1 Pub - G01.1-2010 PT. Integra Automasi An Automation and Control Company Address : Komp. Mutiara Taman Palem Blok B7-51, Jl. Kamal Raya Outer Ring Road, Cengkareng - Jakarta Barat Indonesia 11730 Phone : 62-21-5435 6505 Fax : 62-21-5435 6506 Website: www.integra-automasi.com Email: [email protected]
Transcript
Page 1: Integra company profile

1 Pub - G01.1-2010

PT. Integra Automasi An Automation and Control Company

Address :

Komp. Mutiara Taman Palem Blok B7-51,

Jl. Kamal Raya Outer Ring Road,

Cengkareng - Jakarta Barat

Indonesia – 11730

Phone : 62-21-5435 6505

Fax : 62-21-5435 6506

Website: www.integra-automasi.com

Email: [email protected]

Page 2: Integra company profile

2 Pub - G01.1-2010

Integra Automasi was established on September 2004.

We provide total solution of instrumentation and control from engineering,

procurement, construction, and maintenance services.

Our people have been involved in various projects in oil and gas, petrochemical, power

generation and water industry.

VISION

To be a reputable instrumentation, control, and automation system integrator

To be a high quality service provider in outsourcing of service and maintenance

MISSION

1. To be well-known and trusted company to deliver quality services to our

customer.

2. We always develop win-win relationship, trust, and long term commitment with

our partners and vendors.

3. We create a friendly, honest, creative, innovative and enjoyable environment for

our people.

4. We consistently are growing the business, revenue, and profitability to our

shareholder.

5. Integra continuously build a mutual benefit relationship to university as our

commitment in contributing to country sustainable educational development.

CREDO

LOYAL, INNOVATIVE, FOCUS, ENERGY

Page 3: Integra company profile

3 Pub - G01.1-2010

PRODUCTS AND SERVICES

PROJECTS

Our projects experiences located from South Sumatera, Jambi, Jakarta, Central Java,

East Java, East Kalimantan, and South Sulawesi.

Page 4: Integra company profile

4 Pub - G01.1-2010

PROJECT REFERENCES - 2004

Control Panel Modification – PT. PALYJA - Jakarta

PT. Palyja is operator of water treatment plant in cooperation with PT. PAM Jakarta. The

job is upgrading the existing control panel of Lebak Bulus Pumping Station.

Fire and Gas HMI Development NEDO Project, Pertamina UP V - Balikpapan

HMI - In-touch Wonderware to monitor Sieger Gas Detection System in the area of

Pertamina Refinery UP V Balikpapan.

Page 5: Integra company profile

5 Pub - G01.1-2010

PROJECT REFERENCES - 2005

Smith Metering System Depot Cikampek, Pertamina UPMS

Depot Cikampek was built to cover fuel distribution in north part of West Java area

Service Repair of Electric Actuator, Total Indonesie - Balikpapan

Page 6: Integra company profile

6 Pub - G01.1-2010

Water and Steam Sampling Analyzer System, PLN UBP Suralaya, PT. Indonesia Power

Water and sampling analyzer is a continuous analyzer for monitoring conductivity,

silica content, and pH of steam and water from boiler.

Page 7: Integra company profile

7 Pub - G01.1-2010

PROJECT REFERENCES - 2006

Chevron SAPI Gas Handling Facilities, Chevron Indonesia - Balikpapan

The plant is operated by Hanover at Senipah, East Kalimantan.

The job is installation of field instrument, wiring termination, panel supply, flow

computer setting and configuration, until commissioning

Metering System, Terminal Tanjung Uban, Pertamina UPMs I Medan

We have done installation, wiring, and commissioning of instrumentation and control

for 3 metering skids at Terminal Tanjung Uban, Pertamina UPMs I. Medan. Terminal

Tanjung Uban is tank farm storing facility for Premium, Kerosene, and Diesel Fuel.

Page 8: Integra company profile

8 Pub - G01.1-2010

Timber Tracking - Smart Device Application

Application Development project of Timber Tracking system consist of

2D barcode smart device reader scan

.Net application database of Timber validation & Reporting

WiFi data transformation and XML Web Service collaboration between PC /

Server and smart device (handheld)

Page 9: Integra company profile

9 Pub - G01.1-2010

LPG Metering System Upgrading, Pertamina RU III Plaju Palembang

Panel complete with PLC, PC and HMI Development using In-touch WonderWare.

Cabling and Termination for DCS System, UBP Tanjung Priok, PT. Indonesia Power

Page 10: Integra company profile

10 Pub - G01.1-2010

Oil and Gas Volume Lifting Monitoring, Ditjen MIGAS

The scope are Installing the panel complete with PLC, PC and HMI Development. The

HMI is using Intouch wonderware for monitoring Volume Lifting :

Cico – Tanjung Santan

Medco Energy – FSO Laksmiati

Petrocina - FSO Federal 1

Pertamina EP KM-3 Plaju

Pertamina EP PT. Pusri

Conoco Philips – TGI Pulau Pemping

Page 11: Integra company profile

11 Pub - G01.1-2010

Open Access Monitoring HMI SCADA, BPH MIGAS

Open Access project is a BPH Migas Project that purpose to connect and get production

data from servers database each Gas station which is under BPH Migas authority.

Page 12: Integra company profile

12 Pub - G01.1-2010

PROJECT REFERENCES - 2007

Depot Automation, Pertamina Depot Plumpang UPms III

Installation, wiring and commissioning of instrumentation and control 50 Rotork

Actuator, HMI, and PLC programming at Depot Plumpang UPms III.

Page 13: Integra company profile

13 Pub - G01.1-2010

Prover Relocation-Metering System, Pertamina Depot Plumpang UPms III

Relocation of Pipeprover from Tanjung Priok Jetty Meter to Plumpang Depot Balongan

Pipeline Metering system.

Page 14: Integra company profile

14 Pub - G01.1-2010

Upgrading Metering System, Pertamina Depot Plumpang UPms III

Upgrading of metering system, including installation of instrumentation, wiring

termination, panel, HMI & PLC programming.

Connector SAP Reporting System, Pertamina Depot Plumpang

SAP is an ERP (Enterprise Resources Planning) program which used on central office PT.

Pertamina in Jakarta to manage reporting from all Pertamina depot in Indonesia. This

project is developing Connector SAP Program based on SAP database in central office

so that can make a report more effective, real-time, accurate and reliable

Page 15: Integra company profile

15 Pub - G01.1-2010

Service Repair of Electric Actuator, Pertamina Aviation DPPU Ngurah Rai - Denpasar

The scope of work are from checking local-remote indication actuator, repair and

change actuator parts which not work properly, and disassembly some actuators from

valves to get over hole service, re-assembly actuators onto valves, re-setting and

commissioning.

It is including testing command and feedback from and to Yamatake DCS

Installation of Electric Actuator and ESDV, Pertamina Depot Rewulu - Teras

The project scopes are installation, wiring and commissioning of instrumentation,

electric actuator and ESDV (Emergency Shut Down Valve) at Depot Pertamina Rewulu -

Teras.

Page 16: Integra company profile

16 Pub - G01.1-2010

PROJECT REFERENCES - 2008

Metering and ATG System-Banyu Urip Development, Pertamina EP CEPU

Scope of work:

Metering system complete with coriolis massflow meter, master meter, flow

computer, and skid meter

ATG (automatic tank gauging).

Fuel Management System, STPI (Sekolah Tinggi Penerbangan Indonesia), Curug

Scope of work: Refueling System, ATG (automatic tank gauging) and HMI and Database

application

Page 17: Integra company profile

17 Pub - G01.1-2010

Turbine Management Control, Pertamina RU IV - Cilacap

Scope of work: HMI and Engineering termination.

Page 18: Integra company profile

18 Pub - G01.1-2010

Upgrading of Metering system, Pertamina RU V, Balikpapan

Scope of work: HMI (Human Machine Interface) Development, PLC Programming,

Engineering, and Wiring termination.

Lube Oil Metering system, Pertamina Produksi Pelumas Jakarta – Tanjung Priuk

Page 19: Integra company profile

19 Pub - G01.1-2010

Scope of work: HMI (Human Machine Interface) Development, Engineering, and Wiring

termination.

Page 20: Integra company profile

20 Pub - G01.1-2010

PROJECT REFERENCES – 2009

Actuator Control for Tank inlet/outlet Depo Ujungpandang, Pertamina UPMs VII

Scope of work: HMI (Human Machine Interface) Development, Integration with ATG

System, and Wiring Termination

10 km Crude Oil Pipeline, Petriochina Tuban

Page 21: Integra company profile

21 Pub - G01.1-2010

Ugrading Metering System – Patra Tehnik, Pertamina RU V Balikpapan

Scope of work:

HMI (Human Machine Interface)

Configuration of Thermo Fisher Flow Computer

Radar Tank Gauging – PT Indonesia Power [UBP Priok] – PT PLN (persero)

Scope of work: Supply Radar Tank Gauging, configuration & Installation, Tank Side &

wiring termination, Field Control Unit [PLC+Display], HMI (Human Machine Interface)

Page 22: Integra company profile

22 Pub - G01.1-2010

Page 23: Integra company profile

23 Pub - G01.1-2010

Inventory Monitoring & Control – PT Pertamina (persero) UPMs IV – 5 Depo Jawa Tengah

Scope of work: Actuator installation, configuration & termination, Servo ATG

integration, PLC programming & installation, HMI (Human Machine Interface),

Connector to MySAP Pertamina.

DEPO TEGAL

Page 24: Integra company profile

24 Pub - G01.1-2010

Depo MAOS

Depo CILACAP

Page 25: Integra company profile

25 Pub - G01.1-2010

DEPO PENGAPON - SEMARANG

DEPO CEPU