 3 R 10,500.00External Connector Box R 350.00 3 R 1,050.00Labour, Config and Travel for Wireless R 6,500.00 3 R 19,500.008 port 1G POE (4) Switchs R 1,975.00 2 R 3,950.00CAT 5E Network Points R 444.44 2 R 888.88

LH3000: 3000VA Double conversion online pure sine wave UPS system with shutdown software and extended battery Bat 950 x 570 x 760 UPS 700x770 x 555 21,869.40

21,869.40 1 R 21,869.40

Surge Protection for Weigh Bridge Phase 1 R 9,145.00 2 R 18,290.00

Signs R 750.00 6 R 4,500.00

PC's ‐ Work Station (Xeon Quad Core, E5320 Monitor, M, KB) Phase 1 R 11,050.00 3 R 33,150.00PC's ‐ SERVER (Xeon Quad Core, Monitor, M, KB, 1 TB HD, 4 GB Mem) R 17,953.00 1 R 17,953.009U Swing Frames Cabinets Complete R 2,086.39 4 R 8,345.56Bruch Pannels R 1,536.60 4 R 6,146.40Microsoft Windows 2003 Server + 5 CAL R 4,989.00 1 R 4,989.00BitDefender Windows File Server 1 R 2,027.00 1 R 2,027.00

4 Core Indoor Fibre MM R 25.00 300 R 7,500.00Install Fibre Optic Cable R 4.44 300 R 1,332.00Fibre Splace Tray ST R 250.83 3 R 752.49Pigtrail ST 1m Simplex (MM) R 55.00 9 R 495.00Midcouplers ST R 12.58 9 R 113.22Fibre Patchleads ST‐ST R 172.77 6 R 1,036.62Fibre Fusion Splicing R 177.78 9 R 1,600.02Fibre Sundries Upats, Screws, Cable Ties,Etc R 1,111.11 1 R 1,111.11

LPR Camera IR Pulsed R 26,500.00 6 R 159,000.00Galvanised Pole for Camera Protection / mounting (filled with concrete) R 1,750.00 12 R 21,000.005‐50mm VF A/I Video drive Lense R 1,198.37 6 R 7,190.22

VideoWise Camera Housing Medium Outdoor Aluminum Side Opening Housing, Concealed Cable Entry, Sun Shield, IP65,(L375xH117x138W). Use with GL‐208 Bracket R 344.78 6 R 2,068.68VideoWise Housing BracketIndoor / Outdoor Beige, Wall Mount, Cable Managed, 10kg (Use with GL618, GL‐619 Housing) R 232.40 6 R 1,394.40Dehngaurd : 230 Volts surge protection R 1,210.95 5 R 6,054.75Camera installation incuding back box , rawbolts, focusing and setup R 350.00 9 R 3,150.00CAT6 per M installed R 7.80 150 R 1,170.00Cable Cabtyre 3 core 2.5mm per M installed R 14.00 75 R 1,050.00Camera PS & Surge Protection R 1,780.58 9 R 16,025.22LPR SW R 69,500.00 1 R 69,500.00

Tarred Road Cross and Repair R 319.44 21 R 6,708.24Trenching Soft Rock 500mm DEEP R 52.39 60 R 3,143.40Paving Open and Repair R 83.06 15 R 1,245.90Tarred Road Pole 11M R 830.56 3 R 2,491.6825MM Gal Pipe Under Ground R 44.72 40 R 1,788.8025MM PVC Pipe Under Ground R 19.17 20 R 383.40Power points R 255.56 9 R 2,300.04

Civils Phase 2 R 30,000.00 2 R 60,000.00Commissioning Certification & DeliveryPhase 2 R 8,800.00 1 R 8,800.00Other R 16,689.70 1 R 16,689.70

TOTAL CAPEX AMOUNT FOR PANORAMA R 1,450,919.23

MONTHLY RENT TO OWN ON ABOVE OVER 36 MONTHS/CONTRACT DURATION RENT TO OWN R 52,160.55

MONTHLY Rental R 8,000.00 1 R 8,000.00Support Person R 12,000.00 1 R 12,000.00ADSL R 5,000.00 1 R 5,000.00Other R 15,000.00 1 R 15,000.003G / iBurst Comms (Alternative link) R 2,000.00 1 R 2,000.00Equipment Warrenty R 2,176.38 1 R 2,176.38Training R 2,500.00 1 R 2,500.00CAPITAL COST R 52,160.55 1 R 52,160.55Software cover Support R 100.00 2 R 200.00

OTHER ANNUAL COSTS COVERED OVER 12 MONTHSWeigh Bridge Calibration R 5,800.00 2 R 966.67

TOTAL R 100,003.59

VAT R 14,000.50

TOTAL WITH VAT R 114,004.09

R 1,450,919.23R 323,236.00R 198,377.40

R 929,305.83

R 100,003.59

R 52,160.55

R 734,108.88

LEGENDTotal Capital/Capex Cost/Amount for sitePhase 1 Amount /CostPhase 2 Amount/CostPhase 3 Amount/CostMonthly Amount/Cost which includes rent to own, and monthly aboveRental to own monthly amount which is subject to Financier Terms & Conditions

GOUDKOPPIES SITE

GOUDKOPPIESCOST SUMMARIES EXC VAT

PROJECT Capital TotalPhase 1Phase 2

Phase 3

Monthly including rent to own

RENT TO OWN MONTHLY

BEE/HDI/COMMUNITY PORTION

Refer to Legend below sheet for color coding

Page 32: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 32 Printed 12/2/2007

4.3 ENNERDALE SITE

Summary

Based on our exposure and site visits at Ennerdale the following is prevalent :

As Per Tender Document

1. A New Weighbridge may only be required at a later date and we recommend achieving operational status of the weighbridge by 15 January 2008, whereafter, if Pikitup should desire, a new weighbridge could be phased in.

2. Innovative Software Solutions have been offered and will operate on an open database, such that future expansion or integration is not impeded or limited.

3. Communications Links for real time up date and interfacing to the financial systems (Venus and SAP at a later date) has been catered for and can be accomodated. Existing integration to SAP is currently available.

4. Automated Database is virtual real time based for billing purposes with scale information, which includes, but is not limited to tare weights, real time tonnages, product type, transporter information, vendor/supplier number, etc., and will integrate to Venus and SAP.

5. The lightning protection was found to be good, but not up to the high standard which is required to support the expensive electronics. Thus an upgrade to an improved lightning protection system is recommended.

6. Load Cell replacements/upgrades – Sub Saharah Scales will firstly strive to achieve an availability of 95% plus with the current infrastructure of the existing weighbridges within 15 working days of order or resolution with Pikitup, by doing the following : (1) fix the existing system by commissioning and repair to achieve an SABS operational status, then ; (2) upgrade the electronics on the existing weighbridges if necessary ; then (3) upgrade the weighbridge to a recommended fit for purpose application. This may/or may not include a new weighbridge, and this will only be done in consultation with Pikitup Management and staff. Please note that the Load cells and indicators for the upgrade and new weighbridges will

Page 33: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 33 Printed 12/2/2007

be directly compatible in type, quantity and application, thus there will be extra revenue charges for the electronics.

7. Electronic Access Control - Speed Control will be excercised by the installation of tire slashers/shredders before the weighbridge on entrance and exit to the weighbridge, and at the exit to the site, giving a total of 3 required. The Existing Slasher may be re-used. The weighbridge will have automatically controlled booms gates at the entrance and the exit to the weighbridge and the site. Access card readers are included as an option, and our offer includes Image & Text recognition on the number plates, company emblems, and if Pikitup so wish a Pikitup self-generated Text Number can also be applied to each vehicle at a specific location. The system will include real time Block-Out of financial or malicious offenders.

8. Commissioning and Installation to SABS Approved Standards – The systems (both Upgrade & New – where applicable) will comply to relevant SABS Standards under SABS Certification 1396 (SA420 Instrument), or 1382 (ESIT ART Instrument), or 1300 (M&D Instrument).

9. Training – ongoing training will be provided for minimum of 2 days per month for the first year, 1 day per month thereafter.

10. Maintenance Plan – a fully comprehensive Service Level Agreement has been included to accomodate this for a minimum of 3 years.

Other Issues Not Mentioned

11. Mechanical condition of the weighbridges will still support a minimum of 5-10 years operation should major maintenance now be carried out. This would include resurfacing and painting of the weighbridge with a SABS approved Epoxy paint which is Acid, Alkali, or Bio Chemical Resistant.

12. Provision of rodent prevention & protection to all cabling.

13. Rewelding of all appropriate joins on all the weighbridge.

14. The plinths of the weighbridge with associated ramps to be raised by a minimum of 250mm to allow sufficient clearance to facilitate daily cleaning and inspection of the weighbridge below the platform.

15. Railings/guide rails around the existing weighbridges at the front have been found to be sufficient and only requires repair.

Page 34: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 34 Printed 12/2/2007

16. Drainage around the weighbridge to be re-assessed.

17. Printer system to be upgraded to a later technology , which is inexpensive and simple to operate or replace.

18. Lighting around all weighbridge to be re-assessed to accomodate camera use in the evenings.

19. Site Support – Our offer includes site support for a minimum of 3 years, during which period we wish to empowerand train personnel at Pikitup to become self-sufficient to maintain and calibrate all their relevant weighbridge systems.

20. Cleaning Service and Apparatus – It our intention to ensure availability, cleanliness and pride at the weighbridges by using existing cleaning equipment to maintain clean & clear drainage and weighbridges and sites, thus reducing rodent & vermin infestation, which could damage the weighbridge cables and electronics. This option should be explored at a later date and costs are not included.

PHASE 1 & 2 - breakdown

Ennerdale Landfill Site Phase 1 � the existing weighbridge at the entrance gates will not require immediate

replacement but rather upgrading. These upgrades will be both electronic and mechanical repair. Back Office link

up to be phased immediately thereafter. Time frame to operational status to SABS Specification � 12-13 work

days from tender award. The current situation requires immediate emergency repair on a loadcell to become fully

operational, whereafter Phase 1 should commence. Phase 2 – new weighbridge installation will be phased in

over the next 3 months and will include if required a new weighbridge at the front entrances. Phase 3 – back office installation, tire shredders, booms, integration, camera systems etc. will be phased in from

Phase 1 starting date. All prices in ZAR and are exclusive of Value Added Tax.

Our Standard Terms of agreement apply

Page 35: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 35 Printed 12/2/2007

Description of Product and/or Service COST No Total Exc VATWeigh Bridge Upgrade Existing Phase 1 R 44,808.00 1 R 44,808.00Weigh Bridge (NEW) Phase 2 R 88,254.00 1 R 88,254.00Weigh Bridge Software Phase 1 R 6,600.00 1 R 6,600.00Camera to record vehicle load, with viewing at all weigh bridge offices R 19,750.00 1 R 19,750.00Access Control Unit (Card, PIN & Biometrics) R 12,389.00 4 R 49,556.00Booms and TALON TYRE‐SPIKE BARRIERS R 24,175.00 4 R 96,700.00civil work and delivery & installation ‐‐ for one Talon Tyre‐Spike Barrier R 11,000.00 4 R 44,000.00Traffic Robots (Red / Green) R 2,070.00 4 R 8,280.00Safety / Closing loops R 750.00 4 R 3,000.00Infra RED Beams R 485.33 4 R 1,941.32Installation Material R 1,638.89 3 R 4,916.67

Weigh Bridge Printer (Dot Matrix Duplicate) Phase 1 R 4,195.00 1 R 4,195.00Setup backoffice R 7,500.00 5 R 37,500.00IBM Compact Cash Drawer R 992.00 2 R 1,984.00POS Software R 5,000.00 2 R 10,000.00IBM Distributed Character Display R 1,710.00 2 R 3,420.00Integration to SAP / Exisiting Database R 193,000.00 1 R 193,000.00

ADSL Setup R 4,000.00 1 R 4,000.003G / iBurst Comms (Alternative link) R 3,000.00 1 R 3,000.00Local Wireless Network R 2,000.00 2 R 4,000.00ProSafe 802.11G Wireless Access Point. WG102IS R 958.10 2 R 1,916.20dBi Patch Panel Antenna ANT 24D18 R 1,401.40 2 R 2,802.80Netgear Antenna Cable 10M R 291.50 2 R 583.00POE Adapters R 308.00 2 R 616.00Brackets and Steelworks R 3,500.00 2 R 7,000.00External Connector Box R 350.00 2 R 700.00Labour, Config and Travel for Wireless R 6,500.00 2 R 13,000.008 port 1G POE (4) Switchs R 1,975.00 2 R 3,950.00CAT 5E Network Points R 444.44 2 R 888.88

LH3000: 3000VA Double conversion online pure sine wave UPS system with shutdown software and extended battery Bat 950 x 570 x 760 UPS 700x770 x 555 21,869.40

21,869.40 1 R 21,869.40Surge Protection for Weigh Bridge Phase 1 R 9,145.00 1 R 9,145.00

Signs R 750.00 4 R 3,000.00

PC's ‐ Work Station (Xeon Quad Core, E5320 Monitor, M, KB) Phase 1 R 11,050.00 2 R 22,100.00PC's ‐ SERVER (Xeon Quad Core, Monitor, M, KB, 1 TB HD, 4 GB Mem) R 17,953.00 1 R 17,953.009U Swing Frames Cabinets Complete R 2,086.39 2 R 4,172.78Bruch Pannels R 1,536.60 2 R 3,073.20Microsoft Windows 2003 Server + 5 CAL R 4,989.00 1 R 4,989.00BitDefender Windows File Server 1 R 2,027.00 1 R 2,027.00

4 Core Indoor Fibre MM R 25.00 50 R 1,250.00Install Fibre Optic Cable R 4.44 50 R 222.00Fibre Splace Tray ST R 250.83 2 R 501.66Pigtrail ST 1m Simplex (MM) R 55.00 4 R 220.00Midcouplers ST R 12.58 4 R 50.32Fibre Patchleads ST‐ST R 172.77 4 R 691.08Fibre Fusion Splicing R 177.78 4 R 711.12Fibre Sundries Upats, Screws, Cable Ties,Etc R 1,111.11 1 R 1,111.11

LPR Camera IR Pulsed R 26,500.00 4 R 106,000.00Galvanised Pole for Camera Protection / mounting (filled with concrete) R 1,750.00 8 R 14,000.005‐50mm VF A/I Video drive Lense R 1,198.37 4 R 4,793.48VideoWise Camera Housing Medium Outdoor Aluminum Side Opening Housing, Concealed Cable Entry, Sun Shield, IP65,(L375xH117x138W). Use with GL‐208 Bracket R 344.78 4 R 1,379.12VideoWise Housing BracketIndoor / Outdoor Beige, Wall Mount, Cable Managed, 10kg (Use with GL618, GL‐619 Housing) R 232.40 4 R 929.60Dehngaurd : 230 Volts surge protection R 1,210.95 5 R 6,054.75Camera installation incuding back box , rawbolts, focusing and setup R 350.00 4 R 1,400.00CAT6 per M installed R 7.80 50 R 390.00Cable Cabtyre 3 core 2.5mm per M installed R 14.00 50 R 700.00Camera PS & Surge Protection R 1,780.58 4 R 7,122.32LPR SW R 69,500.00 1 R 69,500.00

Tarred Road Cross and Repair R 319.44 21 R 6,708.24Trenching Soft Rock 500mm DEEP R 52.39 30 R 1,571.70Paving Open and Repair R 83.06 15 R 1,245.90Tarred Road Pole 11M R 830.56 3 R 2,491.6825MM Gal Pipe Under Ground R 44.72 15 R 670.8025MM PVC Pipe Under Ground R 19.17 15 R 287.55Power points R 255.56 3 R 766.68

Civils Phase 2 R 30,000.00 1 R 30,000.00Commissioning Certification & DeliveryPhase 2 R 8,800.00 1 R 8,800.00Other R 8,344.85 1 R 8,344.85

TOTAL CAPEX AMOUNT FOR ENNERDALE R 1,026,605.21

MONTHLY RENT TO OWN ON ABOVE OVER 36 MONTHS/CONTRACT DURATION RENT TO OWN R 36,906.46

MONTHLY Rental R 8,000.00 1 R 8,000.00Support Person R 12,000.00 1 R 12,000.00ADSL R 5,000.00 1 R 5,000.00Other R 15,000.00 1 R 15,000.003G / iBurst Comms (Alternative link) R 2,000.00 1 R 2,000.00Equipment Warrenty R 1,539.91 1 R 1,539.91Training R 2,500.00 1 R 2,500.00CAPITAL COST R 36,906.46 1 R 36,906.46Software cover Support R 100.00 6 R 600.00

OTHER ANNUAL COSTS COVERED OVER 12 MONTHSWeigh Bridge Calibration R 5,800.00 2 R 966.67

TOTAL R 84,513.03

VAT R 11,831.82

TOTAL WITH VAT R 96,344.86

R 1,026,605.21R 86,848.00

R 127,054.00R 812,703.21

R 84,513.03R 36,906.46

R 508,014.70

LEGENDTotal Capital/Capex Cost/Amount for sitePhase 1 Amount /CostPhase 2 Amount/CostPhase 3 Amount/CostMonthly Amount/Cost which includes rent to own, and monthly aboveRental to own monthly amount which is subject to Financier Terms & ConditionsBEE/HDI/COMMUNITY DEVELOPMENT PORTION

Refer to Legend below sheet for color coding

ENNERDALECOST SUMMARIES EXC VAT

ENERDALE SITE

Monthly including rent to ownRENT TO OWN MONTHLYBEE/HDI/COMMUNITY PORTION

PROJECT Capital TotalPhase 1Phase 2Phase 3

Page 36: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 36 Printed 12/2/2007

4.4 PANORAMA SITE

Summary

Based on our exposure and site visits at Panorama the following is prevalent :

As Per Tender Document

1. A New Weighbridge may only be required at a later date and we recommend achieving operational status of the weighbridge by 15 January 2008, whereafter, if Pikitup should desire, a new weighbridge could be phased in.

2. Innovative Software Solutions have been offered and will operate on an open database, such that future expansion or integration is not impeded or limited.

3. Communications Links for real time up date and interfacing to the financial systems (Venus and SAP at a later date) has been catered for and can be accomodated. Existing integration to SAP is currently available.

4. Automated Database is virtual real time based for billing purposes with scale information, which includes, but is not limited to tare weights, real time tonnages, product type, transporter information, vendor/supplier number, etc., and will integrate to Venus and SAP.

5. The lightning protection was found to be good, but not up to the high standard which is required to support the expensive electronics. Thus an upgrade to an improved lightning protection system is recommended.

6. Load Cell replacements/upgrades – Sub Saharah Scales will firstly strive to achieve an availability of 95% plus with the current infrastructure of the existing weighbridges within 15 working days of order or resolution with Pikitup, by doing the following : (1) fix the existing system by commissioning and repair to achieve an SABS operational status, then ; (2) upgrade the electronics on the existing weighbridges if necessary ; then (3) upgrade the weighbridge to a recommended fit for purpose application. This may/or may not include a new weighbridge, and this will only be done in consultation with Pikitup Management and staff. Please note that the Load cells and indicators for the upgrade and new weighbridges will be directly compatible in type, quantity and application, thus there will be extra revenue charges for the electronics.

7. Electronic Access Control - Speed Control will be excercised by the installation of tire slashers/shredders before the weighbridge on entrance and exit to the weighbridge, and at the exit to the site, giving a total of 3 required. The Existing

Page 37: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 37 Printed 12/2/2007

Slasher may be re-used. The weighbridge will have automatically controlled booms gates at the entrance and the exit to the weighbridge and the site. Access card readers are included as an option, and our offer includes Image & Text recognition on the number plates, company emblems, and if Pikitup so wish a Pikitup self-generated Text Number can also be applied to each vehicle at a specific location. The system will include real time Block-Out of financial or malicious offenders.

8. Commissioning and Installation to SABS Approved Standards – The systems (both Upgrade & New – where applicable) will comply to relevant SABS Standards under SABS Certification 1396 (SA420 Instrument), or 1382 (ESIT ART Instrument), or 1300 (M&D Instrument).

9. Training – ongoing training will be provided for minimum of 2 days per month for the first year, 1 day per month thereafter.

10. Maintenance Plan – a fully comprehensive Service Level Agreement has been included to accomodate this for a minimum of 3 years.

Other Issues Not Mentioned

11. Mechanical condition of the weighbridge will still support a minimum of 15-20 years operation should major maintenance now be carried out. This would include resurfacing and painting of the weighbridge with a SABS approved Epoxy paint which is Acid, Alkali, or Bio Chemical Resistant.

12. Provision of rodent prevention & protection to all cabling.

13. Rewelding of all appropriate joins on all the weighbridge.

14. The plinths of the weighbridge with associated ramps to be raised by a minimum of 250mm to allow sufficient clearance to facilitate daily cleaning and inspection of the weighbridge below the platform.

15. Railings/guide rails around the existing weighbridges at the front have been found to be sufficient and only requires repair.

16. Drainage around the weighbridge to be re-assessed.

17. Printer system to be upgraded to a later technology , which is inexpensive and simple to operate or replace.

Page 38: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 38 Printed 12/2/2007

18. Lighting around all weighbridge to be re-assessed to accomodate camera use in the evenings.

19. Site Support – Our offer includes site support for a minimum of 3 years, during which period we wish to empowerand train personnel at Pikitup to become self-sufficient to maintain and calibrate all their relevant weighbridge systems.

20. Cleaning Service and Apparatus – It our intention to ensure availability, cleanliness and pride at the weighbridges by using existing cleaning equipment to maintain clean & clear drainage and weighbridges and sites, thus reducing rodent & vermin infestation, which could damage the weighbridge cables and electronics. This option should be explored at a later date and costs are not included.

Phase 1 & 2 Breakdown

Panorama Compost Site Phase 1 � the existing weighbridge at the entrance gates will not

require immediate replacement but rather upgrading. These upgrades will be both electronic

and mechanical repair. Back Office link up to be phased immediately thereafter. Time frame

to operational status to SABS Specification � 15-20 work days from tender award. Phase 2 �

new weighbridge installation will not be required at all unless the weighbridge is too small or

short whereby an extension will be required for 6M and an electronics upgrade.

Phase 3 � back office installation, tire shredders, booms, integration, camera systems etc.

will be phased in from Phase 1 starting date.

Page 39: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 39 Printed 12/2/2007

Description of Product and/or Service COST No Total Exc VATWeigh Bridge Upgrade Existing Phase 1 R 44,808.00 1 R 44,808.00Weigh Bridge (NEW) Phase 2 R 88,254.00 1 R 88,254.00Weigh Bridge Software Phase 1 R 6,600.00 1 R 6,600.00Camera to record vehicle load, with viewing at all weigh bridge offices R 19,750.00 1 R 19,750.00Access Control Unit (Card, PIN & Biometrics) R 12,389.00 4 R 49,556.00Booms and TALON TYRE‐SPIKE BARRIERS R 24,175.00 4 R 96,700.00civil work and delivery & installation ‐‐ for one Talon Tyre‐Spike Barrier R 11,000.00 4 R 44,000.00Traffic Robots (Red / Green) R 2,070.00 4 R 8,280.00Safety / Closing loops R 750.00 4 R 3,000.00Infra RED Beams R 485.33 4 R 1,941.32Installation Material R 1,638.89 2 R 3,277.78

Weigh Bridge Printer (Dot Matrix Duplicate) Phase 1 R 4,195.00 1 R 4,195.00Setup backoffice R 7,500.00 5 R 37,500.00IBM Compact Cash Drawer R 992.00 1 R 992.00POS Software R 5,000.00 1 R 5,000.00IBM Distributed Character Display R 1,710.00 1 R 1,710.00Integration to SAP / Exisiting Database R 193,000.00 1 R 193,000.00

ADSL Setup R 4,000.00 1 R 4,000.003G / iBurst Comms (Alternative link) R 3,000.00 1 R 3,000.00Local Wireless Network R 2,000.00 1 R 2,000.00ProSafe 802.11G Wireless Access Point. WG102IS R 958.10 1 R 958.10dBi Patch Panel Antenna ANT 24D18 R 1,401.40 1 R 1,401.40Netgear Antenna Cable 10M R 291.50 1 R 291.50POE Adapters R 308.00 1 R 308.00Brackets and Steelworks R 3,500.00 1 R 3,500.00External Connector Box R 350.00 1 R 350.00Labour, Config and Travel for Wireless R 6,500.00 1 R 6,500.008 port 1G POE (4) Switchs R 1,975.00 2 R 3,950.00CAT 5E Network Points R 444.44 2 R 888.88

LH3000: 3000VA Double conversion online pure sine wave UPS system with shutdown software and extended battery Bat 950 x 570 x 760 UPS 700x770 x 555 21,869.40

21,869.40 1 R 21,869.40

Surge Protection for Weigh Bridge Phase 1 R 9,145.00 1 R 9,145.00Signs R 750.00 4 R 3,000.00

PC's ‐ Work Station (Xeon Quad Core, E5320 Monitor, M, KB) Phase 1 R 11,050.00 1 R 11,050.00PC's ‐ SERVER (Xeon Quad Core, Monitor, M, KB, 1 TB HD, 4 GB Mem) R 17,953.00 1 R 17,953.009U Swing Frames Cabinets Complete R 2,086.39 2 R 4,172.78Bruch Pannels R 1,536.60 2 R 3,073.20Microsoft Windows 2003 Server + 5 CAL R 4,989.00 1 R 4,989.00BitDefender Windows File Server 1 R 2,027.00 1 R 2,027.00

4 Core Indoor Fibre MM R 25.00 50 R 1,250.00Install Fibre Optic Cable R 4.44 50 R 222.00Fibre Splace Tray ST R 250.83 2 R 501.66Pigtrail ST 1m Simplex (MM) R 55.00 2 R 110.00Midcouplers ST R 12.58 2 R 25.16Fibre Patchleads ST‐ST R 172.77 2 R 345.54Fibre Fusion Splicing R 177.78 2 R 355.56Fibre Sundries Upats, Screws, Cable Ties,Etc R 1,111.11 1 R 1,111.11

LPR Camera IR Pulsed R 26,500.00 4 R 106,000.00Galvanised Pole for Camera Protection / mounting (filled with concrete) R 1,750.00 8 R 14,000.005‐50mm VF A/I Video drive Lense R 1,198.37 4 R 4,793.48

VideoWise Camera Housing Medium Outdoor Aluminum Side Opening Housing, Concealed Cable Entry, Sun Shield, IP65,(L375xH117x138W). Use with GL‐208 Bracket R 344.78 4 R 1,379.12

VideoWise Housing BracketIndoor / Outdoor Beige, Wall Mount, Cable Managed, 10kg (Use with GL618, GL‐619 Housing) R 232.40 4 R 929.60Dehngaurd : 230 Volts surge protection R 1,210.95 4 R 4,843.80Camera installation incuding back box , rawbolts, focusing and setup R 350.00 4 R 1,400.00CAT6 per M installed R 7.80 50 R 390.00Cable Cabtyre 3 core 2.5mm per M installed R 14.00 50 R 700.00Camera PS & Surge Protection R 1,780.58 4 R 7,122.32LPR SW R 69,500.00 1 R 69,500.00

Tarred Road Cross and Repair R 319.44 21 R 6,708.24Trenching Soft Rock 500mm DEEP R 52.39 60 R 3,143.40Paving Open and Repair R 83.06 15 R 1,245.90Tarred Road Pole 11M R 830.56 3 R 2,491.6825MM Gal Pipe Under Ground R 44.72 40 R 1,788.8025MM PVC Pipe Under Ground R 19.17 20 R 383.40Power points R 255.56 9 R 2,300.04

Civils Phase 2 R 30,000.00 1 R 30,000.00Commissioning Certification & DeliveryPhase 2 R 8,800.00 1 R 8,800.00Other R 16,689.70 1 R 16,689.70

TOTAL CAPEX AMOUNT FOR PANORAMA R 1,001,521.87

MONTHLY RENT TO OWN ON ABOVE OVER 36 MONTHS/CONTRACT DURATION RENT TO OWN R 36,004.71

MONTHLY Rental R 8,000.00 1 R 8,000.00Support Person R 12,000.00 1 R 12,000.00ADSL R 5,000.00 1 R 5,000.00Other R 15,000.00 1 R 15,000.003G / iBurst Comms (Alternative link) R 2,000.00 1 R 2,000.00Equipment Warrenty R 1,502.28 1 R 1,502.28Training R 2,500.00 1 R 2,500.00CAPITAL COST R 36,004.71 1 R 36,004.71Software cover Support R 100.00 2 R 200.00

OTHER ANNUAL COSTS COVERED OVER 12 MONTHSWeigh Bridge Calibration R 5,800.00 2 R 966.67

TOTAL R 83,173.66

VAT R 11,644.31

TOTAL WITH VAT R 94,817.97

R 1,001,521.87R 64,773.16

R 127,054.00R 809,694.71

R 83,173.66R 36,004.71

R 497,697.47

LEGENDTotal Capital/Capex Cost/Amount for sitePhase 1 Amount /CostPhase 2 Amount/CostPhase 3 Amount/CostMonthly Amount/Cost which includes rent to own, and monthly aboveRental to own monthly amount which is subject to Financier Terms & ConditionsBEE/HDI/COMMUNITY DEVELOPMENT PORTION

PANORAMA SITE

PANORAMACOST SUMMARIES EXC VAT

PROJECT Capital TotalPhase 1Phase 2Phase 3 Monthly including rent to ownRENT TO OWN MONTHLYBEE/HDI/COMMUNITY PORTION

Refer to Legend below sheet for color coding

Page 40: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 40 Printed 12/2/2007

SCOPE OF SUPPLY

1. Manufacture & Supply New Weighbridges - or Upgrade Existing Weighbridges, install,

commission and certify all electronics, for above ground use, epoxy coat the weighbridges and relevant accessories as rails/guard rails, complete with SABS Certification.

2. Specifications

a. 12x3M platform

b. SABS Capacity 60000kg – Loadcell Capacity 120000kg – Mechanical Capacity approx. 100000kg

c. Divisions 50kg or better to 20kg

3. Training for weighbridge operators and related personnel, and first line maintenance. Note we provide a 360degree around the clock telephonic support.

4. The 12x3M deck will consist of 2 interlinking decks, approximately 6x3M each with a minimum of 8 universal columns (300WA), tranverse supports, steel bracing, designed and manufactured for a centre loading capacity of about 38 metric tonnes. These beams, 4 on either side, are strategically placed directly under the truck wheel load points. 8x3x1.5m steel plates 10mm thick are welded on, strengthening the steel structure beyond conventional bolted on systems by at least 10-15%.

5. Loadcells and mountings are designed and installed to minimise power surges, lightning arrests and related power/natural occurrences. Plinth reinforcing, loadcell mounting plates, bridge steel deck and mains power supply earthing are placed equi-potential to avoid over or under voltage damage. Where appropriate and approved by the client Clearline lightning protection systems will be used.

6. Epoxy paint which is SABS approved will be used on the weighbridge top deck surface to avoid natural and unnatural acidic or alkaline degradation. The undercarriage of the weighbridges are coated with provinite to limit corrosion & moisture ingress.

7. Craneage is included for both installation and SABS certification/asizing.

8. Options

a. Guide Rails on either side of the weighbridge

b. Estimated - Civil work includes 3 plinths or upgrade of existing concrete to 1x4x0.5M deep at 25MPA (28days) with related reinforcing bars. Plinths interlinked with floating reinforcing link and concrete fill approximately 0.2M deep. Approach ramps to suit ground level and condition of soil – estimated lengths of approximately minimum 4-6M. Subject to verification.

Exclusions

Our scope of work excludes an operator/control cabin and electrical installation thereof, additional

unforeseen problems as drainage, rubble removal, interference from telephone, power or related

“municipal” infrastructure, and additional labour/blasting on hard surfaces (rock or concrete).

NORMAL TERMS & CONDITIONS

Page 41: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 41 Printed 12/2/2007

Guarantee/Warranty

(a) Unless otherwise specified the structure is guaranteed/warranteed as follows: Weighbridges - for 10 (ten) YEARS from date of invoice against any defect attributable to faulty workmanship of material, fair wear and tear excluded.

(b) Unless otherwise specified the electronics is service-guaranteed/warranteed for 60 (sixty) months from date of final invoice against any defect attributable to faulty workmanship of material, fair wear and tear excluded.

(c) This guarantee/warrantee only covers the equipment supplied when it is used correctly under the recommended operating conditions, and for the application for which it is intended.

(d) These guarantees/warrantees are annually renewable subject to Sub Saharah Scales� maintenance terms and conditions, and provided Sub Saharah Scales maintain said equipment.

Civil Work The civil design is based on a soil bearing capacity of 200Kpa. Failing this, a contingency

must be allowed to cover any additional depth that will have to be met. Drawings will be

supplied on order of civil work required.

Validity of Quotation/Proposal

This quotation/proposal remains valid for a period as required within your tender

specifications.

Delivery Period

Upgrades of Existing Weighbridges Critical weighbridges will be operational by 20 working days from awarding of tender to 95%

availability. This excludes financial integration to the back office systems as Venus or SAP.

Work can commence immediately on order.

New Weighbridges 2 � 6 weeks from receipt of your official order or deposit or clearance of technical details or

completion of civil work, whichever is last. Work can commence immediately on order.

Page 42: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 42 Printed 12/2/2007

Escalation (only applicable if timeframe exceeds 28 (twenty eight) days)

a.) 15% Fixed � No escalation b.) 25% Steel � Seifsa related c.) 25% Labour � Seifsa related d.) 10% Materials � Seifsa related

Normal Terms of Payment

! 50 % on order ! 40 % on steel completion ! 10% on Certification

Payments

! Unless otherwise agreed, payment by pro-forma invoice without deduction or set-off in respect of goods sold shall be due and payable prior to delivery.

! The Seller shall charge the Customer interest at the rate of 2% (two per centum) per annum above the prime bank lending rate as determined by Nedbank Bank from time to time, subject to the maximum legal lending rate, on all accounts outstanding in excess of 30 (thirty) days from due date, provided however, that nothing herein contained shall be interpreted as obliging the Seller to afford the Customer any indulgence to effect payment after due date.

! All equipment supplied, remain the property of Sub Saharah Scales, until it has been paid in full

ZAR & Value Added Tax All prices quoted above are in ZAR and are exclusive of Value Added Tax, unless indicated otherwise.

Page 43: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 43 Printed 12/2/2007

55 AALLTTEERRNNAATTIIVVEE BBIIDD:: RREENNTTAALL

The rental option allows PIKITUP to rent the weighbridge solution, equipment, software

etc. at a fixed rate going forward.

PIKITUP SITES

RENTAL PER

MONTH VAT BEE/HDI/COMMUNITY PORTION

TOTAL % of project

SITE

ROBINSON R 138,012.53 R 19,321.75 R

1,136,293.30 46.98

ENNERDALE R 84,513.03 R 11,831.82 R 508,014.70 49.48

PANORAMA R 83,173.66 R 11,644.31 R 497,697.47 49.69

GOUDKOPPIES R 100,003.59 R 14,000.50 R 734,108.88 50.60

MARIE LOUISE R 106,706.60 R 14,938.92 R 756,108.88 46.39

GRAND TOTALS R 512,409.42 R 71,737.32 R

3,632,223.23 AVERAGE 48.64%

Page 44: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 44 Printed 12/2/2007

66 AALLTTEERRNNAATTIIVVEE BBIIDD:: CCOOSSTT PPEERR TTRRAANNSSAACCTTIIOONN

6.1.1 Transaction Management

The concept of transaction management is one that this proposal is based on and consists of

a basic underpinning approach that defines each assessment of a vehicle as a transaction.

The transaction identifies the date, time, location, camera/lane, license plate number,

instantaneous weight, associated type of weight image identifier, (and any other information

that is assessed). The identification of the same vehicle at the exit location is a secondary

transaction and the relevant weight relationship between these two transactions is assessed

and determines the amount the customer is billed. Each of these transactions is sent through

to the service centre and is then matched against any of the registered lists in the database.

The matching of the vehicle to a list will result in the relevant entity being informed of the

event through SMS or email or post or live on the web site with a secure link to the image for

copying and processing of the necessary action, viz. payment, etc.

6.1.2 Weigh Bridge Processing System

The entity responsible for the processing of the transactions in as close to real-time as the

networks will allow. The transaction, with the data that uniquely identifies the vehicle, driver

and location will be passed through the broad based network in http format to the service that

will record the transaction. The vehicle information will then be checked against the lists

received from those enrolled. If a match is identified, the listed entity provider will be notified

of the identification through and email with a link to the image on the PC on site. This gives

the exception entity an opportunity to validate data captured and confirm that this is a valid

transaction and will then trigger the necessary action relevant to the event.

The system will then wait for the vehicle to be next identified and will ascertain the vehicle

weight. Once these have been identified the relevant entity will be notified via an email with a

reference to the image for the entity to validate and then process the necessary amounts

due. This can be done through our solutions, but it is assumed that the current incumbent

would still be used for this.

Page 45: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 45 Printed 12/2/2007

6.1.3 Registered Reference Entity

This refers to the entity that provides information against which the identification of the

vehicle or driver must be checked. In this instance it will be the provision of vehicles

registered ti use the landfill site. If vehicles are identified that do not comply with the list then

the ETA will be informed of the instance via email and would then have the opportunity to

deal with the event as they see fit. Manual payment would then the allowed to proceed.

6.1.4 Reporting

Real-time reporting is possible via a web interface that will provide a dashboard of

information that must be agreed and specified in consultation. Standard reports can also be

extracted from the Database with a reasonable amount of flexibility.

Page 46: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 46 Printed 12/2/2007

Real time reporting is possible via a

web interface that will provide a

dashboard of information that must be

agreed and specified in consultation

with the WEIGH BRIDGE SITES.

Standard reports can also be extracted

from the Database with a reasonable

amount of flexibility.

Figure 2 Dashboard

6.1.5 Financial Model

The financial model for this is based on transaction and a pre-paid service is being offered.

The pricing model consists of a flat rate per month as well as a rate per transaction for

normal assessment as well as for violation processing.

6.1.6 Transaction fee

A prepaid transaction fee will be payable in a pre-paid model and will entitle PIKITUP to the

processing of that number of transactions for the month.

PIKITUP SITES

No of Transactions

a day Cost Per

Transaction BEE/HDI/COMMUNITY PORTION

TOTAL % of project

SITE

ROBINSON 400 R 13.11 R 1,136,293.30 46.98

ENNERDALE 200 R 16.06 R 508,014.70 49.48

PANORAMA 40 R 79.01 R 497,697.47 49.69

GOUDKOPPIES 200 R 19.00 R 734,108.88 50.60

MARIE LOUISE 200 R 20.27 R 756,108.88 46.39

GRAND TOTALS 208 R 29.49 R 3,632,223.23 AVERAGE 48.64%

Page 47: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 47 Printed 12/2/2007

77 SSoolluuttiioonn PPrrooppoosseedd The purpose of this proposal is to

The objective of this proposal is to efficiently process by:-

� Reducing the number of transactions not being billed due to Weigh Bridge not

working, maintenance and automatic systems.

� Nullify the number of overdue accounts due to exclusion from the site if an account is

not paid. The system forces the operators to adhere to rules as pre set in the

software. Warnings will appear to inform operators.

� Promoting awareness of payment of violations by using various means including sign

boards at the sites, Call Centre, mail etc,.

� Introducing technology to support the weigh bridge processes;

� Empowering the local landfill sites

by introducing equipment and

software process to enforce the

weigh in and out process.

7.1 Solution Components

7.1.1 Equipment

7.1.1.1 Access Control

(See Section LPR Spec Sheet on page 101)

Advanced features Fingerprint reader designed specifically for the International high terminal Access Control market. It integrates seamlessly with access control software including our very own product Sabre. The F4 can be

used as a standalone device or it can be utilised on a network with multiple readers. Features

Page 48: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 48 Printed 12/2/2007

• Transaction storage: 50,000 transactions Identification speed: less than 2 seconds Power supply: 12v DC Operating Temp: 0°C to 45°C Operating Humidity: 20% to 80% Communication: TCP/IP network Dimensions: 150 x 145 x 38.5mm Electronic Lock control: 10A / 12v DC Option: Web management interface

Ideal for: Any access control environment

7.1.2 Backroom Services

The backroom services is defined as the process starting from the point of receiving the

motion detection from the camera system at the entrance to the weigh bridge to the point of

issuing the invoice for the type and weigh of material dumped at the landfill site, enrolment of

the users, preparing the daily / weekly / monthly logs per weigh bridge / site, to supplying the

necessary documentation and information to the users.

An Internet enrolment and payment / viewing of billing / usage system is also part of the

software product line.

7.1.2.1 Image Management

� All images will be retained until payment is received. Data from each transaction will

be retained for 7 years.

7.1.2.2 Additional Processes

� Statistical data reporting systems;

� Record data fields from SAP;

� Administrate maintenance;

� Download and manage images;

� Web site � Internet viewing of usage / billing / enrolment;

� Internet viewing of outstanding accounts / offences � (where applicable);

� Maintenance and upgrading of all relevant hardware and software;

7.1.2.3 Administration

� record vehicle data records for landfill management system;

� process vehicle data received from weigh bridge management system;

� administrate weigh bridge data and report;

Page 49: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 49 Printed 12/2/2007

7.1.2.4 Reporting

Reports can be customized to your requirements:-

� prepare reports for weigh bridge;

� prepare reports for sites;

� prepare reports per � day/week month as specified;

7.1.2.5 Financial management

� prepare financial reports;

� Account statistics;

7.1.3 Additional technology

7.1.3.1 Computer system

A network computer system will be able to keep track with the individual accounts and

payment system. These computers will be used to capture all the transactions and status

thereof. This computer will be linked up with the current or new SAP system, thus ensuring

that we can, on a real time basis monitor the status of all sites.

7.1.3.2 Software for Weigh Bridge

Software supplied by the.

7.1.3.3 Automatic Number Plate Recognition System (ANPR)

This ANPR (or LPR) system can be used at the weigh bridge in conjunction with the access

control system. The use of automatic license plate recognition is a system that has many

advantaged, these include:-

� Checking passing vehicles for outstanding accounts;

� Staff or own vehicle identification;

� Expired or illegal license to operate

� Etc.

7.1.3.4 Twenty21 Editor

This program allows the client to process camera violations from their format to clients

preferred format. This software was a range of features that make for high speed capture

Page 50: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 50 Printed 12/2/2007

and conforms to the latest TCSP guidelines. Tracking, auditing, editing and other features

make this software unique in the market place.

7.1.3.5 Access Control

This system is aimed at The idea behind this is to get away from the existing

static systems. The unique auditing system which allows monitoring of staff work

performance and time management have revolutionised the way we look at . The

reporting structures per site per type of selected codes enable management to optimise the

camera settings. Gone are the days where the traffic authorities were forced to use software

where the authorities had to adapt � AKP can adapt to your needs. Low cost, therefore

saving you large amounts of hard earned revenue that can be better used.

7.1.3.6 Access Control Screen Shots

Figure 7-1 Access Control Enrolment system

Figure 7-2 Editor Type Menu - Showing types of users already catered for

Figure 7-3 Image of the access control unit

Figure 7-4 Types of waste being costed on the weigh bridge

Figure 7-5 Pie Chart Report

Page 51: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 51 Printed 12/2/2007

Figure 7-6 Weigh Bridge Report

Figure 7-7 Processed vehicles showing numbers of vehicles still on site

Figure 7-8 Bar Chart report showing number of transactions per site

7.1.3.7 Audit Process

We have developed this ETMS system with full AUDIT PROCESS facilities to enable the

management full control over the system. The system will allow you to track any irregularities

you require to make the system safe and secure. Our secret to success is that you can set

up the parameters to be audited and we will institute the process.

Standard Audit trails

� log on via finger print

Page 52: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 52 Printed 12/2/2007

� system idle log

� system idle log off

� any change to document to be logged

� drop down menu warning or prompt

� SAP cross check and change log and much more

7.1.4 Transaction Capacity Parameters

7.1.4.1 Number of transactions that can be handled during peak periods;

� The data capture software has been designed to allow multiple users (via Thin Client)

to capture as fast as the Data Capture clerk is able to work. Our Data capturers

presently capture 200 to 600 transactions per hour per clerk.

� The viewer software is designed to be operated (via Thin Client or stand-alone

workstation) to be added to as per customer needs.

� The permanent camera systems have no limit on the number of violations captured in

peak periods due to the fact that this system is PC based and all violations are

captured and then processed to hard drive in a real time processing mode � it can

handle up to 10 simultaneous events in the buffer, thus it sums to about 5

transactions per second.

7.1.4.2 Response times for maintenance;

We have the policy to respond to systems going down immediately on a real time basis. We

believe the better the service to the client � the better the payment rate.

- SMS response on the system going offline;

- E-Mail response for real time tracking;

- internet remote view and control for online response;

- walk in maintenance � to be done on site

- Office at site allowing on site response

7.1.4.3 Length of time required for running updates and batches;

The software uses MySQL as database backbone. It is a multi tasking system and batch

process is handled in the background. Thus the user is able to use the system while batch

processes are running. The average throughput is dependent on the hardware you use i.e.

pc and network. The average could be anything from 500 to 2000 records per second.

Page 53: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 53 Printed 12/2/2007

7.1.4.4 Period of running reports;

Depending on the amount of data to be collected From Viewer, a typical report is the number

of transactions per month, the from-date, to-date and amount of sites to include reports can

take anything from 1 to 10 minutes. Reports can be run at same time as other functions �

ETMS is a multi tasking system. The reports can run while the system is printing notices and

at the same time the Call Centre can be running etc. We can adapt the reports to your needs

should the need arise.

7.1.4.5 Length of time required for back-ups;

Back-ups are carried out automatically after-hours by means of schedules tasks and usually

takes between 1 and 10 minutes.

7.1.4.6 Capacity to run off-line;

The proposed System runs independently from the SAP System thus the ability to process

and view transactions is dependent on the following factor:

• The database located on a central server to which connection has been lost or is

database stored on local machine, thus each pc has its own database.

- Advantage of local database � viewing and processing is not dependent on

network

- Disadvantage of local database � if info in corrected on a outstanding account,

only the user that changed it has the change on his/her system unless each

user is notified manually.

The system is configurable to suit the customer�s needs and preferences.

• Procedure, capacity and time required for batch verification and control. One can

verify between 200 and 600 per hour, depending on the operator.

• Procedure, capacity and time required for Notice number verification.

Ciprus/ETMS or TCS system handles this function. The data string is loaded into

the Traffic management System and the Notice number is automatically

generated per violation. The ETMS handles this process immediately

Page 54: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 54 Printed 12/2/2007

7.2 Solution Design Considerations

7.2.1 Booms

� Five-Year Guarantee on turnstile locking mechanisms and base bearings � ROTALOK Rotation Locking Mechanisms: fitted in Turnstar electrical turnstiles. All calibrations are factory-set and need no further adjustment. No routine maintenance � ROTARUN Perpetual Base Bearings: fitted in Turnstar full height and half height turnstiles. Bearing is 100% corrosion resistant. Zero maintenance

� Established in 1990, Turnstar is the largest manufacturer of turnstiles and vehicle barriers in the Southern Hemisphere, producing over 150 turnstiles and barriers a month

Page 55: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 55 Printed 12/2/2007

� Primary supplier of turnstiles to the African mining industry � The Triumph 4 full height turnstile is the biggest-selling turnstile in Africa � Turnstar turnstiles and automatic vehicle barriers will operate with all access, ticketing and time and attendance systems

Blue chip customer base Mining: Anglo American, BHP Billiton, De Beers, Impala Platinum, Lonmin, Placer Dome. Industrial & Commercial: ABB, Alstom, Auto Industrial, BAT, Barloworld, Bromor Foods, Cadbury, Clover, Chep, Coca-Cola, Dorbyl, Eagle Ottawa, Everite, Electrolux, Eskort Meat, Fidelity Cash Management, Ford, Frankwen Forge, Girlock, Illovo Sugar, Kelvinator, Lafarge Cement, McCain Foods, Macsteel, Marley, Metro Rail, Mossgas, Nestlé, Nissan, Plessey, Pretoria Portland Cement, Sealy, SA Post Office, Spoornet, Tiger Foods, Transnet, Unitrans. Offices & Public Buildings: Basil Read, Citibank, CS Holdings, Edcon, Eskom, FCB, Hollard Insurance, Liberty Life, Microsoft, Media 24, Nissan SA, Old Mutual Property Services, Reserve Bank of Mauritius, South African Airways, South African Reserve Bank, South African Revenue Service, Tiger Brands, Total SA, Vodacom, Winnie Mandela Museum, World Bank. Stadia: Alexandra, Charles Mopeli, Ellis Park, Johannesburg Athletics, Jabulani Amphitheatre, Katlehong, Kingsmead, Loftus Versfeld, Makwarela, Newlands, Orlando, Peter Mokaba, Phokeng, Tokoza, Vosloorus, Wanderers. Grenada National Cricket Stadium, West Indies; George V Stadium, Mauritius; Katatura Soccer Stadium, Namibia. Leisure Parks: Cape Point National Park, Kirstenbosch Botanical Gardens, Pretoria Zoo, u-Shaka Island Marine World. Health Clubs: sole supplier to Planet Fitness and Virgin Active. Academic Institutions: Pretoria Girls High School, Pretoria Technikon, Pretoria University, RAU, University of the North, University of the Free State, UCT, WITS.

Page 56: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 56 Printed 12/2/2007

7.2.2 Maintenance

The spares are carried locally thus ensuring fast turn around minimizing down time. Two

people will be employed who will be based on the main sites and who will visit the sites as

per our guidelines, repairs and preventative maintenance performed as per contract

requirements.

HTSOL and the local partner, I-Cube provides a 7 year support program.

Free e-mail, telephone, remote login and live chat support is provided.

Page 57: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 57 Printed 12/2/2007

Figure 9 ISO 9001 Certification

On site support is charged at R7 500.00 per day.

Figure 10 Products certified to FCC15, CE, UL, GS and IEC60825-1

CERTIFICATION

7.2.2.1 SOFTWARE MAINTENANCE

All software upgrades will be provided free for the 1st year. After the 1st

year software maintenance will cost 15% of the purchase price of the

Page 58: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 58 Printed 12/2/2007

software. If the software maintenance option is not selected this can be

purchased when required at market prices.

7.2.2.2 SPARES

Requires spares are indicated in the attached documents:

GUARANTEE - 3 year guarantee on software. Hardware carries a one year guarantee.

7.2.3 Digital Images

The images produced by the equipment shown are of the best in the equipment market. This

is largely due to the physical cameras used in conjunction with the relevant software. The

system uses a camera per lane with zoom facilities enabling number plate clarity with naked

eye.

7.2.4 Data download

The permanent systems can be downloaded in a number of ways:

� Using Wireless download interlinked system

� Using Telkom lines via modem for data download

� Using GSM for data download.

� Removing and replacing one of the following storage devices from camera, using

either : (depending on Camera or type)

o WORM disk;

o MOD drive;

o Memory stick;

o Removable hard drive (preferred);

o SD disk.

7.2.5 Training

We have internationally trained personnel and attend yearly training. Keep staff up to date

with technology and support issues. All training required will be provided.

Page 59: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 59 Printed 12/2/2007

A technician who has full training on all equipment will be available for daily training needs.

On line training and help desk is available 7 days a week.

The training will allow the operator to do the following:-

� Classify the waste;

� Optimise the number of vehicles trough the site;

� Download the data automatically;

� Enrol new and existing users with vehicle, billing and waste details;

� Store any additional info required;

� Perform routine maintenance and trouble shooting;

� Generate required reports and billing information as required

7.3 Customer Responsibilities

The following, non-exclusive, list of items would be required in order for the

project to proceed.

A clean, consistent, source of Electricity is required at all the sites in the field. Delay of the

provision of the electricity beyond that detailed in the project plan will delay the launch of the

project.

Permission to work in the areas designated would be required from the relevant authorities.

Any delay in obtaining the required permission would result in an unknown delay in the

project.

The proposed solution will operate automatically however if PIKITUP are going to ensure the

system operates to the best ability, trained operators and service personnel are required.

The training period as detailed should be followed hence these personnel are required to

start training early.

On site office at all sites

Page 60: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 60 Printed 12/2/2007

88 AAddddiittiioonnaall ccoonnssiiddeerraattiioonnss ffoorr ffuuttuurree ddeeppllooyymmeenntt

8.1 Average Speed Determination (ASD)

The following is an example of software developed using the information generated from the

LPR hardware and software in the field. The SeeCarFlow application uses the data

generated by a number of LPR sites in the field for various applications. For PIKITUP a

similar application would be created and implemented after joint specification.

Speeding vehicles on site are a major problem, seriously affecting the safety of users and

staff on site. ASD can monitor each vehicle and ensure the speed is acceptable plus the

vehicle is tipping where required. Waste placed in the wrong area is a serious problem on all

sites.

Overview

The central application receives recognition updates from all the sites, analyses the data

and matches the vehicle appearances, calculates the data and stores it to database, and

displays it in real time.

The application has the following main display options:

• Map � Travel map with real-time statistics • Travel time � travel time between the dumping sites (in tabular form) • Special Vehicle Travel time � travel time for own vehicles • Flow � distribution of the traffic (e.g., 23% of traffic is dumping at a certain part of

the site, 95% of a certain type of waste is going to a certain place in the landfill) • Status � diagnostics of all sites

These options are described in the following paragraphs.

Travel Map

This option displays a bitmap of the travel map along with travel time figures updated online

on the map. The display includes the map bitmap, the location of sites on the map, and the

travel time between the points displayed on line segments (in both directions if available).

The following figure illustrates an example.

Map display example (without zoom)

Page 61: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 61 Printed 12/2/2007

To focus on a specific area the operator can press (with the left button of the mouse) on a

specific area, and the program will zoom up at that point showing the vicinity of the zoomed

area. Another click will restore the map to its original size. The travel time from Panorama

Entrance to the tipping face is 37 minutes, while the travel time in opposite direction (from

tipping to exit) is only 3 minutes. The time is displayed in a purple colour (predefined in the

settings) along the line segments (with same colour) connecting both sites.

The map display can also display (upon user selection) the average speed in each traffic

segment and the distance between the points.

Travel Time tabular display

The following figure shows a typical display of the Travel time tabular display. The Sites are

listed as A- H (in this example) and the Site location appears on the right side. The average

time between all relevant points is listed in the matrix, where the rows are the �from� site and

the columns are the �to� sites. For example, Site C (third row) to Site A (first column) appears

as 33 minutes – which was calculated according to the readings from both sites. This value is

updated in real-time.

Special vehicles Travel time

The travel time is calculated separately for special vehicles, based on an �allowed� list of

vehicles (such as PIKITUP vehicles). The user can add, edit, delete and search the list of

special vehicles. This list is used then to calculate the travel time for these vehicles. The

display is identical to the regular vehicles travel time tabular display. This option displays the

traffic distribution: the percentage of the traffic flow from point to point. This data is displayed

in a flow matrix, similar to the travel time display. It provides a status of the flow of the traffic

from point to point.

Status: LPR unit status

When selecting this option the program displays the live status of all LPR units. This

includes:

• the number of recognition messages received from each point in a given period, • the percent recognition success (and an alert if a low threshold is reached), • the last time the unit has been initiated or started a recovery process. • On-line Diagnostics results (each unit reports on its status in a periodic cycle)

Page 62: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 62 Printed 12/2/2007

Note that in case of a change in the status of an LPR unit (failure of the on-line diagnostics, or missing messages from that

unit), the SeeCarFlow application will display a message and an alarm will be heard.

Settings

The number, name and position of the sites are defined in the application settings and

could be easily updated if more sites are added.

Other parameters can also be changed in the settings. All settings are password protected

in order to avoid unauthorized changes.

8.2 Travel Time Calculations

This section describes the method of travel time calculations as used in the central

application.

Travel time

Subtracting the recognition times between the sites (see illustration) generates the basic

travel time between a pair of sites. Travel Time between Entrance B & Tipping Face A = {Time at B} – {Time at A} Note that not all sites will be considered pairs. A list of legal pairs is defined in the program

setting (for all cases that measure the traffic in the correct direction).

This calculation will be done separately for standard vehicles and special vehicles (as listed

in the �white list�).

Average Travel time

The average travel time is calculated by averaging the individual travel times that were

recorded in a pre-defined period (every several minutes):

Average Travel Time = (Sum {travel times}) / {Number of vehicles} Since some vehicles stop on the route or may pass twice, which will affect the calculation.

Therefore a standard deviation will be calculated per site pairs. In case a certain time

exceeds the standard deviation it will be excluded from the average travel time. The % of

permissible change over the standard deviation is an application parameter.

Page 63: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 63 Printed 12/2/2007

Comparison Accuracy

Each vehicle will be matched between the sites, with a comparison accuracy that is defined

in the application parameter (�degrees of freedom in match�).

Examples:

1. if the accuracy is 0 then the vehicle code ABC123 must only match ABC123. 2. If the parameter is 1 then ABN123 will match ABC123 (but not ACN123 – the

comparison is performed in the proper position). Furthermore, left or right shift will also be accepted: 1ABC12 will also be acceptable.

Even if the match is accepted, the program will first match in full accuracy and only then try

the lower degree of accuracy (if defined as such).

Storage and export of Results

All calculated travel time statistics will be recorded in a database. This data can be

extracted later for off-line processing. The calculated data will also be transmitted over the

network for other applications using TCP/IP.

The settings above allow the average speed to be determined between site 1 & 2

8.3 INFORMATION ON WIM (WEIGH IN MOTION) for PIKITUP-JHB

8.3.1 High Speed Weigh-in-Motion Apparatus (Piezo Quartz Sensor/Type Lineas 9195E)

The axle weighing senor is to be firmly installed at the locations shown in the drawings. The

equipment must be capable of recording dynamic gross vehicle weights and vehicle axle

loads. Dynamic recording must be capable at passing speeds of up to 120 km/h.

The purpose of this apparatus is to record the characteristics of all vehicles that travel along

the road not travelling through the weigh station (i.e. vehicles other than trucks). Particular

the apparatus is to record (using a digital video camera with plate recognition) an image of

offending vehicles that have chosen not to enter the weigh station as instructed.

8.3.2 Capacity

The sensors must be capable of weighting the following loads:

Page 64: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 64 Printed 12/2/2007

• Nominal axle load 25,000 kg • Working load 30,000 kg • Load limit 37,500 kg • Breaking load (load at rupture)> 40, 000 kg

8.3.3 Accuracy

The accuracy of the WIM system is to be better than ±10% of axle load and ±7% of

gross weight of the static weight in dynamic mode when weighing vehicles at a speed

of 80 km/h. The weighing system shall also achieve the following.

Error on GVW: ≤ ± 7% with a statistical probability of σ = 1

Error on Axle load: ≤ ± 10% with a statistical probability of σ = 1

Error on Axle group load: ≤ ± 10% with a statistical probability of σ = 1

Error on Axle spacing: ≤ ± 0.5 m (2σ) between 2.axles at 1 to 80 km/h

Weighing speed range: 1 to 120 km/h

Weighing speed accuracy: ≤ ± 20 km/h for range 1 to 80 km/h

Overload capacity per axle: ≤ ± 50% with uniform load distribution.

8.3.4 Capacity

The system must be capable of conducing accurate dynamic vehicle weighing in

compliance with accuracies indicated above for dynamic weighing and recording the

following information:

• Determination of axle loads; • Automatic vehicle classification/ weighing; • Weight comparison with stored limit tables; • Axle load recording; • Gross weight calculation; The apparatus in association with the auxiliary devices such as loops and axle

detectors should be capable of recording:

• axle loads; • total loads of multiple axles; • axle spacing of the vehicle; • GVW � gross vehicle weight - total weight of the vehicle; • total vehicle length; • overload of the vehicle with respect to axles, multiple axle, and total weight; • maximum overload of the vehicle in accordance with a stored vehicle table; • variation of the vehicle; • speed during passage over the weighing system (axle detection); • classification of the vehicle with respect to number and spacing of axle;

Page 65: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 65 Printed 12/2/2007

• reliability of the weighing operation by evaluation of the speed variation; • a consecutive number; • the date and time of passage.

8.3.5 Installation and Mounting

The sensors are to be mounted level with the surface of the road.

The system must be earthed properly and protected against electrical surges and

lightning.

8.3.6 Exact Position

The exact position of all the items shall be finalized after the axle load stations have been constructed and following a site inspection.

Design Life of the Equipment

The minimum design life for the electronic equipment before replacement is to be ten

years.

Page 66: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 66 Printed 12/2/2007

Figure (1) Staggered WIM Layout

Figure (2) Standard WIM System � (I)

Electroniccabinet

Staggered WIM - secondary roads or passing lanes

min.30

hard shoulder

driving direction

(300

, 325

, 350

, 375

, 400

)

2 2'

2 2'

min.30

300 - 500

LINEAS sensor

Inductive loops

2 2' See cross section

Sensor cable

hard shoulder

driving direction

(300

, 325

, 350

, 375

, 400

)

Electroniccabinet

Standard WIM system - 2 rows of 4 LINEAS

min. 30

min. 30

300 - 500

3 3'

1 1'

Page 67: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 67 Printed 12/2/2007

all mass in cm

All dimensions in cm

Ground

Protectedsensor-cable

Flexible groutingor Bitumen

Sand protectionlayer

8 mm

80 m

m

Pavement(Bitumen, Beton)

Cross Section 1-1’

Cross-Section 2-2’ of cable slotCross-Section 3-3’ of cable slot

Ground

Protectedsensor-cable

Flexible groutingor Bitumen

Sand protectionlayer

8 mm

80 m

m

Pavement(Bitumen, Beton)

Figure (3) Cross Section of WIM Installation

72 mm ±3 mm

55 m

m ±

3 m

m

sand-epoxygrouting

level beam (forinstallation purpose)

road surface screw

sensor cables inprotection tube

cable fixingclip

foam strip

foam

Page 68: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 68 Printed 12/2/2007

8.3.7 Video Camera with violators recording capability

This equipment shall have the capability of capturing and recording the number plate

(alpha-numeric characters) of all vehicles, including offending vehicle on signal from

HSWIM equipment or when triggered by manual switching. A digital video camera

capable of capturing a clear image of a vehicle (2/3rd of front and 1/3rd of the site) is to

be securely mounted in a weatherproof and dustproof secure housing as shown in

the drawings.

The weighing platform is to be connected to the control computer network in the

Control Office on LS WIM by service able secure ducted cables. Equipment mounted

along the roadside will suitably by mounted on plinths and housed in enclosures to

protect the equipment against the environmental conditions of the area. Feeder

cables to individual road sensors shall be installed in such a way in the road that

aides the maintenance thereof.

The system must be earthed properly and protected against electrical surges and

lightning.

The image is to be relayed to the control office with the following data shown ion the

image as collected by the relevant apparatus:

• the axle loads; • the vehicle speed; • the total loads of multiple axles; • the total weigh of the vehicle; • the maximum overload of the vehicle in accordance with a stored vehicle table; • variation of the vehicle; • classification of the vehicle with respect to number and spacing of axle; • a consecutive number; • the date and time of passage • picture (2/3rd of front and 1/3rd of the site) of overloaded vehicles

The images are to be stored on the system�s network hard drives in the most

economical format that provides a clear image on a suitable computer screen. The

verification of the vehicle characteristics (overload) an operator will delete all images

of non-offending vehicles.

Page 69: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 69 Printed 12/2/2007

Exact Position

The exact position of all the items shall be finalised after the axle load stations have

been constructed and followings a site inspection or recommendation.

8.3.8 Permanent WIM Operations

The majority of WIM data collection is now done with permanently installed weight sensors,

although many sites do not collect data continuously at these sites. Instead, they attach data

collection electronics to previously mounted sensors when data collection is desired. The

scale sensors are then calibrated (or should be calibrated), and data are collected for the

desired time period.

Permanently mounting WIM sensors allows them to be installed flush with the roadway

surface. When done properly, this eliminates the bump that vehicles experience when

crossing surface-mounted sensors. The removal of impact loads on sensors and the

elimination of extra vertical motion caused by bumps result in improved system accuracy.

Permanently mounting sensors flush with the pavement surface also decreases the impact

loads on sensors themselves, which in turn increases sensor life. One common cause of

sensor failure is when sensors become directly exposed to horizontal forces from tire

contact. This exposure often leads to early fatigue failure for both sensors and the bonds

between sensors and pavement.

A variety of other factors play important roles in both the output accuracy and the life of

permanently mounted sensors. Pavement at permanent sensor locations should be:

" Flat (no horizontal or vertical curves) " Smooth (no bumps or other surface conditions that increase dynamic vehicle motion) " Strong (to reduce pavement flex underneath the WIM sensor), and " In good condition.

Flat, smooth pavement reduces vehicle dynamic motion and increases the accuracy of all

WIM sensors. Strong pavement results in longer-lived pavement, which in turn increases

sensor life. Strong pavement is especially important for strip sensors that are embedded

directly into the pavement. The output from these sensors depends on the performance of

the pavement itself. If pavement strength varies significantly over time (e.g.,with

Page 70: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 70 Printed 12/2/2007

environmental conditions), sensor output will also vary, and this greatly decreases the

likelihood of accurate sensor calibration.

Good condition pavement reduces vehicle dynamics and makes the bond between sensors

and pavement more likely to last. A common cause of sensor failure is the failure of sensor/

pavement bonds, which is often traced to poor pavement condition.

Poor installation is another common cause of this failure.

Poor cleaning or drying of pavement cuts results in a weak bond that allows moisture

intrusion and further deterioration of the bond.

Moisture is also a common cause of equipment failure because of intrusion into either the

sensor itself or the communication lines connecting the sensor to the data collection

electronics.

Each vendor and each state highway agency has its own procedures for fighting moisture

intrusion. Similarly, agencies and vendors have equipment and procedures for protecting

permanent equipment from lightning strikes, other environmental effects (extreme

temperatures, humidity, dust), insects, power surges, and various other causes of equipment

or communications failure. No single document exists that lists best practices for protecting

equipment from these common problems.

WIM site principle checklist

Page 71: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 71 Printed 12/2/2007

8.3.9 SITE SELECTION

The site selected for a WIM system should be based on meeting the required "site design

life" and accuracy necessary to support the user. In order to meet these requirements, the

geometric design, pavement condition, and general characteristics of a potential site should

be considered. Selecting an adequate site for the WIM location is a very important part of

meeting the established WIM system requirements.

GEOMETRIC DESIGN The geometric design of a roadway is an important factor that provides a foundation for using dynamic

load measurements to estimate static loads accurately. This is due to the influence longitudinal and

transverse offsets have on the behaviour of a vehicle. The ASTM Standard sets guidelines for the

horizontal curvature, the longitudinal gradient, the cross (lateral) slope, and the width of the paved

roadway lane. The guidelines set standard geometric design requirements for each type of system.

According:

The ASTM Standard (E 1318-94) Geometric Design Requirements and the COST 323 WIM

Technical requirements.

Horizontal Curvature

The maximum allowable horizontal curvature for the roadway is identical for all four types of

WIM system installations. The roadway has to have a horizontal radius of not less than 1740

meters (5,700 feet) for a distance of 46 meters (150 feet) before and after the WIM sensor.

The radius is measured at the centre line of the lane in which the sensor is installed.

Roadway Grade

The maximum allowable roadway grade is the same for WIM systems. For these systems the

roadway grade cannot exceed two percent for a distance of 46 meters (150) feet before and

after the sensor. No documentation was found for the minimum allowable amount of

longitudinal waves in the roadway approaching the sensor.

Cross Slope

The maximum allowable cross (lateral) slope of the road surface is the same for the HS WIM

systems. For these systems the cross slope cannot exceed two percent for a distance of 46

meters (150 feet) before and after the sensor.

Page 72: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 72 Printed 12/2/2007

PAVEMENT CONDITION

The roadway pavement condition is important in the reduction of vehicle bounce.

The guideline set forth in the ASTM Standard E 1318-94 states that for a distance of 46

meters (150 feet) before and after the sensor the roadway surface �shall be maintained in a

condition such that a 150 millimeter (6 inch) diameter circular plate 3 millimeters (0.125

inches) thick cannot be passed beneath a 6 meter (20 foot) long straightedge. The standard

also states that a foundation must be provided and maintained to accommodate the sensors.

SITE LOCATION

The location of a WIM site should be based on more than just the need for truck traffic data.

The site needs to be located in an area with specific qualities including:

1. Availability of access to power and phone

2. Adequate location for controller cabinet

3. Adequate drainage

4. Traffic conditions

Availability of Access to Power and Phone

The site should have access to an AC power source and telephone utilities. Solar power and

cellular phones can be used if utilities are not available. The power source and phone service

used at a site is dependent upon the amount of truck data collected at the site. For more

active sites our experiences determined, that wired phone service would be more cost

effective than cellular (wireless) service.

Adequate Location for Controller Cabinet

The controller cabinet should be located so that it will function throughout the design life of

the site. The cabinet needs to be in an area so that:

• It cannot be hit by a vehicle leaving the roadway, preferably behind a guardrail • It is accessible with a clear line of sight to the sensors • It can be serviced without endangering the technician • Items three and four are important because technicians may need to spend time

at the controller cabinet during system testing, calibration, and maintenance • Air condition and dust protection must be available •

Page 73: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 73 Printed 12/2/2007

8.4 Terms and Conditions of Supply

Price example Project Name: WIM stations with quartz crystal sensors

1. Prices and Schedules for Supply for WIM sensors and grouting staggered version, in Swiss Francs. 1CHF= 0.16ZAR

220m

m60

0mm

conc

rete

grav

el ro

und

220m

m

bad base good base

Concrete

150m

m

220m

m70

0mm

bitu

men

grav

el ro

und

220m

m

bad base good base

Bitumen

150m

m

40-5

0m

mAB

16

70cm

Road construction

170

mm

HM

T 32 22

cm15

cm

60 m

m H

MT2

2

40 A

B11

120

mm

HM

T 16

Page 74: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 74 Printed 12/2/2007

S.No

.

Item No.

Type

Quantity

for 1 WIM

station

2 lanes

Unit

Price

[CHF]

Total Price

for 1 WIM

station

2 lanes

[CHF]

Total

Price

for WIM

station

2 lanes

[CHF]

1 Type 9195E111 - Lineas WIM sensor l = 1,00 m,

including 40 m cable and BNC

connector, protection cable l = 15 m

4

3100.00

12�400

2 Type 9195E211 - Lineas WIM sensor l = 0,75 m,

including 40 m cable and BNC

connector, protection cable l = 15 m

4

3000.00

12�000

3 1000A1

Grouting compound for Lineas sensors

type 9195

5

300.00

1�500

4 Roaf side cabinet must be delivered

localy

TOTAL 25’900

Page 75: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 75 Printed 12/2/2007

2. Prices and Schedules for Supply for WIM sensors and grouting full version

S.No

.

Item No.

Type

Quantity

for 1 WIM

station

2 lanes

Unit

Price

[CHF]

Total Price

for 1 WIM

station

2 lanes

[CHF]

Total

Price

for WIM

station

2 lanes

[CHF]

1 Type 9195E111 - Lineas WIM sensor l = 1,00 m,

including 40 m cable and BNC

connector, protection cable l = 15 m

8

3100.00

24�800

2 Type 9195E211

- Lineas WIM sensor l = 0,75 m,

including 40 m cable and BNC

connector, protection cable l = 15 m

8

3000.00

24�000

3 1000A1

Grouting compound for Lineas sensors

type 9195

10

300.00

3�000

4 Roaf side cabinet must be delivered

localy

TOTAL 51’800

8.4.1.1 3. Cameras, Software and Hardware

S.No

.

Item No.

Type

Quantity

for 1 WIM

station

Unit

Price

Total Price

for 1 WIM

station

Page 76: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 76 Printed 12/2/2007

2 lanes [CHF] 2 lanes

[CHF]

1 Camera colour for 1 lane incl. video

server

2 7�500 15�000

2 Communications Hardware 1 7�500 7�500

3 Central server � if necessary 1 7�000 7�000

4 Software Atol for all stations � uo to 100

stations

1 12�000 12�000

5 Warranty certificate, education for

personal, Software licences

documentation, manuals

1 4�500 4�500

6 Installation – montage, education –according to the, how many stations will be installed

TOTAL

8.4.2 4. Installation of 1 WIM station

8.4.3 The other systems can be installed by your educated personal to reduce the costs – following preparation works must be provided before:

• Installation of road cabinets inclusive underground protection tubes, power supply and communication cables for every station � the distance between sensors and cabinet must be maximum 30m

• Every roadside cabinet must be equipped with a power supply and communication cable connected to the control centre or with a fixed IP address (wireless LAN) (a phone modem GSM could be used also, but the operation costs for on-line data transmission will be to high)

• Installations of camera posts inclusive connection to the cabinets and power supply and communication cable at posts

• Operational room for the central server • For the calibration must be organised a loaded truck � 20 Tons � every axle of the

truck must be statically weighed separate before calibration

Page 77: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 77 Printed 12/2/2007

Item Type Description Unit Price

[CHF]

Days Total

[CHF]

1 Installation WIM � 1 stations

cameras, server, software

inclusive tests � together with

local road work company (this

company will be educated for

following installations)

3 man for 4days

4 20�000

2 WIM system calibration 1 3�000

3 Install. equipment - material 1�500 1�500

4 Travel, expenses, hotel, food etc. 18�000 18�000

Total 42’500

The prices are exclusive of custom fees and delivery costs

The road closure and the road safety organisation are not included

4. Delivery Schedule : ca. 6 week 3. Payment:

80% in advance against delivery of a Pro-forma Invoice

20% 10 days after the installation

6. Warranty 1 year from the date of installation

7. Packaging and Marking Instructions

No special conditions

8. Required Technical Specifications

General description

Specific details and technical parameters

Performance parameters

Page 78: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 78 Printed 12/2/2007

99 IImmpplleemmeennttaattiioonn SScchheedduullee The substantial experience developed from installing systems locally in South Africa and

internationally will prove extremely beneficial during install of the proposed solution. Key to

the successful installation and faultless operation is the initial design, based on a complete

TCP/IP backbone, consisting of ADSL, wireless links and GSM connectivity. The connectivity

allows any PC, database or camera to connect to any computer, ensuring maximum uptime.

The ability to obtain feedback from the equipment in the field in real time, allowing proactive

response to any issue ensures all challenges are resolved before they escalate.

A meeting will be arranged to discuss any modification to the system design, layout, identify

the positions of the proposed install or if any of the options presented will be selected. A

weekly meeting is requested for feedback on progress plus the ability to immediately identify

any issues which might arise. Should any issue need to be addressed, all role players can

be kept informed of the progress and decide on a suitable way forward. This is the ideal

time for the operational staff to get involvement, so they understand the solution from an

operational level. At each meeting additional reading material will be provided to the

operational staff for study and prepare.

The systems will be pre-built before being installed, with substantial tests to limit any on site

issues. This is the ideal time for the operational staff to get hands on involvement, so they

understand the solution from a board level.

Once the systems are installed, extensive tests begin. As these are all done from the control

room this is the ideal opportunity to continue the on the job training of the personal who will

operate the system. Each stage of the process will be extensively tested: from loop

detection, multiple image capture, OCR, transfer of the data (plate, lane, date, time, etc.),

loading users and those plates where an alarm should be generated. Tests will be performed

using dedicated vehicles travelling at specific speeds to ensure the entire system is fully

operational, including the measured distance between sites.

The time critical nature of the project requires total commitment from a dedicated solution

provider who has substantial local experience in providing this solution.

Page 79: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 79 Printed 12/2/2007

A project charter document will be drafted with clear agreement of the deliverables at the

commencement of the project that will be signed to confirm the understanding of what is

included, excluded, concerns, risks, etc. This will allow for a structured approach to any

scope changes.

The progress review meetings will be minuted by the Project Manager. The meetings will be

chaired by the Project Manager and attendance to these meetings by the designated

Municipality representative is required. The project may be delayed, without penalty, if the

required parties are not in attendance.

A formal Change Control process will be included should any deviations be requested from

the original scope be necessary to provide opportunity for the impact on the project to be

identified, motivated and agreed. This approval will be provided by the Municipality, the

primary contractor and the Project Manager in a formalized signed change Request Form

that will be supplied at the commencement of the project.

Page 80: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 80 Printed 12/2/2007

Contract No. IT 1842Supply, Installation & Commissioning of: Automatic Number Plate Recognition System for Lane Violation Enforcement & Speed Violation Detection through Average Speed CorrelatiID Project Name Owner Days Start End 29-Oct 2-Nov 5-Nov 9-Nov 12-Nov 16-Nov 19-Nov 23-Nov 26-Nov 30-Nov 3-Dec 10-Dec

1.0 Contract No. IT 1842Supply, Installation & Commissioning of: Automatic Number Plate Re ASD 28 9-Jul 6-Aug Mon Fri Mon Fri Mon Frid Mon Fri Mon Frid Mon Mon

2.0 Scope Definition Phase ASD 3 29-Oct 1-Nov2.01 Receive order ASD 1 4-Nov 5-Nov2.01 Meet to discuss project plan ASD / ETA 1 4-Nov 5-Nov2.01 Determine any modifications to plan ASD / ETA 2 4-Nov 6-Nov2.01 Decide on the OPTIONS presented ETA 10 4-Nov 14-Nov2.01 Decide on daily meeting time ASD / ETA 1 2-Nov 3-Nov2.01 Decide on weekly Full Briefing meeting day and time ASD / ETA 1 2-Nov 3-Nov

3.0 Equipment ASD 22 29-Oct 20-Nov3.01 Once tender awarded, E-mail & phone suppliers to reserve items ASD 3 1-Nov 4-Nov3.02 Confirm orders and deliver dates ASD 3 5-Nov 8-Nov3.03 Swtich to alternative souces if delivery problems ASD 8 10-Nov 18-Nov3.04 Moitor the status of the equipment ASD 2 10-Nov 12-Nov3.05 EQUIPMENT DELIVERY 23rd ETA 6 19-Nov 25-Nov

4.0 Required Software Development ASD 10-Nov 10-Nov4.01 Define software selection criteria ASD 7 10-Nov 17-Nov4.02 Develop software selection questionnaire ASD 7 17-Nov 24-Nov4.03 Develop Statement of Work ASD 10 20-Nov 30-Nov4.04 Evaluate proposal ETA 10 1-Dec 11-Dec4.05 Select Software Required ETA 10 1-Dec 11-Dec

5.0 Public Transport Vehicle Enrolment ETA 29-Oct 29-Oct5.01 Determine which vehicles are allowed to use the lanes ETA 1 4-Nov 5-Nov5.02 Determine confirmation criteria ETA 7 4-Nov 11-Nov5.03 Set up numerus means where by vehicles can be enrolled ETA 8 14-Nov 22-Nov5.04 Enrol via SMS ASD 22-Nov 22-Nov5.05 Enrol via E-Mail ASD 22-Nov 22-Nov5.06 Enrol via Web Sitw ASD 22-Nov 22-Nov5.07 Enrol via Phone ASD 22-Nov 22-Nov5.08 Enrol via Hand Held unit ASD 22-Nov 22-Nov

6.0 Build Components ASD 7 23-Nov 30-Nov6.01 Check PC is operational ASD 5 22-Nov 27-Nov6.02 Install IO card ASD 5 22-Nov 27-Nov

6.03 Install SEEWAY Software ASD 5 22-Nov 27-Nov

6.04 Install Ethernet HSDPA/3G/EDGE/GPRS WAN Router LIS.HSDPA-220P Duxbury ASD 5 22-Nov 27-Nov6.05 Test Comms on all 6 PC's ASD 5 22-Nov 27-Nov6.06 Connect 8 PORT 1G switch with Power over Ethernet. 4-PoE ports ASD 5 22-Nov 27-Nov6.07 Set PC's IP address ASD 5 22-Nov 27-Nov6.08 Remove WAN router ASD 5 22-Nov 27-Nov6.09 Test Comms on all 6 PC's ASD 5 22-Nov 27-Nov6.10 Connect Cameras ASD 5 22-Nov 27-Nov6.11 Test image capture ASD 5 22-Nov 27-Nov6.12 Check recognition ASD 5 22-Nov 27-Nov6.13 Confirm LPR data sent via network ASD 5 22-Nov 27-Nov6.14 Confirm LPR images sent via network to ETA ASD 5 22-Nov 27-Nov6.15 Confirm automatic shutdown and reboot ASD 5 22-Nov 27-Nov

7.0 Site Install ASD 28 9-Aug 6-Sep7.01 Meet with ETA to identify stakeholders involved in placement All 9 4-Nov 13-Nov7.02 Invite required stakeholders to meeting ETA 2 4-Nov 6-Nov7.03 Meet with required stakeholders to confirm placement All 2 14-Nov 16-Nov7.04 Obtain permission from required stakeholders work on site ETA 5 26-Nov 1-Dec7.05 Install electricty on site ETA 5 26-Nov 1-Dec7.06 Obtain written clearance from Municipality for cutting loops ASD 5 26-Nov 1-Dec7.07 Loop cutting Churchills 5 26-Nov 1-Dec

8.0 Trouble Shooting ASD 28 9-Aug 6-Sep8.01 Meet with ETA to identify stakeholders involved in placement All 9 4-Nov 13-Nov8.02 Invite required stakeholders to meeting ETA 2 4-Nov 6-Nov8.03 Meet with required stakeholders to confirm placement All 2 14-Nov 16-Nov

9.0 Control Room Install ETA 3 26-Nov 29-Nov9.01 Which computer will be used for the servers? ETA 2 26-Nov 28-Nov9.02 Where will the computers be installed ETA 2 26-Nov 28-Nov

10.0 On Site Tests ASD 2 26-Nov 28-Nov10.01 LPR BW image capture for Site 1 - 6 ASD 2 26-Nov 28-Nov10.02 LPR Colour image capture for Site 1 - 6 ASD 2 26-Nov 28-Nov

10.12 LPR BW image recognition for Site 1 - 6 ASD 2 26-Nov 28-Nov0.10 LPR Colour image recognition for Site 1 - 6 ASD 2 26-Nov 28-Nov

0.20 LPR BW image recognition for Site 1 - 6 (NIGHT) ASD 2 26-Nov 28-Nov1.3.1 LPR Colour image recognition for Site 1 - 6 (NIGHT) ASD 2 26-Nov 28-Nov

1.3.1 LPR BW image stored for Site 1 - 6 ASD 2 26-Nov 28-Nov1.3.1 LPR Colour image sored for Site 1 - 6 ASD 2 26-Nov 28-Nov

11.0 Control Room Tests ASD 2 27-Nov 29-Nov11.01 LPR BW image data transfer for Site 1 - 6 ASD 2 27-Nov 29-Nov11.02 LPR Colour image data transfer for Site 1 - 6 ASD 2 27-Nov 29-Nov

11.03 LPR BW image transfer for Site 1 - 6 ASD 2 27-Nov 29-Nov0.01 LPR Colour image transfer for Site 1 - 6 ASD 2 27-Nov 29-Nov

1.3.1 LPR BW data ALARM for Site 1 - 6 (NIGHT) ASD 2 27-Nov 29-Nov1.3.1 LPR Colour data ALARM for Site 1 - 6 (NIGHT) ASD 2 27-Nov 29-Nov

1.3.1 Determination of the distance between all East Bound sites ETA 2 27-Nov 29-Nov1.3.1 Determination of the distance between all West Bound sites ETA 2 27-Nov 29-Nov1.3.1 LPR BW ASD ALARM for Site 1 - 6 ASD 2 27-Nov 29-Nov1.3.1 LPR Colour ASD ALARM for Site 1 - 6 ASD 2 27-Nov 29-Nov

12.0 Hand Over Tests ASD 4 29-Nov 3-Dec12.1 Number plate recognition at low speed ASD 1 29-Nov 30-Nov12.2 Number plate recognition at medium speed ASD 1 29-Nov 30-Nov12.3 Number plate recognition at high speed ASD 1 29-Nov 30-Nov12.4 Number plate recognition at night ASD 1 29-Nov 30-Nov12.5 Speed Violation Detection ASD 1 29-Nov 30-Nov12.6 Automatic detection of unauthorised vehicles ASD 1 29-Nov 30-Nov12.7 Automatic detection of black listed vehicles ASD 1 29-Nov 30-Nov12.8 Automatic alarm on detection of stolen vehicles ASD 1 29-Nov 30-Nov12.9 Colour Photographioc Evidence ASD 1 29-Nov 30-Nov13.0 Link to selected Databases ASD 1-Mar 1-Mar13.1 Traffic Engineering Data Acquisition ASD 1 29-Nov 30-Nov

13.0 Training ETA 14 22-Nov 6-Dec13.1 Develop suitable selection criteria ETA 2 22-Nov 24-Nov13.2 Identify 4 people from ETA / Durban Metro ETA 1 22-Nov 23-Nov

14.0 Spare Parts ETA 11 22-Nov 3-Dec14.1 Recommended Spare Parts be be confirmed ETA 1 22-Nov 23-Nov14.2 Orders of Spares ASD 2 22-Nov 24-Nov

15.0 Support ETA 8 26-Nov 4-Dec15.1 Develop suitable selection criteria ETA 2 26-Nov 28-Nov15.2 Identify 4 people from ETA / Durban Metro ETA 2 26-Nov 28-Nov15.3 Operations Manual ETA 2 26-Nov 28-Nov15.4 Mainteneance Manual ETA 2 26-Nov 28-Nov

16.0 Repair Procedure ETA 4 26-Nov 30-Nov16.1 Develop suitable selection criteria ETA 2 26-Nov 28-Nov16.2 Identify 4 people from ETA / Durban Metro ETA 2 26-Nov 28-Nov Figure 9-1 Sample Weigh Bridge Project Plan

Page 81: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 81 Printed 12/2/2007

1100 AAddddiittiioonnaall ccoonnssiiddeerraattiioonnss

10.1 Company profile

10.2 Social Investment

10.2.1 Jobs created

Over the duration of the contract a number of jobs could be created in the following

positions:-

� Maintenance/Technician

� Customer care centres, violation viewing desk

� Data capturers

� IT and Software support

� Summons servers

� Call centre

� Procurement

� Finance

� Human resources

� Secretarial

� Management

10.2.2 Use of affirmative business enterprises

It is our policy to support and advance affirmative business enterprises.

10.2.3 Investment in the community

We will involve will involve the community in all areas of development. Members of the

community will be fully consulted about the project being implemented and comments will be

requested from the community by means of notices in the local news paper.

Page 82: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 82 Printed 12/2/2007

The community will be expected to make input in all stages of the implementation.

Workshops will be conducted to bring awareness about landfill safety.

10.2.4 Local content

Equipment and accessories proposed:-

� over 70% locally designed and manufactured.

Equipment proposed:-

� over 20% locally designed and manufactured.

Backoffice software:-

� locally designed and maintained locally.

� Collect software is locally designed and maintained locally.

10.2.5 Use of SMMEs

It is our policy to support, promote and work with SMME companies.

Page 83: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 83 Printed 12/2/2007

1111 DDeeffiinniittiioonnss,, aaccrroonnyymmss aanndd aabbbbrreevviiaattiioonnss

AGC -Automatic Gain Control - A circuit for automatically controlling amplifier gain in order to

maintain a constant output voltage with a varying input voltage within a predetermined range of input-

to-output variation

Aperture - In television optics, it is the effective diameter of the lens that controls the amount of light

reaching the photoconductive or photoemitting image pickup sensor.

Aspect Ratio - The ratio of width to height for the frame of the televised picture 4:3 for standard

systems, 5:4 for 1K x 1K, and 16:9 for HDTV

Automatic Brightness Control - In display devices, the self-acting mechanism which controls

brightness of the device as a function of ambient light.

Automatic Gain Control - A process by which gain is automatically adjusted as a function of input or

other specified parameter.

Automatic Iris Lens - A lens that automatically adjusts the amount of light reaching the imager.

Automatic Light Control -The process by which the illumination incident upon the face of a pickup

device is automatically adjusted as a function of scene brightness

Bandwidth - The number of cycles per second (Hertz) expressing the difference between the lower

and upper limiting frequencies of a frequency band; also, the width of a band of frequencies

Blooming - The defocusing of regions of the picture where the brightness is at an excessive level, due

to enlargement of spot size and halation of the fluorescent screen of the cathode-ray picture tube. In a

camera, sensor element saturation and excess which causes widening of the spatial representation of a

spot light source.

Brightness - The attribute of visual perception in accordance with which an area appear to emit more

of less light. (Luminance is the recommended name for the photo-electric quantity which has also been

called brightness.)

CCD - See Charge Coupled Device

C Mount - A television camera lens mount of the 16 mm format, 1 inch in diameter with 32 threads

per inch.

CCTV - Common abbreviation for Closed-Circuit Television

Charge-Coupled Device CCD - For imaging devices, a self-scanning semiconductor array that

utilizes MOS technology, surface storage, and information transfer by shift register techniques.

Page 84: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 84 Printed 12/2/2007

Contrast - The range of light to dark values in a picture or the ratio between the maximum and

minimum brightness values.

Contrast Range - The ratio between the whitest and blackest portions of television image

DDE – Dynamic Data Exchange

Depth of Field - The in-focus range of a lens or optical system. It is measured from the distance

behind an object to the distance in front of the object when the viewing lens shows the object to be in

focus.

Depth of Focus -The range of sensor-to-lens distance for which the image formed by the lens is

clearly focused.

DLL – Dynamic Linked Library

EPS - Edge pre-select

Fiber Optics - Also called optical fibers or optical fiber bundles. An assemblage of transparent glass

fibers all bundled together parallel to one another. The length of each fiber is much greater than its

diameter. This bundle of fibers has the ability to transmit a picture from one of its surfaces to the other

around curves and into otherwise inaccessible places with an extremely low loss of definition and

light, by a process of total reflection.

Field - One of the two equal but vertically separated parts into which a television frame is divided in

an interlaced system of scanning. A period of 1/60 second separates each field start time.

Field of View - The maximum angle of view that can be seen through a lens or optical instrument.

Focal Length - Of a lens, the distance from the focal point to the principal point of the lens

Focal Plane - A plane (through the focal point) at right angles to the principal point of the lens

Focal Point - The point at which a lens or mirror will focus parallel incident radiation.

Gbps – Giga Bits per second

HTS – Hi-Tech Solutions

Iris - An adjustable aperture built into a camera lens to permit control of the amount of light passing

through the lens.

IO – Input output

IP – Internet Protocol

IR – Infra Red

JPG – Joint Photographic Group Image Format

LED – Light Emitting Diode

Monitor - A unit of equipment that displays on the face of a picture tube the images detected and

transmitted by a television camera.

Page 85: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 85 Printed 12/2/2007

MSMQ – Microsoft Message Queue

ND Filter - A filter that attenuates light evenly over the visible light spectrum. It reduces the light

entering a lens, thus forcing the iris to open to its maximum.

Patch Panel - A panel where circuits are terminated and facilities provided for interconnecting

between circuits by means of jacks and plugs.

PC – Windows based Personal Computer

Pixel - Short for Picture Element A pixel is the smallest area of a television picture capable of being

delineated by an electrical signal passed through the system of part thereof. The number of picture

elements (pixels) in a complete picture, and their geometric characteristics of vertical height and

horzontal width, provide information on the total amount of detail which the raster can display and on

the sharpness of the detail, respectively.

PWC - pulse width control

RFID – Radio Frequency Identification

Shutter - Ability to control the integration (of light) time to the sensor to less than 1/60 second; e.g:

stop motion of moving traffic.

Signal-to-Noise Ratio - The ratio between useful television signal and disturbing noise or snow

Snow - Heavy random noise.

Spike - A transient of short duration, comprising part of a pulse, during which the amplitude

considerably exceeds the average amplitude of the pulse.

TCP – Transmission Control Protocol

TBL – Terminal Block

Test Pattern - A chart especially prepared for checking overall performance of a television system. It

contains various combinations of lines and geometric shapes. The camera is focused on the chart, and

the pattern is viewed at the monitor for fidelity.

VB – Visual Basic

VDC – Voltage Direct Current

Vertical Resolution - The number of horizontal lines that can be seen in the reproduced image of a

television pattern

VES – Vehicle Enforcement System

Zoom - To enlarge or reduce, on a continuously variable basis, the size of a televised image primarily

by varying lens focal length.

Zoom Lens - An optical system of continuously variable focal length, the focal plane remaining in a

fixed position.

Page 86: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 86 Printed 12/2/2007

1122 SSuuppppoorrttiinngg ddooccuummeennttaattiioonn

12.1 Technology References

12.1.1 List of countries where the equipment is being used

� Spain

� Switzerland

� Italy

� Brazil

� United Kingdom

� Norway

� France

� Australia

� Canada

� Taiwan

� Hong Kong

� Tunisia

� South-Africa

12.1.2 List of users in Southern Africa

� Botswana Police Services

� Henties Bay Municipality

� Namibian Police

� Walvis Bay Municipality

� Swakopmund Municipality

� Ladysmith Municipality

� Metrorail Braamfontein

� Bloemfontein Municipality

� Kroonstad

� Pudjitjaba

� Sasolburg Prov

� Sasolburg T.L.C

� Zastron

� Germiston

� Brakpan

� Boksburg

� Port Shpestone

� Kwadukuza

� Kwasani

� Richards Bay/Empangeni

� Bethlehem Provincial

� Welkom Municipality

� Welkom Provincial

� Centurion

� Danhauser T.L.C

� Dundee

� Goodwood

� Prov Graaff-Reinett

� Pinetown

� Durban Metro

� Harrismith Provincial

� Krugersdorp T.L.C

� Kuruman Provincial

� Stutterheim Mun

Page 87: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 87 Printed 12/2/2007

� Ladybrand Provincial

� Kroonstad Provincial

� Margate

� Mandini T.L.C

� Metrorail

� Mooi river

� Modimolle

� Nkonkobe

� Newcastle Protection

� Kwazulu Natal Traffic Training

College

� Orapa and Lethlakane Mines

� Phalaborwa

� Paulpietersburg

� Utrecht

� Vryburg

� Provincial Authority Bloemfontein

� Zeerust

� Quakeni

� Sasol Secunda

� National Road Safety Council

Namibia

� Mangaung Local Municipality

� Orapa Mines � Botswana

� Kgatlopele Municipality

� Albert Lithuli

� Metrorail Durban

� Motor Vehicle Accident Fund Namibia

12.1.3 List of current users in South Africa

� Bela Bela Municipality

� Mosselbay Traffic

� Potchefstroom Municipality

� Emfuleni Traffic

� Govan Mbeki

� Ekurhuleni Metropolitan Local

Municipality

� Kwadukuza

� Rustenburg Traffic

� Welkom Municipality

� Piketburg

� Beaufort West Municipality

� Caledon

� Kungwini

� Mangaung Local Municipality

� Jan Kemp Dorp

� Helderberg Traffic

� South Peninsula

� Blaauwberg

� Oostenberg

� Cape Town City Council

� Tygerberg

� Stellenbosch

� DOT Kwazulu Natal

� George Municiplaity

� Hopetown

� Kimberley

� Springbok

� Tshwane

� Madibeng

� Emnambithi

� Ezingolweni

� Ceres

� Mogale

Page 88: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 88 Printed 12/2/2007

� Hibiscus Coast

12.2 REFERENCE SITES: Record of Similar Projects Completed

The development of LPR started in 1995 and first systems were installed internationally in

1996/7. The first systems were deployed in RSA in 1999 by HTSOL

The years experience in ANPR within SA by ASD is over 15 years.

Figure 2 Trucks speeding on the M4 towards the airport

Figure 3 Visitors to Durban who obey the rules of the road

Page 89: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 89 Printed 12/2/2007

Figure 4 M4 Durban Demo of ASD

Page 90: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 90 Printed 12/2/2007

REFERENCE SITES:

Record of Projects Completed in SA by I-Cube

Client Nature of works value of work for which the SUB-CONTRACTOR was directly responsible (excluding vat)

year completed

ACSA 3 Lane LPR system for Baggage access control and logging at Oliver Tambo

R180 000.00 2007

SPS Vehicle Monitoring R375 000.00 2006Fourier Systems:

N4 Toll Rd

N3 Toll Rd

LPR Software R67 000.00

R67 000.00

R67 000.00

2007

2006

2005

John Rupert Access Control R175 000.00 2002SPOORNET HEAD OFFICE

2 Lane LPR system for access control and logging at SPOORNET head office

R220 000.00 2004

AVIS

6 site (multiple lanes per site) LPR for logging vehicles at JHB, DBN and Cape Town Airport’s and AVIS service areas.

R1,2 million 2002

Digital Home Integration Services

Access Control & Logging R75 000.00 2007

HIGHVELD Steel and Vanadium

6 lane Weigh Bridge Monitoring R180 000.00 2006

FANG Access Control R105 000.00 2005SEE

Systems

Vehicle Logging R125 000.00 2005

Page 91: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 91 Printed 12/2/2007

This system is installed in the gates of a South African University. It is used for gate control

and theft prevention. The license plate of the cars entering is

recorded along with the driver face. This data is compared to

the information at the exit and the guard can see that the

person at the entrance to the University was different than

the person driving the car out. The system also provides

statistics and data logging, as well as an on-line surveillance

of the gates.

After the installation of this system the number of thefts decreased sharply. A sample actual

record of an attempted theft is shown in the following animation.

The SeeCarTrap system is based on SeeLane recognition system and has special

modifications for a roadside mobile system. This system is used for catching cars in cases of

warrant of arrest, unpaid fines or taxes and stolen cars. It deals with a database of up to 0.5

million entries. The stand-alone real-time system automatically recognizes the car plate

number then searches a database. It sounds an alarm when a car has been detected in the

'black' list, and displays the vehicle and arrest information contained in the record. This

revolutionary system simplifies the roadblock operation and thus helps to increase selective

enforcement.

The system is also connected to a large outdoor display that shows the car number, the car

type, the reason for arrest and the name of the driver. This display can be seen by the police

officer down the road. All the officer needs to do is wait for the siren, then stop the car and

verify the arrest details, as seen in the film clip below.

The system is portable and installed in minutes by the police officer. It is installed in a battery powered lunch-box PC. It operates day and night on a free-flowing traffic at average speeds of 10-80 KMH. The system contains all the elements of a recognition system: hardware (frame grabber, optional IO card, and a special camera/illumination unit optimized for this application) and software (SeeRoad application and a client application). The application includes a special software trigger option which reduces the need to place a detector on the road, making the system portable and easy to install.

Page 92: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 92 Printed 12/2/2007

This system is installed in a traffic police violations processing center in Pretoria, South Africa (in conjunction with Labat Traffic Solutions using the Startrap Intelligence violation data processing system). It is used to automate the process of handling the fine processing (a fast turnaround from film to fine). The application reads both the license plate off the frame - together with violation information. A sample violation is shown in the following photo. The frame, read from the film, includes the view of the car, the vehicle plate, and the violation information - which includes the date, location and speed, and is attached in the upper-right corner. The system performs both access-control, parking and traffic-flow management functions. It provides solutions for a congested University entrance and enforces an overall traffic policy in its gates and parking lots.

The entrance display provides traffic guidance by displaying one of the 3 options (left 'Guests' for guest parking, middle 'GO' for entrance, and right for 'Inquiries'). The display is controlled by the management software which has multiple authorization lists. Faculty members can use an automated telephone Interactive Voice Response system which accepts requests for temporary passes. The security guards and officers can also change the permit lists on-line. The system keeps records of the traffic events. It also controls the access-control to internal parking lots.

The system consists of a cluster of LPR systems, a management software, and an outdoor traffic light display unit. Each of the camera/illumination units (SeeCarHead ) is installed in a anti-vandalism metal cover. The LPR units are based on (SeeLane server application) which interfaces the hardware and performs the recognition process. It sends recognition messages to the client applications. Each of the client applications perform traffic management decisions and connect via network to a management software on a remote server.

This system is installed in the entrance to a new UK office compound and provides automatic access to authorized cars. The records of the entry and exit are recorded. The

Page 93: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 93 Printed 12/2/2007

system automatically opens the gate for vehicles that match the authorized list. A large outdoor display greets the vehicles (as seen behind the gate).

This system part of a toll road system in South Africa. The license plate is read and used

as a key to fetch the vehicle information from the toll database. The information is compared to a swipe card which is used by the driver. This integrated system reduces fraud and increases the toll income.

The toll system is based on a multi-lane (SeeLane) system which reads and verifies the

plate data and sends a message to the toll control application. This application uses the recognition information to obtain the vehicle data, which is matched to the swipe card information. The results are displayed to the operator and also sent to the control room for further processing of the frauds, and long-term data logging.

This

Vehicle Control & theft prevention (S.Africa)

Roadblock trapping system

(S.Africa)

Violations Film Processing

(S.Africa)

University Traffic management

(Israel)

Office Access system (UK)

Toll station (S.Africa)

Border Control System (Hungary)

Parking System (Singapore)

Airport Parking (USA)

Bus station control (Colombia)

Average Speed Violation

(Portugal)

C3 Access Control (Israel)

Page 94: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 94 Printed 12/2/2007

Double Security access Control (Israel)

University Security Control (Mexico)

Handheld license plate data entry (USA)

Parking Management (Korea)

Gated Community (Israel)

University Access (Korea)

Office Security (Israel)

Site Security (Spain)

Gated Community (USA)

Toll station (Colombia)

Shopping Center (Australia)

Casino Valet Parking (USA)

Port Gates (16 lanes) (Ghana)

Gated Community (Israel)

Shopping Center, 36 lanes (Chile)

Airport security, 8 lanes (Israel)

Shopping Center, 16 lanes (Hungary)

Toll Road, 54 lanes (USA)

Page 95: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 95 Printed 12/2/2007

12.3 KEY COMPANY PERSONAL PROFILE

With over 78 sites in South Africa, the I-Cube LPR system is the leading software solution. I-Cube was

the first company in Africa to implement real time (sub second), high speed (over 175 KM /H), multi-lane

LPR solution in a free flow environment, incorporating average speed determination (on an average 35

000 vehicles a day).

Barry Fryer Dudley, the CEO of ASD is a committee member of the KZN Computer Society of South Africa.

Presentations: Neural networks to enhance safety in local authorities: automatic identification,

tracking and alarm at TECHNOLOGY IN LOCAL GOVERNMENT RAISING

LEVELS OF SERVICES DELIVERY THROUGH TECHNOLOGY 20-21 JUNE

2006 � MIDRAND

Education: MBA at the University of Natal, speciality: IT Information Management & E-Commerce.

The MBA dissertation, Casino Exclusion Technique Exploration - Framework Development,

examines the possible solutions to excluding problem gamblers from SA casinos.

University of Natal, Pietermaritzburg, Republic of South Africa � M.S. thesis (Cum Laude) in

Microbiology (April 1999). Thesis Title: “Application of Image Analysis in Microecophysiology

Research: Methodology Development.”

Publications: The Industry Journal for Security and Business Professionals Volume

11 No. 2 Pg 34/35 DIVERSITY OF LICENSE PLATE RECOGNITION

APRIL SECURITY FOCUS (Vol 22, No. 4) Facts, features and benefits of facial recognition

A. Refereed Journals

Invited and Published

B.T. Dudley, C.A. du Plessis and E. Senior. “Managing leachate in landfills through manipulation of soil cappings: Image analysis studies”, Binary

- Computers in Microbiology, Vol 6, 120-127. (1994)

Submitted and Published

Page 96: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 96 Printed 12/2/2007

B.T. Dudley, A.R. Howgrave-Graham, A.G. Bruton and F.M. Wallis. “The application of digital image analysis to quantifying and measuring UASB digester granules”, Biotechnology & Bioengineering. 42, 279 - 283. (1993)

B. T. Dudley, A. R. Howgrave-Graham, H. Isherwood and E. Senior. “Laboratory-scale UASB

digesters (with/without conditioning tank and recycle): efficacy to treat increased hydraulic loads”, Water SA.

19, 313 - 318. (1993)

B. Papers Presented at Professional Meetings

Invited and Published

B.T. Dudley, C.A. du Plessis and E. Senior. �Managing leachate in landfills

through manipulation of soil cappings: Image analysis studies. Image

Analysis of Microbes in Their Habitats�. Society for General Microbiology Meeting

on Image Analysis at Warwick, United Kingdom, 5 - 7 January 1994.

Submitted and Published B. T. Dudley, E. Senior, A. G. Bruton and F. M. Wallis. �Image analysis methodology

development for use in microecophysiology studies of microbial associations in landfill cover

soil�. Seventh International Symposium on Anaerobic Digestion, Cape Town, 23 - 27 January.

(1994)

Page 97: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 97 Printed 12/2/2007

CURRICULUM VITAE : Dr. M. F. MITCHELL,

1. Personal Details

Name Dr Malcolm F, MITCHELL Nationality South African Profession Civil Engineering: Registered Professional Engineer. Specialisation Transportation Engineering and Administration. Date of Birth 26.11.1935 Company Consultant in single person Private Practice, following

retirement from Department of Transport.

2. Key Professional Experience

Dr Malcolm Mitchell had a distinguished career in civil engineering and public administration

spanning over 40 years before he retired as Deputy Director-General at the South African

National Department of Transport in 1998. His Doctoral dissertation in Transportation

Engineering related to a strategy for developing a road network in Southern Africa and

extensively dealt with institutional and financing aspects of road administration, including

road charging/pricing and fund allocation procedures. His thesis for the Master�s Degree in

Public Administration related to the development and management of a toll road system for

South Africa.

He has had over 70 papers published, received the SAICE Transport Division Award for

outstanding services to the Transportation Engineering Profession (1994) and served on

both the S A Roads Board and the Board of Control of the S A Rail Commuter Corporation.

He was the first Chairman of the South African Committee of Land Transport Authorities, and

the �Roads Function� Committee, a Treasury body responsible for managing the allocation of

all roads funds in South Africa, as well as many other government and professional

committees. He was also an external examiner at several universities, the President of the

Chartered Institute of Transport in Southern Africa and a Senior Fellow and Council Member

of the South African Institution of Civil Engineers.

Page 98: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 98 Printed 12/2/2007

Key areas of experience include:

• Road Management and Toll Roads • Quality Control of Road Construction • Transport Policy Formulation and Implementation • Civil Engineering Contract Documentation and Dispute Adjudication • Road Design and Supervision of Road Construction and Contracts • Geotechnical and Pavement Engineering • Road Financing, Project Programming and Strategic Planning for Transport • Urban Transport Planning and Management

3. Education and Qualifications

• B.Sc.Eng. (Civil): University of Natal, 1956; Won Certificates of Merit for various individual courses; Awarded status of �Scholar of University of Natal� Won final year civil engineering design thesis prize

• B.Admin (Hons): University of South Africa, 1986.

• M.Admin (Public Admin): University of South Africa, 1989; Distinction level passes in Advanced Public Financial Management and Advanced Public Policy Making. Dissertation : Administration of Toll Roads in South Africa with Special Reference to Policy Making, Organisation, Financing and Control

• D.Eng (Transportation): University of Pretoria, 1991; Dissertation : Contributions to Establishing an Appropriate Road System for Southern Africa

4. Some Professional Affiliations, during career.

• Previously: - • � President, Chartered Institute of Transport in South Africa • � Member (and often acting Chairman) South African Roads Board • � South African representative on World Road Association (PIARC) Permanent

International Commission • � Member of the Executive Committee of World Road Association • � Chairman South African Civil Engineering Advisory Council • � Member of Council, and Executive Committee Member, South African Institution of

Civil Engineers • � Member of Civil Engineering Joint Consultative Committee (JCC) comprising SAICE,

SAFCEC and SAACE representatives • � South African Representative on SATCC Committees • � Chairman South African National Committee on Tunnelling • � Member of Board of Directors of South African Rail Commuter Corporation • � Chairman : Committee of Land Transport Officials and Committee of State Road

Authorities

Page 99: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 99 Printed 12/2/2007

• � Deputy Chairman, National Road Safety Council • � Chairman : Annual Transportation Convention Organising Committee • � Chairman : Transportation Division, South African Institution of Civil Engineers • � Member : CSIR Transportation Division, Research Steering Committees • � Member : Various Metropolitan Transport Advisory Boards • � Currently Member : Engineering Council for South Africa, Professional Advisory

Committee for Civil Engineering •

5. Experience Record

• • 1998 to date Following retirement from Department of Transport, established a one

person professional consulting practice, specialising in Transportation matters. Was Specialist Consultant to Transportek Division of the Council for Scientific and Industrial Research until the end of 2005, Chairman of the Dispute Adjudication Board for the Maguga Dam project in Swaziland, and has carried out work for the Development Bank of Southern Africa and some consulting engineering firms. He is currently Executive Director of the South African Road Federation and a member of the Civil Engineering committee of the Engineering Council of South Africa. He is currently registered with the Johannesburg University as a D.Phil. student, with a dissertation examining the development and impact of transport policy in South Africa during the 20th century.

• • 1989 to 1998 Department of Transport - Deputy Director-General • Overall responsibility for central government activities in respect of all aspects of Land

Transport in South Africa, including roads, urban transport, road traffic management and safety, transport policy formulation and strategic planning, research and development and freight and public passenger transport.

• • 1984 - 1989 Department of Transport (Chief Director of National Roads) • Responsible for overall management of all National Roads in South Africa • • 1980 � 1984 Department of Transport (Chief Engineer/Director) • Overall responsibility at central government level for National Road financial

management and project programming and strategic planning, as well as urban transport planning activities for all national roads and metropolitan transport areas in South Africa.

• • 1972 � 1980 Department of Transport (Assistant Chief Engineer) • Head of Materials and Pavement Design Section and, responsible at central government

level for supervision of road design, construction, quality control, geotechnical design, and pavement maintenance activities on all National Roads (including research).

• • 1970-1972 Department of Transport (Assistant Chief Engineer) • National road design and supervision of construction and maintenance contracts at

regional level.

Page 100: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 100 Printed 12/2/2007

• Route location for new national road (N3) over the Drakensberg mountain range (100-km)

• • 1966 � 1970 Consulting Engineer (Senior Engineer to Associate Partner) • National and provincial road design (Geometric and pavement), • � Supervision of road contracts • � Geotechnical engineering design and management of geotechnical and materials

laboratory testing • • 1962 � 1966 Natal Roads Department (Engineer Grade I to Principal Engineer) • Quality control of road construction, geometric, pavement and geotechnical design of

provincial and national roads, bridges and interchanges (200 km road and 5 interchanges) and management of materials testing laboratory.

• • 1956 � 1962 South African Railways and Harbours • On site responsibility for construction of railway tunnels (five twin tunnels, including the

current second longest railway tunnel in South Africa), approximately 50 km of new railway lines involving heavy earthworks various new stations and bridges and major mechanical workshops, as well as maintenance of 250 km of open line.

6. Selected Career Achievements ____________________________________________________________________

• Initiated, promoted and directed introduction of toll roads in South Africa as a road pricing financing mechanism.

• Initiated and administered the first two comprehensive National Transport Policy Studies between 1984 and 1996.

• Initiated, promoted and participated in research and development of procedures for road financing, fund allocation, project prioritisation, road needs studies and cost/benefit analysis for roads, in South Africa.

• Initiated, promoted and directed the extensive use of concrete pavements for heavy-duty roads in South Africa as well as drawing up of a design manual for concrete roads.

• Promoted the use of, and procedures for, statistical quality control for road construction. • Introduced and promoted the first rational; planning approach to the provision of passenger

transport services in Regional Service Council and Metropolitan areas in South Africa. • Promoted the early development (circa 1973 � 1980) of road pavement management systems

in South Africa. • Initiated, promoted and directed developments in respect of revised approaches for road

management in South Africa, i.e. the Road Agency concept. • Involved in initial formulation and development of a project to draw up a Strategic Plan for

Transport in South Africa. • Promoted and directed initiation of Centres of Development in Transportation at selected

South African Universities as well as Technology Transfer Centres for Transportation. • Initiated and promoted first �Build, Operate and Transfer (BOT) National Road Project in South

Africa (N1) in 1993. • Recipient of CSIR award for �Contributions to Transportation Research�. • Recipient of SAICE award for �Outstanding Contribution to the Transportation Engineering

Profession.�

Page 101: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 101 Printed 12/2/2007

7. Publications

Has had over 70 refereed papers published, locally and overseas, primarily in the fields of Transport Policy and Institutional Arrangements, Road Management, Road Design and Road Financing, including Toll Roads and Road Concessions. Has won �Best Paper� awards at Conferences and in the SAICE Journal, as well as presenting papers, by invitation, at the World Bank.

12.4 LPR Spec Sheet

12.4.1 Overview

The Traffic Logging System (TLS) Solution will be provided to WEIGH BRIDGE SITES

to accommodate the need for consistent, real-time traffic data. The traffic data will come

from the License Plate Recognition (LPR) of all vehicles passing through the covered

transport lanes. The system, referred to as the TLS, will provide a take-and-discard

methodology for the vehicles� video and license plate data. Vehicles using the lanes will be

captured allowing proactive, real time reaction to traffic movement and long term studies of

traffic data. The road side portion of the solution proposed uses the See Lane DLL software.

The TLS will allow the Authority to - improve safety on roads and eliminate �black spots�; - limit road closures and traffic delays associated with road works and

unexpected events; - manage the flow of traffic to minimise delays; - provide effective signage; - increase traffic capacity; - provide better road user services such as information signs and systems.

The See Lane DLL is a state-of-the-art vision based recognition system for medium speed

roadside installations. The system can integrate multiple lanes and multiple cameras per lane

into a sophisticated vision-based License Plate Recognition (LPR) system that identifies and

tracks number plates on vehicles travelling at medium speeds. The system is used world wide

for various applications, including traffic data analysis, toll roads, rush hour monitoring and

average speed and car flow studies. The application is supported by a full set of optical and

hardware sub-systems as well as software applications and utilities.

Page 102: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 102 Printed 12/2/2007

The system will work to detect and capture the license plate information for every vehicle passing

through the covered lanes. It will be the responsibility of the motion detection software to determine

vehicle presence, via the advanced digital recording software. The TLS cameras will then capture a

set of images, the See Lane DLL will process these and output the best image and the resulting license

plate, lane, time and associated data to the network. The WEIGH BRIDGE SITES servers will

capture the data for further processing as required.

- Flow estimation – the number of vehicles and types of vehicles can be used for road conjunction analysis that can assist traffic planning.

- On-line traffic report – the roadside information can be reported on web sites in order to supply live reports from the freeway.

- Monitoring – the recognition information may be used for various security applications. - Average Speed – using outputs of several sites, a back end program can be used to

calculate the average speed of the vehicles, based on the time of journey. - Enforcement - The license plate data can be used for a wide range of enforcement

techniques, including outstanding traffic fines, warrants, etc. The average speed can be used to issue violation tickets.

12.4.2 System description:

The proposed system consists of a number of lanes, within the LANDFILL area, with multiple

cameras monitoring the specific areas. Each camera is connected wirelessly to an IP switch

which allows any of the connected computers to view and process the data obtained from the

cameras. If any of the cameras goes down, an alarm is generated immediately. If any of the

computers fail, the other computers automatically take over the processing of the cameras

attached to that computer.

All vehicles passing the camera will be recorded in terms of the time, lane, direction, license

plate (if present), automatic detection of unauthorized vehicles, an alarm if the vehicle is

wanted (black list) and other database operations.

System Architecture SeeLane is a turn-key system comprises of the following elements:

� PC running Windows XP Pro

� SeeCar DLL - which is used to analyze the images and extract license plate string

� 1-4 Recognition Camera unit(s) to capture the images. These cameras are high resolution state

of the art cameras that are connected to the PC via a gigabit network.

� Gigabit Network – 8-port switch and network card (or motherboard network).

Page 103: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 103 Printed 12/2/2007

This is an internal network used for communicating with the cameras.

Figure 5 Elements making up See Lane � Illumination units to illuminate the plates. The illumination units may be external lights, or

solid state strobe units that are supplied.

� I/O card – Not required for this system but could be provided. The input/output board with

multiple I/O discrete lines supports the sensors and illumination control. It is connected via a

cable to a terminal interface board with easy connections and indicator lights.

� BW dedicated rear plate camera – used as an option to supply images used for specific

capture of the rear plate only. This is used for additional recognition where no front plate is

present.

� Sensors to indicate the presence of the car (a sensor for each lane). These are not required and

are not included.

� See Lane

The See Lane Windows application interfaces the hardware elements (camera/illumination unit(s),

IO card and sensor). It controls the illumination (if present), reads the video inputs and passes the

images to the DLL in order to obtain the recognition results. The application displays the image

and recognition results. It then exports the results using messages and image files. Its man-

Page 104: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 104 Printed 12/2/2007

machine interface supports on-line setting control, which can easily adapt the application to

various types of configurations. The image below illustrates how the items link together on

site and in the control room. All the items indicated in the image below reside on site, except

for the remote database which will be on the central server in the control room.

12.4.3 Block Diagram

A breakdown of the See Lane system is shown in the following illustration, which shows a typical

configuration of a See Lane LPR system (single lane). Although a monitor is shown, it is optional,

and a remote access thru the network is usually the standard

configuration.

Figure 6 See Lane Connectivity

The See Lane application runs as a background Windows application in the PC (in the centre),

which has a gigabit network connection (from a network card or the motherboard), via a Gigabit

switch to the IP recognition camera(s) (with integrated illumination). The number of these high

resolution cameras depends on the width and number of lanes, but is limited to 4 or less cameras

based on traffic volume.

Page 105: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 105 Printed 12/2/2007

The PC has an I/O card which is connected via a terminal block to the sensors and the

illumination control signals. An option of a colour / BW overview picture and video is available

with a colour / BW overview camera.

12.5 SITE LOCATION

Figure 7 Site 1 Eastbound Lane Front Camera View

Figure 8 Site 7 Front Camera View

Figure 9 Site 8 Front Camera View

Page 106: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 106 Printed 12/2/2007

Figure 10 Site 8 A Front Camera View

Figure 11 Site 8 C Front Camera View

Page 107: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 107 Printed 12/2/2007

Figure 12 Site 8 D Front Camera View

12.5.1 Site Layout: Installation

The design of the system allows for a motion trigger. For each trigger a series of images will be

captured. The images will then be automatically reviewed by the application running on the Lane

Controller, and the best result will be selected among all

identifications. The application will also select the best

image to be reported that will contain the plate image.

Once a result is determined, the data will be sent by a

message to the server. Below is a diagram depicting the

physical layout of the equipment involved in the single-

lane See Lane TLS system:

Figure 13 Rear camera and Site PC layout

Page 108: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 108 Printed 12/2/2007

Figure 14 Rear camera wiring and

layout

The effective field of view of each unit is

about 12 meters in order to achieve the

proper plate size. The SCH (See Car

Head camera / illumination unit) is

mounted at the side of the lane as close

as possible to the edge (parameter C) and

at height of about 5.1 meters. The range

(parameter B in the figure) is 15.5 meters

from the “loss of detection” point (where

the rear of the vehicle leaves the detector) using a 60 mm lens.

Figure 15 Layout for a rear camera The following illustration shows a typical layout of the See Lane solution (Front Camera only):

Page 109: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 109 Printed 12/2/2007

The SCH unit should be installed at about 15.5M from the loop detection line for standard lens.

See the illustration above, parameter B. This translates to about 19 meters or more from the front

of the car (for standard lens) since a typical vehicle is about 4 meters.

The side distance (parameter C) in this installation is identical – 0.0 to 0.5 meters. Side of the Traffic lane: Install the SCH as close as possible to the traffic lane, within 0.0 to

0.5 meters. See the illustration above, parameter C.

12.5.2 ON WEIGH BRIDGE BEAMS

The trucks will be confirmed fully on the weigh bridge by using beams around the weigh

bridge. If these beams are obstructed, then the weight from the weight bridge will not be

obtained. Only once the beams are unobstructed will the weight be obtained from the weigh

bridge.

12.5.3 TRAFFIC LOGGING

The following illustration shows one of the sites (�Site A� out of N sites) monitored by a

License Plate Recognition (LPR) unit. Each unit is connected via a network to a control room.

Each LPR unit transmits its recognition results to the control room computer where the data

is collected and analyzed. The central computer application then updates and displays the

traffic status that includes average journey times between the LPR sites and also traffic flow

statistics. This information is presented in real-time and saved to a traffic database for off-

line processing.

Page 110: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 110 Printed 12/2/2007

Figure 16 SeeCarFlow illustration (Site A of N sites, with control room)

12.5.4 System Architecture: Overview

The system is based on Hi-Tech Solutions� Vehicle License Plate Recognition (LPR) stand-

alone systems. Multiple LPR units are installed at several permanent sites (2) located in

selected urban road routes (N3 and Smith Street) in the city. Each LPR system performs

real-time recognition on passing cars in a single traffic lane. The LPR unit is based on a

Windows application that controls its integrated camera/illumination unit and an LPR

recognition engine.

Page 111: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 111 Printed 12/2/2007

Figure 17 Image Capture and OCR

Each LPR unit reports the vehicle recognition events via TCP/IP network messages to a

central computer in the traffic control room. The central computer application reads the

recognition results from all sites, calculates the travel data (in real-time), and displays it to the

operator.

This section describes each of the major elements.

LPR units

Each LPR unit is a turnkey system, which is comprised of the following elements:

• a PC Pentium running Windows XP

• LPR unit Windows application software package (described below)

• Recognition DLL – the recognition engine which is used to analyze the images and extract license plate string

• Camera/ Illumination unit to capture the images (detailed below)

• a I/O card - multiple I/O discrete lines - which supports the sensors, illumination control and optional gate-open signal (not required in this design).

• sensor to indicate a presence of the car (motion in this design)

• a list of known vehicles (such as buses or taxis) which will be analyzed separately in the traffic analysis

These components are shown in the following illustration.

Page 112: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 112 Printed 12/2/2007

Camera/Illumination PC Frame Grabber Recognition DLL

Sensor Illum. control LPR Windows application ID strings Identified Vehicle

I/O CARD

Figure 18 LPR unit Architecture

When a vehicle triggers the sensor, the LPR application activates the illumination (if present - which is

controlled by the IO card) and captures a series of images (one or more image fields) which are captured by the

frame grabber or IP stream. It then proceeds with the identification of the car.

The LPR system is designed to work simultaneously with one to four traffic lanes. However

in the SeeCarFlow system the traffic load will limit the number of lanes. According to the

traffic load for each location it will be determined if a single or double lane will be assigned

for each PC.

The application also reports on special vehicles that are listed in the �white-list� (listed in a

file, cars.txt). This is used in SeeCarFlow application to differ between standard vehicles and

special vehicles when displaying the results.

LPR unit Windows Main Display

The LPR unit application main window is designed to display as much information as

possible in a friendly user interface. The window is divided into several display panes, where

each pane is responsible for a single system task (video images, system status, identified

code, ...).

The different panes include:

- Image Display - shows video from the camera (from one of the lanes)

- History Log - display a list of all identified vehicles

Page 113: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 113 Printed 12/2/2007

- Identification Window - a graphical representation of the identified vehicle

- Status Window - system messages and sensor status display

An example of such display is shown in the following figure. The vehicle (that is shown) was

captured with a front camera/illumination unit and displayed on the image display; its license

plate number is shown in the bottom list and graphical display.

Figure 19 Example of LPR application main view

The application can operate automatically without operation control and can be minimized

to a background application.

Figure 20 Personalised Plates are recognised using LPR

12.5.5 LPR Client

Page 114: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 114 Printed 12/2/2007

The LPR unit application is designed to share the vehicle identification results with other processes. This can be

done either by external communication (RS232 or TCP/IP) or by application-to-application messages. The latter

method is implemented by DDE messages that are sent after each identification cycle. Each vehicle generates

one message containing the recognition result.

When a vehicle triggers the motion sensor, the LPR unit application captures a series of images (one or more),

then proceeds with the identification of the car. After completing the identification cycle, a DDE message

containing the ID is sent to the PC Windows system (along with more information: date and time, lane number,

‘white-list’ vehicle and image pointer).

This message is intercepted by another application - the LPR client process. This process receives the

messages, groups a series of recognition results together (for reducing the network bandwidth requirements)

and sends the recognition block across the network via TCP/IP. This data is received at the control room by the

SeeCarFlow central application and used for traffic processing.

Camera/Illumination PC Frame Grabber Recognition DLL

Sensor LPR unit application Identified Vehicle

I/O CARD DDE Message with ID

Client process

TCP/IP

Other Sites SeeCarFlowCentral

Figure 21 Data flow of the Recognition results

Network

Page 115: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 115 Printed 12/2/2007

Figure 22 Networked LPR Sites

The sites will be connected together by a network. The recognition results (grouped in a

block consisting of several recognition results) are transmitted over the network The TCP/IP

protocol is used for this transmission. Each of the Client applications will be a server in this

network, and connect to the client (the central application).

Each of the Client/Server applications has a configurable list of TCP/IP addresses that

specify the network connections. Adding a new site is simple so the traffic control system is

easy to expand.

The information sent across the network includes also the system status in each site for on-

line diagnostic status display.

Additional activities are possible through this network by maintenance technicians:

• change of configuration parameters settings • software update • update of list of known (allowed) vehicles • Other applications as required.

System operation:

Page 116: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 116 Printed 12/2/2007

Vehicles identified as being important to log on a frequent basis would be enrolled into a

database. This database would be stored on the central servers and mirrored on the local

computers. When a vehicle that is enrolled into the database passes the camera, notification

of that vehicle would be generated, along with any other required information, such as driver

name or taxi association or type of vehicle etc.

The database could be generated from:

- Existing Databases of busses and taxis, such as eNATIS, Durban Metro Database, etc.

- Driver enrolment via SM, E-Mail, phone, web site etc. - Uses of the system, that is when a vehicle is detected using the lane it could be then

the enrolled into the allowed database. - Any other existing or future data source as required.

The cameras will capture all vehicles entering and exiting the lanes, storing the vehicle

image, license plate if present, date, time, lane and image. The software will allow vehicles to

be enrolled into an allowed list, linking this information to the license plate. If a vehicle is

detected which is not allowed to use the lane, this will be recorded. If the vehicle is in the

black list, an alarm will be generated. The average speed of the vehicle will be automatically

determined and an alarm generated if it is over the set speed

12.5.6 Data Output

Data will initially be acquired and kept for every vehicle, and WEIGH BRIDGE SITES will

determine which images to keep and which to discard. The data for each vehicle will include:

1) Image - A stand alone, human readable monochrome JPEG image with a resolution of

approximately 1600 pixels by 1024 pixels (for See Lane). This image will display the detected plate

on the best recognized image within the set of images that are captured for that event.

Page 117: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 117 Printed 12/2/2007

Figure 23 Front end of the LPR solution

2) Optical Character Recognition Data:

� Lane (Site) unique ID integer number

� License Plate string

� Date and Time of Image Capture

� File Name (a link to the name of the resulting .jpg file stored in the WEIGH BRIDGE SITES server)

� Confidence of the recognition result

The data will be transmitted to the TCS in two forms:

a) Windows DDE (Dynamic Data Exchange) Message - sent to the WEIGH BRIDGE SITES server

over the TCPIP network. The DDE will contain the VES Optical Character Recognition Data as

described above.

b) Image file - which will be stored on the WEIGH BRIDGE SITES server, then transmitted to the

WEIGH BRIDGE SITES over the NCS via a dedicated transfer service running on the Trip Processing

Server.

Page 118: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 118 Printed 12/2/2007

12.5.7 OCR Engine

All of the systems (2 See Lane sites of 4 front cameras) employ the same See Car OCR engine, which

will run on the local processing units. The OCR engine processes images, locates the relevant license

plate ID in the image, and produces an alphanumeric result for each image processed. The OCR

engine is based on neural network technology and can be trained to recognize different fonts,

characters and syntax. The systems supplied for the WEIGH BRIDGE SITES Project are specially

trained to recognize license plates in Southern Africa, and focus on the local South African plates.

12.5.8 SEE DATA

SeeData is a software service application that connects a cluster of recognition systems (such as

SeeLane or See Lane) together by a network. The networked units can thus report the recognition

results to a Central server.

12.5.9 Client-Server Architecture

SeeData is a set of applications, which comprise of the following elements (see also the

following illustration):

� Remote units (one or more) - also referred as client nodes, or front end units. Each unit has a

LPR (License Plate Recognition) recognition system which generates recognition messages which

report the results.

� Central server (single) The SeeData application is connected to one or more remote units, and

collects their reports to a central recognition system.

It is also possible to send commands from the Server

to the remote (front-end) recognition units, although

this is not described in the diagram.

Figure 24 See Data

12.5.10 Events data

The See Data application, which runs on the Central server, communicates with front-end

Page 119: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 119 Printed 12/2/2007

OCR hosts by a protocol designed especially for HTS application. On this protocol the HTS

recognition systems report the results to the central server.

The See Data protocol is based on TCP/IP. It allows to See Data to operate in cross OS

environment. For example, See Data could receive recognition results from Windows (See Lane

for example) and embedded Linux (C4, Compact Car Controller).

Images and video clips

If “Transfer Images” option is configured in See Data settings the application will handle the

transfer of locally saved images and video clips from the front end hosts to the SeeData Central

Server station.

Figure 25 Rear LPR capture and recognition with alarm Recognition data

Vehicle topic is used for transmitting of recognition data (See Data output). Items of the topic are:

Page 120: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 120 Printed 12/2/2007

� CarCode – string contains recognized license plate

� Name – string contains driver first and last name as was found in database

� Time – event time in format: “Mon Jul 03 14:29:06 2006”

� LaneId – string contains lane index (zero based)

� Authorized – string “1” (vehicle is authorized) or “0” (not authorized)

� File – string contains saved vehicle image path

� Confidence – string contains recognition confidence (“0”-“100”)

� PlateType – string contains one based index of plate format

� Trigger – string contains exact trigger time stamp in format:”032809233”, which

means 3 h 28 m 09s 233 ms

12.5.11 LOG OF EVENTS

The images below illustrate the data obtained from two lanes, from 12:57 to 13:17

Figure 26 Log of the data and images from each site

Figure 27 Vehicle Logged

Page 121: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 121 Printed 12/2/2007

12.5.12 ALARM GENERATION

A list of vehicles which, when captured, will result in an alarm, can be added to the system.

Which vehicles are added to the list, who adds them and how they should be removed needs

to be determined.

The alarm list is stored on the central computer and replicated on each of the field

computers.

Figure 28 Alarm on vehicle detected

12.5.13 System stability

The See Lane systems are based on proven applications that are running in many installations

worldwide - in hundreds of lanes and many diversified applications. The newly developed systems

share most of the common modules in these systems (such as the recognition DLL), and are tested in

various types of tools and methods that are used by HTS development for years. Thus, their stability is

guaranteed by the experience in such systems, the development and test methodologies, and in the

proven components that build these systems,

Nevertheless, additional mechanisms are used to ensure the stability of the systems. These are part of

HTS utilities, which ensure that if the systems will fail, they will be reactivated and also report their

failure to external monitor systems. These utilities include:

Page 122: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 122 Printed 12/2/2007

� SeeService – a watchdog utility that periodically checks the aliveness of the application. In case the

application does not respond, the application will attempt to rerun the application. If this fails, the

utility resets the PC. In any such case the event is written to the Windows event log.

� SeeMonitor – this tool resides on a central server, and monitors the state of each system – by

checking the Windows event log. It will alert external systems in case of a fatal error. It can also show

soft errors (warnings) status, and display a set of graphs of past recognition results, which is a very

important diagnostic tool.

� SeeCleaner – This utility cleans the old images directories after a specified time has elapsed, and

also cleans local diagnostics files. Thus, the system will not grow endlessly in size, a common source

of problem in other Windows based systems (which will not happen here).

12.5.14 Redundancy

In See Lane systems there is a need to guarantee an absolute up time, i.e the systems always work,

even in case of malfunction or required service.

The system is designed to work in an automatic redundancy mode, where the 2nd server

automatically takes over the functions of the other down server.

The dual servers can be set to monitor each other through network messaging and revert to

degraded mode if there is a fault in one of the servers. To support this mode, both servers should

be connected to the same cameras. In the parameters each lane will be designated as “primary”

normal connection, or “secondary” redundancy mode.During the redundancy mode the system is

working in a degraded mode, and the performance may be lower than the normal mode in case of

certain traffic patterns.

Note that the See Lane system is limited to 4 concurrent cameras in the redundancy state.

So a recommended configuration is to have one server normally connected to 2 lanes, the

other server connected to a single lane, while in the backup mode one server will service

the 4 lanes.

Page 123: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 123 Printed 12/2/2007

Insert page 1 of document Insert.pdf and remove this page

Page 124: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 124 Printed 12/2/2007

Insert page 2 of document Insert.pdf and remove this page

Page 125: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 125 Printed 12/2/2007

Insert page 3 of document Insert.pdf and remove this page

Page 126: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 126 Printed 12/2/2007

Insert page 4 of document Insert.pdf and remove this page

Page 127: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 127 Printed 12/2/2007

12.6 Spec Sheet

Page 128: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 128 Printed 12/2/2007

Insert page 1 of document .pdf and remove this page

Page 129: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 129 Printed 12/2/2007

Insert page 2 of document .pdf and remove this page

Page 130: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 130 Printed 12/2/2007

12.7 SABS Approval

Page 131: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 131 Printed 12/2/2007

Insert page 1 of document SABS.pdf and remove this page

Page 132: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 132 Printed 12/2/2007

Insert page 2 of document SABS.pdf and remove this page

Page 133: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 133 Printed 12/2/2007

Insert page 3 of document SABS.pdf and remove this page

Page 134: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 134 Printed 12/2/2007

Page 135: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 135 Printed 12/2/2007

1133 SSEERRVVIICCEE LLEEVVEELL AAGGRREEEEMMEENNTT

MEMORANDUM OF AGREEMENT ENTERED INTO AND BETWEEN:

Sub Saharah Scales CC

Plot 30, Nooigedacht

Rayton

South Africa

Hereinafter referred to as Sub Saharah Scales

and

NAME: I-CUBE (Integrated Intelligent Imaging)

MADADENI

82 KLOOFFALLS RD

KLOOF

Durban KZN 3610

Page 136: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 136 Printed 12/2/2007

Hereinafter referred to as “The Customer”

TABLE OF CONTENTS 1. OBJECTIVE 2. DEFINITIONS AND INTERPRETATION 3. EFFECTIVE DATE 4. AGREEMENT TERM 5. CUSTOMER OBLIGATIONS 6. REPLACEMENT PARTS 7. WARRANTIES AND DISCLAIMERS 8. AVERAGE PERIOD FOR REPAIRS AND REACTIVE MAINTENANCE CONTRACTS 9. WORK FLOW PROCESS 10. EXCLUSIONS WHICH ARE NOT COVERED BY THIS CONTRACT 11. CHARGES AND PAYMENT ON EXCLUSIONS 12. ALTERATIONS AND ATTACHMENTS 13. OTHER PROVISIONS 14. JURISDICTION 15. DOMICILIUM

Page 137: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 137 Printed 12/2/2007

1. OBJECTIVE

This Service Level Agreement covers reactive maintenance and support of all the equipment listed in

the Proposal Referenced Tender Document: PR/70/2007, as furnished by Sub Saharah Scales and

will furnish the level of support services, and I Cube agrees to accept such services in respect of the

hardware and software and related equipment as weighbridges, and supporting software and

accessories, under the following terms and conditions:

2. DEFINITIONS AND INTERPRETATION:

2.1. Unless the context clearly indicates or implies a contrary intention; Words importing the singular shall include the plural and vice versa and words

importing the masculine or feminine gender shall include the neuter and vice versa.

2.2. �Equipment� means all hardware and software specified, and applicable to weighbridge, and related equipment. A wide interpretation should be attached to definition.

2.3. �Period of Maintenance� means shall be agreed on, by both parties (but in this instance will be for a period of (3) three years annually renewable).

2.4. �Consumables� means cables, conduit, or any other components deemed consumable listed by the Original manufacture of the system, but excludes electronics related to the weighbridges, etc.

2.5. �Response Time� means from the time a call is logged with Sub Saharah Scales to the time a representative from Sub Saharah Scales contacts a representative of the customer.

2.6. �Mean Time To Repair (MTTR)� means the time taken to give solution to the problem.

3. EFFECTIVE DATE

This Agreement will become effective on the mutual date agreed on and

when signed by authorised representatives of both parties and

will continue in effect until terminated according to its terms.

4. AGREEMENT TERMS

4.1. The initial term of this Agreement will be for three (3) years from date of commencement. Such term will automatically be renewed for successive one-year terms subject to either parties right to cancel this Agreement by giving thirty days (ONE MONTH, CALENDAR DAYS) written notice to this effect before such term expires.

Page 138: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 138 Printed 12/2/2007

4.2. Performing of a due diligent report on all mission critical equipment before the SLA commences.

4.3. Unless specified accessories are not going to be removed from the Customer site when the equipment is removed from the Customer site for repairs at a Service Centre.

5. CUSTOMER OBLIGATIONS To enable Sub Saharah Scales to provide service to Customer on equipment, the customer

shall:

5.1 Provide adequate working space for use by Sub Saharah Scales� personnel near the equipment;

5.1 Provide Sub Saharah Scales, full access to the equipment, subject only to customers �in house� applicable laws or regulation;

The customer will maintain spares necessary to replace critical customer data in the event of

possible loss or damage to such data by any cause, or spares to replace critical electronic

components for the weighbridge systems, camera systems and accessories as

recommended in PR70/2007. The Customer indemnifies Sub Saharah Scales against data

or similar loss, which may occur in whatsoever way associated to equipment supplied as per

PR70/2007. However Sub Saharah Scales shall as far as possible to Sub Saharah

Scales� discretion try and reserve the data, and or systems.

6. REPLACEMENT PARTS

6.1. The Customer�s equipment parts, which are removed for replacement by Sub Saharah Scales, become the property of Sub Saharah Scales.

6.2. Equipment parts replaced or added by Sub Saharah Scales at Customer special request or instance remain the property of Sub Saharah Scales until fully paid by the Customer.

6.3. Uneconomical to repair equipment will be brought to the attention of the Customer by Sub Saharah Scales.

6.4. Packaging and Handling; all equipment shall be handled with outmost care whilst in transit to and from the Customer�s premises.

7. WARRANTIES AND DISCLAIMERS

7.1. Sub Saharah Scales warrants any work performed on that specific hardware or software equipment, in terms hereof for a period of 90 days and replacement parts

Page 139: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 139 Printed 12/2/2007

to be free of any defects and fit for the purposes for which they are installed. Weighbridge and associated equipment carry a warranty of five (5) years for the electronics and ten (10) years on steel systems manufactured, for which Sub Saharah Scales warrants any work performed on that specific system not beyond terms specified, unless negotiated otherwise by both parties.

7.2. Warranties do not cover repair of damage attributable to:

•••• Products and services provided by a third party, alterations or out of specification of the vendor of the equipment;

•••• Accidents, misuse, negligence or failure of customer to follow instructions for proper use, care and cleaning of equipment;

•••• External factors (example lightning, acts of God, failure or fluctuation of electrical power or air conditioning);

•••• Failure by customer to comply with the environmental specifications prescribed by the manufacture.

8. AVERAGE PERIOD FOR REPAIRS AND REACTIVE MAINTENANCE CONTRACTS 8.1. Silver Reactive Maintenance Contract

CODE DESCRIPTION RESPONSE TIME MTTR

1 High Priority

Partial system failure

1 Hours 24Hours

Working hours covered by Silver Reactive Maintenance Contract Only Monday to Friday: 08h00 till 17h00

Saturday, Sunday & Public Holiday: None

Price Tag: 2.5% of Total Capex Value/12 per month for the first (1st) year and esculated at

15% p.a. thereafter.

Spares: 2.5% of system value

8.2. Gold Reactive Maintenance Contract CODE DESCRIPTION RESPONSE TIME MTTR

1 High Priority

Partial system failure

1 Hours 8 Hours

Working hours covered by Gold Reactive Maintenance Contract Monday to Friday and Saturday: 08h00 till 17h00, and 08h00 till 14h30

Sunday & Public Holiday: None

Price Tag: 3.75% of Total Capex Value/12 per month for the first (1st) year and esculated at

15% p.a. thereafter

Page 140: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 140 Printed 12/2/2007

Spares: 3.75% of system value

8.3. Platinum Reactive Maintenance Contract CODE DESCRIPTION RESPONSE TIME MTTR

1 High Priority

Partial system failure

30 min 4Hours

Working hours covered by Platinum Reactive Maintenance Contract

Monday to Sunday and Includes Public Holidays: 24 hours Price Tag: 5% of Total Capex Value/12 per month for the first (1st) year and

esculated at 15% p.a. thereafter Spares: 5% of system value

Platinum Reactive Maintenance Contracts are subjected to: Hot spares availability onsite � as recommended in PR70/2007

Warm spares availability onsite � as recommended in PR70/2007

Certified engineer/technician onsite - � as recommended in PR70/2007

9. WORK FLOW PROCESS

A detailed fault call with; serial numbers of equipment, location of the equipment and the

necessary contacting details of the representative of the Customer will be logged by the

Customer representative at Sub Saharah Scales and a Customer Repair Order (CRO)

number will be issued to the

Customer by Sub Saharah Scales. A representative of Sub Saharah Scales will contact

the customer within the SLA response time of that particular equipment.

A solution will be rendered within the SLA Mean Time To Repair (MTTR) of that particular

equipment.

The customer will sign off the job performed by Sub Saharah Scales, before the Sub

Saharah Scales representative leaves the Customer site.

Page 141: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 141 Printed 12/2/2007

In the case of a loan unit being provided, the customer must give authorization for the

equipment to be removed from the Customer site,

At the end of each month, a report of all jobs will be submitted by Sub Saharah Scales to

the Customer for sign off.

10. EXCLUSIONS WHICH ARE NOT COVERED BY THIS CONTRACT

• Equipment consumables as per manufacture • Malicious damages to equipment • Infestation damages to equipment • Unfavourable environmental conditions for equipment • Renewable SABS and related regulatory certification caused by any of the above 3

items. • A maximum of one SABS Certification per weighbridge for each year

11. CHARGES AND PAYMENTS ON EXCLUSIONS

• Labour will be charged at a rate of R 350.00 per hour excl VAT. • Call out time from the Repair Centre will be charged at R 150.00 per hour excl VAT. • Charges for all replacement or new materials used in these call out�s will be to the

Customer�s account at Sub Saharah Scales. • Sub Saharah Scales will require an order number or reference number from the

Customer; before all call outs including any of the consumable are done or replaced.

12. ALTERATIONS AND ATTACHMENTS

The Customer will give Sub Saharah Scales prior written notice of any proposed alterations

or attachments to equipment, Sub Saharah Scales then may impose additional charges.

Sub Saharah Scales is not responsible for any malfunction, non-performance or degradation

of performance of equipment, supplies or maintenance support materials caused by or

resulting directly or indirectly from any alteration of attachment.

13. OTHER PROVISIONS

Page 142: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 142 Printed 12/2/2007

Neither party will be liable for failure to fulfil its obligations when due to causes beyond its

reasonable control including, without limitation, the insolvency of Sub Saharah Scales, acts

of God, strikes or lockouts.

Any failure or delay by either party in exercising any right or remedy will not constitute a

waiver.

This Agreement will be governed by the laws of South Africa.

This Agreement constitutes the entire Agreement between the parties. This Agreement will

supersede all other terms and conditions submitted by Customer.

Sub Saharah Scales may cede and assign this Agreement or its interest in any

equipment, or the right to receive payments with the Customer�s prior written consent. Any

such cession and assignment however will not change the obligation of Sub Saharah Scales

to the Customer. The Customer will not cede, assign or transfer its right or obligations under

this Agreement without prior written consent of Sub Saharah Scales. Any cession,

assignment or transfer prohibited by this provision will be void.

This Agreement may be modified or added to, only by written agreement signed by a duly

authorized representative of each party.

NON DISCLOSURE AGREEMENT

Sub Saharah Scales is willing to sign a non-disclosure agreement with the Customer 14. JURISDICTION:

The Customer hereby consents to the jurisdiction of the Magistrate�s Court for the purpose for any action or legal proceedings, which Sub Saharah Scales in terms of this Agreement may institute with regard to any claims of whatsoever nature arising from this Agreement.

Page 143: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 143 Printed 12/2/2007

13.1.1.1 15. DOMICILIUM

The Customer hereby chooses domicilium citandi et executandi for all purposes arising out of or in connection with this Agreement at the Customers address aforementioned where all notices and/or processes may validly be delivered or served upon the Customer. The Customer may change its domicilium by written notice delivered by hand or sent by registered mail to the Customer. Any notice addressed by prepaid registered post to the Customer�s domicilium shall be conclusively deemed to have been received by the Customer on the third day after the date of posting of the same.

AGREEMENT HERETO

������������� ��������������

Commencement Date Renewal Date

13.1.2 On Behalf of the Customer

�������������������. ��������������.

Signature Date

�������������������. ������������.

Print Name Position

On Behalf of Sub Saharah Scales

�������������������.. ��������������.

Signature Date

�������������������.. ��������������.

Name Position

Page 144: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 144 Printed 12/2/2007

Page 145: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 145 Printed 12/2/2007

ISO Certificate

Page 146: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 146 Printed 12/2/2007

Replace this page with ISO Certificate.pdf document

Page 147: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 147 Printed 12/2/2007

13.2 ISO Certification

Page 148: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 148 Printed 12/2/2007

Replace this page with ISO TAE 001.jpg document

Page 149: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 149 Printed 12/2/2007

13.3 TAE Accreditation

Page 150: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 150 Printed 12/2/2007

Replace this page with document TAE SANAS.jpg

Page 151: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 151 Printed 12/2/2007

Replace this page with document TAE SANAS 001.jpg

Page 152: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 152 Printed 12/2/2007

Replace this page with document TAE SANAS 002.jpg

Page 153: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 153 Printed 12/2/2007

Replace this page with document TAE SANAS 003.jpg

Page 154: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 154 Printed 12/2/2007

13.4 NQA Certification

Page 155: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 155 Printed 12/2/2007

Replace this page with document nqa.jpg

Page 156: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 156 Printed 12/2/2007

13.5 Warranty

Page 157: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 157 Printed 12/2/2007

Replace this page with document called warranty letter.jpg

Page 158: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 158 Printed 12/2/2007

Page 159: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 159 Printed 12/2/2007

AAPPPPEENNDDIIXX:: AADDDDIITTIIOONNAALL IINNFFOO::

Further details on the proposed LPR solution is provided in the following appendices and on

the supplied CD.

APPENDIX 1 PPT � A PowerPoint introducing license plate recognition, system design,

showing the proposed site layout, how the system works and some example images of the

solution.

Root directory of the enclosed CD.

APPENDIX 2 See Lane Manual (PDF) � This document provides a technical

overview on See Lane, a state-of-the-art vision based recognition system for roadside

installations. The application is supported by a full set of optical and hardware subsystems as well

as software applications and utilities.

Directory of the enclosed CD: \Manuals

APPENDIX 3: “Overview (PDF)” – Contains a brochure of the LPR solutions

available from ASD.

Root directory of the enclosed CD.

APPENDIX 4: “See Lane (PDF)” – Contains a brochure of the See Lane software

on which See Way is based.

Root directory of the enclosed CD.

APPENDIX 5: “EQUIPMENT SCHEDULE (XLS)” – Full equipment and

software list, capital, rental or cost per transaction amounts

Root directory of the enclosed CD.

Page 160: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 160 Printed 12/2/2007

13.6 MANUALS

APPENDIX 6: “See Car DLL (PDF)” – Contains a brochure of the See Car DLL

software on which See Way is based.

Directory of the enclosed CD: \Manuals

APPENDIX 7: “See Data (PDF)” – Contains technical information on the See Data

a software service application that connects a cluster of recognition systems (such as See

Lane or See Way) together by a network.

Directory of the enclosed CD: \Manuals

APPENDIX 8: See Lane Install (PDF)” – technical information on the LPR

software install, operation and design.

Directory of the enclosed CD: \Manuals

APPENDIX 9: See Utilities (PDF) – Contains technical details of the See Utilities

software describes the set of utilities that support Hi-Tech Solutions� Seex products (such

as See Lane, SeeTruck, SeeCrane or SeeLane). These utilities enrich our products,

ease the technical support and cut the time to market.

Directory of the enclosed CD: \Manuals

APPENDIX 10: See Lane Manual (PDF) – Contains technical details of the See

Lane software on which See Way is based

Directory of the enclosed CD: \Manuals

Page 161: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 161 Printed 12/2/2007

13.7 SA REFERENCE SITES

The directory on the CD: SA Reference Sites contains images from the N3 ASD

demo.

The directory on the CD: SA ASD DEMOS contains working demos from:

- N3 ASHBURTON images (run PLAYER.EXE to see the demo).

- See Car Speed Demo (run RunMe.bat to see the demo of the ASD software)

- I-CUBE LPR Demo of RSA Customised Plates (run PLAYER.EXE to see the demo of colour images being recognised).

- N3 Camperdown Player EX (run PLAYER.EXE to see the demo of 380 cars recognised at high speed).

- Hand Held Plate Demo (run PLAYER.EXE to see the demo of a hand held unit being used to recognise license plates).

- Colour LPR_Demo.wmv � Demo of the colour camera capturing and recognising license plates.

- DBN Metro CCTV Control Room � A 1 hour test of the use of LPR in combination with the existing CCTV cameras. Images of all vehicles captured.

Figure 29 ASD on the N3

SOFTWARE

Drivers: Hasp – Contains the software for the Hasp (dongle) drivers

13.8 PRODUCT SPECIFICATIONS

APPENDIX 13: BEKA POLE_Spec.doc / BekaPole.pdf

Page 162: INSTALLATION OF A FULLY INTEGRATED WEIGHBRIDGE SYSTEM AT ...i-cube.co.za/Weigh Bridge/Proposal for PIKITUP Nov 2007.pdf · installation of a fully integrated weighbridge system at

Witzenburg Municipality - Tender No: 8/2/5/18 PR 70/2007

I-Cube Confidential Page 162 Printed 12/2/2007

APPENDIX 14: AXIS 223M Network Camera:

high performance camera, designed for demanding security installations. It delivers crisp and clear

images disclosing every detail, thanks to its top quality 2.0 Megapixel progressive scan CCD sensor,

Megapixel varifocal lens and advanced image processing.

APPENDIX 15: Duxbury_HSDPA_WirelessRouter.pdf Always on high speed

internet connectivity

APPENDIX 16: Edge_Router-230M.pdf - Auto-sensing Ethernet Switch

Equipped with a 4-port auto-sensing Ethernet switch. WAN type supported The router

supports some WAN types, Static, Dynamic, PPPoE , PPTP ,L2TP, Dynamic IPwith Road

Runner.

APPENDIX 17: quickbridge2_a4.pdf complete, user-installable wireless point-to-

point bridging solution designed for reliable long distance and low latency voice and data

connectivity. This high performance hop-in-a-box is available with 54 Mbps aggregate

throughput.

APPENDIX 18: Swith.pdf The ProSafe FS108P provides power and data from a

single point, using Power over Ethernet (PoE) over a single Cat-5 cable. The eight Fast

Ethernet ports can be used for any 10/100/1 000 Mbps link and four of these ports can

supply industry-standard IEEE 802.3af power

APPENDIX 19: Company Profile.pdf leading international distribution business

of security solutions and services with over 205 branch locations across Europe, the Middle

East, Africa and America has over 50 years of experience in the specialist security sector.

APPENDIX 20: AdleracEVRackDocument.pdf – Next generation

environmental controlled racks.