Instruction to Bidders
23
PETROLEUM EXPLORATION (PVT) LTD. 15, Nazimuddin Road, Sector F-10/4, P.O. Box 1440, Islamabad, Pakistan Tel: 92-51-2299031-36 (6 Lines), Fax: 92-51-2299028 E-Mail: [email protected] . Web: www.pepl.com.pk PEL/M&P/1701/13 INVITATION TO BID TENDER ENQUIRY NO. PEL/BADIN-S/036/13 & PEL/BADAR-2/035/13, DATED 20-09-2013 , FOR CIVIL WORKS. 1
Transcript
Page 1: Instructions to Bidders & BOQ's.

PETROLEUM EXPLORATION (PVT) LTD. 15, Nazimuddin Road, Sector F-10/4, P.O. Box 1440, Islamabad, Pakistan

Tel: 92-51-2299031-36 (6 Lines), Fax: 92-51-2299028E-Mail: [email protected]. Web: www.pepl.com.pk

PEL/M&P/1701/13

INVITATION TO BID

TENDER ENQUIRY NO. PEL/BADIN-S/036/13 & PEL/BADAR-2/035/13,DATED 20-09-2013 , FOR CIVIL WORKS.

1

Page 2: Instructions to Bidders & BOQ's.

1) INTRODUCTION

Petroleum Exploration (Pvt.) Limited (PEL), a Pakistani Exploration and Production Company in private sector (hereinafter referred to as “the Company”), invites Sealed Bids from well-reputed Civil Construction Companies for the Civil Works described in the Schedule of Requirement (Bill of Quantities) as Annexure “B” enclosed. PEL requests that the following instructions are to be strictly adhered in submission of the Bid documents:

2) INSTRUCTIONS TO BIDDERS:

2.1 Only the Bids of bonafide recipients of the Tender Document will be entertained. Upon receipt of this invitation to tender, please confirm the receipt thereof immediately by fax, e-mail or courier to PEL at the following addresses:

Attn: Khawaja Manzur HussainGeneral Manager (Materials & Procurement)15, Nazimuddin Road, Sector F-10/4, P.O. Box 1440, Islamabad, PakistanTel: 92-51-2291671, 2299031-36 (6 Lines), Fax: 92-51-2299028E-Mail: [email protected](With copy to the following e-mail)

[email protected]

In the event a potential bidder decides not to quote, please send us your decline via facsimile or e-mail.

2.2 PEL reserves the right to amend or revise the tender documents prior to the date set for the closing of the tender. All bidders will be informed of any such change through an Addendum to the tender.

2.3 Your quotation must reach on or before 1600 Hrs on October 07, 2013 in Sealed Envelopes which will bear words “Confidential” and Tender Enquiry No. PEL/BADIN-S/036/13 & PEL/BADAR-2/035/13.

2.4 PEL reserves the right to increase or decrease the quantities/scope of work or reject any or all bids and may not necessarily accept the lowest bidder without assigning any reasons what so ever.

2.5 For ease of comparison, prices are to be quoted item-wise, as described in the Schedule of Requirement (Bill of Quantities), (Annexure “B” & Annexure “C”).

2.6 PEL shall be free from any obligation of opening bids in the presence of bidders. PEL shall not be responsible for any costs / expenses incurred by the bidders in connection with the preparation / delivery of bid.

2.7 Bidder shall maintain high safety standards and comply with PEL’s HSE procedures.

2.8 PEL does not encourage advance payment. However, Mobilization/Fixed charges can be invoiced by the Contractor immediately on completion of mobilization of crew and equipments at the job site. The balance final amount of the bill will be paid

2

Page 3: Instructions to Bidders & BOQ's.

within 45-60 days of receipt of duly verified invoice by PEL’s after completion of work and final acceptance of the work performed by the Contractor.

2.9 Closing date of the Tender is October 07, 2013.

2.10 All quotations without exception shall firm and irrevocable for PEL acceptance for a minimum period of 90 days from the tender closing date.

2.11 CVs of all personnel up to the supervisor level to be deployed at site and indicated in the firm’s organ gram shall be supplied with the bid documents.

2.12 Contractor is to provide its profile, project schedule at the time of bidding.

2.13 Details of similar projects completed in the past five years shall be provided.

2.14 Complete list of current projects being executed by the bidder, with project cost, shall be provided with the bid.

2.15 Detailed list of manpower to be deployed for the project shall be provided.

2.16 The company (PEL) reserves the right to appoint one or more contractors dividing the job suitably for early completion if required.

3

Page 4: Instructions to Bidders & BOQ's.

ANNEXURE “A”

3. TERMS & CONDITIONS

The Bidders are expected to examine all instructions, forms, terms & conditions and specifications attached/included in these tender documents. Failure to furnish all information required by the tender documents or submission of a Bid not substantially responsive to the tender documents will be at the Bidder’s risk and may result in the rejection of their Bid.

1. BID PRICES:

Prices must be quoted on lump sum basis inclusive of all taxes and duties, indicating unit price and total Bid prices at the end.

2. ISSUANCE OF INTENT AND SERVICE CONTRACT

The Company shall inform the successful Bidder of its intent. The arrangements between PEL and the successful bidder shall be governed solely by a subsequent written Service Order or a Contract.

3. PAYMENT:

Payment will be made within 45-60 days after submission of Invoice/ Bill duly verified and supported by the authorized PEL representative.

Payment to the Contractor will be subjected to the deduction of withholding tax, as per prevailing Income Tax Laws of Pakistan (where applicable), Bidders claiming exemption must submit copy of Valid Tax Exemption Certificate.

4. COMPLETION PERIOD:

As mentioned in the Schedule of Requirement. However, the Bidder may quote the best possible completion period convenient to him. Earlier completion, if quoted, will be preferred.

1. TAXES AND DUTIES

A Contractor (foreign or a local) shall be entirely responsible for payment of all taxes, duties, levies, license fees, etc. incurred until completion of the contracted Services to the Company.

5. INSPECTION AND TEST

Please note that all civil construction materials are to be of very good quality and from reliable sources. PEL reserves the rights to inspect all materials, equipments tools and implements at Contractor’s works to ensure that the Contractor has the required capability, skill and workmanship to carry out the assigned Services.

6. HEALTH, SAFETY & ENVIRONMENT

Contractor(s) shall at all times comply with and shall cause its employees to abide by, all safety, security, health and environment rules and regulations in force at the site of the work or

4

Page 5: Instructions to Bidders & BOQ's.

otherwise prescribed by the laws of Pakistan. PEL shall not be responsible for any injury, death or any other accident suffered by the Contractor(s) during operation/execution of the Civil Works.

7. APPLICABLE LAW

The Contract shall be interpreted in accordance with the laws of the Pakistan.

4. SCOPE OF WORK-CIVIL WORKS-GENERAL

The Civil Scope of work includes, but is not limited to, furnishing of all equipments/Tools, skilled / unskilled labour, supervision & supply of all construction material /consumables which are required to perform all the operations in connection with the completion of the construction of well location in accordance with the attached Bill of Quantities , Annexure “B”

5. SPECIAL TERMS & CONDITIONS

Bidder is responsible to analyze and use appropriate equipment required to complete the work in time and meeting the specifications and standards.

The quantities given in the BOQ are estimated, payment will be made on the basis of actual physical quantities measured at the site.

PEL reserves the right to change/modify Location design drawing and quantities before or during construction phase to meet requirement of rig finally selected to drill PEL well location.

The financial proposal shall be in the form of BOQ, Annexure “B”.

6. EQUIPMENT

All equipments shall be inspected and approved by PEL’s representative before mobilization to site.

Please provide a complete list of equipment to be deployed for the project. Contractor’s equipment and materials stored at the plant site must meet plant

safety regulation and all kind of preventive measures shall be taken against fire, theft, and all other workplace hazards.

PEL reserves the right to inspect and verify the Contractor’s work being done at any stage and may stop the work if not according to specifications, standard & grades.

7. TIMELY COMPLETION OF THE PROJECT

If the Contractor feels delay in progress of the work, he shall work overtime and use all such additional equipment and/or personnel as may be necessary in timely completion of the work within the dates specified in the Contract at no additional cost to the Company (PEL).

5

Page 6: Instructions to Bidders & BOQ's.

8. PENALITY CLAUSE

In case the work has been delayed except Force Majeure a penalty equivalent to 5% per week of the total value of the Contract will be imposed on the Contract and will be deducted from the final invoice(s).

6

Page 7: Instructions to Bidders & BOQ's.

ANNEUXURE”B”

APPROXIMATE BOQ’S FOR AYESHA-1 WELL CIVIL WORKS

Item.No DESCRIPTION Unit 

BOQ Unit rate Total(PKR)

1 Earth Work CFt 418,890.0 35  1,46,61150  

Supply & filling of earth at location area and camp site from contractor's arranged borrow area including watering and compaction in layers not exceeding 6-inch upto a total of 3-layers to the required grade and elevations. Earthfill compaction will be upto 95% of AASHTO maximum dry density. The thickness ofearth fill should be 1.5-ft.All vegetation and all such unsuitable material such as contaminated oil, Organic material, rubble, hedges, trees, stumps, roots, guardrails, concrete sleepers, foundations, lamp posts, abandoned electrical cables and pipes, existing vegetation, minor steel, concrete, disused paving, debris, loosewindblown material and other foreign material, etc shall be transported and disposed to an approved company designated area.

     

 

                                                                                      2 Rig Pad Foundation        2.1 Reinforced Cement Concrete 1:2:4 CFt 4,557 500  22,78,500   Providing & laying of cement concrete of ratio 1:2:4      

   including reinforcement steel (Grade 60) including        formwork, curing of concrete & transportation of        material & equipments to complete the works in all        respects. The size of rig pad is (46.26×38.04×2.5-feet).        2.2 Plain Cement Concrete 1:4:8 CFt 910 380  3,45,800   Providing & laying of plain cement concrete 1:4:8 of      

   6-inch thickness. (46.26x38.04x0.5)        2.3 Gravel CFt 910 210  1,91,100  Providing & laying gravel of 6-inch thickness.      

          3 Cellar Work        3.1 Reinforced Cement Concrete 1:2:4 CFt 584 630  3,67,920  Construction of Cellar with RCC concrete 1:2:4  

   including reinforcement steel (Grade 60) including        formwork, curing of concrete & transportation of        material & equipments to complete the works in all        respects. The size of cellar is 12x'12'x1=144      

Lomg wall (2)x12'x1x10x=240      

7

Page 8: Instructions to Bidders & BOQ's.

  Short wall (2) x10'x1'0x1'=200        Thickness of cellar walls is 1-ft.                 3.2 Plain Cement Concrete 1:4:8 CFt 95.000 300  28,500  Providing & laying of plain cement concrete 1:4:8 of      6-inch thickness.        3.3 Gravel CFt 98.00 210  20,580  Providing & laying gravel of 6-inch thickness.  

          4 Conductor Pipe        a) Digging of bore hole of 26-inch dia (40 m). RFt 132 944.10  1,24621  b) Insertion of conductor pipe of 20-inch dia in 26-inch RFt 100 6,258  6,25800  dia bore hole.          c) Filling space between bore hole and conductor pipe CFt 300 332  99,600  upto 40 m deep with PCC 1:3:6.          d) Anchoring Conductor Pipe with steel reinforcement Each 4 1000  4000  bars.      

          5 Foundation for Mud Pumps        5.1 Plain Cement Concrete 1:2:4 CFt 975 500  4,87500  Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete &          transportation of material & equipments to complete the          works in all respects. Thickness of foundation should be 1.5-ft.        

  (The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).        

           6 Foundation for Mud Tanks          6.1 Plain Cement Concrete 1:2:4 CFt 2,310 500  11,55000  Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete & transportation          of material & equipments to complete the works in all          respects. Thickness of foundation should be 1.5-ft.        

 

(The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).

       

  6.2 Gravel CFt 1,250 210  2,62500  Providing & laying gravel of 6-inch thickness.                   7 Foundation for Generators          7.1 Plain Cement Concrete 1:2:4 CFt 975 500  4,87500  Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete & transportation        

8

Page 9: Instructions to Bidders & BOQ's.

  of material & equipments to complete the works in all          respects.Thickness of foundation should be 0.75ft.        

  (The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).        

  7.2 Gravel CFt 750 210  1,57500  Providing & laying gravel of 6-inch thickness.                   8 Foundation for Diesel Oil Tank CFt 950 500  4,75000  8.1 Plain Cement Concrete 1:2:4          Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete & transportation          of material & equipments to complete the works in all          respects.The size of foundation is 60'x26'x0.5'        

  (The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).        

  8.2 Brick walls 1.125'x3'x60x(3 Nos) CFt 750 223  1,67250           9 Construction of Flare Pit          9.1 Excavation CFt 5,000  30 150,000  Excavation in soil for cutting pits or water pits with          compacted and dressed base and slopes in true          dimensions of 50-ft×20-ft×5-ft.          9.2 Brick Lining CFt 225 200  45000  Providing & laying of brick lining in 1:6 cement sand          mortar for flooring, containment areas, pad foundations          including curing of work, transportation of all material          at site to complete the work in all respects.                   

10 Construction of Rubbish Pit          10.1 Excavation CFt 1,100 30  33000  Excavation in soil for cutting pits or water pits with          compacted and dressed base and slopes in true          dimensions of 20-ft×13-ft×4-ft.          10.2 Brick Lining Sq.Ft 225 400  90,000   Providing & laying of brick lining in 1:6 cement          sand mortar for flooring, containment areas, pad          foundations including curing of work, transportation          of all material at site to complete the work in all          respects.                   

11 Erection of Barbed wire fence          Break-up Rate          A. Barbed Wire RFt      

9

Page 10: Instructions to Bidders & BOQ's.

  Providing G.I. barbed wire at 9"×9" square spacing.          B. Angle Iron Post RFt        Providing angle iron of section 2"×2"×1/4".          C. Snake Protection Sheet RFt        Providing G.I. sheet of gauge and 3-ft wide for          snake anti-climbing protection.          D. Erection of fence (labour & concrete) RFt        Erection of fence (labour & concrete work) as per          drawing.          Total RFt 5,824 6000  3,49,44000             Main Gate          Providing & fixing 20-ft wide, fence installed double Each 2 40,000  80,000  leaf main gate.                   

12 Tube well Works          a) Water supply pipes G.I fittings of size 2-inch , RFt 1,800 425  7,65000  3/4-inch & 1/2-inch dia.          b) Water supply pipe 4-inch dia RFt 600 3030 18,18000           

13 Waste Mud Pits          Excavation CFt 100,000 30  30,00,000  Excavation in soil for cutting pits or water pits with          compacted and dressed base and slopes in true          dimensions of 95'×95'×5'×02 Nos.          The pits should be 10-ft away from mud tanks.                   

14 Brick Drainage RFt 800 350  2,80,000  Brick drain size 18-inch×18-inch deep and wall          thickness of 9-inch with 4.5-inch bottom thickness          with C.M 1:6, 1/2-inch plaster inside drain all-around.                   

15 Water Tank Each 1 50,000  50,000  Providing & installation of fibre water tank of          capacity 300 Gallons placed on 2 brick pillars and          connecting with water mains.                   

16 Foundations for 50 Nos Pota Cabins CFt 1,500 400  600,000  Brick foundations C.M 1:4 with 1/2-inch plaster on          all sides of size 10-ft×1-ft×1-ft. Two brick steps in          front of pota cabin doors are also to be made.                   

17 Sewerage Pipe Lines RFt 2,000 2000  40,00,000  Providing, laying and complete fixing with all        

10

Page 11: Instructions to Bidders & BOQ's.

  required fittings of 4-inch dia RCC pipe lines with          pota cabin main hole 2-ft×2-ft and connecting with          septic tanks.                   

18 Construction of Septic Tanks Each 4 60,000  2,40,000  Construction of Septic Tank with brick masonary          and plaster work of size 21ft×4ft of 4ft depth                              

19 Living Facilities for Rangers Sq.Ft 725 500  3,62500  Construction of living facilities with brick masonary          C.M 1:6 and plaster and T-iron & Girder, roof tiles          according to drawings & specifications.                   

20 Security check Post          Construction of temporary check posts 14-ft×14-ft with Sq.Ft 196 2000  3,92000

  same specifications as of item 19 in C.M 1:6 P.C.C and plaster, T-iron and Grider roof tiles

       

  with polythene sheet and mud plaster. 4 Nos.                   

21 Chemical Resistance Membrane pit Sq.Ft 30,000 30  9,00,000

  Excavation for 2 Nos waste pit. Compacted and dressed base and slopes in true dimensions of size 120'x120'        

                    

22 Generator Foundation (Camp Site)          Plain Cement Concrete 1:2:4 CFt 1,150 630  7,24,500  Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete &                transportation of material & equipments to complete                the works in all respects.Thickness of foundation          should be 0.5-ft.        

  (The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).        

  Gravel CFt 160 210  33,600  Providing & laying gravel of 6-inch thickness.                   

23 Foundation for Diesel Tank (Camp Site) CFt 200 630  1,26,000  Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete &                transportation of material & equipments to complete                the works in all respects.Thickness of foundation          should be 0.5-ft.        

11

Page 12: Instructions to Bidders & BOQ's.

  (The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).        

           24 Access Road RFt 56,433 2000  11,28,66000   Construction of 20-ft wide & 6" high road by earth filling including watering

and compaction in layers not exceeding compacted 6-inch thickness to therequired grade and elevations. Earthfill compaction will be upto 95% of AASHTO maximum dry density. Water bound macadam of 3-inch thickness.

                                                      

25 Pipe Culverts          Providing & laying of pipe dia 24" for culverts (on RFt 68 907  61,676  the basis of jobs) of pre-cast reinforces concrete.                   

26 Chemical Pad          PCC 1:4:8 CFt 563 300  1,68900  Providing & laying of Plain cement concrete          pad 3" thick foundation foundations including curing of work,          transportation of all material at site to complete the          work in all respects.                   

27 Tandoor Each 1    Providing & installing Tandoor in kitchen in all      30,000 30,000   respects.                 

28 Water Bound Macadam CFt 26,250 550  1,44,37500  Supply & laying 3-inch down crushed stone (Rock          Moram) compacted layers including voids filling with          stonedust/khaka at areas as directed by the engineer.        

TOTAL 19,81,37497

COMPLETION PERIOD:

3 Weeks from the date of award of Contract.

12

Page 13: Instructions to Bidders & BOQ's.

ANNEXURE “C”

APPROXIMATE BOQ’S FOR BADAR-2 WELL CIVIL WORKS

Item.No DESCRIPTION Unit 

BOQ Unit rate Total(PKR)

1 Earth Work CFt500,000.0

35  1,75,00,000  Supply & filling of earth at location area and camp site    

 

  site from contractor's arranged borrow area including        watering and compaction in layers not exceeding 6-inch        upto a total of 3-layers to the required grade and        elevations. Earthfill compaction will be upto 95% of        AASHTO maximum dry density. The thickness of earth        fill should be 1.5-ft.               2 Rig Pad Foundation        2.1 Reinforced Cement Concrete 1:2:4 CFt 4,557 500  22,78500  Providing & laying of cement concrete of ratio 1:2:4      

   including reinforcement steel (Grade 60) including        formwork, curing of concrete & transportation of        material & equipments to complete the works in all        respects. The size of rig pad is (46.26×38.04×2.5-feet).        2.2 Plain Cement Concrete 1:4:8 CFt 910 380  3,45,800  Providing & laying of plain cement concrete 1:4:8 of      

   6-inch thickness. (46.26x38.04x0.5)        2.3 Gravel CFt 910 210  1,91,100   Providing & laying gravel of 6-inch thickness.      

          3 Cellar Work        3.1 Reinforced Cement Concrete 1:2:4 CFt 584 630  3,67,920  Construction of Cellar with RCC concrete 1:2:4  

 

  including reinforcement steel (Grade 60) including        formwork, curing of concrete & transportation of        material & equipments to complete the works in all        respects. The size of cellar is 12x'12'x1=144       Lomg wall (2)x12'x1x10x=240        Short wall (2) x10'x1'0x1'=200        Thickness of cellar walls is 1-ft.                 3.2 Plain Cement Concrete 1:4:8 CFt 95.000 300  28,500  Providing & laying of plain cement concrete 1:4:8 of    

13

Page 14: Instructions to Bidders & BOQ's.

  6-inch thickness.        3.3 Gravel CFt 98.00 210  20,580  Providing & laying gravel of 6-inch thickness.  

          4 Conductor Pipe        a) Digging of bore hole of 26-inch dia (40 m). RFt 132 944  1,24608  b) Insertion of conductor pipe of 20-inch dia in 26-inch RFt 100 6258  6,25800  dia bore hole.          c) Filling space between bore hole and conductor pipe CFt 300 332  99,600  upto 40 m deep with PCC 1:3:6.          d) Anchoring Conductor Pipe with steel reinforcement Each 4 1000  40,000  bars.      

          5 Foundation for Mud Pumps        5.1 Plain Cement Concrete 1:2:4 CFt 975 500  4,87500  Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete &          transportation of material & equipments to complete the          works in all respects. Thickness of foundation should be 1.5-ft.        

  (The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).        

           6 Foundation for Mud Tanks          6.1 Plain Cement Concrete 1:2:4 CFt 2,310 500  11,55000  Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete & transportation          of material & equipments to complete the works in all          respects. Thickness of foundation should be 1.5-ft.        

 

(The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).

       

  6.2 Gravel CFt 1,250 210  2,62,500  Providing & laying gravel of 6-inch thickness.                   7 Foundation for Generators          7.1 Plain Cement Concrete 1:2:4 CFt 975 500  4,87500  Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete & transportation          of material & equipments to complete the works in all          respects.Thickness of foundation should be 0.75ft.        

  (The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).        

  7.2 Gravel CFt 750 210  1,57,500

14

Page 15: Instructions to Bidders & BOQ's.

  Providing & laying gravel of 6-inch thickness.                   8 Foundation for Diesel Oil Tank CFt 950  500 4,7500   8.1 Plain Cement Concrete 1:2:4          Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete & transportation          of material & equipments to complete the works in all          respects.The size of foundation is 60'x26'x0.5'        

  (The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).        

  8.2 Brick walls 1.125'x3'x60x(3 Nos) CFt 750 223  1,67,250           9 Construction of Flare Pit          9.1 Excavation CFt 5,000 30  1,50,000  Excavation in soil for cutting pits or water pits with          compacted and dressed base and slopes in true          dimensions of 50-ft×20-ft×5-ft.          9.2 Brick Lining CFt 225 200  45,000  Providing & laying of brick lining in 1:6 cement sand          mortar for flooring, containment areas, pad foundations          including curing of work, transportation of all material          at site to complete the work in all respects.                   

10 Construction of Rubbish Pit          10.1 Excavation CFt 1,100 30  33000  Excavation in soil for cutting pits or water pits with          compacted and dressed base and slopes in true          dimensions of 20-ft×13-ft×4-ft.          10.2 Brick Lining Sq.Ft 225 400  90,000  Providing & laying of brick lining in 1:6 cement          sand mortar for flooring, containment areas, pad          foundations including curing of work, transportation          of all material at site to complete the work in all          respects.                   

11 Erection of Barbed wire fence          Break-up Rate          A. Barbed Wire RFt        Providing G.I. barbed wire at 9"×9" square spacing.          B. Angle Iron Post RFt        Providing angle iron of section 2"×2"×1/4".          C. Snake Protection Sheet RFt        Providing G.I. sheet of gauge and 3-ft wide for        

15

Page 16: Instructions to Bidders & BOQ's.

  snake anti-climbing protection.          D. Erection of fence (labour & concrete) RFt        Erection of fence (labour & concrete work) as per          drawing.          Total RFt 3,500 6000  2,10,000,00             Main Gate          Providing & fixing 20-ft wide, fence installed double Each 2 40,000  80,000  leaf main gate.                   

12 Tube well Works          a) Water supply pipes G.I fittings of size 2-inch , RFt 1,800 425  7,65000  3/4-inch & 1/2-inch dia.          b) Water supply pipe 4-inch dia RFt 600 330  18,18000           

13 Waste Mud Pits          Excavation CFt 100,000 30  30,000,00  Excavation in soil for cutting pits or water pits with          compacted and dressed base and slopes in true          dimensions of 95'×95'×5'×02 Nos.          The pits should be 10-ft away from mud tanks.                   

14 Brick Drainage RFt 800 350  2,80,000  Brick drain size 18-inch×18-inch deep and wall          thickness of 9-inch with 4.5-inch bottom thickness          with C.M 1:6, 1/2-inch plaster inside drain all-around.                   

15 Water Tank Each 1 50,000  50,000  Providing & installation of fibre water tank of          capacity 300 Gallons placed on 2 brick pillars and          connecting with water mains.                   

16 Foundations for 50 Nos Pota Cabins CFt 1,500 400  6,00,000  Brick foundations C.M 1:4 with 1/2-inch plaster on          all sides of size 10-ft×1-ft×1-ft. Two brick steps in          front of pota cabin doors are also to be made.                   

17 Sewerage Pipe Lines RFt 2,000 2000  40,000,00  Providing, laying and complete fixing with all          required fittings of 4-inch dia RCC pipe lines with          pota cabin main hole 2-ft×2-ft and connecting with          septic tanks.                   

18 Construction of Septic Tanks Each 4 60,000  240,.000

16

Page 17: Instructions to Bidders & BOQ's.

  Construction of Septic Tank with brick masonary          and plaster work of size 21ft×4ft of 4ft depth                              

19 Living Facilities for Rangers Sq.Ft 725 500  3,62500  Construction of living facilities with brick masonary          C.M 1:6 and plaster and T-iron & Girder, roof tiles          according to drawings & specifications.                   

20 Security check Post          Construction of temporary check posts 14-ft×14-ft with Sq.Ft 196 2000 3,92,000

  same specifications as of item 19 in C.M 1:6 P.C.C and plaster, T-iron and Grider roof tiles

       

  with polythene sheet and mud plaster. 4 Nos.                   

21 Chemical Resistance Membrane pit Sq.Ft 30,000 30  9,00,000

  Excavation for 2 Nos waste pit. Compacted and dressed base and slopes in true dimensions of size 120'x120'        

                    

22 Generator Foundation (Camp Site)          Plain Cement Concrete 1:2:4 CFt 1,150 630  724,500  Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete &                transportation of material & equipments to complete                the works in all respects.Thickness of foundation          should be 0.5-ft.        

  (The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).        

  Gravel CFt 160 210 35600  Providing & laying gravel of 6-inch thickness.                   

23 Foundation for Diesel Tank (Camp Site) CFt 200 630  1,26,000  Providing & laying of cement concrete of ratio 1:2:4          including formwork, curing of concrete &                transportation of material & equipments to complete                the works in all respects.Thickness of foundation          should be 0.5-ft.        

  (The foundations should be lined with Polythene/impermeable sheets to avoid any damaged due to water).        

           24 Access Road RFt 6,600 2000  1,32,000,00  Construction of 20-ft wide & 3-ft high road by earth          filling including watering and compaction in layers not        

17

Page 18: Instructions to Bidders & BOQ's.

  exceeding compacted 6-inch thickness to the required          grade and elevations. Earthfill compaction will be          upto 95% of AASHTO maximum dry density. Water          bound macadam of 3-inch thickness.                   

25 Pipe Culverts          Providing & laying of pipe dia 24" for culverts (on RFt 96 907  87,072  the basis of jobs) of pre-cast reinforces concrete.                   

26 Chemical Pad          PCC 1:4:8 CFt 563 300  1,68,900   Providing & laying of Plain cement concrete          pad 3" thick foundation foundations including curing of work,          transportation of all material at site to complete the          work in all respects.                   

27 Tandoor Each 1    Providing & installing Tandoor in kitchen in all     30,000  30,000   respects.                 

28 Water Bound Macadam CFt 40,500 550  2,22,75,000  Supply & laying 3-inch down crushed stone (Rock          Moram) compacted layers including voids filling with          stonedust/khaka at areas as directed by the engineer.                   

28 Repair of existing two bridges & access road   As per actual requirement

            

TOTAL  9,48,39730

COMPLETION PERIOD:

3 Weeks from the date of award of Contract.