Installation/Operational Qualification Protocol ______________________________________________________________________________ IQ/OQ DOCUMENT REV. NO. 0 BarnsteadThermolyne NANOpure DIamond™ Ultrapure Water System *Models D11901, D11911, D11921, D11931 IQ/OQ Approved by: _____________________________ Date: ________________ Manager, QA Approved by: ______________________________Date:________________ Owner BarnsteadThermolyne 2555 Kerper Blvd. Dubuque, IA 52001 USA Phone: 1-800-446-6060 Fax: 319-589-0516 [email protected] SSL2030
Transcript
Page 1: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Installation/OperationalQualification Protocol

______________________________________________________________________________IQ/OQ DOCUMENT

REV. NO. 0

Barnstead ThermolyneNANOpure DIamond™ Ultrapure Water

System*Models D11901, D11911, D11921, D11931

IQ/OQ

Approved by: _____________________________ Date: ________________Manager, QA

Approved by: ______________________________Date:________________Owner

Barnstead Thermolyne2555 Kerper Blvd.

Dubuque, IA 52001 USAPhone: 1-800-446-6060 Fax: 319-589-0516

[email protected]

SSL2030

Page 2: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™Ultrapure Water SystemInstallation/Operation

Qualification

B T Protocol

BT.001.01.A

CustomerProtocol

____________

B T Revision

0

CustomerRevision

___________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer ID

____________________________________________________________

BT.001.01.A09262000 Page 2 of 21

Protocol # ___________ Revision # _______________ Equipment ID __________

Customer ______________________________INDEX

IntroductionScope

ResponsibilitiesProcedure

System Product Water QualitySection TitleA Installation Qualification

1. Unit Location/Installation2. Feed Water3. Supplied Power4. Controller Module5. Spare Parts6. Documentation7. General Comments

B Operation Qualification1. Power Switch2. System Configuration3. Normal Operation4. Optional Pressure or Float Switch5. Controller6. Power Failure Recovery7. General Comments

C Attachments1. Purchase Order Verification2. Acceptance Criteria

Page 3: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 3 of 21

Introduction

The purpose of this installation and operational qualification is to providedocumented evidence that the Barnstead Thermolyne NANOpureDIamond™ Ultrapure Water System is installed properly and performs asintended throughout the operating ranges specified by the owner.

Scope

The equipment to be validated is one of the following: Barnstead Thermolyne Model D11901, D11911, D11921, or D11931 (NANOpureDIamond™ Ultrapure Water System)

Model:

Serial Number: ___________

located in the:

______________________________________________________________________________

used to:

______________________________________________________________________________

Date:____________________________ Completed by: ___________________________

Page 4: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 4 of 21

ResponsibilitiesThe responsibilities of the validation services personnel include:

Execution of this protocolProviding test data for review upon request by customer personnelAnalysis and compilation of data into the summary report package

The responsibilities of the owner include:Supplying all relevant documentation, procedures, manuals anddrawings necessary for the completion of this protocol

Providing personnel when necessary to assist in operation of theNANOpure DIamond™ Ultrapure Water System as necessary forthe completion of this protocol

This protocol is to be completed after the water system has been installed inaccordance with the operation manual.

Procedure

The installation and operation qualifications will be conducted by physicallyobserving and operating the NANOpure DIamond™ Ultrapure Water Systemand any associated equipment, comparing it to relevant documentation forappropriate function, and documenting results on the attached data sheets forfuture change control.

Date:____________________________ Completed by: ___________________________

Page 5: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 5 of 21

Procedure continued

Any performance qualification (PQ) will be the responsibility of the owner, whichmay be performed by the ongoing monitoring of water quality under variousoperations, including but not limited to worst case conditions.

NOTE: Acceptance criteria apply equally to all NANOpure DIamond™Ultrapure Water System configurations (see section on Acceptance Criteria).

System Product Water QualityConfiguration Flow Resistivity TOC Endotoxin

Analytical Up to 1.5liter/min.

Up to 18.2 MΩ Less than 10.0ppb

N/A

UF Up to 1.5liter/min.

Up to 18.2 MΩ Less than 10.0ppb

Less than 0.02EU/ml

UV Up to 1.5liter/min.

Up to 18.2 MΩ Less than 3.0ppb

N/A

Life Science(UV/UF)

Up to 1.5liter/min.

Up to 18.2 MΩ Less than 5.0ppb

Less than 0.02EU/ml

Date:____________________________ Completed by: ___________________________

Page 6: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 6 of 21

Section A

Installation Qualification

1. Unit Location/Installation

2. Feed Water

3. Supplied Power

4. Controller Module

5. Spare Parts

6. Documentation

7. General Comments

Page 7: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 7 of 21

A. Installation Qualification

Step Description Specification or AcceptanceCriteria

Actual Result

1 Unit Location/Installation

Is the NANOpure DIamond™Ultrapure Water System located ona level surface or securely wall-mounted?

Has the minimum clearance,9”(23cm) each sides, 3” (8cm)ontop, 4.75” (12cm)in front beenprovided?

Is unit mounted away fromelectrical equipment orcombustible materials?

Has the water inlet pipingconnection been made?

Has a manual shutoff valve beeninstalled between the main watersupply and the NANOpureDIamond™ Ultrapure WaterSystem?

Y N

Y N

Y N

Y N

Y N

Page 8: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 8 of 21

1 Unit Location/Installationcontinued

Model D11921 & D11931Has the UF (ultrafilter) beeninstalled?

Model D11911 & D11931 has the UV(ultraviolet) lamp been installed?

Has the float switch (P/N D8964)been installed? (optional)

Has the pressure switch (P/N D2706)been installed? (optional)

Has the cartridge pack beeninstalled?

Has initial sanitization of the unitbeen performed?

(If not, sanitization must becompleted before proceeding withIQ procedure:refer to Initial sanitization procedurein operating manuals)

Y N N/A

Y N N/A

Y N N/A

Y N N/A

Y N

Y N

Page 9: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 9 of 21

Unit Location/InstallationContinued

Has initial rinse-up been performed? If not, see manual for initial rinseinstructions.

Has the final 0.2 micron filter beeninstalled?

Y N

Y N

2 Feed Water Supplied feed water must bereverse osmosis, deionized ordistilled, <70 ppm total dissolved solids (TDS).

Record actual TDS.

What is the TOC (total organiccarbon) level of the feed water(ppm) provided to the unit? (required value is <1.0 ppm)

Record actual TOC

What is the turbidity level of thefeed water (as measured in NTU)provided to the unit?(required value is <=1.0 NTU)

Record actual turbidity

What is the pressure of the feedwater (as measured in psig)provided to the unit?(required value is <=100 psig)

Record actual pressure

__________ ppm

___________ ppm

___________ NTU

___________ psig

Page 10: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 10 of 21

2 Feed watercontinued What is the flow rate of the feed

water?

Record actual flow rate

What is the temperature of the feedwater provided to the unit?(required value is 4 - 40°C (40-104°F))

Record actual temperature

________ ml/min

__________ °C/°F

3 Supplied Power Describe supplied electrical power:

Required:100-240 VAC100 Watts47-63 Hz1 phaseVerify amperage of installed fuses:

Record circuit number, ifapplicable, and amperage ofcircuit breaker

__________ VAC

_________ Watts________ Hz________ Phase________ Amps

Circuit #_________________________ Amps

Page 11: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 11 of 21

4 ControllerModule

After switching power switch to ON does initial display indicate correctconfiguration?__Analytical__UV__UF__UV/UF

Does initial display indicate thefollowing:1) BARNSTEAD THERMOLYNE……..2) UNIT INITIALIZING…………………...3) SELF TEST……………………………...4) NANOpure DIamond(tm) IDLE…..

Does pressing “UP” arrow keyaccess Operations menus?SANITIZE UNIT?…………………………NIST CALIBRATE?………………………RESET TIMERS?…………………………ADVANCED MENU?………………….DIAGNOSTIC MENU?…………………

Does pressing “BACK” key returndisplay to IDLE?

Y N

Y NY NY NY N

Y NY NY NY NY N

Y N

Page 12: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 12 of 21

5 Spare parts Recommended spare parts:

D3750, Final filterFZX47, Main fuse (120 v.)FZX54, Main fuse (230 v.)AZ9027, Main transformer fuseCMX25, Sanitization Solution

D11911 & D11931 onlyLMX13, UV Lamp

Describe the types and quantities ofadditional spare parts stocked on-site, if any. List storage locations ofspare parts, if applicable.

Determine if any serviceagreements are applicable.

Stocked on site?

Y NY N N/AY N N/AY NY N

Y N N/A

Agreement #_______________

6 Documentation Verify accuracy of: Customer specification(s) Purchase orders/invoices, etc.

Y NY N

Page 13: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 13 of 21

6 Documentationcontinued

Verify NANOpure DIamond™Ultrapure Water System installationand operation manual dates andstorage locations.

Review that any in-house StandardOperating Procedures are inagreement withBarnstead/Thermolynedocumentation, including; Use Maintenance and Service Cleaning/Disinfection Safety precautions Maintenance procedures

Serial number:________________

Manual Date:________________

Location:________________

Y N

Y NY NY N

7 Discrepancies/GeneralComments

General Comments:____________________________________________________________________________________________________________________________________________________________________________________________________________________

Installation QualificationDate:____________________________ Completed by: ___________________________

Page 14: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 14 of 21

Section B

Operation Qualification

1. Power Switch

2. System Configuration

3. Normal Operation

4. Optional Pressure or Float Switch

5. Controller

6. Power Failure Recovery

7. General Comments

Page 15: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 15 of 21

B. Operational qualification

Step Test or ControlDevice

Specification or AcceptanceCriteria

Actual Result

1 Power switch NANOpure Diamond™ UltrapureWater System is receiving power.

Control panel LCD is lit.

Y N

Y N

2 Configuration Greeting displays correct modelwhen power switch is activated.

AnalyticalUVUF

UV/UF

Y N N/AY N N/AY N N/AY N N/A

3 NormalOperation Does pressing the Start/Stop key

start the pump? Unit displays ***MΩ-cm

Does pressing Start/Stop key againstop pump? (Unit returns to IDLE)

Press the Start/Stop key to start unit.Does pressing Standby key stoppump, and display “Standby?”

Y N

Y N

Y N

Page 16: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 16 of 21

3 NormalOperationContinued

Does pressing Start/Stop key re-startpump and change display to*** MΩ-cm

In IDLE mode, press up or downarrows to scroll through thefollowing menus

• Sanitize unit?……………………….• NIST calibrate?…………………….• Reset timers?………………………• Advance menu?………………….• Diagnostic menu?………………..

To access resistivity setpoint, putunit in IDLE mode. Press up arrowto “Advanced menu?”. Press enter.Continue pressing enter to scrollthrough the following parameters:

Printer Attached?……………………..Remote Gun?………………………….Date Format?………………………….Set Date?……………………………….Set Time?………………………………..Set Cell Constant?…………………….Set Display Brightness?……………….Adjust Set Point?, Push arrow sodisplay reads “YES” and then push

Y N

Y NY NY NY NY N

Y N

Y N

Y N

Y N

Y N

Y N

Y N

Page 17: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 17 of 21

3 NormalOperationContinued

“Enter” Modify set point with up- anddown-arrow if necessary and pressEnter.

Document the programmedsetpoint.

_______MΩ-cm

4 Pressure or FloatSwitch (optional)

Reduce inlet water pressure and/orvolume.Verify that pump shuts down anddisplays “Check Inlet”. Y N

5 Controller Maintains resistivity aboveprogrammed set point. Y N

6 Power FailureRecovery

Press BACK key two times to returnto IDLE mode.Turn main circuit breaker forDIamond(tm) off and then back onto simulate a power failurefollowed by a restoration of power.

Verify that the controller returns tonormal operation upon restorationof power by depressing theSTART/STOP button.

Y N

Discrepancies/ List all discrepancies between specifications and

Page 18: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 18 of 21

7 GeneralComments

actual conditions. All discrepancies must bepresented to authorized customer companypersonnel for resolution and/or statement ofacceptability.

General Comments:__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Operation QualificationDate:____________________________ Completed by: ___________________________

The installation and operational qualifications will be performed as stated in thisprotocol and all raw data sheets will be completed concurrently with theexecution of the protocol.

All documentation (approved protocol, completed data sheets, lab reports) willbe maintained in a single Validation Project File. Upon completion of theprotocol, the data will be analyzed and presented, along with substantiatingdocumentation, in a summary report to be reviewed and approved bydesignated _____________ personnel.

Any modifications to the NANOpure DIamond™ Ultrapure Water System madeduring the course of the protocol execution will be documented as per__________________change control standard operating procedure. Anassessment will be made after the change to determine if re-validation isrequired. All change control forms should be filed and reviewed at least yearlyto determine if re-validation is required.

Page 19: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 19 of 21

Section C

Attachments

1. Purchase Order Verification

2. Acceptance Criteria

Page 20: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 20 of 21

Purchase Order Certification

We certify to the best of our knowledge that the Barnstead Thermolyne NANOpure ®DIamond™ water purification system, Model number ____________, which was purchased andinstalled, is in compliance with the following purchase order.

P.O. Number __________________________ Date: ______________________

Comments: ____________________________________________________________

Reviewed by: ______________________________________

Date: ______________

Page 21: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 21 of 21

Acceptance Criteria

Instruments used to generate all data must be calibrated according toapproved procedures and be traceable to NIST standards. Barnstead/Thermolyne recommends the use of the NIST calibration module, P/NE896X5, for the system’s electronics calibration.

The NANOpure DIamond™ Ultrapure Water System must perform as specifiedby Barnstead/Thermolyne.

Barnstead Thermolyne NANOpure DIamond™ UltrapureWater System

Installation/Operational Qualification Acceptance

Approved by _____________________________________ Date: _______________Manager, QA

Approved by _____________________________________ Date:________________Owner

Page 22: Installation/Operational Qualification Protocol … ·  · 2016-11-15Installation/Operational Qualification Protocol ... NANOpure DIamond™ Ultrapure Water System *Models D11901,

Title

Barnstead Thermolyne

NANOpure® DIamond™

Ultrapure Water SystemInstallation/Operation

Qualification

Protocol

BT.001.01.A

CustomerProtocol

____________

Revision

0

CustomerRevision

____________

Equipment ID

NANOpure®DIamond™

UltrapureWater

System 1

Customer

____________________________________________________________

BT.001.01.A09262000 Page 22 of 21


Recommended