Instructions for Completing theInstructions for Completing the
PPrint rint AAttribute ttribute
RResults esults FormForm
Last revised 3 January 2005
2
In the case of any discrepancies, the current revision of the Climate Control SVPP procedures and
work instructions will take precedence over this document.
This document is intended as a
training aid ONLY.
Please contact the Quality Manager at the receiving plant or [email protected]
for clarification of any discrepancies or issues.
2
33
Table of ContentsTable of ContentsWhat Does SVPP Consist Of? 4
When is SVPP Required? 5
Submitting the SVPP Report 6
The Part Submission Warrant 7 – 8
How to Complete the Print Attribute Results Form
9 – 15
Control Plans 16 – 17
ASSEMBLIES
Overview 18
Alternatives 19
w/ Standard Product 20 – 21
w/ Multiple “Used In” 22
Examples of Completed FORMS
Sheetmetal Assembly 23 – 26
Cable Assembly 27
4Return to Table of Contents
When is SVPP Required?When is SVPP Required?• All Parts, Production or
Prototype.• New Product
– New product completely or new product to a specific plant.
– Significant gap in production, (i.e. hasn’t been made for a long time, etc.)
• Engineering Change– New revision level– Part number change,
etc.
• Material Change
• Process Change– Change of equipment.– Change of sub-tier supplier.– Tooling / Die / Mold change.
• Manufacturing Location Change
• As supporting documentation for:– To document relevant MDA
(Material Deviation) information.
– To verify the part after an MDA has expired.
– To document Corrective Action results / information.
• Other changes to part, process, etc????
5Return to Table of Contents
How to Complete the PAR FormHow to Complete the PAR Form
• The supplier completes #1 - #7 with the appropriate information. The “Climate Control Internal” areas are completed by Climate Control upon receipt of the SVPP Package.
6Return to Table of Contents
How to Complete the PAR FormHow to Complete the PAR Form• #8 The Symbol field is used for
reference symbols as appropriate.– It is used to allow the actual
dimension to remain numeric, therefore enabling the automatic calculations used in other portions of the document.
– Symbols may be used other than those shown.
7Return to Table of Contents
How to Complete the PAR FormHow to Complete the PAR Form• #9 & #10 Whenever
possible, use only numeric values in these columns. – Under normal
conditions, do not add units of measure (mm, in, etc.) here. Again, this enables automatic calculations. In the case of documenting notes, please be as specific and detailed as possible.
8Return to Table of Contents
How to Complete the PAR FormHow to Complete the PAR Form• #11 Following the numeric
format wherever possible, enter the measured or observed values for the
actual samples. – When completing fields for
notes, be as specific as possible. In most cases “OK” will not be accepted.
The Green and Red formatting. This is used as an aid to identifying out of spec conditions. However, the supplier remains responsible for identifying in-spec and out-of-spec conditions.
*
• This is automatic when purely numeric values are used and when the nominal and tolerance values are completed correctly.
• In the case where non-numeric values are used, the format defaults back to black. This is OK .
9Return to Table of Contents
How to Complete the PAR FormHow to Complete the PAR Form• #12 Enter the actual measurement
device/method that was used to determine the result for the samples that are submitted.
Notes: This is the inspection device that was used in measuring the samples for SVPP. This device may differ from what is used for in-process inspection activities or other checks. The intent of this column is to facilitate consistency in measurement when Climate Control follows up with a verification of the reported results.
10Return to Table of Contents
How to Complete The PAR FormHow to Complete The PAR Form• #13 The supplier is responsible for completing
these columns with either “Y” or “N”. – The Supplier completes this column with a “Y”, if
all 3 samples meet the specified requirements. – If any of the samples do not meet the specified
requirements, the supplier completes this column with an “N” for that attribute and must contact Climate Control for approval prior to submitting this Print Attribute Report.
Note: If the samples are found to be non-conforming, the Supplier should correct these issues and complete a new Print Attribute Report. Only in cases where these issues can not be corrected should the Supplier contact Climate Control to request a deviation.
12Return to Table of Contents
Assemblies - OverviewAssemblies - Overview• All assemblies must have complete SVPP for all
components on each level.
Assembly APart Submission Warrant
Print Attribute ReportControl Plan
Capability Study
Sub-Assembly SA1Print Attribute Report
Control PlanCapability Study
Component A2Print Attribute Report
Control PlanCapability Study
Component SA1-1Print Attribute Report
Control PlanCapability Study
Component SA1-2Print Attribute Report
Control PlanCapability Study
13Return to Table of Contents
Assemblies – AlternativesAssemblies – Alternatives• With prior approval from the Quality Manager
at the receiving plant, the following diagrams provide examples of reduced inspection activities for components that are used in multiple assemblies.
• Note: The examples only apply if all of the assemblies are being submitted at the same time or in a very short time span.
14Return to Table of Contents
Assemblies Assemblies (w/Standard Product)(w/Standard Product)
• Generally in an assembly, Full SVPP is completed down to the level of standard (off-the-shelf) product.
Assembly APart Submission Warrant
Print Attribute ReportControl Plan
Sub-Assembly SA1Print Attribute Report
Control Plan
Component A2Print Attribute Report
Control Plan
Component SA1-1Print Attribute Report
Control Plan
Off-the-ShelfComponent SA1-2Verification of Part Identity
(Noted in SA1 PAR document)
In this case, verification of the correct part identity is all that is required.(With the prior approval of Climate Control plant Quality Manager)
15Return to Table of Contents
Note: The Labels “Custom Component” and “Catalog Component” are for illustration.
In actual practice, they would be labeled“Company Name SA1-1” or “Molex SA1-2,” as examples.
Std. Product ExampleStd. Product Example
16Return to Table of Contents
Assemblies Assemblies (w/ multiple “used-in”)(w/ multiple “used-in”)
AssemblyB
SA-B
c
b
B1
AssemblyC
SA-C
d
b
C1
AssemblyA
SA-A
a
b
A1
Include Copies from A, in the packages for Assemblies B and C
17Return to Table of Contents
Examples of Completed FormsExamples of Completed FormsSheetmetal Assembly ExampleSheetmetal Assembly Example
Example of a top level sheetmetal assembly.
18Return to Table of Contents
1E10023(Frame Assembly
-Sealing)PAR &
Ballooned Print
3A86980H02PAR &
Ballooned Print
1E00758G01(Frame
Assembly)PAR &
Ballooned Print
1E00764H01(Bracket -
Expansion Valve)PAR &
Ballooned Print
1E00756H01(Panel - Unit
Frame)PAR &
Ballooned Print
1E00757H01(Panel - Uniot
Frame)PAR &
Ballooned Print
1E00765G01(Base Assembly -
Evap / HeaterBase)PAR &
Ballooned Print
1E00754G01(Base Assembly -
Coil Support)PAR &
Ballooned Print
1E00753H01(Bracket - Filter)
PAR &Ballooned Print)
1E00751H01(Base - Coil
Support)PAR &
Ballooned Print 1E00766H01(Tube - DrainCondensate)
PAR &Ballooned Print
1E00755H01(Panel - Unit
Base)PAR &
Ballooned Print
3A86518H03(Nut Weld Pilot
Projection,M8X1.25)
PAR &Ballooned Print)
Examples of Completed FormsExamples of Completed FormsSheetmetal Assembly ExampleSheetmetal Assembly Example
The SVPP requirements would
cascade as shown here.
19Return to Table of Contents
Examples of Completed FormsExamples of Completed FormsSheetmetal Assembly ExampleSheetmetal Assembly Example
20Return to Table of Contents
Examples of Completed FormsExamples of Completed FormsSheetmetal Assembly ExampleSheetmetal Assembly Example
21Return to Table of Contents
Examples of Completed FormsExamples of Completed FormsCable Assembly ExampleCable Assembly Example
The wire type was previously verified as shown below. Had it not been verified already, it would also fit well between current items #98-99 (STIP) and #99-100 (STIN).